Loading...
HomeMy WebLinkAboutSW7080212_CURRENT PERMIT_20080306STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW /`%I�(J t(�j DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE�QJ�O YYYYMM DD SFr f� ' QF W ATF9 Michael F. Easley, Governor William G. Ross Jr., Secremry rNorth Carolina Department of Environment and Natural Resources O Y Colcen H. Sullins, Director Division of Water Quality March 6, 2008 Mr. Thurman Hardison, Director City of New Bern — Parks & Recreation 300 Pollock Street New Bern, NC 28563 Subject: Stormwater Permit No. SW7080212 City of New Bern — Municipal Swim Complex High Density Project Craven County Dear Mr. Hardison: The Washington Regional Office received a complete Stormwater Management Permit Application for City of New Bern — Municipal Swim Complex on March 3, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7080212 dated March 6, 2008, for the construction of the subject project located on Laura Lane, New Bern, North Carolina. This permit shall be effective from the date of issuance until March 6, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Samir Dumpor, or me at (252) 946-6481. ISincerly, %4—Ao Regional Supervisor Surface Water Protection Section AH/sd: S:\WQS\STORMWATER\PERMIT\SW7080212 cc: Richard J. Edinger, Jr. with Clark Patterson Lee C aven County Building Inspections Washington Regional Office Central Files On, ort,Carolina Naturally North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service Internet; «vw.nc%aterouali[v.ore 943 Washington Square Mall, Washington, NC 27889 1477-623-6748 An Equal OpportunitylAf inative Acton Employer — 50% Recycledl10 % Post Consumer Paper .,d State Stormwater Management Systems Permit No. SV 7080212 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO City of New Bern — Parks & Recreation City of New Bern — Municipal Swim Complex Craven County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until March 6, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 72,963 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SV 7080212 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: 3.95 b. Total Impervious Surfaces, ftZ: 72,963 C. Pond Depth, feet: 8.00 d. TSS removal efficiency: 90% e. Permanent Pool Elevation, FMSL: 18.00 f. Required Permanent Pool Surface Area, ftZ: 8,198 g. Provided Permanent Pool Surface Area, ftZ: 9,534 h. Permanent Pool Volume, ft3: 28,729 i. Temporary Storage Elevation, FMSL: 18.57 j. Required Storage Volume, ft3: 6,195 k. Provided Storage Volume, ft3: 6,229 I. Controlling Orifice: 1.50"0 pipe M. Receiving Stream/River Basin: UT Lawson Creek / Neuse n. Stream Index Number: 27 — 101 — 42 o. Classification of Water Body: "SC; Sw, NSW' II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Page 3 of 7 4; State Stormwater Management Systems Permit No. SW7080212 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will be not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SW7080212 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. 10. This permit shall be effective from the date of issuance until March 6, 2018. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 61h day of March, 2008. INA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Permit No. SW7080212 for Page 5 of 7 State Stormwater Management Systems Permit No. SW7080212 City of New Bern - Municipal Swim Complex Stormwater Permit No. SW7080212 Craven County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW7080212 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Craven County Building Inspections Page 7 of 7 r-a C . t:-. . f , State of North Carolina `- Department of Environment and Natural Resources Division of Water Quality FEB 3 �� 1 � STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original DO I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Ci�Y DP N� f3rEluV - �f.