Loading...
HomeMy WebLinkAboutSW7070220_HISTORICAL FILE_20201028STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW_�D7� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ . COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD 9 ROY COOPER Governor MICHAELS.REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality October 28, 2020 1 mAo 3N1,Inc. Attention: Phillip W. Harrington, President P.O. Box 2232 Elizabeth City, NC 27906-2232 Subject: Stormwater Permit Renewal Stormwater Management Permit SW7070220 Mariners Landing, Phase III Pasquotank County Dear Mr. Harrington: A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SV 7070220 for a Stormwater treatment system consisting of three wet detention ponds serving Mariners Landing, Phase 3 located off River Road in Elizabeth City, NC expires on March 15, 2021. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Permit application forms for renewal can be found on our website at: https //dec nc ov/about/divisions/enerev-mineral-iand-resources/enerav-mineral-tand- rutes/storm�vater-prroa.ram/post-construction. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application form. You can request a copy by e-mailing me at roger.thorpe(q�ncdenr.gov. Sincerely, Roger K. Thorpe Environmental Engineer �� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Washington Regional Office0.13 Washington Square Mall I `Washington. North Carolina 27880 ..m,mm.u�.n�..�..i.uw.r 252.04o.648l V4ArE9 11 6 Y Mr. Milton Tadlock, President 3 N 1, Inc. PO Box 710 Elizabeth City, NC 27907 Dear Mr. Tadlock: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality January 14, 2010 Subject: Request for Stormwater Application Stormwater Review SW7070220 Mariners Landing, Phase III Pasquotank County This office received notification of the minor modification to your CAMA Major permit and minimal plans for the new boat ramp proposed at Mariners Landing subdivision in Pasquotank County. State Stormwater permit SW7070220 requires that any project that proposes any modification from the previously approved plans must receive approval by the Division of Water Quality prior to any construction. Please submit an application for permit modification of SW7070220 to the Division of Water Quality prior to February 14, 2010. To obtain a Stormwater Permit Modification you must submit a completed application, application fee of $505.00, two sets of plans and specifications showing the proposed project and all stormwater treatment units along with engineering calculations and a narrative description. This application package should be received by this office prior to February 14, 2010. If an application package is not received by this date we will consider the project incomplete and the development of the proposed boat ramp shall not be permitted. Any development of the site beyond what is currently approved and prior to receipt of the required permit modification will constitute a violation of permit number SW7070220, 15A NCAC 2H.1000 and North Carolina General Statute 143-215.1 and may result in appropriate enforcement action including a civil penalty assessment of up to $10,000 per day. Please reference the Stormwater Project Number above on all correspondence. If you have questions, please feel free to contact me at (252) 948-3848, cc: Sean Robey, PE (by email) Jonathan Howell, DCM (by email) Washington Regional Office Sincerely, Scott Vinson Environmental Engineer 11 Washington Regional Office North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service Internet: h2o.mr.state.nc.us 943 Washington square Mall, Washington, NC 27889 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper P Vinson, Scott From: Howell, Jonathan Sent: Friday, October 16, 2009 2,41 PM To: Vinson, Scott; Wheeler, Tracey L SAW; Mckenna, Sean; Christy, Vivian; Russell, Kelly Subject: Philip Harrington 3-N-1 CAMA Permit # 93-06 to 3-N-1 c/o Philip Harrington has requested a minor modification to his existing permit. The request if for a boat ramp with (2) access piers and two walkways immediately landward of the existing bulkhead. Can you please submit comments to me when you get a chance. Thanks. Drawings are attached. DWQ # 06-0556 (Vivian, please forward to your appropriate staff for me. Thanks) Action ID #200632620 Jonathan Howell Asst. Major Permits Coordinator 400 Commerce Avenue Morehead City, NC 28557 (252)808-2808 (Ext. 211) www. nccoasta ImanaRement.net E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. C" e� Pe/f­_'A r �Pa1� 9. �iVe I- ------ ------- i Ad N5ENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary VIl t(/ MEMORANDUM av �, t 1 / TO Doug Huggett, Major Permits Coordinator JUL 1 7 (liJ FROM: Kelly Russell, Field Representative, NE DistrMt*head City DCM THROUGH: Frank Jennings III, District Manager, NE District17 DATE: July 16, 2009 SUBJECT: Request for Minor Modification of Major Permit #93-06 issued to: 3-N-I (Phillip Harrington) REFERENCE: (a) Letter from Phillip Harrington (received July 15, 2009) requesting a Minor Modification to Major Permit #93-06 (b) 15A NCAC 07J.0405, Permit Modification Minor Modification to Major Permit 1. Phillip Harrington of 3-N-1 has requested a Minor Modification to Major Permit #93-06, which was issued on 1/3/2007 and expires on 12/31/2010. The original major permit authorized development of Mariner's Landing Subdivision. 2. Phillip Harrington has requested to modify Major Permit #93-06 to construct a boat ramp and 2 40' x 6' shoreside docks and 2 75' x 6' wooden boardwalks for the subdivision property owners. 3. I conducted a site visit on July 15, 2009 to review the Minor Modification request pursuant to the provisions of reference (a) and have determined that the request meets the requirements contained in 15A NCAC 07H .0208 USE STANDARDS. 4. The required fee of $100, paid by check #2188, was received by the Elizabeth City District Office on June 25, 2009. A copy of this monetary transaction is attached for your records. 5. It is recommended that the Minor Modification request be granted, provided all the Permit Conditions of the original permit issued on 1/3/2007 remain in affect 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 \ FAX: 252-264-3723 \ Internet: http://dcm2.enr.state.nc.us An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10 % Post Consumer Paper Cana, (yp'x (o� Women Wnikwnl-yl--- Canal ,�o' x bWood", 'A%nikwax Nh ✓;v,. t, rY'FuruN �5 RscerIA/" JUL 1 7 2009 Morehead City DCM �`Qgril:cr5 a��c�in Saa'( ;':-!c k, .r, _, .., KOJEffDESCRIPTLON, Mariners Landing Phase III Pasquotank County — Elizabeth City - North Carolina 2007 a 9 L� i Mariners Landing Phase III is a proposed residential subdivision containing 155 lots. The tract contains 93.99 acres and is located off of River Road (SR 1169) adjacent too subdivisions that are currently under construction.