HomeMy WebLinkAboutSW7070616_CURRENT PERMIT_20070802STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW7�
DOC TYPE
/� CURRENT PERMIT
l
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATEZUSoa
YYYYMMDD
lk)XW
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
August 2, 2007
Mr. Lindsey A. Crisp, President
Carver Machine Works, Inc.
129 Christian Service Camp Road
Washington, NC 27889
Subject: Permit No. SW7070616
Carver Machine Works 2007 Expansion
High Density Stormwater Project
Beaufort County
Dear Mr. Crisp:
The Washington Regional Office received a complete Stormwater Management Permit
Application for Carver Machine Works 2007 Expansion on July 23, 2007. Staff review of the
plans and specifications has determined that the project, as proposed, will comply with the
Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No.
SW7070616 dated August 2, 2007, for the construction of the subject project.
This permit shall be effective from the date of issuance until August 2, 2017, and shall be
subject to the conditions and limitations as specified therein. Please pay special attention to
the Operation and Maintenance requirements in this permit and in the submitted application.
Failure to establish an adequate system for operation and maintenance of the stormwater
management system will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have
the right to request an adjudicatory hearing upon written request within thirty (30) days
following receipt of this permit. This request must be in the form of a written petition,
conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office
of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such
demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
contact either Scott Vinson, or me at (252) 946-6481.
Sincerel ,
Al Hodge
Regional Supervisor
Surface Water Protection Section
AH/sav: C:\STORMWATER\PERMIT\SW7070616
cc: Richard B. Moore, PE, McDavid & Associates
Beaufort County Building Inspections
Washington Regional Office
Central Files
N"oo�t,Caro ina
Pvatura2
North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service
Internet w vv.ncwatereualitv.ore 943 Washington Square Mall, Washington, NC 27889 1-877-623-6748
An Equal OpportunitylAffrmative Action Employer— 50% Recycled110% Post Consumer Paper
State Stormwater Management Systems
Permit No. SW7070616
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Carver Machine Works 2007 Expansion
Carver Machine Works, Inc.
Beaufort County
FOR THE
construction, operation and maintenance of an infiltration basin in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the
approved stormwater management plans and specifications and other supporting data as
attached and on file with and approved by the Division of Water Quality and considered a part
of this permit.
This permit shall be effective from the date of issuance until August 2, 2017, and shall be
subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.6 on page 3 of this permit. The stormwater controls have been
designed to handle the runoff from 97,237 square feet of impervious area.
3. All stormwater collection and treatment systems must be located in either dedicated
common areas or recorded easements. The final plats for the project will be recorded
showing all such required easements, in accordance with the approved plans and permit.
4. The tract will be limited to the amount of built -upon area indicated on page 3 of this
permit, and per approved plans.
5. Approved plans and specifications for this project are incorporated by reference and are
enforceable parts of the permit. The runoff from all built -upon area within the permitted
drainage areas of this project must be directed into the permitted stormwater control
system.
Page 2 of 7
State Stormwater Management Systems
Permit No. SW7070616
a
i ne Toiiowing design criteria have been provided in the infiltration basin and must be
maintained at design condition:
a. Site Area, acres: 7.50
b.
C.
d.
e.
f.
m
n.
[a
Drainage Area to Basin, ac:
Total Impervious Surfaces, ft2:
Design Storm, inches:
Basins Depth, feet:
Bottom Elevation, FMSL:
Bottom Surface Area, ft2:
Bypass Overflow Elevation, FMSL:
Permitted Storage Volume, ft3:
Type of Soil:
Expected Infiltration Rate, in/hr:
Seasonal High Water Table, FMSL:
Receiving Stream/River Basin:
Stream Index Number:
Classification of Water Body:
II. SCHEDULE OF COMPLIANCE
3.90
97,237
1.00 required; 2.22 provided
3.00
7.00
3,510
10.00
8,001 required; 17,766 provided
Tarboro Sand
1.50
5.00
Pamlico River / Tar -Pamlico
29 — (5)
"SB; NSW'
1. The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance necessary to
assure the permitted stormwater system functions at optimum efficiency. The approved
Operation and Maintenance Plan must be followed in its entirety and maintenance must
occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowin,9 and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of bypass structure, infiltration media, flow
spreader, catch basins, piping and vegetated filter.
g. A clear access path to the bypass structure must be available at all times.
