Loading...
HomeMy WebLinkAboutSW6110204_APPROVED PLANS_20110208STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD 1 I 2 I 3 4 5 A C 1.9 n ° 8 Ineview 2 3 PROJECT LOCATION 1 � Johnsonville Spout g •Avera'sboro■ ! s p e _' a. 55 q a 23 �., 81 Rivers, linde48attlegro'und 8 1 ,f Wrle 690� 401 5 1 p - Falcon s Spivey's :.: •., .k. 3 Wa 4 82 y Corner p" 3 13 2 m Piney Green 4 421 Fayet�t� Ile 5 ! V P e a S A M 5 la rosefl 13 _ - + 6 ' N.C. Justice Ra 4 401 Cumberland59 } 4+ 3 ander 4 3 Autryville Academy Salemburg Cli t 4 6 c,9 '3 Stedman g 4 aeford Cy.FISH Y . _. 3 18 •� n 12 B Arabia %,Hope 2 Cedar 210 NRoseboro Mills 3 Greek ar U, Duntl arrach 2U 8 ,�Parkton 3 4 '1 87 Lena 14 4 Antioch Lumber 7i ,mC U ,M B E R L A N D� 411 !$ridge \ 301 t IS ', 13 211 �• 5 Rex `y t I _ \ _ i 5 Hannon 5 •''¢ioores/ +,F l ittle - -- •-•2 2 L '.'L'akel k• ak,, Stn ry Parka burg Red Springs � S TO ermory to& 242 4 5 1 2 Rennert 2D� Ll ke 1,aakee Ammon 11 Wakulla `5 S St. Pauls ``I 4 53 3 1t 6 5 W ite Oak 108TH ADA BRIGADE COMPLEX, FORT BRAGG POST CONSTRUCTION STORMWATER MANAGEMENT PLAN VICINITY MAP SHFFT NUMBER PLATE REFERENCE NUMBER DRAWING TITLF 1 T1 COVER SHEET 2 DA1 PRE -CONSTRUCTION DRAINAGE AREA MAP 3 DA2 POST -CONSTRUCTION DRAINAGE AREA MAP 4 C1 WET DETENTION BASIN A GRADING PLAN 5 C2 WET DETENTION BASIN A GRADING PLAN 6 C3 WET DETENTION BASIN B GRADING PLAN 7 C4 WET DETENTION BASIN B & C GRADING PLAN 8 C5 WET DETENTION BASIN C GRADING PLAN 9 C6 WET DETENTION BASIN C GRADING PLAN 10 C7 WET DETENTION BASIN D GRADING PLAN 11 C8 WET DETENTION BASIN D GRADING PLAN 12 C9 WET DETENTION BASIN CROSS SECTIONS AND DETAILS 13 C10 WET DETENTION BASIN OUTLET STRUCTURE DETAILS 14 L1 WET DETENTION BASIN A LANDSCAPE PLAN 15 L2 WET DETENTION BASIN A LANDSCAPE FLAN 16 L3 WET DETENTION BASIN B LANDSCAPE PLAN 17 L4 WET DETENTION BASIN B & C LANDSCAPE PLAN 18 L5 WET DETENTION BASIN C LANDSCAPE PLAN 19 L6 WET DETENTION BASIN C LANDSCAPE PLAN 20 L7 WET DETENTION BASIN D LANDSCAPE PLAN 21 L8 WET DETENTION BASIN D LANDSCAPE PLAN 22 L9 LANDSCAPE DETAILS 23 L10 LANDSCAPE DETAILS LEGEND �Ir�lr�11�rr�rr�rr� CONSTRUCTION LIMITS S EXISTING SANITARY SEWER LINE HEADWALL W EXISTING WATER LINE RIP -RAP (TYP.) Gx EXISTING NATURAL GAS LINE -X XX X—X- SILT FENCE jj EXISTING WATER VALVE (WV) ■ JUNCTION BOX (D EXISTING TELEPHONE MANHOLE 2001 NEW CONTOUR 0 EXISTING FIRE HYDRANT - - - 2001- - - EXISTING CONTOUR SD EXISTING STORM DRAINAGE LINE Ili}.I Ilt} I� win IV F i 1 - 1111 I l llll Via, �1 � ,,,.� ���...�"` 1 � � S ■ ' � �I i�A`�. @ �.