- These subdivisions were /Glen are-owried-by 3 N 1, t- 5u70y/A'7 Development of this site will include construction of curb and guttered streets, water mains, sewer mains, a sewer pump station, and multiple detention ponds. The streets will contribute 8.81 acres of impervious surface, the sidewalks contribute another 2.02 acres, the pump static -lot will be limited to-5 0�sf and eaph lot will be limited to 8,5500s of impervious surface. The total site coverage is 41.18 acres or 43.81 %. According to the Pasquotank County Soils Maps as prepared by USDA, Soil Conservation Service, the soils on this site are predominately Augusta and Altavista with small areas of Nixonton, Tomotley, and Cape Fear. Four soil borings were performed in the detention pond areas by Sean C. Robey, PE and Kimberly Hamby on February 12, 2007. All soil borings were conducted with an AMS 2-3/4" diameter, 6' long, hand mud auger. Boring No. 1 was located in the area for the secondary basin for Pond 1. The elevation at the boring location is approximately 7.5'. The first 6-8" inches were loamy topsoil. From 8-30" was a silty clay loam, from 30-42" was a very fine sandy loam, and at 42" it changed to sand. At 66" the sand was wet and we were unable to remove any additional soil with the auger we were using. We estimate the seasonal high water table to be approximately 66" below the surface, or elevation 2.0'. Boring No. 2 was located in the area of the primary basin for Pond 1. The elevation at the boring location is approximately 7.25'. This boring matched Boring No. I exactly except that soil coloration indicated a high water elevation at 60". We estimate the seasonal high water table in this area to be approximately 60" below the surface, or elevation 2.25'. We also observed the adjacent detention pond and noted that it is maintaining its design permanent pool. That pond was designed to have a permanent pool elevation of 4.0 at datum NGVD 29, that would translate to elevation 3.0 at the new datum of NAVD 88. The permanent pool for Pond 1 has been set at 3.0'. Boring No. 3 was located in the area for Pond 2. The elevation at this location is approximately 7.5'. The first 8" were topsoil. From 8-60" was a silty clay. Below 60" was a sandy clay loam. Based on a change in coloration at 54", we estimate the seasonal high water table at 54" or elevation 3.0'. The permanent pool elevation for Pond 2 has been set at elevation 3.0'. Boring No. 4 was made in the area of proposed Pond 3. The elevation at this location is approximately 9.5'. The first 6-8" inches were loamy topsoil. From 8-48" was a sandy clay loam, and at 48" there was an increase in the clay content. At 66-70" it changed to sand. At this point, we had reached the limits of our 6' auger and had not yet seen evidence of the high water table. We observed the adjacent ditch and detention pond that was constructed for Grandview Phase 2. The water level in each appeared to be holding between elevation 2 and elevation 3. Based on this information and the results of the other 3 borings, we estimate the seasonal high water table to be between elevation 2.0' and 3.0'. The permanent pool for Pond 3 has been set at 3.0'. The first two borings supported the soils map classification of Altavista and the third and fourth boring had the higher clay content of the Augusta soils. While the soils have permeability rates that could support infiltration, this project is too large to utilize infiltration basins. We have determined that wet detention basins are the most appropriate method of storm water treatment for this development. All of the detention ponds are designed for 90% TSS removal. Detention Pond I will drain through a piped outlet to a tributary of the Pasquotank River. This piped outlet will be located in a 20' drainage easement that was deeded to 3 N I, LLC. A CAMA permit is being obtained to discharge into the tributary as it is in CAMA jurisdiction. The other two ponds discharge into an existing ditch that drains into a canal that drains directly to the Pasquotank River. In addition to meeting state requirements for stornwatcr treatment, this site will comply with the City of Elizabeth City's Stornwater Ordinance. This ordinance requires that post development runoff not exceed pre development runoff during a 10 year storm event. TR-55 was utilized to estimate the I0-year peak pre development runoff for the entire site at 145.8 cfs and post development runoff for each drainage area. Our "chainsaw routing" method detention pond spreadsheets calculate the peak discharge out of each pond. Based on these methods we have determined the following: Drainage Area Post -development runoff Detention Pond Discharge 1 80.80 cfs 25.88 cfs 2 86.99 cfs 46.63 cfs 3 75.36 cfs 30.74 cfs Total 243.15 cfs 103.25 cfs -Dr_ a ge Area Ucontains 28.91 acres that are designed to drain to Detention Pond 1. It contains all or most of lots 198-211, 222-250, and approximately half of lots 197, 251, and 212-221. The impervious area includes 2.78 acres of streets, 0.65 acres of sidewalk and 9.56 acres of allowable built -upon area on the lots for a resulting impervious area of 12.99 acres or 44.93%. The runoff from the backs of lots 197-200, 208-211, 222-232 and a portion of lots 201 and 212 will sheet flow across grassed yards into swales with 3:1 side slopes that drain to the detention pond. Runoff from the backs of lots 246-251 will sheet flow into a grassed lined Swale with 3:1 side slopes that will connect to the underground collection system. Some of the runoff from the lots adjacent to the pond will sheet flow directly into Detention Pond 1. Runoff from the fronts of the lots will sheet flow across grassed yards over the curb and into the curb and gutter system All of the stormwater from the rest of the lots and streets will be collected in the curb and gutter system that drains into the underground collection system routed to the detention pond. Drainage Areacontains 32.84 acres. The impervious area includes 3.28 acres of street, 0.72 acres of sidewalk, and 10.16 acres of allowable built -upon area on the lots for a resulting impervious area of 14.16 acres or 43.12%. It includes all or most of lots 97- 124, and 185-196 and about half of lots 251, 197, 212-221, 183, 184, 125, 127-134. The runoff from the back yards of lots 97-103, 106-113, 118, 119, and 122-127 will sheet flow to ditches with 3:1 side slopes that either connect to the underground piping system or drain to the forebay of Detention Pond 2. Some of the runoff from the lots adjacent to the pond will sheet flow directly into the pond. Lots 103-105, 114, and 115 are adjacent to a large ditch that drains the River Road Middle School property. These lots will have to be graded to force all runoff from impervious surfaces to the front of the lots and into the roadway drainage system. If necessary, gutters and downspouts shall be utilized to route runoff to the collection system. The rest of the yards' runoff will sheet flow across grassed yards, over the curb, and into the curb and gutter system which is routed to Detention Pond 2 via underground collection system. Drainage-Area.3-contains 25.68 acres. The impervious area includes 2.75 acres of street, 0.65 acres of sidewalk, and 10.63 acres of allowable built -upon area on the lots for a resulting impervious area of 14.03 acres or 54.63%. It contains all or most of lots 126, 135-182 and 179-182 and approximately hall' of lots 125, 127-134, 183, and 184. The runoff from the backs of lots 141-154 will sheet flow to a swale with 3:1 side slopes that drains directly into Detention Pond 3. Some of the runoff from the lots adjacent to the pond will sheet flow directly into the pond. Lots 160-177 are located adjacent to a canal that is in LAMA jurisdiction. These lots -will -have -to be grad cd_to_forca_all_runofLfronr _impervious surfaces to`thc`front-ol epic -lots -an _=roadwa`y drainage -system' If necessary, gutters and downspouts shall be utilized to route runoff to the collection system. The runoff from the rest of the lots will sheet flow over the curb into the curb and gutter system that drains into the underground collection system. All of the stonmwater from this drainage area is routed to Detention Pond 3. The disturbed area for development will not exceed 95 acres. Limits of disturbance have been shown on the plans. aw BORE (I Q 7M 7m MARINERS LANDING PHASE 3 BORE LOCATION MAP FEBRUARY 12, 2007 /3 aae BORE ua PERMANENT POOP. DETENTION PONDS layman & Robey, PC DESIGN OF POND 150-A Hwy 158 East Camden, NC 27921 Mariners Landing Phase 3 --Pot, )d,1_ (252)-335-1888 10 Yr, 24 Fir Storm 02/15/07 DETENTION POND Page I SA/DA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER % IMPRV 3.0 177' 3.5 FT 4.0 