=ks ?ZCXfArX4-) -- 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): TAva,AAP N4zv75&i (Drzee-ro ) 3. Mailing Address for person listed in item 2 above: SOD Tost De_V, 5iVC—l- City: 74EX"3 tie R.nj State: 11J C Zip: 2'S S6 3 Phone: ( 252) 6341 T-190 Fax: ( 2-S2 ) of 3S Email: Ce r-RKer..)bc'rA—A-C, OCI 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): / [Zr OF Niece `a>iMl Myn9aca^'yhL_ ScJIM (?ankLLSK 5. Location ""of Project (street address): t►A%j ZA CWC' /J City: NE" t` by gm County: C-K AO r Jul 6. Directions to project (from nearest major intersection): S A�TS+�I'G Ai 7%31 = L) S "4O € V 9 fR • U No grA rn-r v 3 14 CZD LrLT &t=. ?Pr S 70-zs 90., l} J LZ;F; c..woih t-AA-�u ID 2rear 3r o 7. Latitude: &S O(-r `3 ` . I (on N Longitude: q l • OS' O S • 3 3 CJ of project 8. Contact person who can answer questions about the project: Name: %NvxM A^l 4-46 ss oN Telephone Number. (Z S z l 6 3 g 7- 9 0 0 Email: r-eul,r9 eobern—/Lc. &rn If. PERMIT INFORMATION: 1. Specify whether project is (check one): New ❑Renewal ❑Modification Form SWU-101 Version 8.07 Page I of 4 2. if this application is being submitted aste result of a renewal or modification to an existing permit, ' t the existing permit number N A and its issue date (if known) N A 3. Specify the type of project (check one): []Low Density High Density ❑Redevelop ❑General Permit []Universal SNIP ❑Other 4. Additional Proje Requirements (check applicable blanks): ❑M CAA Major OSedimentation/Erosion Control 7404/401 Permit ❑NPDES Stormwater Information on requirrred,, state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one two two pages) describing stormwater management for the project. /itF 'ryoPO Scb t�kN- t?AL-g�„�y.,/t �rJ'M7LsK giiC da�i «. Yf.LT•T�/��'�- g�'2 �l C�,4e a, :L,.�.7Ac�S rxorvi i.l-r•s '�—z �- GJ -na 6zass o.:.,,.r7 S�raLCS Ay� 7o e.r'> CS "e` N41 xh�evi= •iil �iJce.osc 7 R�r'Ao,LTI 2. Stormwater runoff from this project drains to the c� 14 c River basin. 3. Total Site Area: q-• 3 ZIp acres 4. Total Wetlands Area: ^-R acres 5. 100' Wide Strip of Wetland Area: N d acres (not applicable if no wetlands exist on site) 6. Total Project Area.,: 3. t Z't— acres 7. Project Built Upon Area: 4e 2. f9 7— % S. How many drainage areas does the project have? 3 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. �f`°iiiN.}s;$' F�h:�.�'��7��-.n,..; `¢�Z +.�E t,(�hyy'XtFFb, nei' SaW 'Receiving Stream Name df 3�'Yt'�!,'1n�05`.' �q,"A'W`�iti .�.._....'�4'eam''�YyvSS.....`s3 "i3, .Pi�f�"D'� j i..ie-E'Y••(�i,�x�gql �� Drainage Area i . 'C' ? ��a�-?3'�s����>�'�•L'a' ••,Tv�n"Ri r9p +�sj+ iS 7 �5 ti-1 '-�KF'u^�,�.e�sevi�fi�aas"sbi:cd'��::3Z�°� s z�.�y •a -mar' iwn -+. ,a g-" a 'k-'a. a'rs^r;.,_s'3 �a �r°'s� -sr _ impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. "•Total project area shall be calculated based on the current policy regarding inclusion of ietlands in the built upon area percentage calculation. FormSWU-10l Version8.07 Page 2of4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): (—]Low Density []High Density []Redevelop❑General Permit ❑Universal SIVIP ❑Other 4. Additional Project Requirements (check applicable blanks): ❑CAbIA Major ❑Sedimentation/Erosion Control 7404/401 Permit ❑NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project . 2. Stormwater runoff from this project drains to the 3. Total Site Area: acres River basin. 4. Total Wetlands Area: acres 5. 100' Wide Strip of Wetland Area: acres (not applicable if no tuetlands exist on site) 6. Total Project Area acres 7. Project Built Upon Area: % 8. How many drainage areas does the project have? 3 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Informattgrt,.', Firainage Area, i s Receiving Stream Name t)NIJlNAi> %%2Z So LN,5eoN et. Stream Class & Index No. `�Si ;�"� �.