� ■ i `■ _ ill y I * '�� / 1 1 t ✓r �� r 1 rr � , V b �\ `yl /may V{ �I IL'i _ .y✓��.� �T+�-�„���"\ rtp� 1 i � t'. � /�l/rgrx' Jam* � uJyy°ny.• , PLAN SHEET LAY -OUT ;.p fc) I,i , ; Uor. �meot-, Co, strt C es3 40curnwit; '3 @Quire' Ii e e N,,rih Carolinp. rules re a+ rn ystem de ,gr Insr �i ; confo r- y ,",e pin a .n; pliarn^x v tl rip.�.� SuJ61 o1l fx._. lar� t's�ll. '��r_ 7f.1' _ , gs101i 3tr .ftfn♦i f%'. NC US ARMY CORPS OF ENGINEERS SAVANNAH 11�111@ c7 6 i N O Z 6 O Q O W 1:0 H F )c } WaW I- b �rZ0 o� o� W U �� a� �>� z�F �Z (0 U5IL Uc� J I m 0 UU �z 11 U Z m zM< ov U)3Q Z)OJ NN a' ❑ (nJ LL u) N U ro x & W �WV �N= of a'zF_ w��>� Wya zz� Lu W= C7LLQ Maz 0wz ZOZ 71rn }aQ -iod. 2It> _ ~ Q U z a l- z Y W �J a W LU 0 I-Q < W 55 U J ~ `^ vJ a. I LU oZ2 x¢ > 0 aW Lm F-: U LL z o O U 1= rn O a PLATE REFERENCE NUMBER T1 EET 1 OF 2' c 0 D US ARMY CORPS OF ENGINEERS SAVANNAH ai oZ z r� w p N Z o00o Z ' U ¢o w W~ �-p} oo Qco pN �-N 0� J z 04 d am H> ao0 o�a� W- pZ (1) U U ui a cop w U0 j (� U U m Ux O� �w wo �co< a m pv p Lu (n Zp ¢ m�W 0 J wX N iV p� (nJ LL W N � C doo O mN U)w F of -5m �WU (fn-` aZ� Lu W��>� ZZp w¢o W= ULL¢ moz U Wt WoZ =, AU)¢ 0�-R _� r <0(ap :i Z J LL H Z Y L Z n 0Z O �Lu (D a U Z5 a Z) LLI X= w ry Q (L Q U) W m0 Z o (� 0 Q Z ¢< W L m ~ LL co z a p 0 U 0 a J PLATE REFERENCE NUMBER DA1 1 1 2 I 3 I 4 5 C C WET BAS I_1 US ARMY CORPS OF ENGINEERS SAVANNAH 1111�9 oZ oZ �w wo N O oa0 Z p U ¢ N w ~ Uo } ao � p04 FN m~ O�O, w U F n O o J a. P> ¢oo M z � ob,¢ �'t oz(4 U�UN 111 LL m cc Uo N p� }O � U� mw 0 ❑ (D LLj J wW a u 2 ' Z p p () z p 3:¢ M:D 50 J W x NN Q' p [n J LL (n N H U C � 02" Lu (n C, W U it � W w a'Z� w Wjo 3 L ZZp WQo W= zLL¢ maz ymt w0z 53� }5'a °�,2 �x> _^ Qoyow —19 5 a z �¢ z w Z w O Q �� a U Q XU w Q (L ZW oz O Q o c� w U oa ° Z tm U) O z oLL a 0 O U H O a PLATE REFERENCE NUMBER DA2 SHEET 3 OF23 , 11 2 3 4 I 5 C 0 0 WETLAND, TYP l `\ l •\ I 1 1 1 t 1 1, N N N , � 1 1 ' I ' 1 ' 1 i 1 ' l \ r""- , , , v r ; 1 , I , 1 , i It 11 o , Y I 1 , I I � I � I � I I 1 � I � 1 � / 1 / I I I , 1 1 I 1 i I I 1 , I ' I 1 I I 1 ! fie I I I I 1 r , , I I , I 1 , I 1 / I I , 1 I I I I I 1 ' I I ' I � ' I 1 , 'I 1 I , I h , I 1 1 I it I 1 I I ;1 1 ' , � I , I I , ' 1 ' 1 V I ' ' 1 , I I I , 'I I I I r• I 1-2 1 1 I , I I I 1 I I 11 r' II If If I, / 111, 1 I 1 , I , I I I 11 I / If IV\YI 1 1 I ' 1 �,I 1 ,' ' 1 if it, I1 1 , It I , i 1 / / I , , I / / I , / I II I / 1 I 1 , ' i I , � 1 1 1 1 1 � I 0 i i jI� l j v I 1 1v I I I1� v I I I l I 1 II , II 1 1/ II V I I I ♦ i 1 I I ' ^ 1 1 1 1 I I 1 1 I 