HomeMy WebLinkAboutSW6110808_CURRENT PERMIT_20110914STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
L V
DOC TYPECURRENT
PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE���'�
YYYYM M D D
tl CDMR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Mr. Timothy D'Annunzio
Paraclete Real Estate Holdings, LLC
925 Doc Brown Road
Raeford, NC 28376
Division of Water Quality
Coleen H. Sullins
Director
September 7, 2011
Subject: Stormwater Permit No. SW6110808
Paraclete Landing
High Density Subdivision Wet Pond Project
Hoke County
Dear Mr. D'Annunzio:
Dee Freeman
RECEIVED Secretary
SEP 14 2011
DMR-FAVETTEMLLE REGIONAL OFft
The Stormwater Permitting Unit received a complete Stormwater Management Permit Application for
Paraclete Landing on September 6, 2011. Staff review of the plans and specifications has determined that
the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000
and Session Law 2006-246. We are forwarding Permit No. SW6110808, dated September 7, 2011, for the
construction, operation and maintenance of the subject project and the stormwater BMPs.
This permit shall be effective from the date of issuance until September 6, 2021, and shall be subject to
the conditions and limitations as specified therein. Please pay special attention to the Operation and
Maintenance requirements in this permit. Failure to establish an adequate system for inspectionand
maintenance of the stormwater management system will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit.
This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina
General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC
27611-7447. Unless such demands are made this permit shall be final and binding.
This project will be kept on file at the Fayetteville Regional Office. If you have any questions, or need
additional information concerning this matter, please contact Brian Lowther at (919) 807-6368; or
brian.lowther@ncdenr.gov.
Sincerely,
��') sew
for Colleen H. Sullins
cc: Fayetteville Regional -Office
SW6110808 File
ec: Jarrod E. Hilliard, PE, CFM — Hobb, Upchurch & Associates
Wetland and Stormwater Branch
1617 Mail Sevica Center, Raleigh, North C: colina 27699.1617 T��One�1� 1
Location: 512 N Salisbury St. Raleigh, Norl : Carolina 27604 1 V o Ul CaTUlina.
Phone: 919-807-63001 "X: 919-807-64941 Custom, r Service: 1-877-623-6748 �a�fiNiy�lA�
Internet:w r. waterqu;� ily.org 6' K[Id' ,u/'
An Equal Oppodunily { AKrm�!ive Action Employer
-V
State Stormwater Permit
Permit No. SW61 10808
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY SUBDIVISION DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended,.and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Paraclete Real Estate Holdings, LLC
Paraclete Landing
0.23 mi. from the intersection of Hwy 401 and Brock Rd. (SR 1317)
Raeford, NC - Hoke County
FOR THE
construction, operation and maintenance of a (one) wet detention pond(s) in compliance
with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter
referred to as the "stormwater rules') and the approved stormwater management plans
and specifications and other supporting data as attached and on file with and approved
by the Division of Water Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until September 6, 2021 and
shall be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
2
3.
a
5.
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.5 of this permit. The subdivision is permitted for
98 lots, each allowed a maximum of 2,800 square feet of built -upon area.
The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
The built -upon areas associated with this project shall be located at least 30 feet
landward of all perennial and intermittent surface waters.
The following design elements have been permitted for this wet detention pond
stormwater facility, and must be provided in the system at all times.
a. Drainage Area, acres: 61.0
Onsite, ftz: 1,439,278.8
Offsite, ft2. 1,198,316.8
b. Total Impervious Surfaces, ft`: 53-i,806.0
Page 1 of 8
State Stormwater Permit
Permit No. SWG110808
C.
d.
e.
f.
h.
k.
1.
Q
Lot BUA, ftZ:
Roads/Parking, ftZ:
Other, ftZ:
Offsite, ftZ:
Average Pond Design Depth, feet
TSS removal efficiency:
Design Storm:
Permanent Pool Elevation, FMSL:
Permitted Surface Area @PP ftZ:
Permitted Storage Volume, ftJ:
Storage Elevation, FMSL:
Controlling Orifice:
Permanent Pool Volume, ft3:
Forebay Volume, ft3:
Maximum Fountain Horsepower:
Receiving Stream / River Basin:
Stream Index Number:
Classification of Water Body:
II. SCHEDULE OF COMPLIANCE
274,400
146,851
25,952
84,603
9.25
90%
1.0
245.50
138,376
379,822 at temporary pool
248.00
3" O pipe
1,279,645
270,351
1HP
Stewart's Creek / Cape Fear
18-31-21
..C1,
No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature
(such as swales) shown on the approved plans as part of the stormwater
management system without submitting a revision to the permit and receiving
approval from the Division.
The permittee is responsible for verifying that the proposed built -upon area for
the entire lot does not exceed the maximum allowed by this permit. Once the lot
transfer is complete, the built -upon area may not be revised without approval
from the Division of Water Quality, and responsibility for meeting the built -upon
area limit is transferred to the individual property owner.
3. If an Architectural Review Board or Committee is set up by the permittee to
review plans for compliance with the BUA limit, the plans reviewed must include
all proposed built -upon area. Any approvals given by the Board do not relieve the
homeowner of the responsibility to maintain compliance with the permitted BUA
limit.
4. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
5. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
6. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
e. Further subdivision, acquisition, or sale of al' or part of the rroject area.
The proj,,ct area is defir-ed as all property owned by tl a permittee, for
Page 2 of 8
State Stormwater Permit
Permit No. SW6110808
which Sedimentation and Erosion Control Plan approval or a CAMA Major
permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
7. The permittee shall submit for approval, final site layout and grading plans for
any permitted future development areas shown on the approved plans, prior to
construction.
8. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
9. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
10. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification.
11. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
12. The permittee shall at all times provide the operation and maintenance
necessary to assure that all components of the permitted stormwater system
function at optimum efficiency. The approved Operation and Maintenance Plan
must be followed in its entirety and maintenance must occur at the scheduled
intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans.
f. Debris removal and unclogging of structures, orifice, catch basins and
piping.
g. Access to all components of the system must be available at all times.
13. Records of maintenance activities must be kept by the permittee. The records will
indicate the date, activity, name of person performing the work and what actions
were taken.
14. The permittee shall submit to the Division of Water Quality an annual summary
report of the maintenance and inspection records for each BMP. The report shall
summarize the inspection dates, results of the inspections, and the maintenance
work performed at each inspection.
15. This permit shall become void unless the facilities are constructed in accordance
with the conditions of this permit, the approved plans and specifications, and
other supporting data.
16. Prior to the sale of any lot, the following deed restrictions must be recorded:
a. The following covenants are intended to ensure ongoing compliance with
State Stormwater Management Permit Number SW6110808, as issi,ed by
the Division of Water Ouality under th � stormwater rules.
Page 3 of 8
State Stormwater Permit
Permit No. SW6110808
b. The State of North Carolina is made a beneficiary of these covenants to
the extent necessary to maintain compliance with the Stormwater
Management Permit.
C. These covenants are to run with the land and be binding on all persons
and parties claiming under them.
d. The covenants pertaining to stormwater may not be altered or rescinded
without the express written consent of the State of North Carolina, Division
of Water Quality.
e. Alteration of the drainage as shown on the approved plans may not take
place without the concurrence of the Division of Water Quality.
f. The maximum built -upon area per lot is 2,800 square feet. This allotted
amount includes any built -upon area constructed within the lot property
boundaries, and that portion of the right-of-way between the front lot line
and the edge of the pavement. Built upon area includes, but is not limited
to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and
parking areas, but does not include raised, open wood decking, or the
water surface of swimming pools.
g. All runoff on the lot must drain into the permitted system. This may be
accomplished through providing roof drain gutters, which drain to the
street, grading the lot to drain toward the street, or grading perimeter
swales and directing them into the pond or street. Lots that will naturally
drain into the system are not required to provide these measures.
h. Built -upon area in excess of the permitted amount will require a permit
modification.
i. If permeable pavement credit is requested, the property owner must
submit a request, with supporting documentation, to the permittee and
receive approval prior to construction of BUA.
17. A copy of the recorded deed restrictions must be submitted to the Division within
30 days of the date of recording the plat, and prior to selling lots. The recorded
copy must contain all of.the statements above, the signature of the Permittee, the
deed book number and page, and the stamp/signature of the Register of Deeds.
18. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ
personnel. The facility must be in compliance with all permit conditions. Any
items not in compliance must be repaired or replaced to design condition prior to
the transfer. Records of maintenance activities performed to date will be
required.
19. Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria:
a. The fountain must draw its water from less than 2' below the permanent
pool surface.
b. Separated units, where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the deepest
part of the pond.
c. The falling water from the fountain must be centered in the pond, away from
the shoreline.
d. The maximum horsepower for the fountain's pump is based on the
permanent pool volume. The maximum pump power for a fountain in this
pond is 1 HP.
20. If permeable pavement credit is desired, the permittee must submit a request to
modify the permit to incorporate such language as required by the Division of
Water Quality. The request to modify must include a soils report identifying the
type of soil, the Seasonal High Water Table elevation and the infil'ration rate.
Upon the successful completion of a permit modification, the individual lot owners
that request to utilize pen-,ieable pavements must subm t the necessary forms
Page 4 of 8
State Stormwater Permit
Permit No. SW6' 10808
and documentation to the permittee and receive approval prior to construction of
the permeable pavement.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a completed Name/Ownership Change form signed by both parties, to the
Division of Water Quality, accompanied by the supporting documentation as
listed on page 2 of the form. The approval of this request will be considered on its
merits and may or may not be approved.
2. The permittee is responsible for compliance with all permit conditions until such
time, as the Division approves a request to transfer the permit.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
6. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
7. The permit issued shall continue in force and effect until revoked or terminated.
The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and re -issuance or
termination does not stay any permit condition.
8. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
9. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
10. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit
as allowed by the laws, rules and regulations contained in Session Law 2006-
246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al.
11. The permittee shall notify the Division in writing of any name, ownership or
mailing address changes at least 30 days prior to making such changes.
12. The permittee shall submit a renewal request with all required forms and
documentation at least 180 days prior to the expiration date of this permit.
Page 5 of 8
State Stormwater Permit
Permit No. SW6110808
Permit issued this the 7th day of September 2011.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Division of Water Quality
By Authority of the Environmental Management Commission
Page 6 of 8
State Stormwater Permit
Permit No. SW6110808
Paraclete Landing Page 1 of 2
Stormwater Permit No. SW'6110808
Hoke County
Designer's Certification
I, , as a duly registered in
the State of North Carolina, having been authorized to observe (periodically/weekly/full
time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is a part of this Certification.
Noted deviations from approved plans and specifications:
Signature
Registration Number
Date
SEAL
Page 7 of 8
State Stormwater Permit
Permit No. SW6110808
Certification Requirements:
Page 2 of 2
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf, a
forebay, and the vegetated filter.
15. The required dimensions of the system are provided, per the approved
plan.
cc: NCDENR-DWQ Fayetteville Regional Office
Hoke County Building Inspections
Page 8 of 8
Permit number:
(to be provided by DIVQ)
Drainage Area Number:_
Wet Detention Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
❑ does ® does not incorporate a vegetated filter at the outlet.
