HomeMy WebLinkAboutSW7070724_HISTORICAL FILE_20070810STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW ZO 707�
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE���(�
YYYYMMDD
'g 6o,e,,7- 9dz l
s-lprzMU„��z, �A[.CvLrino+JS
AUG 1 0 2007
/n F
J ICSo�v� Y� i�'�' 1.IVAN
S�y Qz,-Is/ 44,6 /, dies vheP cG�-e
S l rE 7�,47W .
-TorrtL s/7F An6"-) �27I sF
TOilq"L. � LoT S CTowh �pw�e S)
Tom1, 1 � Jri bw- aj,A-o
Zn.2!:LMe Ue- A v��
�2l l�twa.yy. Ci�y cA��w�J -
1 1 4(: re-s
�� unlf5
SU0 &r-
3o/r7P3 sP
19I zeR s F--
I, 89 S-SF-
20/ �,FgIFS17-
~/; ZoVsic
f o.; IL e l
6 (, /4 re S .
Hej A 27)a�
STORMWATER POND
COASTAL STORMWATER DESIGN
WHITFIELD LANDING SUBDIVISION
NEUSE BOULEVARD
NEW BERN, NORTH CAROLINA
AE PROJECT i107021
SIZE POND AND ORIFICE:
SITE DATA
10 1 AL SI 1 t WA I LKSHtAU ARLA =
BUILDING AREA =
SIDEWALK AREA =
PARKING/DRIVE AREA =
GRASS AREA/POND AREA =
- UPON ARFA =
216211 SF
ACRES
4.96
30,713 SF
0.71
1895 SF
0.04
39596 SF
0.91
144007 SF
3.31
% BUA =
DETERMINE POND SURFACE AREA REQUIREMENT AT PERMANENT POOL
REFERENCE SA/DA TABLE
YES
NO
85% TSS REMOVAL WITH 30' VEGATATIVE FILLER
90% TSS REMOVAL FOR WET DETENTION WITHOUT VEGETATIVE FILTER
X
X
SET PERMANENT POOL DEPTH =
8 FT
SA/DA LOW (30%)=
0.8
SA/DA HIGH (40%) =
1.1
• IMPER(ACTUAL%) =
33.4 %
• IMPERVIOUS LOW =
30 %
INTERPOLATED SA/DA VALUE = 0.90 C S A/b A -
REQUIRED SURFACE AREA = 1,945 SF
APPROXIMATE POND WIDTH = 25 FT
APPROXIMATE POND DIMENSIONS = 25 FT X 75 FT
PERM POOL PROV I n J-(%>
' CALCULATE 1" STORM RUNOFF VOLUME
SIDEWALK AREA =
PARKING/DRIVE AREA =
GRASS AREA =
pntin AprA =
1-INCH VOLUME _ �9,493FV
SET PERMANENT POOL LEVEL AT: 9 STAGE _
DETERMINE POND STAGE RISE ASSOCIATED WITH 1" STORM
30713 SF
C=
0.90
1895 SF
C=
0.90
39596 SF
C=
0.90
135813 SF
C=
0.30
C= 0.526
93 FT ELEVATION
STAGE FT
SURFACE AREA FTz
NCREMENTAL VOL FT3'
CUMM. VOL(FT3)
STORM VOL. FT3
-10
0
ERR
ERR
-9
0
0
0
-8
1563
0
0
-7
2082
1823
1823
-6
2637
2,360
4,183
-5
3227
2,932
7,115
-4
3852
3,540
10,656
-3
4512
4,182
14,837
-2
5198
4,855
19,692
-1
5909
5,554
25,246
0
8194
7,052
32,298
0
1
9421
8,808
41,105
8,808
2
10704
10,063
51,168
18,870
3
12045
11,375
36,364
30,245
4
0
0
0
0
5
0
0
0
6
0
0
0
7
0
0
0
8
0
0
0
9
0
0
0
10
0
0
0
CALCULATE 1" STORM RISE
BETWEEN: 93 FT & 94 FT THE STORED RUNOFF =
REMAINING VOLUME TO BE STORED f
BETWEEN: 94 FT & 95 FT INCREMENTAL VOLUME _
RISE ABOVE 95.0 FT CONTOUR = 0.070 FT
qN •v-I
THEREFORE 1" STORM ELEVATION = FT SAY:
STOR 9 FT
q ►-4.1
8808 FT3
685 FT3
10063 FT3
DETERMINE ORIFICE SIZE TO DRAW DOWN THE 1" STORM
AVERAGE AVAILABLE ORIFICE HEAD = 0.55 FT
SIZE ORIFICE FOR 3-DAY DRAWDOWN
AVERAGE Q REQUIRED =
(3 DAY DRAW DOWN)
FROM P. III -II OF HRM
BASIC ORIFICE EQUATION
Q =
DISCHARGE(CFS)
CD =
COEFFICIENT (USE 0.6)
A =
ORIFICE AREA (SF) Q=Co'A'sgrt(
g =
GRAVITY (32.2 FT/Sz)
h =
DRIVING HEAD FT
0.037 FT3/S
(I,( Fr - Z) ass'
SOLVE FOR AREA REQUIRED: A=Q/(CD'sgrt(2gh)= 0.01026 SF
ORIFICE DIAMETER (D) = 0.1143 FT APPROXIMATELY= 1.37 INCHES
TRY 1.25 1 CH DIAMETER ORIFIC =Do L(SO ` rAku..SYL O'�-l'F"G9-� �LbP
FL6W .
CHECK ORIFICE SIZE BY ROUTING THE DRAWDOWN OF THE 1"STORM RUNOFF
DISCHARGE TABLE
h(FT)
Q(CFS)
1.1
0.043
1
0.041
0.9
0.039
0.8
0.037
0.7
0.034
0.6
0.032
0.5
0.029
0.4
0.026
0.3
0.022
0.2
0.018
0.1
0.013
0.05
0.009
0.03
0.007
0.02
0.006
0.01
0.004
0
0.000
NOTE: h MEASURED TO CENTER OF ORIFICE
0=(0.6)(P I/4)(Do/12)2sgrt(2'32.2`h)
INITIAL HEAD = 1.10 FT
APPROXIMATE 1" STORM DRAWDOWN USING 6 HOUR INCREMENTS
REQUIRED VOLUME = 9,493 FT3 POND HAS 1" STORM VOLUME AT t=0
TIME ELAPSED HR
h FT Q CFS
Q/6 HRS
Qcumm
VOL, REMAINING FT3
0
1.10
9.493
6
1.10
0.043
930
930
8,563
12
0.99
0.041
883
1,812
7,681
18
0.89
0.039
836
2,649
6,844
24
0.79
0.037
789
3,438
6,055
30
0.70
0.034
742
4,180
5,313
36
0.62
0.032
695
4,876
4,617
42
0.54
0.030
648
5,524
3,969
48
0.46
0.028
601
6,125
3,368
54
0.39
0.026
554
6,679
2,814
60
0.33
0.023
506
7,185
2,308
66
0.27
0.021
458
7,643
1,850
72
0.21
0.019
410
8,054
1,439
78
0.17
0.017
362
8,416
1,077
84
0.12
0.014
313
8,729
764
90
0.09
0.012
264
8,993
500
96
0.06
0.010
213
9,206
287
102
0.03
0.007
162
9,368
125
108
0.01
0.005
107
9,474
114
0.00
0.002
41
9,516
(23)
120
0.00
ERR
ERR
ERR
ERR
"NOTE: (ERR) INDICATES THAT THE STORM WATER HAS DRAINED NEARLY LEVEL WITH THE ORIFICE HEIGH"
WHICH WILL BE THE HEIGHT OF THE PERMANENT POOL.
THERFORE THE 1" STORM WATER HAS DRAINED WITHIN THE TIME PERIOD OF 2 - 5 DAYS, AND THE RUNOFF
CONTROL FOR THE POND IS SATISFACTORY.
-D iLd1uJ T%a
SA/DA - 85% TSS REMOVAL WITH 30' VEGETATIVE FILTER �, ~�f
IMPER.%
3.OFT
3.5FT
4.OFT
4.5FT
5.OFT
5.5FT
6.OFT
6.5FT
7. OFT
7.5FT
10%
.9
.8
.7
.6
.5
20%
1.7
1.3
1.2_
1.1
1.0
.9
8
.7
----30%
2.5
2.2
1.9`,
1.8
1.
1.5
1.3
1.2
.6
1.0
.5
^-40%
3.4
3.0
',2.6.(j
2.
1.9
1.6
1.4
1.1
.9
1.0
50%
4.2
3.7
3:.3
3.0
.7
2.4
2.1
1.8
1.5
1.3
60%
5.0
4.5
3.8
3.5
3.2
2.9
2.6
2..3
2.0
1.6
70%
90%
§
6 8
5.2
4.5
4.1_�
� 7:
'
3.1
2.9
2.5
2.1
1.8.
90 ..
7.5.._
6.0
fi.-5--
5 2
5.8--
4.7
5.3
4 2
._.4 8..._-4.3
3 7_..
3.2
3.8
2.7
- 2.2
2.0__
100%
8.2
7.4
6.8
6.2 5.6
5.0-
4.4
3.3
3.8
2..8....2.3
3.2
2.6
SA/DA
6NW90%)UT
S REMOVALFOR
WET
DETENTI
VEGETATIVE,FILTER
IMPER.% 3.OFT 3.5FT
10%
1.3
1.0
20%
2.4
2.0
3 0 %
3.5
3.0
---,740%
4.5-
4.0,
50%
5.6
5.0
60%
7.0
6.0
70%
8.1
7.0
80%.
9.4
8.0
90%
10.7
9.0
........ .10 0 $....12.0....
10.0 ..
4.unu 4.5FT 5.OFT 5.5FT
.8
.7
.6
.5
1.8•
1.7
1.5
1.4
2.7
2.5
2.2
1.9
3.5
3.1
2.8
2.5
4.3
3.9
3.5
3.1
5.3
4.8
4.3
3.9
6.0
5.5
5.0
4.5
7.0
6.4
5.7
5.2
7.9
7.2.
6.5
5.9
8.8.
8.1
7.3
.6.6
6.5FT 7.OFT 7.5FT'
1.2
1.0
.9
.6-
1.6
1.3
1.1
2.1
1.8
1.4
2.7
2.3
1.9
1.5
3.4
2.9
2.4
1.9
3.9
3.4
2.9
2.3
4.6
4.0
3.4.
2.8'
5.2
4.6 .,
_ 3..9
3.3.`__..
5.8
.5.1.:,
4.3._.:,
3.6.
-76
�.. -ems! �, ,�/o ,,Vag eL
I�
(-?Coo( L
O'S b
b 'Pslz�l llgZl
Hydrograph Summary Report
Page 1
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
Interval
(min)
Time to
peak
(min)
Volume
(cult)
Return
period
(yrs)
Inflow
hyd(s)
Maximum
elevation
(ft)
Maximum
storage
(cuft)
Hydrograph
description
1
SCS Run
9.25
1
722
25,509
1
—
Pre Dev. 1 Year St
2
SCS Ru
26.40
1
722
71,827
10
—
Pre Dev. 10 Yr. St
3
SCS R noff
12.13
1
723
35,062
1
—
POST Dev. 1 Year S
4
SCS R noff
27.26
2
724
82,982
10
—
POST Dev. 10 Yr. S
5
Rese it
.42
1
749
21,020
1
3
94.80
16,894
Post Dev. 1-Yr. St
6
Rese 'r
17.55
2
728
72.924
10
4
95.65
26,285
Post Dev. 10-Yr. S
P
(�
9,Z
cis
P9 S
ray/
!
s-5-
5
U�
Proj. file: 07021_WHITFIELD.G
WIDF file: NEW BERN.IDF
Run date: 06-20-2007
1
1
5 - Reservoir 71 Yr A- p = 2.42 cfs
0 5 10 15 20 25
Time (hrs)
/ Hyd. 3 /
5
m
1
6 - Reservoiri,-10 Yrf Qp = 17.55 cfs
0
0 5
/ Hyd. 4
10
Time (hrs)
15 20 25
/ Hyd. 6
Hydrograph
Report
Page,
English
H d.
Pre Dev. 1 Year -Storm
' e
= SCS Runoff
Peak discharge =
9.25 cfs
Storm frequency
= 1 yrs
Time interval =
1 min
Drainage area
= 4.96 ac
Curve number =
76
Basin Slope
= 0.4 %
Hydraulic length =
580 ft
Tc method
-
Time of conc. (Tc) =
3 min
Total precip.
