Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW7061016_HISTORICAL FILE_20201021
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 7D� O((,�2 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATEfJl��� YYYYM M D D ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality October 21. 2020 Beaufort County Attention: Mr. Brian M. Alligood, Manager 121 West 3rd Street Washington, NC 27889 Subject: Stormwater Permit Renewal Stormwater Management Permit SV 7061016 Industrial Park, Lot 9 Beaufort County Dear Mr. Alligood: PV to � 0 A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SV 7061016 for a stormwater treatment system consisting of grassed swales and 3 bioretention filters serving lot 9 in the Beaufort County Industrial Park located on Page Road, Washington, NC expires on March 28, 2021. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Permit application forms for renewal can be found on our website at: http://degnc ov about divisions/etiergv-mineral-land-resources/etierav-mineral-land- rules/storm�vater-program/post-construction. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. If you have questions, please feel free to contact me at (252) 948-3923, I will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application form. You can request a copy by e-mailing me at roger. thorpe(aD,ncdenr.gov. Sincerely, Roger K. Thorpe Environmental Engineer North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources J/ Washington Regional Office 1 Q43 Washington Square Mall I Washington, North Carolina :7889 SitdDavid,Associates, Inc. P.O. /Drawer49, Earmv&, NC 27828 Tef. (252) 753-2139 Tax- (252) 753-7220 E-5wad rbmonwd4T4dinccom March 27.2007 Mr. Al Hodge North Carolina Division of Water Quality Washington Regional Office 943 Washington Square Mall Washington, NC 27889 SUBJECT: Dear Mr. Hodge: MAR 2 8 2007 DWQ-WARD StormwaterPemut: SW7061016 Beaufort County Industrial Park Lot 9 Site Development In reference to the subject project and as follow-up to my review of prior submittals with Mr. Bill Moore on March 27, 2007 and subsequent phone conversations, please find enclosed the following exhibits for your review and consideration: Two (2) sets of revised construction drawings where the following changes have been e: Mulch layer in bioretention areas has been changed to first 3" of depth in each ,,cell. .ib. Planting soil layer in bioretention area 1 and 2 has been changedto_12-'. c. Planting soil layer in bioretention area 3 has been changed_to 3535 (note that bioretention cell has been expanded to both traffic island areas and lengthened in the initial retention cell area to maximize surface area). d. Loamy sand (higher infiltration rate) is shown in bioretention cell details from proposed planting soil layer to bottom of cells. P e. ottom elevations of bioretention cells reflects a seasonal high water table elevation of 25.5'. f. Clean -outs have been changed to 6" diameter where tops have been changed to landscape drop inlet grates. t/`• e (1) copy of cover sheets for the three (3) `Bioretention Basin Supplement" sheets. Sheets reflect changes made to bioretention cell details shown on sheet 12 of plans -to include actual storage provided in planting soil (12" in cells 1 and 2, and 1.35'cell 3), basin dimensions and corrected seasonal high water table elevation. 3 Reference sheet 12 of plans, the table provided reflects 1" storage requirements and shows / corrected storage provided based on revised bioretention cell details. �4 Reference sheet 12 of plans, bioretention cell details have been revised to reflect new elevations to provide storage to meet the 1" rainfall requirement. beau(Iot9dwq-sw-pemn ub-hodge-Itr-070327 1 3/27/2007 Reference sheet 12 of plans, the revised table depicts storage provided in bioretention cells summarized as follows: Bioretention Cell Storage Provided 1 3,850 cf 2 3,300 cf 3 3,400 cf Thank you for your prompt assistance and to Mr. Bill Moore for his time and effort to review changes with me in person. Please advise as I may provide any additional information for your review. Sincerely, McDAVID ASSOCIATES, INC. Richard B. Moore, P.E. Farmville Office Enclosures 114 I beauf-lot9dwq-sw-peen-sub-hodge-Itr-070327 2 3/27/2007 1._1_1`If=U MAR 16 2007 ®WQ-WARO GEOTECHNICAL ENGINEERING REPORT QUICK START II INDUSTRIAL FACILITY BEAUFORT COUNTY, NORTH CAROLINA TERRACON JOB NO.72065056 August 3, 2006 Prepared for: BEAUFORT COUNTY ECONOMIC DEVELOPMENT COMMISSION Washington, North Carolina Prepared by: I rer 111-C West Fire Tower Road Wintervllle, North Carolina 28590 (252)353-1600 August 3, 2006 Beaufort County Economic Development Commission 705 Page Road Washington, North Carolina 27889 Attention: Mr, Tom Thompson Director Subject: Report of Geotechnical Services Quick Start II Industrial Facility Page Road Washington, North Carolina Terracon Project No. 72065056 Dear Mr. Thompson: 1 rerrac®n Consulting Engineers 8. Scientists Terracon Consultants, Inc. 111-C West Fire Tower Road Wlnlervllle, North Carolina 28590 Phone 252.353.1600 Fax 252.353.0002 www.terracon.com Terracon Consultants, Inc. Is pleased to present this Geotechnical Engineering Report for the proposed Quick Start II Industrial Facility in Beaufort County, North Carolina. Our services were provided In accordance with Terracon Proposal No. P6-095-72 dated June 26, 2006. Findings, conclusions and recommendations given in this report are subject to the General Comments and limitations presented In the report. Please contact us if you have any questions or comments regarding this report. We are available to discuss our recommendations with you and to provide additional services as necessary during the final design and construction phases of this project. We have enjoyed assisting you and look forward to serving as your consultant on the remainder of this project and future projects. _.tool Sincerely, TE RA ON CONSULTANTS SEAL52 161 0)'ao'- Barney C. Hale, PE Carl F. Bonner, P.E. ;FnraIDt�.+ Principal Greenville Office Manager Registered, North Carolina 11285 Registered, North Carolina 16252 g-;-700(. Attachments Delivering Success for Clients and Employees Since 1965 Mora Than 70 Offlcas Nationwide TABLE OF CONTENTS INTRODUCTION 1 PROJECT DESCRIPTION -------------- --- —---- —------------ -- ------- —-------- ---- -------- —1 SITE EXPLORATION PROCEDURES -------------- ------------ -------- -------------- ------------- 1 Field SITE CONDITIONS -- --- ---------- — -------------2 SUBSURFACE CONDITIONS ----------- ------ - ---- 2 Regional Geology- — ---- ----2 Subsurface Soil Conditions --2 Groundwater Conditions -- Seismic Site Classification--- ---3 ENGINEERING RECOMMENDATIONS ---- ------ ----•-----------•----•------•-•-----3 Geotechnical Considerations 3 Shallow Foundations — --- — 4 Timber Piles- — -- ---- 5 Slabs --- — 7 Retaining Walls -- ---- - 7 Site Preparation -- -9 Excavations 10 Earthwork — 10 Pavements— —10 LIMITATIONS Subsurface Exploration and Conditions Gectechnical Comments --• APPENDIX A Site Location Plan Boring Location Plan Boring Logs APPENDIX B General Notes Unified Soil Classification System 12 12 12 GEOTECHNICAL ENGINEERING REPORT QUICK START 11 INDUSTRIAL FACILITY BEAUFORT COUNTY, NORTH CAROLINA TERRACON PROJECT NUMBER 72065056 August 3, 2006 INTRODUCTION The subsurface exploration for the proposed Quick Start II Industrial Facility In Beaufort County, North Carolina has been completed. Eight soil borings were performed at the project site. Individual boring logs and a Boring Location Plan are Included with this report. The purpose of this geotechnical study was to explore the general subsurface conditions at the project site and to evaluate these conditions with respect to the design and construction of earthwork foundations floor slabs and pavements for the protect. Our scope o services Included drilling soil test borings, performing engineering analyses and preparing this report of our findings and recommendations. PROJECT INFORMATION This report is based on our understanding of the project from our telephone conversations with Mr. Bill Gwlnn of Inner Banks Architecture, PA and our review of a site plan provided to us by Mr. Gwinn. The project Includes the construction of an industrial building shell, including the floor slab, with associated paving, loading dock and entrance roads. The project will be located on Lot 9 of the Beaufort County Industrial Park. We understand that the building consists of a single story, steel framed metal building on a concrete slab on grade. The building will be approximately 49,500 square feet with parking available for approximately 100 cars. Design loads for the building were not provided; however, we assume that they will be similar to the other Quick Start Building. The proposed grades for the building were not provided, however, we assume cut and fill depths will be minimal, less than three feet. SITE EXPLORATION PROCEDURES Field Exploration In order to explore the general subsurface conditions at the project site, Terracon subcontracted Carolina Drilling to drill 8 soil test borings to depths of 5 to 35 feet below existing grades. The borings were advanced at the approximate locations shown on the Quick Start 11 Industrial Facility Terracon Project No. 72065056 Beaufort County, NC August 3, 2004 Boring Location Plan in the Appendix. The number of borings and their locations were selected by Inner Banks Architecture, PA. The borings were located in the field by Terracon personnel by using a measuring wheel for measuring distances and estimating right angles relative to existing site features. The location of the borings should be considered accurate only to the degree implied by the methods used. The soil test borings were performed by a trailer -mounted power drilling rig utilizing rotary wash drilling procedures. Standard Penetration Tests were performed In the soil test borings at 2.5 to 5.0 feet intervals. Terracon personnel visually classified the split - spoon soil samples In general accordance with the Unified Soil Classification System. Boring Logs are Included In the Appendix of this report. The stratification lines on the logs representing changes In soil types are approximate. In -situ the transition in soil types can occur at varying depths and more gradually. Variations in subsurface conditions can also occur between boring locations. The elevations given on the boring logs were interpolated from the contour lines shown on the topographic site plan provided to us. SITE CONDITIONS The site Is located southwest of the intersection of Page Road and Cherry Run Road (SR 1001) on Lot 9 of the Beaufort County Industrial Park. The site Is currently a soybean field. The ground surface generally slopes gently downward toward the south. SUBSURFACE CONDITIONS Regional Geology The project site is located in the Coastal Plain Physiographic Province. The Coastal Plain consists mainly of marine sediments that were deposited during successive periods of fluctuating sea level and moving shoreline. The soils in this province consist of sands, silts, and clays with irregular deposits of shells, which are typical of those lain down in a shallow sloping sea bottom. Alluvial sands, silts, and clays are typically present near rivers and creeks. According to the 1985 Geologic Map of North Carolina, the site overlies the Yorktown formation. This Tertiary marine formation consists primarily of fossiliferous day with varying amounts of fine-grained sand and bluish -gray shell material commonly concentrated in lenses. Subsurface Soii Conditions A cultivated soil layer 9 to 12 inches thick is present at the ground surface in the boring locations. Sandy clay and clayey sand dominate the upper 35 feet of the soil profile although 2 Quick Start II Industrial Facility Terracon Project No. 72065056 Beaufort County, NC August 3, 2004 there are interbedded zones of fine sand between depths of 6 and 18 feet. The sails within 5 feet of the existing ground surface have medium stiff consistency as indicated by Standard penetration test values (N-values) ranging from 4 to 8 blows per foot (bpf). Below a depth of 5 feet, the soils are soft and very loose as Indicated by N-values on the order of 2 to 4 blows per foot. These soft / loose soils typically extend to a depth of 25 to 27 feet where stiff clay is present. While the surface materials are not especially stiff, they do form a relatively thin zone or "crust" of stiffer material overlying soft and loose soils. More detailed descriptions of the subsurface conditions encountered at each boring location are given on the boring logs In the Appendix. Please note that wetlands delineation, the assessment of environmental conditions or chemical testing for the presence of contaminants in the soil or groundwater of the site were beyond the scope of the geotechnical services provided. Groundwater Conditions A mixture of water and "drilling mud" was used to advance the borings. This process can obscure measurements of groundwater levels. However, in the Coastal Plain setting, the drilling fluid level In the borehole gradually stabilizes at a level that corresponds closely to the groundwater level. After a stabilization period of 24 to 48 hours hours, the fluid level in the �IRV/ rA, open boreholes ranged between depths of 3 and 4 feet. Based on this informatlon and our ,At experience in the area, a groundwater level between 3 and 4 feet deep Is.rea able. �ab(� se... Mit !-Z;F G� Fluctuations In the groundwater table on the order 1 to 2 et are typical In the Coastal Plain, depending on variations In pre Ic pi a on, a on and surface water runoff. Seasonal high groundwater levels are expected to occur during or lust after the typically wetter months of the year (November through April). At the time of the exploratlori the groundwater levels would be expected to be near seasonal low levels. Seismic Site Classification r In our opinion, the subsurface conditions at the project site correspond most closely with those of Site Class E as described in Section 1615.1.1 of the 2002 North Carolina State Building Code, primarily due to the thickness of the soft clay zones. Additional field testing using cone penetration testing (CPT) with shear wave velocity measurements would provide a better characterization of the soft clay and potentially allow a revision to Site Class D. We recommend additional field CPT borings be performed with shear wave velocity measurements be performed if the revision to Site Class D would result In a significant savings In the construction cost of the building. 3 Quick Start II Industrial Facility Terracon Project No. 72065056 Beaufort County, NC August 3, 2004 ENGINEERING RECOMMENDATIONS Geotechnical Considerations Based on the data obtained from our subsurface exploration, It is our opinion that the proposed structure can potentially be supported on conventional spread footings. Doing so will require a relatively low design bearing pressure of 1,500 psf or less, footing plan dimensions no larger than 6 feet, and placing the bearing elevation of each footing no deeper than 1 foot below the existing ground surface. The Intent of these limitations is to allow the surface "crust" of stiffer soil to carry the load of the foundations and to reduce the stresses Induced in the underlying soft soils. Even with this approach, some localized overexcavation and replacement of foundation bearing soils will be required. If the building / site design does not allow the implementation of thedesign limitations, options include extensive overexcavation and replacement at each footing or the use of timber plies. The presence of the soft soils at the site also places restrictions on floor loads. Surcharge loads spread over large areas can cause excessive compression of the soft soil and the potential for floor slab damage. This can occur at even modest floor loads on the order of 300 to 400 pounds per square foot. Floor loads associated with office or laboratory space are generally in the range of 40 to 60 pounds per square foot and are not expected to induce large settlements. However, floor loads associated with warehouse storage or manufacturing could lead to excessive floor slab settlement. Shallow Foundations Based on the project Information provided, shallow foundations are expected to have maximum plan dimensions of 6 feet by 6 feet for 50 kip column loads. The footing sizes are being controlled by uplift resistance requirements. The proposed building can be supported on shallow foundations bearing on the stiffer surface zone or properly compacted fill. A net allowable bearing pressure of 1,500 pounds per square foot (psf) or less should be used for design of the footings and the maximum footing plan dimension should be limited to 6 feet. The net allowable bearing pressure Is that pressure which may be transmitted to the soil in excess of the surrounding overburden pressure. Shallow foundations should be designed to bear at least 12 Inches below finished grades for frost protection and protective embedment. However, bearing depths more than 12 inches below the original ground surface should be avoided to limit the applied stresses reaching the loose sand and soft clay zones. Since soil cover is an effective means of developing uplift resistance, raising site grades may be required to increase the embedment depth of the footing while staying within 12 inches of the original ground surface. 