Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW7070616_HISTORICAL FILE_20070723
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT. NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE �Z( (! YYYYMMDD McDAVID ASSOCIATES, INC. Engineers • Planners • Land Surveyors CORPORn9-E OFFICE (252)753-2139• Fm (252) 753-7220 E-mail: oai@o cda,id-ioc.coto 3714 N. Main Street • EO. Drawer 49 Farmville, NC 27828 July 20, 2007 Mr. Scott Vinson, Environmental Engineer Division of Water Quality Washington Regional Office 943 Washington Square Mall Washington, NC 27889 SUBJECT: Dear Mr. Vinson: GOLDSBORO OFFICE (919) 736-7630 • F:ix (919) 735-7351 E-mail: maigold@mcdavid-inc.com 109 17. Wnlnut Street • EO. Box 1776 Goldsboro, NC 27533 JUL 2 3 /I'll! DWQ-W-AFRO Stormwater Review SW7070616 Carver Machine Works Beaufort County In reference to the subject project and in response to your July 17, 2007 correspondence (Vinson to Crisp), the following paragraphs serve as itemized responses to your request for additional information: Please find enclosed one (1) revised copy of calculations (within narrative). Per your instruction, storage volume has been increased to accommodate a 2" rainfall event within the defined drainage area. 1 have used your runoff volume calculations to demonstrate that storage can be provided in excess of 16,002 cf. 2. Reference enclosed calculations in the updated narrative, calculations are provided for determining volume provided in the infiltration basin structure. Dimensions noted in the calculations are consistent with the revised plan sheet. 3. Please find enclosed two (2) revised plan sheets showing the site plan to include the infiltration basin. 4. Reference calculations, drawdown time has been revised based on the increased storage volume provided. Note that drawdown is between the 2-5 day threshold (2.37 days computed). 5. Please note that provided calculations and two (2) copies of revised site plan have been signed, sealed, and dated. W:\D I Oxx_gen\D I OOx_mew\D1005_coacs_msw\I2BM\2007\carver-mach-dwq-permit-resp-070720.doc 1 7/20/2007 Thank you for your assistance. Please advise as I may provide additional information for your review. Sincerely, McDAVID ASSgCIATES, INC. Richard Boore, P.E. m Farville Office Enclosures RBM/rbm Cc: Lindsey Crisp Tom LaBarbera (w/encl.) WAD I Oxx_gcn\D I OOx_msv\D 1005_comes_msw\RB M\2007\carver-mac h-dwq-permit-resp-070720.doc Stormwater Narrative Coastal Plain of the Tar -Pamlico River Basin Carver Machine Works — Building Addition Revised July 20, 2007 Background Existing site is a 7.5 acre tract where existing soil is classified as Tarboro sand (based on "Soil Survey of Beaufort County, North Carolina") with a slope less than 2%. Pre -development condition of the site is a developed property consisting of several buildings, gravel parking/access and a large pond that does not have an outlet to a downstream surface water. The goal of the project is to construct a new 50,000 square foot building and additional gravel transportation facilities to provide an expansion of current business activities. The existing site consists of existing buildings and gravel parking facilities and travel ways. Proposed improvements will include paving of one (1) existing gravel area and placement of concrete over another densely -packed gravel area. The new building will require demolition of an existing small shelter and an existing concrete pad. For the purposes of stormwater management, proposed paving is not expected to increase impervious area, nor is proposed concrete to be placed between the existing office structure and new facility (due to existence of near -impervious packed gravel in areas) A stormwater system consisting of shallow grass swales and an infiltration basin is proposed to provide treatment and storage for new impervious areas proposed by development activities. Stormwater Management Stormwater rules require that facilities be provided that are capable of treating the first inch of rainfall. Stormwater flow on the existing site is separated by existing buildings. Proposed improvements will drain into an infiltration basin which will provide storage prior to discharge into the on -site pond. For determining required storage of the proposed infiltration basin, the change in built upon area is used along with the total site acreage. Note that the proposed 50,000 sf building will not be total additional built upon area. In order to construct the new building, several current built upon areas will be demolished (existing maintenance building and large concrete storage pad). The net difference in increased built upon area resulting from the project is 0.69 acres. The following table summarizes storage volume requirements: Drainage Area sf 170,000 Proposed Built Upon Area sf 97,237.20 Runoff Value 0.5648 1" Storage Requirement cf 8,001.33 2" Storage Requirement cf 16,002.67 Storage Volume Provided cf 17,766.00 Runoff value is calculated using the following equation: Rv = 0.05 + 0.009(I), where I is the computed percentage (change) of impervious area (57.2.100). W W:\D I Oxx_gen\D I OOx_msw\D 1005_corres_msw\RBM\2007\carver-mach-bcauf-co-sw-nar-070720.doc 1 7/20/2007 \\��11111C111/ l y��i a $FAL Required volume is computed using the following equation: 20205 Volume = (Design rainfall, inches) x (Rv/12) x (Drainage area, square feet). R'�GiNE�ooQ�,ti V(1") = (1")x(.5648/12)x(170,000) = 8,001.33 cf 4���RD B V(2") = (2")x(.5648/12)x(170,000) = 16,002.67 cf Based on current rules, a bypass mechanism is required for stormwater flow beyond the first inch of rainfall. If storage is provided for the 2" rainfall event, bypass facilities are not required. Storage is computed by multiplying the surface area of stormwater structures by the pooling depth represented by the thickness of stone filter in the infiltration basin. Storage provided is a minimum two (2') feet above the SHWT. The proposed infiltration facility provides sufficient storage to meet the 2" rainfall event such that no bypass facilities are provided. Note that the existing pond has no outlet to a downstream surface water such that technically, all stormwater is treated well beyond Tar -Pamlico River Basin requirements. Infiltration Basin Dimension Calculations The proposed infiltration basin has a vertical bottom dimension of 60 feet in proximity to the on -site pond. At a 90 degree angle along the eastern property line, the bottom dimension is 117 feet. Perpendicular to the side dimension, the basin continues westward at 7 feet (bottom dimension). A hypotenuse connects the interior of the basin at a dimension of 120 feet. The interior side slope of the basin is 3:1 with an effective depth of 3 feet. Storage volume can be calculated by dividing the structure into a triangle (bottom dimension 53' x 117' that includes the hypotenuse) and a