3.70 i
Distribution =Type
III
Storm duration
Shape factor =
484
ToU Volume = 25,W9 cuR
Hydrograph Discharge Table
Time -- Outflow
Time -- Outflow
Time -- Outflow
(hrs cfs)
(hrs
cfs)
(hrs cfs)
10.47 0.09
16.87
0.27
23.27 0.12
10.67 0.13
17.07
0.26
23.47 0.12
10.87 0.17
17.27
0.25
23.67 0.11
11.07 0.22
17.47
0.23
23.87 0.11
11.27 0.32
17.67
0.22
11.47 0.45
17.87
0.21
11.67 1.16
18.07
0.20
...End
11.87 2.62
18.27
0.20
12.07 8.33
18.47
0.19
12.27 3.55
18.67
0.19
12.47 1.87
18.87
0.19
12.67 1.16
19.07
0.18
12.87 0.98
19.27
0.18
13.07 0.81
19.47
0.17
13.27 0.76
19.67
0.17
13.47 0.72
19.87
0.17
13.67 0.67
20.07
0.16
13.87 0.62
20.27
0.16
14.07 0.57
20.47
0.16
14.27 0.54
20.67
0.15
14.47 0.52
20.87
0.15
14.67 0.50
21.07
0.15
14.87 0.47
21.27
0.14
15.07 0.45
21.47
0.14
15.27 0.42
21.67
0.13
15.47 0.39
21.87
0.13
15.67 0.37
22.07
0.21
15.87 0.34
22.27
0.13
16.07 0.32
22.47
0.13
16.27 0.30
22.67
0.13
16.47 0.29
22.87
0.13
16.67 0.28
23.07
0.12
i�
TR55 Tc Worksheet Page , I
Hyd. No. 1
Pre Dev. 1 Year Storm
Storm frequency = 1 yrs
Sheet Flow
Manning's n-value
Flow length
Two-year 24-hr precip.
Land slope
Travel Time .................
= 0.011
= 300.0 ft
= 3.70 in
= 3.0 %
= 2.3 min
Shallow Concentrated Flow
Flow length
= 50 ft
Watercourse slope
= 0.5 %
Surface description
= Unpaved
Average velocity
= 1.14 fUs
Travel Time ........................................
= 0.7 min
Channel Flow
Cross section flow area
= 6.0 sqft
Wetted perimeter
= 12.6 ft
Channel slope
= 1.0 %
Manning's n-value
= 0.030
Velocity
= 3.02 ft/s
Flow length
= 0.0 ft
Travel Time ........................................ = 0.0 min
Total Travel Time, Tc ........................ = 3.0 min
Hydrograph Report
Page 1
klyd. N .
Pre Dev. 10 Yr. Storm
pe
= SCS Runoff
Storm frequency
= 10 yrs
Drainage area
= 4.96 ac
Basin Slope
= 0.0 %
Tcmethod
=:TR 5
Total precip.
7.00 in
Storm duration
L==24 rs
English
Peak discharge = 26.40 cfs
Time interval =
1 min
Curve number =
76
Hydraulic length =
0 ft
Time of conc. (Tc) =
2.4 min
Distribution =
Type III
Shape factor =
484
Total volume = 71,827 cuff
Hydrograph Discharge Table
Time --
Outflow
Time -- Outflow
Time -- Outflow
(hrs
cfs)
(hrs
cfs)
(hrs
cfs)
9.08
0.27
15.48
0.92
21.88
0.30
9.28
0.31
15.68
0.85
22.08
0.31
9.48
0.37
15.88
0.79
22.28
0.30
9.68
0.42
16.08
0.73
22.48
0.30
9.88
0.48
16.28
0.71
22.68
0.29
10.08
0.55
16.48
0.68
22.88
0.29
10.28
0.65
16.68
0.65
23.08
0.28
10.48
0.75
16.88
0.62
23.28
0.27
10.68
0.87
17.08
0.59
23.48
0.27
10.88
0.99
17.28
0.57
11.08
1.18
17.48
0.54
11.28
1.55
17.68
0.51
...End
11.48
1.97
17.88
0.48
11.68
4.74
18.08
0.46
11.88
9.07
18.28
0.45
12.08
20.29
18.48
0.44
12.28
8.83
18.68
0.43
12.48
4.31
18.88
0.43
12.68
2.84
19.08
0.42
12.88
2.36
19.28
0.41
13.08
1.97
19.48
0.40
13.28
1.85
19.68
0.39
13.48
1.72
19.88
0.38
13.68
1.59
20.08
0.37
13.88
1.47
20.28
0.37
14.08
1.35
20.48
0.36
14.28
1.29
20.68
0.35
14.48
1.23
20.88
0.34
14.68
1.17
21.08
0.33
14.88
1.11
21.28
0.32
15.08
1.04
21.48
0.31
15.28
0.98
21.68
0.31
TR55 Tc Worksheet
Page 1 I W
Hyd. No. 2
Pre Dev. 10 Yr. Storm
Storm frequency = 10 yrs
Sheet Flow
Manning's n-value = 0.011
Flow length = 300.0 ft
Two-year 24-hr precip. = 7.00 in
Land slope = 3.0 %
Travel Time ........................................ = 1.7 min
Shallow Concentrated Flow
Flow length
= 50 ft
Watercourse slope
= 0.5 %
Surface description
= Unpaved
Average velocity
= 1.14 ft/s
Travel Time ........................................ = 0.7 min
Channel Flow
Cross section flow area
= 6.0 sqft
Wetted perimeter
= 12.6 ft
Channel slope
= 1.0 %
Manning's n-value
= 0.030
Velocity
= 3.02 ft/s
Flow length
= 0.0 ft
Travel Time ........................................
= 0.0 min
Total Travel Time, Tc ........................ = 2.4 min
Hydrograph Report
Page 1 l �
Hydv No.,., .3 ..._ _ �._.
_POST Dev. 1 Year Storm �,b
ydrograph type = SCS Runoff
Storm frequency = 1 yrs
Drainage area = 4.96 ac
Basin Slope = 0.0 %
Tc method =
Total precip. = 3.70,i
Storm duration = hrs
English
Pa O'D
Peak discharge = 12.13 cfs
Time interval = 1 min
Curve number = 82
Hydraulic length = 0 ft
Time of conc. (Tc) = 4.7 min
Distribution = Type III
Shape factor = 484
Total Volume= 35,062 cult
Hydrograph Discharge Table
Time --
Outflow
Time -- Outflow
Time --
Outflow
(hrs
cfs)
(hrs
cfs)
(hrs
cfs)
9.62
0.12
16.02
0.40
22.42
0.16
9.82
0.15
16.22
0.38
22.62
0.16
10.02
0.18
16.42
0.36
22.82
0.15
10.22
0.22
16.62
0.35
23.02
0.15
10.42
0.26
16.82
0.33
23.22
0.15
10.62
0.31
17.02
0.32
23.42
0.14
10.82
0.37
17.22
0.31
23.62
0.14
11.02
0.43
17.42
0.29
23.82
0.14
11.22
0.58
17.62
0.28
11.42
0.76
17.82
0.26
11.62
1.38
18.02
0.25
...End
11.82
3.22
18.22
0.24
12.02
10.41
18.42
0.24
12.22
5.38
18.62
0.23
12.42
3.24
18.82
0.23
12.62
1.57
19.02
0.22
12.82
1.33
19.22
0.22
13.02
1.08
19.42
0.21
13.22
0.98
19.62
0.21
13.42
0.92
19.82
0.20
13.62
0.86
20.02
0.20
13.82
0.79
20.22
0.20
14.02
0.73
20.42
0.19
14.22
0.69
20.62
0.19
14.42
0.66
20.82
0.18
14.62
0.63
21.02
0.18
14.82
0.59
21.22
0.17
15.02
0.56
21.42
0.17
15.22
0.53
21.62
0.16
15.42
0.50
21.82
0.16
15.62
0.46
22.02
0.21
15.82
0.43
22.22
0.16
TR55 Tc Worksheet
Page 7
IV
Hyd. No. 3
POST Dev. 1 Year Storm
Storm frequency = 1 yrs
Sheet Flow
Manning's n-value = 0.011
Flow length = 150.0 ft
Two-year 24-hr precip. = 3.70 in
Land slope = 1.0 %
Travel Time ........................................ = 2.1 min
Shallow Concentrated Flow
Flow length
= 50 ft
Watercourse slope
= 1.0 %
Surface description
= Paved
Average velocity
= 2.03 ft/s
Travel Time ........................................ = 0.4 min
Channel Flow
Cross section flow area
= 3.1 sqft
Wetted perimeter
= 6.3 ft
Channel slope
= 0.5 %
Manning's n-value
= 0.030
Velocity
= 2.21 ft/s
Flow length
= 300.0 ft
Travel Time ........................................ = 2.3 min
Total Travel Time, Tc ........................ = 4.7 min
Hydrograph Report
H d. y
POST Dev. 10 Yr.
Storm
pe
= SCS Runoff
Storm frequency
= 10 yrs
Drainage area
= 4.96 ac
Basin Slope
= 0.0 °/
Tc method
5 55
Total precip.
= 7.00
Storm duration
- �s
Hydrograph Discharge Table
N D �D-V-9
Time -- Outflow Time -- Outflow
(hrs cfs) (hrs cfs)
8.33
8.73
9.13
9.53
9.93
10.33
10.73
11.13
11.53
11.93
12.33
12.73
13.13
13.53
13.93
14.33
14.73
15.13
15.53
15.93
16.33
16.73
17.13
17.53
17.93
18.33
18.73
19.13
19.53
19.93
20.33
20.73
0.28
0.37
0.48
0.61
0.74
0.95
1.22
1.61
2.62
11.86
9.22
3.03
2.11
1.84
1.56
1.38
1.24
1.11
0.97
0.83
0.75
0.69
0.63
0.57
0.51
0.48
0.46
0.44
0.42
0.40
0.39
0.37
21.13
21.53
21.93
22.33
22.73
23.13
23.53
End
0.35
0.33
0.31
0.32
0.31
0.29
0.28
Page 1
English
Peak discharge = 27.26 cfs
Time interval = 2 min
Curve number = 82
Hydraulic length = 0 ft
Time of conc. (Tc) = 4.2 min
Distribution = Type III
Shape factor = 484
Taal volume = 82.982 cuff
l�
YR55 Tc Worksheet
Hyd. No. 4
POST Dev. 10 Yr. Storm
Storm frequency = 10 yrs
Sheet Flow
Manning's n-value = 0.011
Flow length = 150.0 ft
Two-year 24-hr precip. = 7.00 in
Land slope = 1.0 %
Travel Time ........................................ = 1.5 min
Shallow Concentrated Flow
Flow length
= 50 ft
Watercourse slope
= 1.0 %
Surface description
= Paved
Average velocity
= 2.03 ft/s
Travel Time ........................................
= 0.4 min
Channel Flow
Cross section flow area
= 3.1 sqft
Wetted perimeter
= 6.3 ft
Channel slope
= 0.5 %
Manning's n-value
= 0.030
Velocity
= 2.21 ft/s
Flow length
= 300.0 ft
Travel Time ........................................ = 2.3 min
Total Travel Time, Tc ........................ = 4.2 min
sage 1
P-0
Hydrograph Report
Page 1
aI
English
Hyd. r5
P stDev.1-yr.Storm (��t
Hy =Reservoir Peak discharge 2.42
Storm frequency = 1 yrs Time interval
Inflow hyd. No. = 3 Reservoir name = WHITFIELD LANDI
Max. Elevation = 94.80 ft Max. Storage = 16,894 cuft
Storage indication medmd used.
Total Volume = 21,020 Cuft
Hydrograph Discharge Table
Time
Inflow
Elevation
Clv A
Clv B Clv C Clv D Wr A
Wr B Wr C Wr D Outflow
(hrs)
cfs
ft
cfs
cfs cfs cfs cfs
cfs cfs cfs cfs
11.80
3.04
93.50
0.03
- - - -
- - - 0.03
12.00
9.00
93.89
0.04
- - - -
- - - 0.04
12.20
5.58
94.56
0.05
- - - 0.27
- - - 0.32
12.40
3.43
94.79
0.05
- - - 2.17
- - - 2.22
12.60
1.59
94.79
0.05
- - - 2.17
- - - 2.22
12.80
1.35
94.75
0.05
- - - 1.76
- - - 1.81
13.00
1.10
94.72
0.05
- - - 1.44
- - - 1.49
13.20
0.99
94.69
0.05
- - - 1.21
- - - 1.26
13.40
0.93
94.68
0.05
- - - 1.07
- - - 1.12
13.60
0.86
94.66
0.05
- - - 0.97
- - - 1.02
13.80
0.80
94.65
0.05
- - - 0.88
- - - 0.93
14.00
0.73
94.64
0.05
- - - 0.81
- - - 0.86
14.20
0.69
94.64
0.05
- - -- 0.74
- - - 0.79
14.40
0.66
94.63
0.05
- - - 0.69
- - - 0.74
14.60
0.63
94.62
0.05
- - - 0.64
- - - 0.70
14.80
0.60
94.62
0.05
- - -- 0.61
- - - 0.66
15.00
0.56
94.62
0.05
- - - 0.57
- - - 0.62
15.20
0.53
94.61
0.05
- - - 0.54
- - - 0.59
15.40
0.50
94.61
0.05
-- -- -- 0.50
- --- -- 0,56
15.60
0.47
94.60
0.05
- --- -- 0.47
- - -- 0.52
15.80
0.43
94.60
0.05
- - -- 0.44
- - - 0.49
16.00
0.40
94.59
0.05
- - - 0.42
- - - 0.47
16.20
0.38
94.59
0.05
- -- - 0.40
- - - 0.45
16.40
0.36
94.58
0.05
- - - 0.38
- - - 0.43
16.60
0.35
94.58
0.05
-- -- -- 0.36
- - - 0.41
16.80
0.34
94.58
0.05
- -- - 0.34
- - - 0.39
17.00
0.32
94.57
0.05
- - - 0.32
- - - 0.37
17.20
0.31
94.57
0.05
- - - 0.31
- - - 0.36
17.40
0.29
94.56
0.05
- - - 0.29
- - - 0.34
17.60
0.28
94.56
0.05
- - - 0.27
- - - 0.33
17.80
0.26
94.56
0.05
- - -- 0.26
- - - 0.31
18.00
0.25
94.55
0.05
- - - 0.24
- - - 0.29
18.20
0.24
94.55
0.05
- - - 0.23
- - - 0.28
18.40
0.24
94.55
0.05
- - - 0.22
- - - 0.27
18.60
0.23
94.55
0.05
- - - 0.21
- - - 0.26
18.80
0.23
94.54
0.05
- - - 0.20
- - - 0.25
Continues on next page...