Page 3 of 7
State Stormwater Management Systems
Permit No. SV 7070616
4. Records of maintenance activities must be kept and made available upon request to
authorized personnel of DWQ. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
The facilities shall be constructed as shown on the approved plans. This permit shall
become voidable unless the facilities are constructed in accordance with the conditions
of this permit, the approved plans and specifications, and other supporting data.
6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior to operation of this permitted facility, a certification must be received from an
appropriate designer for the system installed certifying that the permitted facility has
been installed in accordance with this permit, the approved plans and specifications, and
other supporting documentation: Any deviations from the approved plans an '—___.__....
specifications must be noted on the Certification. A modification may be required for
those deviations.
7. The stormwater systems shall not be used as Erosion Control devices. They must be
kept off line and free from sediment until the project is complete and the entire site has
been stabilized.
Access to the stormwater facilities shall be maintained via appropriate easements at all
times.
The permittee shall submit to the Director and shall have received approval for revised
plans, specifications, and calculations prior to construction, for any modification to the
approved plans, including, but not limited to, those listed below:
a. Any revision to any item shown on the approved plans, including the stormwater
management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the drainage
area.
e. Further subdivision, acquisition, lease or sale of all or part of the project area. The
project area is defined as all property owned by the permittee, for which
Sedimentation and Erosion Control Plan approval or a CAMA Major permit was
sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the approved
plan.
10. The permittee shall submit final site layout and grading plans for any permitted future
areas shown on the approved plans, prior to construction.
11. A copy of the approved plans and specifications shall be maintained on file by the
Permittee for a minimum of ten years from the date of the completion of construction.
12. The Director may notify the permittee when the permitted site does not meet one or more
of the minimum requirements of the permit. Within the time frame specified in the notice,
the permittee shall submit a written time schedule to the Director for modifying the site to
meet minimum requirements. The permittee shall provide copies of revised plans and
certification in writing to the Director that the changes have been made.
13. This permit shall be effective from the date of issuance until August 2, 2017. Application
for permit renewal shall be submitted 180 days prior to the expiration date of this permit
and must be accompanied by the processing fee.
Page 4 of 7
State Stormwater Management Systems
Permit No. SW7070616
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director. In the
event of a change of ownership, or a name change, the permittee must submit a formal
permit transfer request to the Division of Water Quality, accompanied by a completed
name/ownership change form, documentation from the parties involved, and other
supporting materials as may be appropriate. The approval of this request will be
considered on its merits and may or may not be approved. The permittee is responsible
for compliance with all permit conditions until such time as the Division approves the
transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may subject the
Permittee to enforcement action by the Division of Water Quality, in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with any and
all statutes, rules, regulations, or ordinances, which may be imposed by other
government agencies (local, state, and federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including
those as may be required by this Division, such as the construction of additional or
replacement stormwater management systems.
5. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted stormwater
management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The filing of
a request for a permit modification, revocation and reissuance or termination does not
stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater control
must follow the guidelines established in the North Carolina Erosion and Sediment
Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference and are
enforceable parts of the permit.
9. The permittee shall notify the Division of any name, ownership or mailing address
changes within 30 days.
Permit issued this the 2"d day of August, 2007.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
for
V V1GG11 11. VUllll l0, ✓II GLIVI
Division of Water Quality
By Authority of the Environmental Management Commission
Permit No. SW7070616
Page 5 of 7
State Stormwater Management Systems
Permit No. SV 7070616
Carver Machine Works 2007 Expansion
Stormwater Permit No. SW7070616
Beaufort County
Designer's Certification
I, , as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the
construction of the project,
(Project)
for (Project Owner) hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the project construction such
that the construction was observed to be built within substantial compliance and intent of the
approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 6 of 7
State Stormwater Management Systems
Permit No. SW7070616
Certification Requirements:
1. The drainage area to the system contains approximately the permitted acreage.
2. T he'drainage'area to the system contains no more than the permitted amount of
built -upon area.