Fr 4.5 FI' 5.0 FF 5.5 Fr 6.0 FI' 6.5 1-1' ZO I-7 10% 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 OL 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 0.9 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 50% 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 39 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 WATERSHED AREA: 28.91 ACRES WATERSHED % IMPERVIOUS: 449 % PERMANENT POOL ELEVATION: 3 FI' DESIGN PERMANENT POOL DEPTH: 4 Fr SA/DA PERCENTAGE FACTOR: 3.9 % (FROM A11ovETAR1.1;- TAKEN PROM DrSIGN OFSI ORM WA'1171Z CONTROL FACII.I I ES WORKS] TOP MANUAL - PENC 1988) POND SURFACE AREA REQ'D: 49113 SF FOREBAY AREA: 14734 SF AT WIDTH = 0.33 LENGTH, WIDTH = 127.95 LF (BASED UPON MINIMUM SURFACE AREA) LENGTH = 383.949 LF Use these dimensions: WIDTH 102.74 LF LENGTH 872.1 LF VOLUME OF 1 " RAINFALL AREA OF ROOFS: 4.78 AC AREA OF PARKING/CONCRETE: 8.21 AC AREA OF GREEN AREAS: 15.92 AC VOLUME OF RUNOFF 57221.5 CF STORAGE DEPTH FOR MINIMUM AREA = ELEVATION OF I" RAINFALL = 3.64 Normal Pool Elevation 3 VOL (CF)=[(ROOF* 1.0)+(PAR KING *.95)+(GRASS*0.2)1'43,50/12 0.64 FT SEAL 18550 • +F'vgIN.ee" . �� I�I IRpOSi DRAWDOWN - WATER QUALITY Q(2 DAYS) = 0.33114 CFS Q(5 DAYS) = 0.13246 CPS 1" RUNOFF STAGE- 0.64 FI' DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT I" RUNOFFOUTLETDEVICE: 3.95221 INCHDIAHOLE A=[Q/(Cd*SQR'T(2gh))]*l44 Rad.=SQRT(A/PI) Dia. =2*Rid. DIAMETER OF HOLE TO USE: 4.5 INCH DIAMETER I" STORM RUNOFF DRAWDOWN TIME 2.20388 DAYS INFLOW HYDROGRAPH Retum Year Storm 10 Yr Qp = Peak Discharge = 80.8 CIS Tc = Time of Concentration = 22.21 min Calculation of'l'p (Time to Peak) From SCS NEH 4, page 15-7 Eqn. 15.4 Lag Time (L) = (1^0.8*(S+l)^0.7)/(1900*Y^0.5) for L in firs where: I = hydraulic length of watershed (ft) = 1378 S=(1000/CN)-10 = 1.62791 CN = approximately same CN fjorn'TR-55 = 86 -. Y = avg. watershed land slope in % = 0.28 S = (1000/CN)-10 = 1.62791 L= 0.63503 his From SCS NEH 4, page 16-7 Eqn. 16.7 Tp=D/2+L where: D = unit of excess duration rainfall (firs) L = Lag Time (firs) From SCS NEH 4, page 16-8 Eqn. 16.12 D = 0.133 tc where: Tc = Time of Concentration (firs) - (See Tr-55 Printout) THEREFORE: D = 0.04923 firs Tp = 0.65965 firs = 39.5787 min Volume under Hydrograph = 1.39 * Qp * Tp = 266710 Cubic Feet = i SEAL 18550 i �qN C. 000'�, Inflow Hydrograph SCS Dimensionless Hydrograph Time Discharge Time Ratio Ratio hr Discharge Volume cfs cf 0.00 0.00 0.00 0 0.10 0.03 0.07 2 576 0.20 0.10 0.13 8 1919 0.30 0.19 0.20 15 3646 0.40 0.31 0.26 25 5948 0.50 0.47 0.33 38 9018 0.60 0.66 0.40 53 12664 0.70 0.82 0.46 66 15734 0.80 0.93 0.53 75 17845 0.90 0.99 0.59 80 18996 1.00 1.00 0.66 81 19188 1.10 0.99 0.73 80 18996 1.20 0.93 0.79 75 17845 1.30 0.86 0.86 69 16501 1.40 0.78 0.92 63 14966 1.50 0.68 0.99 55 13048 1.60 0.56 1_06 45 10745 1.70 0.46 1.12 37 8826 1.80 0.39 1.19 32 7483 1.90 0.33 _ 1.25 27 6332 2.00 0.28 1.32 23 5373 2.20 021 1.45 17 7944 2.40 0.15 1.58 12 5641 2.60 0.11 1.72 9 4106 2.80 0.08 1.85 6 2955 3.00 0.06 1.98 4 2111 3.20 0.04 2.11 3 1535 3.40 0.03 2.24 2 1113 3.60 0.02 2.37 2 806 3.80 0.02 2.51 1 576 4.00 0.01 2.64 1 422 4.50 0.01 2.97 0 480 5.00 0.00 3.30 0 0 VOIUnle under hydrograph = 253336 cf Based upon runoff volume = 266710 cf Depth re(Id for minimum area = 2,97669 "SEAL - j 18550 = t G i '•.�'.'OINEEP //',//����ICI I I lflloO��\\\\\\\ STAGE STORAGE FUNCTION OF POND (FOR RECTANGULER DETENTION POND ONLY) Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE In s S Z sf ct of ft Page 4 Pond Side Slope (M) = bi Z Z est Elevation 89600 0 0 0 Surface area at normal pool 3 92533 45533 45533 0.5 10.73 -0.69 0.59 3.5 95485 47004 92538 1 11.44 0.00 1.08 4 98454 48485 141022 1.5 11.86 0.41 1.56 4.5 101442 49974 190996 2 12.16 0.69 2.03 5 104447 51472 242468 2.5 12.40 0.92 2.50 5.5 107471 52979 295448 3. 12.60 1.10 2.97 6 110512 54496 349944 3.5 12.77 1.25 3.44 6.5 113572 56021 405965 4 12.91 1.39 3.91 7 116649 57555 463520 4.5 13.05 1.50 4.39 7.5 119745 59098 522618 5 13.17 1.61 4.87 8 Regression Output: Constant 9.34346 Ks = S/ZN) = 84366.33 Std Err of Y Est 0.00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Std Err of Coef. 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISER/BARRELL SPILLWAY W EMERGENCY WEIR) RISER Dr = 18 Riser Dia. (in) Etop = 20.00 Elev. Top Riser (it) Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff Hln = 5 Number of Holes H ld = 2 Hole Dia. (in) EHI = 20.00 Elev. Holes (1) H2n = 5 Number of Holes 112d = 2 Hole Dia. (in) EH2 = 20.00 Elev. Holes (2) 113n 0 Number of Holes H3d = 2 Hole Dia. (in) EH3 = 20.00 Elev. Holes (3) BARREL: Db = 15 Barrel Dia. (in) Einv = 20.00 Elev Invert Barrel (ft) C(lb = 0.60 Barel orifice coeff 5.98 Barrell Adjustment Factor 3 EMERGENCY WEIR Page 5 Cw = 3 Weir coeff Ecr = 3.(A Elev weir coeff (ft) Lw = 6 Weir Length (ft) Riser Riser Riser Elevation Hole Hole Hole Riser Riser Barrel Principal Emergey (1) (2) (3) (weir) (orifice) Spillway Weir 3.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.01 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.05 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.10 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.19 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.30 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.45 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.63 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.82 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.4 4.02 0.0 0.0 0.0 0.0 0.0 0.0 0.00 4.2 4.20 0.0 0.0 0.0 0.0 0.0 0.0 0.00 7.6 4.37 0.0 0.0 0.0 0.0 0.0 0.0 0.00 11.3 4.52 0.0 0.0 0.0 0.0 0.0 0.0 0.00 14.8 4.64 0.0 0.0 0.0 0.0 0.0 0.0 0.00 18.1 4.74 0.0 0.0 . 0.0 0.0 0.0 0.0 0.00 20.9 4.82 0.0 0.0 0.0 0.0 0.0 0.0 0.00 23.1 4.87 0.0 0.0 0.0 0.0 0.0 0.0 0.00 24.6 4.90 0.0 0.0 0.0 0.0 0.0 0.0 0.00 25.4 4.91 0.0 0.0 0.0 0.0 0.0 0.0 0.00 25.8 4.91 0.0 0.0 0.0 0.0 0.0 0.0 0.00 25.9 4.90 0.0 0.0 0.0 0.0 0.0 0.0 0.00 25.4 4.86 0.0 0.0 0.0 0.0 0.0 0.0 0.00 24.3 4.81 0.0 0.0 0.0 0.0 0.0 0.0 0.00 22.6 4.74 0.0 0.0 0.0 0.0 0.0 0.0 0.00 20.8 4.68 0.0 0.0 0.0 0.0 0.0 0.0 0.00 19.0 4.61 0.0 0.0 0.0 0.0 0.0 0.0 0.00 17.2 4.55 0.0 0.0 0.0 0.0 0.0 0.0 0.00 15.6 4.49 0.0 0.0 0.0 0.0 0.0 0.0 0.00 14.0 4.43 0.0 0.0 0.0 0.0 0.0 0.0 0.00 12.6 4.38 0.0 0.0 0.0 0.0 0.0 0.0 0.00 11.4 4.25 0.0 0.0 0.0 0.0 0.0 0.0 0.00 8.7 4.16 0.0 0.0 0.0 0.0 0.0 0.0 0.00 6.7 r 18550 •F'vQINEEP`. sFgN C. ���g11111I tImO, \\ Page 6 ROUTING OF INFLOW HYDROGRAPH "THROUGH POND AND OUTFLOW DI VICE ' Total Riser Riser Riser Barrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway - t(hr) cfs cf Elevation cfs (1+2+3) cfs cfs cfs cfs cfs 0.000 0 0 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.066 2 0 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.132 8 575.633 3.01 0.00 0.00 0.00 0.00 0.00 0.00 0.198 15 2494.41 3.05 0.00 0.00 0.00 0.00 0.00 0.00 0.264 25 6140.08 3.10 0.00 0.00 0.00 0.00 0.00 0.00 0.330 38 12088.3 3.19 0.00 0.00 0.00 0.00 0.00 0.00 0.396 53 21106.5 3.30 0.00 0.00 0.00 0.00 0.00 0.00 0.462 66 33770.5 3.45 0.00 0.00 0.00 0.00 0.00 0.00 0.528 75 49504.4 3.63 0.00 0.00 0.00 0.00 0.00 0.00 0.594 80 67349.1 3.82 1.40 0.00 0.00 0.00 0.00 1.40 0.660 81 86012 4.02 4.17 0.00 0.00 0.00 0.00 4.17 0.726 80 104211 4.20 7.57 0.00 0.00 0.00 0.00 7.57 0.792 75 121409 4.37 11.26 0.00 0.00 0.00 0.00 11.26 0.858 69 136579 4.52 14.84 0.00 0.00 0.00 0.00 14.84 0.924 63 149558 4.64 18.10 0.00 0.00 0.00 0.00 18.10 0.989 55 160226 4.74 20.91 0.00 0.00 0.00 0.00 20.91 1.055 45 168309 4.82 23.10 0.00 0.00 0.00 0.00 23.10 1.121 37 173568 4.87 24.57 0.00 0.00 0.00 0.00 24.57 1.187 32 176561 4.90 25.41 0.00 0.00 0.00 0.00 25.41 1.253 27 178016 4.91 25.82 0.00 0.00 0.00 0.00 25.92 1.319 23 178211 4.91 25.88 0.00 0.00 0.00 0.00 25.88 1.451 17 176667 490 25.44 0.00 0.00 0.00 0.00 25.44 1.583 12 172529 4.86 24.27 0.00 0.00 0.00 0.00 24.27 1.715 9 166641 4.81 22.65 0.00 0.00 0.00 0.00 22.65 1.847 6 159992 4.74 20.84 0.00 0.00 0.00 0.00 20.94 1.979 4 153047 4.68 19.00 0.00 0.00 0.00 0.00 19.00 2.111 3 146132 4.61 17.22 0.00 0.00 0.00 0.00 17.22 2.243 2 139488 4.55 15.55 0.00 0.00 0.00 0.00 15.55 2.375 2 133215 4.49 14.02 0.00 0.00 0.00 0.00 14.02 2.507 1 127362 4.43 12.63 0.00 0.00 0.00 0.00 12.63 2.639 1 121938 4.38 11.38 0.00 0.00 0.00 0.00 11.38 2.968 0 109478 4.25 8.66 0.00 0.00 0.00 0.00 8.66 3.298 0 99681.3 4.16 6.67 0.00 0.00 0.00 0.00 6.67 4.91372 = maximum stage elevation 25.8752 = maximum discharge ts550 = i ''•. FNQINEF,'e''•i Mariner's Landing Phase 3 Pond 1 - Pasquotank County 10yrSTORM 90 70 y 60 a� 50 a. 1Xi ro 40 0 3020 a 10 6 el , i q p p--D---- p'"'I I1 .A— —01 . jq a ° 0.000 0.500 1.000 1.500 2.000 2.500 3.000 3,500 Time (hrs) ° INFLOW (cfs) OUTFLOW (cfs) a .SEAL 8550 Jf •. .