Post Dev. 1-Yr. Storm
Page 2
Hydrograph Discharge Table
Time
Inflow
Elevation
Clv A
Clv B Clv C Clv D Wr A
Wr B Wr C Wr D Outflow
(hrs)
cfs
ft
cfs
cfs cfs . cfs cfs
cfs cfs cfs cfs
19.00
0.22
94.54
0.05
- - - 0.19
- - - 0.24
19.20
0.22
94.54
0.05
- - - 0.19
- - - 0.24
19.40
0.21
94.54
0.05
- - - 0.18
- - - 0.23
19.60
0.21
94.54
0.05
- - - 0.18
- - - 0.23
19.80
0.20
94.54
0.05
- - - 0.17
- - - 0.22
20.00
0.20
94.54
0.05
- -- - 0.17
- -- - 0.22
20.20
0.20
94.54
0.05
- - - 0.16
- - - 0.21
20.40
0.19
94.53
0.05
- - - 0.16
- - - 0.21
20.60
0.19
94.53
0.05
- - - 0.15
- - - 0.20
20.80
0.18
94.53
0.05
- - - 0.15
- - - 0.20
21.00
0.18
94.53
0.05
- - - 0.14
- - - 0.19
21.20
0.17
94.53
0.05
- - - 0.14
- - - 0.19
21.40
0.17
94.53
0.05
- - - 0.13
- - - 0.18
21.60
0.16
94.53
0.05
- - - 0.13
- - - 0.18
21.80
0.16
94.53
0.05
- - - 0.12
- - - 0.17
22.00
0.16
94.53
0.05
-- - - 0.12
- -- - 0.17
22.20
0.16
94.53
0.05
- - - 0.13
- - - 0.18
22.40
0.16
94.53
0.05
- - - 0.13
- - - 0.18
22.60
0.16
94.53
0.05
- - - 0.12
- - - 0.17
22.80
0.15
94.53
0.05
- - - 0.12
- - - 0.17
23.00
0.15
94.53
0.05
- - - 0.11
- - - 0.16
23.20
0.15
94.52
0.05
- - - 0.11
- - - 0.16
23.40
0.14
94.52
0.05
- -- - 0.11
- - - 0.15
23.60
0.14
94.52
0.05
-- - - 0.10
- - - 0.15
23.80
0.14
94.52
0.05
- - - 0.10
- - - 0.15
24.00
0.00
94.52
0.05
- - - 0.09
- - - 0.14
rzane
. ` Reservoir Report
Reservoir No. 1 - WHITFIELD LANDING
Page 1
English
Pond Data
Pond storage is based on known contour areas
Stage I Storage Table
Stage Elevation
Contour area
Incr. Storage
Total storage
ft ft
sqft
cult
cuft
0.00 93.00
8,194
0
0
1.00 94.00
9,421
8,808
8,808
2.00 95.00
10,704
10,063
18,870
3.00 96.00
12,045
11,375
30,245
Culvert / Orifice Structures
[A] [B] [C] [D]
Rise in
= 1.3
0.0
0.0
0.0
Span in
= 1.3
0.0
0.0
0.0
No. Barrels
= 1
0
0
0
Invert El. ft
= 93.00
0.00
0.00
0.00
Length ft
= 1.0
0.0
0.0
0.0
Slope %
= 1.00
0.00
0.00
0.00
N-Value
= .013
.000
.000
.000
Crif. Coeff.
= 0.60
0.00
0.00
0.00
Multistage
= -
No
No
No
Stage / Storage / Discharge Table
Stage Storage Elevation Clv A
ft
cuft
ft
cfs
0.00
0
93.00
0.00
1.00
8,808
94.00
0.04
2.00
18,870
95.00
0.06
3.00
30,245
96.00
0.07
Weir Structures
[A]
[B]
[C]
[D]
Crest Len ft
= 4.7
0.0
0.0
0.0
Crest El. ft
= 94.50
0.00
0.00
0.00
Weir Coeff.
= 3.00
0.00
.0.00
0.00
Eqn. Exp.
= 1.50
0.00
0.00
0.00
Multi -Stage
= No
No
No
No
Tailwater Elevation = 0.00 ft
Note: All outllovvs have D n anelyted under Inlet and outlet control.
Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge
cfs cfs cfs cfs cfs cfs cfs cfs
0.00 - - - 0.00
0.00 - - - 0.04
5.00 - - - 5.06
25.97 - - - 26.04
V
Hydrograph Report
Page t
English
Hyd. No. 6 Pare
Post Dev. 10-Yr. Storm I
Hydrograph type = •Resery Peak discharge _ 55
Storm frequen y = 10 yrs Time interval =-2 min
Inflow hyd. No. - Reservoir name = WHITFIELD LANDI
Max. Elevation = 95.65 It Max. Storage = 26,285 cuft
Storage indication method used
Total Volume = 72,924 cult
Hydrograph Discharge Table
Time
Inflow
Elevation
Clv A
Clv B Clv C Clv D Wr A Wr B
Wr C Wr D Outflow
(hrs)
cfs
ft
cfs
cfs cfs cfs cfs cfs
cfs cfs cfs
12.00
20.27
95.20
0.06
- - - 8.25 -
-- - 8.31
12.40
7.57
95.37
0.06
- -- - 11.39 -
- - 11.45
12.80
2.86
94.96
0.06
- - - 4.42 -
- - 4.48
13.20
2.07
94.82
0.05
- - - 2.55 -
- - 2.61
13.60
1.79
94.77
0.05
- - - 1.99 -
- - 2.04
14.00
1.51
94.74
0.05
- - - 1.66 -
- - 1.71
14.40
1.36
94.71
0.05
- - - 1.42 -
- - 1.47
14.80
1.22
94.70
0.05
- - - 1.26 -
- - 1.32
15.20
1.08
94.68
0.05
- - - 1.14 -
- - 1.19
15.60
0.95
94.67
0.05
- - - 1.01 -
- - 1.06
16.00
0.81
94.65
0.05
- - - 0.87 -
- - 0.93
16.40
0.74
94.64
0.05
- - - 0.76 -
- - 0.81
16.80
0.68
94.63
0.05
- - - 0.69 -
- - 0.74
17.20
0.62
94.62
0.05
- - - 0.62 -
- - 0.67
17.60
0.56
94.61
0.05
- - - 0.56 -
- - 0.61
18.00
0.50
94.61
0.05
- - - 0.50 -
- - 0.55
18.40
0.47
94.60
0.05
- - - 0.45 -
- - 0.50
18.80
0.45
94.60
0.05
- - - 0.43 -
- - 0.48
19.20
0.44
94.59
0.05
- - - 0.41 -
- - 0.46
19.60
0.42
94.59
0.05
- - - 0.40 -
- - 0.45
20.00
0.40
94.58
0.05
- - - 0.38 -
- - 0.43
20.40
0.38
94.58
0.05
- - - 0.36 -
- - 0.41
20.80
0.36
94.58
0.05
- - - 0.34 -
- - 0.39
21.20
0.35
94.57
0.05
- - - 0.32 -
- - 0.37
21.60
0.33
94.57
0.05
- - - 0.31 --
-- - 0.36
22.00
0.31
94.56
0.05
- - - 0.29 -
- - 0.34
22.40
0.32
94.57
0.05
- - - 0.30 -
- - 0.35
22.80
0.30
94.56
0.05
- - - 0.28 -
- - 0.33
23.20
0.29
94.56
0.05
- - - 0.27 -
- - 0.32
23.60
0.28
94.56
0.05
- - - 0.25 --
- - 0.30
24.00
0.26
94.55
0.05
- - -- 0.24 -
-- -- 0.29
End
Reservoir Report
Page 1
e��
Reservoir No. 1 - WHITFIELD LANDING
Pond Data
Pond storage is based on known contour areas
Stage / Storage Table
Stage
Elevation
Contour area
Incr. Storage
Total storage
ft
ft
sqft
cuft
cuft
0.00
93.00
8,194
0
0
1.00
94.00
9,421
8,808
8,808
2.00
95.00
10,704
10,063
18,870
3.00
96.00
12,045
11,375
30,245
English
Culvert / Orifice Structures
Weir Structures
[A]
[B]
[C]
[D]
[A]
[B]
[C]
[D]
Rise in
= 1.3
0.0
0.0
0.0
Crest Len ft
= 4.7
0.0
0.0
0.0
Span in
= 1.3
0.0
0.0
0.0
Crest El. ft
= 94.50
0.00
0.00
0.00
No. Barrels
= 1
0
0
0
Weir Coeff.
= 3.00
0.00
0.00
0.00
Invert El. ft
= 93.00
0.00
0.00
0.00
Eqn. Exp.
= 1.50
0.00
0.00
0.00
Length ft
= 1.0
0.0
0.0
0.0
Multi -Stage
= No
No
No
No
Slope %
= 1.00
0.00
0.00
0.00
N-Value
= .013
.000
.000
.000
C rif. Coeff.
= 0.60
0.00
0.00
0.00
Multi -Stage
= -
No
No
No
Tailwater Elevation =
0.00 ft
Stage / Storage / Discharge Table
Stage Storage Elevation Civ A
ft
cuft
ft
cfs
0.00
0
93.00
0.00
1.00
8,808
94.00
0.04
2.00
18,870
95.00
0.06
3.00
30,245
96.00
0.07
Note: All outflows have Eden analyzed under inlet and outlet control.
Civ B Civ C Civ D Wr A Wr B Wr C Wr D Discharge
cfs cfs cfs cfs cfs cfs cfs cfs
0.00 - - - 0.00
- 0.00 - - - 0.04
- - - 5.00 - - - 5.06
- - - 25.97 - - - 26.04
/JNo=J�(
-Z�D /r>zr+!.
';-t'.'<�
N
Z7 1 Z& ens
'OUTLET PIPE TO ON
Worksheet for Circular Channel
Project Description
Worksheet
Circular Channel
Flow Element
Circular Channel
Method
Manning's Fonnu
Solve For
Full Flow DiametE
Input Data
Mannings Coeffic 0.013 l
Slope 01670 [
Discharge 27.26 cf
Results
Depth
1.95 It 2�i)
Diameter _ 23 in
Flow Area
-3.0 ft.
Wetted Perimel
0.00 ft
Top Width
0.00 ft
Critical Depth
1.80 ft
Percent Full
100.0 %
Critical Slope
014472 Wit
Velocity
9.14 ffs
Velocity Head
1.30 ft
Speck Energ)
3.25 ft
Froude Numlle
0.00
Maximum Discl
29.32 cfs
Discharge Full
27.26 cfs
Slope Full
016700 ft/ft
Flow Type
N/A
;,7
Project Engineer: Joseph C. Avolis
cShaestadUmw\06149_westport.fm2 avolis engineering, pa FlovMaster v6.0 [614e]
06/20/07 03:44:00 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
. STY o -
=ail
Table 8.03b -
Runoff Curve Numbers (CN)
A
B,7
D
Land Use/Cover
�✓
-
Cultivated land
without conservation
72
81
88
91
with conservation -
62
71
78
81
Pasture land
ppoorcondition
68
79
86
89
faircondition
49
69
79
84
good condition —
39
61
74
80
Meadow
good condition
30
58
71
78
Wood or forest land
Thin stand - poor cover, no mulch
45
66
77
83
Good stand - good cover
25
55
70
77
Open spaces, lawns, parks, golf courses, cemeteries, etc.
good condition:
grass cover on 75
or more of the area
39
6
74
80
fair condition:
grass cover on 50
to 75% of the area
49
69
79
84
Commercial and business
areas (85% impervious)
89
92
94
95
Industrial districts
-720/. impervious)
81
88
91
93
Residential:' Development completed and vegetation established
Average lot size Average%Impervious
118 acre or less 65
77
85
90
92
1 /4 acre 38
61
75
83
87
1/3 acre 30
57
72
81
86
12 acre 25
54
70
80
85
1 acre 20
51
68
79
84
2 acre 15
47
66
77
81
Paved parking lots, roofs,
driveways, etc. -
98
98C98
'
98
Streets and roads
paved with curbs and
stone sewers
98
98
98
98
gravel
76
85
89
91
dirt
72
82
87
89 -
Newly graded area
81
89
93
95
Residential: Development underway and no vegetation
Lot sizes of 1/4 acre
88
93
95
97
Lot sizes of 12 acre
85
91
94
96
Lot sizes of 1 acre
82
90
93
95
Lot sizes of 2 acres
81
89
92
94
'Curve numbers are computed assuming the runoff from the house and driveway is directed toward the street.
source: USDA-SCS .