3. All the built -upon area associated with the project is graded such that the runoff
drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The bypass structure weir elevation is per the approved plan.
6. The bypass structure is located per the approved plans.
7. A Trash Rack is provided on the bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-circuiting of
the system.
11. The permitted amounts of surface area and/or volume have been provided.
12. All required design depths are provided.
13. All required parts of the system are provided.
14. The required system dimensions are provided per the approved plans.
cc: NCDENR-DWQ Washington Regional Office
Beaufort Building Inspections
Page 7 of 7
State Stormwater i ' -nagement Systems
Pt.. nit No. SV 7070616
Carver Machine Works 2007 Expansion
Stormwater Permit No. SW7070616
Beaufort County
Designer's Certification
I, �ZuAAaD a. MwRc , as a duly registered EN�e-r,Z in the
State of North Carolina, having been authorized to obsery eno ica weekly/ full time) the
construction of the project,
CAR�Zvew /V4LAlWF Luua1CS Z0v�1 Ff�n.�s�w✓
(Project)
for C,zvc" M4QW vC WLAZk<, i INc • (Project Owner) hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the project construction such
that the construction was observed to be built within substantial compliance and intent of the
approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature t
Registration Number
Date 31 1\ 170ko
NO-PF Zow5
�� a�F ay.•�'E�L
2' SEAL Tr ;
20205 _
i,a,L.
MAR 2 6 2D90
N /l a .\\/D
Page 6 of 7
State Stormwater anagement Systems
_rmit No. SW7070616
Certification Requirements:
x 1. The drainage area to the system contains approximately the permitted acreage.
X 2. -The drainage area to the system contains no more than the permitted amount of
built -upon area.
x 3. All the built -upon area associated with the project is graded such that the runoff
drains to the system.
K 4. All roof drains are located such that the runoff is directed into the system.
K 5. The bypass structure weir elevation is per the approved plan.
n 6. The bypass structure is located per the approved plans.
N1a--7. A Trash Rack is provided on the bypass structure.
K 8. All slopes are grassed with permanent vegetation.
A, 9. Vegetated slopes are no steeper than 3:1.
K 10. The inlets are located per the approved plans and do not cause short-circuiting of
the system. 4 ,m%T ygvv-/.,,. SfiH,,,h,-Aw/,I+FT
X 11. The permitted amounts of surface area and/or volume have been provided.
12. All required design depths are provided.
x 13. All required parts of the system are provided.
14. The required system dimensions are provided per the approved plans.
cc: NCDENR-DWQ Washington Regional Office
Beaufort Building Inspections
i
Page 7 of 7
Carver Machine Works 2007 Expansion
Stormwater Permit No. SW7070616
Beaufort County
Designer's Certification
State Stormwater i ' nagement Systems
PE,, nit No. SW7070616
APR 2 0 2010
I, i2+wAc=o +3. MWRC- , as a duly registered GN6t c z in the
State of North Carolina; having been authorized to obsery eno ica weekly/ full time) the
construction of the project,
CACZVEu- /vyctLywE iu�z%s Z�v I �f �aus�u ✓
(Project)
for C*ayei- M4cµWC WU2k<, ! in/c • (Project Owner) hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the project construction suqh
that the construction was observed to be built within substantial compliance. and intent of the
approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification'.
Signature k /wAmz'�` "(
Registration Number N4LPE- Zo
Date 3 1 1\ 170tO
\��N �\11111►1i//J/ ,
.CARO ii
o b4SSsip� L
SEAL Yet;
= 90205 =
B.