�a1Ntr•�•: ;,'4� c. Aoely POND VOLUME CALCULATIONS FOR 050591 POND 1 VOLUME CALCULATIONS (2 basins 1 forebay).xls POND CALCULATIONS AREA TOTAL PERMANENT POOL SURFACE AREA PERMANENT POOL SURFACE AREA (primary - pond w/ forebay) PERMANENT POOL SURFACE AREA (secondary - pond w/out forebay) MAIN BASIN SURFACE AREA (primary) FOREBAY SURFACE AREA MAIN BASIN SURFACE AREA (secondary) AREA AT EDGE OF MAIN BASIN SHELF (primary) AREA OF MAIN BASIN BOTTOM (primary) AREA AT EDGE OF FOREBAY SHELF AREA OF FOREBAY BOTTOM AREA AT EDGE OF MAIN BASIN SHELF (secondary) AREA OF MAIN BASIN BOTTOM (secondary) SURFACE AREA AT 1" STORAGE (primary) SURFACE AREA AT 1" STORAGE (secondary) ELEVATIONS PP ELEVATION ELEVATION AT EDGE OF MAIN BASIN SHELF ELEVATION OF MAIN BASIN BOTTOM ELEVATION AT EDGE OF FOREBAY SHELF ELEVATION OF FOREBAY BOTTOM ELEVATION OF 1" STORAGE VOLUME CALCULATIONS Fz 89,606.46 63,120.63 /7 �i(7� 1 26,485.83 �PSh 40,716.67 22,403.96 26,485.83 31, 344, 08 24,727.03 17,596.30 15,545.32 19,018.92 14,260.18 65,713.01 27,991.37 F 3.00 -1.00 1.33 0.00 3.64 FD MAIN BASIN VOLUME (primary) 125,493.57 MAIN BASIN VOLUME (secondary) 76,766.62 FOREBAY VOLUME 55,439.39 PERMANENT POOL VOLUME 257,699.58 FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME 21.51% TEMP. STORAGE VOLUME (1" RUNOFF) 58,659.47 TEMPORARY STORAGE OFFSET / ;§r% '•., , SLOPE (EX: IF 3:1 ENTER 3) _ p EAL = 3.00 F/ 18550 OFFSET FROM PP 1.92 �FNQINEEP�. BASIN DIAGRAM CALC iiAFtiI4N (; p$�����\N\ MAIN POND IIIII III SEDIMENT REMOVAL ELEVATION 0.00 PP DEPTH READS ... SEDMENT SHALL BE REMOVED 3.00 FOREBAY SEDIMENT REMOVAL ELEVATION 0.75 PP DEPTH READS ... SEDIMENT SHALL BE REMOVED 2.25 FILE LOCATION - S.Wyman A Robey'OS050591 - Rie or Glen SExcoA050591 POND I VOLUME CALCULATIONS (2 basins 1 lerebay).xle TAB -SAeetl 2/IWW7C56PM PAGE 1 OF 1 PERMANENT POOL DETENTION PONDS DI✓SIGN OF POND Mariners Landing Phase 3 - Pow 10 Yr, 24 Hi Storm DETENTION POND I lyman & Robey, PC 150-A I Iwy 158 East Camden, NC 27921 (252)-335-1888 02/15/07 SA/DA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATI VE 17ILTEIZ % IMPRV 3.0 FI' 3.5 FT 4.0 FT 4.5 FT 5.0 FI' 5.5 F7' 6.0 FI' 10% 1.3 1.0 0.8 0.7 0.6 0.5 0.4 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 40%a 4.5 4.0 3.5 3.1 2.8 2.5 2.1 50% 5.6 5.0 4.3 3.9 3.5 3.1 2.7 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 WATERSHED AREA: 32.84 ACRES WATERSHED % IMPERVIOUS: 43.12 % PERMANENT POOL ELEVATION: 3 FF DESIGN PERMANENT POOL DEPTH: 4 FT SA/DA PERCENTAGE FACTOR: 3.75 % POND SURFACE AREA REQ'D: FOREBAY AREA: AT WIDTH =0.33 LENGTH, WIDTH = LENGTH = Use these dimensions: 53644 SF 16093 SF 6.5 FI' 0.3 1.0 1.3 1.8 2.3 2.9 3.4 4.0 4.6 5.1 Page I 7.0 FT 0.2 0.9 1.4 1.9 2.4 2.9 3.4 39 4.3 (MOM A13OVE'I A BL Ii -TAKEN mom DESIGN OI'SrORM WATER CON I1101. 1'AC I LITIES WORKSHOP MANUAL-1'ENC 1988) 133.721 LF (BASED UPON MINIMUM SURFACE AREA) 401,164 LF WIDTH 155.7 LF LENGTH 590.46 LF VOLUME OF 1 " RAINFALL AREA OF ROOFS: 5.08 AC AREA OF PARKING/CONCRETE: 9.08 AC AREA OF GREEN AREAS: 18.68 AC VOLUME OF RUNOFF 63314.5 CF STORAGE DEPTH FOR MINIMUM AREA = ELEVATION OF I" RAINFALL = 3.69 Normal Pool Elevation 3 VOL (CF)=[(ROOF' 1.0)+(PAR KING*.95)+(GRASS'0.2)1'43,560/12 0.69 FT DRAWDOWN - WATER QUALITY Q(2 DAYS) = 0.3664 CFS Q(5 DAYS) = 0.14656 CPS I" RUNOFF STAGE 0.69 FI' DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT I" RUNOFF OUTLET DEVICE: 4.07962 INCH DIA HOLE A=tQ/(Cd*SQRT(2gh))]* 144 Rad.=SQRT(A/Pl) Dia.=2*Rad. DIAMETER OF HOLE TO USE: 4.75 INCH DIAMETER I" STORM RUNOFF DRAWDOWNTIME 2.10758 DAYS INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = 86.99 cis Tc = Time of Concentration = 20.27 min Calculation of Tp (Time to Peak) From SCS NEH 4, page 15-7 Eqn. 15.4 Lag Time (L) = (IA0.8*(S+1)A0.7)/(1900*YA0.5) for L in I Its where: I = hydraulic length of watershed (f ) S = (I000/CN)-10 CN = approximately same CN from TR-55 Y'=.avg. watershed land slope in % S = (1000/CN)-10 = 1.62791 L= 0.78723 [its From SCS NEH 4 , page 16-7 Eqn. 16.7 Tp=D/2+L where : D = unit of excess duration rainfall (his) L = Lag Time (hrs) From SCS NEH 4 , page 16-8 Eqn. 16.12 D = 0.133 Ic where: Tc =Time of Concentration ([its) - (See Tr-55 Printout) THEREFORE: D = 0,04493 hrs Tp= 0.80969 hrs = 48.5816 min Volume under Hydrograph = 1.39 * Qp * Tp = 352458 Cubic Feet = 1.594 1.62791 = 86 0.23 —r,2EAL v - 185$p Inflow Hydrograph SCS Dimensionless Hydrograph Timc Discharge Time Discharge Volume Ratio Ratio fir CI's of 0.00 0.00 0.00 0 0.10 0.03 0.08 3 761 0.20 0.10 0.16 9 2536 0.30 0.19 0.24 17 4818 0.40 0.31 0.32 27 7861 0.50 0.47 0.40 41 11918 0.60 0.66 0.49 57 16735 0.70 0.82 0.57 71 20792 0.80 0.93 0.65 81 23582 0.90 0.99 0.73 86 25103 1.00 1.00 0.81 87 25357 1.10 0.99 0.89 86 25103 1.20 0.93 0.97 81 23582 1.30 0.86 1.05 75 21807 1.40 0.78 1.13 68 19778 1.50 0.68 1.21 59 17243 1.60 0.56 1.30 49 14200 1.70 0.46 1.38 40 11664 1.80 0.39 1.46 34 9889 1.90 0.33 __ 1.54 29 8368 2.00 0.28 1.62 24 7100 2.20 0.21 1.78 18 10498 2.40 0.15 1.94 13 7455 2.60 0.11 2.11 9 5426 2.80 0.08 2.27 7 3905 3.00 0.06 2.43 5 2789 3.20 0.04 2.59 3 2029 3.40 0.03 2.75 3 1471 3.60 0.02 2.91 2 1065 3.80 0.02 3.08 1 761 4.00 0.01 3.24 1 558 4.50 0.01 3.64 0 634 5.00 0.00 4.05 0 0 Volume under hydrograph = 334784 cf Based upon runoff volume = 352458 cf Depth req'd for minimum area = 3.83379 1 SEAL 18550 _- rf • QINEO' . \\ STAGE STORAGE FUNCTION OF POND (FOR RECTANGULER DETENTION POND ONLY) Pond Side Slope (M) _ Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE bi s In Z Z est Elevation S Z sf cf of It 91935 0 0 0 Surface area m normal pool 3 94182 46529 46529 0.5 10.75 -0.69 0.59 3.5 96448 47657 94187 I 11.45 0.00 1.09 4 98731 48795 142981 1.5 11.87 0.41 1.57 4.5 101033 49941 192922 2 12.17 0.69 2.04 5 103352 51096 244018 2.5 12.40 0.92 2.50 5.5 105690 52260 296279 3 12.60 LI0 2.96 6 108045 53434 349712 3.5 12.76 1.25 3.42 6.5 110418 54616 404328 4 12.91 1.39 3.88 7 112810 55807 460135 4.5 13.04 1.50 4.34 7.5 115219 57007 517143 5 13.16 1.61 4.80 8 Regression OulPut Constant 9.34346 Ks = S/Z^b = 84905.62 SW Err of Y Est 0.00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Std Err of Coef. 0,01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISER/BARRELL SPILLWAY W EMERGENCY WEIR) RISER Dr = 18 Riser Dia. (in) Flop = 20.00 Elev. Top Riser (ft) Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff Hln = 5 Number of Holes Hld = 2 Bole Dia. (in) EH1 = 20.00 Elev. Holes (1) H2n = 5 Number of Holes 1-12d = 2 Hole Dia. (in) EH2 = 20.00 Elev. Holes (2) H3n = 0 Number of Holcs 1-13d = 2 1"tole Dia. (in) EF13 = 20.00 Elev. Holes (3) BARREL: Db = 15 Barrel Dia. (in) Einv = 20.00 Elev Invert Barrel (ft) Cdb = 0.60 Barrel orifice coeff 6.83 Page 4 3 .fCA " • = 1855050 'Is,INEEQ':' C. Ho Barrel Adjusunent Factor EMERGENCY WEIR Page 5 Cw = 3 Weir coell' Ecr = 3.69 Elev weir coeff (ft) Lw = 10 Weir Length (fo Riscr Riser Riser Elevation Hole Hole Hole Riser Riser Banel Principal Emergcy (1) (2) (3) (weir) (orifice) Spillway Weir 3.