rectangular structure with a bottom dimension of 7' x 117'. Accounting for the 3:1 slope, the following is a calculation of volume: V = [% (53 + 9)(117 + 9) + (7 + 9)(117 + 9)] x 3' depth = 17,766 cf Drawdown Calculations In accordance with stormwater regulations, an infiltration structure must dewater within 2 to 5 days. Dewatering time is computed using the following equation: 2 KA T= — V Where T = dewatering time (days) A = infiltrating area (sf) K = hydraulic conductivity of soil (in/hr) V = volume of water requiring infiltration (cf) The proposed 17,766 cf infiltration basin has an odd geometric shape. Area in the equation is defined as the bottom surface area or''/2 of the total wetted wall area. For the proposed basin, the bottom surface area is 3,510 sf. Area soil is identified as Tarboro sand which has a relatively high rate of conductivity. It is proposed that the bottom and interior side slopes of the infiltration basin will have a grass cover. It is W:\D I Oxx_gcn\D I OOx_msw\D 1005_corres_msw\R9M\2007\carver-mach-bcauf-co-sw-nar-070720.doc 2 7/20/2007 assumed that with a grass cover, the hydraulic conductivity will be approximately 6 in/hr. Based on a provided volume of 17,766 cf, dewatering time is calculated as,(p�19YYi�� T = (2)-(6)`(3,510)/ (17,766) Q` •''' CARp T = 2.37 days •a A - Proposed drawdown is within the allowable 2-5 day requirement. _ 20205 Design Storm �IIND ��+ �VG Zz- 1 � •0� � Tar-Pamlico River Basin regulations require treatment of storr4i JMt flows represented by the 1 year, 24 hour storm event. For Beaufort County, the estimated 1 year, 24 hour rainfall is approximately 3.2 inches (per Beaufort County Stormwater Ordinance). Site Development Existing impervious area is not included in proposed treatment/storage calculations. The net change in impervious area on the site amounts to approximately 1.27 acres represented primarily by the new 50,000 square foot building. The site has been divided into 3 catchment areas based on the level of treatment being provided to stormwater within the 3 areas. Offsite drainage is not an issue as the property and adjacent properties are basically flat such that no offsite drainage impacts the property. 3.2 inches of rainfall over a 24 hour period equates to a runoff rate of approximately 1 cubic feet per second (cfs). Stormwater treatment facilities must be capable of conveying this 1 year storm event. Treatment of the 1 year storm event is proposed to be accomplished through 3 catchment areas Stormwater will be treated by a combination of grass swales and bioretention facilities. Per Beaufort County's stormwater ordinance, time of concentration is computed using the following formula: 0.385 LI 'T, =�H/ 128 Where: L = hydraulic length of the watershed in feet = the length of the longest flow path from the most remote point on the watershed ridge to the outlet H = the elevation difference, or fall, in feet along the hydraulic length Rainfall intensity is computed using the following formula: WAD10xx_gcn\DIOOx_mew\DI005 corres_msw\RBM\2007\carver-mach-beau(-co-sw-nar-070720.doc 3 7/20/2007 S h+T Where:l is the rainfall intensity in inches per hour g and h are empirically derived constants T is the duration in minutes set equal to the time of concentration For Beaufort County, the values for g and h for the 1-year storm are 112 and 20, respectively. Based on Beaufort County's formula, pre -development and post -development flows can be computed, summarized as follows: Pre -development Acreage Max length travel (feet) Change in height over outlet (ft) c factor Post -development Acreage Max length travel (feet) Change in height over outlet (ft) Slope Time for concentration (Tc) c factor 7.5 250 5 0.36 7.5 450 6 1.00% 4.56 0.43 acres ft ft acres ft ft min Compute c factor Acreage c Impervious area 2.36 0.7 Non -impervious area 5.15 0.3 Computed average 0.43 Pre Development Post Development Max Length Travel, L 250 450 Height remote point over outlet, H 5 6 Runoff Coefficient, C 0.36 0.43 Time of Concentration (computed) 2.47 4.55 Intensity, (computed) 4.98 4.56 Flow (computed) 13.45 14.71 •a EA t. _ 20205 %7 ZUIY,*7 11!p WON Storage is computed by taking the difference in pre -development and post -development flows and multiplying by pre -development rainfall intensity. Note that the difference in peak flow is less than 10% such that storage is not a requirement. Storage = (14.71-13.45) (4.56 in/hr) (60s/min) W:\D I Oxx_gcn\D I OOx_msw\D 1005_corres—msw\Rn M\2007\carver-mach-bcauf-co-sw-nar-070720.doc 4 7/20/2007 e . Storage = 344.74 cubic feet Actual storage provided in the infiltration basin is summarized as follows: The proposed infiltration basin is a three (T) feet deep facility of differing geometry with an interior side slope of 3:1. Total volume of the facility is 17,766 cubic feet. Based upon post -development built upon area, a two (2") inch rainfall event requires a combined storage of 17,766 cubic feet. The proposed facility has been sized to accommodate the two (2") inch rainfall event in an effort to avoid having to install bypass drainage facilities. fllili!1\!\, WAD I Oxx_gcn\D I OOx_msw\D 1005_comcs_msw\RBM\2007\carver-mach-bcauf-co-sw-nar-070720.doc 5 7/20/2007 CF W ATF9 O C Mr. Lindsey A. Crisp, President Carver Machine Works 129 Christian Service Camp Rd. Washington, NC 27889 Dear Mr. Crisp: Michael F. Easley, Governor William G. Ross Jr., secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality July 17, 2007 Subject: Stormwater Review SW7070616 Carver Machine Works 2007 Expansion Beaufort County This office received a Coastal Stormwater permit application and plans for the subject project on June 20, 2007 with additional information received on July 10, 2007. A preliminary review of the project indicates that before a State Stormwater permit can be issued the following additional information is needed. I ) The required volume was still incorrectly calculated based on a "percent change" of impervious area within the overall drainage area of the infiltration basin. Using the Simple Method to calculate the 1" rain volume for the 170,000sf drainage area, with corresponding 97,237sf of impervious area, the resulting minimum 1" volume is 8,001cf. (2" vol. = 16,002cf) Please see attached example calculation. Note that the existing impervious area runoff does not have to be treated in the infiltration basin if the runoff can be diverted away from the basin. If the runoff can not be diverted away from the basin, then it has to be included within the minimum volume calculations. 2) The provided volume of 7,255cf is stated, but there are no calculations showing how this volume was determined. Please provide these calculations or methods in determining the provided volume. 