� A15�.1.. iz- �n�- v2- Drainage Area (sf) / L, 'L3 to , 2— Existing Impervious* Area (sf) o Proposed Impervious'Area (sf) :?2 , 163.0 Impervious Area (total) S` 2 . -se. Impervious* Surface Area Drainage Areal 5 On -site Buildings (sf) On -site Streets (sf) 7 On -site Parking (so 5 1, 6 u$- S On -site Sidewalks-(sf)_____.------------- Other on -site (sf) O Off -site (sf) O Total (so: - 'L `� 6 3, " Impervious area is defined as the built upon area incivaing, out not unurea to, ouiaungs, rouu�, pou.ng -.. sidewalks, gravel areas, etc. "'Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. FUrm SWU-101 Version 8.07 Nee #'of 4 10. How was the off -site impervious area listed above derived? Y%;7F-S Cif 1M?e-(Z,i zc o% PVL-,� AaZ-�, IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will nut with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SW401-Low Density Low Density Supplement Form SW401-Curb Outlet System Curb Outlet System Supplement Form SW401-Off-Site System Off -Site System Supplement rForm SW401-Wet Detention Basin Wet Detention Basin Supplement Form SW401-Infiltration Basin Infiltration Basin Supplement Form SW401-Infiltration Trench Underground Infiltration Trench Supplement Form SW401-Bioretention Cell Bioretention Cell Supplement Form SW401-Level Spreader Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Form SW401-Wetland Constructed Wetland Supplement Form SW401-Grassed Swale Grassed Swale Supplement Form SW401-Sand Filter Sand Filter Supplement Form SWU-101 Version 8.07 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at htti)://h2o.enr.Ltate,nc.us/su/msi macs htm) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Original and one copy of the Stormwater Management Permit Application Form Original and one copy of the Deed Restrictions & Protective Covenants Form Original of the applicable Supplement Form(s) and O&M agreeinent(s) for each BMP Permit application processing fee of $505 ($4,000 for Express) payable to NCDENR Calculations & detailed narrative desc 'ption of stornIwater treatment/management Copy of any applicable soil report (5 eJ M R�2� Three copies of plans and specifications (sealed, signed & dated), including: ,.- Development/ Project name r- Engineer and firm ..-Legend y. - North arrow r - Scale ,- Revision number & date N JA -Mean high waterline r - Dimensioned property/project boundary .�- Location map with named streets or NCSR numbers Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures v- Wetlands delineated, or a note on plans that none exist r- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations Drainage areas delineated (`k-e-pT - Vegetated buffers (where required) rA-'1A_) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): CL Aa\� �ATTEQSS►� r c Mailing Address: SO FAST A1SA.?'r STZZZI City: K_)AA2-t orrE State: kl C Zip: Z.8 20 Z Phone: L'-y g000 &'X7 3103 Fax: ( 762 1 3'3l 0q0 Z Email: 7wi+ar'sop.1`. CON% VIIL APPLICANTS CERTIFICATION 1, (print or type name of person listed in General Information, item 2)UrK fl 1� Gr w/Yt to �/o V certify that the information included on this permit application f hocf of my knowledge, correct and that the project will be constructed in conformance with the app �y,✓ 9 restrictions and protective covenants will be reco e , and that the pro se 1( 14% „"d •ments of 15A NCAC 2H .1000. ��i � � 0� 1 I 0� Signature: FormSWU-101 Version8.07- Page 4of4 9 NEUSE RIVER BASIN i 7 Name of Stream Subbasin Stream Index Number Map Number Class Langs Mill Run NEU07 27-86-26-2-1 E28NW6 C;SW,NSW i Laurel Creek NEU01 27-11.5-10. 5I 024ITW1 WS-IV;NSW � Laurel Creek r, NEU01 7 11 5 10 7) D230fl5 A V h;S;= NSSWW.. 