4 Quick start II Industrial Facility Terracon Project No. 72065056 Beaufort County, NC August 3, 2004 Under the conditions and limitations stated above, we estimate the total settlement for the building will be less than 1-inch, which is typically tolerable by steel -framed structures. Differential settlement between column footings should also be tolerable (less than about %z- inch). Increasing in footing size or design bearing pressure or lowering the bearing elevation can lead to excessive settlement if extensive remedial work Is not performed. With modest changes In the design parameters outlined above, remedial work can consist of overexcavating from footing bottom to a depth equivalent to the foundation width and replacing the overexcavated soil with washed, crushed stone (NCDOT No. 57 or 67). Terracon should be contacted for further recommendations if this approach is utilized. Even with the design limitations being Implemented, we recommend that the footing excavations be examined by the geotechnical engineer's representative to verify that suitable soils are present at and below the proposed bearing elevation. If soft or unsuitable materials are encountered in the footing excavations, they should be undercut and replaced to the bottom of footing elevation with washed crushed stone (NCDOT No. 57 or 67). Based on the borings and the recommended design bearing pressure, we anticipate that undercutting of footings may be required In the vicinity of Borings B-2 and B-4 due to the more shallow depth to soft clay in this area. Prepared bearing surfaces for foundations should not be disturbed or left exposed during Inclement weather. Saturation of the footing subgrade can cause a loss of strength and Increased compressibility. If construction occurs during Inclement weather, and concreting of foundations Is not possible at the time they are excavated, a layer of lean concrete should be placed on exposed bearing surfaces for protection. Also, concrete should not be placed on frozen subgrades. The bottom of the foundation excavations should also be clean and free of any loose soil, mud, or debris prior to placing concrete. Timber Piles Higher than anticipated column loads could require significant increases in the size or bearing pressure of shallow foundations. Problems associated with raising site grades or keeping the bearing elevation within 1 foot of the original ground surface could also arise. Under these conditions, 8-inch minimum tip diameter, treated timber piles can be used to support the proposed building. Timber piles should be driven into the stiff clay layer beginning at a depth cf about 27 feet. The piles should be designed for a tip bearing depth of 32 to 35 feet below the original ground surface to allow penetration and bearing in the stiff clay zone zone. Design capacities and anticipated tip elevations for the piles are given below: 5 Quick Start II Industrial Facility Beaufort County, NC Terracon Project No. 72065056 August 3,2004 PILE TYPE TIP BEARING DEPTH (FEET)` ALLOWABLE PILE CAPACITY (TONS) COMPRESSION UPLIFT LATERAL- 8" Timber 32 - 35 10 2.5 1 Piles should terminate at or below this depth Lateral load based on 1/2-inch maximum lateral piles deflection and fixed head condition Static pile analyses were used to estimate axial downward and uplift load capacities of single vertical piles based on a total pile embedment depth of 30 feet and a factor of safety of 2.0. The uplift capacities reflect the frictional resistance between the sides of a pile and the surrounding soil. The frictional resistance of the upper 3 feet of soil was neglected. The lateral load capacity was estimated based on a fixed head boundary condition at the top of the pile and a maximum allowable lateral deflection of A inch. We recommend that piles be spaced on -center no closer than the three times the pile butt diameter or width; a center -to -center spacing of approximately 3 feet. The minimum spacing should be maintained to prevent the pile group compression load capacity from being significantly less than the summation of individual pile capacities. This spacing restriction also serves to limit surface heave and to reduce the possibility of damaging previously installed piles. Timber piles should be treated Southern Yellow Pine and meet the requirements of ASTM D 25 for round timber end bearing piles. The pile size should be specified in terms of a minimum tip circumference (25 inches for 8-Inch diameter). The piles should be clean peeled and CCA pressure treated In accordance with the requirements of AW PA C3. A series of four indicator piles should be driven across the building footprint prior to ordering production plies. Indicator pile Installation should be observed by the geotechnical engineer. The results of the Indicator pile driving can be used to evaluate driving resistance, termination criteria, and pile length. The Indicator piles are expected to be part of the design pile layout. We recommend that 40-feet-long indicator piles be used. Production piles should not be ordered until their length has been determined by driving the Indicator piles. We recommend that the pile driving rig be equipped with fixed leads, and the pile hammer should have a rated energy of at least 15,000 foot pounds per blow. All equipment should be subject to the review of the geotechnical engineer. The same pile driving rig and hammer should be used to drive Indicator and production piles. We recommend that dynamic driving criteria required for the recommended design capacity be developed once the rated energy of the hammer is determined. The driving resistance may be determined by either the Engineering News Record Formula or by a wave equation driving 0 Quick Start II Industrial Facility Terracon Project No, 72065056 Beaufort County, NC August 3, 2004 analysis performed by the geotechnlcal engineer. Driving should be terminated immediately if refusal (Le., 4 blows per Inch for timber) is reached to minimize damaging the piles. The installation of a pile foundation system should be in accordance with the local and state building code requirements. In addition, the Installation of all piles should be monitored by the geotechnical engineer's representative. In general, the representative should: 1. Prepare driving criteria. 2. Be present continuously during driving. 3. Record the dimensions of each pile, locate, and report any obvious defects. 4. Count and record the blows for each foot of driving. 5. Record energy rating of hammer. 6. Have knowledge of soil conditions at the site and the minimum required penetration of each pile. 7. Be cognizant of Intended support mechanisms of piles on which to base acceptance or rejection or pre -drilling, etc. 8. Have authority to hold driving when unanticipated difficulties or conditions are encountered. Slabs Ground -level floor slabs may be supported on properly compacted fill or suitable natural soils. A 4-Inch-thick layer of washed stone (NCDOT No. 57 or 67), as well as an impermeable moisture retarder, should be provided beneath all building floor slabs to prevent capillary rise and a damp slab condition. When moisture retarders are used, precautions should be taken during the initial floor slab concrete curing period to reduce differential curing and possible curling of the slabs. The recommendations provided in ACI 302 should be followed. The floor slabs should be designed to resist the anticipated dead and live loads. We recommend that the floor slabs be -designed using a modulus of subgrade reaction (k) of 100 pounds per cubic Inch. We recommend that construction Joints in the slabs Include dowels to Improve load transfer across the Joints and to reduce the potential for differential vertical displacement across the joints. Retaining Walls The project information we were provided did not address retaining walls for the project. We anticipate that if retaining walls are used, they will serve as loading dock walls. Based on the relatively poor quality of the on -site soil as wall backfill material, we recommend designing dock walls with off -site sand being used as the backfill. We recommend that the following soil properties be used for dock walls with sand backfill. 7 Quick start II Industrial Facility Terracon Project No. 72065056 Beaufort County, NC August 3, 2004 Ka = 0.33 Active Lateral Earth Pressure Coefficient Ka = 0.50 At -Rest Lateral Earth Pressure Coefficient Kp = 3.00 Passive Lateral Earth Pressure Coefficient V = 300 Angle of Internal Friction of Backfill c = 0 psf Cohesion of Backfill gait = 1,500 psf Allowable Bearing Pressure of Foundation Soil ye = 120 pcf Moist Soil Unit Weight of Backfill Dock walls are expected to be restrained from rotational movement and should be designed using the at -rest lateral earth pressure coefficient given above. The backfill should be properly drained and meet other requirements given in this report. The design of the dock walls should also Include surcharge loads due to equipment or material storage loads acting at the top of the wall. External stability of a wall should be checked during design, including resistance to sliding, overturning, and global slope failure. Lateral loads applied to the retaining wall footings can be resisted by the adhesion between the footing concrete and the foundation bearing soil. An adhesion value of 500 pounds per square foot may be used for this case. To achieve this adhesion, the bearing surface must be free of mud or loose soil at the time of concrete placement. In addition to the dead weight of the structure and footing concrete, the soil backfill above the footing may be included as dead weight In overturning analyses. The shallow foundation of a dock wall has the same potential for settlement as the building foundations. For this reason, design limitations placed on the column footings should be applied to the dock wall footing. The analysis of global slope stability for the retaining wall was beyond the scope of our services. We recommend that this stability be checked once the design wall heights and grades have been determined. Positive gravity drainage of the backfill behind the retaining wall should be provided to prevent the build-up of hydrostatic pressures from freezing moisture in the backfill. We recommend that a prefabricated geocomposite drainage material (Miradrain TM 6000 or equivalent) be applied to the back of the wall. This vertical drain should be tied into a perforated PVC or HOPE pipe drain located at the base of the wall by wrapping the bottom edge of the product sheets all the way around the pipe. Perforated pipe used to assure positive drainage should have a slot width or hole diameter no larger than 3/8 inch. We recommend that wall backfill materials be compacted with hand-held equipment to between 92 and 95 percent of the standard Proctor maximum dry density and that moisture contents be maintained within 3 percentage points of the optimum content. Hand-held equipment must be used to avoid placing high stresses on the wall during compaction. E Quick Start II Industrial Facility Terracon Project No. 72065056 Beaufort County, NC August 3, 2004 Heavy compactors and grading equipment should not be allowed to operate within 10 feet of the wall during backfllling to avoid developing excessive temporary or long-term lateral soil pressures. Site Preparation The shallow groundwater levels and the moisture -sensitivity of the near surface soils combine to create a condition when: the exposed subgrade soils can deteriorate significantly during site preparation. Due to the moisture -sensitivity of the near surface soils, the exposed subgrade soils can deteriorate significantly during site preparation. Stripping / earthwork should be performed using track mounted equipment. The use of wheel -mounted construction equipment can cause excessive rutting or deflection of the subgrade with the potential for this problem increasing with increasing wheel loads or repetitions. We also recommend that haul trucks being used to remove waste soil from the site or importing off -site borrow material remain off of the areas of the building. pad. The potential for excessive rutting and deflection can also be reduced by performing the site preparation work during typically drier periods of the year (May through October). All topsoil, rootmat, cultivated soil, vegetation, debris and other unsuitable material should be It , removed from the construction areas. We antic i ate an average str Aping depth of 8 to 12 Inches to remove the cultivated soil, topsoil and rootmat Cuitiva ed soil and topsoil should not be used as structural fill in building or pavement areas, but may be used as topsoil in areas to be landscaped. After stripping of cultivated soil and topsoil is completed, the exposed subgrade soils in areas to receive fill or at the subgrade elevation in cut areas should be proofmlled to detect soft or loose soils. Proofrolling should be performed with a moderately loaded dump truck or similar construction equipment. The geotechnical engineer's representative should observe this operation to aid In delineating unstable soil areas. Proofrolling should be performed after a suitable period of dry weather to avoid degrading an otherwise acceptable subgrade. Soils that continue to rut or deflect excessively under the rolling operations should be undercut as directed by the geotechnical engineer and replaced with compacted fill material. Based on the borings, we anticipate that undercutting of soft near -surface soils may be required in the vicinity of Borings B-1, B-2 and B-6. Undercutting of loose or soft soils may also be necessary In localized areas between the boring locations. Potential undercutting can be reduced If the site preparation work Is performed during a period of dry weather. Once stripping and proofrolling are completed, the exposed soils should be sealed with a smooth -drum roller to help protect them from exposure to precipitation. The site should also be kept graded to promote surface water runoff both during and after construction. If site preparation and earthwork are performed during the typically wetter, cooler months of the 7 Quick Start II Industrial Facility Terracon Project No. 72065056 Beaufort County, NC August 3, 2004 year (November through April), a 4-Inch-thick layer of sacrificial, well -graded crushed stone should be placed on the soil subgrades to protect them from precipitation. Excavations Due to the shallow groundwater conditions at this site, trench excavations more than 4 feet deep or unstable excavations should be supported with temporary shoring and bracing, such as trench boxes. However, wet conditions can significantly reduce the stability of excavation sidewalls in moisture -sensitive soils. For this reason, all excavations should be evaluated for stability by a competent person prior to entry by personnel. All excavations must strictly adhere to the most current federal, state and local OSHA regulations. Earthwork Placement of fill across the building and pavement areas may be desirable to raise site grades and improve overall drainage. The weight of fill placed above the existing ground surface elevations will create new surcharge loads on the underlying soils and lead to settlement of the soft clays and loose sands at the site. If a fill zone more than 1 to.2 feet thick Is placed at the site, settlement hubs should be established at the top of the new fill to monitor settlement. Terracon should be contacted for additional review and comment on settlement if grades are to be raised more than 2 feet. Structural fill and backf ll placed at the site should consist of a low to moderate plasticity soil (liquid limit less than 50 and plasticity index less than 20) that Is free of organic material or debris. Fill soils used to raise site grades should classify as CL, SPA or SC In accordance with the Unified Soil Classification System. If off -site borrow is required to raise the site grades, it should not be a "clean" sand. A relatively thin zone of sand fill without silt or clay creates the potential for perched water conditions developing beneath the building as water Infiltrating the surface sand zone becomes trapped by the underlying clayey soils. Highly plastic clays and silts (CH, MH) should not be used as surface fill in pavement or building areas because they are very moisture sensitive and subject to shrinking or swelling with seasonal changes In moisture content. The onsite sandy clay (CL) may be used to backfill trench excavations, but will likely require additional drying before it can be adequately compacted. Structural fill should be placed In 8 to 10-Inch thick loose lifts at a moisture content within two percent of the optimum moisture content of the material as determined by ASTM D 698 (Standard Proctor). Each lift of till should be uniformly compacted to a dry density of at least 95 percent of the maximum dry density of the materlal determined according to ASTM D 698 (Standard Proctor). 10 Quick Start II Industrial Facility Terracon Project No. 72065056 Beaufort County, NC August 3, 2004 The geotechnical engineer's representative should perform in -place field density tests to evaluate the compaction of the structural fill and backfill placed at the site. We recommend a minimum testing frequency of one test per lift per 5,000 square feet of fill area within the building footprint and one test per lift per 10,000 square feet of fill area within the pavement areas. For utility trench backfill, we recommend a testing frequency of one test per lift per 100 feet of trench. Additional testing may be required If variable conditions are encountered during construction. Pavements The majority of the subgrade soils (SC, CL, ML) expected in the proposed pavement areas will behave as cohesive soils. These soils are generally poor to marginal for pavement support since they are subject to softening and loss of -strength with gradual exposure to moisture. Past experience with similar soils Indicates typical soaked CBR values of 3 to 5. We estimate that a design modulus of subgrade reaction value (k) of 100 psi/in should be available for subgrades compacted to 98 percent of the standard Proctor maximum dry density, Based on the anticipated traffic (1 to 1.5 18k ESAL per day) and subgrade conditions, we recommend the following pavement thicknesses and configurations over the prepared subgrades: PAVEMENT TYPE MATERIAL THICKNESS (INCHES) Light -Duty I Heavy -Duty Portland Cement Concrete 5 6 Rigid (4,000 psi) Crushed Stone 4 4 (NCDOT CABC) Asphalt Cement Concrete 3 3.5 Flexible (NCDOT Type S-9.5A or 1-2) Crushed Stone 6 8 (NCDOT CABC) Light -duty pavements should be designated for car parking areas. Heavy-duty pavements should be designated for entrances and exits, truck lanes, and areas in front of loading docks and dumpsters. The early placement of the stone base course will minimize the deterioration of the prepared soil subgrades. However, some loss of crushed stone due to rutting and surface contamination may occur prior to final asphalt or concrete paving. Some infilling and regrading of the stone may be required. 