Loading...
HomeMy WebLinkAboutSW7070121_APPROVED PLANS_20070503STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW �/(' 701a DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD CT C FACILITIES DEPARTMENT OF DEF-EN-.SE HARVEY POINT DEFENSE TESTING ACTIVITY SITE LOCATION MAP SCALE 1"-13•/- MILES GRAPHIC SCALE: 1"-13 MI 0 13 26 HERTFORD, NORTH CAROLINA ZZ44:7m"XIA Hankins and Anderson Consulfing Engineers 4880 Sadler Road Glen ALIcn, Virginia 23060 (804) 285 4171 (804) 217 8520 Fax www.haengineers.com VICINITY MAP SCALE 1"-2000' GRAPHIC SCALE: 1"-2000' 0 2000 4000 INDEX OF DRAWINGS SHEET Ti Ki C 100 C1011 03 C104 C200 C300 C301 C302 C30'3 C400 C401 C402 C500 C501 C502" YC600 C601 C602 C700 C701 C702 C704 E101 E163 £104 E10$ NO DESCRIPTION TITLE '�yEET KEY MaP AND GENERAL NOTES EX!S',AG CONDITIONS EXIST;%6 CONDITIONS AND DEMOLITION EXISTING CONDITIONS AND DEMOLITION EXISTING CONDITIONS AND DEMOLITION DEMOLITION DIMENSIONAL LAYOUT PLAN UTb,Y PLAN UTILITY PLAN UTILITY PLAN TI ITY P U L LAN GRADING AND DRAINAGE PLAN 5 n U �� SPOT ELEVATIONS I DRAINAGE AREAS SECTIONS SANITARY SEWER PROFILES SANITARY SEWER AND ROAD PROFILES SITE AND WATER DETAILS STORM AND SANITARY SEWER DETAILS SANITARY SEWER PUMP STATION DETAILS EROSION AND SEDIMENT CONTROL PLAN -PHASE I EROSION AND SEDIMENT CONTROL PLAN -PHASE II EROSION AND SEDIMENT CONTROL NOTES AILS STORM WATER MANAGEMENT DETAILS SITE PLAN - ELECTRICAL DETAILS DETAILS PANELBOARD SCHEDULES gx . v L'3Y i6' i'.1 APPROVED s Iva;N Cie SVAr R Ot1AUTY 4i l���uirna�-rs Ca , Hankins and Anderson Consulting Engineers 1 Sadler Road Glen Allen, Virginia 23 (804) 285 4171 (804) 217 8520 Fax w .haengineem.mm V) V) O I �o00`,_ •_ a o 0 0 E U � N N C N � "_ VI �_ o E E to N Z3 Z3 (n 0 N of a Doom �0��V) U. CDCD��� 0 0 0 0 0 w I I 1 I 1 CO 00 v rn Q0 w o- DATE December 29, 2006 H&A PROJECT NO. CLIENT PROJECT NO. SCALE DRAWN BY CHECKED BY APPROVED BY SHEET NUMBER 5219.00 GENERAL NOTES 1- TOPOGRAPHIC INFORMATION SHOWN ON THESE DRAWINGS WAS FURNISHED BY MARSH AND LEGGE LAND SURVEYORS, P.L.C., WINCHESTER, VA- WITH INITIAL TOPO COMPLETED IN JANUARY, 2002 AND UPDATES IN JANUARY 2005. 2- THE CONTRACTOR SHALL VISIT THE SITE AND SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING CONSTRUCTION. 3. THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON A FIELD SURVEY AND RECORD DRAWINGS- THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL UTILITIES BEFORE COMMENCING WORK AND FOR ANY DAMAGES WHICH OCCUR BY HIS FAILURE TO LOCATE OR PRESERVE THESE UNDERGROUND UTILITIES. IF DURING CONSTRUCTION OPERATIONS THE CONTRACTOR SHOULD ENCOUNTER UTILITIES OTHER THAN THOSE SHOWN ON THE PLANS, HE SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER AND TAKE NECESSARY AND PROPER STEPS TO PROTECT THE UTILITIES AND ASSURE THE CONTINUANCE OF SERVICE. 4. THE HORIZONTAL AND VERTICAL LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ON THESE DRAWINGS IS APPROXIMATE ONLY, AND REQUIRES CONFIRMATION BY THE CONTRACTOR- WHERE A NEW UTILITY LINE CROSSES AN EXISTING UTILITY, THE CONTRACTOR SHALL DETERMINE BY EXCAVATION OR TEST PITS, THE EXACT LOCATION AND ELEVATION OF THE EXISTING UTILITY. 5. THE CONTRACTOR SHALL DIG TEST PITS AS REQUIRED FOLLOWING NOTIFICATION AND MARKING OF ALL EXISTING UTILITIES TO VERIFY THE LOCATION AND DEPTH OF EXISTING UTILITIES- TEST HOLES TO BE PERFORMED AT LEAST 10 DAYS PRIOR TO START OF UTILITY CONSTRUCTION. ANY DISCREPANCIES ARE TO BE REPORTED IMMEDIATELY TO THE ENGINEER- REDESIGN AND APPROVAL SHALL BE OBTAINED IF REQUIRED- 6. MAXIMUM PROTECTION SHALL BE PROVIDED FOR EXISTING UTILITIES WHICH ARE TO REMAIN IN SERVICE. ALL PROPOSED STRUCTURE TOP ELEVATIONS, INCLUDING VALVE BOX COVERS, ARE TO BE VERIFIED BY THE CONTRACTOR WITH THE SITE PLANS, PROFILES AND CROSS SECTIONS. ADJUSTMENTS TO MEET FINISHED GRADE ELEVATIONS MAY BE REQUIRED- ALL TOPS IN PAVEMENT SHALL BE SET FLUSH WITH AND SHALL SLOPE WITH FINISH GRADE. 7- ALL STREET CUTS AND PATCH WORK REQUIRED FOR UTILITIES INSTALLATION SHALL BE PERFORMED IN STRICT ACCORDANCE WITH NCDOT STANDARDS AND SPECIFICATIONS. 8_ EXISTING CONCRETE CONSTRUCTION SHALL BE REMOVED TO THE NEAREST JOINT. NEW CONSTRUCTION SHALL BE PROVIDED AS SHOWN AND ANY DAMAGED AREA SHALL BE REPAIRED TO MATCH CONDITIONS PRIOR TO CONSTRUCTION- 9. DAMAGE TO ANY EXISTING PAVEMENT, OR OTHER EXISTING STRUCTURES NOT PROPOSED TO BE DISTURBED WITH THIS DEVELOPMENT, WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AND MUST BE REPAIRED TO THE SATISFACTION OF THE OWNER- 10- THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING A SMOOTH TRANSITION TO EXISTING PAVEMENT. 11. THE CONTRACTOR SHALL PROVIDE GRADING THAT WILL ASSURE POSITIVE DRAINAGE AND PRECLUDE PONDING OF WATER_ IF NEW GRADES CREATE DRAINAGE PROBLEMS THAT CAN BE RESOLVED BY CUTTING OR FILLING BEYOND THE LIMITS INDICATED, THE CONTRACTOR SHALL PROVIDE THIS GRADING, AFTER OBTAINING APPROVAL FROM THE CONTRACTING OFFICER- 12- PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY FROM THE DRAWINGS, ALL DIMENSIONS, DETAILS AND TREATMENTS FOR THE PROPOSED WORK INDICATED ON THE DRAWINGS- CONFLICTS THAT WILL IMPACT CONSTRUCTION IN ANY WAY, SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER. 13- REMOVE EXISTING SIGNS THAT INTERFERE WITH NEW CONSTRUCTION. REPLACE SIGNS THAT ARE STILL PERTINENT TO THE SITE- SIGNS THAT ARE NOT TO BE REPLACED SHALL BE RETURNED TO THE OWNER- 14. ALL WATER PIPE, FITTINGS, ACCESSORIES AND THE INSTALLATION THEREOF SHALL COMPLY WITH THE LATEST STANDARDS AND SPECIFICATIONS OF THE AMERICAN WATER WORKS ASSOCIATION, (AWWA), AND THE NORTH CAROLINA/STATE BOARD OF HEALTH, WATERWORKS REGULATIONS- ALL FIRE SERVICE LINES AND THEIR APPURTENANCES, INCLUDING INSTALLATION SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE CODES AND STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION, (NFPA), 15- PROVIDE ALL WATER MAINS WITH A MINIMUM OF 36 INCHES OF COVER TO FINISH GRADE. 16- WATER AND SEWER SEPARATION A_ WATER LINES CROSSING SEWERS SHALL BE LAID TO PROVIDE A SEPARATION OF AT LEAST 18 INCHES BETWEEN THE BOTTOM OF THE WATER LINE AND THE TOP OF THE SEWER- THE LENGTH OF THE SEWER PIPE TO BE CENTERED ON THE POINT OF THE CROSSING SO THAT JOINTS SHALL BE EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER LINE JOINT- B- WHEN CONDITIONS PREVENT A VERTICAL SEPARATION OF 18 INCHES, THE FOLLOWING CONSTRUCTION SHALL BE USED: 1- SEWERS PASSING OVER OR UNDER WATER LINE SHALL BE CONSTRUCTED OF AWWA APPROVED WATER PIPE, PRESSURE TESTED IN PLACE WITHOUT LEAKAGE PRIOR TO BACKFILLING. 