Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW7060809_APPROVED PLANS_20070306
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 7(Z700� DOC TYPE ❑ CURRENT PERMIT 1p APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD B Beg. Const. Sta 0+00 (EP) 10 °' ` I (FG CL =7.4±) 8 6 4 2 Profile: Gravel Construction Access Rd. (off University Dr.) Profile Scale: 1" = 40' H, 1" = 111 = 4' V FG CL = 7.70 Proposed Grade _FG CIL F: Demuck Exist Ditch Min. 12", FG CL 7.00 & Badcfill w/ Seled Mat'L(sand) 8.00 H D - - - - - - x. - - - - - - - - - - - - - - - - - - - - - _ I Dt 1- 6.00 Op-gpok 1 � - Dt Lt & Rt = 5.50 0.40% - - -- FCC C&G fly- Dt Rt I I - Dt Lt & Rt. = 6.4± N -. ... pt. RL Dt Rt - 5.00 \ - Exist UG Gommun. Line Exist UG Prim. Elect. 11iProp. 30' CMP Exten. (See Pla) (Vert. Loc. Approx.) (Vert. Loc. Approx.) 2 - Inv. = 3.6± Prop. 4" CMP (Inv 3.90) Ic*.I 0+00 1+00 2+00 I 3+00 4+00 5+00 6+00 Typical X-section Gravel Access Road X2 WIDTH X2 WIDTH - (SEE BELOW) (SEE BELOW) 6' MIN * 6' 6• GRADE POINT A 3/4"/FT� 2% 2% __ EXIST GRADE ------------- 1.5' 4:1 4:1 \ (OR FLATTER) (OR FLATTER) G p �1 ROOT MAT REMOVAL (STRIPPING Pavement Design: UNDER PAVEMENT (6" MINIMUM) A 6" AGGREGATE BASE COURSE SIZE NCDOT TYPE "A" O 6" OF COMPACTED SELECT BACKFILL (SAND) FROM AN OFFSITE SOURCE. O SUBGRADE COMPACTED TO 100% DENSITY (ASTM D 698) LINED WITH GEOTEXTILE GEOFABRIC (MIRAFI 500 X OR EQUAL) (TO BE PROOF -ROLLED PRIOR TO INSTALL. OF FABRIC) 6' I 3/4"/FT NOTE: ALL DISTURBED AREAS TO BE FINE GRADED, SEEDED, & MULCHED PER SPECIF. *6' MIN. - 1 Z T EXIST GRADE F 1. 5' (OR FLATTER) (OR FLATTER) LOCATION LENGTH (CL) TOTAL WIDTH REMARKS ACCESS ROAD FROM HERR. RD 31 5' 15' PROPOSED SWALES TO BE PER NOTES TO EXIST ASPHALT ® VAUGHAN CTR. ON SHEET NO 1 OF 2. ACCESSUNIVERSITY 585' 20' PROPOSED SWALES TO BE PER TYP TO PROPOSED FREEMLA LANE X-SECTION ABOVE Section A -A: (Exist. Channel Cleanout within Wetlands) Scale: None 1 "HIGH WOODED 404 WETLANDS -WIDTH VARIES (45'-110'±) "HIGH GROUND" GROUND" VARIES 5'± VARIES O 1 4 3 ------�APPROX. EXIST GRADE 2 - REMOVE ALL DEBRIS (INCL FALLEN TREES) 5 FROM DITCH ___----ES- II TREESI I _-L----__---- {I I� HATCHED AREA DENOTES CHANNEL CLEANOUT -. NOTE: EXIST INVERT = 4.2± TO BE CLEANED (DEPTH - 1R BEG (SEE NOES BELOW) OUT TO INV. 3.00± ® POND DISCHARGE POINT SEE PLANS FOR BEG &END (LIMITS) OF CLEANOUT NOTE: CHANNEL MEANDERS WITHIN WETLANDS LIMITS (NOT ALWAYS IN CENTER) CLEANOUT LENGTH = 730 LFf NOES:(WETLANDS REGULATIONS) OEXCAVATION SHALL BE CONFINED TO THE WIDTH OF THE O THE ROOTS OF TREES & OTHER VEGETATION ON THE BANKS OF THE WETLANDS EXISTING CHANNEL, WHICH IS 5'±. (NO SIDE SLOPES) CANNOT BE REMOVED. THE TOPS OF ALL LEANING OR FALLEN TREES SHALL BE REMOVED AS FOLLOWS: OEXCAVATION SHALL FOLLOW THE EXISTING MEANDERING WITHIN 20 FEET OF THE CHANNEL BANKS, ALL LEANING & FALLEN TREES SHALL 2 CHANNEL (NO STRAIGHTENING OF ALIGNMENT ALLOWED) BE CUT OFF LEVEL WITH GRADE / STUMP, AND THE TREE TOP (NOT STUMP) BE CARRIED TO HIGH GROUND, AND REMOVED FROM ECSU CAMPUS. OEXCAVATED MATERIAL SHALL BE DISPOSED OF ONLY ON THE ENTIRE TREE INCL. ROOT OF LEANING OR FALLEN TREES WITHIN THE CHANNEL "HIGH GROUND NO MATERIAL SHALL BE PLACED WITHIN THE O BANKS SHALL BE REMOVED. THESE ARE TO BE CUT OFF AT THE STUMP, AND THE WETLAND LIMITS. MATS MUST BE USED TO PROTECT THE ROOTBALL LIFTED VERTICALLY OUT THE