HomeMy WebLinkAboutSW7070907_CURRENT PERMIT_20191202STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYM M DD
Wit �'d
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
December 2. 2019
Stonebriar Commercial Finance LLC
Attention: Mr. Dirk Stock, Vice President
5601 Granite Parkway, Suite 1350
Plano, TX 75024
Subject: Stormwater Permit No. SW7070907 Ownership Change
ACADEMI - CDQ Facility
High Density Stormwater Project
Camden County
Dear Mr. Stock:
The Washington Regional Office received a Stormwater Management Permit
Application for ownership change for the subject project on October 28, 2019. Staff
review of the application has determined that the permit can be reissued. We are
forwarding Permit No. SW7070907 dated December 2, 2019, for the continued
operation of the subject project.
This permit, upon its effective date, will replace all previous State Stormwater permits for
this proiect. This permit shall be effective from the date of issuance until October 8, 2021
and shall be subject to the conditions and iimitations as specified therein, and does not
supercede any other agency permit that may be required. Please pay special attention to
the Operation and Maintenance requirements in this permit. Failure to establish an
adequate system for operation and maintenance of the stormwater management system
---will-result-in-future-compliance-problems------- - - - ----
If any parts, requirements, or limitations contained in this permit are unacceptable, you
have the right to request an adjudicatory hearing upon written request within thirty (30)
days following receipt of this permit. This request must be in the form of a written petition,
conforming to Chapter 1508 of the North Carolina General Statutes, and filed with the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714.
Unless such dema� ids are made this permit shall be final and binding.
If you have anv questions, or need additional information concerning this matter, please
contact me at (252` 948-3923.
Sincerely,
Roger K. Thorpe
Environmental Engineer
North Carolina Department of Environmental Quality I, Division of Energy, Mineral and Land Resources
J/ Washington Regional Office 1943 Washington Square Mall i Washington, North Carolina 27889
rvcnnycnoI No
252.946.6481
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Stonebriar Commercial Finance LLC
ACADEMI - CQD Facility located at 850 Puddin Ridge Road, Moyock, NC
Camden County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and
the approved stormwater management plans and specifications and other supporting
data as attached and on file with and approved by the Division of Energy, Mineral, and
Land Resources (Division) and considered a part of this permit.
This permit shall be effective from the date of issuance until October 8, 2021, and shall
be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 of this permit. The stormwater control has
been designed to handle the runoff from 53,954 square feet of impervious area
over the 3.10 acres of drainage area for this project.
3. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
4. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system per
approved plans.
5. Plans for the future 34,946 square feet of impervious area on this site must be
submitted to the Division and approved prior to the construction of the additional
impervious area.
6. The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
a. Drainage Area, acres:
3.10
b. Total Impervious Surfaces, ftz:
53,954 (including 34,946sf of future)
C. Design Storm, inches:
1.0
d. Pond Depth, feet:
4.50
e. TSS removal efficiency:
90%
f. Permanent Pool Elevation, FMSL:
9.50
g. Permanent Pool Surface Area, ftz:
5,578
h. Permanent Storage Volume, ft3:
12,496
i. Permitted Forebay Volume, ft3:
2,376
i. Temporary Storage Elevation, FMSL:
10.50
j. Temporary Storage Volume, ft3:
7,394
k. Controlling Orifice:
1.0" 0 pipe
I. Receiving Stream/River Basin:
Tull Creek / Pasquotank
M. Stream Index Number:
30-1-2-2-5-1-1
n. Classification of Water Body:
"B; Sw"
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be followed in its
entirety and maintenance must occur at the scheduled intervals including, but not
limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping.
Q. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of the Division. The records will indicate the
date, activity, name of person performing the work and what actions were taken.
5. The facilities shall be constructed as shown on the approved plans. This permit
shall become voidable unless the facilities are constructed in accordance with the
conditions of this permit, the approved plans and specifications, and other
supporting data.
6. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification-maybe-required-forthose-deviations- --
7. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
The permittee shall submit to the Director and shall have received approval for
revised plans; specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
10. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
11. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
12. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division, accompanied by a
completed name/ownership change form, documentation from the parties
involved, and other supporting materials as may be appropriate. The approval of
this request will be considered on its merits and may or may not be approved.