.I E xd .7i f Y':'. x,`i�.I i kkiWu)i �,i;, .° ?P•: ')4 t4�'i '2 vt"K017FICEiUSE".ONEY& tAgkti H�`i'�".f�;�.^a
Date Received Fee Paid r N. r
/tea �7nn
�+ State of North Carolina ->WACK (Pla)1o,7
REC;r EVE® Department of Environment and Natural Resources
JUN 2 0 2007 Division of Water Quality eoi
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
®IAfQ_W /t RO This form may he photocopied for use as an original
I. GENERAL INFORMATION
1. Applicants name (specify the name of the corporation, individual, etc. who owns the project):
Carver Machine Works
2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance):
Lindsey A. Crisp, President
3. Mailing Address for person listed in item 2 above:
129 Christian Service Camp Road
Washington State: NC Zip: 27889
Telephone Number: ( 252 ) 975-3101
4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
Carver Machine Works 2007 Expansion
5. Location of Project (street address):
129 Christian Service Camp Road
City: Washington, NC 27889 County: Beaufort
6. Directions to project (from nearest major intersection):
From the intersection of River Road and Asbury Church Road, east on River Road
to its intersection with Christian Service Camp Road. Turn right.
7. Latitude: 35d 31' 04" Longitude: 77d 00' 22" of project
8. Contact person who can answer questions about the project:
Name: Richard B. Moore P E Telephone Number: ( 252 ) 753-21,39
II. PERMIT INFORMATION:
1. Specify whether project is (check one): X New Renewal Modification
Form SWU-101 Version 3.99 Page I of 4
:I
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the
existing permit number and its issue date (if known)
3. Specify the type of project (check one):.
_Low Density X High Density _Redevelop General Permit _Other
4. Additional Project Requirements (check applicable blanks):
_CAMA Major X Sedimentation/Erosion Control 404/401 Permit -RWEI'ii� E D
Information on required state permits can be obtained by contacting the Customer Service Center at ��//
1-877-623-6748. JUL 2 3 2007
III. PROJECT INFORMATION
PROJ #
DWQ
1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project.
Stormwater will be treated by a. grass swale that will discharge into an infiltration
basin where it will drain into an existing on —site non —discharge pond.
2. Stormwater runoff from this project drains to the Tar —Pamlico River basin.
3. Total Project Area: 7.5 acres 4. Project Built Upon Area: S 1 • Z %
5. How many drainage areas does the project have? 1
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
OVERAT.T. PROPERTY INFILTRATION DRAINAGE AREA
iVbia&Iin. MWAAli.F4a "[$6\[ V`&i'S.i`idi 3}.� [ yyl
Lf.14 x 'A {q B V*�
",�},, 1B
G?GPIt1 F(kn �...irv+4kiE_�RVir .RYaM... BKu,y���Q
M x i 1 tki'� Y �ij•
�y�-i.. .y,yi;yryY r..Y- iPVpL.. Y+41a T.1�`ilT
Receiving Stream Name
Pamlico River
Pamlico River
Receiving Stream Class
SB; NSW
SB; NSW
Drainage Area
326,700.00 SF
170,000.00 SF
Existing Impervious* Area
75';358.SO: SF
67,180.80 SF
Proposedlmpervious`Area
105,415.20 SF
97,237.20 SF
% Impervious* Area (total)
32.27%
57.20%
..niCLrC�o'w 3Y7°k'NA Y•+i,'R l vA^hi LY[ttlC PP
lIRpET;Y\1OLS llrfacetAreaye.,u.' �
4n'�errJ�$E'0 e S H ll���y¢t
Pii: i�w,k RF r ��u~ 4, u. '.v t ei•.r ��9T
st�.ov tmr
k? �,y �k�FT
0q1
k �Y}.uA �'� 1`.^r M,� 11?: irlt5�i
On -site Buildings
72,745.20 SF
66,745.20 SF
On -site Streets
On -site Parking
32,670.00
30,492.00 SF
On -site Sidewalks
Other on -site
Off -site
Total: 105,415.20 SF
Total: 97,237.20 SF
' Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
Form SWU-101 Version 3.99
Page 2 of 4
9
7. How was the off -site impervious area listed above derived? Summary of existing/prposed
building footprints and parking dimensions.
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table
listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment.
1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number
as issued by the Division of Water Quality. These covenants may not be
changed or deleted without the consent of the State.
2. No more than square feet of any lot shall be covered by structures or impervious materials.
Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood
decking or the water surface of swimming pools.
3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings.
4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to
construction.
5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control
system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity
and performance of the system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and persons
claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplement form(s) listed below must be submitted for each
BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status
and availability of these forms.