This system (check one):
❑ does ® does not incorporate pretreatment other than a forebay.
Important maintenance procedures:
— Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks).
— No portion of themet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated shelf.
— Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
— If the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum extent practical.
— Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a
Coastal County). Records of operation and maintenance should be kept in a known set
location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the wet
Areas of bare soil and/or
Regrade the soil if necessary to
detention basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Vegetation is too short or too
Maintain vegetation at a height of
long.
approximately six inches.
Form SW401-Wet Detention Basin O&M-Rev.4
Page 1 of 4
Permit Number:
(to be provided by UWQ)
Drainage Area Number:_
BMP element: Potentialproblem: How I will remediate theproblem:
The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the
swale sediment off -site.
The pipe is cracked or Replace the pipe.
Erosion is occurring in the
Swale.
The forebay Sediment has accumulated to
a depth greater than the
original design depth for
sediment storage.
The
treatment area
Erosion has occurred.
are present.
Best professional practices
show that pruning is needed
to maintain optimal plant
health.
Plants are dead, diseased or
dying.
Weeds are present.
Sediment has accumulated to
a depth greater than the
original design sediment
storage depth.
Algal growth covers over
50% of the area.
Cattails, phragmites or other
invasive plants cover 50% of
the basin surface.
Regrade the swale if necessary to
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than soravine.
Prune according to best professional
practices
Determine the source of the
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to'streams or
the BMP.
Consult a professional to remove
and control the aleal erowth.
Remove the plants by wiping them
with pesticide (do not spray).
Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4
Permit Number —
(to (to be provided by DWQ)
Drainage Area Number:
BMP element:
Potentialproblem:
How I will remediate theproblem:
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankment.
remove the tree.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair. if applicable)
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
outlet.
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads 14.50 feet in the main pond, the
sediment shall be removed.
When the permanent pool depth reads 10.50 feet in the forebay, the sediment
shall be removed.
Sediment Removal
Bottom
BASIN DIAGRAM
(fill in the blanks)
Permanent Pool Elevation 245.50
235.00 I Pe maven Pool
----------- ♦-- Volume Sediment Removal Elevation 231.00 Volume
234.00 ft Min. .
Sediment Bottom Elevation 230.00 1-ft n
Storage Sedimer
Storage
FOREBAY MAIN POND
Form SW401-Wet Detention Basin O&M-Rev.4
Page 3 of 4
Permit Numher._
(to be provided by DVVQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:Paraclete Landing
BMP drainage area number:I
Print name:Timothy D'Annunzio
Title:Managing Member, Paraclete Real Estate Holdings LLC
Address:925 Doc Brown Road, Raeford, NC 28376
Phone:910-904-0027
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, ) o A w a Notary Public for the State of
yC County of twobo - e do hereby certify that
n/.v a i e personally appeared before me this _jp�
day of A a o ez c f O / , and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal, a a /2 ;12
XA�I ti. /y/ip�sei sro, CDM "' m
SEAL
My commission expires G - X - 1014
Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4
High Density Residential Subdivisions
Deed Restrictions & Protective Covenances
In accordance with Title 15 NCAC 2H.1000 and S.L. 2006-246, the Stormwater Management Regulations,
deed restrictions and protective covenants are required for High Density Residential Subdivisions where
lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed
restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon"
area consistent with the design criteria used to size the stormwater control facility.
I, Timothy D'Annunzio , acknowledge, affirm and agree by my signature below, that I will
cause the following deed restrictions and covenants to be recorded prior to the sale of any lot:
1. The following covenants are intended to ensure ongoing compliance with State Stormwater
Management Permit Number as issued by the Division of Water Quality under the
Stormwater Management Regulations.
2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to
maintain compliance with the stormwater management permit.
3. These covenants are to run with the land and be binding on all persons and parties claiming under
them.
4. The covenants pertaining to stormwater may not be altered or rescinded without the express written
consent of the State of North Carolina, Division of Water Quality.
5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence
of the Division of Water Quality.
6. The maximum allowable built -upon area per lot is 2,800 square feet. This allotted amount
includes any built -upon area constructed within the lot property boundaries, and that portion of the
right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not
limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does
not include raised, open wood decking, or the water surface of swimming pools.
OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the following:
6. The maximum built -upon area per lot, in square feet, is as listed below:
Lot # BUA Lot # BUA Lot # BUA Lot # BUA
This allotted amount includes any built -upon area constructed within the lot property boundaries, and
that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area
includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and
parking areas, but does not include raised, open wood decking, or the water surface of swimming
pools.
7. Each lot will maintain a 30** foot wide vegetated buffer between all impervious areas and surface
waters.
**50 foot for projects located in the 20 coastal counties.
8. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be
accomplished through a variety of means including roof drain gutters which drain to the street, grading
the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them
into a component of the stormwater collection system. Lots that will naturally drain into the system are
not required to provide these additional measures.
Form DRPC-3 Rev.2 05Nov2009 Page 1 of 2
High Density Residential Subdivisions
Deed Restrictions & Protective Covenances
JoH IYAI b. 14 a Notary Public in the
State of i1/C County of 7yI001^ !
do hereby certify that T M /t A/A/ a ti.7 i o personally appeared
before me this the )k day of v s 7` , 20 // , and acknowledge
the due execution of the foregoing instrument. Witness my hand and official seal,
op.SEAL///,pA°.,tee
Signefture
�ryf"r . �.�y°.
