Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW7061113_HISTORICAL FILE_20070501
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOGTYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Z7703 AVOLIS ENGINEERING, P.A. P.O. Box 15564 • New Bern, North Carolina 28561 • (252) 633-0068 April 26, 2007/ Mr. Bill Moore Environmental Engineer Washington Regional Office NCDENR - Division of Water Quality 943 Washington Square Mall Washington, NC 27889 RE: Stormwater Permit SW 7061 113 Ready Mix Concrete Plat New Ditch Road, Pamlico County, North Carolina AE Project No. 06142 Dear Bill: MAY 0 1 Z007 Thanks for the email, enclosed please find two copies of modified project plans Sheet C2 and C3. I have modified the vegetation plan on the aquatic bench in the stormwater pond to coincide with the New Bern Building Supply project. Additionally, I provided a schematic of the washdown pad area. Ready Mix has permitted and constructed similar pads on other Ready Mix Concrete plants in eastern North Carolina. They have another engineering firm working on the NPDES permit application which will have detailed construction requirements for the pad. f this additional information is not considered satisfactory to issue the l,, 5 � ?oF ss��•�.y pno �g yN uA O`�� �.�Avr� GtJ o"✓ '�/�C Vr�p1-y�CS�di Off/"" �� /JW Juu.-�s-lL-�•y on-. /�+-1 lLcd7,u..� oa-- �1/�l�..o�: v a N RECE ED MAR 0 6 2007 DWQ-WARQ Aa- 00 ,. t lam- /� t'�° C° `� �' cry • /`�=. �jT z.- c.gi o�.�,,,d�Ja--�-;a �% 1'tcf' �v ram, wiz. 4� f 77T PIT Or, 1� . c - w AVOLIS ENGINEERING, P.A. L.J P.O. Box 15564 • New Bern, North Carolina 28561 • (252) a-* LM PAR 0 6 2007 March 5, 2007 ®W.Q-WARO Mr. Bill Moore Environmental Engineer Washington Regional Office NCDENR - Division of Water Quality 943 Washington Square Mall Washington, NC 27889 RE: Stormwater Permit SW7061113 Ready Mix Concrete Plant - Pamlico County AE Project No. 06142 Dear Bill: In response to your February 7, 2007 letter requesting additional information for the referenced project, please find the following: • Modified Project Plans (Two Copies) • Detailed Soils Report (Two Copies) It is the intent of the owner to seek coverage under the NPDES General Permit NCG 140000. A separate application will be provided to the Raleigh Central Office in the near future. It is requested that you continue with your review of the Stormwater Permit and if deemed appropriate, issue the Stormwater Permit. Should you have any questions relating to this matter or need any additional information or assistance, please do not hesitate to call. Michael F. Easley, Governor Ho ATT F9 :e. DPD Properties 11, Inc. Attn: Mr. Marshall Tatum PO Box 1639 Winterville, NC 28560 Dear Mr. Tatum: William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources February 7, 2007 Subject: Stormwater Permit SW7061113 Ready Mix Concrete Plant Pamlico County Alan W. Klimek P.E. Director Division of Water Quality This office received your stormwater application for the subject project on November 14, 2006. A preliminary review of the plans and specifications has been completed. In order to complete your application and before a stomrwater permit can be issued, the following items must be addressed: 1) Concrete Plants are regulated through the Federal NPDES Stormwater Program. You can either submit an individual NPDES permit application, or a Notice of Intent (NOI) to be covered under stormwater general permit NCG140000 for the Ready Mix Industry. Applications should be submitted to the Division of Water Quality, Stormwater Group in our central office. Forms and contact information are available on our web site. 2) Provide a detailed soils report that relates "on -site" soil borings to the NRCS Pamlico County Soils Map. Soils report should discuss soil types and suitability for placement of proposed stormwater control measures. Show location of project on county soils map. 3) Provide a written, detailed vegetation plan, prepared by a qualified individual, that indicates a variety of suitable species, location, spacing, soil preparation, fertilizer requirements„ installation procedures, construction schedule, etc. Cattails are a dominant type species and should not be included in the vegetation plan. 4) Delineate drainage basins on site plan & show/discuss how drainage is routed to wet pond. 5) Ready Mix Concrete Plants usually provide "truck washout" areas. Show location of all process/washout facilities. Discuss/explain routing of any process/wastewaters offsite, or to wet pond system. The above requested information must be received in this office prior to March 7, 2007, or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address. If you have questions, please feel free to contact me at 52) 948-3919 Since/rely" - William J. Moor Environmental Engineer Washington Regional Office cc: Avolis Engineering Pamlico County Planning/Inspections Washington Regional Office tCard urah North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service Internet h2o.encstate.ncus 943 Washington Square Mall, Washington, NC 27889 . 