8.03 10
Rev. IV93
1"B"I
In accordance with Title 15 NCAC 2H.1000, the Coastal Stormwater Management Regulations, deed
restrictions and protective covenants are required for High Density Residential Subdivisions where
lots Will be subdivided and sold and runoff will be treated in an engineered stormwater control facility.
Deed restrictions and protective covenants are necessary to ensure that the development maintains a
"built upon" area consistent with the design criteria used to size the stormwater control facility.
1,�Ob UA- acknowledge, affirm and agree by my signature below, that
I will cause the following restrictions and covenants to be recorded prior to the sale of any lot:
1. The following covenants are intended to ensure grigoing compliance with State Stormwater
Management Permit NumberSW '70'7 ;. , as issued by the Division of Water Quality
under NCAC 2H.1000.
2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to
maintain compliance with the stormwater management permit.
3. These covenants are to run with the land and be binding on all persons and parties claiming
under them.
4. The covenants pertaining to stormwater may not be altered or rescinded without the express
written consent of the State of North Carolina; Division of Water Quality.
5. Alteration of the drainage as shown on the approved plan may not take place without the
concurrence of the Division of Water Quality. Foy-. tM77RZ 517E ,
6. The maximum allowable built -upon area per lot isles Z& q square feet.6This allotted
amount includes any built -upon area constructed wit in' h the lot property boundaries, and that
portion of the right-of-way between the front lot line and the edge of the pavement. Built upon
area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate,.
coquina and parking areas, but does not include raised, open wood decking, or the water
surface of swimming pools.
OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the
following:
6. The maximum built -upon area per lot, in square feet, is as listed below:
Lot # BUA Lot # BUA Lot # BUA Lot # BUA
This allotted amount includes any built -upon area constructed within the lot property boundaries,
and that portion of the right-of-way between the front lot line and the edge of the pavement. Built
upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate,
coquina and parking areas, but does not include raised, open wood decking, or the water
surface of swimming pools.
7. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be
accomplished through a variety of means including roof drain gutters which drain to the street,
grading the lot to drain toward the street, or grading perimeter sweles to collect the lot runoff
and directing them into a component of the stormwater collection system. Lots that will naturally
drain into th�/Zs"t/z�,
mareenot required to provide these additional measures.
Signature: �Date:
I, Betb_;Simmonat�slyd,y a Notary Public in the
State of North Carolina. County of Craven
do hereby certify that Robert W. Edwards personally appeared
before me this the 19th day of September 20 07 , and acknowledge
thedueexel of the foregoing instrument. Witness my hand and offcR� Splrrrrrr
Signature 3A
NOTARY
My Commission expires April 22, 2009 PUBLIC
p9!'TNI00``w.
L
STORMWATER NARRATIVE
Whitfield Landing - A Planned Unit Development
Neuse Boulevard
New Bern, North Carolina
The Whitfield Landing Subdivision project consists of the development of a 39 unit townhouse
development on 4.96 acres of land located on the eastern side of Neuse Boulevard in New Bern,
Craven County, North Carolina. An access road and public utilities will be extended in to the
property off of Neuse Boulevard to serve the proposed development. Thirty-nine townhouse
units will be developed as presented on the project plans. Parking areas will be provided along
the public street as presented on the project plans.
It is proposed that a total of 72,204 square feet of impermeable surfaces be created associated
with the subdivision. These impermeable surfaces include public roadway, individual parking
areas, building footprints and sidewalks. Considering this impermeable area, the project will be
developed to an overall density of 33.4% necessitating the design and installation of an
engineered stormwater treatment and collection system. Specifically, it is proposed that a
stormwater retention pond be installed on -the subject property. All runoff from impermeable
surfaces will be directed to the forebay areas of the stormwater retention pond. The stormwater
retention pond is designed to receive all runoff associated with the one -inch rainfall event. The
stormwater retention pond is designed to a 90% TSS removal standard, although a dedicated
outlet swale is provided. The stormwater retention pond will discharge through an existing ditch
located on the eastern side of the subject property and ultimately discharging to the former
Martin Marietta quarry lake presently owned by the City of New Bern to the east. A curb and
gutter road cross section will be utilized on this project. Stormwater runoff will occur from the
individual lots towards the street system or through a series of rear lot line swales.
The stormwater system that is proposed for this subdivision will comply with the Coastal
Stormwater Permitting Regulations and also will provide nitrogen removal and runoff
attenuation required to comply with the City of New Bern Stormwater Permitting Program.
^15f
FINANCIAL RESPONSIBILITY/OWNERSHIP FORM
SEDIMENTATION POLLUTION CONTROL ACT
No person may initiate any land -disturbing activity on one or more acres as
form and an acceptable erosion and sedimentation control plan have been c
Land Quality Section, N.C. Department of Environment and Natural Resourcr
the question is not applicable or the e-mail and/or fax information unavailable,
Part A.
1. Project Name Whitfield
- A Planned Unit
JUL 2 3 200
0kfYQ-V,'R0
the Act before this
proved by the
e gr not and, if
in th d
2. Location of land -disturbing activity: County Craven City or NG w�l� >ierin
Highway/StreetNeuse Blvd LatitudeN35°-8,149' Longitude 721
I Approximate date land -disturbing activity will commence: August 1 , 2007
4. Purpose of development (residential, commercial, industrial, institutional, etc.): Residential
5. Total acreage disturbed or uncovered (including off -site borrow and waste areas): 4.96 AC
6. Amount of fee enclosed: $ 250.00 . The application fee of $50.00 per acre (rounded
up to the next acre) is assessed without a ceiling amount (Example: a 9-acre application fee is $450).
7. Has an erosion and sediment control plan been filed? Yes X No Enclosed X
8. Person to contact should erosion and sediment control issues arise during land -disturbing activity:
Name Michael A. Rogers E-mail Address
Telephone 252-636-3500 Cell # 252-571-9236 Fax #
9. Landowner(s) of Record (attach accompanied page to list additional owners):
Michael A. Rogers & Robert Edwards 252-636-3500
Name Telephone Fax Number
1415 Alexander Lane 1415 Alexander Lane
Current Mailing Address Current Street Address
New Bern NC 26562 New Bern NC 28562
City State Zip City State Zip
10. Deed Book No. 2569 Page No. 707 Provide a copy of the most current deed.
Part B.
t. Person(s) or firm(s) who are financially responsible for the land -disturbing activity (Provide. a
comprehensive list of all responsible parties on an attached sheet):
Michael A. Rogers & Robert Edwards
Name E-mail Address
1415 Alexander Lane 11415 Alexander Lane
Current Mailing Address Current Street Address
New Bern NC 28562 New Bern NC 2B562
Cih State Zip City State Zip
Telephone 252-636-3500 . Fax Number
2. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address
of the designated North Carolina Agent:
Name
Current Mailing Address
City State Zip
Telephone
i
E-mail Address
Current Street Address
City State ZIp
Fax Number
(b) If: the Financially Responsible Party is a Partnership or other person engaging in business under an
assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible
Party is a Corporation, give name and street address of the Registered Agent:
Name of Registered Agent
Current Mailing Address
City
Telephone
Zip
E-mail Address ;
Current Street Address I
City State izip
Fax Number
The above information is true and correct to the best of my knowledge and belief and was provided
by me under oath (This form must be signed by the Financially Responsible Person if an individual
or his attorney -in -fact, or if not an individual, by an officer, director, partner, or registered agent with
the authority to execute instruments for the Financially Responsible Person). I agree to provide
corrected information should there by any change in the information provided herein.
Michael A. Rogers & Robert Edwards Owners
v e rWIne Title or Authority
,ignatSyri l _ Da e
I, Beth Simmons , a Notary Public of the County of Craven
State of North Carolina, hereby certify that Michael A. Rogers & Robert Edwards
appeared
personally before me this day and being duly sworn acknowledged that the above form was
executed by him.
Witness``� M 0���'otarial seal, this lY' " day of (vn- 20
a NOTARY Notary
PNINLIC = ✓
My commission expires Aril 22, 200922, 2009
FINANCIAL RESPONSIBILITY/OWNERSHIP FORM
SEDIMENTATION POLLUTION CONTROL ACT
No person may initiate any land -disturbing activity on one or more acres as covered by the Act before this
form and an acceptable erosion and sedimentation control plan have been completed and approved by the
Land Quality Section, N.C. Department of Environment and Natural Resources. (Please type or print and, if
the question is not applicable or the e-mail and/or fax information unavailable, place N/A in the blank.-); a `7%
Part A.
1. Project Name Whitfield Landing — A Planned Unit Development JUL J 0 2UJif,��p� p
2. Location of land -disturbing activity: County Craven City or Township New Bern)WO-�n�yf/P91RO
Highway/Street Neuse Blvd LatitudeN35°-8.149' Longitude W770-5.772'
3. Approximate date land -disturbing activity will commence: August 1, 2007
4. Purpose of development (residential, commercial, industrial, institutional, etc.): Residential
5. Total acreage disturbed or uncovered (including off -site borrow and waste areas): 4.96 AC
6. Amount of fee enclosed: $ 250.00 The application fee of $50.00 per acre (rounded
up to the next acre) is assessed without a ceiling amount (Example: a 9-acre application fee is $450).
7. Has an erosion and sediment control plan been filed? Yes X No Enclosed X
8. Person to contact should erosion and sediment control issues arise during land -disturbing activity:
Name Michael A. Rogers E-mail Address
Telephone 252-636-3500 Cell # 252-571-9236 Fax #
9. Landowner(s) of Record (attach accompanied page to list additional owners):
Michael A. Rogers & Robert Edwards 252-636-3500
Name Telephone Fax Number
1415 Alexander Lane 1415 Alexander Lane
Current Mailing Address Current Street Address
New Bern NC 2a562
City State Zip
New Bern NC
10. Deed Book No. 2569 Page No. 707 Provide a
Part B.
1. Person(s) or firm(s) who are financially responsible for the land -
comprehensive list of all responsible parties on an attached sheet):
Michael A. Rogers & Robert Edwards
Name E-mail Address
Zip�i
t�e-mosfbufPehf deed
JUI_ % ti 'IijO%
bingLAM5t4y�y,i1'i(Prnyid,e4 a
WASHINGTON REGIONAL 10 FHCE
1415 Alexander Lane 1415 Alexander Lane
Current Mailing Address Current Street Address
New Bern NC 28562 New Bern NC ;B562
City State Zip City State Zip
Telephone 252-636-3500 . Fax Number
I i ,
2. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address
of the designated North Carolina Agent:
Name
Current Mailing Address
City
Address
Current Street Address
Zip City
Telephone Fax Number
State
(b) If the Financially Responsible Party is a Partnership or other person engaging in business under an
assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible
Party is a Corporation, give name and street address of the Registered Agent:
Name of Registered Agent
Current Mailing Address
City State Zip
Te
E-mail Address
Current Street Address
Fax Number
State Zip
The above information is true and correct to the best of my knowledge and belief and was provided
by me under oath (This form must be signed by the Financially Responsible Person if an individual
or his attorney -in -fact, or if not an individual, by an officer, director, partner, or registered agent with
the authority to execute instruments for the Financially Responsible Person). I agree to provide
corrected information should there by any change in the information provided herein.
Michael A. Rogers & Robert Edwards
Owners
I, Beth Simmons , a Notary Public of the County of Craven
State of North Carolina, hereby certify that Michael A. Rogers & Robert Edwards appeared
personally before me this day and being duly sworn acknowledged that the above form was
executed by him.