My Commission expires G - 5/11"
CoH,`�`�,
Form DRPC-3 Rev.2 05Nov2009 Page 2 of 2
0742
ti 0738
FILED
HOKE COUNTY
ONNIE DUDLEY
REGISTER OF DEEDS
FILED Dec 18, 2006
AT 02:20:21 pm
BOOK 00742
START PAGE 0738
END PAGE 0742
INSTRUMENT # 09216
BK:00742 PG 0738 1
Cei�e or HpV�ovai toy necummg
���I tmteby eertily that this transaction
hereon has been tourd to c I10V with in(
Subdivision Regulations ct the countY of
Hoke. N:uth caralina, and thnt this has
been approved for recording in the Office
of the Register of Deeds of Ho a County.
Titi
_._ ..._._.. ems. —,----
NORTH CAROLINA GENERAL WARRANTY DEED
Parcel identifier No. 494660001502
Excise Tax: $0.00
Prepared by: Richard A. Galt, PLLC, 2533 Raeford Road, Fayetteville, NC 28305
Return after recording to: Richard A. Galt, PLLC, 2533 Raeford Road, Fayetteville, NC 28305
Brief Description for the Index:
This Deed made this the IS's day of September, 2006 by and between:
GRANTOR I GRANTEE
CAROLYN B. TILLERY, also known as
CAROLYN BROCK SHOCK,
an unmarried woman
PARACLETE REAL ESTATE HOLDINGS, LLC,
a North Carolina limited liability company
Meiling Address:
110 Fulton Street
Raeford, North Carolina 28376
Enter in appropriate block for each party: name, address, and, if appropriate, character of entity, e.g., corporation
or partnership
The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and
assigns, and shall include singular, plural, masculine, feminine or neuter as required by context.
WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is
hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee
simple, all that certain lot or parcel of land situated in or near the Hoke County, North Carolina and more
particularly described as follows:
FOR LEGAL DESCRIPTION, SEE EXHIBIT "A" ATTACHED HERETO AND MADE A PART
HEREOF.
THIS IS A DEED OF CORRECTION EXECUTED AND DELIVERED BY GRANTOR TO CORRECT
THE LEGAL DESCRIPTION IN THE GENERAL WARRANTY DEED RECORDED IN BOOK 661,
PAGE 663, HOKE COUNTY, NORTH CAROLINA REGISTRY.
FOR HISTORY OF TITLE, SEE ALSO THE ESTATE FILE OF ROY EUGENE BROCK, FILE NO.
99-E-5, IN THE GENERAL COURT OF JUSTICE, SUPERIOR COURT DIVISION, HOKE COUNTY,
NORTH CAROLINA.
The property hereinabove described was acquired by instrument recorded in Book 179, Page 291,
A map showing the above described properly is recorded in Book of Plats _, Page _.
0742
0741 BK:OO742 PG:O741
STRDTDER LAND SDRYETID6
Leland D. SMer, PU L-2768 1 iT �A - `� ° �"
120 Easi ENV Avenue
Raelord, NMn Phone 910-875-8081 Cardine 28376
Fax 910-875-8081
Email l_trwhe ineanhlink_net
Brock Ti ry to
to %P Slorlant,
57.386 Acres
MCLauchlin To ship, Hoke County,
North Carolin
A In tract or parcel of land in McLauchlin Township, Hoke County, North Carolina, situated about
7:5 miles northwest of Raeford, N.C., fronting on the north side of U.S. Hwy. No. 401 and on the east side
of S.R. No. 1317, Brock Road, being further described as follows:
Commencing at North Carolina Grid Monument 'WHALE';
THENCE North 83 degrees 16 minutes 02 seconds West (meridian as per N.C. Dept. of Trans. Project
No. 6.441036) for a distance of 1231.48 feet (horizontal ground distance) to a rebar in the north right of
way line of U.S. Hwy. No. 401. said rebar being in a common line of the Carolyn B. Tillery tract described
in Deed Book 179, at Page 291 in the Hoke County Registry and the John H. Lindsay 104 acre tract
described in Deed Book 85. at Page 238 and being THE POINT OF BEGINNING of the tract hereon
described;
THENCE from the beginning as the north right of way line of U.S. Hwy. No. 401. South 89 degrees 26
minutes 01 seconds West for a distance of 33.33 feet to a right of way disc: 1
THENCE continuing as said right of way line. South 89 degrees 26 minutes 01 seconds West for a
distance of 539.08 feet to a rebar in said right of way line, the southeast corner of The County of Hoke
tract described in Deed B-OZIF4TW, at Page 630;
THENCE as a common line with The County of Hoke, North 00 degrees 33 minutes 59 seconds West
for a distance of 50.00 feet to a rebar;
THENCE continuing as a common line with The County of Hoke, South 89 degrees 26 minutes 01
seconds West for a distance of 50.00 feet to a rebar;
THENCE continuing as a common line with The County of Hoke, South 00 degrees 33 minutes 59
seconds East for a distance of 50.00 feet to a rebar;
THENCE continuing as the north right of way—hne of U.S. Hwy. No. 401, South 89 degrees 26 minutes
O1 seconds West for a distance of 795.92 feet to a rebar at the intersection of the north right of way line of
U.S. Hwy. No. 401 and the northeast right of way line of S.R. 1317, Brock Road;
THENCE as said intersection right of way line, North 42 degrees 19 minutes 33 seconds West for a
distance of 97.13 feet to an iron rod in the east right of way line (30' from center) of S.R. No. 1317;
THENCE as said right of Way MW,, North 02 degrees 19 minutes 28 seconds East for a distance of
1217.02 feet to a rebar in said right of way line, a common corner with Steven M. Langmack (D.B. 494,
Pg. 419); —
THENCE as a common line with Langmack. North 80 degrees 13 minutes 41 seconds East for a
distance of 264.98 feet to a rebar, a common corner with Langmack;
THENCE continuing as a common line with Langmack, North 21 degrees 40 minutes 38 seconds East
for a distance of 334.48 feet to a rebar, a common corner with Langmack in a southwest line of "A
Revision of Cobble Ridge" (Slide 798, Map No. 001);
THENCE as a common line with "A Revision of Cobble Ridge' South 69 degrees 28 minutes 21
seconds East for a distance of 830.78 feet to an iron slake, a common comer with *A Revision of Cobble
Ridge" and "Quail Hollow Wesl" (Slide 2-85, Map-5 —
0742
0742
BK00742 PG:0742
r THENCE as a common line with 'Quail Hollow West", South 69 degrees 29 minutes 11 seconds East
for a distance of 1042.82 feet to an iron rod, a common corner with -Quail Hollow West' and in a
northwest line of the aforementioned John H. Lindsay tract (D.B. 85. Pg. 238):
THENCE as a common line with said Lindsay 104 acre tract, South 35 degrees 56 minutes 01
seconds West for a distance of 1201.50 feel to the point of beginning.