1-877-623-6748 J0rn S �pF W A TE90 Michael F. Easley, Governor i �O G William G. Ross Jr., Secretary rNorth Carolina Department of Environment and Natural Resources Alan W. Klimek P.E. Director "•w. Division of Water Quality February 7, 2007 DPD Properties II, Inc. Attn: Mr. Marshall Tatum PO Box 1639 Winterville, NC 28560 Subject: Stormwater Permit SW7061113 Ready Mix Concrete Plant Pamlico County Dear Mr. Tatum: This office received your stormwater application for the subject project on November 14, 2006. A preliminary review of the plans and specifications has been completed. In order to complete your application and before a stomrwater permit can be issued, the following items must be addressed: 1) Concrete Plants are regulated through the Federal NPDES Stormwater Program. You can either submit an individual NPDES permit application, or a Notice of Intent (NOI) to be covered under stormwater general permit NCG140000 for the Ready Mix Industry. Applications should be submitted to the Division of Water Quality, Stormwater Group in our central office. Forms and contact information are available on our web site. 2) Provide a detailed soils report that relates "on -site" soil borings to the NRCS Pamlico County Soils Map. Soils report should discuss soil types and suitability for placement of proposed stormwater control measures. Show location of project on county soils map. 3) Provide a written, detailed vegetation plan, prepared by a qualified individual, that indicates a variety of suitable species, location, spacing, soil preparation, fertilizer requirements, installation procedures, construction schedule, etc. Cattails are a dominant type species and should not be included in the vegetation plan. 4) Delineate drainage basins on site plan & show/discuss how drainage is routed to wet pond. 5) Ready Mix Concrete Plants usually provide "truck wash -out' areas. Show location of all process/wash-out facilities. Discuss/explain routing of any process/wastewaters offsite, or to wet pond system. The above requested information must be received in this office prior to March 7, 2007, or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address. If you have questions, please feel free to ;Moor e at 252) 948-3919. Siinncerree William Environmental Engineer Washington Regional Office cc: Avolis Engineering Pamlico County Planning/Inspections Washington Regional Office oc"atCaroura� North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215- Customer Service Internet h2o.enr.statanc.us 943 Washington Square Mall, Washington, NC 27889 1-877-623-6748 - lvx ro-v, rJQ..� �D,4c-& 1012y T llii¢77�1; 1r- .4/LGA NOV 14 2006 ®WQ-WAR® c SEAL _ 15738 oy.F iNE� o``.. VIN O` nn nm��� 21-7 -no 5 S'O rues ge De,,� As a r� c2o�, �a-ej�: grcwcll -�r0.FF�c e.� rcc�,.�c�w orate — gu,loP'Af� — Or-GIcg� ►8Go SF i h-,ck- Park. — (goo s� slura.� 6,Nz — 3C no SF cove c.,-,1�. p 6v�t- 1700 s F �,.} — Zopo SF• �a�t,J�� SuBrva-►tZ — 1 o A— a1*o,Da-emeiWe, So) a9 5'SF ✓ OGO SF ✓ r'(3ss'sF J,!o A'c P APdA ,)= 91j 3srsf x'7 S, q2%v RCc I L,T - UCaJ bpasyf1 f�>�' �Y�►n r 17W %D� Tss s4oYcvf J Y59' is, SA/DA - 85% TSS REMOVAL WITH 30' VEGETATIVE FILTER IMPER.% 3.OFT 3.5FT 4.OFT 4.5FT 5. OFT 5.5FT 6. OFT 6.5FT 7. OFT 7.5FT 10% .9 .8 .7 .6 .5 20% 1.7 1.3 1.2 1.1 1.0 .9 .8 .7 .6 .5 30% 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 40% 3.4 3.0 2.6,: 2.4 2.1 1.9 1.6 1.4 1.1 .9 1.0 50% 4.2 3.7 3..3' 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60% 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70% E,`0 5.2 4.5 4.1_ 3:7 3.1 2.9 2.5 2.1 1.8 .80% 6.8 6.0 5.2_ 4.7 4 3.7 3.2 2.7 2.2 2.0 90% 7.5 6.5 5.8 5.3 - 4.8 4.3 3.8 -3.3 2.8 2.3--- 100% 8.2 7.4 6".8 6.2 5.6 5.0 4.4 3.8 3.2 2.6 SA/DA - > 90% TSS REMOVAL FOR WET DETENTION WI UT VEGETATIVE FILTER IMPER.% 3.OFT 3.5FT 4.OFT 4.5FT 5.OFT 5.5FT 6.OFT 6.5FT 7.OFT 7.5FT' 10% 1.3 1.0 .8 .7 .6 .5 .4 .3 .2 .1 20% 2.4 2.0 1.8• 1.7 1.5 1.4 1.2 1.0 .9 .6- 30% 3.5 3.0 2.7 2.5 1.9 1.6 1.3 1.1 4.5 4.0 3.5 3.1 2.5 2.1 1.8 1.4 .8 1.1 .;40% 50% 5.6 5.0 4.3 3.9 3. 3.1 2.7 2.3 1.9 1.5 60% 7.0 6.0 5.3 4.8 3.9 3.4 2.9, 2.4 1.9 70% 8.1 7.0 6_0 5.5 5.0 4.5 3.9 3.4 2.9 2.3 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.8 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 3.3 100%- 12.0- 10.0 8.8. 8.1 7.3 6.6 5.8 5.1 4.3 - 3.6 iz'a 3/ (fie qc� t PO wY7 A % Pea rvm.fit)13�T Pisa L = f )No 5G�JD ke, 3:/ G:U) RA176J qo3 ?S o0 5� AAA, /�" �Q-rnn� o�.%� �0�: `-mosF>(,4o3Sp ok 6-2,h 7o-lj A /Loki Iva 12/e7(p 9 `i 11 JL4-w 93 lot otiq `7 ? sle7 s Q 93 � ayc( 5'� ? �.