21rtW4,v a,Uk-9 xNWirC .p Leary Canal NEU13 27154- 32SE9 SA;HQW,NSW Vi Ledge Creek NEU01 27-10-(0.5) C24NW4 WS-II;HQW,NSW Ledge Creek NEU01 27-10-(1.81 C24NW8 WS-IV;NSW Ledge Creek (including portion of Ledge Creek NEU01 27-10-(2) C24NW4 WS-IV;NSW,CA Arm of Falls Lake) Ledge Creek (Lake Rogers) NEU01 27-10-(1) C24NW8 WS-I I;HQW, NSW, CA Lee Swamp NEU12 27-54-5-2-1-(1) G26NE2 C;NSw Lee Swamp NEU12 27-54-5-2-1-(2) G26NE2 WS-IV; NSW Lee Swamp NEU07 27-66-9-1 E26NE8 C;SW,NSW Lees Branch NED10 2.7-101-40-4 G30SE9 C;Sw,NSW Lewis Branch NEU07 27-86-15-2 F27NE3 C;SW,NSW Lewis Creek NEU14 27-149-3 H33NE6 SA;ORW,NSW Lewis Creek NEU13 27-150-9-1 G32NW8 9C; Sw,HQN,NSW Lick Creek NEU01 27-3-3-3 C22NE3 WS-III;NSW ' Lick Creek NEU01 27-11-(0.5) D23NE5 WS-IV;NSW Lick Creek NEU01 27-11-(1.5) D23NE3 WS-IV;NSW,CA Lighter Knot Swamp NEU07 27-86-26-1.5-1 E28SW2 C;Sw,NSW Little Arm Branch NEU02 27-34-11-2 E24NE2 C;NSW Little Bear Creek NEU13 27-150-27 G32NE4 SA;HQW,NSW Little Beaverdam Creek NEU01 27-12-3-(1) C24SW6 WS-IV,B;NSW Little Beaverdam Creek NEU01 27-12-3-(2) C24SW6 WS-IV;NSW Little Beaverdam Creek NEU01 27-12-3-(3) C24SW6 WS-IV;NSW,CA Little Bernal Branch NEU04 21-52-6-3-1 F25NW4 C;NSW Little Black Creek NEU04 27-45-3 E24SW7 C;NSW Little Brier Creek NEU02 27-33-4-1 D23NES C;NSW Little Buffalo Creek NEU06 27-57-17 E2614W8 C;NSW Little Chinquapin Branch NEU11 27-101-11 G20SE6 C;SW'KSW Little Contentnea Creek NEU07 27-86-26 E28NWB C;Sw,NSW Little Creek NEU01 27-2-11 C22SE2 WS-IV;NSW Little Creek NEU02 27-43-12 - E25NW7 C;NSW Little Creek NEU03 27-43-15-10 E24NW9 C;NSW Little Creek NEU06 27-57-19 E25SE6 C;NSW Little Creek NEU07 27-86-3.7 E26NW5 C;NSW Little Creek NEU10 27-135-11 H32NE5 SA;HQW,NSW Little Creek NEU10 27-139 G33SW7 SA;HQW,NSW Little Creek (East Side) NEU07 27-86-2-5 D26SW4 C;NSW Little Creek (West Side) NEU07 27-86-2-4 D25SE6 C;NSW Little Drum Creek NEU13 27-152-9 G32NE6 SA;HQW,NSW Little Eve Creek NEU13 27-152-8 G32NE6 SA;HQW,NSW Little Hell Creek NEU11 27-101-24 H29NE3 C-;SW,NSW . ... ..............Little- John"Creek-..-_ .......__.__—.._._— ._.__.--_.__NEUl0-___—_20-l-15-6.—____.._—H31NEe----SC;Sw,NSw-___�_.--. Little Lake NEU10 27-112-1-2-1-1 H31SWl C;SW,NSW Little Ledge Creek NEU01 27-10-3-(1) C24SW1 WS-IV;NSW Little Ledge Creek NEU01 27-10-3-(2) C24SW4 WS-IV;NSW,CA Little Lick Creek NEU01 27-9-(0.5) D23NE2 WS-IV;NSW Little Lick Creek (including portion of Little NEU01 27-9-(2) C23SE9 WS-IV;NSW,CA Lick Creek Arm of Fall. Lake) Little Marsh Run NEU05 27-72-1.5 F27NES C;SW,NSW Little Oyster Creek NEU13 27-154-5 G32NE3 SA;HQW,NSW Little Pasture Creek NEU13 27-150-17 G321M9 SA;HQW,NSW Page 11 of 22 o r Permit No. (fo be provided by OWO) ® orpF W A Te90G NCDENR FEB 13 2003 STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT ®���Q..AR� This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. 17 P, ROJ EC1-a IN FORMATION,'= Project name City of New Bern - Municipal Swim Complex Contact person Thurman Hardison Phone number 252-639-2900 Date 30-Jan-06 Drainage area number 3 II.1DESIGN INEORMATION Site Characteristics Drainage area 172,236 ft2 Impervious area 72,963 It2 %impervious 42.36222393 % Design rainfall depth 1.0 in Storage Volume: Non -SR Waters Minimum volume required 6,195 It Volume provided 6,229 It, Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff it Minimum volume required ft3 Volume provided ff3 Peak Flow Calculations Is pre/post control of the.4* 24-hr peak flow required? !D yc y (Y or N) kyi, 24-hr rainfall depth / D Il0. s T. 7.0 in Bafioaaf:Epre-development a Cm scs ME.