3) Only 1 revised plan sheet was provided. There needs to be 2 copies of any revised plan sheets so that one copy can remain on file with the Division and one copy can be approved and sent with the permit once issued. 4) Please just note that for infiltration systems, the drawdown of the design storm can be quicker than 2 days, but cannot be longer than 5 days. (The wet detention pond design requires a 2-5 day drawdown.) 5) Please remember to seal, sign & date any revised calculations and 2 sets of plan sheets. The above requested information must be received in this office prior to July 25, 2007 or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address. No-Cafo ural'� Mh. North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service Internet: h2o.enratate.nc.us 943 Washincton Souare Mall. Washinvon. NC 27899 1-877-623-6748 You should also be aware that the Stormwater Rules require that the permit be issued prior to any development activity. Construction without a permit is a violation of 15A NCAC 2H.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to $10,000 per day. Please reference the Stormwater Project Number above on all correspondence. If you have questions, please feel free to contact me at (252) 948-3848. Sincerely, Scott Vinson Environmental Engineer Washington Regional Office cc: Richard B. Moore, PE — McDavid & Associates John Weeks (email copy only) Washington Regional Office nor' �(l. t cb �n b�1 v l o Cis g h l-0, 11 r p Sc,o _ Carver Machine Works Subject: Carver Machine Works From: <rbm@mcdavid-inc.com> Date: Mon, 23 Jul 2007 15:18:11 -0400 To: "Scott Vinson" <Scott. Vinson@ncmail. net> Mr. Scott Vinson NC DEN - Division of Water Quality Scott: Reference the subject, I mailed revisions per your last comments on Friday. You should receive them today. I left instructions to have the package sent via UPS so we could track the delivery. The package was sent via US mail. I have had someone in our office try to contact you today to check to see if you received my response. I have been told that your voice mail confirms that you are going to be out of the office the rest of the week. Please advise if my submittal reached your office today. Recognizing that July 25th was my deadline, I will have a second copy hand -delivered, if necessary. Thanks for your assistance. Please advise as I may provide any additional information for your review. Richard B. Moore, P.E. McDavid Associates, Inc. Tel: (252) 753-2139 Fax: (252) 753-7220 1 of 1 7/23/2007 4:09 PM Re' Carver Machine Works Add.Info Request Subject: Re: Carver Machine Works Add.Jnfo Request From: "Scott. Vinson@ncmail.net" <Scott.Vinson@ncmail.net> Date: Thu, 19 Jul 2007 15:43:42 -0400 (EDT) To: <rbm@mcdavid-inc.com> CC: Lindsey Crisp <Icrisp@cmwglobal.com>, Tom LaBarbera <tlabarbera@cmwglobal.com> R 4, A Robert, I'm sorry for any miscommunication we might have had. There has to be at least one treatment system that meets it's individual design requirements. The only runoff that is required to be treated is from the new impervious area. If the existing impervious runoff is not proposed to be routed around the treatment system, and it drains into the system, then it has to be fully accounted for in the sizing of the system. The pond can be used as a treatment system for the new developement if it is retrofitted to meet all current design requirements, ie forebay, vegetated shelf, outlet structure, etc. If the infiltration basin is to be permitted as the sole treatment system, then it has to meet it's design requirements. For both systems to be used & permitted as the treatment system, (and neither individually meeting all their design requirements) is not typically considered, however I am willing to discuss this with the rest of our stormwater staff Monday morning if they are available. It would be preferred to base the sizing calculations for the infiltration basin on the actual drainage area proposed to drain into the basin, no change in impervious or credits can be considered if the infiltration basin is the only system that is proposed to be permitted. If the application & permit does not cover any aspect of the pond, then there can be no allowance considered because there would be no permit control over the pond. It could be filled or drained sometime in the future if it is not covered in the permit. I out of the office today and will not be back in until Monday morning. If you have any more questions, please call or write and I will respond Monday. Again, sorry for any confusion. Take care, Scott I of 1 7/23/2007 1 L43 AM McDAVID ASSOCIATES, INC. INC. Engineers • Planners • Land Surveyors CORPOIttvrE OFFICE GOLDS130RO OFFICE (252)753-2139• Fax (252) 753-7220 (919)736-7630• Fax (919) 735-7351 E-mail: mai@mcdavid-inccom I mail: maigold@mcdavid-ine.com 3714 N. Main Street • P.O. Drawer 49 109 E. Walnut Street • P.O. Box 1776 Farmville, NC 27828 Goldsboro, NC 27533 July 6, 2007 REGEUVED Mr. Scott Vinson, Environmental Engineer JUL 1 0 20G7 Division of Water Quality Washington Regional Office �p� ant 943 Washington Square Mall DWQ-WAR® Washington, NC 27889 SUBJECT: Stormwater Review SW7070616 Carver Machine Works Beaufort County Dear Mr. Vinson: In reference to the subject project and in response to your July 2, 2007 correspondence (Vinson to Crisp), the following paragraphs serve as itemized responses to your request for additional information: 7 1. Please find enclosed one (1) revised copy of calculations (within narrative). Per your instruction, volume is calculated based on the built upon area impact of the proposed project. Note that the additional built upon area (impervious area) takes into account proposed demolition of two (2) existing impervious surfaces on the site represented by a machine finishing building and concrete slab. A single drainage area is shown where all catchment areas have been combined. 2. Reference enclosed calculations in the updated narrative, drawdown calculations are shown based on stormwater design manual guidelines. ✓3. Please note that all provided calculations are signed, sealed and dated. ✓ 4. Please find enclosed a revised page 2 of 4 of Form SWU-101. Under Section III, item 3 has been corrected to reflect the total property acreage. Item 4 has been revised to reflect the percentage of built upon area resulting from the proposed activities as a comparison to the total property acreage. Item 6 has been revised to reflect two (2) tables that show the differences between the total site and the proposed drainage area. All area figures are shown in square feet where not otherwise required. / 5. Please Find enclosed one (1) copy of a revised sheet 1 of the site plan. The delineated drainage area has been corrected to show the flow from '/2 of the roof area of the existing office. Labeling of the drainage area has been corrected. 