2. WATER LINES PASSING UNDER SEWERS SHALL, IN ADDITION, BE PROTECTED BY PROVII a- A VERTICAL SEPARATION OF AT LEAST 18 INCHES BETWEEN THE BOTTOM OF SEWER AND THE TOP OF THE WATER LINE. b- ADEQUATE STRUCTURAL SUPPORT FOR THE SEWERS TO PREVENT EXCESSIVE DEFLECTION OF THE JOINTS AND THE SETTLING ON AND BREAKING OF THE W/ c. THAT THE LENGTH OF THE WATER LINE BE CENTERED AT THE POINT OF THE SO THAT JOINTS SHALL BE EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE 17- ALL PAVEMENT SECTIONS ON THE APPROVED PLANS ARE BASED ON A MINIMUM CBR VALUE OF 5 OWNER'S DISCRETION, CBR TESTS MAY BE PERFORMED BY THE OWNER'S TESTING AGENCY AND SUBMITTED TO THE ENGINEER FOR REVIEW PRIOR TO PLACEMENT OF BASE MATERIAL. CBR VALU LESS THAN 5 MAY REQUIRE REVISED PAVEMENT SECTIONS- 18- CONSTRUCTION DEBRIS SHALL BE CONTAINERIZED IN ACCORDANCE WITH THE NORTH CAROLINA LI CONTROL ACT; NO LESS THAN ONE LITTER RECEPTACLE SHALL BE PROVIDED AT THE CONSTRUCI SITE- 19_ WETLANDS CRITERIA A. THE WETLAND LIMITS HAS BEEN ESTABLISHED AS THE OUTSIDE EDGE OF THE EXISTING I ALONG THE;SOUTH,WEST AND NORTHERN SIDES OF THE SITE, ALONG THE EASTERN ED( WETLAND LINE FOLLOWS THE DITCH BACK TO THE CULVERT AT THE SITE ENTRANCE. B. CONTRACTOR SHALL FLAG THE WETLANDS LIMITS PRIOR TO BEGINNING WORK AND SHALL INTO THE WETLANDS DURING SITE WORK OPERATIONS- C- THE DEBRIS PILES SHALL BE REMOVED WITHOUT DISTURBING THE WETLANDS- 20- THE OFFSITE SANITARY FORCE MAIN WILL TRAVERSE PART OF THE FUTURE ADMINISTRATION BUILDING WORK, AND ALSO CONNECT TO THE ADMINISTRATION BUILDING SANITARY SEWER. THE CTEC CONTRACTOR MUST COORDINATE THE TIMING OF HIS WORK WITH THE ADMINISTRATION CONTRACTOR TO ASSURE THE TIMELY COMPLETION OF BOTH CONTRACTS. 21- TWO OF THE THREE FUTURE BUILDINGS (SHOP AND WAREHOUSE) WILL BE CONSTRUCTED UNDER THE SUPERVISION OF HPDTA DURING THE WORK OF THIS PROJECT. CONTRACTOR SHALL PREPARE THE BUILDING PADS FOR THESE TWO BUILDINGS EARLY IN THE SITE PREP WORK SO THAT THE BUILDING CONSTRUCTION MAY BEGIN AS SOON AS POSSIBLE- 22. EXISTING DRAINFIELD NUMBERS 1 AND 2 SHALL BE REMOVED COMPLETELY AND BACKFILLED WITH SUITABLE MATERIAL- DRAINFIELD NUMBERS 3 AND 4 MAY PARTIALLY REMAIN IN PLACE. REMOVE AS NECESSARY TO CONSTRUCT THE PROJECT AS SHOWN. PORTIONS OF THE DRAINFIELD TO REMAIN MUST BE APPROVED BY THE CONTRACTING OFFICER. 23. UNDER FAVORABLE CLIMATIC CONDITIONS AND WITH APPROVAL FROM THE CONTRACTING OFFICER, THE DEBRIS FROM THE LOG AND STUMP BERM MAY BE BURNED ON SITE- THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING STRUCTURES AND KEEPING ALL WORK OUT OF THE WETLANDS. GRAPHIC SCALE: 1"-150' 0 150 Hankins and Anderson Consulting Engineers 10 Sadler Road Glen Allen, Virginia 231 (804) 285 4171 (804) 217 8520 Fax w .haengineers.com a) W N I O 0) o 0 c c ' a 0 0 0 rn u) U) rn-- r V) �w p L C_n C _rCCn C U) U) (n 0 o o a CIO M o o 0 0 w < Co Co m p I O I N Q Z Q LLu �0 Q0 W J Z �. Q d, w-V wQ--� < W Z LLj Lu O Y V U DATE December 29, 2006 H&A PROJECT NO. 5219.00 CLIENT PROJECT NO. SCALE DRAWN BY BY RM CHECKED BY NB APPROVED BY BAL SHEET NUMBER 300 K-1 i r I � dl I I II III NOTES 1 _ INFORMATION SHOWN0N oN ACTUAL FIELD SURVEY ----- THE COMPLETION , , �- Z `oti\' OF THE SURVEY, THE OWNER HAS REMOVED CERTAIN ITEMS THAT ARE SHOWN `ya �' ( o` ON THIS PLAN. THE DEMOLITION DRAWING IREPRESENTS THE SITE "AFTER" OWNER DEMOLITION_ THIS DRAWING (C10O) MAY BE HELPFUL IN IDENTIFYING ANY ITEMS OR UTILITIES THAT MAY STILL REMAIN_ 2_ THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS_ THE SURVEYOR MAKES NO GUARANTEES \ I III I Ji 1 THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE 5\ _ IIIII �'A \ AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION `p. 5 INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY p AS POSSIBLE FROM INFORMATION AVAILABLE_ "p \ 3. HORIZONTAL ORIENTATION IS BASED ON STATE GRID NC NAD 83 (93). VERTICAL WETLANDS - �,l ;I1 DATUM IS BASED ON NGVD 29 ELEVATIONS ESTABLISHED BY GPS METHODS. WETLANDS s ,I N 869,215.94 N 869,180.48 WETLANDS -, , E 869,215.94 E 2,785,032.58 N 869,074.85 - 5\ \ E 2,785,280.75 "_--- - \� I III m EDGE _WETLANDS �"" ,� - _�-- 11 � III — WETLANDS N 869,054.75 E 8 49 S, . O -iQ_— �---- -{ ax------------- '�------`____- --,� -t - - x---- -a - x x x % x x x x- x-__ z x x x x x x xrk�- x x.--x x x ' CHAIN LINK FENxCE ---y\ 7 - oMP ¢ p�P 0 - titi\ ,ya\ ASPHA(7- t\ I I I I I x po o m � V0 'I \Nv.. __ 7 _ o y\ G R A S S dAVVp' ANTER 9%dd yip- JI`h\ `7\ ' I I � I I � I I ' I I GR ' ' I !\� dbpdx re I ------ pSFXISTING BUILDING 7-9 v A' TOP 7.87 TOP-T98 INV_=737 fFE-:{0.46) INVr,1=6 n'�ep0e^� �9 qo 4" PVC HILAN E q i \' A � ti-PtbNTER \,}\ 1p\ INV 14=7.3y, ,0\ LEGEND (EXIST) _ _ _TREE LINE X XX - CHAIN LINK FENCE W ___WATERLINE ------ ---- ___CONTOUR OVERHEAD UTILLITIES T __-FIBER OPTICS 7.15)----__ __SPOT ELEVATION BO--------------- LOW OFF (FLUSHING HYDRANT) CIP______________ CAST IRON PIPE CMP_------------- CORRUGATED METAL PIPE CO -------------- SANITARY CLEANOUT CONIC ------------- CONCRETE E---------------- COORDINATE ELEC_------------- ELECTRICAL ELEV-------------- LEVATION FEE-E-_ ___ __-FINISH FLOOR ELEVATION FH -- _ _ - _ -FIRE HYDRANT GA -- __ ___GUY ANCHOR INV-------------- JNVERT IRT -- __JRON ROD TRAVERSE MP- --------------- METAL POST N ---NORTHING COORDINATE 0/H-------------- OVERHEAD PVC - --POLYVINYLCHLORIDE RCP _ __ --REINFORCED CONCRETE PIPE TRB------------- -TELEPHONE RELAY BOX W WATER MAIN p° �q5 pdNV. (7.14 ---- —------ - M \ o \ p\ WLP WOOD LIGHT POLE WP-- -- - WOOD POST MP° Mp SE P IC v tipv 4 o}v qv �z oti v xl WPP-- --- --WOOD POWER POLE p� A. o yeti qv{m�� tnai5}v Q }}v� h WV WATER VALVE 0 - - I � \ \I 'I h\ : 1 fi HEAT F 2 t�0-- -C-G—N�C_ q }-- Z t�0� ,A a a}\ 1 1 _ _ _ _ _ _ _ - `� ' MPO P!Jbi ' `-' VxO - G4 1 �V0`' vl �0 . I I r -_--________ O LL ,�5\I o w O a 1 I I .\ I 'i II p X J w \� {e:���,�+tt\0,oti}, 1 I I 1 0 Ll1 o { �\ }} i.t! pl ' 4o W _ ___ \� __ ___ __-_ _-- - - - - - . _ 0,\'` 'y\i g1 \0� ��\ \0� l`� C9 _ _ _ - _ - - - '1\ II J T„P 8-Oo \ a 0 a V.I \� - .\p of ' IS. i'T t \� \' 1 \N\'1 O .\�\ q\_ «\�\ o\____ �`'\ I S MPo oMP MP , I iNliN-r.5 } ,, 43 ,�\ ,,,%\ l - 1 , .\ n\ - - -- ---- ---- WETLANDS \: n 3S� - 0 a b. e �� ",ti\ 8 P of `e. �\ o\ ., �IPnVDUT='4 UJN WALK /( ` '\2 G \ ' �- x\0Qx \T\ - -- - - _ - -- N 869.032J4-- - e \ I e >Q- of-- 7 _ -.\ 1--- ---- ° SP I� p°, 901 s\4'PVC }\ 0 ry, p\ d ., q\ 9. x q\•� 1 _ k`____ w _--- - - - - -- E 2,784,881.43 M \a 1 : e \ a e, 0 O \�} '\ a}\ \6 I' i -- - -- -- - ----- ----------------------- �•\ h\ }a\ I }o , .m`l ANTENNA x 0 \ 0?\' y 19 1�' IC d `_ _ - - 61 _ _ - 7 \�5\ }y\ _ _ _ `\ ` 0 \ ` N. Y 9\ of « ,\ S\ — o. « \ no\ EDGE OF PAVE GRASS , 6 k`�� .\� , \' 9?,'Li . �\ �"� \ .�' ay` 1 \1 5\ p ) EXISTING ` a �vl N _ :AX)------------- }ql \ APPROX. LOCATION 1 .\ oM I •L .