The permittee is responsible for compliance with all permit conditions until such
_-time-as the Division -approves -the -transfer -request -
Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division, in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
5. The permittee grants DEQ Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request.for a. permit modification, revocation and reissuance or
termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9. The permittee shall notify the Division of any name, ownership or mailing
address changes within 30 days.
10. This permit shall be effective from the date of issuance until October 8, 2021.
Application for permit renewal shall be submitted 180 days prior to the expiration
date of this permit and must be accompanied by the processing fee.
Permit issued this the 2 nd day of December, 2019.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
for
------- S:-Daniel-Smith-Director
Division of Energy, Mineral, and Land Resources
By Authority of the Environmental Management Commission
ACADEMI - CQD Facility
Stormwater Permit No. SW7070907
Camden County
Designer's Certification
I, , as a duly registered
in the State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
SEAL
Signature
Registration Number
Date
Certification Requirements:
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
15. The required system dimensions are provided per the approved plans.
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Interim Director
NORTH CAROLINA
Environmental Quality
May 8, 2019
ACADEMI Real Estate, Holdings, LLC
ACADEMI, LLC, Manager
Attention: Ms. Katherine F. McKenzie -Veal
850 Puddin Ridge Road
Moyock, NC 27958-8679
Subject: Stormwater Permit No. SW7070907 Name Change
Academi — CDQ Facility
High Density Stormwater Project
Camden County
Dear Ms. McKenzie -Veal:
The Washington Regional Office received a Stormwater Management Permit
Application for name change for the subject project on March 27, 2019. Staff review of
the application has determined that the permit can be reissued. We are forwarding
Permit No. SW7070907 dated May 8, 2019, for the continued operation of the subject
project.
This permit, upon its effective date, will replace all previous State Stormwater permits for
this project. This permit shall be effective from the date of issuance until October 8, 2021
and shall be subject to the conditions and limitations as specified therein, and does not
supercede any other agency permit that may be required. Please pay special attention to
the Operation and Maintenance requirements in this permit. Failure to establish an
adequate system for operation and maintenance of the stormwater management system
will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you
have the right to request an adjudicatory hearing upon written request within thirty (30)
days following receipt of this permit. This request must be in the form of a written petition,
conforming to Chapter 150B of the North Carolina General Statutes, and filed with the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714.
Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
contact me at (252) 948-3923.
Sincerely,
Roger K. Thorpe
Environmental Engineer
Ygnlmio nMmwnW Oe/y�
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Washington Regional Office 1 943 Washington Square Mali I Washington. North Carolina 27889
252.946.6481
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
ACADEMI Real Estate Holdings, L.L.C.
ACADEMI - CQD Facility located at 850 Puddin Ridge Road, Moyock, NC
Camden County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwaterrules') and
the approved stormwater management plans and specifications and other supporting
data as attached and on file with and approved by the Division of Energy, Mineral, and
Land Resources (Division) and considered a part of this permit.
This permit shall be effective from the date of issuance until October 8, 2021, and shall
be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 of this permit. The stormwater control has
been designed to handle the runoff from 53,954 square feet of impervious area
over the 3.10 acres of drainage area for this project.
3. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
4. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system per
approved plans.
5. Plans for the future 34,946 square feet of impervious
area on this site must be
submitted to the Division and approved prior to the construction of the additional
impervious area.
6. The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
a. Drainage Area, acres:
3.10
b. Total Impervious Surfaces, ft2:
53,954 (including 34,946sf of future)
C. Design Storm, inches:
1.0
d. Pond Depth, feet'.
4.50
e. TSS removal efficiency:
90%
f. Permanent Pool Elevation, FMSL:
9.50
g. Permanent Pool Surface Area, ft2:
5,578
h. Permanent Storage Volume, ft3:
12,496
i. Permitted Forebay Volume, ft3:
2,376
i. Temporary Storage Elevation, FMSL:
10.50
j. Temporary Storage Volume, ft3:
7,394
k. Controlling Orifice:
1.0" § pipe
I. Receiving Stream/River Basin:
Tull Creek / Pasquotank
M. Stream Index Number:
30-1-2-2-5-1-1
n. Classification of Water Body:
"B; Sw"
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be followed in its
entirety and maintenance must occur at the scheduled intervals including, but not
limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and.