11 Quick Start II Industrial Facility Beaufort County, NC Terracon Project No. 72065056 August 3, 2004 Pavements and bases should be constructed In accordance with the guidelines of the North Carolina Department of Transportation "Standard Specifications for Roads and Structures". The 1995 publication addresses the use of the "Marshall' mixes (1-2 and Type H binder) while the 2002 publication addresses the use of the "Superpave" mixes (S-9.5A and I- 19.08). Materials, weather limitations, placement, and compaction are specified under appropriate sections of these publications. Prevention of infiltration of water into the subgrade is essential for the successful performance of any pavement. Both the subgrade and the pavement surface should be sloped to promote surface drainage away from the pavement structure. LIMITATIONS Subsurface Exploration and Conditions The boring locations and ground surface elevations given in this report should be considered accurate only to the degree implied by the methods used to determine them. The boring logs represent our interpretation of the subsurface conditions based on the field logs, and visual examinations of samples by an engineer, geologist, or technician, in addition to tests of the field samples. The lines designating the Interfaces between various strata may be gradual. The generalized subsurface strata and profiles described in this report are intended to convey trends in subsurface conditions. The boundaries between strata are approximate and Idealized. They have been developed by interpretations of widely -spaced borings; therefore, actual subsurface conditions may vary from those given between boring locations. Groundwater levels have been measured or Inferred in the boreholes at the times and under ( the conditions stated on the boring logs. Changes in the groundwater conditions may occur o- ak - due to variations in rainfall, evaporation, construction activity, surface water runoff, and other kp+� site specific factors, L Our geotechnical services Include storing the samples collected and making them available for Inspection for 90 days. The samples are then discarded unless our client requests otherwise. The assessment of site environmental conditions or the presence of contaminants in the soil, rock, surface water or groundwater of the site was beyond the scope of this geotechnical study. 12 Quick Start II Industrial Facility Beaufort County, NC General Comments Terracon Project No. 72065056 August 3, 2004 Terracon should be retained to review the final design plans and specifications so comments can be made regarding Interpretation and implementation of our geotechnical recommendations in the design and specifications. This will help reduce the potential for misinterpretation of the recommendations provided in this report. Terracon should also be retained to provide testing and observation during excavation, grading, foundation, and construction phases of the project. Testing and observation by the geotechnical engineer of record provides documentation regarding compliance with the recommendations provided in the geotechnical engineering report and the project specifications. Terracon shall not be held responsible for others' Interpretation of subsurface conditions. Therefore, we recommend that the owner retain Terracon for foundation and earthwork phases of the project. The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the Indicated locations and from other Information discussed in this report. This report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be Immediately notified so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not Include either specifically or by Implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or Identification or prevention of pollutants, hazardous materials, or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. The scope of services for this project does not Include either specifically or by implication any evaluation or assessment of -existing or proposed slopes on the site. If the owner is concerned about slope stability on the project, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either express or implied, are Intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing. 13 UNITED STATES — DEPARTMENT OF THE INTERIOR — GEOLOGICAL SURVEY % Nis Balqa Chapel % Ln I XSUBJECTSITE • '?d of SCALE 1:24 000 0 XUNEnm 1 2 000 0 WETW taaD moo ULM 1300 a Iwo 2000 3000 4000 5000 am ?am acm 9000 IQ 000 FELT CONTOUR INTERVAL 5 FEET KVIDNAL GED0E110 v 0AT1A1 W JWZ9 UFO LINO � to-nm cowwo QUADRANGLE WASHINGTON, NORTH CAROLINA 1951 PR1983 7.5 MINUTE SERIES (TOPOGRAPHIC) VICINITY MAP No FIG. No. Ire TOPOGRAPHIC GEarECHNICAL EXPLCRATION QUICK START 11 INDUSTRIAL FAC:U`rY M. cmcmn tISIPAGrROM WASHINGTON, BEAUFCRrC(MJNIY, NORTH CARCUNA REMLOX '—, . • _ _ r0 LEGENG $ APPROXIMATE SOIL BORING LOCATION r- NOT TO SCALE �o '� fed93mi"' SOIL BORING LOCATION DIAGRAM FIG. NO. GEOTECHNICAL EXPLORATION QUICK START II INDUSTRIALFACIUTY ra.mec ,8 rsls � `�`"� vM1ww 1151 PAGE ROAD WASHWGTK BEAUFORT COUNTY. NORTH CAROI MA CB o� AlLY200B 8.0 13.0 20.0 Cultivated topsail (approx. 1') Medium stiff to stiff moist to saturated brown and gray silty fine sandy CLAY (CL). Very loose saturated gray fine to medium SAND (SW). Soft saturated gmy, silty fine sandy CLAY (CL) with course sand. Boring temtinated at 20 feet. 40.0 Classified Br.. L. Cutsell Dnller. Carolina Dulling Drill Rig: CME 45 Boring Type: Mud Rotary Im SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS • L su T BORING LOG BORING NUMBER B-1 DATE DRILLED 7/12/2006 PROJECT NUMBER 72065056 PROJECT Quick Start II Industrial Facility 4 7 4 2 2 I 2 I 0.0 1.0 8.0 12.0 27.0 35A Cultiwted topsail (oppmx. I'). — SoR to medium stifFmoist to saturated orange and gray silty fine sandy Loasa saturated gray silty slightly clayey fine to medium SAND (SK. Soft saturated gray silty fine sandy CLAY (CL). SULTrarturaled gray silty fins sandy CLAY (CL). Boring lcnsrinated at 35 reet. 40.0 Classified By: L Cutrell Driller Carolina Drilling Drill Rig: CME45 Baring Type: Mud Rotary GROUND Dols71 QM 40 S w mxaenamus nos otamt tn.evnnor+ sritsit�nawrna wa �s SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS BORING LOG BORING NUMBER B-2 DATE DRILLED 7/12/2006 PROJECT NUMBER 72065056 PROJECT Quick Start II Industrial Facility 4 5 2 5 2 1 2 1 4 1 10 1 9 m 20.( 40.0 Classified By. L Cutmil Dollar. Carolina Drilling Drill Mr. CMB 45 Baring Type: Mud Rotary ao ow Dole $�vterzaa nnm nerrli a"Ai w+ ❑ us srAmuzAnannn+E Dann sa SEE KEY SBEEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS Cultivated topsoil (approL 1'). 0 Medium stiff to stiff moist to sattuated ran and gray silly One sandy CLAY (CL). �:' • Looso saturated sill slightly clayey fine to medium SAND (SM). gray Y Oh Y YcY Soft saturated gray silly fine sandy CLAY (CL). Boring teardnated at 20 feet. 0 to in In en An an rnn • • • • • BORING LOG BORING NUMBER B-3 DATE DRILLED 7/12/2006 PROJECT NUMBER 72065056 PROJECT Quick Start II Industrial Facility PAGE 1 OF 1 lremacuo S 6 4 2 2 2 8.0 12.0 18.0 35.0 Cultivated topsail (approx. 1�. Soft to stiff maist to solurated orange and gray silty fine sandy CLAY (CL). Very loose saturated gray silty clayey fine to medium SAND (SC). Loose s wnucd gray fine to onerse SAND (SW). Soft to very stiff sotermed gray silty fine sandy CLAY (CL). Boring terminated at 35 IEcl. 40.0 Classified By: L. CutrsO Driflar. Carullon Drilling Drill Rtg: CME 45 Boring Type Mud Rotary �cu �®r SEE KEY SHEET FOR E}G?LANATION OF SYMBOLS AND ABBREVIATIONS 0 10 20 30 40 60 80 100 • • • • • BORING LOG BORING NUMBER B-4 DATE DRILLED 7/13/2006 PROJECT NUMBER 72065056 PROJECT Quick Start II Industrial Facility 6 8 2 2 9 1 2 I 13 15 9 a 6.0 8.0 12.0 17.0 20.0 Cultivated topsoil (approx. I'). Medium stif£rroist to saturated orange and gray silty fine sandy CLAY (CL). Loose saturated orange silty slightly clayey fine to medfunt SAND (SM). Loose saturated Stay fine to caosse SAND (SW). Very lam sawralm gray silty slightly clayey One to medium SAND (SC). Soft saturated gray silty CLAY (CFO. Boring terminated at 20 fact. 40.0 Classified By. 1- Cuoell Driller. Carolina Drilling Drill Rfg: CME 45 Boring Type: Mud Rotary DROU SZvur_oos aWA ' MUINNOS DATB TUIE OEMEt"AnON STABIUZAMONTIME 2,ts, ss SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS • • • BORING LOG BORING NUMBER B-5 DATE DRILLED 7/13/2006 PROJECT NUMBER 72065056 PROJECT Quick Start II Industrial Facility 5 6 4 9 2 1 2 1 M 0.0 01. 5.0 40.0 E Culdvaud lopsail (approx. P). Medium stiff moist to souaated orange and gray silly fine sandy CLA Baling t=ninatcd at 5 fed. Classified W. L. Cutmll Drills. Carolina )Ri01ng Drill Rig: CME 45 Boring Typo: Mud Rotary GROUNDWATER RFADrNG3 DATE i7F1E Ol7'DI ELEVATION SrABIUZATiDtr TIME ,1/1Niaoa III Iq• ]9 SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS u 10 20 30 40 60 90 100 • • 11 BORING LOG 11 DATE DRILLED 7/12/2006 PROJECT NUMBER 72065056 PROJECT Quick Start H Indushial Facility lr l •I 0.0 1.0 5.0 0.0 gray ano omnge Fine sandy CLAY (CL). Classified By: L. CutrcO Duller.. Carolina Drilling Drill Rtg: CME 45 Baring Typc Mud Rotary SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS • p II BORING LOG II DATE DRILLED 7/12/2006 PROJECT PLUMBER 72065056 PROJECT Quick Start II Industrial Facility raa 1.0 5.0 40.0 L gmr Ctudflcd Sr. L Cuaell Driller Carolina Drilling Drill Rig: CME 45 Boring Type Mud Rauay �scn�� �ti?a:!»aia2 SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS Im 11 BORING LOG 11 DATE DRILLED 7/13/2006 PROJECT NUMBER 72065056 PROJECT Quick Start II Industrial Facility GENERAL NOTES DRILLING & SAMPLING SYMBOLS: SS: Split Spoon -1 -�18" I.D., 2" O.D., unless otherwise noted HS: Hollow Stem Auger ST: Thin -Walled Tube - 2" O.D., unless otherwise noted PA: Power Auger RS: Ring Sampler - 2.42" I.D., 3" OZ., unless otherwise noted HA Hand Auger DB: Diamond Bit Coring -4", N, B RB: Rock Bit as: Bulk Sample or Auger Sample W S: Wash Boring or Mud Rotary The number of blows required to advance a standard 2-Inch C.D. split -spoon sampler (SS) the last 12 Inches of the total 18-Inch penetration with a 140-pound hammer failing 30 Inches Is considered the "Standard Penetration" or "N-value". WATER LEVEL MEASUREMENT SYMBOLS: WL: Water Level WS: While Sampling NIE: Not Encountered WCI: Wet Cave In WO: While Drilling OCI: Dry Cave In BCR: Before Casing Removal AS: After Boring ACR: After Casing Removal Water levels indicated on the borfng logs are the levels measured In the borings_ at the times Indicated. Groundwater levels at other times and other locallons across the site could vary. In pervious soils, the Indicated levels may reflect the location of groundwater. In low permeability soils, the accurate determination of groundwater levels may not be possible with only short -tens observations. DESCRIPTIVE SOIL CLASSIFICATION: Soil classification Is based on the Unified Classification System. Coarse Grained Solis have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Solis have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays If they are plastic, and silts If they are slightly plastic or non -plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse -grained soils are defined on the basis of their In -place relative density and fine-grained soils on the basis of their consistency. CONSISTENCY OF FINE-GRAINED SOILS Standard Unconfined Penetration or Compressive N-value (SS) Strength, Qu, osf Bows Ft. Consistancv < 500 <2 Very Soft 500 — 1,000 2-3 Soft 1,001 — 2,0(10 4-6 Medium Stiff 2,001 — 4,000 7-12 Stiff 4,001 — 8,000 13-26 Vary Stiff 8,000+ 28+ Hard RELATIVE PROPORTIONS OF SAND AND GRAVE Descriptive Tennis) of other Percent o constituents DryWelght Trace < 15 With 15-29 Modifier > 30 RELATIVE PROPORTIONS OF FINES Descriptive Term(s) of other Porcento constituents DryWalah Trace < 5 With 5-12 Modifiers > 12 RELATIVE DENSITY OF COARSE -GRAINED SOILS Standard Penetration or N-value (SS) Blows/Ft 0-3 4-9 10-29 30-49 50+ Relative Dons[N Very Loose Loose Medium Dense Dense Very Dense GRAIN SIZE TERMINOLOGY Malor Component of Sample Particle Size Boulders Over 12 In. (300mm) Cobbles 12 in. to 3 In. (300mm to 75 mm) Gravel 3 In. to #4 slave (75mm to 4.75 mm) Send #4 to #200 sieve (4.75mm to 0.075mm) Silt or Clay Passing #200 Steve (0.075mm) PLASTICITY DESCRIPTION Term Plasticity Index Nan -plastic 0 Low 1-10 Medium 11-30 High 30+ Irerracon UNIFIED SOIL CLASSIFICATION SYSTEM Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests" Coarse Grained Soils Gravels Clean Gravels More than 50% retained More Nan 50%orccarse Lose than 5% OnW fraction retained on Cu a 4 and l sCc s3` Cu < 4 and/or 1 > Cc > 3' on No. 200 slave No. 4 slave Gravels with Fines Mora Fines classify as ML or MH than 12%Mae Fines classify as CL or CH Sands Clean Sands Cu a 5 and 1 s Cc s 3' 50% or more of coarse Less than 59. Mesa Cu < 0 and/or 1 > Cc > 34 fraction passes No. 4 slave Sande with Fines Flnes dassly as ML or MH More than 120/6MssO Fines Classify as CL or CH ring ramau acns onu ono days umu.,•, 50% or more passes the Liquid limit less than 50 No. 200 slave organic SUts and Clays Inorganic Liquid nmil 50 or more PI > 7 and plats on or above •A' Una' PI <4 or plots below'A' line' Son Classmrauon Group Symbol Group Name GW Well -graded gravel' GP Poorly graded graver GM SUN aravel!0." GC SW Well -graded sand' SP Poorly graded sand' SM Silty sancid " SC Clayey Sand''" CL Lean clay"'" ML Silr' Liquid Omit - oven dried <0.75 OL Organic clay""" Llquld limit - not dried Organic sllt`1 O PI plots on or above'A' Ilne CH Fat clay""" PI lots below'A" line MH Elastic Sol" organk Liquid limit - Oven dried <0.75 OH Organic day`r Liquid ItinU - not dried Organic slit + Highly organic soils Primarily organle matter, dark In color, and organic odor PT Peal "Based on the material passing the 3-In. (75-mm) slave s If geld sample contained cobbles or boulders, or both, add Wth cobbles or boulders, or both' to group name. `Gravels with 5 to 12% lines require dual symbols: GW-GM well -graded gravel with silk GW-GC well -graded gravel with day, GP -GM poorly graded gravel wlih silk GP -GC poorly graded gravel with day. o Sands with 5 to 12% fines require dual symbols: SW -ISM well -graded sand with silk SW -SC well -graded sand with day, SP-SM poorly graded sand with silk SP-SC poorly graded sand with day 2 s Cu - Dmro,o Cc = Drp Dip x Dap 'If soil contains 2 15% sand, add 'with sand' to group name. elf Ones classify as CL-ML, use dual symbol GC -GM, or SC-SM. so 50 40 O }Z 30 C V 20 g a 10 7 4 0 :omt i t 1--&ea "if fines are crganlG add 1Wt1 organic Ones' to group name. If suit contains 2: 15%gravel, add Vth graver to group name. If Aberberg limits plot in shaded area, sot is a CL-ML, silty clay. slf sell contains 15 to 29% plus No. 200, add "with sand' or'Wllh gravel; whichever Is predominant. If soll contains t 30% plus No. 200 predominantly sand, add "sandy' to group name. "If soli contains a 30% plus No. 200, predominantly gravel, add "gravelly' to group name. "PI k 4 and plots on or above'A' line. OPI < 4 or plots below'A' line. 'PI plots on or above Wine. Opt plots below'A' line. For classification of fine-grained soils and fln"nalned fraction of coerse-gmined soil- e •• • Jae Equallon of'A' - line •P Hommntal at PI-4 to Ur20.e. than PI.0.73 (LL-20) °s 0'Z` Equation of LP - be VeNcal at hate to P1.7, (J� Then P1.0.9 (ILL-8) • Ole �d •°I MH or OH or OL _ i.ML 0 10 1e 20 30 40 5o 00 70 90 90 100 110 LIQUID LIMIT (LL1 Irerracon] Project Map Soils Map — Beaufort County Quick Start 2 Commercial Development — Lot 9 Beaufort County Industrial Park SOD I 1 --•- js Project location — La series soils are Leaf silt loam liV y! 0 W:\D10xx-gm\D100x_msw\D1005_cort—=w\RBM\20061Bmufort IP Site 9\bcip-site9-soil-map.doc 1 3/14/2007 �26p ti h �10 I v t 31: RV'IC _01 - r Lot 9.-,- Beaufort County Industrial Park (Location Approxim4te'), I _ r f Ad yl -jt� _. I�ii✓rst I �r'6l'_�/��-�lT� Il_II(�'=t �'�-!_ i �-� �_.J_-���kt..f-sIOZe�f _�� O/_T- i -Ij __ I ...L-5.� � %L;� /u.>ti, I I ,�•i/ I l``I - i '=j—j --- ! I , i-�---r- 1I S✓.s��t�-1— _, 2 rl ��A Ir�l f /_I�/ZIrGG I 3� r I I _ I 1 I Ii r__i. I- I --�- I_ r , r I..- I_ t_ _� -I.--I T I ( - j I I I 1 ( - I 't -i - -j-' - I -- -�--�--'-I---I--�- i -I• -'-r- -I- �-1 -i----i--,--r � if I , 17r - � I - �_I_ _.L_J - I -'----'- I - I I � � J-- I-- } -� '- � - I---r t -� -�--•k - � - { -�-z { -�- l- -� -I 1 -- 1 i- 1 - I I i � I r I :I� I. I •i I I. i. I I I I I i I, ! i I 1 I I I l v{ - -r—%e ; 5w6.o.{ } ; j i eA t-- -i I_I L J —{--` _Ci=--! f� -I--I ----i-1--I- I�-1-_� T --�T 1-� -' -i I_I I- -I i !_ ��-!_I-I- f i-i_I_L l_ IL a MCDAVID ASSOCIATES, INC. N c. Engineers • Planners • Land Surveyors CORPORATE OFFICE COLDSRORO OFFICE. (252)753-2139•r:. (252)753-7220 (919)736-7630• Fax (919) 735-7351 E-mail: mai@mcdaeid-inccom E-mail: maigold@mcdavid-inccom 3714 N. Main Street • PO. Drawer 49 109 E. Walnut Street • P.O. Box 1776 Farmville, NC 27828 Goldsboro, NC 27533 March 15, 2007 RECEOVED Mr. William J. Moore vl__� MAR 16 2007 North Carolina Division of Water Quality Washington Regional Office DWQ-WAR® 943 Washington Square Mall Washington, NC 27889 SUBJECT: StormwaterPermit: SW7061016 Beaufort County Industrial Park Lot 9 Site Development Dear Mr. Moore: In reference to the subject project, thank you for meeting with me to review and discuss your comments. As follow-up to our conversation, please find enclosed the following exhibits for your review: I . One (1) copy of a revised narrative that provides revised stormwater calculations. 2. One (1) copy of a revised application document. 