BANK, CARRIED TO HIGH GROUND, AND WETLANDS, WHEN TRANSPORTING MATERIAL TO HIGH GROUND. REMOVED FROM ECSU CAMPUS. � 1 Section B-B: (Exist. Ditch Cleanout) Section C-C: (Exist. Ditch Cleanout) N CLEANOUT LENGTH = 260 LF± Scale: None 2: N A CLEANOUT TO FOLLOW THE ALIGNMENT N 0 C('1L= OF THE EXIST DITCH BOTTOM L 20 C&G WALK ///TTT��� 1 C _SHOULDER _ ` BACKSLDPE - O (WOODED) I SHOULDER C \ _ _ _ EXIST DITCH INVERT± \\ /� BACKSLDPE , _----_-_ --- � (WOODED) �- HATCHED AREA DENOTES DITCH EXIST DITCH INVERT± BOTTOM CLEANOUT (DEPTH = 1.0'±) 3' FB 2 HATCHED AREA DENOTES DITCH BOTTOM CLEANOUT (DEPTH = 1.0'±) OEXIST DITCH CENTERLINE MEANDERS (NOT ALWAYS PARALLEL TO 3' FB EXIST CURB) THE CENTERLINE OF THE BOTTOM CLEANOUT TO BE 20'± FROM CLEANOUT LENGTH = 240 LFf THE EXISTING CURB, FROM THE 30" OUTLET PIPE TO THE XDRAIN UNDER UNIVERSITY DRIVE. O EXIST SHOULDER HAS A COUPLE OF TREES - CONTRACTOR TO OEXCAVATED MATERIAL: T 2 WORK AROUND THESE BARRICADE TO PROTECT) AS NOTE 1 INDICATES, THE ALIGNMENT OF THE BOTTOM CLEANOUT ( ) IS TO BE STRAIGHT. THIS WILL LEAVE SOME LOCATIONS OF EXIST DITTO CFILLTMTHE EAT LL NEED LOCATIONS.LING. DITCH EXCAVATION MAY BE ALL EXCESS EXCAVATED MATERIAL STO O ALL ED AEXCAVAVATED TI EXCAVATED MATERIAL FROM EXIST DITCH TO BE HAULED BE HAULED FROM THE ECSU CAMPUS. FROM THE ECSU CAMPUS. General Notes: 1.) SCOPE OF WORK: THESE PLANS (SHEET 1 OF 2 & 2 OF 2) INDICATE THE DESIGN OF THE FOLLOWING PROPOSED ITEMS, WHICH ARE ASSOCIATED WITH THE PROPOSED 274 BED DORMITORY LOCATED ON THE ECSU CAMPUS: A.) GRAVEL ACCESS ROADS FOR CONTRACTOR ACCESS TO THE POND AND PROPOSED DORM SITE. (SEE SHEET 2 OF 2 FOR ADDIT GRAVEL ROAD) B.) PROPOSED WET DETENTION POND WITH OUTLET STRUCTURE C.) IN ADDITION TO THE ABOVE, THESE PLANS SHOW THE LAYOUT FOR THE PROPOSED HOT & CHILLED WATER LINES (DESIGNED BY OTHERS), AND THE OUTLINE OF A FUTURE PARKING LOT TO BE CONSTRUCTED NORTH OF THE PROPOSED DORM. THESE ARE SHOWN ONLY TO INDICATE PROPOSED LAND DISTURBANCE AREAS, IN ORDER TO SECURE THE NECESSARY EROSION & STORMWAER PERMITS FOR THE COMPLETE 274 BED DORM PROJECT, AND ARE NOT PART OF THIS CONTRACT. NOTE: SEE THE "SITE PLAN" FOR PROPOSED 274 BED DORMITORY BY MILLENIUM 3D, SHEETS C0100 THRU C0400 (4 SHEETS) FOR ADDITIONAL SIEWORK ITEMS SUCH AS PROPOSED FIRE LANE PAVEMENT, STORMDRAIN, WALKS, WATER & SEWER SERVICES, AND GRADING. 2.) ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF N.C. DEPT. OF TRANSPORTATION SPECIFICATIONS. (THE REFERENCE TO DOT SPECS. IS FOR THE PURPOSE OF DEFINING THE METHODS OF WORK, MATERIALS, TOLERANCES, JOINT SPAC., ETC - NOT FOR BASIS OF PAYMENT.) 3.) PRIOR TO CONSTRUCTION OR EXCAVATION, THE CONTRACTOR SHALL ASSUME THE RESPONSIBILITY OF LOCATING ANY UNDERGROUND UTILITIES (PUBLIC OR PRIVATE) THAT MAY CROSS THROUGH THE AREA OF CONSTRUCTION, THAT ARE NOT SHOWN ON THESE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING AT HIS EXPENSE ANY EXISTING UTILITY DAMAGED DURING CONSTRUCTION. 