6. Please find enclosed one (1) copy of a revised page 2 of Form SWU-103. The following information addresses each initial item: W:\D I Oxx_gen\D I00x_msw\D 1005_corres_msw\RnM\2007\carver-mach-dwq.permit-resp-070709.doc 1 7/9/2007 a. The infiltration basin is located in excess of 50 feet from any class SA water and excess of 30 feet from any other surface water. Note that the on -site pond is not currently classified as a surface water. It is confined to the property and has no outlet. b. The infiltration basin is located in excess of 100 feet from any water supply well. The area is provided central water from the Beaufort County Regional Water System. c. The bottom of the infiltration basin is proposed at an elevation of 7.0 feet. The seasonal high water table has an elevation of 5.0 feet. The bottom of the basin is at least 2 feet above the seasonal high water table. d. There is no bedrock or impervious soil horizon within 3 feet of the bottom of the proposed infiltration basin. e. The proposed infiltration basin is not sited on or in fill material. f. The infiltration basin is not located in a defined ease r lent. Please advise if any separate agreement is needed. C p ^ I1 &1V114_1V_ g. The drainage area of the proposed infiltration basin is less than 5 acres. h. Soils are classified as Tarboro sand. The published minimum hydraulic conductivity of Tarboro sand exceeds 0.52 inches per hour. i. The infiltration basin is sized to capture runoff form the first 2 inches of rainfall based on the proposed additional built upon area. Design volume and calculations are provided in a revised narrative. j. No additional build -out on the drainage area is proposed. The proposed improvements represent the perceived maximum built -out. The infiltration basin is sized to accommodate storage to the proposed project. k. Reference plan sheet for details of the infiltration basin and grass swales. All side slopes are proposed to have vegetative cover with slopes of 3:1. I. A grass Swale is provided to provide pretreatment of stormwater flow. m. Reference the plan sheet for a detail of the infiltration basin. A proposed 6" clean sand layer is proposed in the bottom of the structure. — n. No vegetated filter overflow is proposed. The volume of th1e infiltration bassin`i'sp� capable of capturing the 2" rainfall event. No{. v oj) b,,f 4 4yef o"-t w o. Natural infiltration is proposed as the me.od of flow distribution. In the event "Pif of a rainfall event in excess of the 2" rainfall, the basin has an overflow wier that includes a rip -rap apron that will reduce dissipate flow and distribute it into the on -site pond. p. Reference the plan sheet for a detail of the infiltration basin. A staff gauge is proposed and note added for benchmark for required cleaning of the structure. _ q. Any runoff in excess of the design volume will bypass flow directly into the non - discharge pond located on the property. r. Reference the revised narrative for draw down calculations demonstrating that draw down will occur in approximately 2 days. s. Plans ensure that the installed infiltration basin will meet design specifications. ✓7. Reference the enclosed revised plan sheet, the infiltration basin bottom contour elevation has been labeled consistent with the profile view. 8. Reference the enclosed revised plan sheet, a cross sectional detail of the proposed collection swales showing 3:1 side slopes is provided. WAD IOxx_gen\DI00x_msv\D 1005_coucs_msw\RnM\2007\carver-mach-dwq-pemiit-resp-070709.doc � 2 7/9�tO0 61 Reference the enclosed revised plan sheet, a staff gauge is proposed in the infiltration basin. A note has been added providing the benchmark at which sediment must be removed from the structure. 140. Please find enclosed a copy of page 4 of the application form SWU-101 with initials added to Section VI. LAl. Please note that the enclosed narrative containing calculations has been sealed with signatures and dates. Ot1t y C "-KtW p la— ' a c,S1-4 12. Please find enclosed a check for $1,000.00. Please advise as I may provide additional information for your review. Sincerely, Enclosures RBM/rbm Cc: Lindsey Crisp Tom LaBarbera (w/encl.) TES, INC. P.E. W:\DI Oxx_gen\DI OOx_msw\D 1005_corres_msw\RDM\20074arver-mach-dwq-permit-resp-070709.doc L M 3 1 7tY4VQjk- F%R��Q�-0h JUL 1 0 2007 Stormwater Narrative DVV WAR© l Coastal Plain of the Tar -Pamlico River Basin Carver Machine Works — Building Addition Background 20205 ;1ctNE;`�'o��� 4Rti B. �flllllll�� \ Existing site is a 7.5 acre tract where existing soil is classified as Tarboro sand (based on "Soil Survey of Beaufort County, North Carolina") with a slope less than 2%. Pre -development condition of the site is a developed property consisting of several buildings, gravel parking/access and a large pond that does not have an outlet to a downstream surface water. The goal of the project is to construct a new 50,000 square foot building and additional gravel transportation facilities to provide an expansion of current business activities. The existing site consists of existing buildings and gravel parking facilities and travel ways. Proposed improvements will include paving of one (1) existing gravel area and placement of concrete over another densely -packed gravel area. The new building will require demolition of an existing small shelter and an existing concrete pad. For the purposes of stormwater management, proposed paving is not expected to increase impervious area, nor is proposed concrete to be placed between the existing office structure and new facility (due to existence of near -impervious packed gravel in areas) A stormwater system consisting of shallow grass swales and an infiltration basin is proposed to provide treatment and storage for new impervious areas proposed by development activities. Stormwater Management Stormwater rules require that facilities be provided that are capable of treating the first inch of rainfall. Stormwater flow on the existing site is separated by existing buildings. Proposed improvements will drain into an infiltration basin which will provide storage prior to discharge into the on -site pond. For determining required storage of the proposed infiltration basin, the change in built upon area is used along with the total site acreage. Note that the proposed 50,000 sf building will not be total additional built upon area. In order to construct the new building, several current built upon areas will be demolished (existing maintenance building and large concrete storage pad). The net difference in increased built upon area resulting from the project is 0.69 acres. The following table summarizes storage volume requirements: Total Site Area Acres 7.50 Proposed Built Upon Area Acres 0.69 Runoff Value 0.13 1" Storage Requirement cf 3,615.48 2" Storage Requirement cf 7,230.96 Storage Volume Provided cf 7,255.00 Runoff value is calculated using the following equation: - t C1. M-2 Pt 1/Kn/'I Rv = 0.05 + 0.009(I), where I is the