Together with and subjecttacouaoants, easements, and restrictions of record.
ore or less and being the remainder portion of the Cardyn
Said properly contains 75 386 acres
Brock Tilley tract as described in Deed ook 179, at Page 291 in the Hoke County Registry.
Permit Number:
(to be provided by DWQ)
Drainage Area Number:
Wet Detention Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
❑ does ® does not incorporate a vegetated filter at the outlet.
This system (check one):
❑ does ® does not incorporate pretreatment other than a forebay.
Important maintenance procedures:
— Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks).
— No portion of the wet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated shelf.
— Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
— If the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum extent practical.
— Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a
Coastal County). Records of operation and maintenance should be kept in a known set
location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the wet
Areas of bare soil and/or
Regrade the soil if necessary to
detention basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Vegetation is too short or too
Maintain vegetation at a height of
long.
approximately six inches.
Form SW401-Wet Detention Basin O&M-Rev.4
Page l of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number:
BMP element:
Potentialproblem:
How I will remediate theproblem:
The inlet device: pipe or
The pipe is clogged.
Unclog the pipe. Dispose of the
swale
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged.
Erosion is occurring in the
Regrade the swale if necessary to
swale.
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
The forebay
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design depth for
possible. Remove the sediment and
sediment storage.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The vegetated shelf
Best professional practices
Prune according to best professional
show that pruning is needed
practices
to maintain optimal plant
health.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The main treatment area
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design sediment
possible. Remove the sediment and
storage depth.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Algal growth covers over
Consult a professional to remove
50% of the area.
and control the algal growth.
Cattails, phragmites or other
Remove the plants by wiping them
invasive plants cover 50% of
with pesticide (do not spray).
the basin surface.
Form SW40I-Wet Detention Basin O&M-Rev.4
Page 2 of 4
Permit
(to be provided by DWQ)
Drainage Area Number:
BMP element:
Potentialproblem:
How I will remediate theproblem:
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankment.
remove the tree.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair. (if applicable)
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
outlet.
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads 14.50 feet in the main pond, the
sediment shall be removed.
When the permanent pool depth reads 10.50 feet in the forebay, the sediment
shall be removed.
Sediment Removal
Bottom
BASIN DIAGRAM
(fill in the blanks)
Permanent Pool Elevation 245.50
235.00 1 Pe maven Pool
----------- Volume Sediment Removal Elevation 231.00 Volume
234.00 -ft Min.
------------- ---------- ------
Sediment Bottom-Elevation-230.00 1-ft r
- --------------
Storage Sedimet
Storage
FOREBAY MAIN POND
Form SW401-Wet Detention Basin O&M-Rev.4
Page 3 of 4
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:Paraclete Landing
BMP drainage area number:
Print name:Timothy D'Annunzio
Title:Managing Member, Paraclete Real Estate Holdings, LLC.
Address:925 Doc Brown Road, Raeford, NC 28376
Phone:910-904-0027
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
/ '.1'42 , a Notary Public for the State of
yL' County of M'061' e do hereby certify that
%i'A D'A z/� Al 4,1 z i a personally appeared before me this 1�
day of A i t o c f P,9 and acknowledge the due execution of the
forgoing welt detention basin maintenance requirements. Witness my hand and official
seal, a 4a-- /'R- )��
coeaaaae . _
�COU%A �•
'rraranMr�"�
SEAL
My commission expires /. - X - P o/L
Form SW401-Wet Detention Basin O&M-Rev.4
Page 4 of 4
DWQ USE ONLY
Date Received
Fee Paid
Permit Number
606 - toS 13
6A-0'lc t>, o C)
Applicable Rules: ❑ Coastal SW —1995 ❑ Coastal SW — 2008 ❑ Ph I1- Post Construction
(select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan
❑ Other WQ M mt Plan:
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
I. GENERAL INFORMATION
1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
2. Location of Project (street address):
Project is 0.23 mi. from the intersection of Hwy 401 and Brock Rd (SR 1317) E911 address not vet provided
City: Raeford County: Hoke Zip: 28376
3. Directions to project (from nearest major intersection):
From Fayetteville, travel west on Highway 401 (Raeford Road / Fayetteville Road)
approximately 13 miles, turn right onto Brock Road (SR 1317)
Site is approximately 0.23 miles from the intersection of Hwy 401 and Brock Road site is on the right