4.) THE CONTRACTOR WILL BE REQUIRED TO PROVIDE SEEDING, EITHER TEMPORARY OR PERMANENT, PER THE SEEDING SCHEDULE ON THESE PLANS, ON ALL AREAS THAT ARE DISTURBED BY THEIR CONSTRUCTION ACTIVITY. ANY NEWLY SEEDED AREAS DAMAGED BY CONSTRUCTION TRAFFIC / ACTIVITY SHALL BE RE -SEEDED 5.) EROSION CONTROL DURING CONSTRUCTION: THIS PROJECT, HAVING A LAND DISTURBED AREA GREATER THAN 1 ACRE, REQUIRES AN EROSION & SEDIMENTATION CONTROL & STORMWATER PERMIT, TO BE OBTAINED BY THE ENGINEER. THE CONTRACTOR IS REQUIRED TO PROVIDE ADEQUATE EROSION CONTROL PRACTICES, TO PREVENT SEDIMENT / SILT FROM ERODING INTO NEARBY DITCH SYSTEMS. ANY EROSED MATERIAL IS TO BE REMOVED AND ALL BARE EARTH AREAS RESULTING FROM THE CONTRACTORS WORK SHALL BE RESEEDED AND MULCHED AS NEEDED TO PROVIDE NEW GRASS ON THE BARE AREAS. IN ADDITION, THE CONTRACTOR SHALL PROVIDE/ADD ANY ADDITIONAL DEVICES NECESSARY (OR AS REQUESTED BY N.C. DOT OR N.C.D.E.H.N.R. OFFICIALS) TO PREVENT SEDIMENT FROM CONSTRUCTION ACTIVITIES FROM ENTERING ANY ADJACENT DITCH OR WATERCOURSE. N.C. DOT = NORTH CAROLINA DEPARTMENT OF TRANSPORTATION N.C. D.E.H.N.R. = N.C. DIVISION OF LAND RESOURCES, DEPARTMENT OF ENVIRONMENT, HEALTH & NATURAL RESOURCES. (LAND QUALITY SECTION) 6.) STAKEOUT WILL BE PROVIDED TO THE CONTRACTOR BY THE OWNER. 7.) APPROXIMATE DISTURBED AREA: A.) PROPOSED GRAVEL CONSTRUCTION ACCESS ROAD FROM HERRINGTON RD TO THE EXIST ASPHALT NORTH OF THE CENTRAL UTILITY PLANT = 0.50 AC B.) PROPOSED GRAVEL CONSTRUCTION ACCESS ROAD FROM UNIVERSITY DR TO THE PROPOSED DORM SITE, WET DETENTION POND, 274 BED DORM WORKSITE, CHILLER LINES, & FUTURE PARKING LOT = 7.64 AC C.) PROPOSED CLEANOUT EXISTING DITCH (WITHIN WETLANDS) = 0.45 AC TOTAL DISTURBED AREA = 8.59 AC [USE 9.0 ACRES] B.) ALL EXCAVATED MATERIAL NOT SUITABLE FOR (OR NEEDED FOR) YARD FILL, SHALL BE HAULED OFFSITE, UNLESS OTHER SUITABLE ARRANGEMENTS ARE MADE BETWEEN THE CONTRACTOR AND ECSU. ANY MATERIAL WASTED ON ECSU PROPERTY SHALL BE GRADED TO DRAIN, AND SEEDED I / wx I / 1 {� CQVCREIE 40EWALK _ / I y O Proposed Exist W W _ _ 4A W W W W W W W W �.. � •�W W W + W W W W = �ww ' W (TO BE REMOVED) g AR ! / I I I ( ' I I ( e / C 1 W 3A w W W W W W W W W W Wetlands W W W W ��� W I W W W W i W W -J. " ` wl Clearing Limits & P Ditch Cleanout 1 W W W W W W W W W W w W W' �j•�W W W W W ` Proposed Silt Fence TYPICAL MEANDERING ( 1 1 W W W W W CHANNEL (5' WIDE±) W W W W W W W W _W �q See Section B-B W .. v W W W W W W W W v- W W W W W W� W. �. ' W W `�, 15 1 1 W W W W W W W W W W W W W W W W W W W �1•�/ .lW W W W �W W W W WJI W W !1• .� W y I W W W - W W EXIST SEDIMENT W W W �d ! I I I C ELEV - 3.6± p i A I EXIST 48" C� 1 1 W W W (TO BE REMOVED) j EWTWLA _P �y 'W� w W w- W w W WProposed p C Proposed DitchCleanoutC I: I C - - TRIPLE LINE /� Pro osed Channel Cleanout I 1 ` W W W W W W i/` -y /� W W W W W .J c \.' O O (See Section C C) I i 16 - - INV 2:1 (See Section A -A) • I _ I Ile19 INV 2.06 Proposed Work Items -- 23 W� INV 2.00 W W W W W W W W W W W W W W W W W W W W W W/ \ F 1-PEIil6 e a W I WWW Wetlands W / W + w y W + W . W w .y Proposed 584' Long x 20' Wide Proposed Well. Detention Pond - w End Existing Ditch Cleanout w + W = "' O Gravel Construction Access Rd; © Water Surface Area: 0.45 Ac. W W W W 6 58 ❑ ill �• // 1 j // // l /� J >P4 , "i ,' CVNCREIE SIOEWA A PU( Or.GR•. 