3. One (1) copy of revised Bioretention Supplement Sheets. 4. One (1) copy of a Geotechnical Engineering Report performed by Terracon. 5. One (1) copy of a map exhibit showing soil classification as taken from the Beaufort County text mapping on-line viewer. 6. One (1) copy of a map extract from the "Soil Survey of Beaufort County, North Carolina" with the approximate location of the project area shown. 7. Two (2) copies of revised construction drawings. Please review submittals at your earliest convenience. If you have any questions or need clarification on any issue, please do not hesitate to call me at (252) 753-2139. You can E-mail me at rbinnmcdavid- inc. coin. Thank you for your assistance. RBM:fla Enclosures cc: Paul Spruill Tom Thompson D805RBM07 1 2:23 I'M BEA UF0RT-00-IP-L0T9-STRM WTR-PER-070415-00l.wpd 070315 I \' r 1 County of Beaufort Attn: Mr. Paul Spruill PO Box 1027 Washington, NC 27889 Dear Mr. Spruill: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources January 10, 2007 Subject: Stormwater Permit SW7061016 Industrial Park - Lot 9 Beaufort County Alan W. Klimek, P.E. Director Division of Water Quality This office received your stormwater application for the subject project on October 17, 2006. A preliminary review of the plans and specifications has been completed. In order to complete your application and before a stomrwater permit can be issued, the following items must be addressed: °-1) Provide all stormwater/design calculations ✓2) Do the clean -outs shown in the bioretention basins serve as overflow outlets? Show detail of clean-out/outlet structures with elevations ✓3) Bioretention filters must be designed to treat 1-inch storm; calculate storage volume required for each drainage basin - compared to storage volume provided in each basin. Storage provided by proposed swales should not be included in storage calculations. -'�4) Provide bioretention supplement sheets for each filter; along with proper operation & maintenance agreement V/5) Beaufort County soils map indicates seasonal high water table (SHWT) between 1.0-2.5 feet for Lenoir Soils. On -site soils investigation (borings by hand auger to depth of 4-6 feet) will be necessary to evaluate soil/water table conditions and justify/show that bioretention filters, as proposed, will work for this site. Provide detailed soils report. ✓6) Show drainage basins/discuss stormwater treatment measures for entire site ✓ 7) Provide vegetation plan, prepared by qualified professional, for bioretention filters r�8) Land Quality staff could not find a copy of a sedimentation & erosion control plan for this project. Explain. 9) Provide revised plans, specifications, calculations & detailed stormwater narrative to reflect all changes. North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service Intemet h2c.encstate.nc.us 943 Washington Square Mall, Washington, NC 27889 1-877-623-6748 "Rep) No rhCarol 11 atural County of Beaufort January 10, 2007 Page Two The.above requested information must be received in this office prior to February 12, 2007, or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address. If you have questions, please feel free to contact me at (252) 948-3919. Sincerely, ` Will J. Moore Environmental Engineer Washington Regional Office cc: Pat McClain - Land Quality - Washington Office McDavid Associates = Farmville Office Beaufort County Planning/Inspections .4ashington Regional Office • i -I_-1 _. -t._ I-- ' - J � - fi I i - 1-�•,I/'I _ __ I f- -I� I 1 t __.. r __ sk 3aSU- , 1 ' � I -- I '--� Lam_- � -;- -r-, I -SS. i¢_c,_�,_ ;---� �- -, -- - -I -i- I -_r I I f i i Tip- i 17 36 37- I n/ !_Gvd� 28.1._a' M4, No le R,'.��Elr-w.i- 9,2L - - S�f__r i_¢1/��e��as1� Leuf o.S_- / S -I l _ 15Nw r_!@� ,�30 �_?➢ �_��S C_S_I s�e.v�._�_I I--I--I'--�--�--•Ceaorr /•+�=iZ'I�-i__ —�---I— I �—1 V4 _I _i_n vt✓f G--—�i_.%<<� - I — -U— � — — - -- — '-- i—I f�� �•'��Loa«.. Svc--- --.4a. --0 s--�S ---- -- III f/e'r 11 L ce.�_ So•� S�k/7 d 5--=�—i� — -- --- - -- ---- f' 2 _—__,Z_$_-7 3 _Z6. v 2 . 73 Zg. O-r 74 - L2 nOrr oam _� - f � . I- i i - - - - -- --------------- ------ ---- ---- -II --- - -- -- .. - --------- ---------- ------------ ------I -- - �� - - =--= =-- ---- _ 1 - -- - ----- I. ----- - - -- -- - --- -- - --------------- -- ------ - - - -f -- - -- - - - - - -- - --- - -- - - ---- ---- - - - - -- -- - -- - ----__�I --- - - - - - - -- ;- ------ ---------------,C------- -------------------------------- -- --- - ---- --------r-- - --- - --- - IL07 ? ''!3 ;°- _ ?� I.� �P •� 3S——#—J—'BB..c__ _ly --I--I--�-- -� I 3 � �._So�Q� = � _•�9e %�� —�_316 '/o � �394-ci I� ���zz. ; L L I_ !. ! I T Y►-4� �; -� - - -- - Cov. -- - - I _I � CIS I gz. �4z ��--�-�¢,,�t ��•-� -r- I ! B7 ! ;?itii ! -�?-!= Za 2-_7._o -- -I—� s�LZ I r 11 11 d i 10 be - PS BMP Removal Summary Narrative MAR 16 '2007 Coastal Plain of the Tar -Pamlico River Basin Beaufort County Industrial Park — Lot 9 Site Development DTI -WARD Background Existing site is a 6.6 acre tract where existing soil is classified as Leaf sandy loam (based on "Soil Survey of Beaufort County, North Carolina" with a slope less than 2%. Pre -development condition of the site is a managed agriculture field that will be converted into a commercial site. Existinq qroundwater table is approximately three (3) to four (4) feet below the site performed by Terrarnn and hand auger borings. The "Soil Survey of Beaufort 50, o County, North Carolina" identifies a seasonal high water table (SHWT) for Leaf series of 0.5 feet to 1 feet below the groStfld surface. Initial Leaf classification appears to have /t been assigned at a time when the entire surrounding property was wooded. Over time, the area was cleared for agriculture farming where drainage improvements were made (most likely by a local farmer) to improve the ability to manage crops. In recent years, Page Road has been constructed through the property where road -side ditches hel drain the area, perhaps contributing to lowerinq the SHWT in the immediate vianity o The goal of the project is to construct a shell building and parking facilities to provide commercial development in Beaufort County within a defined industrial park. '7 The shallow qroundwater table--aoses--a potential problem to the use of wet detention structures to provide adequate stormwater treatment to comply with the Tar -Pamlico River Basin strategy. —A—Treatment ent system consisting of shallow grass swa a and bioretention structures is viewed as a preferable alternative due to easier maintenance and better curb appeal for marketing of the completed facility. -r-it� S i S war �t C/r /ri a� ow cA Stormwater Management Stormwater rules require that facilities be provided that are capable of treating the first inch of rainfall. Stormwater flow is divided into three (3) catchment areas where bioretention structures provide treatment. The following table summarizes data on the three (3) catchment areas and the proposed bioretention structures. Catchment Area 1 Catchment Area 2 Catchment Area 3 Area 2.03 2.13 2.50 Built Upon Area 0.71 0.76 0.90 % Impervious Area 34.98% 35.68% 36.00% 1" Storage Requirement cf 2,688.17 2,869.31 3,394.05 2" Storage Requirement cf 5,376.35 5,738.62 6,788.10 Storage Volume Provided cf 5,390.00 5,742.00 3,432.00 Runoff values are calculated using the following equation: Y Rv = 0.05 + 0.009(I), where I is the measured rainfall event in inches. W:\DI0xx_gcn\DI00x_msw\D1005_comes_msw\RBM\2000\Beaufort IP Site 9\bcip-sitc9-bmp-attachment-rev-070315.doc 1 3/15/2007 Required volume is computed using the following equation: Volume = (Design rainfall, inches) x (Rv/12) x (Drainage area, square feet) Based on current rules, a bypass mechanism is required for stormwater flow beyond the first inch of rainfall. If storage is provided for the 2" rainfall event, bypass facilities are not required. Storage is computed by multiplying the surface area of bioretention structures by the pooling depthrepresented by a top layer o mu c ma er11M , Storage prove a Is a minimum two (2') feet above the . Bioretention facilities provided for catchment areas 1 and 2 provide sufficient storage to meet the 2" rainfall event. The third bioretention structure (serving catchment area 3) provides sufficient storage for the 1" rainfall. For the third bioretention structure, rainfall in excess of the 1" rainfall will pond in proposed curb & gutter where it will be collected by a underground drainage tile and discharged into a grass Swale. Drainage improvements serve as bypass facilities. The downstream grass swale conveys runoff 72' to the roadside ditch of Page Road. Design Storm Tar -Pamlico River Basin regulations require treatment of stormwater flows represented by the 1 year, 24 hour storm event. For Beaufort County, the estimated 1 year, 24 hour rainfall is approximately 3.5 inches. Site Development Proposed impervious area amounts to approximately 2.37 acres that is divided into 3 catchment areas such that no more than 1 acre of impervious area drains to any 1 catchment. Offsite drainage is not an issue as the property and adjacent properties are basically flat such that no offsite drainage impacts the property. 3.5 inches of rainfall over a 24 hour period equates to a runoff rate of approximately 1 cubic feet per second (cfs). Stormwater treatment facilities must be capable of conveying this 1 year storm event. Treatment of the 1 year storm event is proposed to be accomplished through 3 catchment areas Stormwater will be treated by a combination of grass swales and bioretention facilities. The following is a summary of flows associated with the 1 year, 24 hour storm event. W:\DIOxx_gen\DI OOx_msw\DI005_corres_msw\RBM\2006\Beaufort IP Site 9\bcip-site9-bmp-attachment-rev-070315.doc 2 3/15/2007 1 Year, 24 Hour Storm Event Comparison Pre-develooment Acreage 6.6 acres Max length travel (feet) 250 ft Change in height over outlet (ft) 1 ft c factor 0.30 Intensity (i) 0.15 in/hr Runoff Calculation Q = ciA Q = (0.30)(0.15)(6.6) 0.29 cfs Post -development Acreage 6.6 acres Max length travel (feet) 450 ft Change in height over outlet (ft) 4 ft Slope 1.00% Time for concentration (Tc) 4.5 min c factor 0.48 Intensity (1) 0.15 in/hr Compute c factor Acreage c Impervious area 2.37 0.8 Non -Impervious area 4.23 0.3 Computed average 0.48 Runoff Calculation Q=ciA Q = (0.48)(0.15)(6.6) Storage Required (0.46-0.29)*(4.5)*60s/min 1KII-Win 46,85625 cf The following table summarizes storage provided by proposed stormwater management facilities: Catchment Area Storage Summary Catchment Area Bioretention Volume (cf) Grass Swale Total Volume cf Length (ft Area sf Volume cf 1 5,390.00 147 12 1,764 7,154.00 2 5,742.00 148 12 1,776 7,518.00 3 3,432.00 300 12 3,600 7,032.00 Total Storage 21,704.00 W:\DI0xx_gcn\D100x_msw\D1005_coires_msw\R13M\2006\13cau1'ort IP Site 9\bcip-sitc9-burp-attachment-rev-070315.doc 3 3/15/2007 Proposed storage is adequate to meet the storage needs associated with the 1 year, 24 hour storm event. Proposed stormwater facilities need to ultimately be capable of processing the peak stormwater flow represented by the 10 year storm event. The following is a comparison of peak flow stormwater data. Peak Storm Comparison (10 Year Storm Event) Pre -development Acreage 6.6 acres Max length travel (feet) 250 ft Change in height over outlet (ft) 1 ft Slope 1.00% Time for concentration (Tc) 5 min c factor 0.30 Intensity (1) 5.40 in/hr Runoff Calculation Q = ciA Q = (0.30)(7.0)(6.6) 10.69 cfs Post -development Acreage 6.6 acres Max length travel (feet) 450 ft Change in height over outlet (ft) 4 ft Slope 1.00% Time for concentration (Tc) 1.8 min c factor 0.48 Intensity (1) 5.40 in/hr Compute c factor acreage c Impervious area 2.37 0.8 Non -impervious area 4.23 0.3 Computed averse 0.48 Runoff Calculation Q = ciA Q = (0.48)(7.0)(6.6) 17.09 cfs Storage Required (22.19-13.86)-(5)'60s/min 1,920 cf Proposed storage facilities are more than adequate to accommodate the peak flow rate. Conveyance channels need to be designed to make sure that discharge of stormwater from the site does not occur at a rate in excess of the pre -development rate. The 3 grass swales are all designed at a slope of 0.8% where average depth is 2' and computed average perimeter is 12.65'. Velocity and rate of discharge can be computed using Manning's equation: W:\DlOxx_gen\D]00x_msw\DI005_corrw_msw\R13M\2006\13cau furl II' Site 9\bcip-site9-bmp-attachment-rev-070315.doc 4 3/15/2007 V = 1.486/n(R)213(S)/' The value for n (Manning's coefficient) is based on the roughness for the channel. Based on a loamy soil (0.02) + moderately irregular surface (0.01) + proposed dense vegetation (0.08) + minimal meandering ration (0.02), n is assumed to be a value of 0.13. V = 1.486/(0.13)-(0.95)213*(0.008)1/2 V = 1.0 fps (feet per second) A velocity of 1.0 fps or less is recommended for discharge into a bioretention area consisting of a top layer of mulch material. Stormwater flow is computed by multiplying the velocity times the area of the channel. Q=VA Q = (1.0)*(1 2) Q = 12 cfs (cubic feet per second) Stormwater flow following development is less than the pre -development flow, complying with stormwater regulations and erosion and sedimentation control requirements. As part of bioretention structures, an underdrain system is proposed due to the slow permeability rate of the Leaf sandy loam soil. As a final consideration of design facilities, storage is evaluated to determine its ability to handle runoff from the 1 year, 24 hour storm event. 3.5 inches over the proposed impervious area of 2.43 acres equates to a total volume of water amounting to (2.43acres*43,560sf/acre*3.5in*1/12in/ft) 30,873.15 cf. Assuming 25% of this volume will be processed through evaporation and infiltration into the natural soil, a 75% stormwater volume equates to (75%*30,873.15) 23,154.86 cf. The proposed 23,218.75 cf of storage accommodates 75% of the total 1 year, 24 hour storm event for the proposed impervious areas. Bioretention Planting Summa Bioretention cells will periodically be inundated with water. Due to the relatively high seasonal high water table (SHWT), the site has been elevated wh bottom of retention cells is only approximately two (2') fee Blow the existing natural ground elevation. Existing soil material will be removed from the a cell areas and replaced with planting soil that offers better oermeabl illy C—efls will be lined with landscape filter fabric that &ill allow promotion of root development from plantings. In general, t' he middle of cells will contain the most moisture, suc at pan ings must be well for wet conditions. Planting within bioretention cells will be a combination of hardwood trees in the middle section and shrubs on the perimeter. Hardwood trees are less susceptible to disease and insect damage. The following table summarizes recommended plantings within the cells. W:\DIOxx_gcn\DIOOx_msw\DI005_corres_ntsw\RI3M\2006\13caufnrt II' Site 9\bcip-sitc9-bmp-attachnsnt-rev-070315.doc 5 3/15/2007 Form Common Name Shrub Witch Hazel Shrub Black Willow Shrub Azalea Shrub Spice Bush Shrub Wax Myrtle Shrub American Hazlenut Hardwood Tree Shadbush Hardwood Tree River Birch Hardwood Tree Persimmon Hardwood Tree Smooth Sumac Hardwood Tree American Holly Shrubs and trees should be planted as seedlings (trees approximately 5' in height) where their root formations are allowed to develop within the newly installed planting soil. Plants will grow quickly where their mature spans will be approximately 5' diameter for shrubs and 20' for trees. W:\DlOxx_gen\1)I00x_msw\DI005 cones_msw\K13M\2006\Beaufort IP Site 9\bcip-site9-bmp-attachment-rev-070315.doc 6 3/15/2007 ' RUN OFF COEFFICIENT -- 6.6 - 0.48 LAND USE -- C- 0 BUSINESS nr1WN-rnwN ARFAC - ISTREEfS: z,DRIVESA --ROOFS - t!AWNSF - SAP - SAN HE HE/ HEA _ AGRICULTI -CUI ;.HEA =S! _ ' 'SAN y WOODCANDS !evlsed 17/1/?006 - TGH - U,2%�. 10.05-01 Len th of overland flow 1450 000- feet -"' Surface Mannin s n Mannin s "n" for surface 0 020 Smooth Surface - `- 0.011 Avera a watershed sloe 1 000 ft./R. Fallow. _ - 0.050 Constant alpha 74500 Cuitiva[ed,< 20%'Residue _ 0060+ Constant m "1667 Cultivated > 20%'.Residue- - - - 0i170- Weighted Runoff Coefficient 0.481 Grass, Short OA50' '.:Grass. Dense '-- Grass Bermuda _ - � Wodds, Llghl ' - Woods. Dense ,- -- _ 0,240. _ -. -0.41Y, --.` 0,400: �- 0.800_. _2-7%I '0.1-0.15T_ I Enter the Rainfall Intensity .P, 7% -- ,0.15-0 2__ ISelect the Trial Time of Du - of Concentration if less thz IOvedand Flow rvltc(mlr U,2% _0.13-0.17_ - -2-7% 0 18-0.22 Calculate the shallow conc P, 7% 0 25-0.35 Calculate the channel Row Sum these three componel DOTH 03-0.6 Shallow Shallow Concentrated FlovFlov OUGH s02-05 a - Paved CROP 0 3-0.6 Flow Length CROP _02-0.5 - Slope _- CROP=0.2-04 tc(minutes) CROP 0i1-025 v Unpaved - Flow Length (SOIL 0 15-0.45 " Slope ( SOIL 0 05-025 , tc (mmuces) ` 0.05-0.25 Total Time of Concentr Rainl i (Ind -sl 457f--- - 7 36 3.1 4 771 -= -P 198` - -1 358Vf - 257 17 3231- -- _ 3,42 71 2,881 4,85 =' i 2,501 594 -. -=L 231) _.. _ 11 MI. Data W DINxyenD101n a 9N10fiyn:_euaW9MlNT1vPv:ePm]s:alpNmNMapeaJ.de T.p rawaw 1 Y1S2W] 1\FPLI Said oaia W�OI o..3enNlol, e.celNl oiz 9en ..4W9M�2MTSnVai�ea. 1a+.inna'.mNM1.p.a�. qe v1YtW1 T. p.- 1 Tar -Pamlico Stormwater Rule 15A NCAC 2B .0258 Coastal Plain of the Tar -Pamlico River Basin: Includes Greenville and Washington as well as Pitt and Beaufort Counties Last Modified 3/15/2007 Total Nitrogen and Total Phosphorus Loading Calculation Worksheet (Automated) Project Name: Beaufort County Industrial Park- Lot 9 Sire Develop rnenr Date: February 21, 2007 By: Richard B..1loore, P.E. Checked By: Directions (same for pre -development and post -development tables): > Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the values in light blue. > Compare total areas of development in pre- and post- tables for consistency (bottom of column (2)), and also for consistency with the site plans. If all of these values are not the same, there is an error that must be corrected. > Unless drainage onto the development from offsite is diverted around or through the site, offsite catchment area draining in must be included in the acreage values and treated. Pre-development: ........................................................................................................................ :Type of Land Cover Areal 8 M Formula Avecagc EMC.: Column ' Average.EMC Column -'. acres. 