*aeO 64.0 (unitless) Rationaft,post-development —aem Scs 79.0 (unitless) Rainfall intensity: 1-yr, 24-hr storm to 4R 8.7 in/hr Pre -development 1-yr, 24-hr peak flow 10 4v 12.5 ft3/sec Post -development 1-yr, 24-hr peak flow 10 `la 19.8 ft3lsec Pre/Post Lyr, 24-hr peak flow control 10 yM1 7.3 tt3/sec Basin Elevations Basin bottom elevation 10.00 ft Sediment cleanout elevation 11.00 If Bottom of shelf elevation 17.50 fit Permanent pool elevation 18.00 If Top of shelf elevation 18.50 It Temporary pool elevation 18.57 It Volume and Surface Area Calculations SAIDA ratio 0.05 (unitless) Surface area at the bottom of shelf 5459.00 fe Volume at the bottom of shelf 19434.80 ft3 Permanent pool, surface area required 8,198 112 Permanent pool, surface area provided 9,534 h2 Permanent pool volume 28,729 ft3 Average depth for SAIDA tables 3.013299769 If Surface area at the top of shelf 11643 It, Volume at the top of shelf 34023 ft3 OK K7 Form SW401-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 1 of 2 I Permit No. (to be provided by OWO) Forebayvolume 6,163 ft' Forebay % of permanent pool volume 21 % OK Temporary pool, surface area provided 11,973 ft2 Drawdown Calculations Treatment volume drawdown time 3.3 days OK Treatment volume discharge rate 0.02 ft3/s Pre -development 1-yr, 24-hr discharge 12.49 ft3/s OK Post -development 1-yr, 24-hr discharge 5.70 ft'/s OK Additional Information Diameter of orifice 1.50 in Design TSS removal 90 % Basin side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10 ft OK Length of flowpalh to width ratio 3.1 :1 OK Length to width ratio 3.1 :1 OK Trash rack for overflow & orifice? y (Y or N) OK Freeboard provided 1 it OK Vegetated filter provided? n (Y or N) Design must be based on 90%TSS removal Recorded drainage easement provided? n (Y or N) Need a recorded drainage easement Tao pE}7y 2s At Re ADM Captures all runoff at ultimate build -out? y (Y or N) OK D. Mco by v ry Drain mechanism for maintenance or emergencies Permanent Pool can be drained by field pump for maintenance or emergencies Form SW401-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 2 of 2 Permit (to be Provided by DWO) ca.gVRlED . gC.a'ECnYraT,,.*i, i,'�,.. �.. "','1�`„ ,. {,'. :, a.l tr la s, ik .:s F.,, s r<N.,'t• j s tf ..+Y ,`.tt��.9?�r t'"`pt.Y Please Indicate the page or plan sheet numbers where the supporting documentation can be found. An Incomplete submittal package will result In a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan III a Sheet No. 1. Plans (V - 50' or larger) of the entire site showing: n saw 4. D- Design at ultimate build -out, 50^ ?er•4c wazs- Off -site drainage (if applicable), Mr.e nit— 3 - Delineated drainage basins (include Rational C coefficient per basin), Rr,bo-` se < +9 - Basin dimensions, C a. 0 - Pretreatment system, Dc--s O'ta- High flow bypass system, ,DL.,'CY.D - Maintenance access, Reeerded dreinasemeRt and public right of way (ROW), pc- eOverflow device, and G t . D Boundaries of drainage easement 2. Partial plan (1' = 30' or larger) and details for the wet detention basin showing: Oznxd'2a.c a 1.0 Outlet structure with trash rack or similar, C u-o - Maintenance access, i�v--T 5cc xA - Permanent pool dimensions, C Y a - Forebay and main pond with hardened emergency spillway, Q-rP-� 5m t'% - Basin cross-section, L. (.D - Vegetation specification for planting shelf, and 14 j A - Fkeretltp:" 1 sz� e9 3. Section view of the dry detention basin (1' = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. _ � C_� • C) 4. If the basin is used for sediment and erosion control during construction, dean out of the basin is specified on the plans prior to use as a wet detention basin. 7t 't9 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verity volume provided. 7 �L lFr`�z- d t 6. An assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. �w C �•� 7. A construction sequence that shows how the wet detention basin will be protected from sediment unfil the entire drainage area is stabilized. 8. The supporting calculations. a�eo�� 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement. 10. A copy of the deed restriction. ��as''M1"VLY'+ rkaa�!'