computed percentage (change) of impervious area (0.69/7.50`100). Vol, W:\D I Oxx_gcn\D I OOx_msw\D 1005_corres_msw\R13M\2007\carver-mach-beauf-co-sw-nar-070705.doc 1 7/5/2007 '� M � .t Required volume is computed using the following equation: Volume = (Design rainfall, inches) x (Rv/12) x (Drainage area, square feet). Based on current rules, a bypass mechanism is required for stormwater flow beyond the first inch of rainfall. If storage is provided for the 2" rainfall event, bypass facilities are not required. Storage is computed by multiplying the surface area of stormwater structures by the pooling depth represented by the thickness of stone filter in the infiltration basin. Storage provided is a minimum o 2') feet above the SHWT. The proposed infiltration facility provides sufficient storage to meet the 2" rainfall event such that no bypass facilities are provided. Note that the existing pond has no outlet to a downstream surface water such that technically, all stormwater is treated well beyond Tar -Pamlico River Basin requirements. Drawdown Calculations In accordance with stormwater regulations, an infiltration structure must dewater within 2 to 5 days. Dewatering time is computed using the following equation: -..kNIMi... 2KA RMAY, ve-Zvi 7 = � v - ` O� SS%p).141, � 1 SF-r',L 9r• '- Where T dewatering time (days) - 20205 A = infiltrating area (sf) �1�/S►�7Q-: N K = hydraulic conductivity of soil (in/hr) '���c 7GIt1F-'o��� V = volume of water requiring infiltration (cf) �i�4,7OI Ip, 's�\��\ The proposed 7,255 cf infiltration basin has an odd geometric shape. Area in the equation is defined as the bottom surface area or %2 of the total wetted wall area. For the proposed basin, the bottom surface area is 1,200 sf. Area soil is identified as Tarboro sand which has a relatively high rate of conductivity. It is proposed that the bottom and interior side slopes of the infiltration basin will have a grass cover. It is assumed that with a grass cover, the hydraulic conductivity will be approximately 1.5 in/hr. Based on a provided volume of 7,255 cf, dewatering time is calculated as follows: T = (2)-(1.5)`(1,200)/ (7,255) T = 2.02 days Proposed drawdown is within the allowable 2-5 day requirement. Design Storm Tar -Pamlico River Basin regulations require treatment of stormwater flows represented by the 1 year, 24 hour storm event. For Beaufort County, the estimated 1 year, 24 hour rainfall is approximately. 3.2 inches (per Beaufort County Stormwater Ordinance). WAD IOxx_gcn\DIOOx_msw\D1005_corres_msw\RBM\2007\carver-mach-bcauf-co-sw-nar-070705.doc 2 7/5/2007 Site Development Existing impervious area is not included in proposed treatment/storage calculations. The net change in impervious area on the site amounts to approximately 1.27 acres represented primarily by the new 50,000 square foot building. The site has been divided into 3 catchment areas based on the level of treatment being provided to stormwater within the 3 areas. Offsite drainage is not an issue as the property and adjacent properties are basically flat such that no offsite drainage impacts the property. 3.2 inches of rainfall over a 24 hour period equates to a runoff rate of approximately 1 cubic feet per second (cfs). Stormwater treatment facilities must be capable of conveying this 1 year storm event. Treatment of the 1 year storm event is proposed to be accomplished through 3 catchment areas Stormwater will be treated by a combination of grass swales and bioretention facilities. Per Beaufort County's stormwater ordinancetime of concentration is computed using the following formula: vad,11011" 3 111I0.385 T=�H/ 128 Where: L = hydraulic length of the watershed in feet = the length of the longest flow path from the most remote point on the watershed ridge to the outlet H = the elevation difference, or fall, in feet along the hydraulic length Rainfall intensity is computed using the following formula: Where:/ is the rainfall intensity in inches per hour g and h are empirically derived constants T is the duration in minutes set equal to the time of concentration For Beaufort County, the values for g and h for the 1-year storm are 112 and 20, respectively. Based on Beaufort County's formula, pre -development and post -development flows can be computed, summarized as follows: W:\D I Oxx_gen\D I OOx_msw\D 1005_corres_msw\R13M\2007\carver-mach-beau f-co-sw-nar-070705.doc 3 7/5/2007 Pre -development Acreage 7.5 acres Max length travel (feet) 250 ft Change in height over outlet (ft) 5 ft cfactor 0.36 .a?�a - ^� Post -development 1 I` Acreage 7.5 acres Max length travel (feet) 450 ft 7tt•t�1;, , , Change in height over outlet (ft) 6 ft Slope 1.00% �' Time for concentration (Tc) 4.56 min {k : '` �\ c factor 0.43 Compute c factor Acreage c Impervious area 2.36 0.7 Non -impervious area 5.15 0.3 Computed average 0.43 Pre Development Post Development Max Length Travel, L 250 450 Height remote point over outlet, H 5 6 Runoff Coefficient, C 0.36 0.43 Time of Concentration (computed) 2.47 4.55 Intensity, I (computed) 4.98 4.56 Flow (computed) 13.45 14.71 Storage is computed by taking the difference in pre -development and post -development flows and multiplying by pre -development rainfall intensity. Note that the difference in peak flow is less than 10% such that storage is not a requirement. Storage = (14.71-13.45) (4.56 in/hr) (60s/min) Storage = 344.74 cubic feet Actual storage provided in the infiltration basin is summarized as follows: The proposed infiltration basin is a three (3') feet deep facility of differing geometry with an interior side slope of 3:1. Total volume of the facility is 7,255 cubic feet. Based upon post -development built upon area, a two (2") inch rainfall event requires a combined storage of 7,230.96 cubic feet. The proposed facility has been sized to accommodate the two (2") inch rainfall event in an effort to avoid having to install bypass drainage facilities. WAD I Oxx_gcn\D I OOx_msw\D 1005_corres_msw\R13 M\2007\carver-mach-beau f.co-sw-par-070705. doc 4 7/5/2007 Michael F. Easley, Governor William G. Ross Jr., Secretary v r` North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality July 2, 2007 Mr. Lindsey A. Crisp, President Carver Machine Works 129 Christian Service Camp Rd. Washington, NC 27889 Subject: Stormwater Review SW7070616 Carver Machine Works 2007 Expansion Beaufort County Dear Mr. Crisp: This office received a Coastal Stormwater permit application and plans for the subject project on June 20, 2007. A preliminary review of the project indicates that before a State Stormwater,permit can be issued the following additional information is needed. 