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of the Division. The records will indicate the
date, activity, name of person performing the work and what actions were taken.
5. The facilities shall be constructed as shown on the approved plans. This permit
shall become voidable unless the facilities are constructed in accordance with the
conditions of this permit, the approved plans and specifications, and other
supporting data.
Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
7. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
8. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
9. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. - Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
10. . The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
11. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
12. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division, accompanied by a
completed name/ownership change form, documentation from the parties
involved, and other supporting materials as may be appropriate. The approval of
this request will be considered on its merits and may or may not be approved.
The permittee is responsible for compliance with all permit conditions until such
time as the Division approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division, in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
5. The permittee grants DEQ Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9. The permittee shall notify the Division of any name, ownership or mailing
address changes within 30 days.
10. This permit shall be effective from the date of issuance until October 8, 2021.
Application for permit renewal shall be submitted 180 days prior to the expiration
date of this permit and must be accompanied by the processing fee.
Permit issued this the 8ch day of May, 2019.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
for
S. Daniel Smith, Interim Director
Division of Energy, Mineral, and Land Resources
By Authority of the Environmental Management Commission
ACADEMI - CQD Facility
Stormwater Permit No. SW7070907
Camden County
Designer's Certification
I, , as a duly registered
in the State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on, page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
SEAL
Signature
Registration Number
Date
Certification Requirements:
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
15. The required system dimensions are provided per the approved plans.
r"
I
OFFICE USE ONLY
Date Received Fee Paid Perre Number State of North Carolina 5WA-CK 9 ll�l0 /�j
Department of Environment and Natural Resources
Division of Water Quality RECEivED
STORMWATER MANAGEMENT PERMIT APPLICATION FORM SEP 13 2007
This for'rn may be photocopied for use as an original
I. GENERAL INFORMATION
DWQ-WAR®
1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): /� 1
- G f; T l7'u G_Drn,C S tcc
2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance):
s4CA-So,,3 P9,5,b4u7-
3. Mailing Address for person listed in item 2 above:
p-0- 'Z,r /.n74
City: M o)'e2CA- State: A)L zip: Z7ySr&
Telephone Number: ( Z-5 Z ) '/ 35- - 7 419
4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
h( c1--WA 7i5l9 A4a"D e4- Ca?� r'=f�LrGi7'Y
5. Location of Project (street address):
050 PVA�„Aj R,ncp 29A
City: M 0YOL6f County: vrMt)EN
6. Directions to project (from nearest major intersection):
FKlJM 14,& AS- /6�; Go Spurr/ aa. 17Zr6GF- /ZoX1,�,
7-ALA- Er,"YifhnNCF 'N cAcuuA 2 is Ar —PA)h of RoAls
7. Latitude: -2,6* Z("-S/ Longitude: 760- 121- Oy of project
8. Contact person who can answer questions about the project:
Name: Telephone Number: ( Z 5 2- ) - /g y /
If. PERMIT INFORMATION:
1. Specify whether project is (check one): New Renewal Modification
Form SWU-101 Version 3.99 Page I of 4
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the
existing permit number A/,,14 and its issue date (if known) . A7,/.9
I, 3. Specify the type of project (check one):
_Low Density t/ Fligh Density _Redevelop _General Permit _Other
4. Additional Project Requirements (check applicable blanks):
_LAMA Major !/Sedimentation/Erosion Control 404/401 Permit NPDES Stormwater
pRE✓/a.str nE�M,T�n
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748.
III. PROJECT INFORMATION
1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project .