�t� j /- �..1 cH jrovc,,•,, I�u�ct w, e% S-�aa STORMWATER POND CALCULATIONS COASTAL STORMWATER DESIGN PROPOSED READY MIX CONCRETE FACILITY NEW DITCH ROAD PAMLICO COUNTY, NORTH CAROLINA AE PROJECT #06142 SIZE POND AND ORIFICE: SITE DATA BUILDING AREA = SIDEWALK AREA = PARKING/DRIVE AREA = GRASS AREA/POND AREA = % BUA = 217798 SF 5.00 / 11060 SF 0.25 0 SF 0.00 V/ yj7 9 80295 SF 1.84 126443 SF 2.90 DETERMINE POND SURFACE AREA REQUIREMENT AT PERMANENT POOL RFFFRFNC.F CA/IA TARI F 41.9 % YES NO 85%TSS REMOVAL WITH 30' VEGATATIVE FILLER 90% TSS REMOVAL FOR WET DETENTION WITHOUT VEGETATIVE FILTER X X SET PERMANENT POOL DEPTH = SA/DA LOW (40%)= SA/DA HIGH (50%) _ • IMPER(ACTUAL%) _ • IMPERVIOUS LOW = INTERPOLATED SA/DA VALUE _ REQUIRED SURFACE AREA = APPROXIMATE POND WIDTH = APPROXIMATE POND DIMENSIONS = PERM POOL POOCH pllo /!per -' 5 FT 2.8 3.5 41.9 % 40 % 2.94 6,403 SF 44E-� 46 FT 46 FT X 138 FT %,, F pk,- ` CALCULATE 1" STORM RUNOFF VOLUME BUILDING AREA INCL. LOADING DOCK & RAMP= 11060 SF C= 0.90 SIDEWALKAREA = R4, •65+.00Z649 0 SF C= 0.90 PARKING/DRIVE AREA = le, " +11s�; f�/ = 80295 SF C= 0.90 GRASS AREA = ( •A / /J�(�` C� ) , 118943 SF C= 0.20 CQ � 8 POND AREA = 7,500 SF C= 1.00 1-INCH VOLUME = 9,459 FT3 0 / C= 0.5211 SET PERMANENT POOL LEVEL AT: 0' STAGE = v 96 FT ELEVATION DETERMINE POND STAGE RISE ASSOCIATED WITH V STORM STAGE FT SURFACE AREA FTz NCREMENTAL VOL FT3' CUMM. VOL(FT3) STORM VOL. FT3 -10 0 ERR ERR -9 0 0 ERR -8 0 0 ERR -7 0 0 0 -6 0 0 0 -5 3900 0 0 n -4 4556 4,228 4,228 -3 5244 4,900 9,128 -2 5964 5,604 14,732 Po}r -1 6716 6,340 21,072 0 7500 7,108 0 1 8736 8,118 36,298 8,118 2 10044 9,390 45,688 17,508 3 11424 10,734 56,422 28,242 4 12876 12,150 68,572 40,392 5 0 0 68,572 40,392 6 0 0 68,572 40,392 7 0 0 68,572 40,392 8 0 0 68,572 40,392 9 0 0 68,572 40,392 10 0 0 68,572 40,392 CALCULATE 1" STORM RISE BETWEEN: 96 FT & 97 FT REMAINING VOLUME TO BE STORED BETWEEN: 97 FT & 98 FT RISE ABOVE 97.0 FT CONTOUR = 0.140 FT THEREFORE 1" STORM ELEVATION 0.20 FT THE STORED RUNOFF = INCREMENTAL VOLUME _ SAY: 97.2 FT STOR TAB 1.2 FT 8118 FT3 1,341 FT3 9390 FT3 C� n DETERMINE ORIFICE SIZE TO DRAW DOWN THE 1" STORM AVERAGE AVAILABLE ORIFICE HEAD = 0.6 FT SIZE ORIFICE FOR 3-DAY DRAWDOWN AVERAGE Q REQUIRED = 0.036 FT3/S (3 DAY DRAW DOWN) FROM P. III -II OF HRM Q = DISCHARGE(CFS) Co = COEFFICIENT (USE 0.6) A = ORIFICE AREA (SF) g = GRAVITY (32.2 FT/Sz) h = DRIVING HEAD (FT) SOLVE FOR AREA REQUIRED: ORIFICE DIAMETE71.-5 TRY A DISCHARGE TABLE h(FT) Q(CFS) 1.1 0.062 1.05 0.061 1 0.059 0.9 0.056 0.8 0.053 0.7 0.049 0.6 0.046 0.5 0.042 0.4 0.037 0.3 0.032 0.2 0.026 0.1 0.019 0.05 0.013 0.04 0.012 0.03 0.010 0.02 0.008 A=Q/(CD'sgrt(2gh)= 0.00978 SF 1116 FT APPROXIMATELY= DIAMETER ORIFIC =Do 1.34 INCHES NOTE: h MEASURED TO CENTER OF ORIFICE Q=(0.6)(P I /4)(Do/ 12)Zsgrt(2"32.2'h ) INITIAL HEAD = 1.20 FT APPROXIMATE 1" STORM DRAWDOWN USING 6 HOUR INCREMENTS V REQUIRED VOLUME = 9,459 FT3 POND HAS 1" STORM VOLUME AT t=0 0 TIME ELAPSED HR h FT Q CFS Q/6 HRS Qcumme VOL. REMAINING FT3 0 1.20 9,459 6 1.20 0.065 1,398 1,398 8,061 12 1.02 0.060 1.291 2,689 6,770 18 0.86 0.055 1,183 3,872 5,587 24 0.71 0.050 1,075 4,946 4,513 30 0.57 0.045 966 5,912 3,547 36 0.45 0.040 856 6,768 2,691 42 0.34 0.035 746 7,514 1,945 48 0.25 0.029 634 8,148 1,311 54 0.17 0.024 521 8,668 791 60 0.10 0.019 404 9,073 386 66 .05 1 83 9,355 2 0.01 0.007 1 02 (43) 78 0.01 ERR ERR ERR ERR 84 ERR ERR ERR ERR ERR 90 ERR ERR ERR ERR ERR 96 ERR ERR ERR ERR ERR 102 ERR ERR ERR ERR ERR 108 ERR ERR ERR ERR ERR 114 ERR ERR ERR ERR ERR 120 ERR ERR ERR ERR ERR "NOTE: (ERR) INDICATES THAT THE STORM WATER HAS DRAINED NEARLY LEVEL WITH THE ORIFICE HEIGHT WHICH WILL BE THE HEIGHT OF THE PERMANENT POOL. THERFORE THE 1" STORM WATER HAS DRAINED WITHIN THE TIME PERIOD OF 2 - 5 DAYS, AND THE RUNOFF CONTROL FOR THE POND IS SATISFACTORY. y -7 Z ho1-4-f-s i t/ '102" �39`„�".,�'4„�.�°":� i j�i4Si� .�I ,�., w%}..mil,, ,A `Q� !'��•�t.?.a%t �fY2 �IGE--C /. S " orlf-,Zcri D ?6. D ' �/�Bn� /�So D v6rtl-L6W' e7. (/-/w r crlt �YlfH aeF4.,t 6 Slur- -T�1j7- des �� �J `9 rmyz, was A-vLZ- ps i ��ro MO awn -TAA-)t - ems--- DaA�/-%, - Hydrograph Summary Report /b Page 1 Hyd. No. Hydrograph typo (origin) Peak Time Flow interval (cfs) (min) Time to peak (min) Volume (cult) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 8.18 1 725 25,791 1 — Pre Dev. 1 Year St 2 SCS Runoff 9.51 2 724 58,324 10 — Pre Dev, 10 Yr. St 3 SCS Runoff 12.81 1 725 39,428 1 — p POST Dev. 1 Year S II D Fa i 4 SCS Run 28.49 2 724 87,459 10 — — — POST Dev. 10 Yr. S rJ o Qa 5 Reservoir 4.73 1 741 28,937 1 3 7.83 15,918 Post Dev. 1-Yr. St t, I TR P o 6 Reservoir 17.61 2 730 77,463 10 4 98.72 25,206 Post Dev. 10-Yr. S W t4lt PD Proj. file: 06142_READYMIX.G OF file: NEW BERN.IDF Run date: 11-02-2006 1 1 5 - Rese 0 0 5 / Hyd. 3 -1 Yr-Qp=4.73 10 Time (hrs) 15 20 / Hyd. 5 Posr �pM 25 v, S On 1 1 6 - Rese / Hyd. 4 - 10 Yr - Qp = 17.61 cfs 10 15 20 Time (hrs) / Hyd. 6 25 30 Lip P"r Dg, - ",&t w, ll"v-- n .Posy-tla f3 t-� Flydrograph Report Page 1 13 Hyd. No. 1 Pre Dev. 1 Year Storm Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 1 yrs = 5.00 ac = 0.0 % = TR55 = 3.70 in = 24 hrs Hydrograph Discharge Table English Peak discharge = 8.18 cfs Time interval = 1 min Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 5.9 min Distribution = Type III Shape factor = 484 Total volume = 25,791 cult Time -- Outflow Time -- Outflow Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) (hrs cfs) (hrs cfs) 10.70 0.08 13.90 0.65 17.10 0.27 20.30 0.17 10.80 0.10 14.00 0.62 17.20 0.27 20.40 0.17 10.90 0.12 14.10 0.60 17.30 0.26 20.50 0.17 11.00 0.15 14.20 0.58 17.40 0.25 20.60 0.16 11.10 0.17 14.30 0.57 17.50 0.25 20.70 0.16 11.20 0.22 14.40 0.56 17.60 0.24 20.80 0.16 11.30 0.27 14.50 0.55 17.70 0.23 20.90 0.16 11.40 0.32 14.60 0.53 17.80 0.23 21.00 0.16 11.50 0.39 14.70 0.52 17.90 0.22 21.10 0.15 11.60 0.56 14.80 0.51 18.00 0.22 21.20 0.15 11.70 1.01 14.90 0.49 18.10 0.21 21.30 0.15 11.80 1.62 15.00 0.48 18.20 0.21 21.40 0.15 11.90 2.43 15.10 0.47 18.30 0.21 21.50 0.15 12.00 5.03 15.20 0.45 18.40 0.20 21.60 0.14 12.10 8.01 15.30 0.44 18.50 0.20 21.70 0.14 12.20 4.77 15.40 0.43 18.60 0.20 21.80 0.14 12.30 3.72 15.50 0.41 18.70 0.20 21.90 0.14 12.40 2.92 15.60 0.40 18.80 0.20 22.00 0.14 12.50 2.03 15.70 0.39 18.90 0.20 22.10 0.22 12.60 1.36 15.80 0.37 19.00 0.19 22.20 0.14 12.70 1.21 15.90 0.36 19.10 0.19 22.30 0.14 12.80 1.12 16.00 0.34 19.20 0.19 22.40 0.14 12.90 1.02 16.10 0.33 19.30 0.19 22.50 0.14 13.00 0.92 16.20 0.33 19.40 0.19 22.60 0.14 13.10 0.85 16.30 0.32 19.50 0.18 22.70 0.14 13.20 0.82 16.40 0.31 19.60 0.18 22.80 0.13 13.30 0.80 16.50 0.31 19.70 0.18 22.90 0.13 13.40 0.77 16.60 0.30 19.80 0.18 23.00 0.13 13.50 0.75 16.70 0.30 19.90 0.18 23.10 0.13 13.60 0.72 16.80 0.29 20.00 0.17 23.20 0.13 13.70 0.70 16.90 0.28 20.10 0.17 23.30 0.13 13.80 0.67 17.00 0.28 20.20 0.17 23.40 0.13 Continues on next page... Pre Dev. 1 Year Storm Page 2 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 23.50 0.12 23.60 0.12 23.70 0.12 23.80 0.12 23.90 0.12 ... End TR55 Tc Worksheet Hyd. No. 1 Pre Dev. 1 Year Storm Storm frequency = 1 yrs Sheet Flow Manning's n-value Flow length Two-year 24-hr precip. Land slope Travel Time ................. = 0.011 = 200.0 ft = 3.70 in = 0.5 % ...................... = 3.4 min Shallow Concentrated Flow Flow length = 100 ft Watercourse slope = 0.5 % Surface description = Unpaved Average velocity = 1.14 ft/s Travel Time ........................................ = 1.5 min Channel Flow Cross section flow area = 6.0 sgft Wetted perimeter = 12.6 ft Channel slope = 0.3 % Manning's n-value = 0.030 Velocity = 1.65 ft/s Flow length = 100.0 ft Travel Time ........................................ = 1.0 min Total Travel Time, Tc ........................ = 5.9 min Page 7 Hydrograph Report �ge1 %�o Hyd. No. 2 Pre Dev. 10 Yr. Storm Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 4.24 ac = 0.0 % = TR55 = 7.00 in = 24 hrs -- English Peak discharge = 19.51 cfs Time interval = 2 min Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 5 min Distribution = Type III Shape factor = 484 Total Volume = 58,324 cuft Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) Time -- Outflow (hrs cfs) 9.23 0.20 15.63 0.73 22.03 0.36 9.43 0.24 15.83 0.68 22.23 0.26 9.63 0.28 16.03 0.63 22.43 0.25 9.83 0.33 16.23 0.60 22.63 0.25 10.03 0.37 16.43 0.58 22.83 0.24 10.23 0.45 16.63 0.55 23.03 0.24 10.43 0.53 16.83 0.53 23.23 0.23 10.63 0.62 17.03 0.51 23.43 0.22 10.83 0.71 17.23 0.48 23.63 0.22 11.03 0.82 17.43 0.46 23.83 0.21 11.23 1.08 17.63 0.44 11.43 1.39 17.83 0.41 11.63 2.57 18.03 0.39 ...End 11.83 5.74 18.23 0.38 12.03 18.04 18.43 0.37 12.23 8.64 18.63 0.37 12.43 5.09 18.83 0.36 12.63 . 2.51 19.03 0.35 12.83 2.12 19.23 0.34 13.03 1.72 19.43 0.34 13.23 1.57 19.63 0.33 13.43 1.47 19.83 0.32 13.63 1.37 20.03 0.32 13.83 1.26 20.23 0.31 14.03 1.16 20.43 0.30 14.23 1.10 20.63 0.29 14.43 1.05 20.83 0.29 14.63 0.99 21.03 0.28 14.83 0.94 21.23 0.27 15.03 0.89 21.43 0.27 15.23 0.84 21.63 0.26 15.43 0.79 21.83 0.25 TR55 Tc Worksheet Page 1 / Hyd. No. 2 Pre Dev. 10 Yr. Storm Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 200.0 ft Two-year 24-hr precip. = 7.00 in Land slope = 0.5 % Travel Time ........................................ = 2.5 min Shallow Concentrated Flow Flow length = 100 ft Watercourse slope = 0.5 % Surface description = Unpaved Average velocity = 1.14 ft/s Travel Time ........................................ = 1.5 min Channel Flow Cross section flow area = 6.0 sqft Wetted perimeter = 12.6 ft Channel slope = 0.3 % Manning's n-value = 0.030 Velocity = 1.65 ft/s Flow length = 100.0 ft Travel Time ........................................ = 1.0 min Total Travel Time, Tc ........................ = 5.0 min kydrograph Report Page , Hyd. No. 3 POST Dev. 1 Year Storm Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 5.00 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.70 in Storm duration = 24 hrs Hydrograph Discharge Table Time -- Outflow (hrs cfs) Time -- Outflow (hrs cfs) English Peak discharge = 12.81 cfs Time interval = 1 min Curve number = 84 Hydraulic length = 0 ft Time of conc. (Tc) = 5.9 min Distribution = Type III Shape factor = 484 Time -- Outflow (hrs cfs) Total Volume = 39,428 cult Time -- Outflow (hrs cfs) 9.27 0.13 12.47 3.21 15.67 0.50 18.87 0.24 9.37 0.14 12.57 2.04 15.77 0.48 18.97 0.24 9.47 0.16 12.67 1.68 15.87 0.46 19.07 0.24 9.57 0.17 12.77 1.55 15.97 0.44 19.17 0.24 9.67 0.19 12.87 1.41 16.07 0.42 19.27 0.23 9.77 0.20 12.97 1.28 16.17 0.41 19.37 0.23 9.87 0.22 13.07 1.15 16.27 0.41 19.47 0.23 9.97 0.23 13.17 1.10 16.37 0.40 19.57 0.23 10.07 0.25 13.27 1.06 16.47 0.39 19.67 0.22 10.17 0.27 13.37 1.03 16.57 0.38 19.77 0.22 10.27 0.30 13.47 0.99 16.67 0.38 19.87 0.22 10.37 0.33 13.57 0.96 16.77 0.37 19.97 0.22 10.47 0.35 13.67 0.92 16.87 0.36 20.07 0.21 10.57 0.38 13.77 0.89 16.97 0.35 20.17 0.21 10.67 0.41 13.87 0.85 17.07 0.34 20.27 0.21 10.77 0.45 13.97 0.82 17.17 0.34 20.37 0.21 10.87 0.48 14.07 0.78 17.27 0.33 20.47 0.21 10.97 0.52 14.17 0.76 17.37 0.32 20.57 0.20 11.07 0.56 14.27 0.74 17.47 0.31 20.67 0.20 11.17 0.64 14.37 0.73 17.57 0.30 20.77 0.20 11.27 0.74 14.47 0.71 17.67 0.30 20.87 0.20 11.37 0.84 14.57 0.69 17.77 0.29 20.97 0.19 11.47 0.96 14.67 0.67 17.87 0.28 21.07 0.19 11.57 1.16 14.77 0.66 17.97 0.27 21.17 0.19 11.67 1.91 14.87 0.64 18.07 0.26 21.27 0.19 11.77 2.93 14.97 0.62 18.17 0.26 21.37 0.18 11.87 4.11 15.07 0.60 18.27 0.26 21.47 0.18 11.97 6.36 15.17 0.59 18.37 0.26 21.57 0.18 12.07 12.75 15.27 0.57 18.47 0.25 21.67 0.18 12.17 8.44 15.37 0.55 18.57 0.25 21.77 0.17 12.27 5.64 15.47 0.53 18.67 0.25 21.87 0.17 12.37 4.46 15.57 0.51 18.77 0.25 21.97 0.17 Continues on next page... iE POST Dev. 1 Year Storm Page 2 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 22.07 0.31 22.17 0.20 22.27 0.18 22.37 0.17 22.47 0.17 22.57 0.17 22.67 0.17 22.77 0.17 22.87 0.16 22.97 0.16 23.07 0.16 23.17 0.16 23.27 0.16 23.37 0.15 23.47 0.15' 23.57 0.15 23.67 0.15 23.77 0.15 23.87 0.15 23.97 0.14 .End TR55 Tc Worksheet Page 1 00 Hyd. No. 3 POST Dev. 1 Year Storm Storm frequency = 1 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 200.0 ft Two-year 24-hr precip. = 3.70 in Land slope = 0.5 % Travel Time ........................................ = 3.4 min Shallow Concentrated Flow Flow length = 100 ft Watercourse slope = 0.5 % Surface description = Unpaved Average velocity = 1.14 ft/s Travel Time ........................................ = 1.5 min Channel Flow Cross section flow area = 6.0 sgft Wetted perimeter = 12.6 ft Channel slope = 0.3 % Manning's n-value = 0.030 Velocity = 1.65 ft/s Flow length = 100.0 ft Travel Time ........................................ = 1.0 min Total Travel Time, Tc ........................ = 5.9 min Hydrograph Report Pager English Hyd. No. 4 POST Dev. 10 Yr. Storm Hydrograph type = SCS Runoff Peak discharge = 28.49 cfs Storm frequency = 10 yrs Time interval = 2 min Drainage area = 5.00 ac Curve number = 84 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Total volume = 87,459 cuft Hydrograph Discharge Table Time -- Outflow Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) (hrs cfs) 8.10 0.29 14.50 1.36 20.90 0.37 8.30 0.34 14.70 1.29 21.10 0.36 8.50 0.39 14.90 1.22 21.30 0.35 8.70 0.44 15.10 1.15 21.50 0.34 8.90 0.50 15.30 1.08 21.70 0.33 9.10 0.56 15.50 1.01 21.90 0.32 9.30 0.62 15.70 0.94 22.10 0.52 9.50 0.69 15.90 0.87 22.30 0.33 9.70 0.76 16.10 0.80 22.50 0.32 9.90 0.83 16.30 0.77 22.70 0.31 10.10 0.92 16.50 0.74 22.90 0.31 10.30 1.05 16.70 0.71 23.10 0.30 10.50 1.18 16.90 0.68 23.30 0.29 10.70 1,33 17.10 0.65 23.50 0.29 10.90 1.47 17.30 0.62 11.10 1.69 17.50 0.59 11.30 2.16 17.70 0.56 ...End 11.50 2.68 17.90 0.52 11.70 5.97 18.10 0.50 11.90 11.03 18.30 0.49 12.10 25.52 18.50 0.48 12.30 10.38 18.70 0.47 12.50 5.20 18.90 0.46 12.70 3.22 19.10 0.45 12.90 2.67 19.30 0.44 13.10 2.20 19.50 0.43 13.30 2.06 19.70 0.42 13.50 1.91 19.90 0.41 13.70 1.77 20.10 0.41 13.90 1.62 20.30 0.40 14.10 1.50 20.50 0.39 14.30 1.43 20.70 0.38 TR55 Tc Worksheet Page 1 a"- Hyd. No. 4 POST Dev. 10 Yr. Storm Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 200.0 ft Two-year 24-hr precip. = 7.00 in Land slope = 0.5 % Travel Time ........................................ = 2.5 min Shallow Concentrated Flow Flow length = 100 ft Watercourse slope = 0.5 % Surface description = Unpaved Average velocity = 1.14 fUs Travel Time ........................................ = 1.5 min Channel Flow Cross section flow area = 6.0 sgft Wetted perimeter = 12.6 ft Channel slope = 0.3 % Manning's n-value = 0.030 Velocity = 1.65 ft/s Flow length = 100.0 ft Travel Time ........................................ = 1.0 min Total Travel Time, Tc ........................ = 5.0 min Hydrograph Report page, RL English Hyd. No. 5 Post Dev. 1-Yr. Storm Hydrograph type = Reservoir Peak discharge = 4.73 cfs Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 3 Reservoir name = READY MIX CONCR Max. Elevation = 97.83 ft Max. Storage = 15,918 cuft Stowe Mdicedon method used. Total Volume = 28,937 cuff Hydrograph Discharge Table Time Inflow Elevation Clv A Clv, B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.10 12.39 97.52 0.07 - - - 1.70 - -- - 1.70 12.20 6.95 97.77 0.08 - - - 4.04 - - - 4.04 12.30 5.26 97.83 0.08 - - - 4.67 -- - - 4.67 12.40 4.05 97.82 0.08 - - - 4.65 - - - 4.65 12.50 2.78 97.78 0.08 - - - 4.21 - - - 4.21 12.60 1.84 97.72 0.08 - - - 3.55 - - - 3.55 12.70 1.64 97.66 0.07 - - --- 2.97 - - - 2.97 12.80 1.50 97.62 0.07 - - - 2.55 - - - 2.55 12.90 1.37 97.58 0.07 - - - 2.23 - - - 2.23 13.00 1.23 97.55 0.07 - - - 1.97 - - - 1.97 13.10 1.13 97.52 0.07 - - - 1.75 - - - 1.75 13.20 1.09 97.50 0.07 - - - 1.57 - - - 1.57 13.30 1.05 97.49 0.07 --- - - 1.45 - -- - 1.45 13.40 1.02 97.47 0.07 - - - 1.35 - - - 1.35 13.50 0.98 97.46 0.07 - - -- 1.27 --- - - 1.27 13.60 0.95 97.45 0.07 - - - 1.20 - - - 1.20 13.70 0.91 97.44 0.07 - - - 1.13 - - - 1.13 13.80 0.88 97.43 0.07 - - - 1.08 - - - 1.08 13.90 0.84 97.43 0.07 - - - 1.02 - - - 1.02 14.00 0.80 97.42 0.07 - - - 0.98 - - - 0.98 14.10 0.77 97.41 0.07 - - - 0.93 - - - 0.93 14.20 0.75 97.41 0.07 - - - 0.89 - - - 0.89 14.30 0.74 97.40 0.07 - - - 0.86 - - - 0.86 14.40 0.72 97.40 0.07 - - - 0.83 - - - 0.83 14.50 0.70 97.39 0.07 - - - 0.81 - - - 0.81 14.60 0.69 97.39 0.07 - - - 0.79 - - - 0.79 14.70 0.67 97.39 0.07 - - - 0.77 - - - 0.77 14.80 0.65 97.38 0.07 - - - 0.75 - - - 0.75 14.90 0.63 97.38 0.07 - - - 0.73 - - - 0.73 15.00 0.62 97.38 0.07 - - - 0.71 - - - 0.71 15.10 0.60 97.37 0.07 - - - 0.69 - - - 0.69 15.20 0.58 97.37 0.07 - - - 0.67 - - - 0.67 15.30 0.56 97.36 0.07 - - - 0.65 - - - 0.65 15.40 0.54 97.36 0.07 - - - 0.63 - - - 0.63 15.50 0.53 97.36 0.07 - - - 0.61 - - - 0.61 15.60 0.51 97.35 0.07 - - - 0.60 - - - 0.60 Continues on next page... Post Dev. 1-Yr. Storm Page 2 a 4 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 15.70 0.49 97.35 0.07 - - - 0.58 - - - 0.58. 15.80 0.47 97.35 0.07 - - - 0.56 - - - 0.56 15.90 0.45 97.34 0.07 - - - 0.54 - - - 0.54 16.00 0.44 97.34 0.07 - - - 0.52 - - - 0.52 16.10 0.42 97.34 0.07 - - - 0.50 - - - 0.50 16.20 0.41 97.33 0.07 - - - 0.49 - - - 0.49 16.30 0.40 97.33 0.07 - - - 0.47 - - - 0.47 16.40 0.40 97.33 0.07 - - - 0.46 - - - 0.46 16.50 0.39 97.33 0.07 - - - 0.45 - - - 0.45 16.60 0.38 97.33 0.07 - -- - 0.43 - - - 0.43 16.70 0.37 97.32 0.07 - - - 0.42 - - - 0.42 16.80 0.36 97.32 0.07 - - - 0.41 - - - 0.41 16.90 0.36 97.32 0.07 - - - 0.40 - - - 0.40 17.00 0.35 97.32 0.07 - - - 0.39 - - - 0.39 17.10 0.34 97.32 0.07 - - - 0.38 - - - 0.38 17.20 0.33 97.31 0.07 - --- -- 0.38 -- -- -- 0.38 17.30 0.32 97.31 0.07 - - - 0.37 - - - 0.37 17.40 0.32 97.31 0.07 - - - 0.36 - - - 0.36 17.50 0.31 97.31 0.07 - - - 0.35 - - - 0.35 17.60 0.30 97.31 0.07 - - - 0.34 - - - 0.34 17.70 0.29 97.31 0.07 - - - 0.33 - - - 0.33 17.80 0.28 97.30 0.07 - - - 0.32 - - - 0.32 17.90 0.28 97.30 0.07 - - - 0.32 - - - 0.32 18.00 0.27 97.30 0.07 - - - 0.31 - - - 0.31 18.10 0.26 97.30 0.07 - - - 0.30 - - - 0.30 18.20 0.26 97.30 0.07 - - - 0.29 - - - 0.29 18.30 0.26 97.30 0.07 - - - 0.29 - - - 0.29 18.40 0.25 97.30 0.07 - - - 0.29 - - - 0.29 18.50 0.25 97.30 0.07 - - - 0.28 - - - 0.28 18.60 0.25 97.29 0.07 - - - 0.28 - - - 0.28 18.70 0.25 97.29 0.07 - - - 0.28 - - - 0.28 18.80 0.25 97.29 0.07 - - - 0.27 - - - 0.27 18.90 0.24 97.29 0.07 - - - 0.27 - - - 0.27 19.00 0.24 97.29 0.07 - - - 0.27 - - - 0.27 19.10 0.24 97.29 0.07 - - - 0.26 - - - 0.26 19.20 0.24 97.29 0.07 - - - 0.26 - - - 0.26 19.30 0.23 97.29 0.07 - - - 0.26 - - - 0.26 19.40 0.23 97.29 0.07 - - - 0.26 - - - 0.26 19.50 0.23 97.28 0.07 - - - 0.25 - - - 0.25 19.60 0.23 97.28 0.07 - - - 0.25 - - - 0.25 19.70 0.22 97.28 0.07 - - - 0.25 - - - 0.25 19.80 0.22 97.28 0.07 - - - 0.24 - - -- 0.24 19.90 0.22 97.28 0.07 - - - 0.24 - - - 0.24 20.00 0.22 97.28 0.07 - - - 0.24 - - - 0.24 20.10 0.21 97.28 0.07 - - - 0.24 - - - 0.24 20.20 0.21 97.28 0.07 - - - 0.23 - - - 0.23 20.30 0.21 97.28 0.07 - - - 0.23 - -- - 0.23 20.40 0.21 97.28 0.07 - - - 0.23 - - - 0.23 20.50 0.20 97.28 0.07 - - - 0.23 - - - 0.23 Continues on next page... Post Dev. 1-Yr. Storm Page 3 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C MID Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 20.60 0.20 97.28 0.07 - - - 0.22 - - - 0.22 20.70 0.20 97.27 0.07 - - - 0.22 - - - 0.22 20.80 0.20 97.27 0.07 - - - 0.22 - - - 0.22 20.90 0.19 97.27 0.06 - - - 0.22 - - - 0.22 21.00 0.19 97.27 0.06 - - - 0.21 - - - 0.21 21.10 0.19 97.27 0.06 - - - 0.21 - - - 0.21 21.20 0.19 97.27 0.06 - - - 0.21 - - - 0.21 21.30 0.19 97.27 0.06 - - - 0.21 - - - 0.21 21.40 0.18 97.27 0.06 - - - 0.20 - - - 0.20 21.50 0.18 97.27 0.06 - - - 0.20 - - - 0.20 21.60 0.18 97.27 0.06 - - - 0.20 - - - 0.20 21.70 0.18 97.27 0.06 - - - 0.20 - - - 0.20 21.80 0.17 97.27 0.06 - - - 0.19 - - - 0.19 21.90 0.17 97.26 0.06 - - - 0.19 - - - 0.19 22.00 0.17 97.26 0.06 - - - 0.19 - - - 0.19 22.10 0.27 97.27 0.06 - - - 0.20 - - - 0.20 22.20 0.18 97.27 0.06 - - - 0.20 - - - 0.20 22.30 0.17 97.27 0.06 - - - 0.20 - - - 0.20 22.40 0.17 97.27 0.06 - - - 0.19 - - - 0.19 22.50 0.17 97.26 0.06 - - - 0.19 - - - 0.19 22.60 0.17 97.26 0.06 - - - 0.19 - - - 0.19 22.70 0.17 97.26 0.06 - - - 0.19 - - - 0.19 22.80 0.17 97.26 0.06 - - - 0.18 - - - 0.18 22.90 0.16 97.26 0.06 - - - 0.18 - - - 0.18 23.00 0.16 97.26 0.06 - - - 0.18 - - - 0.18 23.10 0.16 97.26 0.06 - - - 0.18 - - - 0.18 23.20 0.16 97.26 0.06 - - - 0.18 - - - 0.18 23.30 0.16 97.26 0.06 - - - 0.17 - - - 0.17 23.40 0.15 97.26 