11 GRA I I I I®I I I I A 5 P H A L T i 1 It FF 5 I 1 �' / u/ IIII 61f1 / 1^ I OQ'YGREIE sIDEWAIK `_ ' I I I I I I I O^Y 13If� I \ „ „ , I FF -E - r \ ll ,C9:, �.'71\ s� Proposed c� 1211 w " v' i'( I�q �f f1=,«: .I- \- HALT \ P , i, I ! POPCN CH i < - 71>a-"__ %°/ �`11 �! = \ A R K l N G ,� �, Const. Limits I- @ HG Jry-�* -- I A 1 kill = - �, S P H A L T AI\\ \I Q/I1z•uwv- ______v _ P A R K I N G '' I if ,I tl // l____�__ _ •S pp -I) 14 \ ®n 4-PM 1 r O,_ - -_;\ I'1` -. ll._.w 15M I „ q it _ ________ ` � NEAnxO> __'/+ __ I - 1 w qy�I/ $ t - < A ®�-1 R r- e - 1 - G \ I - r1 - 1 \ - f ew _ 1 - _ I I' _ Ill 111 �- '\ •�;\y ' _ _\ w 11 D�• ._ .. ® I'rr;-'; - - - _ G . a01�0 _ R� -_.z ilsl ,4' C el £ _ _ 12___- l I m _ \ / - d@� ____ __. _-" I I u: - _ ew - - xX g �� �____-"1 @i' ''E 2 GRFSOE w4' `. T E_.x,+� PR \\ CON I I E -1B t2'PCP '� ___E-. CeNORETE BIDEWNK I l_\A^I g l■_ T `�B-_._ 1 / i / -\ 12.24 9.ag \\� _ �" _._E 1 T t8' RCP _ - _ E/- ! _ _ u `\ _ ._E _ V' -E T_-T - f T j _i "_9"1'.E T=-. ^' _ .3 I I CON 1� � AOEWAU(Ac / C _/ I R}�'� \ 5 $ cr / / $ I @\ CEDAR i I 36' / /I ! G R A 5 �4)✓\ I i A 1 - illl u iWMi- E tr. ,_5'_i -I' T^ ? 1 PWE OAK l I , ` @� PIE / „II I _ W soo\PR.B----- _-�� oT.wN�' -E_' i j i / Proposed �< y v`._ I �;o _.T-._. T_ \ 1 24 FF 10.54 ; / 'b;' _\ �� \ _ -._-a-.._.. _e_.. �, }:r--<�i -T-- 1" , �Gta-' i MNE I 10.54 �. Const. Limits ,I _ _ I' 21' G R A S S T �F_ F ;_ l l i w k-9w _. _._.. i O "ME _T _ ,' _ _ 11 qd', / O. O / / A •� I.,s '.AT 111 I 28' \s �:\ is 1. i ; 'ss i x j i ( I ii ♦`� .\{. .s' 9 ®9 O\_.-a'ss- \, OX PINE X_X-0cwA/HUHI _--11 �'2-;X X_X �^ l G R A Y W i_ I i 2-r• \ WCr oss j ' I g 5 x vld N J v 9e 9 C\ _ t I __ I ° o r e Jp'✓ �G e I J z-_.-If I _ O w I J 'k l 1 • � , 117 �'� GRp55 �/ I 9-...:I / I W I I W\\ BA KET _ I -a•wJ # W i o r° I A L u 0 R 532w- \. ; i I i I R 1 i % I U O ! `� I PI• � \ ; Be vE i `�' 1 ^\ I Ax GLASS J UI I I w \ I x \ _--�I o 1 I __ W 1 NN / G -1 `'I � / Wes- /E / 2 i OAK 11 \. / 1 1e' ! / R p S S \ �� x PINE `.. �/e / i c \ BEDELL HALL : /i o /; v I G R A Ef K ee ��w O 17\ CAFETERIA . / �. ' � III • \ / / I I D I S� \ � � x � I I / / O��` \ \ fi ll ,• / , III �I G R A 5 $ I _ T _ _ ! \\\ 2 E v I r, o w i ,c�� I GJ•(J y\`_ .-\ 9 r _ , / �x-X , l - _ a-WYINRE / x E q o� � iVEy TANK / .� /_ -1 - r _� I x-x c/ n/ J'x ti „,IDNOrpH x B' / / x I / -----I--... -A... II _ _r I 1 I r E T __ I / P2NO T I ��• - -_„YI 8 Const. L" its A •AAY" ' R A S S ii OAK ', / n c / / �y Proposed Const.-�/1 -� 5+84.22 ' 8.° g0 1 �• 0 G \ Clearing Limit ++..n++ 1nnln� 24• / G° / �'� �', A ♦............... b 1 NNE y / 1 d/ O r ♦ •w\ Prop. Fire Lane @ �� rj/ I '�. . "♦ / �` (See Gen. Note No. 1) OAK _ ' l ;'`V IIII W ' I ' 'I� / / sO' w• \ \ 0 3.- \ , , 1 /1 Nr I PINE PINE /\ / - ♦♦ //- -' - - _._ _ _E-i_ - _r_ - -_-T _.-'-r - E r _ PIV `1 :♦ ,�; % End 20' Wide Gravel Access ! 1 / OAK _ O E � _F _ fit NCNIG ROTE.4i.. 1 1 /'�./ E E. IIII ' I IIII i 1 i TABLE NM P,(y1,C \ # BEECN ' I 1 .r / -i j //©AK j1111 _ _ ` ❑ BOIOM m TABLE \ o NNE 1. - _ - 1 'JILL_ _______=,,;;1 ! : LI E �0 I ; ' �• `, 2,•0 W /' !/ /= I Footprint of Proposed 274 Bed Dorm L= IIII _E-._.J 1 � 11 1 I PINE \ OAK I �Pf, 1 I ,.,♦Sy \ ����_} JJ�E OPINEQ ® xi i 6° (See Gen. Note No. 1) \ OAKy' ♦ \ O Bm , `PINE B' M, \ OAK O A ° O O $ �. O O Q fi RIM N 3.86 r r , OAK BENLN \ O `-\ PINE . / /14 �.• ' L ,O ♦� 8 °- l M"5 INV S 3.46. ^ INV I 1 Y PINE OpA' 30 /•�' l I �I °I t 1;1 PARKING O PINE \or A$PH 1 11OAK ; z4'40 O B \ '\ /'' c ; / • O W ° ° 0 $ �E/Tr� ii/ NNEO c�W`y0 \ $ / / �` \/ 0 EEYA/iKj l l G R A `WK,E ) ' �' .Y tip/ / '/ PINE PE OAKari' (,2- AK I`O/`g91 \ Clearin Limits O N 030, o �•�'f.:.'If (Dorm Project) NNE QI �� �� J I /n / 12e •30 m OAKNNEQ80 1220 N20 NE dTvS oBEEO A3 NNE 1 I 1 \\ 4 D `` - -i-r_._- PINEO O F�:.7 to'. SHELP TOP w , ' OF BANK ELEV 7.53z4' o I 1 L _ /! t Forway Feg2Wide Gravel Access Rd; Approx. 