1) The required volume were incorrectly calculated with a "percent change" of impervious area for the individual catchments within the overall drainage area of the infiltration basin. Please revise the minimum required volumes using the proposed impervious'area percentage for the one drainage area to the infiltration basin. Combine the catchment areas that drain into infiltration area into one drainage area for the application and calculations. 2) Please provide all pertinent draw down calculations based on the design storage volume and expected minimum infiltration rates. 3) The provided calculations were not signed, sealed nor dated. 4) On page 2 of 4 of the application form SWU-101, under section Ill., no.6, please provide one drainage area column for the overall property (including proposed impervious area) and one column to represent just the drainage area to the new infiltration basin. Please also provide these areas in "square feet". 5) The delineated drainage area on the plans is slightly mislabeled and points to a force main. The delineation appears to be slightly off as well with existing building roof drains that are directed to the road right of way, and not the infiltration basin. Please revise. 6) Some of the required items listed in the checklist on page 2 of 3 of the supplement form SWU- 103 have not been met and have been addressed within the narrative, but others have not, and all are initialed. Please revise page 2 such that those items not provided within the infiltration basin design are not initialed and attach a page with justifications for all those items not provided. 7) Please label the proposed infiltration basin bottom contour elevation on the plan view. 8) Please provide a cross sectional detail of the proposed collection swales with 3:1 or fatter side slopes. 9) Please provide a benchmark noting the sediment removal depths/elevations within the pretreatment swale(s) or basin cross-section detail. Nrinhcam .117afrrraL North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer service Internet: h2o.enr.stala.nc.us 943 Washington Sauare Mall. Washington. NC 27889 1-877-623-6748 10) Please provide a copy of page 4 of 4 of the application form SWU-101 with the appropriate hand initials under section VI., no. 1. 11) Please remember to seal, sign & date any revised calculations and 2 sets of plan sheets. 12) Please provide the 25% additional information fee associated with the Express Stormwater Review Program of $1,000.00 by check made payable to "NC DENR". The above requested information must be received in this office prior to July 10, 2007 or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address. You should also be aware that the Stormwater Rules require that the permit be issued prior to any development activity. Construction without a permit is a violation of 15A NCAC 21-1.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to $10,000 per day. Please reference the Stormwater Project Number above on all correspondence. If you have questions, please feel free to contact me at (252) 948-3848. Sincerely, Scott Vinson Environmental Engineer Washington Regional Office cc: Richard B. Moore. PE — McDavid & Associates John Weeks (email copy only) L A'ashington Regional Office Stormwater Narrative RECEIVED Coastal Plain of the Tar -Pamlico River Basin Carver Machine Works — Building Addition JUN 2 0 2007 Background D Q-VVAR® Existing site is a 7.5 acre tract where existing soil is classified as Tarboro sand (based on "Soil Survey of Beaufort County, North Carolina") with a slope less than 2%. Pre -development condition of the site is a developed property consisting of several buildings, gravel parking/access and a large pond that does not have an outlet to a downstream surface water. The goal of the project is to construct a new 50,000 square foot building and additional gravel transportation facilities to provide an expansion of current business activities. The existing site consists of existing buildings and gravel parking facilities and travel ways. Proposed improvements will include paving of one (1) existing gravel area and placement of concrete over another densely -packed gravel area. The new building will require demolition of an existing small shelter and an existing concrete pad. For the purposes of stormwater management, proposed paving is not expected to increase impervious area, nor is proposed concrete to be placed between the existing office structure and new facility (due to existence of near -impervious packed gravel in areas) A stormwater system consisting of shallow grass swales and an infiltration basin is proposed to provide treatment and storage for new impervious areas proposed by development activities. Stormwater Management Stormwater rules require that facilities be provided that are capable of treating the first inch of rainfall. Stormwater flow is divided into three (3) catchment areas where stormwater management structures provide treatment. The following table summarizes data on the three (3) catchment areas and the proposed bioretention structures. Catchment Area 1 Catchment Area 2 Catchment Area 3 Area Acres 3.47 1.37 2.66 Pre -Development Built Upon Area 1.1 0.38 0.25 Post -Development Built Upon Area 1.55 0.52 0.3 Percentage Increase 12.97% 10.22% 1.88% 1" Storage Requirement cf 2,100.15 706.08 646.17 2" Storage Requirement c 4,200.30 1,412.16 1,292.34 Storage Volume Provided cf 7,255.00 R ffI es are calculated usin the followin e uation �0�" uno vau g g q ()\ Rv = 0.05 + 0.009(I), where I is the computed percentage (change) of impervious area. Required volume is computed using the following equation: Volume = (Design rainfall, inches) x (Rv/12) x (Drainage area, square feet). ` O' W AD10xx_gen\D100x_msw\D 1005_corres_msw\RDM\2007\carver-mach-beauf-co-sw-nar-070618.doc 1 6/18/2007 Based on current rules, a bypass mechanism is required for stormwater flow beyond the first inch of rainfall. If storage is provided for the 2" rainfall event, bypass facilities are not required. Storage is computed by multiplying the surface area of �j stormwater structures by the pooling depth represented by the thickness of stone filter n— the infiltration basin. Storage provided is a minimum two (2') feet above the SHWT. The infiltration facility provided serves both catchment area 1 and 2.7 Flow s by _ beyond the 1" rainfall is collected in a drop inlet structure where flow ipassed directly to the existing on -site pond. Note that the existing pond has no outlet to a downstream surface water such that technically, all stormwater is treated well beyond Tar -Pamlico River Basin requirements. Design Storm Tar -Pamlico River Basin regulations require treatment of stormwater flows represented by the 1 year, 24 hour storm event. For Beaufort County, the estimated 1 year, 24 hour rainfall is approximately 3.2 inches (per Beaufort County Stormwater Ordinance). Site Development Existing impervious area is not included in proposed treatment/storage calculations. The net change in impervious area on the site amounts to approximately 1.27 acres represented primarily by the new 50,000 square foot building. The site has been divided into 3 catchment areas based on the level of treatment being provided to stormwater within the 3 areas. Offsite drainage is not an issue as the property and adjacent properties are basically flat such that no offsite drainage impacts the property. 