\' _ - -, _ _ - - - - 0 p rr I DRAINFIELD N0, 2 0l }}\ x P 1 BUILDING' 11 i a d5\ py\ «V- z F F.E. (1a9?; IRT - #s wp a Byp, a\ ER ROAD \a6 Q ✓ I '1 \�' a 868859.88 p IV 5\ EDGE OF PAVE J M \ , PLANTER e PLAN?ER V1 '�\ WETLANDS Op ^e ASPHALT SURFACE) ti a\ a P= 0 bl \. 2785185.34 wl N 8688,854.3.5 \ ~1 --'--------------- \� a °- \ .00�\ E 5 269 dy\ - - - --w --- w— 0yp\ \0° LE - -,p\ .\0. , - d,\ - - w- - W \ PLANTER ,p } \' TOP a.os� n V.-8.35 \ \' 2 7 27 - I 0 74 _ �5\ ^�\ 1 W .'� « 'I , yry\ \ 0 0pl �' 4"PVC 0\ 0 g�\ - -Iff 51 0\ — - - - - O \p \p O�hti TOP=8.31 q py 0ygl ;a: 60\ \ - ---w-Wa-yq\- 7 - -_------_\.___ \oAl .0 INV.IN-7.66 �\ N w-�— \p - ---- --- ----- ----------- x w�X �l «\A --- - --- -- wl,. I II ', HEAT PUMP 3 INV.OUT=7.61, ey \0�}\ aq ;0\ hry��w w �`g\ 1.\p9\- - ^mil `n\ -.5- ' U (9 pA 9A Ab 43 A0 A�' 6g 1pl ) I,pg\ I it I 1 0a ZZ -) 0� d0\ 0d}\ 4"PVC - i i JZ6. � �\bY ___ ______(�1l APPROX. LOCATION N ba\ \0' ^ TOP=8.3 1 I DRAINFIELD N0.,3 � 0 o $,p\ `0. Q INV. II ' CONC. S OOP , 1 tlJ m a ASPHALT PARKING LOT P=8.33 INV.=8.26 0;x 03,1 \�A' WPP ,A- +x. II Ir TRB 0 ELEG`RIC Ili 4 1°\ }ti\ 0\ pl PLANTER ' ) }\ \0. I , I �' � 0 F.F.E. (a.63 TOP=8.41 \0. GENERATOR `e\ ,\' \ F.F.E. (8.66) INV.=8.34 ' "W/'E.R AME 1 " - _ - �' A0p x SHECfEf? 'I 'i 'I li i x EXISTING w v s c R p\ \ I \�. BUILDING \« - - 7-12 HAT x F.F.E. (8.74) ql x q\ O MN e\ x' \0 PHMP x HEATIQ,NE , ?\ WETLANDS a `9\ W - W wx \a>q PUMP CONC. N 865,874.53 'I s?ooP e I E 2,784,798.85 - e �� ' I I APPROX. LOCATION GRASS DRAINFIELD NO. 4 ��\ 1\ r 11 ' ' U. (60 `N P-y -,_1--- - ` \4,IG\P^\ i �\0`\ \OeSy «\q'xyy` \09�\ CHAIN LINK FENCE 6gi i x----vim=x_ _ _____ x_ _— x x x x x , a x x T x x x wPPI x I \ p1J h` I r `. \.y. _____________________ \ r \_ �------ =��-------------- 0�-------------------- \N�Tho-�\�`b�='' BENCHMARK N gN� WQ I _ 5 NAIL IN WPP w I r I I I I r I -41 d\ p\ x I QIQ J z e\ `. EDGE OF WETLANDS 1 ' U o I I I WETL D$ WETLANDS WETLANDS N 868, 64.04 a N 868,783.27 E 2,784,780.25 N 868,735.21 E 2,78 ,114.16 I E 2,784,898.74 I e\ ' 1'1 0\ `9l W\ MATCH LINE SHEET C101 g1310«\0I 1 NOTES REFER TO SHEET C104 FOR DEMOLITION IN THIS AREA `5\ I I `5\ N `6\ `d\ `p\ `y\ «0'\ GRAPHIC SCALE: 1"-30' 0 30 Hankins and Anderson Consulting Engineers 10 Sadler Road Glen Allen, Virginia 23M (804) 285 4171 (804) 217 8520 Fax wonv.haengineers.00m -v (D 7 (/1 a) 0 (n •� a a c 0 cO c 0 c 0 NV) (n w v, (n U) (0 0 O 0 0 ` i 111111111 mommommom Z F-.,. mz O = J Q J www wZ H � p Q J O �JV w �v a NV Z O U U X W DATE December 29, 2006 H&A PROJECT NO - CLIENT PROJECT NO. SCALE DRAWN BY CHECKED BY APPROVED BY 9 SHEET NUMBER 60 5219.001 r-30' I �Il *--A� I 01 BALI 1 I IBLDG CORNER BLDG CORNER 1 N 869,054-52 N 869,031-16 1 E 2,785,228-59 E 2,785,289-25 I 65' 100' I 1 FUTURE BUILDING v [—LIMITS FUTURE SHOP (NIC) OF CONSTRUCTION I (NIC) o FF-8.75 1 FF-8.20 `O STA 12.65.58 ROAD A- ' 16.5' 1 STA 12.62-78 ROAD B I BLDG CORNER BLDG CORNER N 869,008.80 6) LIMITS OF N 869,099-70 E 2,784,936.017 FUTURE CONCRETE N 869,063-75 E 2,785,029-38 E 2,785,069.09 FUTURE CONCRETE SIDEWALK 1 N -71 2,785, 64. E 2,785,264.80 CONSTRUCTION 1 --------------- - - -T -- _ -- ------ - - --- ------------------r--------'--'--_� - - - -- I :N:8Fx9d999..... -:- 4.36.03 ROAD A 070.08 ::_:! .:2:754�921'33 ::'a :::::::: ::.:.:::.:.:.::.:.::.:.::.:.:-::: ::.._._..._.._._..:Y.:"."...".."... ':::::::: - _ r.. 4 10 03 78 9 - E 2 - - - - - •:-.61:37........ A _ R q:: _ _ G,4F} I01 13fi:D4 .... • .. _ ..—?;::: :':'.p' '.'.'.•.'.-.'.'.. .'. �. •.'. •.•.. •.'.'.'.'.-.'.CY'.-.'.--•.-.•:•.-.•.-.•:--.'.'.'.'.-.'.'-'.'.-. :'--.':-.'.-: •.'-•..-.'.'-'.'.-.'.'.-.'.::- -.- -... - ...... ............... 0t I I :::-:�::'.:. -:-:-:-:- :-:-- - FUTURE—� :::: _•:: R•304.: I CONCRETE R*5 BLDG CORNER BLDG CORNER--- 1 N 869,038-35 N 869,009.59 : ..... M E 2,784,897.81 E 2,784,972.46 17 �- orn FUTURE �. o 1 WAREHOUSE R'010 FNIgC)0 3..:.. - U1 N 868,871.09 �.::. o E 2,785,114.62 :.. I ...... a C/L CURVE DATA DELTA-86. 16'11" R-50.00' T-46.85' L-75.28' PC STA 10.54.26 PI STA 11.01.11 PT STA 11.29.54 PI COORDIANTES N 868,943.06 E 2,785,239.74 1 �108.03�_ _ 1 I s�? :.: PLANTER : s 1 80, 6J6 5 ...... I (D (D j ,l 1 z z M � -' STA 10.00-00 ROAD / �n n 1 CONC. STOOP N � y STA 10.00.00 ROAD E w m r •�� N 868,835J9 N 868,846.55 I Q E 2,785,209-61 8 E 2,785,206.251 1 N IN c- MP a I PLANTER F.F.E. (8.63) ❑ 1 1 N 868,798-36 I EXISTING w E 2,785,194-57 G R A S S BUILDING a 1 7-12 1 I I 02 C/L CURVE DATA F.F.E. (a 4) ❑ 1 DELTA-96. 58'49" I 1 R- 92.00' STOOP ' T-103.95' L-155.72' GRASS 1 PC STA 10.86.92 1 PI STA 11.90-87 ' PT STA 12.42.64 PI COORDIANTES N 868,893.01 r _ E 2,785,024.48 I 1 BENCHMARK /' f- w I NAIL IN WPP W a 1 ELEV=8.99 N I F- N< LIMITS OF CONSTRUCTION I1 I 1 I N 868,814.90 E 2,785,312-91 RIVER ROAD (ASPHALT SURFACE) GRASS ,10 OF PAVE LEGEND (EXIST) REFER TO SHEET C100 LEGEND (NEW) t I_ -ASPHALT PAVEMENT -_-CONCRETE — - --ROAD CENTER LINE J_IMITS OF CONSTRUCTION _ _JNDICATES NO PARKING AREA BLDG- - - - - _ - - - BUILDING E------------PASTING COORDINATE FF------------ FINISH FLOOR L------------- MIN. - - _ -MINIMUM N-------------NORTHING NIC------------NOT IN CONTRACT POC----------- ON CURVE PC ------------ OF CURVATURE PI ------------- OF INTERSECTION PT ------------ OF TANGENCY R------------RADIUS STA ---------- STATION T------------ -TANGENT INDICATES HANDICAP PARKING GRAPHIC SCALE:1"-30' 0 30 60 Hankins and Anderson Consulting Engineers 1 Sadler Road Glen Allen, Virginia 2: (804) 285 4171 (804) 217 8520 Fax w haengineers.wrn a) 3 rn I O a� V) o C 0O C C •� a O O O E to V) N ' — (n !n (n !n V) ♦^ v 3 3 3 (n (n (n o p C _ O LL co c0 co CD o 0 0 0 w a oID 00 c M V CD^ O N DATE December 29, 2006 H&A PROJECT NO- CLIENT PROJECT NO. SCALE DRAWN BY CHECKED BY APPROVED BY SHEET NUMBER 5219.00 r—_w 7, 0 mm C200 a\ COORDINATE LOCATION OF STORM SEWER I I I I -----_ STORM SEWER STRUCTURES STRUCTURE \y,\ _ _ Hankins and Anderson by /II'I'I I�I� C/L OF EW-1 } } } C/L INSIDE LOCATION Consulting Engineers Ve01 ��AT FACE FACE WALL 4880 Sadler Road Glen Allen, Virginia 23060 RCP 01 ENDWALL EW 1 (8}4)2854171(804)2178520Fax EE N 868,957.07 w.vw.haengineers.can j E 2,785,075.20 ENDWALL EW-1 SWM POND OUTLET CONTROL CATCH BASIN O by v�, 02 NNDWALL 868,969. 