11 SI +9.1 t of TN m 6 2 3 `(4) of TP :(ia L Transporta4nfunpenlouv 0.51 2.60 0.00 0.19 0.00 Hoof impervious 0.51 1.95 0.00 0.11 0.00 '.17anaged pervious (lawntlandscaped) 0.51 1.42 0.00 0.28 0.00 Yianaled pervious (eKoplaiid) 6.66 0.51 4.23 14.37 1.23 4.18 :Managed pervious ' (pasture) 0.51 2.04 0.00 0.62 0.00 :'Wooded pervious ;:;;! 0.51 0.95 0.00 0.14 0.00 E+r8ehon Im( T;\ Loadlug 14.37 TP Loadng 4.18 Total Area oC Dcvetopment 6.66 PN Pxp Coelt ', 2.16 TP Exp. Caeft 0.63 (167ac/yr);. Post -development: �'. type of l,andl Cover Area:: S.M, Formula Averii& EMIC Column lverage9MC Column :. ... acres - U.51 +'9.1 I of T\ m !. i; 2 3 •'.'4 of TP m 1. 2 :� 36 Transot.tAtton:impervious-; 1.29 3.84 2.60 12.93 0.19 0.95 Hoof Impervious 1.14 3.84 1.95 8.58 0.11 0.48 Tlanaged pervious 4.22 3.84 1.42 23.03 0.28 4.54 :.Wooded pervious 3.84 0.94 0.00 0.14 0.00 Eract[pn Impervious (I) 0.37 TN Loading 44.54 TP 1,eading 5.97 Total Area of nevelopment ! 6.66 ThFxp. Coeff, 6 69 TI' �xP„Coeff 0.90 i(Iblaclyr);-, (16fac/yr);,-. Note: The nutrient loading goals are 4.0 Ib/ae/yr for TN and 0.4 Ib/ac/yr for TP. If the post -development nutrient loading is below these levels, then no BMP is necessary. Otherwise, the next worksheet calculates post -development TN and TP loadings after BMPs are installed. \\F-PC 1\Server_Data_W\D10xx_gen\D 101 x_excet\D 1012_gen_excel\RBM\2006\beaufort-edc-site-9-nit-red-talc-070221.xis Tab: Export before BMPs 1 3/15/2007 Tar -Pamlico Stormwater Rule 15A NCAC 2B .0258 Coastal Plain of the Tar -Pamlico River Basin: Last Modified 5/23/03 Includes (ireenville and Washington as well as Put and Beautm1 Counties BMP Removal Calculation Worksheet (Automated) Project Name: Beaulorr Coonm Duhecyinl l o,k - Lw 9 sire Dr•ra6I... wnt Date: Pebrunrr 21. 200 By: RicLarA B. 3Lu "'. 1' k'. Checked By: Directions: > It may be advantageous to split the development into separate catchments to be handled by separate BMPs. The tables below allow the development to be split into as many as three catchments, and can be copied for greater than three. NOTE: Unless runoff mowing onto the development from offsite is routed separately around or through the site, the offsite catchment area draining in must be included in the acreage values of the appropriate land use(s) and treated. > Above each table: Enter the catchment acreage in the top green blank. Based on a comparison of the post -development TN and TP export coefficients you calculated above to the role requirements of 4.0 Ib/ac/yr TN and 0.4 Ib/ae/yr TP, select BMP(s) from the list for treating the catchment runoff. Enter the chosen BMP(s) nutrient removal rates in the green blanks. If more than one BMP is to be used in series, the combined removal rates will be calculated automatically in the blue blanks. > Catchment'rables: Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the light blue boxes. NOTE: Compare the Total Catchment Acreage for the Development (final table) to the value you established in the pre-BMP worksheol tables, and also to the site plans, for consistency. All of these values need to be the same ..... ..... .......... .... . ....................... ........... ........ ......... ....................... ... ..... ..... .. ... .. .. .. ... ............. ..... ..... .. ... ... .. ... .. .. .......... ..... .... ... ..... ... .. ... ..... .... .. ... .......... ..... .... ............. ... .. ... .. ..... ... .. ..... .. .......... ... .......... ..... ... .. ..... .... ..... .......... ......... TN TP ... .. ... .. ... .. .. .. ... .. .. ... ... .. ..... .. .. ... .. ...... ..... ..... .. .. ..... .. .. ... .......... ....... .. ..... I)esCgn Stagdard BMP Wri6pct¢ntmn Pjind 25 40 NC 17M17P Manual Nutrient Storm»aieHVetland ! 40 35 NC BMPManual Removal 'sand Fill 35 45 NC UMP Manual Rates Btore[entlon 35 45 NC BMP Manual .Grass S»ales;; 20 20 NC BMP Manual x+eget$ted Filter Steip »/ 20 35 NC BMP Manual .::1;exeLS rcudek y petcn4., 10 10 NC BMP Manual Calchment 1: Total acreage of ealchmenl 1 =r--2703--7 ac First BMP's TN removal rate=( 20 1% First BMP's TP removal rate = 20 Second BMP's TN removal rate 35 1% Second BMP's TP removal rate =1 45 1% Third BMP's'rN removal rate=l 1% Third BMP's TP removal rate=l 1% TOTAL TN REMOVAL RATE= 48 % TOTAL TP REMOVAL RATE = 56 % ................ ... .......... ... ... ... ... ......... ... ...... .. ..... .. ...... ... ... .............. ....... ...... Yype oQl and Coxer :; Catchment 5 67 woimtiN Xvfti V'MC ii ;:�Coimna :Average $Mc!n Columii! peeea a 0.51 +91 1 'I'N m L '(2 3 4 TP 1 L: 2' 3• (6, 7 ransportailoa oultugioud 'O.t7 3.69 2.60 1.63 0.19 0.12 Roofimpervmus :� 0.54 3.69 1.95 3.89 0.11 0.22 tNlanaged pen tour :i 1.22 3.69 1.42 6.40 0.28 1.26 \Vooded pervious 0.00 3.69 0.94 0.00 0.14 0.00 Area taken up by BMP,; 0.10' ' 3.69 1.95 0.72 0.11 0.04 Fra¢non lmpen sous (p,= 0.35 Pec.6\1P 31\ 1264 Pre-$MP:T 1.64 Liigtl (Ib/yr):, Lontl (lblyejj:. otat Area of lies GltopmGn 2.03 Prc-B\1P TN - 623 PrG-$MP,T, 0.81 F:zpo it(Ib/ac/yir !tixport(Ib/pefjT PPsI BMP TN 6 57 0.72 Cliad (Ibiyry;. !i' Load (Iblyrj;: Post BMP T\; 3 24 Posf BM1IP T ''1Rxport 0.36 } xpo'rr(Ib/ac/F (Ibla¢1yf) aF-PC1\Servef_Data W\D10xx_gen\D10lx_excel\D1012_gen_excel\RBM\2006\beautort-edc-site-9-nit-red-tale-070221.xls Tab: Export after BMPs 1 3/15/2007 Tar, -Pamlico Stormwater Rule 15A NCAC 28 .0258 Last Modified 5/23/03 Catchment 2: Total acreage of catchment 2 = ' 2.13 ac First BMP's TN removal rate = '�' :15' -a. % First BMP's TP removal rate - 15 Second BMP's TN removal rate = 1 35 % Second BMP's TP removal rate 4545: Third BMP's TN removal rate = % Third BMP's TP removal rate =l -�1% I % TOTAL TN REMOVAL RATE= 44.75 % TOTALTP REMOVAL RATE = 53.25 % (b 2l (3) (4) (5} Type of Lnnd Goscr Ci tel� lien S.M. FoYmWa Average FMC o !.; Column -Average Emc o Colomil Acr88 e 1 £ .... 2 3 �•.' b- -' Transportation mlpcn loos :: 0.22 3.76 2.60 2.15 0.19 0.16 In per D.54 3.76 1.95 3.96 0.11 0.22 blanagcd pernods - 1.22 3,76 1.42 6.51 0.28 1.28 Wooded pen tour 0.01) 3.76 0.94 0.00 0.14 0.00 Area takes . by BMR; 0.15 3.76 1.95 1.10 0.11 0.06 Fraettdn Imperrmus {1}* 0.36 I're-BMPTN :: 13 71 ! Pre-BMPT. 1.73 Lead (Ib/yr)',:: ;' Load (fb/yr) 2 I otal Area nT Development 2.13 1're-BLIP 7`N - fiA4 - pre-BMPT 0.81 Expnrt(IbfacYyr: ,1;zport(Ib/ac%yr Poi IfDIP'I:. 7.56 Post-8M11P T 0.81Loud (Iblprp::'. (tblyej;,'.. Post B11P 3.56 . 1 on-BMPT 038 F.x _pit (Ib/axdy'i ,Ez ort (Ib/nctvr Catchment 3: Total acreage of catchment = 2.5 ac First BMP's TN removal rate = F 20 1 % First BMP's TP removal rate = 20 % Second BMP's TN removal rate = 3I I % Second BMP's TP removal rate =1� 41 1 % Third BMP's TN removal rate=��% Third BMP's TP removal rate =)_• - I% TOTAL TN REMOVAL RATE = 44.8 % TOTAL TP REMOVAL RATE= 52.8 % 7v pe of Land Gozer .! Cate111hCnf S.M1t. Formula 1verof kveragC tMC of Golumnl,;! Acres a OS1 +9.1I TN m 1. 4 :' Tp m h 2 3 •: b' raasportahon impl,rvldus : ' 0.9U - 3.79 2.611 8.86 0.19 0.65 Roofmpcn loos 0.00 3.79 1.95 0.00 0.11 0.00 Managed pentPVS'`: 1.10 3.79 1.42 5.91 0.28 1.17 Wooded pervmus 3.79 0.94 0.00 0.14 0.00 Arm ta6ea u 0.50 3.79 1.95 3.69 0.11 0.21 P'radidn Impervious II}: 0.36 Ile&BMP TN . 18.46 PMI' T reB 2.02 I otal Area of Development 2.50 I're-BMP7EV : 7.39 PrCBMp-r :: 0.81 Fxport(Ib(ae/yi ;E%port(Ib7agtV* PosLBMP TN 10.19 pma BMp T_. 0.95 Leal phlyrp,:: Lded (lbtyrjj:; Post BMP T;\ 408 Post BMPT. 038 ixport(Ib/act>r Fzpert(Ib(ac/yr \\F-PC1\Server_Dala_W\DIOx _gen\D101x_excel\D1012_gen_excel\RBM\2006\beaufon-edc-site-9-nit-red-talc-070221.xis Tab: Export after BMPs 2 3115/2007 Tar -Pamlico Stormwater Rule 15A NCA C 2B .0258 Nutrient Loadinjes front the Catchments: Last Modified 5/23/03 catchment 2.03 3.24 0.36 catcbmewt'2. 2.13 3.56 0.38 ..... . alte im PC 2.50 4.08 0.38 :T6TA,i.,.0.6,R.DEIIELOPIkIENT 6.66 3.65 0.37 Note: The nutrient loading goals are 4.0 lb/ac/yr for TN and 0.4 lb/ae/yr for TP. If the post -development nutrient loading is below these levels, then the BMPs planned are adequate. Otherwise, additional BMPs and/or modifications in development plans are required. U-M\Server — Data—W\D1Oxx_9enU1O1x exceIRD1012gen excel\RBM\2006\beaufoM1-edc-site-9-nit-red-�Ic-070221.xis Tab: Export after BMPs 3 311512007 M3 IY.ICDAVID ASSOC.ATES, INC. Engineers • Planners • Land Surveyors CORPORATE OFFICE (252) 753-2139 • Fax (252) 753-7220 E-mail: mai@mcdavid-inc.com 3714 N. Main Street • P.O. Draw 49 Fartnville, NC 27828 Mr. William J. Moore North Carolina Division of Water Quality Washington Regional Office 943 Washington Square Mall Washington, NC 27889 Dear Mr. Moore, January 26, 2007 GOLDSBORO OFFICE (919)736-7630• Fax(919) 735-7351 E-mail: maigold@mcdavid-inc.com 109 E. Walnut Street • P.O. Box 1776 Goldsboro, NC 27533 MAR 0 7 2007 SUBJECT: Stormwater Permit SW7061016 Beaufort County Industrial Park Lot 9 Site Development In reference to the subject project and in response to your January 10, 2007 correspondence (Moore to Paul Spruill), the following paragraphs are itemized to correspond to your request for additional information: Stormwater/design calculations are included in the enclosed narrative. 2. Clean -outs are not intended to serve as overflow outlets. In the event of a large storm event, stormwater flow will spill over retention/grass Swale structures and bypass naturally into the roadside ditch that fronts the property. Plans have been revised to show clean -out elevations in bioretention areas. Clean -outs are proposed to serve as a method of flushing perforated drainage pipe in the bottom of structures in the event of a blockage. Bioretention areas are designed to treat in excess of the one (1") inch storm event as demonstrated in the enclosed narrative. 4. Bioretention supplement sheets are enclosed for your review. A draft operation and maintenance agreement is enclosed that can be executed upon your approval. 5. Beaufort County soil survey data classifies the soil as leaf silt loam (copy of soil map extract enclosed). The seasonal high water table is identified to be between 0.5-1.5 feet. The classification of the soil appears to have been performed when the area was wooded. At some time, the property was cleared and an underdrain system installed to support agriculture activities. Page Road was constructed with road side ditches that further assist in lowering the water table. The proposed invert of retention structures is approximately two (2') feet below the current natural ground elevation where approximately two (T) feet of fill material is proposed to be used to build up the site for construction of the building and parking facilities. Retention structures are proposed to be lined with geosynthetic material and filled with planting soils that offer better D906RBM07 1 1:03 PM BEAU-CO-IND-PK-STRM W TR-PER-DW Q-070122-OOI .wpd 070122 permeability than existing leaf soils. The combination of fill material, liner installation and minimization of invert to drain pipes will be sufficient to avoid potential impact from the water table. 6. The property is 6.6 acres. The back portion of the property will remain undisturbed. Plans show catchment areas for three (3) distinct drainage areas. Stormwater treatment will be accompanied by bioretention and grass swales. Stormwater will ultimately be discharged to the roadside ditch of Page Road where it will technically receive additional treatment before it ultimately discharges to a downstream tributary of Tranter's Creek. A vegetation plan is included in the enclosed narrative for bioretention areas. 8. A sedimentation and erosion control plan has not been submitted to the Division of Land Resources. The project area is under the jurisdiction of the City of Washington with regard to stormwater permitting. Primary effort has been to develop measures to comply with the City of Washington requirements. Once the City's requirements are addressed, a complete erosion and sedimentation control permit application will be submitted to the Division of Land Resources. 9. One (1) set of revised plans, specifications, calculations and narrative is enclosed for your review. Thank you for your assistance. Please advise as I may provide additional information for your review. Sincerely, McDAVID ASSOCIATES, INC. Richard B. Moore, PE Farmville Office RBM:fla Enclosures cc: Paul Spruill D906RBM07 BEAU-CO-IND-PK-STRM WTR-PER-D WQ-070122-001.wTd INC PM 070122 Project Map Soils Map — Beaufort County Quick Start 2 Commercial Development — Lot 9 Beaufort County Industrial Park WADIOxx RmMI00x_mw\1)1005_cor —msw\RBM\2006\Bmufon IP Site 9tbcipsite9-wi1-=p.doc 1 1/16/2007 BMP Removal Summary Narrative Coastal Plain of the Tar -Pamlico River Basin Beaufort County Industrial Park — Lot 9 Site Development Background Existing site is a 6.6 acre tract where existing soil is classified as Lenoir loam with a slope less than 2%. Pre -development condition of the site is a managed agriculture field that will be converted into a commercial site. Existing groundwater table is approximately two (2') feet below the ground surface. The goal of the project is to construct a shell building and parking facilities to provide commercial development in Beaufort County within a defined industrial park. The shallow groundwater table poses a potential problem to the use of wet detention structures to provide adequate stormwater treatment to comply with the Tar -Pamlico River Basin strategy. A treatment system consisting of shallow grass swales and bioretention structures is viewed as a preferable alternative due to easier maintenance and better curb appeal for marketing of the completed facility. Design Storm Tar -Pamlico River Basin regulations require treatment of stormwater flows represented by the 1 year, 24 hour storm event. For, Beaufort County, the estimated 1 year, 24 hour rainfall is approximately 3.5 inches. ./ Site Development Proposed impervious area amounts to approximately 2.43 acres that is divided into 3 catchment areas such that no more than 1 acre of impervious area drains to any 1 catchment. Offsite drainage is not an issue as the property and adjacent properties are basically flat such that no offsite drainage impacts the property. 3.5 inches of rainfall over a 24 hour period equates to a runoff rate of approximately 1 cubic feet per second (cfs). Stormwater treatment facilities must be capable of conveying this 1 year storm event. Treatment of the 1 year storm event is proposed to be accomplished through 3 catchment areas Stormwater will be treated by a combination of grass swales and bioretention facilities. The following is a summary of flows associated with the 1 year, 24 hour storm event. 'Drtiras�► $Q-S 'nJ /oca loot s: Pe - arKT of4•4 - cl",ek /o 1001s A-60l„l W:\DIOxx_gen\DIOOx msw\D1005_cmres_msw\RBM\2006\Beaufort IP Site 9\bcip-site9-bmp-at1achment.doc 1 1/19/2007 NOTE: THERE IL A UNDERGROUND IRRIGATION SYSTEM THAT IS NOT SHOWN ON THIS S11TE ' ,w TOPOGRAPHIC MAP. EP ],07 :o p &H M07 ALL DISTANCES ARE HORIZONTAL GROUND gd B` DISTANCES UNLESS OTHERWISE NOTED. 7 R ELEVATIONS REFERENCED TO NCGS 'SwMCO' CPS 1992 rU' ,.e u ` ELEVATION 15.51' A• Y VICIQ��YIYMAP YI jH.T.S.) ;] 6,615 ACRES R�W g0 J ri_b r •. __ v"s 45D.oA0" gR%LEY PARKWAY e 4 E jp3+,60 ST' AA� �� T9R4 x 51Y.63 ]?a \ / e ]6] �0.00 LA 6. 651 \ n ]i• " N 5.286 ACRES i &iR \r nA".> 400. DUB— N N tlo u ],a 1. HOPWOO➢ MARTIN INYO, CERNFY THAT TH73 RUT VAS DRAWN UNDER MY DIRECTION AND SIPERVISIDN FRDN AN ACTUAL SLANGS lA DEED U(SCRIPTIOR] RECORDED IN ROCK 12M PAGE OBI IH THAT THE CRRUR OG CLOSURE AS CALCULATED RY Unruxs AND DEPARTURES IS ➢DEmm I THAT THE BOUNDARIES NOT SIINVEYEO ME SHDVN AS BROKEN LINES PLATTED FROM INFIN- "TIM GOUND IN a 'PAGE AND THAT THIS PLAE VAS PREPARED IN ACCORDANCE GS. A)-N, AS AMENWD VITNESS NY ORIGINAL SIGNATURE, REGISTRATION N1INBER AND SEAL THIS 27 OAT AOVCMBER .AD 2001. REGISTRATICH NUMBER L-15.6 / THAT THE SURVEY CREATE& A sNROlvl,,N pF LAND VIT•IN TK AREA OF A CCMTY OR MNICIPALITT THAT HAS AN ORDINANCE THAT REGULATES PARCELS OF LAND NOMD MARTIN .10 PROFCSSIOAL LAND SWEVETM RECISTRAYION HUNKER- L-I346 REVISMNS I \ v) I I \ I ]n• \ I ]vs IIi Aa \ ]:d O '70 N \ x J 0 5.88� A^RE`' w_ o A.' NA 'A n.R ] Sd IT, ].T \ vA NEE NR AT 13, u.• " )1 427.30' " Dm u 1161:30' J.O. BRILEY.� O.B. .921, PG. 796 AIAAINR11111", ® EXISTING FLAT BAR ■ EXISI NC R/w MON. r.a C Y EXISTING REBM SEAL i 0 EXISTING IRON PIPE LAW A EXISTING PK NAIL O SET NLW IRON PIPE QVE; mA•``,, O SET NAIL "]rygrn uu•„� 0 SET IRON PIPE IN RNE STUMP 0 NO POINT SET B SOIL BORING (SB-1) COMMUNITY WATER 100 0 100 200 300 GRAPHIC SCALE - FEEr TOPOGRAPHIC SURVEY FOR, - 10121 US HWY 17 SONth Vauceb.m North Carolina 285BE DATE, 11-07-01 MAYO AND SCALD P -TDB• STATE NC Beaufort County ASSOCIATES, PA. mMNrv, REAurURT Industrial Park (252) 916-3460 Washington. ton. N.L. 7NRI YgSHINGiON (2S2) 633-3736 FAX Bern, N.C. - (252) 9>S-3>30 FAX FILE NOS 0II0-9 1 Year, 24 Hour Storm Event Comparison Pre -development Acreage Max length travel (feet) Change in height over outlet (ft) c factor Intensity (i) Runoff Calculation Q = ciA Q = (0.30)(0.15)(6.6) Post -development Acreage Max length travel (feet) Change in height over outlet (ft) Slope Time for concentration (Tc) c factor Intensity (i) 6.6 acres 250 ft 1 ft 0.30 0.15 in/hr 0.29 cfs 6.6 acres 450 ft 4 ft 1.00% 4.5 min 0.48 0.15 in/hr Compute c factor acreage c Impervious area 2.38 0.8 Non -impervious area 4.22 0.3 Computed average 0.48 Runoff Calculation Q = ciA Q = (0.48)(0.15)(6.6) Storage Required (0.46-0.29)"(4.5)`60s/min 0.46 cfs 46.85625 cf The following table summarizes storage provided by proposed stormwater management facilities: Catchment Area Storage Summary Catchment Area Bioretention Volume c Grass Swale Total Volume c Length ft Area s Volume c 1 2,290.75 147 12 1,764 4,054.75 2 9,108.00 148 12 1,776 10,884.00 3 4,680.00 300 12 3,600 8,280.00 Total Storage 23,218.75 W:\DlOxx_gen\DIOOx_msw\D1005 coues_msw\RBM\2006\Beaufort IP Site 9\bcip-site9-bmp-attachment.doc 2 1 /19/2007 Proposed storage is adequate to meet the storage needs associated with the 1 year, 24 hour storm event. Proposed stormwater facilities need to ultimately be capable of processing the peak stormwater flow represented by the 10 year storm event. The following is a comparison of peak flow stormwater data. Peak Storm Comparison (10 Year Storm Event) Pre -development Acreage 6.6 acres Max length travel (feet) 250 ft Change in height over outlet (ft) 1 ft Slope 1.00% Time for concentration (Tc) 5 min c factor 0.30 Intensity (1) 7.00 in/hr Runoff Calculation Q = ciA Q = (0.30)(7.0)(6.6) 13.86 cfs Post -development Acreage 6.6 acres Max length travel (feet) 450 ft Change in height over outlet (ft) 4 ft Slope 1.00% Time for concentration (Tc) 1.8 min c factor 0.48 Intensity (i) 7.00 in/hr Compute c factor acrea e c Impervious area . 