55 LF Exist C&G, Al Wide Conc. Entr. Gutter i ! I e ♦ �'.� -� i TYP PROP. TEMPORARY RIP -RAP \ ry 1 1 I ?a" CMP 9 i AK '� o FI R DAM (SEE DETAIL, SH. 2) m cea i P15N` TYP.) - 0 - - - e/ 30 i INV f '1 I / ' _ WM' -- \' '(J j 1 ' / I Detention Pond,' � V �� 1 PROPOSED STORM DRAIN c • l ��� IIit '�. I IICjTrii A r 1 VICINITY MAP n.t.s. r r � r LOCATION A 5-O 08 n r I d- ,31111111//// SEAL 6063 - - � 6063 - � ///iDow`\\ PLAN REVISIONS LU (7 Q LQa Z aQ� O rn z V) w � Z OFj U Law W �2i 10 0 Q O N N 0 9 N \ / 9 el C 18• ° 8� e I 1 \0 . \J � W 'OLE i"' Ax rE R • � CREiE 40EY' 1 /t� W> .. c, O Q 1 B• s 9 ® L �IgpLE � '\ 0'." 1 114. R ASS s �� G \�(. GR A S 5 _ _ _ r._ _ _ \ @ 1 _ T \ s\ WN I'u y.•� ", i 17 3 LL i OAK A S O W A� 1 3 N +j 0 W O @ IO_ ilk WERRY U: ^ I }J is •+ b;; e o o I •V N Z • e °\ ` ® N o awe C L ■- L ...-...- C N .� = 3 W E N N • B.Q ...im IL..a...a 1 _ I 1! i Al W SEE SITE PLAN NEW% End Silt Fence \ I / w a K ••. N .. Ps• - - --� �--- / � \ '\ 1 I / / I DORMITORY FOR SC.) • 1.� I I 1 TORY DE � Fl\ �.�d�/•� - � I `I fy� Y4�!! T / \ �:W / I , 00 / / B �• +� 1 c n' / Proposed Const.,b.O L11 1 I - I NCNc O / / W / / / i 1 \\ / // Y W W ` �• ♦♦ I ° Clearing Limits & / k1 ` ♦ ° I 0i IlUI_W01 ,O+f I1 I 1W ( Ii II I BEEPI I (I / d°P°<yJ�/R l / c/ �, wO/w , WWJL,. ZAW WWWwW ,W WWW' / I/ / , ///� //��m(O // _///; //, '�' °iT ' �W, O��W a W ,1 �/}-�`'pJ\ /L .Ji1✓//a�P-WY /WWW WWWW I (SOWWWWW WWWW kWW , VVV2C///W /We°\�W-s'- >, /� � F� A•KCiP ` ._ i \@ G R AI111 SS _" Proposed Silt ecai 0a/ a0�1d ..•................,r........, •_- N PINo ° $ • Future Future B2O W W W O Pond 6. Pond OP OF BANK (ELEV 7.03) o\71 to 1 B1 i4 a 6•0 W , I aBJ Gkw .a. XW Y W W W OAK NINE - OOC VzNkq, Z 11 �_111 -Z�=1I11 - 1- ©WW AW `WW 1 \W\ \\ \ \\ \ \ -- -am --•- ° W I /W/ W WW/rj/AW/' WW 'WW WWW WWW WWW JWWW. WW1Z WW \wW/ /\W \W1p WI`/W/- -`L ���-T _�W _ WW W W /W/ /WW/ 1 WW W/jW�''�/',wW` JJJW444 �WW B /WWw` WWW. \WWWW -WWW` % IIW`"; ... W'`r i1 w SW-��WW� ' ^ QWWW .W�•W+WWCiwWW ' �/W-�W� WI�.+W-l/��\�VW1 '�Vw ' `\W1- `�W �WWW I-�W/W �WW 'W ' WWW vW�W1�_aW�� 1I. =W -W1. 'WWB,WW11� W WW� 1WWg g .. Oae10 En t Fence MAPE5 • !i I O4-J /Q S VJ(0 OAK rw PG / 1 601� G!R A I" Wetlands'. "A w W ww.B TPICAL MEANDERING � /W Y W H EXIST SEDIMENT W W W W CHANNEL (5' WIDE±)A 4 W W ELEV = 4.2± Proposed Const., I i 1 at Pipe Inlets) (See Typ. X-section this Sheet) (See Detail, Sheet 2 of 2) Prop. Related Work Descriptions: i Prop. Related Work Descriptions: Proposed Hot & Chilled Water p C Jj PROPOSED CONCRETE OUTLET STRUCTURE (WEIR) D I I 1 O - I U I OW I I / •V/ x ; O .< Site Plan = _ ''� W I I: 'lot Scale: 1" = 40 t j I DESIGNED: DAB � A,� DRAWN: DAB NQIiTH (;ARO , A:EN iIROWEN ' i I I CHECKED: WPM MANAGE. OO��// 1 I! SCALE: 1" = 40' OVERFLOW ELEVATION = 5.85 EXTEND EXISTING 30" CMP WITH LIKE MATERIAL, APPROX. B1 Piping Desl n b Others ! DI=)IDN OF WATER QUAL.ITr' `�I ! Al 20 LF (INSTALL 30" FLARED END SECTION ON END & INSTALL (SEE DETAIL, SHEET 2 OF 2) p g ( g Y ) I I 1 // II PROD. NO. E1693 5 SY RIP -RAP APPLICATION DOWNSTREAM OF NEW FES) a I. n. ��rC�/l G I! I FILE NO. C-100- PROPOSED RIP -RAPPED CHANNEL ,;dtB-_20�' / 1 z1 B2 (SEE DETAIL, SHEET 2 OF 2) CONSTRUCTION LIMITS FOR GRAVEL ACCESS ROAD:5�1I L II,, I j AIDE II ® REMOVE ALL TREES / BRUSH WITHIN 30' OF CENTERLINE. O 1 i I I SIOIn1i#dteF F'9Fm11 No!i_ ��"� I I I CADI/ rr Future Parking Lot (Outline) - I I. �.