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.02 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.06 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.13 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.23 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.38 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.57 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.80 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.1 4.04 0.0 0.0 0.0 0.0 0.0 0.0 0.00 6.2 4.27 0.0 0.0 0.0 0.0 0.0 0.0 0.00 13.3 4.48 0.0 0.0 0.0 0.0 0.0 0.0 0.00 21.1 4.66 0.0 0.0 0.0 0.0 0.0 0.0 0.00 28.7 4.80 0.0 0.0 0.0 0.0 0.0 0.0 0.00 35.3 4.91 0.0 0.0 0.0 0.0 0.0 0.0 0.00 40.5 4.99 0.0 0.0 - 0.0 0.0 0.0 0.0 0.00 44.2 5.03 0.0 0.0 0.0 0.0 0.0 0.0 0.00 46.3 5.03 0.0 0.0 0.0 0.0 0.0 0.0 0.00 46.6 5.01 0.0 0.0 0.0 0.0 0.0 0.0 0.00 45.7 4.98 0.0 0.0 0.0 0.0 0.0 0.0 0.00 44.1 4.94 0.0 0.0 0.0 0.0 0.0 0.0 0.00 42.0 4.85 0.0 0.0 0.0 0.0 0.0 0.0 0.00 37.3 4.74 0.0 0.0 0.0 0.0 0.0 0.0 0.00 32.3 4.63 0.0 0.0 0.0 0.0 0.0 0.0 0.00 27.5 4.53 0.0 0.0 0.0 0.0 0.0 0.0 0.00 23.2 4.44 0.0 0.0 0.0 0.0 0.0 0.0 0.00 19.5 4.36 0.0 0.0 0.0 0.0 0.0 0.0 0.00 16.3 4.28 0.0 0.0 0.0 0.0 0.0 0.0 0.00 13.7 4.22 0.0 0.0 0.0 0.0 0.0 0.0 0.00 11.5 4.16 0.0 0.0 0.0 0.0 0.0 0.0 0.00 9.7 4.11 0.0 0.0 0.0 0.0 0.0 0.0 0.00 8.3 4.01 0.0 0.0 0.0 0.0 0.0 0.0 0.00 5.3 3.93 0.0 0.0 0.0 0.0 0.0 0.0 0.00 3.6 BSSo y .Q!NEEV ; ROBO �i���/1 Page 6 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Total Riser Riser Riser Barrel Emcrg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway t(hr) cfs cf Elevation cfs (1+2+3) cfs cfs cfs cfs cfs 0.000 0 0 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.081 3 0 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.162 9 760.7 3.02 0.00 0.00 0.00 0.00 0.00 0.00 0.243 17 3296.37 3.06 0.00 0.00 0.00 0.00 0.00 0.00 0.324 27 8114.14 3.13 0.00 0.00 0.00 0.00 0.00 0.00 0.405 41 15974.7 3.23 0.00 0.00 0.00 0.00 0.00 0.00 0,486 57 27892.3 3.38 0.00 0.00 0.00 0.00 0.00 0.00 0.567 71 44627.7 3.57 0.00 0.00 0.00 0.00 0.00 0.00 0.648 81 65420.2 3.80 1.06 0.00 0.00 0.00 0.00 1.06 0.729 86 88693.7 4.04 6.17 0.00 0.00 0.00 0.00 6.17 0.810 87 111997 427 13.31 0.00 0.00 0.00 0.00 13.31 0.891 86 133474 4.48 21.10 0.00 0.00 0.00 0.00 21.10 0.972 81 152427 4.66 28.74 0.00 0.00 0.00 0.00 28.74 1,053 75 167632 4.80 35.31 0.00 0.00 0.00 0.00 35.31 1.134 68 179147 4.91 40.52 0.00 0.00 0.00 0.00 40.52 L215 59 187114 4.99 44.23 0.00 0.00 0.00 0.00 44.23 1.296 49 191464 5.03 46.30 0.00 0.00 0.00 0.00 46.30 1.376 40 192169 5.03 46.63 0.00 0.00 0.00 0.00 46.63 1.457 34 190240 5.01 45.71 0.00 0.00 0.00 0.00 45.71 1.538 29 186804 ".4.98 44.09 0.00 0.00 0.00 0.00 44.09 1.619 24 182321 4.94 41.99 0.00 0.00 0.00 0.00 41.99 1.781 18 172043 4.85 37.28 0.00 0.00 0.00 0.00 37.28 1.943 13 160807 4.74 32.31 0.00 0.00 0.00 0.00 32.31 2.105 9 149424 4.63 27.49 0.00 0.00 0.00 0.00 27.49 2.267 7 138827 4.53 23.19 0.00 0.00 0.00 0.00 23.19 2.429 5 129213 4.44 19.48 0.00 0.00 0.00 0.00 19.48 2.591 3 120648 4.36 16.33 0.00 0.00 0.00 0.00 16.33 2.753 3 113159 4.28 13.70 0.00 0.00 0.00 0.00 13.70 2.915 2 106640 4.22 11.53 0.00 0.00 0.00 0.00 11.53 3.077 1 100981 4.16 9.74 0.00 0.00 0.00 0.00 9.74 3.239 1 96062.9 4.11 8.26 0.00 0.00 0.00 0.00 8.26 3.644 0 85423.9 4.01 5.31 0.00, 0.00 0.00 0.00 5.31 4.048 0 79316.9 3.93 3.58 0.00 0.00 0.00 0.00 3.58 5.03189 = maxinnmi stage elevation 46.6332 = maximum discharge _ SEAL 18550 �F�p✓ c. ao�`� I Mariner's Landing Phase 3 Pond 2 - Pasquotank County 10 yr STORM 100 90 EPb 80 d b 70 60 50 40 ro O 30 20 10 • M 1j, 0 0.000 1.000 2.000 3.000 4.000 5.000 Time (hrs) INFLOW (cfs) OUTFLOW (cfs) % EAL , 1855o r!',V c. Floe-. p POND VOLUME CALCULATIONS FOR S:INyrnan & Robey '051050591 -River Glen 21ExcePO50591 POND 2 VOLUME CALCULATIONS.xis POND CALCULATIONS AREA Fz PERMANENT POOL SURFACE AREA MAIN BASIN SURFACE AREA FOREBAY SURFACE AREA AREA AT EDGE OF MAIN BASIN SHELF AREA OF MAIN BASIN BOTTOM AREA AT EDGE OF FOREBAY SHELF AREA OF FOREBAY BOTTOM SURFACE AREA AT 1" STORAGE PP ELEVATION ELEVATION AT EDGE OF MAIN BASIN SHELF ELEVATION OF MAIN BASIN BOTTOM ELEVATION AT EDGE OF FOREBAY SHELF ELEVATION OF FOREBAY BOTTOM ELEVATION OF 1" STORAGE UME CALCULATIONS— MAIN BASIN VOLUME FOREBAY VOLUME PERMANENT POOL VOLUME FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME TEMP. STORAGE VOLUME (1" RUNOFF) TEMPORARY STORAGE OFFSET SLUPE (EX: IF 3:1 ENTER 3) OFFSET FROM PP BASIN DIAGRAM CALC MAIN POND SEDIMENT REMOVAL ELEVATION PP DEPTH READS ... SEDIMENT SHALL BE REMOVED FOREBAY SEDIMENT REMOVAL ELEVATION PP DEPTH READS ... SEDIMENT SHALL BE REMOVED � 1,avaoo 68,453.18 23,490.48 56,333.76 47,865.20 18,419.79 16,292.55 95,386.75 F 1.33 -1.00 1.33 0.00 F3 225,588.88 58,078.78 283,667.66 20.47% 64,628.99 �— !P §EAL 16550 C , QINEEF;. Jr/vw:f4l c1; R®1�`�1y\\`\\\ 2.07 0.00 3.00 0.75 2.25 2/15/2007 11:29 AM PAGE 1 OF 1 PERMANENT POOL DETENTION PONDS Hyman & Robey, PC DESIGN OF POND 150-A Hwy 158 Last Camden, NC 27921 Mariners Landing Phase 3 - Pond'37 (252)-335-1888 10 Yr, 24 Hr Storm 02/15/07 DETENTION POND Page I SA/DA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER IMPRV 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FI' 6.0 FT 6.5 PI' 7.0 FT 10% 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 20% 2.4 2.0 1.8 1.7 1.5 1.4 L2 1.0 0.9 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 40% 4.5 4.0 3.5 3.1 2.9 2.5 2.1 1.8 1.4 50% 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 80% 9.4 8.0 7.0 6.4 5.7 52 4.6 4.0 3.4 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 100% 12.0 10.0 9.9 9.1 7.3 6.6 5.8 5.1 4.3 WATERSHED AREA: 25.68 ACRES WATERSHED % IMPERVIOUS: 54.63 % PERMANENT POOL ELEVATION: 3 FT DESIGN PERMANENT POOL DEPTH: 4 PI' SA/DA PERCENTAGE FACTOR: 4.8 % (FROM ABOVE'rA6LE- I AK17NTRONI DPSIGNOPSrORM WATER -, CON'I R01. ITCII.❑'I LS N'ORKSI IOP MANUA I. - I'I?NC 1988) POND SURFACE AREA REQ'D: 53694 SF FOREBAY AREA: 16108 SF AT WIDTH = 0.33 LENGTH, WIDTH = 133.783 LF (RASED UPON MINIMUM SURFACE AREA) LENGTH = 401.349 LF Use these dimensions: WIDTH 121.56 LF LENGTH 545.06 LF VOLUME OF I" RAINFALL AREA OF ROOFS: 5.31 AC AREA OF PARKING/CONCRETE: 8.72 AC AREA OF GREEN AREAS: 11.65 AC VOLUME OF RUNOFF 57804.1 CF STORAGE DEPTH FOR MINIMUM AREA = ELEVATION OF I" RAINFALL = 3.87 Normal Pool Elevation 3 VOL (CF)=hR0OP*1.0)1(11ARKING*.95)+(GRASS*0.2)1*43,560/12 0.87 FT r'RptS�1 SEAL 18550 i .......... �44 11111l l l lftl o®w - \\\\N DRAWDOWN - WATER QUALITY Q(2 DAYS) = 0.33451 CPS Q(5 DAYS) = 0,13381 CFS I " RUNOFF STAGE 0.87 FT DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FI' I" RUNOFF OUTLET DEVICE: 3.67428 INCH DIA HOLE DIAMEI'ER OF HOLE TO USE: 4.25 INCH DIAMEI - I" STORM RUNOFF DRAWDOWN TIME 2.1355 DAYS A=fQ/(Cd*SQRT(2gh))1* l44 Rad.=SQRT(A/Pp Dia.