2.38 0.8 Non -impervious area 4.22 0.3 Computed average 0.48 Runoff Calculation Q = ciA Q = (0.48)(7.0)(6.6) 22.19 cfs Storage Required (22.19-13.86)"(5)'60s/min 2,499 cf (2.5 min x 2 for overland Bow) (4.5 min x 0.4 for impervious) Proposed storage facilities are more than adequate to accommodate the peak flow rate. Conveyance channels need to be designed to make sure that discharge of stormwater from the site does not occur at a rate in excess of the pre -development rate. The 3 grass swales are all designed at a slope of 0.8% where average depth is 2' and computed average perimeter is 12.65'. Velocity and rate of discharge can be computed using Manning's equation: WADI Oxx_gen\D I00x_msw\D1005 cores msw\RBM\200G\Beaufort It, Site 9\bcip-site9-bmp-attachmem.doc 3 1/19/2007 V = 1.486/n(R) y3(S) h The value for n (Manning's coefficient) is based on the roughness for the channel. Based on a loamy soil (0.02) + moderately irregular surface (0.01) + proposed dense vegetation (0.08) + minimal meandering ration (0.02), n is assumed to be a value of 0.13. V = 1.486/(0.13)*(0.95)113*(0.008)1/2 V = 1.0 fps (feet per second) A velocity of 1.0 fps or less is recommended for discharge into a bioretention area consisting of a top layer of mulch material. Storrnwater flow is computed by multiplying the velocity times the area of the channel. Q=VA Q = (1.0)*(12) Q = 12 cfs (cubic feet per second) Stormwater flow following development is less than the pre -development flow, complying with stormwater regulations and erosion and sedimentation control requirements. As part of bioretention structures, an underdrain system is proposed due to the slow permeability rate of the Lenoir loam soil. Additionally, due to the relatively shallow groundwater table, a geosynthetic liner is proposed which will help the facilities to achieve maximum storage volume. As a final consideration of design facilities, storage is evaluated to determine its ability to handle runoff from the 1 year, 24 hour storm event. 3.5 inches over the proposed impervious area of 2.43 acres equates to a total volume of water amounting to (2.43acres*43,560sf/acre*3.5in*1/12in/ft) 30,873.15 cf. Assuming 25% of this volume will be processed through evaporation and infiltration into the natural soil, a 75% stormwater volume equates to (75%*30,873.15) 23,154.86 cf. The proposed 23,218.75 cf of storage accommodates 75% of the total 1 year, 24 hour storm event for the proposed impervious areas. Bioretention Planting Summa Bioretention cells will periodically be inundated with water. Due to the relatively high seasonal high water table (SHWT), the site has been elevated where the bottom of retention cells is only approximately two (2') feet below the existing natural ground elevation. Existing soil material will be removed from the cell areas and replaced with planting soil that offers better permeability. Cells will be lined with geosynthetic material that will help keep groundwater from infiltrating into cells. In general, the middle of cells will contain the most moisture, such that plantings must be well -suited for wet conditions. Planting within bioretention cells will be a combination of hardwood trees in the middle section and shrubs on the perimeter. Hardwood trees are less susceptible to disease and insect damage. The following table summarizes recommended plantings within the cells. W:\DIOxx_gen\DIOOx_msw\D1005 cortes_msw\RBM\2006\Beaufort IP Site 9\bcip-site9-bmp-attachment.doc 4 1/19/2007 Form Common Name Shrub Witch Hazel Shrub Black Willow Shrub Azalea Shrub Spice Bush Shrub Wax Myrtle Shrub American Hazlenut Hardwood Tree Shadbush Hardwood Tree River Birch Hardwood Tree Persimmon Hardwood Tree Smooth Sumac Hardwood Tree American Holly Shrubs and trees should be planted as seedlings (trees approximately 5' in height) where their root formations are allowed to develop within the newly installed planting soil. Plants will grow quickly where their mature spans will be approximately 5' diameter for shrubs and 20' for trees. W:\DIOxx_gen\D100x_msw\D1005_corres_msw\RBM\2000\Beaufort IP Site 9\bcip-site9-bmp-attachment.doc 5 1 /19/2007 11 acn� D.. wntmwy.�wiat. e�ototzy.. mrmw.mo>.ae.wa�++.ww.w..ax• t vtvzam \K-FCt•^xrv� oe. YMIOvym�D101� cono�ony.n_.m�WBMxaaTac�r.��.a..e.�.won++�wl�.pr..a.a. � v6zoW me. wa.a.. Precipitation Frequency Data Server Page 1 of 5 POINT PRECIPITATION s' FREQUENCY ESTIMATES ` FROM NOAA ATLAS 14 North Carolina 35.573 N 77.07 W 29 feet from "Precipitation -Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: Thu Jan 18 2007 Confidence Lirnitsk .._ Seasonali 6� Lo, at onsMa p nOttan4 Info „GIS�da lyMaps k Hel'p Precipitation Frequency Estimates (inches) 5i mmmmmin 1 hrhhr 6 r 12 h yda 7 yA 10 20 30 45 day 11 60 day 0.45 0.72 0.90 1.23 1.53 1.79 1.92 2.30 2.69 3.17 3.68 P 15Q 4.87 5.55 7.51 9.29 11.53 13.85 0.52 0.83 1.04 1.44 1.81 2.14 2.29 2.74 3.21 3.86 4.45 5.02 5.86 6.65 8.95 11.04 13.64 16.35 0 0.59 0.95 1.20 1.70 2.18 2.63 2.82 3.39 3.98 4.99 5.72 6.39 7.36 8.24 10.88 13.28 16.29 19.29 10 0.67 1.08 1.36 1.98 2.57 3.16 3.42 4.11 4.85 5.94 6.81 7.52 8.60 9.55 12.46 15.06 18.46 21.64 25 0.76 1.21 1.54 2.28 3.03 3.81 4.17 5.02 5.97 7.37 8.45 9.17 10.39 11.44 14.72 17.54 21.51 24.85 50 0.84 1.33 1.69 2.54 3.44 4.41 4.88 5.90 7.06 8.59 9.87 10.57 11.89 13.01 16.56 19.51 23.99 27.38 100 0.91 1.44 1.82 2.79 3.84 5.02 5.62 5.81 8.20 9.94 11.46 12.09 13.49 14.68 18.50 21.54 26.55 29.94 200 0.97 1.54 1.95 3.03 4.25 5.67 6.42 7.81 9.47 11.44 13.23 13.73 15.21 16.46 20.55 23.62 29.23 32.53 500 1.06 1.67 2.11 3.35 4.81 6.57 7.55 9.22 11.28 13.677 15.91 16.21 17.69 19.01 23.43 26.46 32.94 36.03 1000 1.14 1.79 2.25 3.64 5.32 7.40 8.62 10.58 13.04 15.58 18.21 18.41 19.75 21.1] 25.75 28.69 35.90 38.73 " q These precipitation frequency estmates are based on a oadial dura8on sedes ARI is the Average Recurrence Interval. iIMl*wlt9X16VBfS10n:%�O f2bie, `,;7. Please refer to the documentation for more Information.NOTE: Formatting forces estimates near zero to appear as zero. http://hdsc.nws.noaa. gov/cgi-binlhdsclbuildout.perl?type=pf&seri es=pd&units=us&statena... 1 / 18/2007 Precipitation Frequency Data Server Page 2 of 5 Partial duration based Point Precipitation Frequency Estimates Version: 3 35.573 N 77.07 N 29 ft 1 2 3 4 5 6 7 8 910 20 30 40 50 80100 140 200 300 500 700 1000 Average Recurrence Interval (years) Thu Jan 18 13:13:01 2007 Duration 48-hr -x- 30-day -�- 10-min 3-hr ->t- 4-day 45-day -�- 15-min 6-hr 7-day-a- 30-min a 12-hr -+- 10-day -+- 60-min -x- 24-hr 20-dau -� http://hdsc.nws.noaa.gov/cgi-bin/hdsc/buildout.perl?type=pf&series=pd&units=us&statena... 1 / 18/2007 Precipitation Frequency Data Server Page 3 of 5 Partial duration based Point Precipitation Frequency Estimates Version: 3 35.573 N 77.07 W 29 ft C C C C C C 6 L L L L L L L L L L L L L L E E E E E E m 1 I I I I I I I I I 1 I I N M V .D m N m C N m N m m m + N Duration Thu Jan 18 l3t13101 2007 L L T T T T T T M T T M L S m m m N m m m m m m I I v a v a v v v a a s M Y M V N f\ m N m m N m Average Recurrence Interval, (wears) 1 -; 0 2100- 5 -- 200 10 -a 500 -1- 25 -11- 1000 Confidence Limits - * Upper bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ARI** 5 10 15 30 60 120 3 6 12 24 48 4 7 10 20 30 45 60 (years) min min min min min min hr hr hr hr hr day day day day day day day = 0.49 0.79 0.98 1.35 1.68 1.99 2.15 2.59 3.02 3.50 4.06 4.53 5.31 6.02 8.11 9.97 12.40 14.77 0.57 0.92 I.15 1.59 2.00 2.37 2.56 3.08 3.59 4.26 4.91 5.49 6.39 7.22 9.67 11.85 14.67 17.44 0 0.65 1.04 1.32 1.87 2.40 2.91 3.16 3.80 4.45 5.50 6.31 6.97 8.02 8.94 11.78 14.26 17.50 20.58 10 0.74 1.19 1.50 2.18 2.83 3.49 3.82 4.60 5.42 6.54 7.49 8.21 9.36 10.35 13.48 16.17 19.83 23.11 25 0.84 1.33 1.69 2.50 3.33 4.20 4.64 5.61 6.65 8.08 9.26 9.99 11.30 12.39 15.91 18.83 23.12 26.55 50 0.92 1.46 1.85 2.79 3.78 4.86 5.43 6.58 7.84 9.42 10.82 11.52 12.94 14.11 17.91 20.96 25.81 29.27 100 0.99 1.58 2.00 3.06 4.21 5.52 6.23 7.58 9.09 10.89 12.58 13.20 14.69 15.93 20.06 23.19 28.63 32.07 200 1.07 1.70 2.14 3.33 4.68 6.24 7.11 8.67 10.49 12.56 14.58 15.04 16.671 17.92 22.33 25.49 31.59 34.92 500 1.16 1.84 2.32 3.69 5.29 7.23 8.38 10.24 12.49 15.06 17.61 17.84 19.40 20.80 25.61 28.66 35.75 38.81 1000 1.25 1.98 2.48 4.01 5.86 8.16 9.59 11.77 14.46 17.21 20.25 20.38 21.79 23.23 28.29 31.19 39.13 41.87 The upper bound of the confidence interval at 90% confidence level is the value which 5%of the simulated quarible values for a given frequency are greater than. "These precipitation frequency estimates are based on a partial duration series ARI is the Average Recurrence Interval. Please refer to the documentation for more information. NOTE: Formatting prevents estimates near zero to appear as zero. * Lower bound of the 90% confidence interval http://hdsc.iiws.noaa.gov/cgi-bin/hdsc/bui ldout.perl?type=pf&series=pd&units=us&statena... 1 /18/2007 Precipitation Frequency Data Server Page 4 of 5 Precipitation Frequency Estimates (inches) ARI** 5 ]0 15 30 60 120 3 6 12 24 48 4 7 (years) min min min min min min hr hr hr hr hr day day 10 20 30 45 60 day 11 day 11 day 11 day 11 day 0.41 0.65 0.81 1.12 1.39 1.62 1.73 2.07 2.42 2.90 3.36 3.81 4.48 5.14 6.98 8.66 10.77 13.01 = 0.47 0.76 0.95 1.31 1.65 1.93 2.06 2.47 2.89 3.53 4.07 4.61 5.40 6.16 8.31 10.30 12.75 15.36 O 0.54 0.86 1.09 1.54 1.98 2.37 2.54 3.04 3.57 4.54 5.22 5.85 6.76 7.61 10.10 12.36 E22 18.09 10 0.61 0.98 1.23 1.79 2.33 2.84 3.06 3.68 4.34 5.40 6.20 6.86 7.88 8.79 11.55 14.00 17.21 20.26 25 0.68 1.09 1.38 2.05 2.73 3.41 3.71 4.47 5.31 6.64 7.62 8.31 9.46 10.46 13.56 16.23 19.97 23.19 50 0.75 1.19 I.51 2.28 3.09 3.93 4.32 5.22 6.23 7.68 8.84 9.50 10.73 11.81 15.16 17. 77 22.15 25.45 100 0.81 1.28 1.62 2.48 3.42 4.45 4.94 5.97 7.16 8.81 10.16 10.75 12.06 13.20 16.81 19.73 24.38 27.70 200 0.86 1.37 1.73 2.69 3.77 4.99 5.60 6.79 8.18 10.01 11.58 12. 99 13.47 14.68 18.51 21.50 26.64 29.90 500 0.93 1.47 1.85 2.94 4.22 5.73 6.51 7.92 9.61 11.76 13.67 14.04 15.43 16.72 20.84 23.86 29.70 32.77 1000 0.99 1.56 1.96 3.17 4.63 6.39 7.35 8.97 10.95 13.22 15.39 15.71 17.01 18.33 22.65 25.65 32.06 34.94 ' The lower bound of the confidence Interval at 90%confidence level is the value which 5%of the simulated quanble values for a given frequency are less than. "These precipitation frequency estimates are based on a oaNal duration maxima series. ARI is the Average Recurence Interval. Please refer to the documentation for more information. NOTE: formatting prevents estimates near zero to appear as zero. Maps - These maps were produced using a direct map request from the U.S. Census Bureau Mapping and Cartoaraohic Resources Tiger Mao Server. Please read disclaimerfor more information. http://lidsc.nws.noaa.gov/cgi-binlhdsclbuildout.perl?type=pf&series=pd&units=us&statena... 1 /18/2007 Precipitation Frequency Data Server Page 5 of 5 LEGEND — State — Connector — County IZ Stream = Indian Resv rZff Military Area CM LakelPond/Ocean National Park — Street E-0 Other Park — Expressway O City —Highway D C$unty6 .8all Scale 1:228503 p gg *average --true scale depends on Inonitoreresolut on Other Maps/Photographs - View USGS digital orthophoto quadrangle (DOO) covering this location from TerraServer; USGS Aerial Photograph may also be available from this site. A DOQ is a computer -generated image of an aerial photograph in which image displacement caused by terrain relief and camera tilts has been removed. It combines the image characteristics of a photograph with the geometric qualities of a map. Visit the USGS for more information. Watershed/Stream Flow Information - Find the Watershed for this location using the U.S. Environmental Protection Agency's site. Climate Data Sources - Precipitation frequency results are based on data from a variety ofsources, but largely NCDC The following links provide general information about observing sites in the area, regardless of if their data was used in this study. For detailed information about the stations used in this study, please refer to our documentation. Using the National Climatic Data Center's (NCDC) station search engine, locate other climate stations within: +/30mlutes ; .,.OR... +ia,+/ti1,, degfee fir of this location (35.573/-77.070). Digital ASCII data can be obtained directly from NCDC. Hydrometeorological Design Studies Center DOCtNOAAMational Weather Service 1325 East-West Highway Silver Spring, MD 20910 (301) 713-1669 Questions?: HDSC.Ouestions(@,noaa.gov Disclaimer http://lidsc. nws.noaa.gov/cgi-binlhdscfbuildout.perl?type=pf&�serics=pd&units=us&statena... 1 /18/2007 UPS Internet Shipping: Shipment Details . Page] of 2 Shipping Create a Shipment p View ITR story or Void Shipment Set Preferences Create A Return Calcu—late Timeand Cost Schedule a Pickup Use Intel�Tools Get UPS Labels, Paks, and More ij Open a UPS Account m eI p— UPS Internet Shipping Demo See how easy it is to ship online using UPS Internet Shipping. .)Watch the demo Home I About UPS I Contact UPS I Getting Started @ UPS.com UPS Uni s Welcome, Selena T. Sutton I Logout Create A Shipment Package j Freight I I International Forms Shipment Details MAR 0 7 2007 DWQ- NARO i Ny ups ',. n (47S CuNF anne ctuN ov— TjC-L VGZ'1 Below are the details for the shipment you selected in History. Address Information Ship To: Shipper: Ship From: � // NC DENR V MCDAVID ASSOCIATES, INC. MCDAVID ASSOCIAT BILL MOORE LISA JOYNER SELENA T. SUTTON 943 WASHINGTON SQUARE 2527532139 2527532139 MALL 3714 NORTH MAIN STREET 3714 NORTH MAIN S WASHINGTON NC 27889-3532 FARMVILLE NC 27828 FARMVILLE NC 2782 Shipment Information Service: UPS Ground Service Shipping: ................. . Package Information Package 1 of 1 Tracking Number: 1ZXX72250392158451 Package Type: Your Packaging Actual Weight: 4.0 Ibs Billable Weight: 0 4.0 Ibs Reference#1: BEAU CO IP 1-06-0307 Billing Information Bill Shipping Charges to: Shipper's Account XX7225 Total: All Shipping Charges in USD Printing Preferences ❑ Use my UPS thermal printer to print labels ❑ Use my UPS thermal printer to print receipts Note: Your invoice may vary from the displayed reference rates. If you require additional information, contact details are available by selecting the Contact the bottom of the screen. https://www.ups.com/uis/create 3/6/07 UPS: Tracking Information Page 1 of' I Home I About UPS i Contact UPS I Getting Started @ UPS.com E a' EE off Ek E EE�`� y,5lai� p[rrgE racking 11 �Fref hi lacaitens„� �.uSSt ,p BusPnns dti4ngg Tracking _Track Shipments Track by Re et fence Get Signature Images Track y-mail Import Tracking Numbersk SMSiracking Track with Quantum View Access Ilex Global View Integrate Tracking Tools Void a Shipment g elm Find Answers to Your Tracking Questions 4Go to Tracking FAQ a Welcome, Selena T. Sutton I Logoul Track Shipments Track Packages & Freight Quantum View Flex Global View Tracking Summary Tracking Number: 1Z XX7 225 03 9215 845 1 $41ie:: Gd C4 aq- prOgrd5S Type: Package Status: r,Deliverecl Delivered on: - 01/29/2007 1:25 P.M. Delivered to: WASHINGTON, NC, US Signed by: WATERS Service Type: GROUND Tracking results provided by UPS: 03/06/2007 8:29 A.M. EST (USA) Printer Friendl'iQ UPS Uni Printer Friend NOTICE: UPS authorizes you to use UPS tracking systems solely to track shipments tend for you to UPS for delivery and for no other purpose. Any other use of UPS tracking syste information is strictly prohibited. E• Back to Shipping History Home i Shipping I Tracking I Freight i Locations I Support i Business Solutions I About UPS I Contact UPS i Getting Started I My UPS i Site Guide I Advanced Search i UPS Global I UPS Corporate Copyright © 1994-2007 United Parcel Service of America, Inc. All rights reserved. Web Site Terms of Use I Privacy Policy I Trademarks I UPS Tariff/Terms and Conditions https l/wwwapps. ups. com/WebTracking/processlnputRequest'?tracknums_dispiayed=5&Type... 3/6/07 STORMWATER CONTROL STRUCTURE MAINTENANCE AGREEMENT PROJECT: Beaufort County Industrial Park - Lot 9 Site Development RESPONSIBLE PARTY: Beaufort County PHONE #: (252) 946-0019 ADDRESS: 121 West V Street Washington, NC 27889 Monthly or after every runoff producing rainfall, whichever comes first: a. Remove debris from trash rack. b. Check and clear orifice of any obstructions. c. Check pond side slopes; remove trash, repair eroded areas before next rainfall. II. Quarterly a. Inspectthe collection system (i.e. catch basin, piping, grassed swales) for proper functioning. Clear accumulated trash from basin grates, and basin bottons, and check piping for obstructions. b. Check pond inlet pipes for undercutting. Repair if necessary. c. Repair any broken pipes. d. Replace rip rap that is choked with sediment. III. Semi -Annually a. Remove accumulated sediment from bottom of outlet structure. b. Check pond depth at various locations. If depth is reduced to 75% or original design depth, remove sediment to original design depth. c. Reseed grassed swales twice yearly. Repair eroded areas immediately. IV. General a. A natural buffer is encouraged along the banks of the bioretention cells where appropriate. Annual mowing can be used to maintain a low buffer. Vegetation along the dam should be mowed on a regular basis to discourage root intrusion. b. Wetland plants are encouraged along cell perimeter; however, invasive species such as , cattails must be moved when they cover the entire surface of the pond. . c. All components of bioretention system to be kept in good working order. d. In case the ownership of the hioreiantion cell transfers, the current owner shall, within thirty (30) days of transfer of ownership, notify the Beaufort County, County Manager's office of such ownership transfer. e. This property and bioretention cell is also subject to the Operation and Maintenance Manual % filed with the register of deeds. I, BeaufortCounty, hereby acknowledge that I am the financially responsible party for maintenance of this bioretention cell. I will perform the maintenance as outlined above, as part of the Certificate of Compliance with Stormwater Regulations received for this project. Signature: Date: I, a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , 20_, and acknowledge due execution of the foregoing instrument. Witness my hand and official seal, Seal My commission expires: D805PBM07 1 - 1 L06 AM BEAU-00-IP-SITE9-STM WTR-CNTRL-STRT-MAINT- AGMT-070126-001.wpd 070126 �V-s, _ r (.