Form SWU-102
Wet Detention Basin Supplement
Form SWU-103
Infiltration Basin Supplement
Form SWU-104
Low Density Supplement
Form SWU-105
Curb Outlet System Supplement
Form SWU-106
Off -Site System Supplement
Form SWU-107
Underground Infiltration Trench Supplement
Form SWU-108
Neuse River Basin Supplement
Form SWU-109
Innovative Best Management Practice Supplement
Fonn SWU-101 Version 3.99
Page 3 of 4
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
1. Please indicate that you have provided the following required information by initialing in the space provided
next to each item
Initials
• Original and one copy of the Stormwater Management Permit Application Form
• One copy of the applicable Supplement Form(s) for each BMP
Permit application processing fee of $420 (payable to NCDENR)
Detailed narrative description of stormwater treatment/management
Two copies of plans and specifications, including:
- Development/Project name
- Engineer and firm rip,%E D
-Legend
C
- North arrow
- Scale JUL 10 2007
- Revision number & date
- Mean high water line DWQ
- Dimensioned property/project boundary PROd # —_
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VII. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent (individual or firm): Richard B. Moore, P.F. Mr David Acanriarpc -_1RC.
Mailing Address: P.O. Drawer 49
City: Farmville State: NC Zip: 27828
Phone: (252 ) 75-3-9139
VIII. APPLICANT'S CERTIFICATION
Fax: ( 252 ) 753-7220
I, (print or type name of person listed in General Information, item 2) Lindsey A. Crisp
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A
NCAC 2H .1000.
Signature: Date:
C�
Form SWU-101 Version 3.99 Page 4 of
VI. ' SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
1. Please indicate that you have provided the following required information by initialing in the space provided
next to each item.
Initials
Original and one copy of the Stormwater Management Permit Application Form
One copy of the applicable Supplement Form(s) for each BMP
Permit application processing fee of $420 (payable to NCDENR)
Detailed narrative description of stormwater treatment/management
Two copies of plans and specifications, including:
- Development/Project name
- Engineer and firm
-Legend
- North arrow
- Scale
- Revision number & date
- Mean high water line
- Dimensioned property/project boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VII. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent (individual or firm): Richard B. Moore. P.R., Mrnavid AcGnriates'_,Snr_
Mailing Address: P.O. Drawer 49
City: Farmville
Phone: ( 2 5 2 ) 79-1-9139
VIII. APPLICANT'S CERTIFICATION
State: NC
Fax:( 252 ) 753-7220
27828
I, (print or type name of person listed in General Information, item 2) Lindsey A. Crisp
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A
NCAC 21-1.1000.
z /_
Form SWU-101 Version 3,99
Page 4 of 4
Date:.
Permit No. 5 U%D%O 6 /(6
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources Division of Water Quality �Z C.&J'/ Z
STORMWATER MANAGEMENT PERMIT APPLICATJUL
ION FORM �/ �
2 3 2007
INFILTRATION BASIN SUPPLEMENT PROD DWQ
This form may be photocopied for use as an original
DWQ Stormwater Management Plan Review:
A complete stormwater management plan submittal includes a stormwater management permit application, an
infiltration basin supplement for each system, design calculations, soils report and plans and specifications
showing all stormwater conveyances and system details.
I. PROJECT INFORMATION
Project Name: Carver Machine Works 2007 Expansion
Contact Person: Lindsey A. Crisp, President Phone Number: (252 ) 975-3101
This worksheet applies to: Basin No. 1 in Drainage Area 1
(as identified on plans) (from Form SWU-10I)
H. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be
based upon an actual field investigation and soil borings. County soil maps are not an acceptable source
of soils information. All elevations shall be in feet mean sea level (finsl).
Soils Report Summary
Soil Type
Infiltration Rate
SHWT Elevation
Basin Design Parameters
Design Storm
Design Volume
Drawdown Time
Basin Dimensions
Basin Size
Basin Volume Provided
Basin Elevations
Bottom Elevation
Storage Elevation
Top Elevation
Tarboro Sand
1.5 in/hr or cf/hr/sf (circle appropriate units)
5.0 finsl (Seasonal High Water Table elevation)
2 inch (1.5 inch event for SA waters, I inch event for others)
n, rbb c.f.