.6:^a� a rasi>id' Form SW401-Wet Detention 13asin-Rev.1 FEB 1 3 2008 Part ill. Required Items Checklist, Page 1 W 1 DWQ-WAR0 Permit (to be provided by DWQ) Drainage Area Number: 3 RECEIVE Set Detention Basin Inspection and Maintenance Agreement N �AC. FEB � &I,wtll keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be !� +/►,7eo Zcted, repaired or replaced immediately. These deficiencies can affect the integrity �� of s&ctures, safety of the public, and the removal efficiency of the BMW. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This systatn one): ❑ does N does not This systkmAcheck one): ❑ does Poes not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. I approximately six inches. Form SW401-Wet Detention Basin I&M-Rev.2 Permit Number: (to be provided by DWQ) Drainage Area Number: 3 BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin I&M-Rev.2 V J Permit Number: (to be pr( led kv owg) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads feet in the main pond, the sediment shall be removed. When the permanent pool depth reads S ' feet in the forebay, the sediment shall be removed. Sediment Removal Bottom Elevatio BASIN DIAGRAM (fill in the blanks) t3 •D I Pe manenN Volume t? � -It Min. Sediment FOREBAY Storage Permanent Pool Elevation /9•0 Sediment Removal Elevation I 1 • O ------------------------------------------ Bottom Elevation 10�0 MAIN POND Volume ft n. Sediment Storage Form SW401-Wet Detention Basin 1&M-Rev.2 Permit (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Projectname: GT`1 of ;,A ,.Jr.v` Ca.,.�i•t?< BMP drainage area number. 3 Print name: Title: ( J-rr Address: 3 D a Pc> Lp ck- Phone: 2— 3 9 -27 e I Signature: Z4 Date: / o Note: T'he legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of Not �" COcC-OV\Y12 , County of do hereby certify that l mac,-\ 6 . �-V'_rN M an ,1r personally appeared before me this �r\ day of hr )0LigL% I AOOI , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, .%O"XA.E:.HF< pTA/? ; —s— y' •. z '�.,N COUNT, •` SEAL My commission expires a1,a�C� g Form SW401-Wet Detention Basin I&M-Rev.? V� o� P'uLt_e� Permit v- f J 1 i Ar fto be provided by DWO) 02OF W A7F9'q h r 7 O Y FEB I J LUUSTORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM DWQ-WARO GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must also be filled out, printed and submitted along with all of the required information. Project name Contact name Phone number. Date Drainage area number Thurman Hardison 252-639-2900 January 30, 2008 9 I1 DESIGNpNF,ORMATION Site Characteristics Drainage area 172,236 it Impervious area 72,963 ft2 Percent impervious 42.4% % Design rainfall depth 1.0 inch Peak Flow Calculations 10-yr, 24-hr runoff depth 10-yr, 24-hr intensity Post -development 10-yr, 24-hr peak flow Velocity Maximum non -erosive velocity (peak 10-year storm) Soil characteristics (enter'x' below) Sand/silt (easily erodible) Clay mix (erosion resistant) Grass Type (enter'x' below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: Maximum velocity Side slopes Swale length Option 2: Convevance Swale. Seekina Pollutant Credit Maximum velocity for 10-yr storm Side slopes Swale length Option 3: Conveyance Swale, Not Seeking Pollutant Credit: Maximum velocity Side slopes 9� 7 n 8.7 ,/hr 19.77 ft /sec 4.5 fVsec x x n (Y or N) :1 ft y (Y or N) 1.0 ft/sec OK 5 :1 OK 625 ft OK n (Y or N) 34S * 2-80 = 6 ZS ('-F> Form SW401-Grassed Swale-Rev.2 Parts I and 11, Project Design Summary, Page 1 of 2 r• Permit Number: (to be provided by DWO) Swale Characteristics Swale Shape: Enter an'x' in the appropriate cell below: Trapezoidal x Parabolic V-shaped Width of the bottom of the swale 5 it Width of the top of the swale 20 it Maintenance agreement: Is this included in the application? Yes (Y or N) This design is for the following design option: Option 1: Curb outlet swale N Option 2: Conveyance swale, seeking pollutant credit Y OK. Maintenance provision not needed. JAArmT riJPA.xE Option 3: Conveyance Swale, not seeking pollutant credit N (kj�6FMI;uT S5 ?dvuz�6 il Additional Information Is the swale sized for all runoff from ultimate build -out? Yes OK Is the BMP located in a recorded drainage easement with a no (Y or N) Insufficient ROW location. f'Z o?E7.