4. Latitude:35° 2.0' 8.1954" N Longitude:-79° 6.0' 31.0386" W of the main entrance to the project.
II. PERMIT INFORMATION:
1. a. Specify whether project is (check one): ®New ❑Modification
b.If this application is being submitted as the result of a modification to an existing permit, list the existing
permit number n/a , its issue date (if known) n/a and the status of
construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification
2. Specify the type of project (check one):
❑Low Density ®High Density ❑Drains to an Offsite Stormwater System [—]Other
3. If this application is being submitted as the result of a previously returned application or a letter from DWQ
requesting a state stormwater management permit application, list the stormwater project number, if
assigned, n/a and the previous name of the project, if different than currently
proposed, n/a
4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be
obtained by contacting the Customer Service Center at 1-877-623-6748):
❑LAMA Major
❑NPDES Industrial Stormwater
®Sedimentation/Erosion Control: 45.50 ac of Disturbed Area
0404/401 Permit: Proposed Impacts
b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number,
issue date and the type of each permit:N/A
AUG 29 2011 L
NE14ift STORMWATER BwwcH
Form SWU-101 Version 07Jun2010 Page I of 6
III. CONTACT INFORMATION
I. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee,
designated government official, individual, etc. who owns the project):
Applicant/Organization: Paraclete Real Estate Holdings LLC
Signing Official & Title: Timothy D'Annunzio, Managing Member
b.Contact information for person listed in item la above:
Street Address: 925 Doc Brown Road
City: Raeford State: NC Zip: 28376
Mailing Address (if applicable): 925 Doc Brown Road
City: Raeford State: NC Zip: 28376
Phone: ( 910 ) 904-0027 Fax: ( 910 ) 904-0557
Email: Paracte777@aol.com
c. Please check the appropriate box. The applicant listed above is:
® The property owner (Skip to Contact Information, item 3a)
❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below)
❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and
2b below)
❑ Developer* (Complete Contact Information, item 2a and 2b below.)
2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the
person who owns the property that the project is located on):
Property Owner/1
Signing Official &
b.Contact information for person listed in item 2a above:
Street Address:
Mailing Address (if
Phone:
State:
State:
Fax: ( 1
3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other
person who can answer questions about the project:
Other Contact
Signing Official &
b.Contact information for person listed in item 3a above:
Mailing Address:
Phone:
4. Local jurisdiction for building permits: Hoke County
Fax:
Zip:
Point of Contact:Conrad Garrison Phone #: (910 1 875-8407
Form SWU-101 Version 07Jun2010 Page 2 of 6
IV. PROJECT INFORMATION
1. In the space provided below, briefly summarize how the stormwater runoff will be treated.
Stormwater runoff will be treated within a wet detention basin designed for 90% TSS per NCDENR BMP
a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
❑ Approval of a Site Specific Development Plan or PUDApproval Date:
❑ Valid Building Permit Issued Date:
❑ Other: Date:
b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW — 1995 ❑ Ph II — Post Construction
3. Stormwater runoff from this project drains to the Cape Fear River basin.
4. Total Property Area: 33.73 acres
5. Total Coastal Wetlands Area: 0.00 acres
6. Total Surface Water Area: 0.00 acres
7. Total Property Area (4) — Total Coastal Wetlands Area (5) — Total Surface Water Area (6) = Total Project Area':
33.73 acres
Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area
between the banks ofstreams and rivers, the area below the }formal High Water (NHW) line or Mean High Water
(MH W) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to
calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be
included in the total project area.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 30.45 %
9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered
stormzater BMP. For low density and other projects, use 1 for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
provided in the same format as below.
Basin Information
Drainage Area 1
Drainage Area _
Drainage Area
Drainage Area
Receiving Stream Name
Stewart's Creek
Stream Class *
C
Stream Index Number *
18-31-21
Total Drainage Area (sf)
2,657,628.0
On -site Drainage Area (sf)
1,469,278.8
Off -site Drainage Area (sf)
1,188,316.8
Proposed Impervious Area** (sf)
531,806.0
% Im ervious Area** (total)
20.01
Impervious" Surface Area
Drainage Area 1
Drainage Area _
Drainage Area _
Drainage Area
On -site Buildings/Lots (sf)
274,400
On -site Streets (sf)
146,851
On -site Parking (sf)
0
On -site Sidewalks (sf)
25,952
Other on -site (sf)
0
Future (sf)
0
Off -site (sf)
84,603
Existing BUA*** (sf)
0
Total (sf):
531,806
Stream Class and Index Number can be determined at: http:*ortal.ncdenr org/web/zvq/ps/csu/classifications
Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
Form SWU-101 Version 07Jun2010 Page 3 of 6
'Report only that amount of existing BUA that Will remain after development. Do not report any existing BUA that is
to be removed and which Will be replaced by new BUA.
11. How was the off -site impervious area listed above determined? Provide documentation. Using AutoCAD
with GIS Orthophotography overlaid, existing streets were bound by polylines and the areas of these and a
standard area per home was computed.
Proieets in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened &
Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600.
V. SUPPLEMENT AND O&M FORMS
The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms
must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded
from http://portal.ncdenr.org/web/wq/ws/su/bml2-manual.
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. A detailed application instruction sheet and BMP
checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete
application package should be submitted to the appropriate DWQ Office. (The appropriate office may be
found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/mals.)
Please indicate that the following required information have been provided by initialing in the space provided
for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions
for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms dots.
Inds I
1. Original and one copy of the stormwater Management Permit Application Form. _
2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants J —
Form. (if required as per Part VII below)
3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M �C
agreement(s) for each BMP.
4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to
htto://www.envhelp.org/pages/onestol2exl2ress.html for information on the Express program
and the associated fees. Contact the appropriate regional office Express Permit Coordinator for
additional information and to schedule the required application meeting.)
5. A detailed narrative (one to two pages) describing the stormwater treatment/management for
the project. This is required in addition to the brief summary provided in the Project
Information, item 1.
6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the
receiving stream drains to class SA waters within '%mile of the site boundary, include the'h
mile radius on the map.
7. Sealed, signed and dated calculations.
8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including:
a. Development/Project name.