=2*lZacl. INFLOW HYDROGRAPH Retum Year Storm 10 Yr Qp = Peak Discharge = 75.36 cis Tc = Time of Concentration = 20 min Calculation of Tp (Time to Peak) From SCS NET14, page 15-7 Eqn. 15.4 Lag'rime (L)=(1^0.8*(S+I)^0.7)/(1900*Y^0.5) for 1. in Hrs where: I = hydraulic length of watershed (ft) S = (1000/CN)-10 CN = approximately same CN from TR-55 Y = avg. watershed land slope in S = (I 000/CN)-10 = 1.62791 L= 0.61637 his From SCS NEH 4, page 16-7 Eqn. 16.7 Tp=D/2+L where: D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4 , page I6-8 Eqn, 16.12 D=0.133tc where: 'rc= Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D= 0.04433 his Tp= 0.63854 Ivs 38.3124 min Volume under Hydrograph = 1.39 * Qp * 7'p = 240794 Cubic Feet = 1174 1.62791 86 = 0.23 V 18550 /����11�111�108�\\\\p Innow Hydrograph SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio Ratio hr cfs cf 0.00 0.00 0.00 0 0.10 0.03 0.06 2 520 0.20 0.10 0.13 8 1732 0.30 0.19 0.19 14 3291 0.40 0.31 0.26 23 5370 0.50 0.47 0.32 35 8142 0.60 0.66 0.38 50 11433 0.70 0.82 0.45 62 14205 0.80 0.93 0.51 70 16111 0.90 0.99 0.57 75 17150 1.00 1.00 0.64 75 17323 1.10 0.99 0.70 75 17150 1.20 0.93 0.77 70 16111 1.30 0.86 0.83 65 14898 1.40 0.78 0.89 59 13512 1.50 0.68 0.96 51 11780 1.60 0.56 1.02 42 9701 1.70 0.46 1.09 35 7969 1.80 0.39 1.15 29 6756 1.90 0.33._ 1.21 25 5717 2.00 0.28 1.28 21 4851 2.20 0.21 1.40 16 7172 2.40 0.15 1.53 11 5093 2.60 0.11 1.66 8 3707 2.80 0.08 1.79 6 2668 3.00 0.06 1.92 4 1906 3.20 0.04 2.04 3 1386 3.40 0.03 2.17 2 1005 3.60 0.02 2.30 2 728 3.80 0.02 2.43 1 520 4.00 0.01 2.55 1 381 4.50 0.01 2.87 0 433 5.00 0.00 3.19 0 0 Volume under hydrograph = 228720 of Based upon runoff volume = 240794 of Depth req'd for minimum area = 3.63422 SEAL 18550 'Si�,� .f✓ STAGE STORAGE FUNCTION OF POND (FOR RECTANGULER DETENTION POND ONLY) Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUMEVOLUMESTAGE In s S Z sf of cf if Pond Side Slope (M) = In Z Z est Elevation 66257 0 0 0 Surface area at normal pool 3 68266 33631 33631 0.5 10.42 -0.69 0.59 3.5 70293 34640 68271 1 11.13 0.00 1.09 4 72338 35658 103929 1.5 11.55 0.41 1.56 4.5 74401 36685 140613 2 11.85 0.69 2.03 5 76482 37721 178334 2.5 12.09 0.92 2.50 5.5 78581 38766 217100 3 12.29 1.10 2.97 6 80698 39820 256919 3.5 12.46 1.25 3.43 6.5 82832 40882 297802 4 12.60 1.39 3.90 7 84995 41954 339756 4.5 12.74 1.50 4.37 7.5 87156 43035 382791 5 12.86 1.61 4.85 8 Regression Output: Constant 9.34346 Ks = S/Z^b = 62050.95 Sid Err of Y Est 0.00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom __ 5 X Coefficient(s) 1.15215 = b Std Err of Coef. 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISER/BARRELL SPILLWAY W EMERGENCY WEIR) RISER Dr - 19 Riser Dia. (in) Etop = 20.00 Elev. 'Fop Riser(it) Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff Hln = 5 Nmnbcr of Holes Hid = 2 Hole Dia. (in) EHI = 20.00 Elev. Holes (1) H2n = 5 Number of Holes H2d = 2 Hole Dia. (in) EH2 = 20.00 Elev. Holes (2) H3n = 0 Number of Holes H3d = 2 Hole Dia. (in) EI-I3 = 20.00 Elev. Holes (3) BARREL: Db = 15 Barrel Dia. (in) Einv = 20.00 Elev Invert Barrel (ft) Cdb = 0.60 Barrel or coeff 6.63 Page 4 3 SEAL 18550 LL' a^. ��GMG'cQ'+i Barrel[ Adjustment Factor EMERGENCY WEIR Page Cw = 3 Weir coeff Ecr = 3.87 Elev weir coeff (ft) Lw = 7 Weir Length (ft) Riser Riser Riser Elevation Hole Hole Hole Riser Riser Barrel Principal Etnergcy (1) (2) (3) (weir) (orifice) Spillway Weir 3.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.02 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.06 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.12 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.22 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.36 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.54 0,0 0.0 0.0 0.0 0,0 0.0 0.00 0.0 3.75 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.98 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.8 4.22 0.0 0.0 0.0 0.0 0.0 0.0 0.00 4.3 4.44 0.0 0.0 0.0 0.0 0.0 0.0 0.00 8.9 4.63 0.0 0.0 0.0 0.0 0.0 0.0 0.00 14.0 4.80 0.0 0.0 0.0 0.0 0.0 0.0 0.00 18.8 4.93 0.0 0.0 0.0 0.0 0.0 0.0 0.00 23.0 5.04 0.0 0:0_ 0.0 0.0 0.0 0.0 0.00 26.5 5.11 0.0 0.0 0.0 0.0 0.0 0.0 0.00 29.0 5.15 0.0 0.0 0.0 0.0 0.0 0.0 0.00 30.3 5.16 0.0 0.0 0.0 0.0 0.0 0.0 0.00 30.7 5.16 0.0 0.0 0.0 0.0 0.0 0.0 0.00 30.6 5.14 0.0 0.0 0.0 0.0 0.0 0.0 0.00 30.0 5.09 0.0 0.0 0.0 0.0 0.0 0.0 0.00 28.2 5.02 0.0 0.0 0.0 0.0 0.0 0.0 0.00 25.7 4.93 0.0 0.0 0.0 0.0 0.0 0.0 0.00 22.9 4.84 0.0 0.0 0.0 0.0 0.0 0.0 0.00 20.2 4.76 0.0 0.0 0.0 0.0 0.0 0.0 0.00 17.6 4.68 0.0 0.0 0.0 0.0 0.0 0.0 0.00 15.3 4.61 0.0 0.0 0.0 0.0 0.0 0.0 0.00 13.3 4.54 0.0 0.0 0.0 0.0 0.0 0.0 0.00 11.5 4.48 0.0 0.0 0.0 0.0 0.0 0.0 0.00 10.0 4.43 0.0 0.0 0.0 0.0 0.0 0.0 0.00 8.7 4.31 0.0 0.0 0.0 0.0 0.0 0.0 0.00 6.0 4.22 0.0 0.0 0.0 0.0 0.0 0.0 0.00 4.3 C 18550 ........ EEP.. C. Page 6 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Total Riser Riser Riser Barrel finerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway I (hr) cfs cf L'levation cfs (1+2+3) CIS cfs cfs cfs ets 0.000 0 0 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.064 2 0 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.128 8 519.7 3.02 0.00 0.00 0.00 0.00 0.00 0.00 0.192 14 2252.03 3.06 0.00 0.00 0.00 0.00 0.00 0.00 0.255 23 5543.47 3.12 0.00 0.00 0.00 0.00 0.00 0.00 0.319 35 10913.7 3.22 0.00 0.00 0.00 0.00 0.00 0.00 0.383 50 19055.7 3.36 0.00 0.00 0.00 0.00 0.00 0.00 0.447 62 30489.1 3.54 0.00 0.00 0.00 0.00 0.00 0.00 0.511 70 44694.2 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.575 75 60804.9 3.98 0.79 0.00 0.00 0.00 0.00 0.79 0.639 75 77772.8 422 4.28 0.00 0.00 0.00 0.00 4.28 0.702 75 94111.3 4.44 8.93 0.00 0.00 0.00 0.00 8.93 0.766 70 109209 4.63 14.01 0.00 0.00 0.00 0.00 14.01 0.830 65 122099 4.80 18.82 0.00 0.00 0.00 0.00 18.82 0.894 59 132672 4.93 23.05 0.00 0.00 0.00 0.00 23.05 0.958 51 140886 5.04 26.49 0.00 0.00 0.00 0.00 26.49 1.022 42 146577 5.11 28.95 0.00 0.00 0.00 0.00 28.95 1.086 35 149622 5.15 30.29 0.00 0.00 0.00 0.00 30.29 1.149 29 150627 5.16 30.74 0.00 0.00 0.00 0.00 30.74 1.213 25 15031-7 , 5.16 30.60 0.00 0.00 0.00 0.00 30.60 1.277 21 148999 5.14 30.02 0.00 0.00 0.00 0.00 30.02 1.405 16 144900 5.09 28.22 0.00 0.00 0.00 0.00 28.22 1.532 11 139097 5.02 25.73 0.00 0.00 0.00 0.00 25.73 1.660 8 132361 4.93 22.92 0.00 0.00 0.00 0.00 22.92 1.788 6 125532 4.84 20.16 0.00 0.00 0.00 0.00 20.16 1.916 4 118929 4.76 17.60 0.00 0.00 0.00 0.00 17.60 2.043 3 112744 4.68 15.29 0.00 0.00 0.00 0.00 15.29 2.171 2 107102 4.61 13.26 0.00 0.00 0.00 0.00 13.26 2.299 2 102011 4.54 11.50 0.00 0.00 0.00 0.00 11.50 2.426 1 97449.1 4.48 9.99 0.00 0.00 0.00 0.00 9.99 2.554 1 93373.6 4.43 8.70 0.00 0.00 0.00 0.00 8.70 2.873 0 84326.8 4.31 6.03 0.00 0.00 0.00 0.00 6.03 3.193 0 77833.9 4.22 4.30 0.00 0.00 0.00 0.00 4.30 5.1592 = maximwu stage elevation 30.7398 = maximum discharge SEAL d 18550 tp ...MEEer':: /, � �tC,. Mariner's Landing Phase 3 Pond 3 - Pasquotank County 10yrSTORM 80 70 0 60 z 50 r6 0 L 40 01,:. b� 0 30 20 a a �.. 10 0 0,000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 Time (hrs) fl--- INFLOW (cfs) + OUTFLOW (cfs) SEAL 18550 POND VOLUME CALCULATIONS FOR S:IHyman & Robey '051050591 - River Glen 21 ExceAO50591 POND 3 VOLUME CALCULATIONS.xis POND CALCULATIONS AREA Fz PERMANENT POOL SURFACE AREA MAIN BASIN SURFACE AREA FOREBAY SURFACE AREA AREA AT EDGE OF MAIN BASIN SHELF AREA OF MAIN BASIN BOTTOM AREA AT EDGE OF FOREBAY SHELF AREA OF FOREBAY BOTTOM SURFACE AREA AT 1" STORAGE ELEVATIONS PP ELEVATION ELEVATION AT EDGE OF MAIN BASIN SHELF ELEVATION OF MAIN BASIN BOTTOM ELEVATION AT EDGE OF FOREBAY SHELF ELEVATION OF FOREBAY BOTTOM ELEVATION OF 1"STORAGE 00,401.30 49,418.65 16,838.91 38,631 .67 31,225.39 12,018.60 10,092.10 70,284.87 F -1.00 1.33 0.00 3.87 VOLUME CALCULATIONS F3 MAIN BASIN VOLUME 154,905.49 FOREBAY VOLUME 38,799.64 PERMANENT POOL VOLUME 193,705.13 FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME 20.03% TEMP. STORAGE VOLUME (1" RUNOFF) 59,395.96 TEMPORARY STORAGE OFFSET SLOPE (EX: IF 3:1 ENTER 3) 3.00 OFFSET FROM PP 2.61 BASIN DIAGRAM CALC MAIN POND SEDIMENT REMOVAL ELEVATION 0.00 PP DEPTH READS ... SEDIMENT SHALL BE REMOVED 3.00 FOREBAY SEDIMENT REMOVAL ELEVATION /0.75 PP DEPTH READS ... SEDIMENT SHALL BE REMOVED., r J, 2.25 a'SEAL = 18550 ItNE 1).il111171; 2/15/2007 11:37 AM PAGE 1 OF 1 North Carolina Secretary of State http://www-s cmtary.statc.nc.us/corporations/Corp.aspx?Pitenild=53.. "A North Carolina q1;. Elaine F. Marshall DEPARTMENT O THE Secretary SECRETARY OF STATE .'r.F uw !