-ry Ss A�z¢�9�f recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the Swale to the SHWT? 1.0 If OK Dwt+eu 3-( -TNe C2,1 What is the ground level elevation? 21.5 fmsl What is the elevation of the bottom of the swale? 20.0 fmsl What is the SHWT elevation? 19.0 fmsl What is the longitudinal slope of the swale? 0.0 % OK What is the depth of freeboard? 0.0 It OK Form SW401 -Grassed Swale-Rev.2 Parts I and II. Project Design Summary, Page 2 of 2 Permit No: (to be assigned by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Page/ Plan Sheet No. C N.O1. Plans (V + 50' or larger) of the entire site showing: Dwg-A r- v.o - Design at ultimate build -out, 5.�) n - Off -site drainage (if applicable), rw•SS •Delineated drainage basins (include Rational C coefficient per basin), Wns ti, a t 9,0 - Swale dimensions (width, length, depth), D­t�� ` • o • Maintenance access, k • o - Recorded dfai;ent and public right of way (ROW), a j f_ a.0 - Grass species, and T' 1, o - Boundaries of drainage easement. �✓ �� 2. Plan details (1' = 50' or larger) for the grassed swale showing: D� c %0 - Swale dimensions (width, length, depth), C a. o - Maintenance access, 0-t. o - Recorded cl a; ge-e sment and public right of way (ROW), C y- o - Design at ultimate build -out, L o.o - Grass species, s,>mfc . vLT Mnx3 Off -site drainage (if applicable),and e C t. o - Boundaries of drainage easement. O&S 3. Section view of the grassed swale (V = 20' or larger) showing: C- g. o - Side slopes, - AND - ��e s�„n> - Longitudinal slope, -Freeboard - Swale dimensions, and - SHWT level(s) kv X S f� °8 4. Supporting calculations (including maximum velocity calculations for applicable storms) WJJ 5 c L14. of 5. An assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. GG.o 6. A construction sequence that shows how the bioretention cell will be protected from sediment until the entire drainage area is stabilized. 6 'X 14, 7. The supporting calculations (including underdrain calculations, if applicable). fir; a`c&4iF 0 6. A copy of the signed and notarized inspection and maintenance (I&M) agreement. L` I • \ 9. A copy of the deed restriction. (we, A S06w o rs 10 FEB 13 2008 SW401-Grassed Swale-Rev.2 Part III, Page 1 of 1 Permit Name: (to be provided DWQ) FEB 13 20r1 Drainage Area Number: Grassed Swale Inspection and Maintenance Agreement r%1A1^ 1AJA r%r I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of inspection and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide time and a one-time fertilizer application Sediment covers the grass at Remove sediment and dispose in an the bottom of the swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of damage have occurred at the Contact the NC Division of Water Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Grassed Swale I&M-Rev.2 Page 1 of 2 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Cl<-i aE 3rtLN — t-k0K3sC%-?%oc- --4"�2M (nO'PLrx BMP drainage area number. NMI Print name: )a L-rti � i 4 a �r . q r Title: L17-Y lMA�,j G bG Address: s7n �a �l rc SrtiE� uate: i - '�2- a - 1115< Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, o"i ' �c a Notary Public for the State of �ot 41 , County of C `ca:0e.r) , do hereby certify that l k`c ?r VS F\ a )-'VW\C&h 7(- personally appeared before me this nd day of ` O6, and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, —o— �'•. AUB LAG �'p r SEAL My commission expires u `u 1 01(DO S Form SW401-Grassed Swale I&M-Rev.? IPage 2 of 2