31 - h,\ DITCH STORAGE SWM DITCH OUTLET CONTROL „', \ 5 STOP-OF-1TER - 6.0 - CATCH BASIN I E 2,785,012.55 HIGH DITC INV - 5.0 �05 Gov TOP - 6.83 �vv', II'„', �v s 03 ENDWALL EW-1 > LOW DITCH INV - 3.5 THROAT INV IW\e- 6-0 6 \6e\ �' \a\ _-----I _ AVG DEPTH - 1-75 THROAT INV OUT - 6.0 N 868,879.00 DITCH WIDTH 10' ', �a6v %,v�tiv E 2,785,183.34 a 6" PERF. INV IN - 2.75 -- SIDE SLOPE - 3:1 6" OVERFLOW INV IN 4.5 "lli�� i'w 1 - _ 04 ENDWALL EW-1 PITCH LENGTH - 600' 6" PVC INV OUT - 3.50 F r - -'' N 868,814.62 S'TQRAGE VOLUME, 16,020 CF _ -' "I }\I :e. E 2,785,169.64 - 05 ENDWALL EW-1 _\ ,\6'�F�----•-��_L,I,P� EDG. -�-� I _ "-� N 868,935.33 7 E WETLANDS6 ___-- - -- - 5 -- -- -- -- -- 515JI� 06 SWM POND OUTLET CONTROL CATCH BASIN 5 �\ _ N 868,921.09 7 ` 6 5 e - E 2,785,208.16 e\ 0 8 °\ r----�---- \e�\IV 6" PERF. PVC rI _G R A SS TORM SE WER\__ _____________ F__________________ _ �--- \ SCHEDULE \ II LIMITS OF FUTURE SHOP ', -___ -_, __ . �,___ 7 __-- (NIC) eA CONSTRUCTION _--' T FF.r8.75 \ 1 _ (NIC) `. } A 6 � � 01 ENDWALL EW-1 \y\ FF-8.20 `�\ 8 }\ TOP 7.38V OUT 5.15 LIMITS 0 -� "6� • ; h}\ O O 64 LF OF 15' RCP AT 0.25/. O CONSTRU ION \ h\ 8 e}\ \ a\ 6 \ 1 02 ° ENDWALL EW-1 •� _s_�__ ________'�_ o 2 I----�,�----r- \-r--------- `--------r-- -i �---------I II T P 7 Z c c c 0 .54 o c 0 •O_ O_ N N V) °\ , 8 `9\ 03 ENDWALL EW-1 w .�' •�' N O `e. I p n °ti\ ` ` / `�\ TOP 7.53 .Q o E E u> B B •' �e o�\,a xe / INV OUT 5.30 ,�^ n -0 '> ' ASS `�°'� a°\. }\ `e_ `e. ' ' v , 7 V) (n (n O - I I c } 5� Of q°" 141) - eh \ \e'\ens--- .eh\,,\ r - -------- 03 04 66 LF OF 15" RCP AT 1.06/ }^ I I S-I,;410" 1 ' \ 04 ENDWALL EW-1 C� �O Q L �. ` �� 0� \ Z TOP 8.23 I i..E V) \, _ Q ' INV IN 6.0 •� pl . 6A �9 / e` e U. I I cD \eti �6.� tt i _ ° a W` '_ 8 05 ENDWALL EW-1 cn co cn co 1� 13TOP 6.87 CD CD CD CD CD F56" PE �:SPV O6 o ------ ---- INV OUT 4.64 0 coo o v_ � c_a T 9 05 06 57 LF OF (3) 15" RCP AT 0.25/ o �� W . �1\ I i II 02 1 15 RC DITCH 0 0.2,�o`\w s\ '\9\ ------------- .\�y]------'��\------ \ a\ O6 SWM CATCH BASIN ----- -- ---------_\�-------* -� �e�\ -- TOP 7.50 �o\---- 7 - --- , / - - 'r�'1 - - <• ____ k ------ INV IN 4J8 \ _ - ,' ` FUTUR 5 \ y��l t\- `12" MP `�1T� 7 - �5\ -_ r, WAREHO E \e. ,.� \ }\ ti �,J_------- ---- \--------- bI ti\ (NIC> ---------------- -�; 6 \ n \e FF -8.0 6 \e \ 1 _ _ phi Z _ 1 e \eal`q 6 1 03 ep6 h\- - 6n\ ROAD g\ J Q I y RIVER R e CL J ` ' \(ASPHALT SURFACE) x Lu i, W ♦leh y\�y\ e`'\ PLANTER Q r, `\ O I' \e \ \ �y� - I \eye .\e n Sk\ W-- `"W- _ _ _ _ _ w- \b9 7 M w W - W_ ___ ___ W , EAT P P Ur 0eel �, \g. , .\e �\ 1 _ ` \ } k \g. ----------------'eti\ .\' - \ \egk Z Z Q "'i ya \ea }ai .\ LLJ LL u ATNFIELD ' NC. TOOP co OJ i rn ne \e ,\0 W \e. / _ *yl \ 9\ 59 J\��'T `t `L ,le. I,k�° Xca a 8 6\ N 6 \ 06 SWM POND OUTLET CONTROL Q " ul \e� b`� NJ I CATCH BASIN v V \ v 04 \e\ `n�a\ ,'1}\ TOP - 7.50 }\ o -�-I w 7 ,e 9\ e,,\ e> eo9 e �51°� \ THROAT INV IN - 6.5 \ 0 N I `e' TOP OF BA`F�LE - 6.5 'I a\ 17D TRB fie. E CTRIC \� ,^ I� , . ry\ �a\ `e,\ PLANTER ,' ` F.F.E. (8.63) 4 \e. ' ' ,e\Cie - F.E.E. (see) }ti\ 6" PERF_ INV IN 3.8 $ Q F- Z \ \e. cE RATOR I 1 6" OVERFLOW INV IN 5.25 y\ `a\ L.1_ w FRAME e 6" PVC INV OUT 3.80 LEGEND (EXIST) O Q POND STORAGE (INTERIOR) EXISTING �REFER TO SHEET C100 r , JJ G R A s s ,�\ 5`• TOP OF WATER 6.5 LJ.J Z V 1 °\ \ \e BUILDING ` - I °\ J Z 1 STORAGE VOLUME 10,201I11,,eLF I- I 7-12 d , I I I c\ I y\ , ,\ � X � ,\ n ,� WJ/7A�\ a LEGEND (NEW) C� NOTE` C AT 5 o I I I I a\ ' °\p H` \` F.F.E. (8.74) le°\ yl \bl i t �\ $ \6. I , S e\ ,' A. AF1MP `, HEAT `g\ „\ 1-- N „ I , I 1 .\ - - - STORM S e - oNEM� --STORM SEWER }\ GRADING SHOWN(OVER DRAINFIELD N0.3 e\ e)\ h\ 1°\ \e>� PUMP \e°9 CONC. 6EPN f LF______________-LINEAR FEET MAY BE MODIFIED TO THAT ONLY NECESSARY ` k ` STOOP I INV-------------- JNVERT J-\ TO DRAIN THE, 5IiE, IF TO DO OTHERWISE ® S _ 8 - _ S_ • S ola RCP_ _ _ _ _ _ _ _ _ - - - REINFORCrb CONCRETE PIPE WOULD BE DETRINNAAENTAL TO THE DRAINFIELD. '1' APPROX. LOCATION � -' " G R A S I , ' , I , 1 ��\ N _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ J`IORTHING COORDINATE AVY EQUIPMENT DO NOT USE H OVER THE \ ErDRAINFIELD NO. 4 ��\ I" ', i DRAINFIELD. a\ f \' \eol \e\ E_-___ �___-----FASTING COORDINATE DATE �, C/L--=�---------- CENTERLINE FF----------------FINISH FLOOR December 29 2006 NIC______________-NOT IN CONTRACT u H&A PROJECT N0. I I . \ey-------------- �9�----- WPp' I \eor O -DESIGNATES STORM STRUCTURE \e--------- \ e-------`r-b\'-' BENCHMARK, \e W Q „I y `\ ` --- �e----------- 21900 l _�-----------�--------------s--------- \ N - -T? - - - - - - - , NAIL IN WPP w , I „ , m CLIENT PROJECT NO. ELEV.=8.99_ SCALE N0T-31 L 0REFER TO SHEET C500 FOR SECTIONS A -A, B-B, DRAWN BY �¢-T', ','-IMITS OF «Qy\ C-C, D-D, E-E AND F-F ,'� - al III 1 CONSTRUCTION pm EDGE OF WETLANDS CHECKED BY \ Q I I I II a 1 \e APPROVED BY N 1 9\ GRAPHIC SCALE: 1"-30' BAL. ,0 SHEET �. \9ptil ,\93}\ 9ptil«\ee� SHEET NUMBER 0 30 60 C400 r V 4 V -Wl FUTURE BUILDING (NIQ FF-8.75 BENCHMARK NAIL IN WPP ELEV.=8.99 RIVER ROAD (ASPHW SURFACE) GRASS LEGEND (NEW) .8-26 -SPOT ELEVATION GRAPHIC SCALE: 1"-30' 0 30 60 (a Hankins and Anderson Consulting Engineers 0 Sadler Road Glen Allen, Virginia 23060 (804) 285 4171 (804) 217 8520 Fax w haengineersmm 3 V) O I VCAj o 0 c c 0 a 0 0 EU V) (n c rn •(n - — C 0 E C 2 :3 U) ' V) V) (n Qf _ o cd o O c °� U. 111111111 mommommom Q Z fZ Z O =J wW� J Q F H < J H ~ H 0U= �w LL- F- 0 W O U DATE December 29, 20M H&A PROJECT NO. 5219.00 CLIENT PROJECT NO. SCALE DRAWN BY RBP CHECKED BY IMB APPROVED BY SHEET NUMBER BAL C401 `0\ `g\ `gl SIDE SLOPE = 3=1 j 6" OVERFLOWINV iN 4.5 '`DITCH LENGTH = 600' 6" PVC INV OUT = 3.50 Y�o\ STORAGE � VOLUME, 16,020 CF EDGE �IWETLANDS,- Hankins and Anderson I _ `-- - - - - - _ - - - - - - - - -- - - 5 - - - - - " - - `51 Consulting Engineers 01 Virginia - _ U1 4880 Sadler Road Glen Allen, 23060 6 _� .•.� I ` (804) 285 4171 (804) 217 8520 Fax SWA \✓ 7' ` DRAINAGELE C--^—^---F DRAINAGE AREA-7�_018 oc 6 www.haengineers.eom PERT. PVC - / -'- Tc 15 min \ \6� 00\ by\ 7\ 01 6 j __ _____________,L6o1__________ / -\ ba\ - \1 - i`�'1601 ' ASS O i_______-_---__-____ ___-____ \-_---- GR T 5 BUILDING \d ,. C .0 \i _______yl__ { C) (NIc) . q FF6 \ I g 7,! V . I I`� B lJ R A S S \\ � ! ! `O1`-�, �A — ey1 I i �. \. - — 1 _ - _ _ -. �— - LBO �\ y\ `a 0ti v v I I I SS � \ til. � t .\�g'� ' \ (��`. � y Ole 1 I 0 w_ _ __________-- r o 61-V F 6" PE(�kS�PV — 06 \\ --- p I p\ a�0 �y1 of �_\ N ------------ ! Dt, AIN>AGE AREA-0.590 cic - e� i - -- ------ - I ! C / ,5 D'Ti ��_ \e:.��\� o FFSITE -- --- _. 91 - --- __- --- �9 _ `ol o_l \e 5\ i 1 al }til \\ w Q0.1 \ C O I �,�(//Oa, D tAI AG€- _AREA62.13 - - - - ,\�9 _ - - - - - r - �N _ - - - ,,------ TC �Imin . °ice o\�a°\\� �� !> 1.°'----- - ----- �-p1-- ---- .\ --------o �SP --= al------VFOV ---- •_ ''VV�� Q \.� T, :r �\ \ \ C �__ _ _____________________ FUTUR \ \ 0 51 �T 30-min ----, --- ---- of -}�--- ED PAVE o c c ,l' ,. 0ho'�61 }I�t rV' v `1'1',CMP t _d1________ 7 �5\ ' O I WAREHOUSE �� \�y f \ _ �\�, TOTAL DA TO C 2. \. \e� \0, ` � 911 of l �yl ---- a71 0. 