0.06 - - - 0.17 - - - 0.17 23.50 0.15 97.26 0.06 - - - 0.17 - - - 0.17 23.60 0.15 97.26 0.06 - - - 0.17 - - - 0.17 23.70 0.15 97.26 0.06 - - - 0.17 - - - 0.17 23.80 0.15 97.26 0.06 - - - 0.16 - - - 0.16 23.90 0.15 97.25 0.06 - - - 0.16 - - - 0.16 24.00 0.00 97.25 0.06 - - - 0.16 - - - 0.16 End Reservoir Report Page 1 Reservoir No. 1 - READY MIX CONCRETE Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr.Storage Total storage ft ft sqft cuft cult 0.00 96.00 7,500 0 0 1.00 97.00 8,736 8,118 8,118 2.00 98.00 10,044 9,390 17,508 3.00 99.00 11,424 10,734 28,242 4.00 100.00 12,876 12,150 40,392 English Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 1.5 0.0 0.0 0.0 Crest Len ft = 3.1 0.0 0.0 0.0 Span in = 1.5 0.0 0.0 0.0 Crest El. ft = 97.20 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 96.00 0.00 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 0.1 0.0 0.0 0.0 Multi -Stage = No No No No Slope % = 0.50 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi -Stage = - Yes No No Tailwater Elevation = 0.00 ft NoteAll oudlows have Deen enetyzed under Inlet and outlet mntrul. Stage I Storage I Discharge Table Stage Storage Elevation Clv A Clv B Clv C Ctv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 96.00 0.00 - - - 0.00 - - - 0.00 1.00 8,118 97.00 0.06 - - - 0.00 - - - 0.00 2.00 17,508 98.00 0.08 - - - 6.74 - - - 6.74 3.00 28,242 99.00 0.10 - - - 22.75 - - - 22.75 4.00 40,392 100.00 0.12 - - - 44.14 - - - 44.14 Hydrograph Report Pagel o27 Hyd. No. 6 Post Dev. 10-Yr. Storm Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 4 Max. Elevation = 98.72 ft storage hdiradon method used. Hydrograph Discharge Table English Peak discharge = 17.61 cfs Time interval = 2 min Reservoir name = READY MIX CONCR Max. Storage = 25,206 cuft Total volume = 77,463 cult Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.20 1.92 97.26 0.06 - - - 0.19 - - - 0.19 11.40 2.42 97.39 0.07 - - - 0.81 - - - 0.81 11.60 3.74 97.52 0.07 - - - 1.68 - - - 1.68 11.80 8.41 97.77 0.08 - - - 4.06 - - - 4.06 12.00 21.31 98.20 0.09 - - - 9.43 - - - 9.43 12.20 13.27 98.69 0.10 - - - 17.06 - - - 17.06 12.40 7.82 98.40 0.09 - - - 12.33 - - - 12.33 12.60 3.54 98.08 0.08 - - - 7.83 - - - 7.83 12.80 2.94 97.86 0.08 - - - 5.06 - - - 5.06 13.00 2.39 97.73 0.08 - - - 3.69 - - - 3.69 13.20 2.13 97.66 0.07 - - - 2.91 - - - 2.91 13.40 1.98 97.61 0.07 - - - 2.46 - - - 2.46 13.60 1.84 97.58 0.07 - - - 2.19 - -- - 2.19 13.80 1.70 97.55 0.07 - - - 1.99 - - - 1.99 14.00 1.55 97.53 0.07 - -- - 1.81 - -- - 1.81 14.20 1.46 97.51 0.07 - - - 1.66 - - - 1.66 14.40 1.39 97.50 0.07 - - - 1.55 - - - 1.55 14.60 1.32 97.49 0.07 - - - 1.47 - - - 1.47 14.80 1.25 97.48 0.07 - - - 1.39 - - - 1.39 15.00 1.18 97.47 0.07 - - - 1.32 - - - 1.32 15.20 1.11 97.46 0.07 - - - 1.24 - - - 1.24 15.40 1.04 97.45 0.07 - - - 1.17 - - - 1.17 15.60 0.97 97.44 0.07 - - - 1.10 - - - 1.10 15.80 0.90 97.43 0.07 - - - 1.03 - - - 1.03 16.00 0.83 97.42 0.07 - - - 0.96 - - - 0.96 16.20 0.79 97.41 0.07 - - - 0.89 - - - 0.89 16.40 0.76 97.40 0.07 - - - 0.84 - - - 0.84 16.60 0.73 97.39 0.07 - - - 0.81 - - - 0.81 16.80 0.69 97.39 0.07 - - - 0.77 - - - 0.77 17.00 0.66 97.38 0.07 - - - 0.74 - - - 0.74 17.20 0.63 97.38 0.07 - - - 0.71 - - - 0.71 17.40 0.60 97.37 0.07 - - - 0.68 - - - 0.68 17.60 0.57 97.36 0.07 - - - 0.65 - - - 0.65 17.80 0.54 97.36 0.07 - - - 0.61 - - - 0.61 18.00 0.51 97.35 0.07 - - - 0.58 - - - 0.58 18.20 0.49 97.35 0.07 - - - 0.55 - - - 0.55 Continues on next page... Post Dev. 10-Yr. Storm Page 2 ` , Hydrograph Discharge Table Time Inflow Elevation CIv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 18.40 0.48 97.34 0.07 - - - 0.53 - - - 0.53 18.60 0.47 97.34 0.07 - - - 0.51 - - - 0.51 18.80 0.47 97.34 0.07 - - - 0.50 - - - 0.50 19.00 0.46 97.33 0.07 - - - 0.49 - - - 0.49 19.20 0.45 97.33 0.07 - - - 0.47 - - - 0.47 19.40 0.44 97.33 0.07 - - - 0.46 - - - 0.46 19.60 0.43 97.33 0.07 - - - 0.45 - - - 0.45 19.80 0.42 97.33 0.07 - - - 0.44 - - - 0.44 20.00 0.41 97.32 0.07 - - - 0.43 - - - 0.43 20.20 0.40 97.32 0.07 - - - 0.42 - - - 0.42 20.40 0.39 97.32 0.07 - - - 0.41 - - - 0.41 20.60 0.38 97.32 0.07 - - - 0.40 - - - 0.40 20.80 0.37 97.32 0.07 - - - 0.40 - - - 0.40 21.00 0.36 97.32 0.07 - - - 0.39 - - - 0.39 21.20 0.35 97.31 0.07 - - - 0.38 - - - 0.38 21.40 0.34 97.31 0.07 - - - 0.37 - - - 0.37 21.60 0.34 97.31 0.07 - - - 0.36 - - - 0.36 21.80 0.33 97.31 0.07 - - - 0.35 - - - 0.35 22.00 0.32 97.31 0.07 - - - 0.34 - - - 0.34 22.20 0.33 97.31 0.07 - - - 0.37 - - - 0.37 22.40 0.33 97.31 0.07 - - - 0.36 - - - 0.36 22.60 0.32 97.31 0.07 - - - 0.35 - - - 0.35 22.80 0.31 97.31 0.07 - - - 0.34 - - - 0.34 23.00 0.30 97.31 0.07 - - - 0.33 - - - 0.33 23.20 0.30 97.30 0.07 - - - 0.32 - - - 0.32 23.40 0.29 97.30 0.07 - - - 0.31 - - - 0.31 23.60 0.28 97.30 0.07 - - - 0.30 - - - 0.30 23.80 0.28 97.30 0.07 - - -- 0.30 - - - 0.30 24.00 0.27 97.30 0.07 - - - 0.29 - - - 0.29 24.20 0.00 97.28 0.07 - - - 0.25 - - - 0.25 24.40 0.00 97.27 0.06 - - - 0.20 - - - 0.20 End Reservoir Report Page 1 on Reservoir No. 1 - READY MIX CONCRETE Pond Data Pond storage is based on known contour areas Stage I Storage Table English Stage ft 0.00 1.00 2.00 3.00 4.00 Elevation ft 96.00 97.00 98.00 99.00 100.00 Contour area sqft 7,500 8,736 10,044 11.424 12,876 Incr. Storage Total storage cuft cuft 0 0 8,118 8,118 9,390 17,508 10,734 28,242 12,150 40,392 Culvert I Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 1.5 0.0 0.0 0.0 Crest Len ft = 3.1 0.0 0.0 0.0 Span in = 1.5 0.0 0.0 0.0 Crest El. ft = 97.20 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 96.00 0.00 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 0.1 0.0 0.0 0.0 Multi -Stage = No No No No Slope % = 0.50 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Drif. Coeff. = 0.60 0.60 0.00 0.00 Multistage = - Yes No No Tailwatet Elevation = 0.00 ft NoteAll oudlo s nave been analyzed under inlet and ou0et control. Stage I Storage I Discharge Table Stage Storage Elevation Clv A ft cuft ft cfs 0.00 0 96.00 0.00 1.00 8,118 97.00 0.06 2.00 17,508 98.00 0.08 3.00 28,242 99.00 0.10 4.00 40,392 100.00 0.12 Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge cfs cfs cfs cfs cfs cfs cfs cfs 0.00 - - - 0.00 0.00 - - - 0.00 6.74 - - - 6.74 22.75 = - - 22.75 44.14 - - - 44.14 Table 8.03b Runoff Curve Numbers (CN) Hydrologic Soil Group A B C D Land Use/Cover , Cultivated land without conservation 72 81 88 91 with conservation 62 71 78 81 Pasture land poorcondltion 68 79 86 89 iaircondi ion good condition — 49 39 69 61 79 74 84 80 Meadow good condition 30 58 71 78 Wood or forest land Thin stand - poor cover, no mulch 45 66 77 83 Good stand - good cover 25 55 70 77 Open spaces, lawns, parks, golf courses, cemeteries, etc. good condition: grass cover on 75 % 61 80 or more of the area 39 fair condition: grass cover on 50 to 75% of the area 49 69 79 84 Commercial and business areas (85%impervious) 89 92 94 95 Industrial districts j72%impervious) 81 88 91 93 Residential I Development completed and vegetation established Average lot size Average% Impervious 1/8 acre or less 65 77 85 90 92 1/4 acre 38 61 75 83 87 1/3 acre 30 57 72 81 86 12 acre 25 54 70 80 85 1 acre 20 51 68 79 84 2 acre 15 47 66 77 81 Paved parking lots, roofs, driveways, etc. 98 98 t 98 98 Streets and roads paved with curbs and storm sewers 98 98 98 98 gravel 76 85 89 91 dirt 72 82 87 89 Newly graded area 81 89 93 95 Residential: Development underway and no vegetation Lot sizes of 114 acre 88 93 95 97 Lot sizes o112 acre 85 91 94 - 96 Lot sizes of 1 acre 82 90 93 95 Lot saes of 2 acres 81 89 92 94 'Curve numbers are computed assuming the runoff from the house and driveway is directed toward the street. source: USDA-SCS 8.03 10 Rev. Ina 4 .. Worksheet Worksheet for Triangular Channel Project Description Worksheet TURFCLUB Flow Element Triangular Chan Method Manning's Forrr Solve For Channel Depth Input Data Mannings Coeffic 0.030 Slope 003000 ft/ft Left Side Slope 3.00 H : V Right Side Slope 3.00 H : V Discharge 17.61 cfs Results Depth 1.61 It Flow Area 7.8 ft- Wetted Perim( 10.18 ft Top Width 9.66 ft Critical Depth 1.16 ft Critical Slope 0.016848 ft/ft Velocity 2.27 ft/s — Velocity Head 0 ft Specific Enerc 1.69 ft Froude Numb( 0.45 Flow Type Subcritical Project Engineer: Joseph C. Avolis clhaestadVn*M06142_readymixfm2 avolia engineering, pa FlowMaster v6.0 [614e) 11/02/06 08:05:56 AM ®Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 7551666 Page 1 of 1 Michael F. F.an•, Go rnor WtLiam G. Ross Jr, Sevaary rNorth Cardin Depatixomt of Fmvo®ent end Naha! Rcaaas p Alan W. Khrat, P.E Director Division of Water Quality November 9, 2006 DPD Properties II, Inc. Mr. Marshall Tatum, Vice President PO Box 1639 Winterville, NC 28590 SUBJECT: Stormwater Application for Ready Mix Concrete Plant Dear Mr. Tatum: This office received a stonnwater permit application for the subject project on November 7, 2000. A preliminary review of your project indicates that the application package is incomplete. The following items are needed to make the package complete: $420 check _ signature by owner on page 4 of application 2 sets of plans _ narrative _ supplement (wet detention, infiltration basin, low density, curb outlet system, off -site system, underground infiltration trench) signature by owner on supplement form c_ soils report We are returning the entire package to you. Once the package is complete you may resubmit. You should also be aware that the Stormwater Rules require that a permit be issued prior to any development activity. Construction without a permit is a violation of 15A NCAC 2h.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to S10.000 per day. If you have any questions, please feel free to contact me at (252) 948-3544. Sincerely, 1 r Al Dodge, R gloi`3Jperv+sor Surface Water Protection Washington Regional Office cc: A I's Engineering, P.A. /ITVaRO No.-th Carolina Division of Water Quality Internet�Tor,,'�7,/-� 7� 94- Washington Square Mall Phone (252) W-6481 :V o11111 .robin Washington, NC 27889 Fa (252) 946-9215 Nn u„ally