-- PROPOSED CHANNEL (REMOVE TREES THAT ANY PART OF AN EXPOSED ROOT IS 83 (SEE DETAIL,ARTH E SHEET 2 OF 2) ��- WITHIN THE 30' DIMENSION) (200± Spaces) Site Plan \ PROP 44 LF - 24" PIPE FOR X-DRAIN W/ FES ON EACH ® PROPOSED EARTH BERM: TOP OF BERM ELEVATION TO BE 7.0 MIN. (PLACE COMPACTED I '` 0 B' GRAPHIC SCALE A3 END (INCL IN LENGTH) INV IN 3.90 INV OUT 3.80 FILL TO ESTABLISH BERM W/ 5' TOP, PER DETAIL) It OAK Proposed Construction Limits INSTALL 5 SY RIP -RAP APPLICATION ON OUTLET END 0AV It SHEET NO. (& clearing limits when in Woods) A4 PROPOSED ROADSIDE DITCHES (SEE TYPICAL X-SECT ON FOR C Proposed Wetland Channel F Existing Mitchell -Lewis Dorm ) __,�� 10 0 20 40 8O 60 "GRAVEL ACCESS ROAD" 1 of 2 O to be Demolished b Others' Proposed Silt Fence (560 LF±) APPROX. 75 LF O PROPOSED DITCH SLOPE PROTECTION and Exist Ditch Cleanout - (Y ) )( I � I Ix '� � I ,X. A5 (COVER BOTH SLOPES (12' WIDTH±) WITH A STRAW EROSION ' I (See Plan for locations) CONTROL BLANKET THAT WILL PROTECT AGAINST EROSION WITH UP (See Sections A -A B-B & C-C) 41 1 1 TO 5 FPS FLOW (NORTH AMERICAN GREEN OR EQUAL) _ 1, ,I ( IN FEET ) 1 inch = 40 ft. DATE: 8-04-06 •. 1 1. 1 .. i I. i I. 1 " i I. 1 " i Parkview Drive N sessall V O C� C / 000 const. / j40,0 Note: For additional information „� < 3F Umtiat / on Existing Site, See "Topographic a9L / Survey" & "Demolition Sheets" OAD=�,"» a = = = s = _ _ (� Tc �® 1 lli II • �' 3D Const �2" r"; ,,•' F I .°old _ 2i L Limlta3 Wn ConsLt imi,e (Property , ;Kass IIII Sa ` section A -A p / „\ c ® R A s s i111 8b I NOTE: GiACE YARD TO DRAIN TO Z PROPOSED DROP INLETS (TYIRCI v Al�anatp - V •,aT II i _,,(((��I k. ! NOTE: AU- SAMHAW (TARO INLETS SHALL NG Proposed Potable I y I ` \N f ENTIRE PERIOD OR` A CO IMIJ TION-UNITIL NEW / Water Connection 2 " VEpETATION PREVENTS THE EROSION OF SILT (ew NMatlW NNet) E III `� ip 4 ! INTO THE STORM SEWER SYSTEM.(SEE DETAIL L SN COsco B,A s< c A s ,A s.,r CO o bAt MT ZM 1 H t ASS °v- a GRASS IIII qpI?a _ g{ ro ® ConstnlCtiib on Limt — _ Jill ill 5 0 (Property Line - Sea Section A -A for I p ° ate. Sea Section A -A Construction umilst -- "g ' Prop. Seel Wel p , `�� (seeoweolrMro ;:pl 11 ! 0 / T �xs sMM Cuero) Ci I` SA Rr A TE ro EMsr •°'"®�;. "`IIII- O GAS NNE ConsWctlon Limltst 19 - \ nyR ...,,: 1 I (Exlatl41 FShaMOI ' RASS prod Gm IIII /' a� A " eLOO CORNER TO Sealer Connection* GR OW TO PL - Man' = (aeeNNaNNNNM — New ,0 ��•°j(\/'''`��J�/ ���. � aeo // � e ra! s �}(U-(��(�I]IySe O .. - `r V/en7 DOr� IX PEl00A'T,m Y"OPE"� GO Ol r NANRAL OAS UK G R A S S ,* I IIII ®{ Proposed "File" IIII Water ConrLxtion / v a p W�PA' I — o I IIII i (sRR NOMe tlireheae �v �\ rW w.0 LOWE STREET IIII / F� ♦ �;' 8 V ate/ c R a 5( SLOPE / q ♦ 11 _ — —•—'—• IIII G R A SS ./ O p �' n RsI — .j IIII 10 O /O Const Limtist J o A /lr / / A A,17) E _ "°« /r N p �Q lA .ID r c� q. 11 l 70 r I I I I \O 1 A T I �,L_ Eastern Cont. Limpet >O -ARMY (Property Line -RMIII R III I H College 6t) O, PR R o h @1, G R A s s nQ d R{�,,=ys� • /� °\rm` IIF h• PAR.YINC \ { cRass — \ mrxrt mr'. O See Details (Sheet 00800) for Z / I Typical Xaeotions on Proposed Sturm Drain Installation (EElst. Storm Drain to be removed) GRASS °Pl-� 23 + 25 oy 1yI �� aggSPygLr / � � v r MADESPILLOUT TO y DRAINININTO NEW 1 I GO a 3 RIDLEY STREET i AL. � Corot. Limit" for Proposed Storm Dreint J r� E f • gg o"o Nt J RV OR s < 3 J / eel r� ,�i� �� —y act s �— r ' r / See Details (Sheet C0800) for 28 ° p(¢] 4U Y ®fig"� ®' @@ 1. CgNt / / Typical X-section on Proposed "° !