1 I I I I N N I 1 1 \ I I I 1 1 1 1 i 1 , � �-I I ' i / 1 � 1_/ 1 1 ' 1 I n 1 1 1 1 I I 1 n , , , IIVI 1 1 1 I I I I 1 , 1 `J I �`('�' 1 '1 1 1 1 • ' '' I' I 1 ' \ 1 I 1 \ 1 1 \ + 1 1 m QQ ' I I 1 1 ' 1 1 \ 1 1 ` \ 1 1 1 ` I 1 1 1 1 , \ 1 1 1 1 ' 1 ' 1 ' 1 1 '1 IJ VV ', ��( 225 ', J>� ; V J �: yl 1 ' 1 ' N1 L ; 1 1 TQ 1120' WIDE FOREBAY SPILLWAYEL 222.5, CLASS B, STONE i I' , I , 1 1 ,, 1 1 , ml1 11 , 1 1 1 ' 1 1 i 1 1' 1 1 1 ' ' � 20' WIDE EMERGENCY SPILLWAY EL. 225.0' CLASS 'B' STONE ' it It 1 ' 1 1 ' 1 ; 20' WIDE FOREBAY 1, f 1 ' SPILLWAY EL 222.5' 1 I 1' 1 � 1 1 CLASS 'B' STONE " WET DETENTION BASIN A Oil .IIII/IIII/III/ 1I1�1/11111111.„L2Ii 01'I/ /I/11//////III/I/I�ItlIhVl1 i/tI/II/III//I///I/I►(ICUIn. W. SEE SHEET 5 MATCHLINE -A- NOTES 1. CONTRACTOR SHALL PUMP ALL WATER FROM EXISTING DRY DETENTION BASINS PRIOR TO CONSTRUCTION OF WET DETENTION BASINS. THE WATER SHALL BE PUMPED TO A SILT SACK TO FILTER SEDIMENT PRIOR TO DISCHARGING FLOW OFF SITE. 2. ALL SEDIMENT SHALL BE REMOVED FROM THE EXISTING DRY DETENTION BASINS AND STORED IN LOCATION AS DIRECTED BY FORT BRAGG. 3. CONTRACTOR SHALL LINE THE ENTIRE WET DETENTION BASIN BOTTOM AND SIDE SLOPES, INCLUDING THE FOREBAY WITH A ONE FOOT THICK CLAY LINER. THE CLAY LINER SHALL EXTEND FRAM THE BOTTOM ELEVATION OF THE POND TO AN ELEVATION ONE FOOT ABOVE THE PERMANENT POOL ELEVATION, THE CLAY LINER SHALL BE CONSTRUCTED AND COMPACTED SUCH THAT THE INFILTRATION RATE IS NOT MORE THAN 0.01 WHIR. 4. SEE LANDSCAPING PLANS AND DETAIL SHEETS FOR PLANTING REQUIREMENTS WITHIN AND SURROUNDING THE WET DETENTION BASINS. 5. EXISTING RISER STRUCTURE SHALL BE MODIFIED AS SHOWN IN DETAILS. IF THE EXISTING RISER STRUCTURE IS DAMAGED BY THE CONTRACTOR DURING CONSTRUCTION, IT SHALL BE REPLACED BY CONTRACTOR AT NO ADDITIONAL COST TO OWNER. 6. EXISTING RIP -RAP OUTLET PROTECTION TO BE REPLACED AFTER DRY DETENTION BASINS ARE CONVERTED TO WET DETENTION BASINS. 1 1 1 1 t 1 1 1 1 / 1 1 1 1 1 1 1 1 1 1 1 11{ tl j`t 1 1 1 1 1 t 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 f 1 1 1 i 1 1 ' / , , / / / , / , / / / / , / / / / / , , , , 1 1 t 1 1 1 ' 1 / 1 / GRAPHIC SCALE 0 30' 60, SCALE:1"- 30' • ••OFE�N j�9 ♦ . QP % US ARMY CORPS OF ENGINEERS SAVANNAH III�I IIYII J o z �w .. 