2.3-1 days
varies ft.x
7.0 fmsl
10.0 finsl
10.5 fmsl
0
sq.ft. (bottom dimensions)
FormSWU-103 Rev3.99 Page 1 of 3
RECEIVED
Ill. REQUIRED ITEMS CHECKLIST
JUL 10 2007
The following checklist outlines design requirements per the Stormwater Best N�gcXient PradNes Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and r n
Section: 15 A NCAC 214 .1008.
Initial in the space provided to indicate that the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. Attach justification if a requirement has not been met.
Applicants Initials
_& a. System is located 50 feet from class SA waters and 30 feet from other surface waters.
!aD!!= — b. System is located at least 100 feet from water supply wells.
2— C. Bottom of system is at least 2 feet above the seasonal high water table.
+ d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon.
N— c. System is not sited on or in fill material or DWQ approval has been obtained.
f. System is located in a recorded drainage casement for the purposes of operation and
maintenance and has recorded access easements to the nearest public right-of-way.
g. Drainage area for the device is less than 5 acres.
!�- It. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is
attached.
i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for
areas draining to SA waters ). Design volume and infiltration calculations attached.
j. System is sized to take into account the runoff at the ultimate built -out potential from all
surfaces draining to the system, including any off -site drainage. Calculations attached.
k. All side slopes stabilized with vegetated cover arc no steeper than 3:1 (H:V).
Tg�_ I. A pretreatment device such as a catch basin, grease trap, filter strip, grassed Swale or
sediment trap is provided.
in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or
dense vegetative cover is provided.
n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum
length is 50 feet for SA waters, 30 feet for other waters).
�^ o. Flow distribution mechanism within the basin is provided.
p. A benchmark is provided to determine the sediment accumulation in the pretreatment device.
q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided).
r. System is designed to draw down the design storage volume to the proposed bottom
elevation under seasonal high water conditions within five days. A soils report and all
pertinent draw -down calculations are attached.
s. Plans ensure that the installed system will meet design specifications (constructed or
restored) upon initial operation once the project is complete and the entire drainage area is
stabilized.
Fonn SWU-103 Rev 3.99 Page 2 of 3
t IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT
1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion,
trash accumulation, vegetative cover, and general condition.
2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow
vegetated cover to maintain a maximum height of six inches, and remove trash as needed.
3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow
structures for blockage and deterioration. Remove any blockage and repair the structure to approved design
specifications.
4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth
in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the
original design depth without over -excavating. Over -excavating may cause the required water table
separation to be reduced and may compromise the ability of the system to perform as designed. Removed
sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will
adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.).
A benchmark shall be established in the pretreatment unit. The benchmark will document the original
design depth so that accurate sediment accumulation readings can be taken. The measuring device used to
determine the depth at the benchmark shall be such that it will give an accurate depth reading and not
readily penetrate into accumulated sediments.
When the design depth reads 5.75 feet in the pretreatment unit, the sediment shall be
removed from both the pretreatment unit and the infiltration basin.
If the Division determines that the system is failing, the system will immediately be repaired to original
design specifications. If the system cannot be repaired to perform its design function, other stormwater
control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed.
I acknowledge and agree by my signature below that I am responsible for the performance of the five
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Print Name and Title: Lindsey A. Crisp, President
Address: 129 Christian Service Camp Road, Washington,, NC 27889
Phone: (252) 975-3101 Date: l `1 -.2
Note: The legally responZd party sho4d not be a homeowners association unless more than 50% of the lots have been sold and a
resident
nojthe subdivision has been named the president. q
1%� � '/� A " 1 t #,h ell , a/Notary Public
nnfor
/the State of & M C L!✓d111V,4 County of
l.U/f1�.1G✓tlAu' do hereby certify that [,/iVJ1$ES/ i+• L►"t personally appeared before me this fZ•
day of Q, L.lfl / , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements.
Witness my hand and official seal,
SEkl,
My commission expires 1.1 / I t/ -c2d / 0
Fonn SWU-103 Rev 3.99 Page 3 of 3