Witness �� t ��,�� .-SON",
SIM 0�;otarial seal, this S day of J 2O t,
NOTARY
o _ Notary
PUBLIC
My commission expires_ April 22, 2009
M
4/s-
�, �'!�. ��.�. � c-•t,-•`br•,r lam y-� cdP U��ca� e�� �/�._
�J
�I '��\ / � (�i kf_
P/! t' �itn�-!/�V�G .��/�c�// L�r�_
y"'I-����lt'-�„i•
LI I Nf TA w/ Its I gr'0"2-.-v�%. S A:; +,
�DD,.rse.. /1
Ltae
This map is compiled on 1974 aerial photography by the U. S. soC
Department of Aurir,,It.,rc c. ;, r,,.,.__.._.:__
ellCA
CAI-Cc�4-4776AIS ES§i
CvH��eFePc( Gyp of�"'� SU3��1v�5�Qti1 = ,sass
C� ✓'�� ram- �� �. Tt- x 3' = 9�'�2
j") AV7r F"A-7rz10 J CO ICU
SMsuyL�(�
� v e,„- .
90
L • fib - -t- r aL
N
#7a�zi'9f,2us �n aWt7-7OA
y
l2—`�-��✓e�.--r-e. �� c�,�e.. r D � cL � �e s.U-.� Gr.-.?�o�L
/ /tee_. C� - V�- �✓ �• �dv�— �J -�� 01 %`?..�-.
CC C`�wP��o c p ���g v� eve,",-
PL
&-�2 or`e, L?✓zov�o( �r,�
Appendices P
U
39, _---IT
Discharge (ft'/sec)
Curves may not be extrapolated.
Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter).
Rev. 12/93
8.06.3
_N
U)
n
M
CL
Q
a
Ott =ds�
2 [mrrZPA 9iS9 l
��
Boa►
o�
o�L
�
C
La
c25/7
Zj
�s ��1
rS'Z�l
cc
1 a
l/
)
,\CW,7n hi r
i
,V wn,7oA
-N,)Iae q;j Lv -vov
-zn r,O-L-
� VA ��
-7\N �3 -9-tm:?�4
A� D1o2
ye
f%_ 9Z%"G,rG'.,,2P
l_.C-�C�!✓� Q Tl'd�-CY�CtJnr.a.i/�% � � a�<,�� �jl.�,ir�' /yrz�
57d (47+1
EA -
15738
%" GIN��Q'•����
Project Summary Report
Project Description
Worksheet
TURFCLUB
Flow Element
Triangular Chan
Method
Manning's For r
Solve For
Channel Depth
Input Data
Mannings Coeffic 0.030
Slope .019000 f tft
Left Side Slope 5.00 H : V
Right Side Slope 5.00 H : V
Discharge 4.79 cis _ C
Results
Depth
0.57 ft
Flow Area
1.6 ft'
Wetted Part"
5.84 ft
Top Width
5.72 it
Critical Depth
0.56 ft
Critical Slope
0.02052.9 fttft—V
Velocity
2.93 ft/s
Velocity Head
ft
Specific Enerc
0.71 ft
Froude Numtx
0.96
Flow Type
Subcritical
Project Engineer: Joseph C. Avolis
c:thaestadVrnw\Iakes at antioch.fm2 avolis engineering, pa FlowMaster v6.0 [614e]
10/30/07 10:27:40 AM ®Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 2 of 2
EROSION AND SEDIMENTATION CONTROL PLAN
Whitfield Landing - A Planned Unit Development
Neuse Boulevard
New Bern, North Carolina
Prepared for:
Mr. Michael Rogers
Mr. Robert Edwards
1415 Alexander Lane
New Bern, NC 28562
Prepared by:
Avolis Engineering, P.A.
P.O. Box 15564
New Bern, NC 28561
(252)633-0068 Office
(252)633-6507 Fax
June 20, 2007
EIULI�
007
LAND QUALITY SECTION
WASHI�ON REGIONAL OFFICE I
—
? 15738
pyNGlt�►E;�� g
i���nu
TABLE OF CONTENTS
1.0 Project Description.............................................................................................................1
2.0 Site Description....................................................................................................................1
3.0 . Adjacent Property...............................................................................................................2
4.0 Soils.......................................................................................................................................2
5.0 Planned Erosion and Sedimentation Control Practices..................................................2
6.0 Schedule of Erosion and Sedimentation Control Activities............................................4
7.0 Maintenance Plan................................................................................................................4
8.0 Vegetation Plan...................................................................................................................5
Appendices
Appendix A Calculations
1.0 PROJECT DESCRIPTION
This project consists of the development of a 39 unit townhome subdivision on 4.96 acres of land
located on the eastern side of Neuse Boulevard in New Bern, Craven County, North Carolina. It
is proposed that a public road and public utility systems be installed to serve the subdivision.
The subject property is located within the Corporate Limits of the City of New Bern and the City
of New Bem Planning Jurisdiction governs the proposed developed.
The subject property is located on the eastern side of Neuse Boulevard, a major traffic corridor in
the City of New Bern. No Section 404 Wetlands exist on the subject property. No Neuse
Riparian Buffer areas or "blue line" stream areas exist on the subject property. The subject
property is abutted along its eastern side by a small strip of land owned by the City of New Bern
which surrounds the large lake that was formed when mining operations ceased in the Martin
Marietta quarry. There is a moderate topographic relief existing on the subject property
occurring in the easterly direction from Neuse Boulevard towards the Martin Marietta quarry.
Stormwater runoff from the proposed development will discharge in an easterly direction and
will be treated through a stormwater retention pond prior to discharging towards the Martin
Marietta quarry through an existing ditch system.
This Erosion and Sedimentation Control Plan addresses land disturbing activities associated with
the installation of the roads and utility systems on site and for the construction of the townhouse
units themselves. It is proposed that the majority of the 4.96 acre parcel be disturbed in order to
make the necessary site improvements. The limits of the disturbance for this project are the
property lines. Considering a total disturbed area of 4.96 acres, a permit fee in the amount of
$250 (5 acres * $50/acre) is included with this permit application.
2.0 SITE DESCRIPTION
The subject property is currently occupied by two residential dwelling and barn and shelter
structures. The property has been utilized for residential purposes over the last 40 to 50 years. It
is proposed that the existing residential development on the property be demolished and that a
new access drive be extended into the property off of Neuse Boulevard. The subject property
abuts Neuse Boulevard, a major traffic corridor in the City of New Bern.
A moderate topographic relief exists on the subject property. Topographic relief is occurring in
an easterly direction from Neuse Boulevard towards the former Martin Marietta quarry lake
located to the east. This abutting property to the east is presently owned by the City of New
,Bern.
No Section 404 Wetland are present on the subject property. Additionally, no Neuse Riparian
Buffer areas or "blue line" stream areas exist on the subject property.
• � I
Stormwater runoff from a section of Neuse Boulevard is occurring along the southeastern
property line in an existing ditch which discharges in an easterly direction. This runoff pattern
will be maintained; although, it is proposed to shift the existing ditch to a point closer to the
property line as indicated on the project plans.
3.0 ADJACENT PROPERTY
The subject property is abutted along its eastern side by property owned by the City of New Bern.
A small strip of land exists between the eastern property line and the surface waters of the lake
formed at the location of a former Martin Marietta quarry. The lake and this small strip of land
are presently owned by the City of New Bern. The subject property is abutted along its northern
side by vacant land. The subject property is abutted along its southern side by residential
development and sparse commercial development occurring along Neuse Boulevard. The subject
property is abutted along its western side by Neuse Boulevard, a major traffic corridor.
It is proposed that Erosion and Sedimentation Control practices be employed during construction
and after construction to control sediment and erosion on the property. Additionally, all
stormwater runoff from the project will be directed to a new stormwater retention pond onsite.
Considering the implementation of these practices, the proposed development is not suspected to
impact surrounding properties in any manner.
4.0 SOILS
The soils on the subject property were observed through the placement of hand augers on the site.
These hand augers revealed a soils to depths of at least four feet to consist of sandy clay loam.
The erosion hazard of this soil is considered to be minor. Considering the moderate existing and
proposed slopes for this project and the soil types present, no significant erosion hazards exist
relative to the soil types present on the property.
5.0 PLANNED EROSION AND SEDIMENTATION CONTROL PRACTICES
Erosion and Sedimentation Control Practices to be utilized on the project include: Land Grading,
Gravel Control Entrance, Grassing, Surface Preparation, Surface Stabilization, Dust Control,
Mulching, Outlet Stabilization, Inlet Protection, Check Dams, Silt Fencing and Stormwater
Retention Ponds. Construction details and specifications for each planned erosion control device
are included on the project plans and are described in this Erosion Control Plan. This Erosion
Control Plan will become part of the construction documents.
5.1 Land Grading
Land Grading will be required on the majority of the subject property. The limits of
disturbance are the property lines. It is proposed that light to moderate grading occur on
the majority of the subject property in order to install the road system, public utility
system and the individual townhome units themselves.
Any off -site material needed to reach the design grades will be obtained from a mining
facility which is permitted through the North Carolina Department of Environment and
Natural Resource's Land Quality Section.
All exposed slopes will be graded 3:1 or flatter and will be fine graded immediately after
rough grading. Exposed soil surfaces will be disced, vegetated and mulched according to
the vegetation plan in order to produce stabilized surfaces.
5.2 Gravel Control Entrance
A gravel control entrance will be constructed at the project entrance off of Neuse
Boulevard as indicated on the project plans. During wet weather, it may be necessary to
wash vehicle tires at this location to prevent the transport of soil onto the adjacent areas.
A detail of the gravel control entrance is included on the project plans. Any soil material
transported onto the adjacent public road will be removed on a daily basis or as needed.
5.3 Grassing
The areas disturbed by this project will be stabilized with grass as specified on the project
plans.
5.4 Surface Preparation
All cut and fill slope surfaces will be lightly roughened by discing prior to vegetating.
The surfaces of the slopes will be left in a loose condition and grooved on the contour.
5.5 Surface Stabilization
Surface stabilization will be accomplished with vegetation and mulching as specified in
the vegetation plan.
5.6 Dust Control
Dust will be controlled on the site by sprinkling should excessive dust be generated
during the course of construction.
5.7 Outlet Stabilization
The outlet areas of all roadway culverts will be stabilized with rip rap aprons. A detail of
these devices are included on the project plans.
5.8 Inlet Protection
Inlet protection will be installed around all drop inlets and curb inlets proposed for the
project. A detail of the inlet protection is included on the project plans.
5.9 Check Dams
Check dams will be installed in outlet swales as a means to slow runoff and trap
sediment. A detail of the check dam is included on the project plans.
5.10 Silt Fencing
Silt fencing will be used at the base of any fill and natural slopes as depicted on the
project plans and along portions of the perimeter of the property in order to protect
adjacent property. The silt fencing will be checked and maintained after every runoff
producing rainfall event. Sediment will be removed from behind the silt fencing when it
reaches a depth of six inches or otherwise shows signs of potential failure. A detail of the
typical silt fence is included on the project plans.
5.11 Stormwater Retention Pond
One stormwater retention pond will be constructed on the site. All surface water runoff
from the development will be directed towards the stormwater treatment pond. The pond
will be installed early in the construction process in order to take advantage of their
ability to trap sediment. Upon completion of construction, the pond will be restored to
their original design depths.
6.0 SCHEDULE OF EROSION AND SEDIMENTATION CONTROL ACTIVITIES
A schedule of Erosion and Sedimentation Control activities is included on the project plans.
7.0 MAINTENANCE PLAN
A maintenance plan for all Erosion Control devices is included on the project plans.
0
8.0 VEGETATION PLAN
A project vegetation plan is included on the project plans.
APPENDIX A
r
►-
CcJyi?'Fi6-LD
Pli� ec - Zlosor,lo f7 a w Pi� e� Gs, fs F d
s7Lr u-4/,dies ovic� aP.rG „GYM
S irs- �A?a;
TUTyt-L -5 /7;F A _ ! (�� 2 I I s F y,
Tal i�rL 1-07 S CTowh �DvN�25) uAj4
TamL Wtrk bw araro SVo LF
Z,w�rMea.l�fe Aytac,,,/
-Eew t b l s (V� ��/-� - 3 a, " i3 s P
26�7 S F
89 ss�
- J2l �cw�. �✓3� C�'"1�u.f�-�J - zoo � s � s �
�72, Zo V Sic /• 6(o 5 .