{Vita{iR W§. OFFICE USE ONLY Date Received Fee Paid Permit Number �v(� State of North Carolina SW,4� iokiloCo �ko ®WQ WAPDrepartment of Environment and Natural Resources l Division of Water Quality 0 tI10 STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Beaufort County 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Jay coy, Chairman kv05r1Mv.�fE 3. Mailing Address for person listed in item 2 above: 121 West 3rd Street City: Washington State: NC Zip: 27889 Telephone Number: ( 252 1 946-0079 4, Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Contract No. 1 — Civil'Sitework Beaufort County Industrial Park — Lot 9 5. Location of Project (street address): Lot 9,-Page Road, Beaufort County Industrial Park City: Washington County: Beaufort 6. Directions to project (from nearest major intersection): From Washington take US 264 West to its intersection with Leggett Road. Turn right and is on your rignr. 7. Latitude: 350 36' 09" Longitude: 770 05' 26" of project S. Contact person who can answer questions about the project: Name: Richard B. Moore, PE Telephone Number: ( 252 ) 753-2139 II. PERMIT INFORMATION: 1. Specify whether project is (check one): X New Renewal Modification Projec Form SWU-101 Version 3.99 Page 1 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): _Low Density _High Density _Redevelop _General Permit _Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major X Sedimentation/Erosion Control _404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748, III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will travel to grass swales where it will discharge to three (3) bioretention cells 2. Stormwater runoff from this project drains to the Tar —Pamlico River basin. 3. Total Project Area: 6.66 d acres 5. How many drainage areas does the project have? 1 4. Project Built Upon Area: 36.5 % 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. oBasinxInformationt))� yi` Receiving Stream Name u: r kDrainageAreal°qy x's1�6a UT Mitchell Branch � Ar6a "Drainage"-,Z � �_ S,c af.t� Receiving Stream Class C • SW Drainage Area Approximately 200 acres Existing Impervious` Area Approximately 10 acres Proposed Impervious'Area 2.43 acres %Impervious Area (total) 6.22% �.=.z. t I'mpetviotis,, Surface;Arear k On -site Buildings u r + nr is 5, a, r ' ,M�� ..ina e ArearL x ,god.. mwl"r a�4��o- 5.73 acres y 7•Li�+ r"0;_ p�t i' Drainage Area+2 Y,�'t�R y K�l,'WWifiJ].W�(lo -.�n v.,nwan On -site Streets 1.20 acres On -site Parking 5.50 acres On -site Sidewalks Other on -site Off -site Total: 12.43 acres Total: Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. How was the off -site impervious area listed above IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be. provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall he covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required Information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide Information on your behalf, please complete this section. Designated agent (individual or firm): Richard B. Moore PE McDavid Associates, Inc. Mailing Address: PO Drawer 49 City: Farmville Phone: ( 252 ) 753-2139 VIII. APPLICANT'S CERTIFICATION State: NC Zip: 27828 Fax: ( 252 ) 753-7220 I, (print or type name of person listed in General Information, item 2) Jay McRQy. Chairman certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. Date: I0,9.10L Form SWU-101 Version 3.99 Page 4 of 4 MCDAVID ASS®CIATES, INC. INC. Engineers • Planners • Land Surveyors CORPORATE OFFICE GOLDSBORO OFFICE (252)753-2139• F. (252) 753-7220 (919)736-7630• F. (919) 735-7351 E-mail: E-mail: maigold@mcdavid-inc.com 3714 N. Main Street • P.O. Drawer 49 109 E. walnut Street • RO. Box 1776 Farmville, NC 27828 Goldsboro, NC 27533 October 12, 2006 NC Department of Environment of Natural Resources Division of Water Quality 943 Washington Square Mall Washington, NC 27889 SUBJECT: Stormwater Management Permit Lot 9 Site Development Beaufort County Industrial Park Dear Sirs/Madams: In reference to the subject project and on behalf of Beaufort County, please find enclosed the following exhibits in support of a request for a Stormwater Management Permit: Two (2) copies of an executed Stormwater Management Permit Application form. 2. Two (2) copies of final plans consisting of fourteen (14) pages dated June 15, 2006. 3. Two (2) copies of specifications. 4. Two (2) copies of a detailed narrative of proposed stormwater treatment. 5. Permit fee in the amount of $420.00 made payable by McDavid Associates, Inc. check. On behalf of Beaufort County, please advise as we may provide additional information for your review. DECEIVED Sincerely, VID ASS ATES, INC. OCT I 2U1i6 DWQ-WARE R More, PE Farmville Of cc RBM:fla Enclosures D405RBM06 I 9:29am 13EAU-CO-IND-PK-LOT9-STRMWTR-PERM-DWQ.LTR;2 061012 McDavid Associates, Inc. 3714 N. MAIN ST., P.O. DRAWER 49 FARMVILLE, N.C. 27828 C Deoartment of Environment and rhE-K xcmDec: Natural Resources - uwQ Date: 10/11/2006 Check AL: ,ran 4 Invoice -w-vend Date Reference Balance 1669 061011 10/11/OE 1-06-0307-9042 Beau DWQ Permit $42C.00 McDaIAssociates, Inc. 3714 N. MAIN ST., P.O. DRAWER 49 'MC FARMVILLE, N.C. 27828 PH. 252-753-2139 21133 $420.00 Discount $0.00 BB&T 66-112/531 BRANCH BANKING AND TRUST COMPANY 71401 Farmville, North Carolina Exactly: Four hundred twenty and no/ 100 Dollars Attn: Accounting Department PAY NC Department of Environment and Natural Resources- DWQ TO THE ORDER 943 Washington Square Mall OF Washington NC 27889 002113311' t:053101h21,:51hL9?355711' DATE 10/11/200E CHECK NO. 021133 Pa`/ A -mount $420.00 021133 21133 AMOUNT $420.00 OCT 17 2006 NARRATIVE EROSION AND SEDIMENTATION CONTROL PLAN DWQ-WARD LOT 9 DEVELOPMENT BEAUFORT COUNTY INDUSTRIAL PARK BEAUFORT COUNTY Project Description The purpose of the project is to construct a 50,000 SF shell building and parking facilities on lot 9 of the Beaufort County Industrial Park. The project area is located adjacent to Page Road west of the City of Washington. The industrial park is included in the City of Washington's service area. Lot 9 is a 6.6 acre tract which will be completely disturbed as a result of grading and landscaping activities. Approximately 36.5% of the site will be converted to impervious surface. Site Description The site consists of basically flat topography, with slopes less than 2%. The site has long been used for agriculture crop production where grass is planted following harvests. There is no evidence of any erosion at the site. Drainage flows west to a road -side ditch that drains to an un-named tributary to Mitchell Branch of the Tar - Pamlico River Basin. Adiacent Properties Land use in the vicinity of the project is a combination of commercial properties and agriculture. The site is located within a dedicated industrial park. The project is not anticipated to have any adverse impact to adjacent properties. Soils The predominant soil classification in the project area is Lenoir loam. This soil is somewhat poorly -drained where infiltration is rapid and surface runoff is slow. The soil maintains a high moisture content and the seasonal high water table is about two (2') feet. No problem is anticipated in establishing a vegetative cover once construction activities are complete. Soil excavated by construction will be used as backfill in order to minimize the need to haul material from the site for disposal. Backfilling is considered the best use of excavated material as a majority of the ground surface will remain undeveloped (no traffic loading). No offsite disposal of soil is anticipated by the proposed construction activities. Borrow material will be used for proposed building pad in order to meet compaction requirements. Planned Erosion and Sedimentation Control Practices Construction Entrance One (1) gravel driveway is proposed to provide temporary (and permanent) access to the site. This drive will be maintained during the entire length of the project. WAD 10"_g=\D100z_m w\D 1005_cones_m w\RBM\2006\b6p-sitc9-nw.doc 1 7/1112006 2. Land Grading Construction will occur on a dedicated site (lot). As construction activities occur, excavated material will be used to backfill the exposed trench. No excess spoil material is anticipated to result from the project. Following backfilling and compaction, the disturbed area will be seeded and fertilized in order to establish a vegetative cover. 3. Gravel Filter Check Dam In an effort to confine sediment runoff to the project area, check dams will be installed at all outlet locations. Check dams will be checked following each rainfall event. Any noticeable buildup of sediment will be promptly removed to insure that the check dam remains effective. 4. Silt Fence In an effort to minimize the potential for runoff of sediment, a silt fence shall be installed between the existing Page Road and limits of disturbed area. 5. Surface Stabilization/Dust Control The moisture content of existing soils is such that dust is not anticipated to be a problem. The ability to compact existing soils will minimize erosion and sedimentation runoff. CONSTRUCTION SCHEDULE 1. Confirm adequacy of construction entrance to provide access to project site. 2. Perform construction stakeout of work elements for infrastructure 3. Establish temporary check dams and install silt fences as needed. 4. Install drainage/retention structures 5. Construct infrastructure 6. Prepare disturbed area for seeding. 7. Inspect gravel check dams weekly and following each rainfall event. Make repairs as necessary. 8. Once infrastructure is complete, immediately perform landscaping. 9. Estimated time of project area disturbance: 8 weeks. W:\DI Oxx_gen\D IOOx_m MDI005_cor es_msw\RBM\2006\bcip-site9-nar.doc 2 7/11/2006 MAINTENANCE PLAN All erosion and sediment control practices will be checked for stability and operation following every runoff -producing rainfall and/or at least once every week. Any needed repairs will be made immediately following an inspection. 2. Sediment shall be removed from behind check dams once it becomes approximately four (4") inches deep. Check dams will be repaired as needed to maintain establishment. 3. Sod will be continuously irrigated, mulched, and fertilized as needed to establish and maintain a vigorous vegetative cover. ATTACHMENTS 1. Aerial project map. 2. Soil Survey Panel Extract 3. USGS Quadrangle map extract 4. Tar -Pamlico River Basin Stormwater Summary WAD 10"_g=IDI 00x_mcw\DI 005_cor cs_m w\RBM12006Ibcip-site9-nu.doc 3 7/11/2006 Ul 0C d:1,VlWhill WAD I Oxx_gen\]) I 00x—mw\D I 005—coffes—msw\R]3MU006\bcip-sitc9-nu. doc 4 7/11/2006 '��, 1�� s 4 .q eC 'li `1 —1 � q . .ram Tf9 �� s f 1 x6R Y.e w a h i.� to As Vgol tt a Top oZone - The Web's Topographic Map . Page 1 of I !=o ozone- ghl I P3 I bUft IM, Z ds DaVw \04spel iShaw g�i Nr 17 Xpe t. k 29 *v J, Rli v V.-3 V.0 V.V I.Z 1.3 KIII ky 0 0.2 0.4 0.6 0.8 1 Mi Map center is 350 36' 09"N, 770 05'26"W (WGS84/NAD83) Washington quadrangle Projection is UTM Zone 18 NAD83 Datum G=-1.218 http://ww-w.topozone.conilprint.asp?z=18&n=3941889&e=310638&size=l&u=6&datum=n... 7/3/2006 Tar -Pamlico Stormwater Rule 15A lvi:AC 2B .0258 Coastal Plain of the Tar -Pamlico River Basin: Includes Greenville and Washington as well as Pitt and Beaufort l:otmties Last Modified 7/11/2006 Total Nitrogen and Total Phosphorus Loading Calculation Worksheet (Automated) Project Name: Beaufort County Industrial Park - Lot 9 Site Development Date: July 11, 2006 By: Richard R. Moore, P.E. Checked By: Directions (same for pre -development and post -development tables): > Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the values in light blue.' > Compare total areas of development in pre- and post- tables for consistency (bottom of column (2)), and also for consistency with the site plans. If all of these values are not the same, there is an error that must be corrected. > Unless drainage onto the development from offsite is diverted around or through the site, offsite catchment area draining in must be included in the acreage values and treated. Pre -development: ;� ...:�of)vah� � tiYe'riii:ili'e' :ii:i€ S:MiF:ai+piula: eApeta'@:AMC::, n:::::::: Colv�..::.:..t1........ 9tra k......�'L.............................. 3 :�:. : o z m w x ?< `T'tarispo:rCattan 3inpe nits 0.51 2.60 0.00 0.19 0.00 us 0.51 1.95 0.00 0.11 0.00 f2<MQeage':peiiYioy9s 0.51 1.42 0.00 0.28 0.00 l >i;Mauaggil_peiaoys;;;> 0.51 4.23 1437 1.23 4.18 1N ivagedpecys foie iii' 0.51 2.04 0.00 0.62 0.00 WdislPeCYig!uBisj>':>. 0.51 0.95 0.00 0.14 0.00 '" of ii;;;Tf1Ei6a81u' l ea31::: y� .$ >4 Y 1437 4.18 6.66 `xia. ......:::::::t:::t:t: 2.16 TF k X;• ,: 0.63 Post-development: iiEirii� �'.cio7iie'niFCo�epiiii iiiiiA?ce@ii YP ;:: orniul iSM..F............9....:.........g .A.eza eaEi�IC'€;i;CoW ..........:..........................,...,.:..:�&::.:.:.,»:..»>;;:<.::.:.:.:.: ................. . i'0['1`M':itt' 2.... ;h:m brT . .... 3.. 2.. 6.: �Traii9parp4ivn)iiipeFvjous: 3.84 2.60 12.93 0.19 0.95 i'R4.afC:ci'v[oggs:'s;'��s; ..:.: P ............:.................. 3.84 1.95 8.58 0.11 0.48 s;;A7a4 [kl#U5!ii`.ie` llkd.lt .........:...:.:.:.:.....:... 3.84 1.42 23.03 0.28 4.54 '.i'11loodtil`crviapsi;i P,...:...:.................... 3.84 0.94 0.00 0.14 0.00 . ..Frastioulmpbrvwustf)s 037 "1'NT.oadta', 44.54 TPJ..Coading 5.97 6.66 lly;l" i;:CAeff0.90 6.69 TP. z "lGoet w...... :'f...........teR:o[.LfevelP .menq Note: The nutrient loading goals are 4.0 lb/ac/yr for TN and 0.4 lb/ac/yr for TP. If the post -development nutrient loading is below these levels, then no BMP is necessary. Otherwise, the next worksheet calculates post -development TN and TP loadings after BMPs are installed. \\F-PC11Server_Data _1MD10xxyen\D101 x_exrel\D1012_gen_excel\RBM\2006\beaufort-edc-site-9-nit-red-calc.xls Tab: Export before BMPs 1 7/11/2006 Tar-PamlicoStormwater Rule 15ANCAr 2B.0258 Coastal Plain of the Tar -Pamlico River Basin: Last Modified 5123103 Includes Greenville and Washington as well as Pitt and Beaufort Counties BMP Removal Calculation Worksheet (Automated) Project Name: Beaufort Courrte /uuhu.strial Park -Lot 9 She Development Date: July 1/ 2006 By: Richard B. Moore, Y.E. Checked By: Directions: > it may be advantageous to split the development into separate catelunents to be handled by separate BMPs. The tables below allow the development to be split into as many as three catchments, and can be copied for greater than three. NOTE: Unless nmoff flowing onto the development from offsite is routed separately =and or through the site, the offsite catchment area draining in must be included in the acreage values of the appropriate land use(s) and treated. > Above each table: Enter the catchment acreage in the top green blank. Based on a comparison of the post -development TN and TP export coefficients you calculated above to the rule requirements of 4.0 Ib/ac/yr TN and 0.4 Ib/ae/yr TP, select BMP(s) from the list for treating the catchment runoff. Enter the chosen BMP(s) nutrient removal rates in the green blanks. If more than one BMP is to be used in series, the combined removal rates will be calculated automatically in the blue blanks. > Catchment Tables: Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the light blue boxes. NOTE: Compare the Total Catchment Acreage for the Development (final table) to the value you established in the pre-BMP worksheet tables, and also to the site plans, for consistency. All of these values need to be the same .. `u ..... BMP VueiDetefiippPopd 25 40 NC BMP Manual Nutrient SfuM:tiatFr'iHpUasdi€ 40 35 NC BMP Manual Removal $?!! LtQ(ej 35 45 NC BMP Manual Rates $ioi ¢eriijj k t[ 35 45 NC BMP Manual 20 20 NC BMP Manual �?@et9tei{�IiibtiNi{iftiF 20 35 NC BMP Manual 10 10 NC BMP Manual Catchment I: Total acreage of catchment I = ac First BMP's TN removal rate = 2 % First BMP's TP removal rate = % Second BMP's TN removal rate Second BMP's TP removal rate = % Third BMP's TN removal rate = % Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE = 48 % TOTAL TP REMOVAL RATE = 56 % :.°' 21i'm'eaf s[is�yipoF,E;andG'aveE�af......: ....... S'M11rFUiroola'Ave'.......MCi6 .. r........... .......�...........................:.:.:.:.:.:..:.:.:..:.......................:.....:.... ::i€'Cclumu>: �Auo'....BMC:y. ;:S:;eolnitiu:;: 'si1SU'i',',fiiou3mper4fpp9 4.29 2.60 1.90 0.19 0.14 l�4Vf;ijipel!y14!19 4.29 1.95 4.52 0.11 0.25 >l:Mpda'ge3pei.;vious°:;;i°.;5 4.29 1.42 5.48 10.28 11.08 �3lttidEpcitiiaaF<izi< 4.29 0.94 0.00 0.14 0.00 [ AieBaeklnugti'yBNIF''s' ......................................................... 4.29 1.95 0.84 0.11 0.05 0.42 € ,.,P, e•BTvtt! . , 12.73 €..P 1 2 aratAte9;ptthy¢lopmept;;,;;; 1.71 €� B i....P... r� .MP... ::. 7. ie AMPT 89 srt see o�' .u�e�r .Pus[ Bh1Y 6.62 POef 19MYT; 0.67 ` . ... Goad Qblyr),`. Load (ifli.