/ r' ,s ,� j @ SG�gfNG / c re A s s g. Stem Drain Installation27 tN / Const Limits for pl m �✓ �� °'s \ c R a s s I Proposed Storm Dmint tom— � �' •� / \ \ \/a • 9 •r^° ! / d GIG iE,�. �'3 � T �' ' • / / \ � F^i 1\� / i' I F• ,/ RO i `8.i GRASS ., l Ilb go _6-�'d ••e - ��E li '°v /F � i4„ A e� ®9 � � ' ; lltt.„A(ttrbbCGGJ F e ENt \ f '.N 3 I / / Limb of deadng / &CGLst,-is /I Fropoeed Fire • - _ _ lane(24-F.F) FD - LWW, R^oIn Limits of peering / CLEANG,T O & Const Limits 4J3) • 'off \ I � i . I Nat , w EEiroE �. - r o (S \ L° ,. `'�• `` \ PROP. qrA a S / ` \ (SEE OETA � M 0 '7 .1119 o-a«Dl{)' vm At P wet Pond \ 1 s ��Nad y �N a // // / = (Pxm•pDolBleva7lj , `� r e Q r4 / 3s o q>T/ a, l Proposed Gearing Limits I i F a N' $Proposed Sllt Fence�,��� �'r aT ♦ GRAD �•�,,,f / 8 rnn. S •TO o APPROX 110 LF SrIF FENCE NO 2 (SEE DETAe, sr1EEr COSOO) / / \ -y � � L S / y .:... 0 P.xo limits of Cl C�st. �`A '....... iaE s✓am % / 1 - , • T I Limits $ Pro Sift F; B 8 J C ♦� — — ^TAI'Ls mFEsfCDfEsNaoLE) / (SEE Wetlands WA\ WE T LL A' AA /O- / / Wetlands w o vrtG+ a j /• OF INV. 90 ErL N rI A �— TYPICAL A --I;n f>:a.•i.I M ' NC .. ..... 5Po�CHANNEL WIDE3)33 , , • 1 I EIOST SEDIMENT ` b P6° ELEV - 51 I.. (TO 9E REMOVED) I /^, n ®@ WOODS ��=g I Proposed Chan Cleanout vP� �o oAlrvcLEANwr „L o (See Se n A -A) 21) C o Permitted Wet Detention Pond Data: WOODS L;�ll'i , ;Y Permit No: SW7060809 (3 ,06-07) D, Depth: 6 Feet Orifice: 4" 1¢ � I / Water Surface: 19,794 SF 114 CO Volume Stored: 51,159 CF ` ` : I 1 �� rr I � . 9EC. PROPOSED GTW CLEANWT n �I \ PER $ECTON C-C (MATON E% ° !— Ll Drainage Basin Limits Dashed Lines Denote The Approx. Limits Of Drainage Basin 'I Basin Boundaries were determined from field work and / or topographic surveys, done by McA 8L others. New Location of Proj: "Mitchell Lewis Replacement Dorm" with Walk / Fire Lane Improvements (Building size: 21,300SF±) ECSU Drainage Basin "C" Data: Basin Total Acres: 14.2 Design Impervious: 50% Old Location of Proj: "Proposed 274 Bed Dorm" with Hardscape Improvements incl. Fire Lane on 2 sides (Building Size: 26,200 SF±) Composite Plan (shows previous & current locations of ECSU Dorm project) Plot Scale: 1 " = 60' DATE: 9-11-2009 McDOWELL &ASSOCIATES, P.A. SCALE: 1" = 60' DRAWN BY: DAB CHECKED BY: WPM JOB NO. E1684 IL- P. O. BOX 391 1899 WEEKSVILLE RD. ELIZABETH CITY, NORTH CAROLINA PH.(252) 338-4161 FAX (252) 335-9585 11 1 a I_ YEECSU VICINITY MAP n.t.s. LINE TABLE LINE BEARING DISTANCE 1-2 S 18'38'56' E 20.80 2-3 N 89'26'10` W 64.93 3-4 N 60°56'47' W 43.18 4A-5A S 27°27'48' E 23.16 5A-6A I S 41-36'23' W 21.29 6A-7A S 60°39'34' W 23.30 7A-8A � S 36'S3'44' W 53J8 8A-9A - S 23°14'05' E 52.14 9A-10A S 33°32'25' E 34.46 IOA-11A S 19'40'02' E 46.20 11A-12A S 02`40'59' E 39.67 124-13A S 32°09'17' W 45.35 13A-14A S 75'18'45' W 82.97 14A-15A S 29'32'44' W 73.27 ISA-16A S 06'08'15' E 52.24 16A-17A S 39'34'14' E 69.93 174-ISA S 69°07'26- E 2Z53 ISA-19A S 38`36-24- E 16.92 19A-20A N 69-52'02' E 30.94 2OA-21A S 40-27.57- E 43.03 21A-22A S 19'00'45' E 45.91 22A-23A S 32°02'16' E 28.43 23A-24A S 44°30.16' W 20.72 24A-25A S 29'47'46' E 41.81 25A-26A S 57°04'50' E 35.34 25A-27A S 