0 � •O O Imo. y\ . r �� 0 `L .� d 6 I (NIC) \ y\ 6\ y N _ \0_____ e� y E U .� FINAL C 0.72 \ 9\ 5\ L E 6 FF=F3-0 6 �pl.\\� INAL TC'7 min - J yl------- 9ay� 3 \�61 `e N U�s� a i spa 5 V0, ROAD �6s1 0 ' RIVER SURFACE) - -1yl - - - EO E OF PAVE «\ 6 x 391 7 (n 7 - - w w— (n (n (n B U:G�elaQ -`�-----VI- ----W-- w `al ---� o �q ROAD y�."'" -j y�l _ -w---w�--- ,51--------------� 0 Q 0 0 CZ 1 «i . I♦ i bl \0/ \ 'J�\ 9\ — .\g' , /- y�l g -- _____�___ - 51 `gl _-_ Q / �, / \\� 1 �'°'l- ____1_.—_ p-- , •, «\� j al _ �—�1N - V! - - o-1 _ _ \ «C61 _ � \ 0g Z Z n n a /! i r---5`�-ls=- y ' k yyl 0\ U. 0 (D e / I apt a�,11 A. \3 r I' /, 6 ) `6\---------- ---' ti\ ca co cn co �II v 'i 'i v, HEAT PUMP a1 a r\}� t' } i Ve � 9A,¢ e 1 � \ ro e a 'V. jE `sl V \�yd f 50l 'Q�\N\LZ .\ k� / 0 0 0 0 \ CONC. TOOP ~ �' -,l y9 !\aT� \00\ Q ao Do v am - --T;RAINFIELD a° N J t%�.� j ! �'09 ', �� / o o cN -" -' 00 \� w m / \. j i 6 �N� 6231,`0 frl6 SWM POND OUTLET C0NTR01L o � cv c: �°wT` ' N��L �� CAI,_ BASIN > 7 A �_l� v l vVg�A vN0, r/�7V Tr—P - 7.50 THRC:AT INV iN -=6.5 P OF Try ( �L E P?`F: 5 TRB `e '��� M ELECTRIC \�L 0 \ r i� _ v A \ \ \ I PLANTER ,' `F.F.E.�1 , I I p 6" PFRF. INV IN 3.8 I (8.63) GENERATOR II F.F.E. 8-66) l r , , I 6`� OVERF�OW ,N ✓ N 5_?S ( / - W FRAME 0 1 PVC OUT / / SHELffR p�„ ✓<, iNJV v�„T 3_+,30 ------- �� EXISTING POND STORAGE (INTERIOR) c R A s s w °\ BUILDING y I TOP OF WATER = 6.5 / z I STORAGEOV'OLUME 1C} 'LO r7-12 D51 I y\ CULVERT A \£ `I S DRAINAGE AREA-0: 1 Pc I Q V' I r l p HEAT \ F.F.E. (8.74) t v�D.45 ♦V �MH , ^��l L e\ 8 _ PUMP \ p HEAT T � In NQNE i I i � Lu v 9l ��1 h\ mooA V03�YPUMP Vq.^°j CONC. C. 5.��EP , Vim STOOP , «Q tit 0 < I I 1 `�' ,' � I I I I I I - 8 I W � I I APPROX. LOCATION � � GRASS ' DRAINFIELD NO. 4 ,t9A vA N 1 , v �oA el r- � Cie ' V9' r — , k ��\any A17r' \&9ryl \ it r w V w 0 �J .\\ l li Ih\ �r N2(Sn 6 Ohl a BENCHM LL ELEV.=8.99- Q L `,p`NOTE a, 6� —_ �*� REFER TO SHEET C500 FOR SECTIONS A A, B B, \ �� C C, D-D, E-E AND F,F —_ - - -—���'�'.� �h�� �� - EDGE OF WETLANDS 3 / ' I DRAINAGE DIVIDE .�a1 DATE m ,� \91 / r 2006 °y�y � \9p`Ll j51 9p11 \g®\ � . December 29 H&A PROJECT N0.5219.00 CLIENT PROJECT NO. I I I I I I 9\ I I I I SCALE GRASS �pN \ 8 r3W DRAWN BY Aryl �1 0\ , i ,A1 7V A 1 ' T 't. , I I I 1 I I 'L\ I I p�pp I�pf CHECKED 8Y IMB I APPROVED BY ' A qE I h\ GRAPHIC SCALE: 1"-30' BAL \�' Al 1 1 i \9. '\9\ \\ ' .Q I SHEET NUMBER « .Q?� 5�- I , `. 0 30 60 C402 LIMITS OF — CONSTRUCT / / I , I I I 1 I Q Ji I LLJ I` v o \ C C \ II,'1 II I I ,1„II \ I III 1 I I I --------- -- _ I IIII„ SEDIMENT TRAP NO. 1 - DRAINAGE AREA-4.27 AC I'II ' VOLUME REQUIRED-7,686 CU FT VOLUME PROVIDED-11,360 CU FT 1 SF SF GL EDGE 7 6 0 0 3.2 SIDE SLOPES-3=1 WEIR LENGTH-12 FT ETLANDS ------ 5 4 - 5 4 ili 7 7 GL --- TO PS M '_____________________________________________________ ---------------- _----------------- ----- 4 TO if I ' --- I PS if - I \ , EROSION CONTROL ABBREVIATIONS Hankins and Anderson REFERENCED TO THE "EROSION AND SEDIMENT CONTROL Consulting Engineers PLANNING AND DESIGN MANUAL", LATEST EDITION 4880 Sadler Road Glen Allen, Virginia 23061 ~ TO TOPSOILING (804 ) (eoa)2as2oFax 2864171 n w w w> \ REF. 6.04 w .haengineers.com c^ �, i°r�av58X CE CONSTRUCTION ENTRANCE 0 REF- 6.06 Mtn o J ^o Poo4 z w I _ / PS PERMANENT SEEDING s / REF. 6.11 0 -w __-- O MULCHING 00 --- REF. 6.14 0�0 a GL GRASSED LINED CHANNEL REF. 6.30 SEDIMENT TRAP I' REF. 6.60 SILT FENCE —X—X— REF. 6.62 I LIMITS OF I 1 CONSTRUCTION 'I I I , ' 1 III GR ASS -----_ _-- a ' Vo _____________________ \ 1 I - ------ ------ g w -\ �tsj 1 0 - - _ U. - )'\ '11--------------------------------_�__-_ _ ---------------------------- I'I---------------------- --- --- moo } SF I�"' /MP '1685�---------- ------- Wv oW ----- O�� Q ' °O OOo°oc pO 1 -1 G-WEEN�LSE-E RFCFRAT.TAROMICRE CI I Ea1 1\ °Z1Jo$1It\ �o6°O '5II� av , `I 1 I II' 'II,0o II Ir� I`I0c,� o I IiU � qot 1 £ .�xof�da �I�3f°o � s o O ° O PLANTER 00o000 o O 0 ooo�°b°00p00 0°0aw 00 0 000o0 Uo(5 10 000 0O0O U0 zzg-°PROX. LOCATION IN. �67t) STOOP y-1 X5 0. LL I TRB PLANTER 63) F.FE(8.66) EXISTING G R A S 5 BUILDING Q %-12.F.E. (8.74)wAT MP HEAT8 PUMP CONC STOOP APPROX. LOCATION G R A S S DRAINFIELD N0. 4 0 --___--__-__________________— , BENCHMARK NAIL INWPP ELEV.=899_J DRAINAGE DIVIDE SF wqu=�xANDEDGE OI ly I ,' \\ �I '\ , - I p — xw ------E-D-GE--OFwP—A ----- RIVER ROAD tz GE OF PAVE (ASPHALT SURFACE) -w- w-----w- - -- W --- - - ---— o 1 ----w- -- - - ---- - - - - -- N �Z N 1 1 I I I I 1 LEGEND (NEW) _--LIMITS OF CONSTRUCTION 6 —___ CONTOUR DRAINAGE DIVIDE i I \ NOTES 1. IF THE CONTRACTOR USES ANOTHER SITE FOR BORROW OR WASTE ACTIVITY, HE SHALL BE RESPONSIBLE FOR OBTAINING AN EROSION AND SEDIMENT CONTROL PERMIT FOR SUCH LAND DISTURBING ACTIVITY, THE PERMIT WILL NOT BE REQUIRED IF THAT SITE IS REGULATED UNDER THE MINING ACT OF 1971, OR IS A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT- 2- THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES- IN ANY EVENT SLOPES LEFT EXPOSED SHALL WITHIN 21CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION_ GRAPHIC SCALE: 1"-30' 0 30 a� 3 I N C O_ CO C 0 C O rn N -- rn cn N O :3 V) U) 7 (n 7 (n N [L b� o p _ o _ a p p c c 3: m , LE ET_ I 1_ W Lu F.. Q 1..� L _J QCL w LLu J ULJ Vi ' Z � � H L r W J F 0 J O � a L.I_ � Z � Lu 1� L u OO W DATE December 29, 2006 H&A PROJECT NO. CLIENT PROJECT NO SCALE DRAWN BY CHECKED BY APPROVED BY 09 SHEET NUMBER 60 BAL C700 T--- EROSION CONTROL ABBREVIATIONS Hankins and Anderson ION AND SEDIMENT CONTROL REFERENCED TO THE "EROSION Consulting Engineers , ,III n PLANNING AND DESIGN MANUAL", LATEST EDITION ' ' I ' ` CP 4880 Sadler Road Glen Allen, Virginia 2306( ' TO TOPSOILING (804) 285 4171 (804) 217 8520 Fax REF- 6-04 w haengineers.com �II',',', CONSTRUCTION ENTRANCEW-20 1��'I 11 y ¢ REF- 6-06 1 111I�I - DITCH STO AGE S'NP� DITCH OUTLET CONTROL II',;; TS TEMPORARY SEEDING �ATER F.O - CAT H BASIN REF- 6-10 HIGH DITCH ;NV = 5-O TOP = 6.83 I'111 �s O '" 01 PS PERMANENT SEEDING ' -- LOW DITCH ;N J = 3. ; TLiRv T .N J iN 6.G I ' -- AVG DEPTH = 1 75 THROAT INV 'DU = 6-0 II REF- 6-11 6 D TCH WIDTH �0' PERF INV N 2 75 SIDE 'LOPE - OVFR_I OW ;NV iN 4-5 i'� � O MULCHING -DITCH LENGTH 600' � 6" PVC !NV OUT - 3.50 ;'I"'', I /� - REF- 6-14 ST RAGE VOLUME 16,G20 CF _-'- 5,-, "II �/ --- ;I'I II GL GRASS LINED CHANNEL —_ J REF_ 6.30 �-� EDGE OI WETLANDS.- -- - 7 6 —7 I - OP OUTLET PROTECTION -._ - - ---'- - -- - - ---- - - - _ - - - - - - - - 5^ REF. 6.41 SEDIMENT TRAP 7 - - REF- 6-60 7 (SF) SILT FFNCF —X—X— LIMITS OF CONSTRUCTION TO \ . IL / .