? 3o f HIJ a Da-,V\sv
� i �
SIZE POND AND ORIFICE:
SITE DATA
TOTAL SITE WATE
3UILDING AREA =
SIDEWALK AREA =
PARKING/DRIVE AREA =
GRASS AREA/POND AREA =
- UPON AREA =
% BUA =
STORMWATER POND
COASTAL STORMWATER DESIGN
WHITFIELD LANDING SUBDIVISION
NEUSE BOULEVARD
NEW BERN, NORTH CAROLINA
AE PROJECT #07021
ACRES
A=
216211 SF
4.96
30,713 SF
0.71
1895 SF
0.04
39596 SF
0.91
144007 SF
3.31
DETERMINE POND SURFACE AREA REQUIREMENT AT PERMANENT POOL
OCCCO Ckll C QAIMA TAQI C
33.4
1
YES
NO
85%TSS REMOVAL WITH 30' VEGATATIVE FILLER
90%TSS REMOVAL FOR WET DETENTION WITHOUT VEGETATIVE FILTER
X
X
SET PERMANENT POOL DEPTH = 8 FT
SAIDA LOW (30%)= 0.8
SAIDA HIGH (40%)
% IMPER(ACTUAL%) = 33.4 %
% IMPERVIOUS LOW = 30 %
INTERPOLATED SAIDA VALUE = 0.90 e- S A
REQUIRED SURFACE AREA = 1,945 SF
APPROXIMATE POND WIDTH = 25 FT
APPROXIMATE POND DIMENSIONS = 25 FT X 75 FT
PERM POOL PROVID9-n^
\!/1LV VL!\IL 1 VIVI\IYI I\VIYVI l
AREA =
SIDEWALK AREA =
PARKING/DRIVE AREA =
GRASS AREA =
POND AREA =
1-INCH VOLUME _ 9,493 FT3
SET PERMANENT POOL LEVEL AT: V STAGE _
DETERMINE POND STAGE RISE ASSOCIATED WITH 1" STORM
1895 SF
39596 SF
135813 SF
C= 0.526
93 FT ELEVATION
C=
C= 0.90
C= 0.90
C= 0.30
C= 1.00
STAGE FT
SURFACE AREA FT2
NCREMENTAL VOL FT'
CUMM. VOL(FT3)
STORM VOL. FT3
-10
0
ERR
ERR
-9
0
0
0
-8
1563
0
0
-7
2082
1823
1823
-6
2637
2,360
4,183
-5
3227
2,932
7,115
-4
3852
3,540
10,655
-3
4512
4,182
14,837
-2
5198
4,855
19,692
-1
5909
5,554
25,246
0
8194
7,052
32,298
0
1
9421
8,808
41,105
8.808
2
10704
10,063
51,168
18,870
3
12045
11,375
36,364
30,245
4
0
0
0
0
5
0
0
0
6
0
0
0
7
0
0
0
8
0
0
0
9
0
0
0
10
0
0
0
CALCULATE 1" STORM RISE
BETWEEN: 93 FT & 94 FT THE STORED RUNOFF =
REMAINING VOLUME TO BE STORED f
BETWEEN: 94 FT & 95 FT INCREMENTAL VOLUME _
RISE ABOVE 95.0 FT CONTOUR = 0.070 FT
q4.v`7
THEREFORE 1" STORM ELEVATION = FT SAY:
STOR'" 982r FT
q 4, j �f
8808 FT3
685 FT3
10063 FT3
DETERMINE ORIFICE SIZE TO DRAW DOWN THE 1" STORM
AVERAGE AVAILABLE ORIFICE HEAD = 0.55 FT
SIZE ORIFICE FOR 3-DAY DRAWDOWN
AVERAGE Q REQUIRED =
(3 DAY DRAW DOWN)
FROM P. III -II OF HRM
BASIC ORIFICE EQUATION
Q =
DISCHARGE(CFS)
CD =
COEFFICIENT (USE 0.6)
A =
ORIFICE AREA (SF) Q=CdA`sgrt(
g =
GRAVITY (32.2 FT/Sz)
h =
DRIVING HEAD FT
0.037 FT3/S
(1,1 F-r; -L -D,55/
SOLVE FOR AREA REQUIRED: A=Q/(CD'sgrt(2gh)= 0.01026 SF
ORIFICE DIAMETER (D) = 0.1143 FT APPROXIMATELY=
TRY A 1.25 I CH DIAMETER ORIFIC =Do Q S E S M k.LK
CHECK ORIFICE SIZE BY ROUTING THE DRAWDOWN OF THE 1"STORM RUNOFF
DISCHARGE TABLE
h(FT)
Q(CFS)
1.1
0.043
1
0.041
0.9
0.039
0.8
0.037
0.7
0.034
0.6
0.032
0.5
0.029
0.4
0.026
0.3
0.022
0.2
0.018
0.1
0.013
0.05
0.009
0.03
0.007
-0.02
0.006
0.01
0.004
0
0.000
1.37 INCHES
D�L. Plcg'-Tb SLbp
F66W .
NOTE: h MEASURED TO CENTER OF ORIFICE
0=(0.6)(PI/4)(Do/12)2sgrt(2'32.2'h)
INITIAL HEAD = 1.10 FT
9
APPROXIMATE 1" STORM DRAWDOWN USING 6 HOUR INCREMENTS
REQUIRED VOLUME = 9,493 FT3 POND HAS 1" STORM VOLUME AT t=-0
TIME ELAPSED HR
h
Q CFS
Qf6 HRS
Qcuem
VOL. REMAINING FT3
0
1.10
9,493
6
1.10
0.043
930
930
8,563
12
0.99
0.041
883
1,812
7,681
18
0.89
0.039
836
2,649
6,844
24
0.79
0.037
789
3,438
6,055
30
0.70
0.034
742
4,180
5,313
36
0.62
0.032
695
4,876
4,617
42
0.54
0.030
648
5,524
3,969
48
0.46
0.028
601
6,125
3,368
54
0.39
0.026
554
6,679
2,814
60
0.33
0.023
506
7,185
2,308
66
0.27
0.021
458
7,643
1,850
72
0.21
0.019
410
8,054
1,439
78
0.17
0.017
362
8,416
1,077
84
0.12
0.014
313
8,729
764
90
0.09
0.012
264
8,993
500
96
0.06
0.010
213
9,206
287
102
0.03
0.007
162
9,368
125
108
0.01
0.005
107
9,474
114
0.00
0.002
41
9,516
(23)
120
0.00
ERR
ERR
ERR
ERR
"NOTE: (ERR) INDICATES THAT THE STORM WATER HAS DRAINED NEARLY LEVEL WITH THE ORIFICE HEIGH'
WHICH WILL BE THE HEIGHT OF THE PERMANENT POOL.
THERFORE THE 1" STORM WATER HAS DRAINED WITHIN THE TIME PERIOD OF 2 - 5 DAYS, AND THE RUNOFF
CONTROL FOR THE POND IS SATISFACTORY.
<-�-tD4-vv\-- c)6u--"yl--s ad� I VNA ftlYt
CC)/
SA/DA - 85$ TSS REMOVAL WITH 30' VEGETATIVE FILTER
% 3.OFT 3.5FT 4.OFT 4.5FT 5.OFT 5.5FT 6.OFT 6.5FT 7.
0
tu%
.9
.8
.7
.6
.5
20%
1.7
1.3
1.2.
1.1
1.0
.9
.8
.7
-300
2.5
2.2
1.9:,
1.8
1.
1.5
1.3
1.2
^-4 0 %
3.4
3.0
;,.2.6.:
�
2.
1.9
1.6
1: 4
50%
4.2
3.7
1-3'
3.0
.7
2.4
2.1
1.8
60%
5.0
4.5
3.8
3.5
3.2
2.9
2.6
2.3
7f70$
.,0
�.8
5.2
4.5
4.1_
�7:
3.1
2.9
2.5
t0$
6.0
5.2
_
4.7
4.2
3.7
3.2____2..7.__.
90$
7.5
6.5
5.8
5.3
'4'.8
4.3
3.8
3.3
100%
8.2
7.4
GA
6.2 5.6
5.0
4.4
3.8
SA/DA
> 9Q$
SS
REMOVAL
FOR
WET
DETENTI-
N WI
UT VEGETATIVE.FILTER
.OFT 3.5-FT 4.OFT 4.5FT 5.
20%
2.4
2.0
30%
3.5
3.0
----.-740%
4.5-
4.0
50%
5.6
5.0
60%
7.0
6.0
70%
8.1
7.0
80%
9.4
8.0
90% 10.7 9.0
100%-'- 12-.0--10.0
.6
.5
1.0
.9 . ; .... .
1.1
1.0
1.5
1.3
2.0
1.6
2.1
1.8
2.2......_
2.0
2.8
2.3---.....-
3.2
2.6
1I/
W
7.5FT'
1.8-
1.7"
1.5
1.4
1.2
1.0
.9
.6.
2.7
2.5
2.2
- 1.9
1.6
1.3
1.1
3.5
3.1
2.8
2.5
2.1
1.8
1.4
4.3
3.9
3.5
3.1
2.7
2.3
1.9
1.5
5.3
4.8
4.3
3.9
3.4
2.9
2.4
1.9
6.0
5.5
5.0
4.5
3.9
3.4
2.9
2.3
'7.0
6:4.
5*7-
5.2
4.6
4.0
3.4.
2.8:
7.9.
7.2
6.5
5.9
5.2
4.6
...3.3-
8:8 :
8:1
7.3
6. 6
- 5.8
5.1
_3..9
4.3.;
.. 3. 6:
rr
FAa
S7j}�2y�L�r�-7�'L l�0 �•Y� �S Sit?1sFt�c7�✓� Si� gY� �u�,
e)S'.Q
-' -. _- `iy/ (I-i t✓ey era R.m�
b 1
-�w VQ-v /�� -�-
Hydrograph Summary Report
F Page 1
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(CIS)
Time
interval
(min)
Time to
peak
(min)
Volume
(cuft)
Return
period
(yrs)
Inflow
hyd(s)
Maximum
elevation
(R)
Maximum
storage
(cam)
Hydrograph
description
1
SCS Ru
9.25
1
722
25,509
1
—
Pre Dev. 1 Year St
2
SCS Run
26.40
1
722
71,827
10
—
Pre Dev. 10 Yr. St
3
SCS Ri noff
12.13
1
723
35,062
1
—
POST Dev. 1 Year S
4
SCS R inoff
27.26
2
724
82,982
10
—
POST Dev. 10 Yr. S,
5
Resery 'r
. 2
1
749
21,020
1
3
94.80
16,894
Post Dev. 1-Yr.' St
6
Resery it
17.55
2
728
72,924
10
4
95.65
25,285
Post Dev. 10-Yr. S
p
T-
2�2c�s
0
Poem
t
Proj. file: 07021_WHITFIELD.G
WIDF file: NEW BERN.IDF
Run date: 06-20-2007
1
1
5 - Reservoir -1 Yr - , p = 2.42 cfs
0 5 10 15 20 25
Time (hrs)
/ Hyd. 3 /
5
�ST �
Imo.
F
(n
CY
1
1
6 - Reservoir; -10 Yr,� Qp = 17.55 cfs
0
0 5
/ Hyd. 4
10
Time (hrs)
15 20 25
/ Hyd. 6
Hydrograph Report
ftge 1 I-5
Hyd.
Pre Dev. 1 Year -Storm
e
= SCS Runoff
Storm frequency
= 1 yrs
Drainage area
= 4.96 ac
Basin Slope
= 0.4 %
Tc method
Total
-
at duration
Storm duration
Peak discharge = 9.25 cfs
Time interval =
1 min
Curve number =
76
Hydraulic length =
580 ft
Time of conc. (Tc) =
3 min
Distribution =
Type III
Shape factor =
484
Hydrograph Discharge Table
Time -- Outflow
Time -- Outflow
Time --
Outflow
(hrs
cfs)
(hm
cfs)
(hm
cfs)
10.47
0.09
16.87
0.27
23.27
0.12
10.67
0.13
17.07
0.26
23.47
0.12
10.87
0.17
17.27
0.25
23.67
0.11
11.07
0.22
17.47
0.23
23.87
0.11
11.27
0.32
17.67
0.22
11.47
0.45
17.87
0.21
11.67
1.16
18.07
0.20
...End
11.87
2.62
18.27
0.20
12.07
8.33
18.47
0.19
12.27
3.55
18.67
0.19
12.47
1.87
18.87
0.19
12.67
1.16
19.07
0.18
12.87
0.98
19.27
0.18
13.07
0.81
19.47
0.17
13.27
0.76
19.67
0.17
13.47
0.72
19.87
0.17
13.67
0.67
20.07
0.16
13.87
0.62
20.27
0.16
14.07
0.57
20.47
0.16
14.27
0.54
20.67
0.15
14.47
0.52
20.87
0.15
14.67
0.50
21.07
0.15
14.87
0.47
21.27
0.14
15.07
0.45
21.47
0.14
15.27
0.42
21.67
0.13
15.47
0.39
21.87
0.13
15.67
0.37
22.07
0.21
15.87
0.34
22.27
0.13
16.07
0.32
22.47
0.13
16.27
0.30
22.67
0.13
16.47
0.29
22.87
0.13
16.67
0.28
23.07
0.12
English
Taal volume = 25,509 cuft
TR55 Tc Worksheet
Page 1
Hyd. No. 1
Pre Dev. 1 Year Storm
Storm frequency = 1 yrs
Sheet Flow
Manning's n-value
Flow length
Two-year 24-hr precip.
Land slope
Travel Time ..................