S7�RMW,4 /z RV/vJFf ev/ R rnF..A7F� us,ti, A w�-
2. Stormwater runoff from this project drains to the �� i CAuo7t9Nt River basin.
3. Total Project Area: 3.' 0 acres 4. Project Built Upon Area: yD
5. Flow many drainage areas does the project have? 0AjE
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
gwL1>-o�i—
Basin Information-'-Ara{Wage-pr'ea=�.—
Receiving Stream Name
Receiving Stream Class
�j s Cl Y
7Z - S
Drainage Area F�
-7y 91,0
- 13 y Q !?, 6
Existing Impervious" Area(SP�
O
/ 4 3
Proposed ImperviousµArea SF-
G) ego?
SY
%Imperviousµ Area (total)
?—!P 41
410.0
.,
Impetvious SurfaceArea;".:'
'-' ��z��—j ��','^��
•'�,"-"6�ili'aag"e--Are-o •�''''•'
On -site Buildings F
S 0 0 0
1 L /
On -site Streets
On -site Parking
/
On -site Sidewalks Sp
(� Z 5
Other on -site
_
Off -site
_
Total: �uo7
Total: qsy
Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
59,17v
4,193
34 )'t `t b
SPfo
9 �193
aa, r7&o
,A193
3`',946
Form SWU-101 Version 3.99
Page 2 of 4
7. 1-low was the off -site impervious area listed above derived? AVW C,g.A �>/JFWrro
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table
listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment.
1. The following covenants are intended to ensure ongoing compliance with state stor'ntwater management permit number
as issued by the Division of Water Quality. These covenants may not be
changed or deleted without the consent of the State.
2. No more than square feet of any lot shall be covered by structures or impervious materials.
Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood
decking or the water surface of swimming pools.
3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings.
4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to
construction.
5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control
system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity
and performance of the system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and persons
claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplement form(s) listed below must be submitted for each
BMP specified for this project. Contact the Stornewater and General Permits Unit at (919) 733-5083 for the status
and availability of these forms.
✓Form SWU-102
Form SWU-103
Form SWU-104
Form SWU-105
Form SWU-106
Form SWU-107
Form SWU-108
Form SWU-109
Wet Detention Basin Supplement
Infiltration Basin Supplement
Low Density Supplement
Curb Outlet System Supplement
Off -Site System Supplement
Underground Infiltration Trench Supplement
Neuse River Basin Supplement
Innovative Best Management Practice Supplement
Fonn SWU-101 Version 3.99
Page 3 of 4
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
( A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
1. Please indicate that you have provided the following required information by initialing in the space provided
next to each item.
• Original and one copy of the Stormwater Management Permit Application Form
• One copy of the applicable Supplement Form(s) for each BMP
• Permit application processing fee of S4-20 (payable to NCDENR) $4/,000
• Detailed narrative description of stormwater treaunent/management
• Two copies of plans and specifications, including:
- Development/Project name
- Engineer and firm
-Legend
- North arrow
- Scale
- Revision number & date
- Mean high water line
- Dimensioned property/project boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
/ - Vegetated buffers (where required)
l
VII. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent. (individual or firm): _ 4�IA
Mailing Address:
City: State:
Phone: ( ) _ Fax: (
VIII. APPLICANT'S CERTIFICATION
(print or type name ofperson listed in General Information, item 2) (9 /z S— T-fCk-S oro
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of I5A
NCAC 21-1.1000.
Signature:
Date: 9 G o
Form SWU-101 Version 3.99 Page 4 of 4
Permit No. 511 ?'D?
(Q
State of North Carolina to be provided by DW
Department of Environment and Natural Resources
Division of Water Quality! �9
STORMWATER MANAGEMENT PERMIT APPLICATION FO `M� CA�J ���j
WET DETENTION BASIN SUPPLEMENT OCT 0 3 2007
This form may be photocopied for use as an original
DWQ
DWO Stormwater Management Plan Review PROD #
A complete Stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details.