It. Engineer and firm. oo} Qrp.s�Actk
c. Location map with named streets and NCSR numbers.
d. Legend. ,/
e. North arrow
I. Scale. ,
g. Revision number and dates.
h. Identify all surface waters on the plans by delineating the normal pool elevation of v
impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal
waters, and any coastal wetlands landward of the MHW or NHW lines.
• Delineate the vegetated buffer landward from the normal pool elevation of impounded
structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters.
i. Dimensioned property/project boundary with bearings & distances.,,`
j. Site Layout with all BUA identified and dimensioned. 1__�
k. Existing contours, proposed contours, spot elevations finished Floor elevations.
I. Details of roads, drainage features, collection systems, and stormwater control measures.
Form SWU-101 Version 07Jun2010 Page 4 of 6
m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a 158C s 11 e el
qualified person. Provide documentation of qualifications and identify the person who
made the determination on the plans.
—�
n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations.
o. Drainage areas delineated (included in the main set of plans, not as a separate document).
p. Vegetated buffers (where required).
9. Copy of any applicable soils report with the associated SHWT elevations (Please identify
_ �F
�I
elevations in addition to depths) as well as a map of the boring locations with the existing
elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the
) Pe
project area clearly delineated. For projects with infiltration BMPs, the report should also
�I _ f
include the soil type, expected infiltration rate, and the method of determining the infiltration ratel.
(Infiltration Devices submitted to WiRO: Schedule a site visit for D WQ to verify the SHWT prior
to submittal, (910) 796-737&)
10. A copy of the most current property deed. Deed book: 742 Page No: 738
11. For corporations and limited liability Lom rix (LLC): Provide documentation from the NC
Secretary of State or other official documentation, which supports the titles and positions held
by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The
corporation or LLC must be listed as an active corporation in good standing with the NC
Secretary of State, otherwise the application will be returned.
http://www.secretary.state.nc.us/Corporations/CSearch.asi2x
VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective
covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed
BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided
as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and
protective covenants forms can be downloaded from
http://12ortal.ncdenr.org/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal.
In the instances where the applicant is different than the property owner, it is the responsibility of the property
owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring
that the deed restrictions are recorded.
By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and
protective covenants for this project, if required, shall include all the items required in the permit and listed
on the forms available on the website, that the covenants will be binding on all parties and persons claiming
under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot.
Vill. CONSULTANT INFORMATION AND AUTHORIZATION
Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a
consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as
addressing requests for additional information).
Consulting Engineer:larrod E. Hilliard, PE, CFM
Consulting Firm: Hobbs, Upchurch & Associates, Pa
Mailing Address:300 SW Broad Street
City:Southem Pines State:NC Zip:28387
Phone: (910 ) 692-5616
Email:6hilliard@hobbsupcl)urch.com
Fax: (910 ) 692-7342
IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this
section)
I, (print or type name of person listed in Contact Information, item 2a) certify that I
own the property identified in this permit application, and thus give permission to (print or type name of person
listed in Contact Information, item 1a) with (print or type name of organization listed in
Contact Information, item la) to develop the project as currently proposed. A copy of
the lease agreement or pending property sales contract has been provided with the submittal, which indicates the
party responsible for the operation and maintenance of the stormwater system.
Form SWU-101 Version 07Jun2010 Page 5 of 6
As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to
me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a
completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment
facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid
permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including
the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6.
a Notary Public for the State of . County of
do hereby certify that
before me this _ day of
stormwater permit. Witness my hand and official seal,
SEAL
personally appeared
and acknowledge the due execution of the application for a
My commission
X. APPLICANT'S CERTIFICATION
I, (print or type name of person listed in Contact Information, item 1a) Timothy D'Annunzio
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of the
applicable stogywater rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211.
Date:1!!rAtnt
I, J off iy v H —H a Notary Public for the State of .41 C- County of
MOO,- e do hereby certify that -J'i'm .%) A~ Lr iv 2 i t7 personally appeared
before me this / f day of /u u S f as/i ,and acknowledge the due executtion-of the application for a
stormwater permit. Witness my hand and official seal, „� 2, A
►yCY.'"
My commission expires li - V- �p D/4
Form SWU-101 Version 071un2010 Page 6 of 6
Permit No.
(to be provided by DWQ)
A®��
O�O� W A 7F9OG
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Pad 111) must be printed, filled out and submitted along with all of the required information.
17PRO9 EC711 NEO RMAT ION
Project name
Paraclete Landing
Contact person
Jarred E. Hilliard, PE, CFM
Phone number
910-692-5616
Date
7113/2011
Drainage area number
1
Site Characteristics
Drainage area
Impervious area, post -development
% impervious
Design rainfall depth
Storage Volume: Non -SA Waters
Minimum volume required
Volume provided
Storage Volume: SA Waters
1.5' runoff volume
Pre -development 1-yr, 24-hr runoff
Post -development 1-yr, 24-hr runoff
Minimum volume required
Volume provided
Peak Flow Calculations
Is the prelpost control of the 1 yr 24hr stone peak flow required?
1-yr, 24-hr rainfall depth
Rational C, pre -development
Rational C, post -development
Rainfall intensity: 1-yr, 24-hr storm
Pre -development 1-yr, 24-hr peak flow
Post -development 1-yr, 24-hr peak flow
Pre/Post 1-yr, 24-hr peak flow control
Elevations
Temporary pool elevation
Permanent pool elevation
SHWT elevation (approx. at the perm. pool elevation)
Top of 1011 vegetated shelf elevation
Bottom of 1011 vegetated shelf elevation
Sediment cleanout, top elevation (bottom of pond)
Sediment cleanout, bottom elevation
Sediment storage provided
Is there additional volume stored above the state -required temp. pool?