— \ 1 ��---------- - TS \ F56 PERF.' C \tv6 `t'- o PS OP - - - — i - -- I CIa5 CP , 5,. 41 L ----- ___--- --------------------- M---- tO2 i _IT, H G 2 — - --- --- -- ------ -- --- --- i S w _ _ _ - - - _ _ - _ - _ - - - - - _ _ _ _ F-F� _ - _ _ 11 1 _ % ----- I D �?' \. T ---- - - --- --------- --- - --- - wJ - owSP - \ e3a FUTURE ,, } . SF , �„ MP ��. --- --- 7 -------------- - ------------------------- I�- 5 _ , ,1C1 -_--- - . ---- ---- --- - -- EDGE OF PAVE' i WAREHOUSECIP OPY��----------- TO PS M `: o°° __i--------------------------- \ a I FF=8.0 E op�76 00000 a a w RIVER ROA EDGE of PA J ,_ Q °o°$$o(ASPHALT SURFACE PLANTER - o 0°o ao _ ° __ - _ ____Vf _=-W _ •' oe o god -----w-4_W - ------ W0---- , �' I - ----W- - -� ------ ', I ( 1 - -..(� `�- - o°p° uO p°q appoy _ _ _ _ _ yy_ _ _ _ _ _ _ _ _ _ 7 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ L,J II 1 - - .ffj °$oo o O"0 'ooO��p40b W ___-_-____ ______-___ � - CE w II -!. -aOc oo W W --- --------- --- --- -- - - - --- - W 'IIi t/ )- - I_ II , HEAT PUMP C7 C9 i I J.-.�._ I { - r ao Q�°� ° -`�6°�� ____-_--_- - _ Z „"'� ! ( - I " - INV.,� IQ��Nv_ \( ' _ — �2AINFIELD ' CONIC TOO P 0) 0 m �� -- J f -- . f ..8 I ! TO 6 `, o- 00 w m LL TS 9N ) - '' y231 % 0� SWM POND OUTLET CONTROL y CNN. L ,' 1 CATCH BASIN I I 7�I ' i II , I II II I ,111, I ' , , I , , I , 1 I ` r I I I I I I I , To PS M TO Ts PS T T PR T TI N IN° ' ' OP = 7.50 PS P �5,°� THROAT INV IN = 6-5 j` d5O-0-5O we I rn T B MPo ELECT C ,I` 'I� �N`I' ' � � � TOP OF BAFFLE - 6.5 PLANTER �' ` F.F.E. (8.63) La-8' GENERATOR I I ',' 6" PERF- INV W = 3-8 TS FF.E. (s-66) 1 6" OVERFLOW INV IN 5.25 _ Do-3-75' -"wrFRAME b" PVC INV OUT = 3.80 APRON THICKNESS-1. 3' SHELTg I LEGEND (NEW) W-11-75EXISTING If POND STORAGE (INTERIOR) G R A s s BUILDING TOP OF WATER = 6.5 — - ---LIMITS OF CONSTRUCTION ---- 7-12 1 STORAGE VOLUME - 1O,2O0 OF ' wH, \ I I I I © HAT F.F.E. 8.74 PUM P \ ❑ HEAT PHONE N` , I PUMP CONC. STOOP 8 1 CATION , -- G R A S S -- -� 'I ----- ------=A`_ BENCHMARK WPPi F-w ' NAIL IN WPP W < u J 1CO � ELEV.=$.99 z i ',I ', ' s I"L LIMITS OF CONSTRUCTION EDGE OF WETLANDS a o 0 3 IGRAPHIC SCALE: 1"-30' �I 0 30 60 0 VNj o C o c c O •� O O -V)_ ^ V) - V) rn N N 07 0 o ° � CL3 O O) 1 LE li 111111111 mommommom Q Z Lu Lu T� Q. Z W W J C)e Z J Q � =3 O w = Z J CL a T LL. Z O 0Z 0 Iw u 00 °u V DATE December 29, 2006 H&A PROJECT NO. CLIENT PROJECT NO. SCALE DRAWN BY CHECKED BY APPROVED BY SHEET NUMBER 5219.00 TITII - - r PROJECT DESCRIPTION EROSION AND SEDIMENT CONTROL NOTES THE OWNER PROPOSES TO MODIFY AN EXISTING SITE TO SERVE OTHER PURPOSES. FOUR SMALL BUILDINGS USED TO HOUSE TRAINEES HAVE BEEN REMOVED AND THE OTHER TWO REMAINING BUILDINGS WILL BE RENOVATED FOR THE NEW USER. A NEW SHOP AND WAREHOUSE AND A HOTEL TYPE STRUCTURE WILL REPLACE THE FORMER BUILDINGS. THE SURROUNDING ADJACENT AREA HAS BEEN DECLARED WETLANDS AND WILL NOT BE DISTURBED WITH THIS PROJECT_ THE SITE AREA IS APPROXIMATELY 4.4 ACRES, WITH APPROXIMATELY 3.3 ACRES BEING DISTURBED WITH NEW CONSTRUCTION. APPROXIMATELY 2150 FEET OF SANITARY SEWER WILL BE INSTALLED OFF -SITE. CRITICAL AREAS THE SITE IS VERY FLAT WITH MINIMAL CHANCE OF SEDIMENT LEAVING THE SITE, DRAINAGE SWALES HAVE BEEN PREVIOUSLY CUT ALONG THE PERIMETER OF THE SITE TO PROVIDE DRAINAGE. THESE SWALES WILL BE MODIFIED AND MOVED TO THE PERIMETER, ADJACENT TO THE WETLANDS. SILT TRAPS WILL BE USED PRIOR TO NEW DITCHES ENTERING THE EXISTING SWALES. EROSION AND SEDIMENT CONTROL MEASURES UNLESS OTHERWISE INDICATED ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO THE STANDARDS AND SPECIFICATIONS OF THE CURRENT EDITION OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. STRUCTURAL PRACTICES 1_ TEMPORARY GRAVEL CONSTRUCTION ENTRANCES / EXITS REF 6.06 2. GRASS LINED CHANNELS REF 6.30 3. OUTLET PROTECTION REF.6.41 4. TEMP. SEDIMENT TRAP REF_ 6.60 5. SEDIMENT (SILT) FENCE REF 6.62 SOILS VEGETATION PRACTICES 1_ TOPSOILING REF 6.04 2. TEMPORARY SEEDING REF 6.10 3. PERMANENT SEEDING REF 6,11 4_ MULCHING REF 6.14 TOPSOIL WAS ENCOUNTERED AT EACH BORING LOCATION AT A DEPTH OF APPROXIMATELY 6 TO 10 INCHES. THE SUBSURFACE SOILS RECOVERED FROM BENEATH THE SURIFICIAL ORGANIC SOILS WERE NOTED TO BE UNIFORM AND CONSISTANT AT THE 6 BORING LOCATIONS AND WERE ARRANGED IN A TWO LAYER CONFIGURATION. THE INITIAL SOIL LAYER EXTENDED FROM BENEATH THE TOPSOIL TO DEPTHS RANGING FROM 2 TO 18 FEET BELOW EXISTING GRADES. THE SOILS OF THIS LAYER WERE PRIMARILY COHESIVE IN NATURE AND WERE COMPRISED OF CLAY (CH, CL) WITH VARYING AMOUNTS OF SAND AND SANDY SILT (ML)- THE SECOND AND FINAL SOIL LAYER EXTENDED FROM BENEATH THE INITIAL SOIL LAYER TO THE BORING TERMINATION DEPTHS (MINIMUM 30 FEET). THE SOILS OF THIS NATURE WERE GENERALLY GRANULAR IN NATURE AND NOTED TO CONSIST OF SAND WITH VARYING AMOUNTS OF SILT, CLAY AND MARINE SHELL FRAGMENTS (SP, SP-SM, SM, SC). TEMPORARY SEEDING TOPSOIL STOCKPILES AND ALL AREAS TO BE ROUGH -GRADED DURING THE INITIAL PHASE OF CONSTRUCTION SHALL BE SEEDED WITH FAST GERMINATING, TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING. SELECTION OF THE APPROPRIATE SEED MIXTURE WILL DEPEND UPON THE TIME OF YEAR IT IS TO BE APPLIED. SEASONAL SEED MIXTURE INFORMATION IS AVAILABLE ELSEWHERE ON THIS DRAWING. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN FIFTEEN WORKING DAYS OR THIRTY CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING ON ANY PORTION OF THE SITE. PERMANENT SEEDING SHALL BE APPLIED WITHIN FIFTEEN WORKING DAYS OR NINETY CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. MANAGEMENT STRATEGIES 1. SEDIMENT TRAPPING MEASURES SHALL BE INSTALLED AS A FIRST STEP IN CLEARING AND GRADING OPERATIONS_ 2. CONSTRUCTION SHOULD BE SEQUENCED SO THAT GRADING OPERATIONS CAN BEGIN AND END AS QUICKLY AS POSSIBLE. 3. TEMPORARY SEEDING OR OTHER STABILIZATION PRACTICES SHALL FOLLOW IMMEDIATELY AFTER GRADING- 4_ AREAS WHICH ARE NOT TO BE DISTURBED SHALL BE CLEARLY MARKED BY FLAGS, SIGNS ETC. 5. THE JOB SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL PRACTICES. MAINTENANCE IN GENERAL,ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL BY THE CONTRACTOR_ THE FOLLOWING ITEMS WILL BE CHECKED OR REPLACED. 1_ THE SILT FENCES WILL BE CHECKED REGULARLY FOR UNDERMINING OR DETERIORATION_ 2. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND OF VEGETATION IS MAINTAINED. AREAS SHOULD BE TOP SOILED, FERTILIZED, RESEEDED AND MULCHED AS NEEDED. 3. WHEN ALL AREAS HAVE BEEN STABILIZED, EROSION AND SILTATION CONTROL MEASURES SHALL BE REMOVED AND THE AREAS RESTORED. SEQUENCE OF OPERATION 1_ NOTIFY PERSONNEL AT THE FACILITY 48 HOURS PRIOR TO START OF CONSTRUCTION_ 2. CONSTRUCTION ENTRANCE, SILT FENCE, GRASS LINED SWALE AND THE TEMPORARY SEDIMENT TRAP SHALL BE CONSTRUCTED AS A FIRST STEP IN PROPOSED LAND DISTURBING ACTIVITIES AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE/CLEARING TAKES PLACE. 