= 0.011
= 300.0 ft
= 3.70 in
= 3.0 %
= 2.3 min
Shallow Concentrated Flow
Flow length
= 50 ft
Watercourse slope
= 0.5 %
Surface description
= Unpaved
Average velocity
= 1.14 ft/s
Travel Time ........................................ = 0.7 min
Channel Flow
Cross section flow area
= 6.0 sqft
Wetted perimeter
= 12.6 ft
Channel slope
= 1.0 %
Manning's n-value
= 0.030
Velocity
= 3.02 ft/s
Flow length
= 0.0 ft
Travel Time ........................................
= 0.0 min
Total Travel Time, Tc ........................ = 3.0 min
Hydrograph Report
Page 1
15,
yd. NO'
Pre Dev. 10 Yr. Storm
pe
= SCS Runoff
Storm ftequency
= 10 yrs
Drainage area
= 4.96 ac
Basin Slope
= 0.0 %
Tc method
= TR55
Total precip.
= 7.O0 in -
Storm duration-`"-241trs
English
Peak discharge = 26.40 cfs
Time interval =
1 min
Curve number =
76
Hydraulic length =
0 ft
Time of conc. (Tc) =
2.4 min
Distribution =
Type III
Shape factor =
484
Total volume = 71,827 cult
Hydrograph Discharge Table
Time -- Outflow
Time -- Outflow
Time -- Outflow
(hrs
cfs)
(hrs
cfs)
(hrs
cfs)
9.08
0.27
15.48
0.92
21.88
0.30
9.28
0.31
15.68
0.85
22.08
0.31
9.48
0.37
15.88
0.79
22.28
0.30
9.68
0.42
16.08
0.73
22.48
0.30
9.88
0.48
16.28
0.71
22.68
0.29
10.08
0.55
16.48
0.68
22.88
0.29
10.28
0.65
16.68
0.65
23.08
0.28
10.48
0.75
16.88
0.62
23.28
0.27
10.68
0.87
17.08
0.59
23.48
0.27
10.88
0.99
17.28
0.57
11.08
1.18
17.48
0.54
11.28
1.55
17.68
0.51
...End
11.48
1.97
17.88
0.48
11.68
4.74
18.08
0.46
11.88
9.07
18.28
0.45
12.08
20.29
18.48
0.44
12.28
8.83
18.68
0.43
12.48
4.31
18.88
0.43
12.68
2.84
19.08
0.42
12.88
2.36
19.28
0.41
13.08
1.97
19.48
0.40
13.28
1.85
19.68
0.39
13.48
1.72
19.88
0.38
13.68
1.59
20.08
0.37
13.88
1.47
20.28
0.37
14.08
1.35
20.48
0.36
14.28
1.29
20.68
0.35
14.48
1.23
20.88
0.34
14.68
1.17
21.08
0.33
14.88
1.11
21.28
0.32
15.08
1.04
21.48
0.31
15.28
0.98
21.68
0.31
TR55 Tc Worksheet
Page 1 1 c0
Hyd. No. 2
Pre Dev. 10 Yr. Storm
Storm frequency = 10 yrs
Sheet Flow
Manning's n-value
Flow length
Two-year 24-hr precip.
Land slope
Travel Time ....................
= 0.011
= 300.0 ft
= 7.00 in
= 3.0 %
................... = 1.7 min
Shallow Concentrated Flow
Flow length
= 50 ft
Watercourse slope
= 0.5 %
Surface description
= Unpaved
Average velocity
= 1.14 ft/s
Travel Time ........................................ = 0.7 min
Channel Flow
Cross section flow area
= 6.0 sqft
Wetted perimeter
= 12.6 ft
Channel slope
= 1.0 %
Manning's n-value
= 0.030
Velocity
= 3.02 ft/s
Flow length
= 0.0 ft
Travel Time ........................................ = 0.0 min
Total Travel Time, Tc ........................ = 2.4 min
Hydrograph Report
Page 1
_Hyd- No,,..3-__...-__
POST Dev 1 Year Stom
ydroaraph type = SC
S Runoff
Storm frequency = 1 yrs
Drainage area = 4.96 ac
Basin Slope = 0.0 %
Tc method
Total precip. = 3.70.i
Storm duration = hrs
English
Peak discharge = 12.13 cfs
Time interval =
1 min
Curve number =
82
Hydraulic length =
0 ft
Time of conc. (Tc) =
4.7 min
Distribution =
Type III
Shape factor =
484
Total volume = 35,062 cuff
Hydrograph Discharge Table
Time --
Outflow
Time -- Outflow
Time --
Outflow
(hrs
cfs)
(hrs
cfs)
(hrs
cfs)
9.62
0.12
16.02
0.40
22.42
0.16
9.82
0.15
16.22
0.38
22.62
0.16
10.02
0.18
16.42
0.36
22.82
0.15
10.22
0.22
16.62
0.35
23.02
0.15
10.42
0.26
16.82
0.33
23.22
0.15
10.62
0.31
17.02
0.32
23.42
0.14
10.82
0.37
17,22
0.31
23.62
0.14
11.02
0.43
17.42
0.29
23.82
0.14
11.22
0.58
17.62
0.28
11.42
0.76
17.82
0.26
11.62
1.38
18.02
0.25
...End
11.82
3.22
18.22
0.24
12.02
10.41
18.42
0.24
12.22
5.38
18.62
0.23
12.42
3.24
18.82
0.23
12.62
1.57
19.02
0.22
12.82
1.33
19.22
0.22
13.02
1.08
19.42
0.21
13.22
0.98
19.62
0.21
13.42
0.92
19.82
0.20
13.62
0.86
20.02
0.20
13.82
0.79
20.22
0.20
14.02
0.73
20.42
0.19
14.22
0.69
20.62
0.19
14.42
0.66
20.82
0.18
14.62
0.63
21.02
0.18
14.82
0.59
21.22
0.17
15.02
0.56
21.42
0.17
15.22
0.53
21.62
0.16
15.42
0.50
21.82
0.16
15.62
0.46
22.02
0.21
15.82
0.43
22.22
0.16
TR55 Tc Wolrksheet
Hyd. No. 3
POST Dev. 1 Year Storm
Storm frequency = 1 yrs
Sheet Flow
Manning's n-value
Flow length
Two-year 24-hr precip
Land slope
Travel Time ................
= 0.011
= 150.0 ft
= 3.70 in
= 1.0 %
= 2.1 min
Shallow Concentrated Flow
Flow length
= 50 ft
Watercourse slope
= 1.0 %
Surface description
= Paved
Average velocity
= 2.03 ft/s
Travel Time ........................................
= 0.4 min
Channel Flow
Cross section Flow area
= 3.1 sqft
Wetted perimeter
= 6.3 ft
Channel slope
= 0.5 %
Manning's n-value
= 0.030
Velocity
= 2.21 ft/s
Flow length
= 300.0 ft
Travel Time ........................................
= 2.3 min
Total Travel Time, Tc ........................ = 4.7 min
Hydrograph Report
H d.. .-4---__ � _
POST Dev. 10 Yr. Storm N D
pe = SCS Runoff
Storm frequency = 10 yrs
Drainage area = 4.96 ac
Basin Slope = 0.0 a
Tc method 55
Total precip. L= 7.00
Storm duration - �s
Hydrograph Discharge Table
Time -- Outflow Time -- Outflow
(hrs cfs) (hrs cfs)
8.33
0.28
21.13
0.35
8.73
0.37
21.53
0.33
9.13
0.48
21.93
0.31
9.53
0.61
22.33
0.32
9.93
0.74
22.73
0.31
10.33
0.95
23.13
0.29
10.73
1.22
23.53
0.28
11.13
1.61
11.53
2.62
11.93
11.86
...End
12.33
9.22
12.73
3.03
13.13
2.11
13.53
1.84
13.93
1.56
14.33
1.38
14.73
1.24
15.13
1.11
15.53
0.97
15.93
0.83
16.33
0.75
16.73
0.69
17.13
0.63
17.53
0.57
17.93
0.51
18.33
0.48
18.73
0.46
19.13
0.44
19.53
0.42
19.93
0.40
20.33
0.39
20.73
0.37
PaWI
English
�D-V-')
Peak discharge = 27.26 cfs
Time interval =
2 min
Curve number =
82
Hydraulic length =
0 ft
Time of conc. (Tc) =
4.2 min
Distribution =
Type III
Shape factor =
484
Total volume = 82.9a2 cuff
TR55 Tc Worksheet
Page ,
rAW
Hyd. No. 4
POST Dev. 10 Yr. Storm
Storm frequency = 10 yrs
Sheet Flow
Manning's n-value = 0.011
Flow length = 150.0 ft
Two-year 24-hr precip. = 7.00 in
Land slope = 1.0 %
Travel Time ........................................ = 1.5 min
Shallow Concentrated Flow
Flow length
= 50 ft
Watercourse slope
= 1.0 %
Surface description
= Paved
Average velocity
= 2.03 ft/s
Travel Time ........................................ = 0.4 min
Channel Flow
Cross section flow area
= 3.1 sqft
Wetted perimeter
= 6.3 ft
Channel slope
= 0.5 %
Manning's n-value
= 0.030
Velocity
= 2.21 ft/s
Flow length
= 300.0 ft
Travel Time ........................................ = 2.3 min
Total Travel Time, Tc ........................ = 4.2 min
Hydrograph Report Page 1
al
English
Hyd.
P st Dev. 1-Yr. Storm W� I r`
Hy = Reservoir Peak discharge " 2.42
Storm frequency = 1 yrs Time interval
Inflow hyd. No. = 3 Reservoir name = WHITFIELD LANDI
Max. Elevation = 94.80 ft Max. Storage = 16,894 cuft
slom¢e NEicuacn meths ueea.
Total Volume=21,020 cuts
Hydrograph Discharge Table
Time
Inflow
Elevation
Clv A
Chr B Clv C Clv D Wr A Wr B
Wr C Wr D Outflow
(his)
efs
It
cis
cfs cis cfs cis cfs
cfs cfs cis
11.80
3.04
93.50
0.03
- - -- -- --
- - 0.03
12.00
9.00
93.89
0.04
- - - - -
- - 0•04
12.20
5.58
94.56
0.05
- - - 0.27 -
- - 0.32
12.40
3.43
94.79
0.05
- - - 2.17 -
- - 2.22
12.60
1.59
94.79
0.05
- - - 2.17 -
- - 2.22
12.80
1.35
94.75
0.05
- - - 1.76 -
- - 1.81
13.00
1.10
94.72
0.05
- - - 1.44 -
- - 1.49
13.20
0.99
94.69
0.05
- - - 1.21 -
- - 1.26
13.40
0.93
94.68
0.05
- - - 1.07 -
- - 1.12
13.60
0.86
94.66
0.05
- - - 0.97 -
- - 1.02
13.80
0.80
94.65
0.05
- - - 0.88 -
- - 0.93
14.00
0.73
94.64
0.05
- - - 0.81 -
- - 0.86
14.20
0.69
94.64
0.05
- - - 0.74 -
-- - 0.79
14.40
0.66
94.63
0.05
- - - 0.69 -
- - 0.74
14.60
0.63
94.62
0.05
- - - 0.64 -
- - 0.70
14.80
0.60
94.62
0.05
- - - 0.61 -
- - 0.66
15.00
0.56
94.62
0.05
- - - 0.57 -
- - 0.62
15.20
0.53
94.61
0.05
- - - 0.54 -
- - 0.59
15.40
0.50
94.61
0.05
- - - 0.50 -
- - 0.56
15.60
0.47
94.60
0.05
- - - 0.47 -
- - 0.52
15.80
0.43
94.60
0.05
- - - 0.44 -
- - 0.49
16.00
0.40
94.59
0.05
- - - 0.42 -
- - 0.47
16.20
0.38
94.59
0.05
- - - 0.40 -
- - 0.45
16.40
0.36
94.58
0.05
- - - 0.38 -
- - 0.43
16.60
0.35
94.58
0.05
- - - 0.36 -
- - 0.41
16.80
0.34
94.58
0.05
- - - 0.34 -
- - 0.39
17.00
0.32
94.57
0.05
- - - 0.32 -
- - 0.37
17.20
0.31
94.57
0.05
- - - 0.31 -
- - 0.36
17.40
0.29
94.56
0.05
- - - 0.29 -
- - 0.34
17.60
0.28
94.66
0.05
- - - 0.27 -
- - 0.33
17.80
0.26
94.56
0.05
- - - 0.26 -
- - 0.31
18.00
0.25
94.55
0.05
- - - 0.24 -
- - 0.29
18.20
0.24
94.55
0.05
- - - 0.23 -
- - 0.28
18.40
0.24
94.55
0.05
- - - 0.22 -
- - 0.27
18.60
0.23
94.55
0.05
- - - 0.21 -
- - 0.26
18.80
0.23
94.54
0.05
- - - 0.20 -
- - 0.25
Continues on next page...