Elevation of the top of the additional volume
2,657,628 rye
531,806 it'
20.01 %
1.0 in
50,959 ft' OK
379,822 fts
OK, volume provided is equal to or in excess of volume required.
Its
it,
fts
ft1
it,
Y (Y or N)
3.0 in
0.32 (unitless)
0.42 (unitless)
0.13 inlhr OK
2.53 ft'lsec
3.33 ftelsec
0.80 Wiser
248.00 fmsl
245.50 fmsl
246.10 fmsl
246.00 fmsl
245.00 fmsl Data not needed for calculation option #1, but OK if provided.
231.00 fmsl
230.00 fmsl Data not needed for calculation option #1, but OK if provided.
1.00 it
Y (Y or N),
248.0 fmsl OK
Form SW401-Wet Detention Basin-Rev.8-9117/09 Parts 1.811. Design Summary, Page t of 2
Permit No.
(to be provided by DWQ)
II. DESIGN INFORMATION -
Surface Areas
Area, temporary pool
160,772 ftz
Area REQUIRED, permanent pool
18,603 fit'
SAIDA ratio
0.70 (unitless)
Area PROVIDED, permanent pool, Ape,,,.
138,376 ft`
OK
Area, bottom of 1Oft vegetated shelf, At we,
130,168 ft`
Area, sediment cleanout, top elevation (bottom of pond), Aeoi pwd
59,771 k`
Volumes
Volume, temporary pool
379,822 113
OK
Volume, permanent pool, Vp.,,
1,279,645 ft'
Volume, forebay (sum of forebays if more than one forebay)
270,351 ft'
Forebay %of permanent pool volume
21.1% %
OK
SAIDA Table Data
Design TSS removal
90 %
Coastal SAIDA Table Used?
N (Y or N)
MounlainlPiedmont SAIDA Table Used?
Y (Y or N)
SAIDA ratio
0.70 (unitless)
Average depth (used in SAIDA table):
Calculation option 1 used? (See Figure 10-2b)
Y (Y or N)
Volume, permanent pool, V...
1,279,645 ft'
Area provided, permanent pool, Apm
138,376 ft`
Average depth calculated
9.25 ft
OK
Average depth used in SAIDA, d., (Round to nearest 0.511)
9.0 It
OK
Calculation option 2 used? (See Figure 10-2b)
(Y or N)
Area provided, permanent pool, Ap,,,
138,376 k'
Area, bottom of 10ft vegetated shelf, A� ww
130,168 ft`
Area, sediment cleanout, top elevation (bottom of pond), Apor pona
59,771 ft'
'Depth' (distance b/w bottom of 1Oft shelf and top of sediment)
14.00 It
Average depth calculated
ft
Average depth used in SAIDA, d„, (Round to nearest 0.511)
It
Drawdown Calculations
Drawdown through orifice?
Diameter of orifice (if circular)
Area of orifce (if -non -circular)
Coefficient of discharge (Co)
Driving head (He)
Drawdown through weir?
Weir type
Coefficient of discharge (C.„)
Length of weir (L)
Driving head (H)
Pre -development 1-yr, 24-hr peak flow
Post -development 1-yr, 24-hr peak flow
Storage volume discharge rate (through discharge office or weir)
Storage volume drawdown time
Additional Information
Vegetated side slopes
Vegetated shelf slope
Vegetated shelf width
Length of flowpath to width ratio
Length to width ratio
Trash rack for overflow 8 orifice?
Freeboard provided
Vegetated filter provided?
Recorded drainage easement provided?
Capures all mnof at ultimate build -out?
Drain mechanism for maintenance or emergencies is:
Y (Y or N)
3.00 in
in'
0.59 (unitless)
0.79 ft
(Y or N)
(unitless)
ft
ft
2,53 ft/sec
3,33 ft'Isec
0,21 ft3/sec
2.85 days
3 :1
10 1
10.0 ft
3 :1
5.0 :1
Y (Y or N)
1.0 It
OK, draws down in 2-5 days.
OK
OK
OK
OK
OK
OK
OK
N (Y or N) OK
Y (Y or N) OK
Y (Y or N) OK
Emergency Spillway
Form SW401-Wet Detention Basin-Rev.8-9/17/09 Pans L a II. Design Summary, Page 2 of 2
Permit
(to be provided by DWQ)
III. REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Pagel Plan
Ini ials
Sheet No.
C —17
1. Plans (1" - 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Basin dimensions,
- Pretreatment system,
- High flow bypass system,
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Overflow device, and
rG 1 f
t.7
- Boundaries of drainage easement.
p—IT
2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing:
- Outlet structure with trash rack or similar,
- Maintenance access,
- Permanent pool dimensions,
- Forebay and main pond with hardened emergency spillway,
- Basin cross-section,
- Vegetation specification for planting shelf, and
- Filter strip.
C -18
3. Section view of the wet detention basin (1" = 20' or larger) showing:
- Side slopes, 3:1 or lower,
- Pretreatment and treatment areas, and
- Inlet and outlet structures.
4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified
on the plans prior to use as a wet detention basin.
C XIr's
5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay,
to verify volume provided.
6. A construction sequence that shows how the wet detention basin will be protected from sediment until the
L
��/7
�GS�
entire drainage area is stabilized.
7. The supporting calculations.
Cnia Yd(
6. A copy of the signed and notarized operation and maintenance (0&M) agreement.
J—�' H ertc 6 In 9. A copy of the deed restrictions (if required). ( Pl JS 0 AC r! J /✓�lJ�
c H �G�� ^ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County
soil maps are not an acceptable source of soils information.
Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1