3.2 inches of rainfall over a 24 hour period equates to a runoff rate of approximately 1 cubic feet per second (cfs). Stormwater treatment facilities must be capable of conveying this 1 year storm event. Treatment of the 1 year storm event is proposed to be accomplished through 3 catchment areas Stormwater will be treated by a combination of grass swales and bioretention facilities. Per Beaufort County's stormwater ordinance, time of concentration is computed using the following formula: 3 0.385 T = �H� 128 Where: L = hydraulic length of the watershed in feet = the length of the longest flow path from the most remote point on the watershed ridge to the outlet H = the elevation difference, or fall, in feet along the hydraulic length W AD I Oxx_gen\D 100x_msw\D 1005_cones_msw\P BM\2007\carver-mach-beau f.co-sw-nar-070618.d oc 2 6/18/2007 Rainfall intensity is computed using the following formula: Where:l is the rainfall intensity in inches per hour g and h are empirically derived constants T is the duration in minutes set equal to the time of concentration For Beaufort County, the values for g and h for the 1-year storm are 112 and 20, respectively. Based on Beaufort County's formula, pre -development and post -development flows can be computed, summarized as follows: Pre -development Acreage 7.5 acres Max length travel (feet) 250 ft Change in height over outlet (ft) 5 ft c factor 0.36 Post -development Acreage 7.5 acres Max length travel (feet) 450 ft Change in height over outlet (ft) 6 ft Slope 1.00% Time for concentration (Tc) 4.56 min c factor 0.43 Compute c factor Acres e c Impervious area 2.36 0.7 Non -impervious area 5.15 0.3 Computed averse 0.43 Pre Development Post Development Max Length Travel, L 250 450 remote point over outlet, H 5 6 -Height Runoff Coefficient, C 0.36 0.43 Time of Concentration (computed) 2.47 4.55 I (computed) 4.98 4.56 -Intensity, Flow (computed) 13.45 14.71 W9DiOx_gen\DI0Ox_msw\1)1005_corres_msw\RBM\2007\carver-mach-beauf-co-sw-nar-070618.doc 3 6/18/2007 Storage is computed by taking the difference in pre -development and post -development flows and multiplying by pre -development rainfall intensity. Note that the difference in peak flow is less than 10% such that storage is not a requirement. Storage = (14.71-13.45) (4.56 in/hr) (60s/min) Storage = 344.74 cubic feet Actual storage provided in the infiltration basin is summarized as follows: The proposed infiltration basin is a three (T) feet deep facility of differing geometry with an interior side slope of 3:1. Total volume of the facility is 7,255 cubic feet. Based upon post -development built upon area, a two (2") inch rainfall event requires a combined storage of 4,904.80 cubic feet. The proposed facility has been sized to accommodate the two (2") inch rainfall event in an effort to avoid having to install bypass drainage facilities. W:\DI O"_gen\DI OOx_msw\D 1005_coues_msw\RBM\2007\carver-mach-beauf-co-sw-nar-07061 S.doc 4 6/18/2007 130 TABLE 15.--SOIL AND EATER FEATURES --Continued Soil Soil name and IHydro-I I I I I I I .I I I map symbol I logic Frequency I Dura- (Months I Depth I Kind IMontha Ilnitiall Total (Uncoated IConor IarouP 1 I tion I I I I I I I ateol I Ft I I I In 1 In I 1 La_____________1 D None ------- ___ I __- 10.5-1.51ApparentlJan-Apr) ___ I ___ IBigh----- IModer Leaf I I I I I I I I 1 I I Le ------------- I D INone------- I ___ I ___ 11.0-2.51APParent1Dec-May1 ___ I ___ (High ----- (High. Lenoir I I I I I I I I I I I I I I I I Lo------------- I B/D I I INone------- I ___ I I I -_- I 0-1.OIApparant I I lDea-Mayl ___ I ___ (High ----- lBigh. Leos I I I I I II I I I I LY------------- I C INone------- I --_ I ___ 10.5-1.51Apparent )Nov-Apr1 __- I -__ (High ----- lHigh. Lynchburg me_____________[ D I Frequent --- (Brief INov-Apr 10. 5-1. 51 Apparent l Dec -Marl ___ I ___ (High ----- IModet Muckalee Pa ------------- I B/D (None ------- I ___ I --- I 0-1.51ApparentlDec-Mayl ___ I -_- (High_____ IBigh'. Pantego I I I I I I I I I I I Pe ------------- I D INone------- I ___ I--- 10-1.OIAppareat[Nov-Aprl __- I -__ I High_____ IBigh' Perquimana I 1 I I I I I 1 I I I I- Pm+. Pita I I I 11 I I I I I I Po ------------- I D INone------- I ___ I ___ 10-1.OIApparentlDec-Mayl 9-12 1 18-24 (High_____ I High Ponrer I I I I 1 I I I I I I Pt ------------- I B/D INone------- I ___ I ___ I 0-1.01APParentlDec-Apr) ___ I ___ laigh----- lnigh Portsmouth I I x I I I I I 1 I I Ra_____________ I B/D INone______,_1 ___ 1 ___ I 0-1.OIApparentlNov-Aprl ___ I ___ lHigh----- [High Rai" I I I 1 I I I I I I I Ro------------- I D INone------- I ___ I ___ I 0-1.0IApparentlNov-Mayl ___ I ___ IHi h_____lBi h 9 9 Roanoke Sb ------------- I C INone------- I ___ I ___ 12.0-4.0l ApparentlDec-Marl _-_ I ___ ILA ------ jMode Seabrook I I I I 1 I - I 1 I I Seabrook ------ I C I INons------- I --- I --- I2.0-4.OlApparentlDec-Marl --- I --- ILow------ (Mode I I Urban land. I I I I 1 I I 1 I I I I StA------------ I B I (None ------- I --- I --- 14.0-6.0IApparentlDec-Jun1 --- I --- (Moderate (High TaB____________I A Tarboro I To_____________1 B/D Tomotley I I Tr_____________I C Torhunta I I Ud-. I Udorthents I I Ur-. I Urban land I I I I I 1 I I I I I I None_______I ___ 1 ___ 1 >6.0 I ___ 1 ___ 1 ___ 1 ___ ILow______I, I I I I I I I I I I I I None ------- I --- I --- 10-1.OIApparentlDec-Marl --- I--- IHigh ----- I I I I I I I I I I 1 I I I I I I I I I i INone------- I ___ I ___ 10.5-1.51ApparenttDec-Mayl ___ I ___ IHigh----- I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I t I I I I See footnote at and of table. North Carolina Secretary of State http://www.secretary.state. nc.us/corporations/Corp.aspx?Pitemld=50... CORPORATIONS North Carolina Elaine F. Marshall DEPARTMENT OF THE Secretary SECRETARY of STATE Corporations Home Search By Corporate Name Search For New Corporation Search By Registered Agent Important Notice Corporations FAQ Tobacco Manufacturers Dissolution Reports Non -Profit Reports Verify Certification Online Annual Reports LINKS & LEGISLATION KBBE B2B Annual Reports SOSID Number Correction 2001 Bill Summaries 1999 Senate Bills Annual Reports 1997 Corporations 1997 Register for E-Procurement Dept. of Revenue ONLINE ORDERS Start An Order New Payment Procedures -- CONTACT US Corporations Division Secretary of State's web site TOOLS Secretary of State Home Secretary of State Site Map Printable Page PO &:x 29622 Raleigh, NC 27626-K22 919)B07-2060 Date: 6/29/2007 Click here to: View Document Filings I Print apre-populated Annual Report Form I