` PCB B::z 29722 Ralei3h, NC: 27E26-0622 CORPORATIONS Date: 3/15/2007 Corporations Home Search By Corporate Name Search For New Corporation Search By Registered Agent Important Notice Corporations FAQ Tobacco Manufacturers Dissolution Reports Non -Profit Reports Verify Certification Online Annual Reports LINKS & LEGISLATION KBBE B2B Annual Reports SOSID Number Correction 2001 Bill Summaries 1999 Senate Bills Annual Reports 1997 Corporations 1997 Register for E-Procurement Dept. of Revenue ONLINE ORDERS Start An Order New Payment Procedures CONTACT US Corporations Division Secretary of State's web site I TOOLS Secretary of State Home Printable Page—! - Click here to: View Document Filings I %Print apre-populated Annual Report Form I Annual Report Count I File an Annual Report I Corporation Names Name Name Type NC 3 N 1,Inc. Legal Business Corporation Information SOSID: 0598079 Status: Current -Active Date Formed: 7/19/2001 Citizenship: Domestic State of Inc.: NC Duration: Perpetual Registered Agent Agent Name: Tadlock, Milton Registered 301 South Road Street Office Address: Elizabeth City NC 27909 Registered PO Box 710 Mailing Address: Elizabeth City NC 27907 Principal Office 301 South Road Street Address: Elizabeth City NC 27909 Principal Mailing PO Box 710 Address: Elizabeth City NC 27907 Stock Class Shares No Par Value Par Value Common 100000 Yes N/A I of 2 3/ 15/2007 4:32 PM North Carolina Secretary of State http://www.sccretary. stale.nc.us/corporations/Corp.aspx?Pitenild=53.. For questions or comments about the Secretary of State's web site, please send e-mail to Webmaster. 2 of 2 3/15/2007 4:32 PM _` PROJECT D1 SCRIPTION Mariners Landing Phase III Pasquotank County — Elizabeth City - North Carolina Mariners Landing Phase III is a proposed residential subdivision containing 155 lots. The tract contains 93.99 acres and is located off of River Road (SR 1169) adjacent to two subdivisions that are currently under construction. These subdivisions were been approved as Grandview Phase 2 and River Glen. Both Grandview Phase 2 and River Glen are owned by 3 N 1, LLC, the same developer as this project. We are in the process of changing the names of those projects to Mariners Landing Phases I & 11. Development of this site will include construction of curb and guttered streets, water mains, sewer mains, a sewer pump station, and multiple detention ponds. The streets will contribute 8.81 acres of impervious surface, the sidewalks contribute another 2.02 acres, the pump station lot will be limited to 5,000 sf and each lot will be limited to 8,500 sf of impervious surface. The total site coverage is 41.18 acres or 43.81 %. According to the Pasquotank County Soils Maps as prepared by USDA, Soil Conservation Service, the soils on this site are predominately Augusta and Altavista with small areas of Nixonton, Tomotley, and Cape fear. Four soil borings were performed in the detention pond areas by Scan C. Robey, PE and Kimberly Hamby on February 12, 2007. All soil borings were conducted with an AMS 2-3/4" diameter, 6' long, hand mud auger. Boring No. 1 was located in the area for the secondary basin for Pond 1. The elevation at the boring location is approximately 7.5'. The first 6-8" inches were loamy topsoil. From 8-30" was a silty clay loam, from 30-42" was a very fine sandy loam, and at 42" it changed to sand. At 66" the sand was wet and -we were unable to remove any additional soil with the auger we were using. We estimate the seasonal high water table to be approximately 66" below the surface, or elevation 2.0'. Boring No. 2 was located in the area of the primary basin for Pond 1. The elevation at the boring location is approximately 7.25'. This boring matched Boring No. 1 exactly except that soil coloration indicated a high water elevation at 60". We estimate the seasonal high water table in this area to be approximately 60" below the surface, or elevation 2.25'. We also observed the adjacent detention pond and noted that it is maintaining its design permanent pool. That pond was designed to have a pennanent pool elevation of 4.0 at datum NGVD 29, that would translate to elevation 3.0 at the new datum of NAVD 88. The permanent pool for Pond 1 has been set at 3.0'. Boring No. 3 was located in the area for Pond 2. The elevation at this location is approximately 7.5'. The first 8" were topsoil. From 8-60" was a silty clay. Below 60" was a sandy clay loam. Based on a change in coloration at 54", we estimate the seasonal high water table at 54" or elevation 3.0'. The permanent pool elevation for Pond 2 has been set at elevation 3.0'. Boring No. 4 was made in the area of proposed Pond 3. The elevation at this location is approximately 9.5'. The first 6-8" inches were loamy topsoil. From 8-48" was a sandy clay loam, and at 48" there was an increase in the clay content. At 66-70" it changed to sand. At this point, we had reached the limits of our 6' auger and had not yet seen evidence of the high water table. We observed the adjacent ditch and detention pond that was constructed for Grandview Phase 2. The water level in each appeared to be holding between elevation 2 and elevation 3. Based on this information and the results of the other 3 borings, we estimate the seasonal high water table to be between elevation 2.0' and 3.0'. The permanent pool for Pond 3 has been set at 3.0'. The first two borings supported the soils map classification of Altavista and the third and fourth boring had the higher clay content of the Augusta soils. While the soils have permeability rates that could support infiltration, this project is too large to utilize infiltration basins. We have determined that wet detention basins are the most appropriate method of storm water treatment for this development. All of the detention ponds are designed for 90% TSS removal. Detention Pond I will drain through a piped outlet to a tributary of the Pasquotank River. This piped outlet will be located in a 20' drainage casement that was deeded to 3 N 1, LLC. A CAMA permit is being obtained to discharge into the tributary as it is in CAMA jurisdiction. The other two ponds discharge into an existing ditch that drains into a canal that drains directly to the Pasquotank River. In addition to meeting state requirements for stormwater treatment, this site will comply with the City of Elizabeth City's Stornwater Ordinance. This ordinance requires that post development runoff not exceed pre development runoff during a 10 year storm event. TR-55 was utilized to estimate the 10-year peak pre development runoff for the entire site at 145.8 cfs and post development runoff for each drainage area. Our "chainsaw routing" method detention pond spreadsheets calculate the peak discharge out of each pond. Based on these methods we have determined the following: Drainage Area Post -development runoff Detention Pond Discharge 1 80.80 cfs 25.88 cfs 2 86.99 cfs 46.63 cfs 3 75.36 cfs 30.74 cfs Total - 243.15 cfs 103.25 cfs Drainage Area 1 contains 28.91 acres that are designed to drain to Detention Pond 1. It contains all or most of lots 198-211, 222-250, and approximately half of lots 197, 251, and 212-221. The impervious area includes 2.78 acres of streets, 0.65 acres of sidewalk and 9.56 acres of allowable built -upon area on the lots for a resulting impervious area of 12.99 acres or 4493%. The runoff from the backs of lots 197-200, 208-211, 222-232 and a portion of lots 201 and 212 will sheet (low across grassed yards into swales with 3:1 side slopes that drain to the detention pond. Runoff from the backs of lots 246-251 will sheet flow into a grassed lined Swale with 3:1 side slopes that will connect to the underground collection system. Some of the runoff from the lots adjacent to the pond will sheet flow directly into Detention Pond 1. Runoff from the fronts of the lots will sheet flow across grassed yards over the curb and into the curb and gutter system All of the stonnwater from the rest of the lots and streets will be collected in the curb and gutter system that drains into the underground