15'40'04' E 42.06 27A-28A S 16°53'461 E 81.79 2BA-29A S 41°24'52' E 20.76 29A-30A N 51'34'25' E 42.24 30A-3IA { S 24'31'25' E 13.12 a LS3 C�' C 00 a Q�9'Is O 0 0 O S 79-72'41" W r,;-' /QO \ 32.45' RawVONLIVENT � a INSET SCALE i - 40' Q a Y 5 SEE INSET LINE TABLE LINE BEARING DISTANCE 1-2 S 61'24'22' E 19.73 2-3 S 84.20'03- E 46A4 3-4 N 62°29'40' E 38.12 4-5 N 37°20'14- E 32.99 5-6 N 23'49'12' E 67.11 6-7 N 21-27'55' E 65.38 7-8 S 88°01'10' E 36.36 8-9 S 13°49'44' W M32 9-10 S 03'54'59' W 58.77 10-11 S 27.11'40- E 37.49 11-12 S 69'36'01' E 54.99 12-13 S 77'43'06' E 63.53 13-14 S 72-48'39- E 69.41 14-15 S 41'41'20' E 60.11 15-16 S 81'48'53' E 47.93 16-17 S 51*51,21, E 67.45 17-18 S 78'05'54' E 24.46 18_19 S 35'34'10' E 2361 19-20 1 S 63'33'34' E 51.35 20-21 S 69'45'32' E 39.61 21-22 S 66°15'27' E 49.13 22-23 S 82'45'49' E 24.31 23-24 N 79°15'49' E 25.48 24-25 S 25'01'35' W 23A9 25-26 S 63*07,22, W 37.38 26-27 N 66'44'22' W 48.94 27-28 N 79'01'40' W 67.30 28-29 N 67'12'27' W 53.27 29-30 S 80.03'22' W 50.22 30-31 N 75'02'30' W 22.88 31-32 S 71'42'06' W 76.21 32-35 1 N 70'00'M' W 124.79 35-3 61.30 36-37 -0 N810' W SL34 37-38 N 69'48'44' W 48.73 38-39 N 56'06't4' W 51.36 39-40 N 54.16'30' W 20.69 N 04°09'04- W 113.93 a �'. OL TIE LINE 24-1A N 5237'47' E 209.36' 5 5 M \ v \ Y (� SF I I W_'t4" E 440.84_� TIF F 444-1 a C�aA\ 0 LINE TABLE LINE BEARING DISTANCE IA-2A S 24*17'29' W 67s6 2A-3A S 09°30'32' W 67.70 3A-4A S 68°10'36' E 67.87 4A-5A N 82°32'25' E 40.84 5A-GA N 51.43'23' E 49.87 6A-7A N 48°02'17' E 54.20 7A-SA N 61"32'11' E 36.47 BA-9A S 46'48'06' E 2129 9A-10a I S 48 01 32- W 71.36 10A-11A S 57 5 55' W 3403 11A-12A S 11 03 42' w 14.44 12A-13A S 20 54'06' E 2649 13A-14A S 72'21'23' E 54.49 14A-15A S 83*21,03, E 39.11 t5A-16A S 67'4455' E 39.10 16A-17A S 66`02'40' E 47.52 17A-18A S 74°53'59' E 22.02 18A-19A N 88-25'43' E 43.62 19A-20A S 45'14'09- E 50.69 2OA-21A S 70'47'49' E 30.11 21A-224 N 66'23'30• E 56.97 22A-23A N 75°39'39' E 39.06 23A-24A S 52'31'46' E 18.79 24A-25A S 45°42'25' W 42.27 25A-26A S 00°40'48' W 32.04 26A-27A S 60-36'41- E 54.22 27A-28A N 81°52'45' E 42.94 28A-29A S 78°25'00' E 27,31 29A-30A S 31'32'41' E 24,40 30A-20 S 73°31'47' W 101.48 20-19 N 75-38'36- W 21.53 19-18 N 26'38'26' W 25.40 18-17 N 72°29'24' W 46.36 17-16 N 67'16'06' W 44.99 16-15 S 18'52'52' W 35.60 15-14 N 16'38'12' W 34.08 14-13 N 26'50'29' W 26.04 13-12 N 59'29'44- W 57.68 12-11 N 79°40'38' W 43.02 11-10 N 67`02'26' W _ 52.37 10-9 N 79'17'57' W 36.56 9-8 N 70`14'18- W 35.62 8-7 N 86'22'48' W 48.19 7-6 N 72°07'00' W 48.06 6-5 S 81°29'05' W 42.53 f 5-4 S 88'53'02' W 42.00 4-3 N 73'01'55' W 51.86 3-2 N 77*19110, w 34,87 2-1 N 50'14'43' W 16.71 1-IA N 28'34'06' E 242.88 0 HALSTEAD BOULEVARD it t HA 1 5 f' - /2 i _ J -_ "• - /.� - Aga <J �RIvE FAA a Aix A4'CA � .-43 LINE TABLE LINE BEARING IDISTANCE 1-2 S 33*39,16, E 2144 2-3 S 31°14'55' E 52.36 3-4 S 68°17'12' E 50.84 4-5 S 32°18'16- E 38.00 5-6 S 59'00'55- E 24.34 6-7 S 61*28,26, E 56.62 7-8 S 79°31' 29' E 94.33 8-9 S 68°48'44' E 50.63 9-11 N 09'30'26' W 142.27' 10-11 I N 39'38'04' W 54.65 11-12 N 68°24'03' W 50.40' t2-13 64°IS'22' W f--F 51.23' _ 13-I4 S 89°26'28' W 50.92' 14-15 1 N 08°39'57- W 42.78' 15-16 1 S 68°22'50' W 1 92.49' 16-1 S 25'a2'3a' w 6ZiT Ld p O rn a { i n - w ° r- w { W z j 1� ` 0 U O t f ro rr� vJ z O O Q Q � U r J � � Q � d cn o (n W U U ui W N co W N --j Lu