Annual Report Count I File an Annual Report I Corporation Names Name Name Type NC Carver Machine Works, Legal Inc. NC Carver's Machine Works, Prey Legal Inc. Business Corporation Information SOSID: 0297963 Status: Current -Active Date Formed: 8/22/1979 Citizenship: Domestic State of Inc.: NC Duration: Perpetual Registered Agent Agent Name: Crisp, Lindsey A Registered 129 Christian Camp Rd Office Address: Washington NC 27889 Registered 129 Christian Camp Rd Mailing Address: Washington NC 27889 Principal Office 129 Christian Camp Road Address: Washington NC 27889 Principal Mailing 129 Christian Camp Road Address: Washington NC 27889 Stock 1 of 1 6/29/2007 1:03 PM Wy NCDENR S North Carolina Department of Environment and Natural Resources Request for Express Permit Review FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Include this form with the application package because it help us to distinguish which projects are going through the express review and not the routine review. RECEIVED • Fayetteville or Raleigh Region -David Lee 919-7914203; david.leeancmail.net JUN 2 0 2007 • Mooresville & Asheville Region -Patrick Grogan 704-663-3772 or patrick.grogan(cDncmail.net • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison(cDncmall.net 1nI • Wilmington Region -Cameron Weaver 910-350-2004 or cameron.weaverjc)ncmail.net DWQ-WARD Project application received after 12 noon will be stamped In the following work day. APPLICANT Narr Company City/State Washington, NC Zip 27889 SYSTEM(S) TRIBUTARY TO Pamlico River SURFACE WATER Company State or National Environmental Policy Act (SEPA, NEPA) - EA or EIS Required ❑Yes ® No ❑ STREAM ORIGIN Determination: of Stream calls; Stream Name ® STORMWATER ❑Low Density ❑ High Density -Detention Pond ❑ High Density -Other ❑ Low Density -Curb & Gutter ® High Density -Infiltration ❑ Off Site WETLANDS MUST BE ADDRESSED BELOW ❑ COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information MANAGEMENT ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® LAND QUALITY ® Erosion and Sedimentation Control Plan with 1.6 acres to be disturbed.(CK #,(for DEN R use)) ❑ WETLANDS (401): Check all that apply Isolated wetland on Property ❑ Yes ❑ No Wetlands on Site ❑ Yes ❑ No / _Buffer Impacts: ❑ No ❑ YES: acre(s) ---- - - - - — — -- - -- -- — -- -- _ . YES -'-- Major Wetlands Delineation has been completed: ❑Yes ❑ No % Minor Variance: ❑ No ❑--� - - - - - - -- - - General Variance ❑ No ❑ YES US ACOE Approval of Delineation completed: ❑ Yes ❑ No 401 Application required: ❑Yes ❑ No If YES, ❑ Regular 404 Application in Process w/ US ACOE: ❑ Yes ❑ No / Permit Received from US ACOE ❑ Yes ❑ No Perennial, Blue line stream, etc on site ❑ yes ❑ No The legislation allows additional fees, not to exceed 50% of the original Express Review permit application fee, to be charged for subsequent reviews due to the insufficiency of the permit applications. For DENR use only Fee Split for multiple permits: (Check# 5'l _7 Total Fee Amount S SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA i IVariance Ma'; ❑ Min SW D; LD -;jL--p' ,13`;)15 401: LQS t 00 -0-7 1 4 4-4- Stream Deter,_ 129 Christian Camp Service Rd., Washington, NC - Google Maps http://maps.google.com/maps?f=q&hl=en&gcocode=&q=129+Christ... Address 129 Christian Service Camp -- 0 0Z Rd C�23PS Washington, NC 27889 1 of 1 6/29/2007 1:02 PM LA)a-RO NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Governor Mr. Lindsey A. Crisp 129 Christian Service Camp Rd. Washington NC, 27889 Dear Mr. Evans: Coleen H. Sullins Director May 14, 2010 Natural Resources Dee Freeman Subject: CLOSURE --NOTICE OF VIOLATION NOV-2010-PC-0305 Permit Condition Violations Stormwater Permit No.SW7070616 Carver Machine Works Beaufort County On April 20, 2010 this Office received a written response to the Notice of Violation issued on March 30, 2010. The response provided copies of the designer's certification as required by the conditions of the permit. Please continue to inspect and monitor your site for compliance with both the permit and O&M requirements. The Division considers this violation closed. Thank you for your cooperation and conscientious effort to help safeguard the waters of the State. If you should have any questions regarding these matters, please contact me at 252-948-3966. S, cer4AManning i Jeff y Environmental Specialist Surface Water Protection Section Washington Regional Office cc: DWQ Central Files �VaRO Files North Carolina Division of Water Quality Internet: w%%'a' mmnierqunit1vore 9,13 Washington square Mall Phone: 252-946-6481 One Washington, NC 27889 FAX 252-946-9215 NorthCarolina An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper naturally Carver Machine Works, Inc. Titanium, Hastelloy & Stainless Equipment Manufacturers & Rebuilders 129 Christian Service Camp Road • Washington, NC 27889 • Phone: (252) 975-3101 • Fax: (252) 975-3949 April 17, 2010 North Carolina Division of Water Quality APR 2 0 2010 943 Washington Square Mall Washington, NC 27889 Re: 3-13-2010 Notice of Violation NOV-2010-PC-0305 Mr. At Hodge: When NCDENR came to inspect the site on March 10`h, 2010 they informed our Facilities Engineer, Tom LaBarbera, that our site design engineer, McDavid and Associates had not submitted a Designer's Certificate of completion with a final as -built drawing. Mr. Jeffery A. Manning said this issue would be noted as a non-conformance and asked us to have the designer send the documentation to NCDENR when we received this letter. Mr. Manning also stated that outside of this issue, he was satisfied with the site condition. A scanned copy of the submission to NCDENR is attached. Please let us know of any other open items and confirm that this violation has been resolved. Thank you for your assistance in clearing up this matter. Sincerely, ,� Lindsey A. Cris President &1C 0 An Employee Owned Company' MCDAVID ASSOCIATES' INC. INC. � Engineers •Planners •Land Surveyors CORPORATE OFFICE GOLDSBORO OFFICE (252)753-2139• Fax(252) 753-7220 (919)736-7630• Fax (919) 735-7351 E-mail: mai@mcdavid-inc.com E-mail: maigold@mcdavid-inc.com 3714 N. Main Street • P.O. Drawer 49 109 E. Walnut Street • P.O. Box 1776 Farmville, NC 27828 Goldsboro, NC 27533 March 24, 2010 Mr. Scott Vinson North Carolina Division of Water Quality 943 Washington Square Mall Washington, NC 27889 Subject: Stormwater Permit SW7070616 Carver Machine Works Beaufort County Dear Mr. Vinson: In reference to the subject project, please find enclosed one (1) copy of each of the following: I. Designer's Certification " U 7r - 2. As Built Drawing 11_� t/(v' 448 Please advise as I may provide any additional information for your review. Q IQ Sincerely, McDavid Associ,4es, Inc. Richard B. ore, P. E. Farmville Of Ice RBM/cep Enclosures cc: Tom LaBarbera (w/encl.) D805R13M 10 1 738 AM CAR V ER -MACHINE W ORKS-V INSON-LTR-100324-002.wpd 100324