Post Dev. 1-Yr. Storm Pape 2 / 1
Hydrograph Discharge Table aC C11�
Time
Inflow
Elevation
Clv A Clv B Clv C
Clv D Wr A Wr B Wr C
Wr D Outflow
(hrs)
cfs
It
Cfs Cfs Cfs
Cfs Cfs Cfs Cfs
Cfs Cfs
19.00
0.22
94.54
0.05 - -
- 0.19 - -
- 0.24
19.20
0.22
94.54
0.05 - -
- 0.19 - -
- 0.24
19.40
0.21
94.54
0.05 - -
- 0.18 - -
- 0.23
19.60
0.21
94.54
0.05 - -
- 0.18 - -
- 0.23
19.80
0.20
94.54
0.05 - -
- 0.17 - -
- 0.22
20.00
0.20
94.54
0.05 - -
- 0.17 - -
- 0.22
20.20
0.20
94.54
0.05 - -
- 0.16 - -
- 0.21
20.40
0.19
94.53
0.05 - -
- 0.16 - -
- 0.21
20.60
0.19
94.53
0.05 - -
- 0.15 - -
- 0.20
20.80
0.18
94.53
0.05 - -
- 0.15 - -
- 0.20
21.00
0.18
94.53
0.05 - -
- 0.14 - -
- 0.19
21.20
0.17
94.53
0.05 - -
- 0.14 - -
- 0.19
21.40
0.17
94.53
0.05 - -
- 0.13 - -
- 0.18
21.60
0.16
94.53
0.05 - -
- 0.13 - -
- 0.18
21.80
0.16
94.53
0.05 - -
- 0.12 - -
- 0.17
22.00
0.16
94.53
0.05 - -
- 0.12 - -
- 0.17
22.20
0.16
94.53
0.05 - -
- 0.13 - -
- 0.18
22.40
0.16
94.53
0.05 - -
- 0.13 - -
- 0.18
22.60
0.16
94.53
0.05 - -
- 0.12 - -
- 0.17
22.80
0.15
94.53
0.05 - -
- 0.12 - -
- 0.17
23.00
0.15
94.53
0.05 - -
- 0.11 - -
- 0.16
23.20
0.15
94.52
0.05 - -
- 0.11 - -
- 0.16
23.40
0.14
94.52
0.05 - -
- 0.11 - -
- 0.15
23.60
0.14
94.52
0.05 - -
- 0.10 - -
- 0.15
23.80
0.14
94.52
0.05 - -
- 0.10 - -
- 0.15
24.00
0.00
94.52
0.05 - -
- 0.09 - -
- 0.14
End
Reservoir Report
Page 1
Reservoir No. 1 - WHITFIELD LANDING
Pond Data
Pond storage is based on known contour areas
Stage I Storage Table
Stage Elevation
Contour area
Incr. Storage
Total storage
ft ft
sgft
cuft
cuft
0.00 93.00
8,194
0
0
1.00 94.00
9,421
8,808
8,808
2.00 95.00
10,704
10,063
18,870
3.00 96.00
12,045
11,375
30,245
English
Culvert I Orifice Structures
Weir Structures
[A]
[B]
[C]
[D]
[A]
[B]
[C]
[D]
Rise in
= 1.3
0.0
0.0
0.0
Crest Len ft
= 4.7
0.0
0.0
0.0
Span in
= 1.3
0.0
0.0
0.0
Crest El. ft
= 94.50
0.00
0.00
0.00
No. Barrels
= 1
0
0
0
Weir Coeff.
= 3.00
0.00
0.00
0.00
Invert El. ft
= 93.00
0.00
0.00
0.00
Eqn. Exp.
= 1.50
0.00
0.00
0.00
Length ft
= 1.0
0.0
0.0
0.0
Multi -Stage
= No
No
No
No
Slope %
= 1.00
0.00
0.00
0.00
N-Value
= .013
.000
.000
.000
Orif. Coeff.
= 0.60
0.00
0.00
0.00
Multistage
= -
No
No
No
Tailwater Elevation =
0.00 ft
Nola: All oWlo have Oeen analyzed, m Inlet end eWM mntel.
Stage I Storage I Discharge Table
Stage
Storage
Elevation
Clv A
Civ B Clv C Clv D Wr A Wr B Wr C
Wr D Discharge
ft
cuft
ft
cfs
cis cis cfs cis cfs cis
cis cis
0.00
0
93.00
0.00
- - - 0.00 - -
- 0.00
1.00
8,808
94.00
0.04
- - - 0.00 - -
- 0.04
2.00
18,870
95.00
0.06
- - - 5.00 - -
- 5.06
3.00
30,245
96.00
0.07
- - - 25.97 - -
- 26.04
a?
Hydrograph Report per,
English
Hyd. No. 6
Post Dev. 10-Yr. Storm LA)
Hydrograph type,= -Resew ' Peak discharge 55 c
Storm frequen ' = 10 yrs Time interval - min
Inflow hyd. No. - Reservoir name = WHITFIELD LANDI
Max. Elevation = 95.65 ft Max. Storage = 26,285 cult
Storage as ication method used.
Total VOlurne = 72,924 tuft
Hydrograph Discharge Table
Time
Inflow
Elevation
Clv A
Clv B Civ C Civ D Wr A Wr B
Wr C Wr D Outflow
(hm)
cis
ft
cfs
efs cfs cis cis cfs
cis cis cis
12.00
20.27
95.20
0.06
- - - 8.25 -
- - 8.31
12.40
7.57
95.37
0.06
- - - 11.39 -
- - 11.45
12.80
2.86
94.96
0.06
- - - 4.42 -
- - 4.48
13.20
2.07
94.82
0.05
- - - 2.55 -
- - 2.61
13.60
1.79
94.77
0.05
- - - 1.99 -
- - 2.04
14.00
1.51
94.74
0.05
- - - 1.66 -
- - 1.71
14.40
1.36
94.71
0.05
- - - 1.42 -
- - 1.47
14.80
1.22
94.70
0.05
- - - 1.26 -
- - 1.32
15.20
1.08
94.68
0.05
- - - 1.14 -
- - 1.19
15.60
0.95
94.67
0.05
- - - 1.01 -
- - 1.06
16.00
0.81
94.65
0.05
- - - 0.87 -
- - 0.93
16.40
0.74
94.64
0.05
- - - 0.76 -
- - 0.81
16.80
0.68
94.63
0.05
- - - 0.69 -
- - 0.74
17.20
0.62
94.62
0.05
- - - 0.62 -
- - 0.67
17.60
0.56
94.61
0.05
- - - 0.56 -
- - 0.61
18.00
0.50
94.61
0.05
- - - 0.50 -
- - 0.55
18.40
0.47
94.60
0.05
- - - 0.45 -
- - 0.50
18.80
0.45
94.60
0.05
- - - 0.43 -
- - 0.48
19.20
0.44
94.59
0.05
- - - 0.41 -
- - 0.46
19.60
0.42
94.59
0,05
- - - 0.40 -
- - 0.45
20.00
0.40
94.58
0.05
- - - 0.38 -
- - 0.43
20.40
0.38
94.58
0.05
- - - 0.36 -
- - 0.41
20.80
0.36
94.58
0.05
- - - 0.34 -
- - 0.39
21.20
0.35
94.57
0.05
- - - 0.32 -
- - 0.37
21.60
0.33
94.57
0.05
- - - 0.31 -
- - 0.36
22.00
0.31
94.56
0.05
- - - 0.29 -
- - 0.34
22.40
0.32
94.57
0.05
- - - 0.30 -
- - 0.35
22.80
0.30
94.56
0.05
- - - 0.28 -
- - 0.33
23.20
0.29
94.56
0.05
- - - 0.27 -
- - 0.32
23.60
0.28
94.56
0.05
- - - 0.25 -
- - 0.30
24.00
0.26
94.55
0.05
- - - 0.24 -
- - 0.29
...End
Reservoir Report
Page ,
English
Reservoir No. 1 - WHITFIELD LANDING
Pond Data
Pond storage is based on known contour areas
Stage / Storage Table
Stage Elevation Contour area Incr. Storage Total storage
ft ft sgft cuft
cult
0.00 93.00 8,194 0
0
1.00 94.00 9,421 8,808
8,808
2.00 95.00 10,704 10,063 18,870
3.00 96.00 12,045 11,375 30,245
Culvert / Orifice Structures
Weir Structures
[A] [B] [C] [D]
[A]
[B]
[C] [D]
Rise in = 1.3 0.0 0.0 0.0
Crest Len ft = 4.7
0.0
0.0 0.0
Span in = 1.3 0.0 0.0 0.0
Crest El. ft = 94.50
0.00
0.00 0.00
No. Barrels = 1 0 0 0
Weir Coeff. = 3.00
0.00
0.00 0.00
Invert El. ft = 93.00 0.00 0.00 0.00
Eqn. Exp. = 1.50
0.00
0.00 0.00
Length ft = 1.0 0.0 0.0 0.0
Multi -Stage = No
No
No No
Slope % = 1.00 0.00 0.00 0.00
N-Value = .013 .000 .000 .000
Orif. Coeff. = 0.60 0.00 0.00 0.00
Multi -Stage = - No No No
Tailwater Elevation =
0.00 ft
Note: All a Ims have bean analym! un r Intl entl ouual coniml.
Stage I Storage / Discharge Table
Stage Storage Elevation Clv A Civ, B Clv C Civ D Wr A Wr B
Wr C
Wr D Discharge
ft cuft ft cfs cfs cfs
cfs cfs cfs
cfs
cfs cfs
0.00 0 93.00 0.00 - -
- 0.00 -
-
- 0.00
1.00 8,808 94.00 0.04 - -
- 0.00 -
-
- 0.04
2.00 18,870 95.00 0.06 - -
- 5.00 -
-
- 5.06
3.00 30,245 96.00 0.07 - -
- 25.97 -
-
- 26.04
,�,5
mid
n
/-,L--)• I = ca
=s-
0
,,,..ems 114-91 % I'�'� - fs�d -J1711--
y;� =(�)
r
O TLET PIPE TO PON
Worksheet for Circular Channel
Project Description
Worksheet
Circular Channel
Flow Element
Circular Channel
Method
Manning's Formu
Solve For
Full Flow Diamete
Input Data
Mannings Coeffic 0.013
Slope 01670 t
Discharge f 27.26 d_.
Results
Depth
1.96 It
Diameter
23 in
Flow Area
_
3.0 ft'
Wetted Perime,
0.00 It
Top Width
0.00 ft
Critical Depth
1.80 It
Percent Full
100.0 %
Critical Slope
014472 iVft
Velocity
9.14 1113
Velocity Head
1.30 ft
Specific Energ)
3.25 ft
Froude Numbe
0.00
Maximum Disci
29.32 cis
Discharge Full
27.26 cfs
Slope Full
016700 f tft
Flow Type
NIA
Project Engineer: Joseph C. Avolis
c:%haestedVmwt06149 Wastport.fm2 avolie engineering, ps FlowMaster 16.0 161461
05/20/07 03:44:00 PM 0 Heeated Methods, Inc. 37 Brookside Road Waterbury. CT 06708 USA (203) 755-1666 Page 1 of 1
V
Table 0.03b
Runoff Curve Numbers (CN)
Hydrologic Soil Gro p
A
B/ ,
C
D
Land Use/Cover
Cultivated land
without conservation
72
81
88
91
with conservation
62
71
78
81
Pasture land
poor condition
68
79
86
89
lair condition
49
69
79
84
good conddion _
39
61
74
80
Meadow
good condition
30
58
71
78
Wood or forest land
Thin stand • poor cover, no mulch
45
66
77
83
Good stand - good cover
25
55
70
77
open spaces, lawns, parks, gob courses, cemeteries, etc.
good condition:
grass cover on 75"/
j'
or more of the area
39
6
74
80
lair condition:
grass cover on 50
to 7501. of the area
49
69
79
84
Commercial and business
areas (85% impervious)
89
92
94
95
Industrial districts
{72%impervious)
81
88
91
93
Residential:' Development completed and vegetation established
Average lot size Average% Impervious
1/8 acre or less 65
77
85
90
92
1/4acre 38
61
75
83
87
1r3 acre 30
57
72
81
86
12 acre 25
54
70
80
85
1 acre 20
51
68
79
84
2 acre 15
47
66
77
81
Paved parking lots, roofs,
driveways, etc.
98
986
98
98
Streets and roads
paved with curbs and
stone sewers
gravel
98
76
98
85
98
89
98
91
dut
72
82
87
89
Newly graded area
81
89
93
95
Residential: Development underway and no vegetation
Lot sizes of 1/4 acre
88
93
95
97
Lot sizes of 12 acre
85
91
94
96
Lot sizes of 1 acre
82
90
93
95
Lot sizes of 2 acres
81
89
92
94
'Curve numbers are computed assuming the runoff from" house and driveway is directed toward the street.
source: USDASCS .
8.03 10
Rev. V193