I. PROJECT INFORMATION
Project Name:
Contact Person: '�>TleuA n `7:';M e A✓? Phone Number: (252) y35`^/ 4 41/
For projects with multiple basins, specify which basin this worksheet applies to: iV /A
elevations 9-Zg-017 %LEL'is,o,,,y
Basin Bottom Elevation p7�, Q ft. (floor of the basin)
Permanent Pool Elevation /• S ft. (elevation of the orifice)
Temporary Pool Elevation /O . S ft. (elevation of the discharge structure overflow)
areas
Permanent Pool Surface Area 9 sq. ft. (water surface area at the orifice elevation) S S7 g SF
i
Drainage Area O ac. (on -site and off -site drainage to the basin)
Impervious Area / • Z y ac. (on -site and off -site drainage to the basin)
volumes
Permanent Pool Volume
Temporary Pool Volume
Forebay Volume
Other parameters
SA/DAI
,-Diameter of brifi,c6
Design Rainfall
Design TSS Removal 2
Fonn SWU-102 Rev 3.99
to�_ cu. ft. (combined volume of main basin andforebay) /2- y9(o
—6�/'1_ cu. ft. (volume detained above the permanent pooh % 3 g y CF
cu. ft. (approximately 20% of total volume)
Cr%AuC-r�' 4-r N()(u-) ma -rive, 4 sG°t7 V.
Zf (surface area to drainage area ratio from DWQ table)
in. (2 to 5 day temporary pool draw -down required 9
in.
% (minimum 85% required)
/Vo,i: PeA 9-Y—Zo0-7 t,,4LC✓c47yn1U5,
Page 1 of 4 .5fi/1 f} %(jEzan"b) I / S / S'r
tv Etv D0,v``D SA = St 5-79 sF . 0 k
0
I
Maintenance activities shall be performed as follows:
After every significant runoff producing rainfall event and -at least monthly:
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition.
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within
2 to 5 days as designed.
2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
3. Inspect and repair the collection system (i.e, catch basins, piping, swales, riprap, etc.) quarterly to maintain
proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of
in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or stream, etc.).
The measuring device used to detennine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments.
s:5
When the permanent pool depth reads jo > feet in the main pond, the sediment shall be removed.
3 3,1,
When the permanent pool depth reads � feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(fill in the blanks)
V Permanent Pool Elevation .- /
Sedimcnl R\iol EL 6l 75' °�------------Sediment Removal Elevation p.i3I-
FOREBAY
Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency drain shall be minimized to the maximum extent practical.
Form SWU-102 Rev 3.99 Page 3 of 4
Footnotes:
When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the
actual impervious % and permanent pool depth. Lincar interpolation should be employed to determine the correct value for non-
standard table entries.
2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide
90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal.
IL REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 21-1 .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applicants Initials
_ a.
_b.
C.
d.
c.
The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
The forebay volume is approximately equal to 20% of the basin volume.
The temporary pool controls runoff from the design storm event.
The temporary pool draws down in 2 to 5 days.
If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
calculations)
f. The basin length to width ratio is greater than 3:1. (A-g ouT- 2 I
g. The basin side slopes above the permanent pool are no steeper than 3:1.
It. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). (ip :
i. Vegetative cover above the permanent pool elevation is specified.
j. A trash rack or similar device is provided for both the overflow and orifice.
k. A recorded drainage casement is provided for each basin including access to nearest right-
of-way.
1. If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified prior to use as a wet detention basin.
m. A mechanism is specified which will drain the basin for maintenance or an emergency.
Ill. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided.
This system (check one) 0 does does not incorporate a vegetated filter at the outlet.
This system (check one) 0 does 0-does not incorporate pretreatment other than a forebay.
Form SWU-102 Rev 3.99 Page 2 of
All components of the wet detention basin system shall be maintained in good working order.
I acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Print name: (9^-H2Y C 774eksoH
Title: �2FS -1}ryE .JT- /�
Address: c?Sd I��()J�w,hCr' �C /0"Y1,e NC Z7SS,3
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a
resident of the subdivision has been named the president.
I,YDCl/ a Notary Public for the State of Np;2-44 ZA
County of do hereby certify that CAAr k_
personally appeared before me this day of ��17LeMl7 tZ, =-I , and acknowledge the due
execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal,
NpTARy
PU8LIC
SEAL
My commission expires .Y ritArAQ
Form SWU-102 Rev 3.99 Page 4 of