collection system routed to the detention pond. Drainage Area 2 contains 32.84 acres. The impervious area includes 3.28 acres of street, 0.72 acres of sidewalk, and 10.16 acres of allowable built -upon area on the lots for a resulting impervious area of 14.16 acres or 43.12%. It includes all or most of lots 97- 124, and 185-196 and about half'of lots 251, 197, 212-221, 183, 184, 125, 127-134. The runoff from the back yards of lots 97-103, 106-113, 118, 119, and 122-127 will sheet flow to ditches with 3:1 side slopes that either connect to the underground piping system or drain to the forebay of Detention Pond 2. Some of the runoff from the lots adjacent to the pond will sheet flow directly into the pond. Lots 103-105, 114, and 115 are adjacent to a large ditch that drains the River Road Middle School property. These lots will have to be graded to force all runoff from impervious surfaces to the front of the lots and into the roadway drainage system. If necessary, gutters and downspouts shall be utilized to route runoff to the collection system. The rest of the yards' runoff will sheet flow across grassed yards, over the curb, and into the curb and gutter system which is routed to Detention Pond 2 via underground collection system. Drainage Area 3 contains 25.68 acres. The impervious area includes 2.75 acres of street, 0.65 acres of sidewalk, and 10.63 acres of allowable built -upon area on the lots for a resulting impervious area of 14.03 acres or 54.63%. It contains all or most of lots 126, 135-182 and 179-182 and approximately half of lots 125, 127-134, 183, and 184. The runoff from the backs of lots 141-154 will sheet flow to a Swale with 3:1 side slopes that drains directly into Detention Pond 3. Some of the runoff from the lots adjacent to the pond will sheet flow directly into the pond. Lots 160-177 are located adjacent to a canal that is in CAMA jurisdiction. These lots will have to be graded to force all runoff from impervious surfaces to the front of the lots and into the roadway drainage system. If necessary, gutters and downspouts shall be utilized to route runoff to the collection system. The runoff from the rest of the lots will sheet flow over the curb into the curb and gutter system that drains into the underground collection system. All of the stormwater from this drainage area is routed to Detention Pond 3. The disturbed area for development will not exceed 95 acres. Limits of disturbance have been shown on the plans. MARINERS FEBRUARY NCDENR North Carolina Department of Environment and Natural Resources Request for Express Permit Review FILL-IN all information below and CHECK required.Permit(s). Fax or email this completed form, a!ong with e narrative and vicinitd mao of the project location to the appropriate One -Stop Coordinator: • . Fayetteville or Raleigh Region -David Lee 919-791+4203; david.leepncmail.nell • Mooresville & Asheville Region -Patrick Grogan 704.663-3772 or patrick..grocanOncmaif.net • Washington Region -Lyn Hardison 252-946-9215 or Iyn.hardisonpncmail.net • Wilmington Region -Cameron Weaver 910-350-2004 or cam eron.weaverta)ncmail.net Project application received after 12 noon will be stamped in the following work day. APPLICANT Name Milton Tadleck Company 3 N 1, Inc. Address P o Box 710 City/StateFi ,,,—Zip 2"90- Phone (252) 338-5134 Fax Email PROJECT SYSTEM(S) TRIBUTARY TO SURFACE WA. T ER CLASSIFICATION PROJECT Name Mariners Landing ?has= TTT County P=_sc. PROJECT LOCATION(ADDRESS)South sic- Riv,­ P-,a h !,; Company Hvman & Roney Address Po Box 339 0ity%S,aeCa-icen. Zip 17v,_ Phone ( 252 ) 335-1888 Fax Email State or flationa! Environmental Policy Act (SEPA, N_PA) — EA or E,'S Required ❑IYes ❑ No ❑ STREAM OPIGINDetermination: SC of Stream calls: Stream Name Pasc.uotan1: R` cer STORMWATEP, ❑Low Density ❑ High Density -Detention Pond i1I High :Dens; y-Ot nr ❑ Low Density -Orb & Gufte ❑ Kohl Density-Innitration ❑i Off S �e WETLANDS MUST BE ADDRESSED BELOW ❑ COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures infcrmaticn MANAGEMENT ❑ Upland Develcoment ❑ %. arina De:-eioomeni Urban WF-L-2:1,ont LAND QUALITY ❑ Erosion and Sedimentatic- Control Plan with ^5 acres i, be ds,urbed.I1-K => :u (fc- DE use;;. WETLANDS (401): Check all that aDDIV solated wetland on :,=ee,'-s ❑ tdD Vuetlands on Site ❑ Yes ❑ No Buffer immpacts: ❑ Nc' Wetlands Delineation has been completed: ❑ `'es ❑ No / Minor Variance : ❑ N, i YE Major General Variance 7, No ❑ YES US ACOE Approval of Delineation completed: ❑ Yes ❑ Nlo 401 Application required: 7-Yes ❑1 No If "ES. 7 Regular 404 AD?iication in Process wl US ACOE ❑ `'es ❑ No % Permit .—;eceived from. US ACOE ❑ Yes ❑ c Perennial, Blue line stream, etc on site ❑ yes No The legislation allows additional fees, not to ex_-eed 50% of the original Express Review perm) appiicahcn fee, to be charged for subsequent reviev.s due to the insufficiency of the permit appiica5ons. For DENR use only Fee Split for multiple permits: (Check # ) Total Fee Amount S I SUBMITTAL 'ee DP,T=S SUBhiiT.TAL DAT=S =ze i CAMiA Vzr ante (i❑ Ma : i❑ Min) SW (❑ Hu: ❑ LD; 4G1: LQS Stream Deter,_ L' 3 N 1, INC. P.O. BOX 710 ELIZABETH CITY. NC 27907 PAY TO THE OROEROF NCDENR GATEWAY BANK & TRUST CO. NORTHC ROLINA VIRGINIA %-1224MI 2/19/2007 '"4 000.00 2463 Four Thousand and 00/100,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,>,.,,,,..,,,,,,,,,,,,,,,,,,_,.,,,.,,,,.,,,,,.,,,,,,,, DOLLARS NCDENR MEMO: 11800 246311• 1:053 II l 2 24E1: 20 L00086 19,10 ri a OFFICE USE ONLY Date Received Fee Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality CETWSTORMWATER MANAGEMENT PERMIT APPLICATION F _.• This form may he photocopied for use as an original FEB 212001 Fik 20 LUUI I. GENERAL INFORMATION mm 1. Applicants name (specify the name of the corporation, individual, etc, who owns the project): 2.. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): 3. Mailing Address for person listed in item 2 above: City: F1 9 zal-hpth Ci 1-y State: NC Zip: 27907 Telephone Number: ( 252 1 338-5134 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Mariners Landing Phase III 5. Location of Project (street address): South side of River Road (SR 1169) behind River Glen and Grandview sub. City: F1 i 71aheth Ci ty County: Pasguotank 6. Directions to project (from nearest major intersection): • • • .• :• • - •� -11 OFF•.• C •• 7. Latitude: -16 o 17 1 Longitude: 7601 1 1 of project 8. Contact person who can answer questions about the project: Name: xirI n- Aarrhy Telephone Number: ( 252 ) 335—I888 H. PERMIT INFORMATION: 1. Specify whether project is (check one): X New . Renewal Modification Form SWU-101 Version 3.99 Page I of 4 3 N 1, INC. P.O. BOX 710 ELIZABETH CITY, NC 27907 PAY TO THE ORDER OF NCDENR GATEWAY BANK & TRUST CO. NORTH CAROLINA - VIRGI NIA W 12Z4W 2463 2/19/2007 s $ **4.000.00 Four Thousand and DOLLARS NCDENR 8 MEMO: 1"002463110 1:0531L22L.D:201,0008619,16 Engineers and Land Surveyors February 19, 2007 Scott Vinson Division of Water Quality -Surface Water Section Washington Regional Office 943 Washington Square Mall Washington, NC 27889 Subject: Stormwater Management Permit Mariners Landing III Project # 050591 Dear Mr. Vinson: Enclosed for your review and approval, please find the following items: (252) 335-1888 Office (252) 338-2913 Office (252) 338-5552 Fax Two (2) copies of sheets C-5, 10 and 11 for the above referenced project. 2. The original and one copy of the Stormwater Permit Application and required attachments. 3. Two (2) copies of the project description and calculations. 4. Check in the amount $4000.00 for the required fee. If you have any questions, please do not hesitate to call this office at (252)335-1888. cc: file Milton Tadlock Sincerely, Sean C. Robey, P.E. Q) ..... n1' Kimberly D.l%Iamby Project Manager P. O. Box 339, Camden, NC 27921