(ye);, Paso-�Mt 3.87 PAFfttgCT,, 039 $zpotttlblaefyf� Export(Ibfac/y \\F-PC1\Server_Data_W \D l Om_gen\0101 x_ecceaD 1012_gen_axceORBMt2006\beaufortadosite-9-nil-red-mlcxls Tab: Export after BMPs 1 7/11/2006 Tar -Pamlico Stormwater Rule 15A NCA0 2B .0258 Last Modified 5/23103 Catchment 2: Total acreage of catchment 2,, ac First BMP's TN removal rate R % First BMP's TP removal rate = ;2�' Second BMP's TN removal rate = as. , % Second BMP's TP removal rate = , 4�... % Third BMP's TN removal rate = % Third BMP's TP removal rate = " " % TOTAL TN REMOVAL RATE= 48 % TOTAL TP REMOVAL PATE= 56 % Type Pf:LOil.CAtCbpK'Rt, ?'hi F.orpmlA Avenggi;llAo ."%Ipmn ,AvW'a$C rfilWr.,o .: ...: Culemn';; . :1'+5. :.T:N ... _ .:.6_. (ETrdusperiafluitimpCYi6u8�'? 433 2.60 2.46 0.19 0,16 60[iippe!i6g6;[;i;z 433 1.95 4.56 0.11 0.26 lyigryg�apeYe76pit?;°.a? 433 1.42 5.54 0.28 1.09 Stooded„peryous��:;�;� 433 0.94 0.00 0.14 0.00 ���[kreatek:eeuQ4y8MP 433 1.95 1.27 0.11 0.07 »3P,rA Eiou im e.. dur. �. 0 €€:Udall?(EbIY 1384 . "'SNPT 160 TD d � €iYreiBA1P� :�. 7.65 re. :: �9rt.(IbiA51.' 0.68 7.20 t P. uci 81HP0.70 Eea BMP]'' 3.98 T: f.R . -Bh1P 039 I Y4 Catchment 3: Total acreage of catchment 3 = ac First BMP's TN removal rate = % First BMP's TP removal rate = % Second BMP's TN removal rate = % Second BMP's TP mmoval mte = 3 % Third BMP's TN removal rate = % Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE - 48 % TOTAL TP REMOVAL RATE = 56 % eafU4nd:CDYdrfSCdtepgEciK:4;M;Fotmpla:Av:. aA��:fabtai4kAy@Y?CFiMC;A.;iC918mp T't9ispAtgtloQiuperi!�ous� 3.79 2.60 8.86 0.19 0.65 R646kripetYidi!9':;.?;! 3.79 1.95 0.00 0.11 0.00 i`:Eil?{A6.�.:",.y?ef}30,U8E;"° 3.79 1.42 5.91 0.28 1.17 ' t::60d ,pejryaq!is ::!`; 3.79 0.94 0.00 0.14 0.00 r;Areq;i`skiej'ppDy81tiI 3.79 1.95 3.69 0.11 0.21 i'.i . F ian Im e�vtoua. .......................... iiPr'aBA1R:' 18 .46 P'P [fYfR.At....... ? 2.02 pre BNP 739 PRe 8 iiPT 0.81 9.60 Na . ..... T 0.89 1: a...c1.:.Y...:. ;iiE,d A..[tb..... Y. . 3.94 afi=BirlP. T. :'�'��Yae" '/ 036 �Ex �urt'ItiPecd�'�- EY lirtItii \\F-PCIGServer Data_W\D10xx_gen\Dl01x exceaD1012_gen exc rRBM\20061beaufortedc-slle-9-nit-redr le.rds Tab: Export after BMPs 2 7/11/2006 Tar -Pamlico Stormwater Rule 15A NCAr 2B .0258 Last Modified 5123/03 Nutrient Loadings from the Catchments: ea[i5meut7i;;1.00 3.87 039 ?iCatcS,irieutZi";;; 1.81 3.98 039 �,aicAmEpC � � 2.50 3.84 036 l'pTq'.j<71p1'.IiOIIV`.t 531 3.89 037 Note: The nutrient loading goals are 4.0 Ib/ac/yr for TN and 0.4 lb/ac/yr for TP. If the post -development nutrient loading is below these levels, then the BMPs planned are adequate. Otherwise, additional BMPs and/or modifications in development plans are required. \\F-PC1lServer Data W\D10u_.Uen\D101x e ex M1012_gen exmRRBM@006\beaufont d0-siteg-nit.md-wlc.xb Tab: Export after BMPs 3 71112006 BMP Removal Summary Attachment Coastal Plain of the Tar -Pamlico River Basin Beaufort County Industrial Park — Lot 9 Site Development Background Existing site is a 6.6 acre tract where existing soil is classified as Lenoir loam with a slope less than 2%. Pre -development condition of the site is a managed agriculture field that will be converted into a commercial site. Existing groundwater table is approximately two (2') feet below the ground surface. The goal of the project is to construct a shell building and parking facilities to provide commercial development in Beaufort County within a defined industrial park. The shallow groundwater table poses a potential problem to the use of wet detention structures to provide adequate stormwater treatment to comply with the Tar -Pamlico River Basin strategy. A treatment system consisting of shallow grass swales and bioretention structures is viewed as a preferable alternative due to easier maintenance and better curb appeal for marketing of the completed facility. Design Storm Tar -Pamlico River Basin regulations require treatment of stormwater flows represented by the 1 year, 24 hour storm event. For Beaufort County, the estimated 1 year, 24 hour rainfall is approximately 3.5 inches. Site Development Proposed impervious area amounts to approximately 2.43 acres that is divided into 3 catchment areas such that no more than 1 acre of impervious area drains to any 1 catchment. 3.5 inches of rainfall over a 24 hour period equates to a runoff rate of approximately 1 cubic feet per second (cfs). Stormwater treatment facilities must be capable of conveying this 1 year storm event. Treatment of the 1 year storm event is proposed to be accomplished through 3 catchment areas Stormwater will be treated by a combination of grass swales and bioretention facilities. The following is a summary of flows associated with the 1 year, 24 hour storm event. W:\3)10xx_gen\D I OOx_msw\D1005_comes msw\RBM\2006\Beaufort IP Site 9\bcip-site9-bmp-attachment.doc 1 7/11/2006 I Year, 24 Hour Storm Event Comparison _Pre -development Acreage 6.6 acres Max length travel (feet) 250 ft Change in height over outlet (ft) 1 ft c factor 0.30 Intensity (i) 0.15 in/hr Runoff Calculation Q=ciA Q = (0.30)(0.15)(6.6) 0.29 cfs Post -development Acreage 6.6 acres Max length travel (feet) 450 ft Change in height over outlet (ft) 4 ft Slope 1.00% Time for concentration (Tc) 4.5 min c factor 0.48 Intensity (i) 0.15 in/hr Compute c factor acreage c Impervious area 2.38 0.8 Non -impervious area 4.22 0.3 Computed average 0.48 Runoff Calculation Q = ciA Q = (0.48)(0.15)(6.6) Storage Required (0.46-0.29)' (4.5)'60s/min 0.46 cfs 46.85625 cf The following table summarizes storage provided by proposed stormwater management facilities: Catchment Area Storage Summary Catchment Area Bioretention Volume c Grass Swale Total Volume c Length ft Area s Volume 1 2,290.75 147 12 1,764 4,054.75 2 9,108.00 148 12 1,776 10,884.00 3 4,680.00 300 12 3,600 8,280.00 Total Storage 23,218.75 W:\1)10 x_gen\D100x_mswiD1005_comes_mswaBM\2006\Beaufort IP Site 9\bcip-si1e9-bmp-attachment.doc 2 7/11/2006 �1 1 Proposed storage is adequate to meet the storage needs associated with the 1 year, 24 hour storm event. Proposed stormwater facilities need to ultimately be capable of processing the peak stormwater flow represented by the 10 year storm event. The following is a comparison of peak flow stormwater data. Peak Storm Comparison (10 Year Storm Event) Pre -development Acreage Max length travel (feet) Change in height over outlet (ft) Slope Time for concentration (Tc) c factor Intensity (i) Runoff Calculation Q = ciA Q = (0.30)(7.0)(6.6) Post -development Acreage Max length travel (feet) Change in height over outlet (ft) Slope Time for concentration (Tc) c factor Intensity (i) 6.6 acres 250 ft 1 ft 1.00% 5 min 0.30 7.00 in/hr 13.86 cfs 6.6 acres 450 ft 4 ft 1.00% 1.8 min 0.48 7.00 in/hr Compute c factor acreage c Impervious area 2.38 0.8 Non -impervious area 4.22 0.3 Computed average 0.48 Runoff Calculation Q=ciA Q = (0.48)(7.0)(6.6) Storage Required (22.19-13.86)-(5)'60s/min 22.19 cfs 2,499 cf (2.5 min x 2 for overland flow) (4.5 min x 0.4 for Impervious) Proposed storage facilities are more than adequate to accommodate the peak flow rate. Conveyance channels need to be designed to make sure that discharge of stormwater from the site does not occur at a rate in excess of the pre -development rate. The 3 grass swales are all designed at a slope of 0.8% where average depth is 2' and computed average perimeter is 12.65'. Velocity and rate of discharge can be computed using Manning's equation: W:\DIOxx_gen\1)100x_msw\D1005_comes msw\RBM\2006\Beaufort IP Site 9\bcip-site9-burp-attachment.doc 3 7/11/2006 V = 1.486/n(R) 113(S) x The value for n (Manning's coefficient) is based on the roughness for the channel. Based on a loamy soil (0.02) + moderately irregular surface (0.01) + proposed dense vegetation (0.08) + minimal meandering ration (0.02), n is assumed to be a value of 0.13. V = 1.486/(0.13)'(0.95)7J3'(0.008)"2 V = 1.0 fps (feet per second) A velocity of 1.0 fps or less is recommended for discharge into a bioretention area consisting of a top layer of mulch material. Stormwater flow is computed by multiplying the velocity times the area of the channel. Q=VA Q = (1.0)*(12) Q = 12 cfs (cubic feet per second) Stormwater flow following development is less than the pre -development flow, complying with stormwater regulations and erosion and sedimentation control requirements. As part of bioretention structures, an underdrain system is proposed due to the slow permeability rate of the Lenoir loam soil. Additionally, due to the relatively shallow groundwater table, a geosynthetic liner is proposed which will help the facilities to achieve maximum storage volume. As a final consideration of design facilities, storage is evaluated to determine its ability to handle runoff from the 1 year, 24 hour storm event. 3.5 inches over the -proposed impervious area of 2A3 acres ecivates o a total vo ume of —water amounting to (2.43acres'43,560sf/acre"3.5in'1/12in/ft) 30,873.15 cf. Assuming 25% of this volume will be processed through evaporation and infiltration into the natural soil, a 75% stormwater volume equates to (75%"30,873.15) 23,154.86 cf. The proposed 23,218175 cf of storage accommodates 75% of the total 1 year, 24 hour storm event for the proposed impervious areas. �31rjiu F, r/� W:\DIOxx_gcn\DIOOx—mw\DI005—cor es_msw\RBM\2006\Beaufort IP Site 9\bcip-site9-bmp-attachment.doc 4 7/11/2006 ---------- -- - --------------------- -------- -- -----�j---- - -- I I - --- - -- - -------------- - - --�- Ix' - --- -- --- ' _ fi ------- -- - --- I . -- --- - ` - - ---- --- -- �---�---i-- -- --------�-----{ ----- --- - - _- - - - - - ---------r----- --- - --=- ----- --- - �I -- - -- - -- - - - -------��-_`��.--- ---- -- -- It--- -- - --- - - - - --- ------------------------- -- - - -j� --- -- ---- -yl -- - L1 - -- --------------- -- ---- - II -- -�---- - - - -- ----------------------------- i - - - - ----- _ _--- -- -- ------ - ---- -I -- -- - - - -- - --- -- ---------------- - - I - �� -- - - - i I _- ------- - -- �i. -- -- -r --- - - -- -- �� �I) ATF9 1;1Or n�—{ � Y CERTIFIED MAIL 7006 0100 0000 8379 4935 County of Beaufort Attn: Mr. Paul Spruill PO Box 1027 Washington, NC 27889 Dear Mr. Spruill: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality March 5, 2007 Subject: RETURN Stormwater Project SW7061016 Industrial Park - Lot 9 Beaufort County This office received a stormwater application for the subject project on October 17, 2006. By letter dated January 10, 2007 (copy attached), additional information was requested to complete your stormwater application. As of today, this information has not been received; therefore, your project is being returned as incomplete. Please be advised that construction of the proposed facilities without a valid permit is a violation of 15A NCAC 2H.1000 and North Carolina General Statute 143-215.1 and may subject you to appropriate enforcement actions in accordance with North Carolina General Statute 143-215.6. Civil penalties of up to $10,000 per day per violation may be assessed for failure to secure a permit required by North Carolina General Statute 143-215.1. If you decide to pursue the project in the future, you must submit a stormwater application package, along with plans and specifications, and a permit processing fee. If you have any questions or comments concerning this matter, please call Mr. Bill Moore, or me, at the Washington Regional Office at (252) 946-6481. Sincerely, Al Hodge, Regional Supervisor Surface Water Protection Section Washington Regional Office cc: Land Quality - Washington Office Beaufort County Planning/Inspections Central Files Washington Regional Office N''o��`nnCaroli ,n�atura!! North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service Internet h2o.en .slate.ac.us 1 943 Washington Square Mall, Washington, NC 27889 1-877-623-6748 BTU S Postal Service.. �L CERTIFIED MAIL. RECEIPT (DomesticMail Only; NoInsurance Coverage Provided) '. For tlelivery,intormatlon visit our wetisita at www.usps.com®13 , .. _ 0 ®_ post,postage C3 (Endommnt Required)Here 0 0 Restricted Delivery Fee PS Form 3a00; Junc 20a2 �:`. ._'�� ,�,WSee flevei5oifoi lnsVuciionY 0 l W�►-L �ek a4x FINANCIAL RESPONSIBILITY/OWNERSHIP FORM t13110 7 SEDIMENTATION POLLUTION CONTROL ACT No person may initiate any land -disturbing activity on one or more acres as covered by the Act before this form and an acceptable erosion and sedimentation control plan have been completed and approved by the Land Quality Section, N.C. Department of Environment and Natural Resources. (Please type or print and, if the question is not applicable or the e-mail and/or fax information unavailable, place N/A in the blank.) . Part A. 1. Project Name: 2. Location of land -disturbing activity: County: Beaufort City or Township: Highway/Street: 3. Approximate date land -disturbing activity will ID �j-�1 JAN 3 0 2007 ` 7s 4. Purpose of development (residential, commercial, industrial, institutional, etc.):commercial 5. Total acreage disturbed or uncovered (including off -site borrow and waste areas):6.66 LG.ND QUALITY SECTION REGIONAL OFFICE 6. Amount of fee enclosed: $350.00 . The Express Permitting application fee is a dual charge. The normal fee of $50.00 per acre (rounded up to the next acre) is assessed without a ceiling amount. In addition, the Express Permitting supplement is $250.00 per acre up to eight acres, after which the Express Permitting supplemental fee is a fixed $2,000.00 (Example: 9 acres total is $2,450). 7. Has an erosion and sediment control plan been filed? Yes No Enclosed X 8. Person to contact should erosion and sediment control issues arise during land -disturbing activity: Name: Richard B. Moore, P.E. E-mail Address: rbm(a)mcdavid-inc com Telephone: (252) 753-2139 Cell # (252) 714-1563 Fax # (252) 753-7220 9. Landowner(s) of Record (attach accompanied page to list additional owners): Beaufort County (252) 946-0079 (252) 946-7722 Name Telephone Fax Number 121 West 3rd Street 121 West 3id Street Current Mailing Address Current Street Address Washington NC 27889 Washington NC 27889 City State Zip City State Zip 10. Deed Book No. Page No. Provide a copy of the most current deed. Part B. 1. Person(s) or firm(s) who are financially responsible for the land -disturbing activity (Provide a comprehensive list of all responsible parties on an attached sheet): Beaufort County paul spruill(cDncmail net Name E-mail Address 121 West 3rd Street 121 West 3 d Street Current Mailing Address Current Street Address Washington NC 27889 City State Zip Washington NC 27889 City State Zip Telephone: (252) 746-7031 Fax Number: (252) 746-7075 .. 2. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address of the designated North Carolina Agent: Name E-mail Address Current Mailing Address Current Street Addr City State Zip City Telephone Fax Number (b) If the Financially Responsible Party is a Partnership or other assumed name, attach a copy of the Certificate of Assumed Name Corporation, give name and street address of the Registered Agent: Name of Registered Agent E-mail Address Current Mailing Address City State Zip Telephone State Zip person engaging in business under an If the Financially Responsible Party is a Current Street Address City State Zip Fax (c) In order to facilitate Express Permitting, it is necessary to be able to contact the Engineer or other consultant who can assist in providing any necessary information regarding the plan and its preparation: Engineering Firm or other consultant E-mail Address Individual contact person (type or print) Telephone Number The above information is true and correct to the best of my knowledge and belief and was provided by me under oath (This form must be signed by the Financially Responsible Person if an individual or his attorney -in -fact, or if not an individual, by an officer, director, partner, or registered agent with the authority to execute instruments for the Financially Responsible Person). I agree to provide corrected information should there by any change in the information provided herein. Paul Spruill Type r„p nt name 8igwgure County Manager Tittllee or Authority vim--- 07 Date I. L SA A . N' h't , a Notary Public of the County of'l) eauU 6 V State of North Carolina, hereby certify that Paul Spruill appeared personally before me this day and being duly sworn�gg)5pqWedged that the above form was executed by him. a al seal, this a3 day of 2007 S. Witrks�en� i s = Not ry CD ?U� GCS va��;° 'Sw My commission expires 7- I Z3 I ) Y , rnb- k .;ble rn P S 2'ygo.7S ��;^ Rr>--.or�.00q(4:) .� •ir�ei. - ----- - -wl- - -- --- ----- - ------------- --mac --- -- — -- — --x N.u-- toe - PK_#�-3 -- --dos 90 �— �2,s4�------- —-------- -------- -- -- — -- --- - — - � I fFFwT < � be l.o✓ Nt {. r<� ---------------- -- -- ---- --. (d --- F rttSAc iP' P yy•6o Permit Number SW7061016' Program Category State SW Permit Type State Stormwater Primary Reviewer bill.moore Coastal SW Rule Coastal Stormwater - 1995 Permitted Flow Facility Name Beaufort County Industrial Park - Lot 9 Location Address Lot 9 Page Rd Washington NC 27889 Owner Owner Name Beaufort County Heal444)epm*mrer7t Central Files: APS_ SWP_ 11/15/12 Permit Tracking Slip Status Project Type Active New Project Version Permit Classification 1.00 Individual Permit Contact Affiliation Major/Minor Region Minor Washington County Beaufort Facility Contact Affiliation Owner Type Government - County Owner Affiliation Paul Spruill PO Box 1027 Dates/Events Washington NC 27889 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 03/28/07 10/17/06 03/28/07 03/28/07 03/28/21 Regulated Activities Requested/Received Events State Stormwater- High Density Deed restriction requested 2.37 Qom/-/'0'ac- Deed restriction received Additional information requested 01/10/07 Additional information received 03/07/07 Additional information requested 03/13/07 Additional information received 03/16/07 Engineer/tech specialist certification received 10/27/10 Outfall NULL Waterbody Name Stream Index Number Current Class Subbasin /.lam ins�e�. f-vr.�. N� l cif !>u/T C//-J<<`i !� fia'�Cert %017-7/2t7(0 — 2�•�S• cC/r/ts� sky-,,,— ,,/ / 1+O'N S4ia �pd �j AIO HCG /'A 4 YT p4 t/ e-169 'a O-AA Yvb �eh 7