3. PERFORM SITE CLEARING AND EXCAVATION OPERATIONS FOR NEW ROADS, UTILITIES, SITE WORK AND BUILDING. 4. INSTALL CULVERTS WITH INLET AND OUTLET PROTECTION, AS INDICATED. 5. SEED AND MULCH ALL DISTURBED AREAS. 6. FINE GRADE AND INSTALL PAVEMENT. PERMANENTLY STABILIZE ALL DISTURBED AREAS. 7. AFTER THE SITE HAS BEEN STABILIZED TO THE SATISFACTION OF THE EROSION AND SEDIMENT CONTROL INSPECTOR, REMOVE ALL TEMPORARY CONTROL PRACTICES, INCLUDING THE GRAVEL CONSTRUCTION ENTRANCE, SEDIMENT FENCING, AND TEMPORARY SEDIMENT TRAP- 8- STABILIZE ANY AREAS DISTURBED BY THE REMOVAL ACTIVITIES. FLUSH ALL CULVERTS AFTER REMOVAL OF INLET PROTECTION CONTROL PRACTICES. 1_ ALL EROSION AND SEDIMENT CONTROL MEASURES UTILIZED IN THIS PLAN ARE IN ACCORDANCE WITH THE CURRENT EDITION OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. STANDARDS AND SPECIFICATIONS NOTED IN THESE PLANS ARE DESIGN MANUAL DESIGNATIONS. 2. CONTROL PRACTICES SHALL BE INSTALLED PRIOR TO BEGINNING MAJOR CLEARING OR GRADING. 3. CONTROL PRACTICES SHALL BE INSTALLED AS SHOWN ON THE DRAWINGS. MINOR FIELD CHANGES AND ADJUSTMENTS ARE PERMISSIBLE AS LONG AS THE INSTALLATION FUNCTIONS, AND CONFORMS TO SPECIFICATIONS, AND ARE APPROVED BY EROSION CONTROL INSPECTOR_ 4. LIMING, FERTILIZING, SEEDING AND MULCHING MUST BE COMPLETED AS SOON AS THE SITE HAS BEEN BROUGHT TO GRADE ON ANY PORTION OF THE SITE. 5. A STABILIZED CONSTRUCTION ENTRANCE SHALL BE USED AT ALL POINTS OF CONSTRUCTION INGRESS AND EGRESS. 6. ANY MATERIAL DEPOSITED ON EXISTING ROADS AS A RESULT OF HAULING OPERATIONS FROM THE SITE, SHALL BE REMOVED IMMEDIATELY_ USE A MECHANICAL SWEEPER_ WASHING THE ROADWAY WITH WATER IS NOT PERMITTED. 7. GRADING OPERATIONS SHALL BE DONE IN CONFORMANCE WITH THE STANDARD SPECIFICATION FOR LAND GRADING. 8. DIRECT RUNOFF SO THAT IT DOES NOT RUN DOWN THE FACE OF CUT / FILL SLOPES, 9. MAINTAIN EXISTING DRAINAGE DURING CONSTRUCTION_ 10. AN APPROVED COPY OF THE EROSION AND SEDIMENT CONTROL PLAN SHALL BE AVAILABLE AT THE SITE AT ALL TIMES. 11. NO MORE THAN 500 FEET OF UTILITY TRENCH SHALL BE OPENED AT ONE TIME. 12. WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS, EXCAVATED MATERIAL IS TO BE PLACED ON THE UPHILL SIDE OF TRENCHES. 13. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED UNTIL THE SITE HAS BEEN STABILIZED TO THE SATISFACTION OF THE EROSION AND SEDIMENT CONTROL INSPECTOR. 14. IMMEDIATELY STABILIZE ALL AREAS DISTURBED BY THE REMOVAL OF SEDIMENT CONTROL MEASURES. 15. NO DISTURBED AREA WILL BE DENUDED FOR MORE THAN 30 CALENDAR DAYS. 16. ALL STORM AND SEWER LINES NOT IN STREETS ARE TO BE MULCHED AND SEEDED IMMEDIATELY AFTER BACKFILL. 17. ALL ELECTRIC POWER, WATER AND SEWER TRENCHES ARE TO BE TOPSOILED, SEEDED AND MULCHED IMMEDIATELY FOLLOWING BACKFILL. 18. ANY DISTURBED AREA NOT PAVED, SODDED OR BUILT UPON WITHIN 30 DAYS IS TO BE SEEDED ON THAT DATE WITH OATS, ABRUZZI RYE OR EQUIVALENT, AND MULCHED WITH HAY OR STRAW (MAY BE MODIFIED DEPENDING ON CONSTRUCTION PROGRESS). 19. PROPERTIES AND ROADS ADJACENT TO THE SITE SHALL BE KEPT CLEAN OF MUD AND SILT CARRIED FROM SITE EITHER BY VEHICULAR TRAFFIC OR RUNOFF. 20-IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO INSPECT AND MAINTAIN EROSION CONTROL DEVICES PERIODICALLY AND AFTER EVERY ERODIBLE RAINFALL, 21_ THE APPROVED EROSION AND SEDIMENT CONTROL PLAN MAY BE CHANGED BY THE AUTHORITY THAT APPROVED THE PLAN, AND ADDITIONAL CONTROLS REQUIRED WHERE INSPECTION HAS REVEALED THAT THE PLAN IS INADEQUATE TO SATISFY THE MINIMUM STANDARDS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS. 22.IMPLEMENTATION OF THIS EROSION AND SEDIMENT CONTROL PLAN SHALL BE SUBJECT TO CONTROL BY NORTH CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS AND INSPECTORS. 23. NO MATERIALS ARE TO BE STORED OUTSIDE OF THE LIMITS OF CLEARING AND GRADING. TEMPORARY SEEDING SEEDING MIXTURE SPECIES RATE (LB/ACRE) RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE IN PIEDMONT AND COASTAL PLAIN KOREAN IN MOUNTAINS) 50 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. SEEDING DATES COASTAL PLAIN - DEC. 1 - APR_ 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR ,APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-'0-10 FERTILIZER_ MULCH APPLY 4,000 LB/ACRE STRAW_ ANCHOR STRAW 3Y TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISC WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE- RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. SEEDING MIXTURE SPECIES RATE (LB/ACRE) GERMAN MILLET 40 IN THE PIEDMONT AND MOUNTAINS,A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB/ACRE.. SEEDING DATES COASTAL PLAIN - APR. 15 - AUG. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER_ MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISC WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE- RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING RECOMMENDATIONS FOR FALL SEEDING MIXTURE SPECIES RATE (LB/ACRE) RYE (GRAIN) 120 SEEDING DATES MOUNTAINS - AUG. 15 - DEC. 15 COASTAL PLAIN AND PIEDMONT - AUG. 15 - DEC. 30 SOIL AMENDMENTS FOLLOW SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISC WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY_ TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH_ IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15,OVERSEED WITH 50 LB/ACRE KOBE (PIEDMONT AND COASTAL PLAIN) OR KOREAN (MOUNTAINS) LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. PERMANENT SEEDING NO.4CP FOR: WELL - DRAINED SANDY LOAMS TO DRY SANDS. LOW TO MEDIUM CARE SEEDING MIXTURE RATE SPECIES 10 20 LB/ACRE CENTIPEDEGRASS (30 BU/ACRE SPRIGS) SEEDING DATES MARCH - JUNE SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 300- LB/ACRE 10-10-10 FERTILIZER_ MULCH DO NOT MULCH MAINTENANCE FERTILIZE VERY SPARINGLY - 20 LB/ACRE NITROGEN IN THE SPRING WITH NO PHOSPHORUS. CENTIPEDEGRASS CANNOT TOLERATE HIGH pH OR EXCESS FERTILIZER. SPRIGGING CAN BE DONE THROUGH JULY WHERE WATER IS AVAILABLE FOR IRRIGATION_ PLANT SPRIGS IN FURROWS WITH A TRACTOR -DRAWN TRANSPLANTER, OR BROADCAST BY HAND. FURROWS SHALL BE 4 TO 6 INCHES DEEP AND 2 FEET APART_ PLACE SPRIGS ABOUT 2 FEET APART IN THE ROW WITH ONE END AT OR ABOVE GROUND LEVEL. BROADCAST AT RATES SHOWN ABOVE, AND PRESS SPRIGS INTO THE TOP 1.5 - 2 INCHES OF SOIL WITH A DISK SET STRAIGHT SO THE SPRIGS ARE NOT BROUGHT BACK TOWARD THE SURFACE_ TO DRY SANDS; LOW MAINTENANCE SEEDING MIXTURE SPECIES PENSACOLA BAHIAGRASS RATE (LB/ACRE) SERICEA LESPEDEZA 50 COMMON BERMUDAGRASS 30 GERMAN MILLET 10 SEEDING DATES 10 APRIL 1 - JULY 15 SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 3,000 LB/ACRE GROUND AGGRICULTURAL LIMESTONE AND 500 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH_ ANCHOR BY TACKING WITH ASPHALT, ROVING, OR NETTING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REFERTILIZE THE FOLLOWING APRIL WITH 50 LB/ACRE NITROGEN. REPEAT AS GROWTH REQUIRES. MAY BE MOWED ONLY ONCE A YEAR. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND MOW AS OFTEN AS DESIRED. NOTE: USE COMMON BERMUDAGRASS ONLY ON ISOLATED SITES WHERE IT CANNOT BECOME A PEST_ BERMUDAGRASS MAY BE REPLACED WITH 5 LB/ACRE CENTI- PEDEGRASS. PERMANENT SEEDING NO.7CP SEEDING MIXTURE SPECIES RATE (LB/ACRE) COMMON BERMUDAGRASS 40-80 (1-2 LB/1,000 FT/SQ) SEEDING DATES APRIL - JULY SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 3,000 LB/ACRE GROUND AGGRICULTURAL LIMESTONE AND 500 LB/ACRE 10-10-10 FERTILIZER. MULCH USE JUTE, EXCELSIOR MATTING, OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER BOTTOM OF CHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON CHANNEL SIDE SLOPES ABOVE THIS HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4,000 LB.ACRE GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES WHERE THEY CAN CLOG DRAINAGE DEVICES. MAINTENANCE A MINIMUM OF 3 WEEKS IS REQUIRED FOR ESTABLISHMENT_ INSPECT AND REPAIR MULCH FREQUENTLY. REFERTILIZE THE FOLLOWING APRIL WITH 50/LB ACRE NITROGEN_ Hankins and Anderson Consulting Engineers '0 Sadler Road Glen Allen, Virginia 23( (804) 285 4171 (804) 217 8520 Fax w ..haengineers.c -0 (D 7 W I Otn o 00 C C 0 0 0 U (n (n V) V) E E :3 U) :3 :3 U) cf) (n o 0 o a v fz m- EZi� U. co co cO cn o o 0 0 W 00 0 0 I I I cov I o Q F-- a. Z W W_ J H H U w J a U L¢L U0 H Z U DATE Z Lu L W Lu O Z W Q ` J H 7 J W W Z O DO USU w Lu December 29, 2006 H&A PROJECT NO. 5219.00 CLIENT PROJECT NO. SCALE As Noted DRAWN BY RW CHECKED BY NB APPROVED BY BAL SHEET NUMBER C702 J DESIGN SETTLED TOP MAX STORAGE u r I mlrv00 -11-1 L`L� -ill °O 000 O o00o °o� 00 ° _ l �x °oo$OTo a �° o° �i II 2.1 SIDE CN1 FIABRIC LTER=1� °0 0 0 a ° °p ill' SLOPE ° _ 6 FT 1:1 SIDE SLOPE MAX STONE SECTION STORAGE VOLUME REFER TO E & S PLAN SHEETS OVERFILL 6" FOR SETTLEMENT EMERGENCY BY-PASS 6" BELOW SETTLEDTOP OF DAM NATURAL GROUND 5 FT MIN °p °p° o°00 QOQO 00000, 00 ° °o OOo°po°oo00 p°0O 00 o°c 0 0 0 °oo °o Oo o°O O°00°00 °° Oo ° 0 0 0 °0°(1 0 ° o 0 0 i I «Q o N 2 o ° o°o 0 0, OUTLET TOE OF FILL 0 J <L CULVERT TOE OF FILL 30 DISTANCE IS 6' MINIMUM IF FLOW IS_TOWARD rmtjANKivirN SILT FENCE CULVERT INLET PROTECTION NO SCALE LNCDOT LCLASS B EROSION FILTER NO- 57 STONE CONTROL STONE FABRIC LNORMAL DITCH GRADE NOTE: REMWHEN THE TOP OPO SDIMENT FROM TRAP SEDIMENT REACHES S WITHIN IIIIIII BOTTOM OF EXCAVATION 2-5 FEET OF THE TOP OF STONE p CROSS SECTION o�o�gb °° 11 so, PJ� ° ° ° 0 ° TEMPORARY SEDIMENT TRAP DETAIL QP.°°0°°° G� o�°0 opO0 uIIIIIIIIIIIIIIIIIIIIIIIIII 0 o°°OQ°°o�° o ° °no°n0- REF- 6.60 NO SCALE 2"-3" COAf AGGREGATE FILTER FABRIC TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT REF. 6.06 NO SCALE 2.5' rLAIN 12' SECTION A -A 7' 2-5' SECTION B-B x USE TYPICAL SECTION SHOWN ON PLANS OR NORMAL SIDE SLOPE, BOTTOM WIDTH, AND DEPTH OF CHANNEL, DITCH OR NATURAL GROUND. 'ONE FOR EROSION CONTR OUTLET P NO SCALE 1. SET POSTS AND EXCAVATE A 4"X4" TRENCH UPSLOPE ALONG THE LINE OF POSTS 3- ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH- MINIMUM 36" INSTALLED HEIGHT- (WITH WIRE SUPPORT) NO SCALE 2- STAPLE WIRE FENCING TO THE POSTS. 4-BACKFILL AND COMPACT THE EXCAVATED SOIL_ IR9 FILTER FABRI U WIRE — i l- — IIIIIII - 1=III=11'I _III III III -III. EXTENSION OF FABRIC AND WIRE INTO THE TRENCH ILE IP Hankins and Anderson Consulting Engineers 10 Sadler Road Glen Allen, Virginia 23060 (804) 285 4171 (804) 217 8520 Fax w .haengineers.com 0 7 rn O I a> tA •— Of (n O C CO C C 0 0 0 U ( u1 N N -- E E 0 -0 -0 ) a fz o o v a c: li La LL 111111111 mommommom Q Z LLJ Z Z O Luc wwOC J J J� J w wZ0 J o T _ a U + N L� ZZ w0 C)UU U 0 w LLJ DATE December 29, 2006 H&A PROJECT NO. CLIENT PROJECT NO. SCALE DRAWNBY CHECKED BY APPROVED BY SHEET NUMBER 5219.00 As Noted RM WIB BAL C703 Y CATCH BASIN FRAME & GRA1 EQUAL OR SIMILAR TO; NEENAH R-6133 SECURE PVC RISER PIPE TO STRUCTURE WALL WITH 3 STAINLESS STEEL STRAPS & SS EXPANSION BOLTS. �w.l_ f PLAN 6" PVC RISER THRUI STRUCTURE TOP CATCH BASIN STEPS: 1'-2" OC IN ACCORDANCE WITH NC STD 840.66 6" PVC OUT 4.80 ORIFICE OPENING ELEV 3.25 OPNG SIZE-1" •A - HOLES INV 4.75 ORIFICE OPENING: HOLE DRILLED IN BOTTOM OF 6" PVC CAP ELEVATION SWM POND OUTLET NO SCALE NC STANDARD 840.04 MODIFIED BOTTOM OF DITCH 6" PERFORATED 1 PVC PIPE, WRAPPED - IN A PORUS FABRIC SOCK PORUS FILTER FABRIC .L PIPE PENETRATIONS 1ALL BE SEALED WITH NON -SHRINKING GROUT -_ATCH BASIN FRAME & GRATE -QUAL OR SIMILAR TO; VEENAH R-6130 WEEP HOLES: 3" DIAMETER WITH 12"X12" PLASTIC HARDWARE CLOTH,I/4" MESH 1 CF NO. 78 AGGR IN A PORUS FABRIC BAG SHALL BE PLACED AT EACH HOLE. TOP ELEV 7.50 THROAT INV 6.50 6" PVC OVERFLOW IN 5.25 3-15" RCP INY. 4,78 6" PERF PVC IN 3.80 BOTTOM STRUCTURE 2-50 NO.57 STONE NO, 57 STONE 18" SWM PERFORATED INLET P NO SCALE 0 wi 1.50' NCRETE DI CONCRETE DIT N 60 1 575 1 5 tO • 6.0 CATCH BASIN FRAME & GRATE EQUAL OR SIMILAR TO; NEENAH R-6134 ALL PIPE PENETRATIONS SHALL BE SEALED WITH A NON -SHRINKING GROUT 6" PERF PVC CATCH BASIN STEPS: 1'-2" OC IN ACCORDANCE WITH NC STD 840.66 6" PVC OVERFLOW IN 4.50 3-3" DIA. WEEP HOLES INV 3.50 6" PERF PVC IN 2.75 SWM NO SCALE 445 3.46 - - - I i 4-46 I 1.50' I 1 60 SECURE PVC RISER PIPE TO STRUCTURE WALL WITH 3 • STAINLESS STEEL STRAPS & SS EXPANSION BOLTS. 6" PVC OUTLET PIPE 6" PVC SCREW PLUG OVERFLOW CLEANOUT 6.0 • ' WEEP HOLES: 3" DIAMETER WITH 12"X12" PLASTIC HARDWARE CLOTH,I/4" MESH WEEP 1 CF NO. 78 AGGR IN A PORUS FABRIC BAG HOLES SHALL BE PLACED AT EACH HOLE. 6"I 4'-0" 6„ PLAN ORIFICE OPENING) ELEV 2.33 OPNG SIZE-1.25" ELEVATION 6" PVC RISER THRU STRUCTURE TOP TOP ELEV 6.83 THROAT INV 6.00 THROAT OPEN BOTH SIDES OF STRUCTURE 6" PVC CROSS INV OUT 3.50 BOTTOM STRUCTURE 1.58 ORIFICE OPENING: HOLE DRILLED IN BOTTOM OF 6" PVC CAP Np v # �isi¢:' e- H OUTLET CONTR. NC STANDARD 840.04 Al (m Hankins and Anderson Consulting Engineers 0 Sadler Road Glen Allen, Virginia 23060 (804) 285 4171 (804) 217 8520 Fax www.haengineers.can a� •0 z too 0 c c 0 0 U V) N E V (n (n cr CZ O O 0 0 �C)3:i U. cn co co co rD 0 0 0 CDw I I I 1 I a m 00 v a) co C) O � OI i N i 0 w Z Lu QLu V �z Q 2J Z w W J J F w � � w W�F-- aU Wiiii- W ILL. F— oe u O �W" Z V O '.— in DATE December 29, 2006 H&A PROJECT NO. 52119.00 CLIENT PROJECT NO SCALE As Noted DRAWN BY RW CHECKED BY APPROVED BY BAL SHEET NUMBER C704