0 0 Iil0 NZ Zoo <0 W'- HD} ON � = � 00 wWU FNw6 a� F> � Z � F 0Z tq 050N W mo af Uri (D /n n m U� 00w O� w wa m m KcaEno Oa Lu O �< DO W Nip o� (1)J LL (nN H U of �vm LnX� ��W OWU t1N_ LL'z♦Y C9 In w=M W ZZD > L w¢o W= U' LL Q maz (/1 '0 t WOZ s�.v < °-� >a ��> _' Q 0 < ~ Z J fL z W z_ o? 0 ¢ a �z L ¢ mJ to U z tZ F O d0 Q F-Z 2Z z— Q Q Qw u~i W� =m 00 OLL Z O U W U ` 5 a PLATE REFERENCE NUMBER C1 r �bw•-L iO I y�`o,34 EE yZ«@ oaT3 _� a 2Eo2 -3yovo m C 3P�wc'a¢e 2 �'9m ncC E v ., :J �1 i•'r1-- t: 7, ..,_- T :-.,� ,�7`., ' is--•-: -- 1 E 11 5 7 c A /w l20g y "20g; 3 MATCHLINE -A- SEE SHEET 4 il�lll \ t \`, \ \ \ \, , \\\\ \\ \\ \ ,\ \ + `\\ ,\ ,\ \\ \\ \\ \ \\ \` \\ \,\\` 1 ,y1 \\ \\\ \\`\ , \ \ \ \\ ` `\ \ \ ` \ \ ` `, \ \\ ` \\ \ \� \ , \ \ \ `\ \ \\ `\\\ `\ \\ `\'\ `\ `, `\ IA \ `\ \ \\ \\ \,�� J�`\ `\ \\ `\ `\ \ \\ \`\C �\``\ \\ \ \\\\ \ i ` \ \ \ \ \ \\ \ ` \\ \ \ \V, ,l \ ,\ \ 1'''\\\\ ``\\\\`\``\\`\\\\ \`\ \`\ \\`\`\ IV \I \ +1 1 +1 1 \ 1 1 SD \\\` \ \\ \\ \``\ STRUCTUR`E`\StE'\ E`\.`; NOTES 1. CONTRACTOR SHALL PUMP ALL WATER FROM EXISTING DRY DETENTION BASINS PRIOR TO CONSTRUCTION OF WET DETENTION BASINS. THE WATER SHALL BE PUMPED TO A SILT SACK TO FILTER SEDIMENT PRIOR TO DISCHARGING FLOW OFF SITE. 2. ALL SEDIMENT SHALL BE REMOVED FROM THE EXISTING DRY DETENTION 3. D SI LINER. 1 ' '' ' ' PERMAN '1 i CONSTRI 11 11 RATE IS ,,1 + it'll I P,0�2mEBA 2 4. SEE LAn It , REQUIRE 5. EXISTINC + 1 1 1 1 ' IF THE 'i DURING 1 NO ADD i it % ' It It 6. EXISTINC it 'ip I I I t DETENTI( 1 1 P 1 , , 1 1 1 1 , I 1 1 , � , 1 , C 't It 1 ', l l� i +, 1 1 I 1 ,' , 1 1 1 i 1,� III 1 1 1 1 , tV" , 1 1 1I 1' 1 , 1 1 1 1 1 + ,p}v��y 1 vlJ" 1 I 1 1 1 t 1 1 i, , 1', 1 '1' 1 ' I 'I'vJ1 t 1', 1 1 1 �1 1 1 i �' Y 1 t 11 It ,, 1 i tl , 1 11 1 1 \ t 1 1 1 I i 1 1 1 1 11,11 1i t ' , 1 ,11 + 1 1 , , 1 1 ' 1 ' 1 1 1' 1 1 1 1 t` i' It i ' 't , 1 1 1' , ' t ` I It 'I 'i 11i C t 11' ii'C 1 5 'i , 11 I`, `1 � 1'1 R' G Ill ,1 ' tt it ,i ; i 1 1 1 1 1 + 1 \ 1 ,1' I, 1 ' t,, , I I 11, ,1,1 ,1 1 il,I�tl , , 1„ 1 , 1'1'i I 1, i11+ 1 1 1 l i l i,l m 1 1 1 , 1 \ \ 11 1 1 1 1 1 1 1 iit C \ / \ ), `` ♦ `� ``` \ `. \----' / / . �I ill 1\ 11' , ; I II 1 it tt 1 ✓ \` \\\�♦ ��` / 1 111' 1 ' I 1It It ';1 I, it ; I ;'I ; RI �RIP-RAP LET 1 --------- 'W x 25'L', 2' v Ov 104I/,,1 NI CN ♦ ` C N 1 1 `' 1 1 1 1 N4 t l i'\ ,\',1i1;i\',1' �\ `\ \` \��\ \ c\�\,\\I \`Ja\,\`\\\\\\\ \ \ \\\ \ \1.\I\.`. \ND STORED IN LOCATION AS DIRECTED BY FORT BRAGG. TOR SHALL LINE THE ENTIRE WET DETENTION BASIN BOTTOM SLOPES, INCLUDING THE FOREBAY WITH A ONE FOOT THICK C THE CLAY LINER SHALL EXTEND FRdM THE BOTTOM V OF THE POND TO AN ELEVATION ONE FOOT ABOVE THE NT POOL ELEVATION. THE CLAY LINER SHALL BE CTED AND COMPACTED SUCH THAT THE INFILTRATION NOT MORE THAN 0.01 INMR. )SCAPING PLANS AND DETAIL SHEETS FOR PLANTING RENTS WITHIN AND SURROUNDING THE WET DETENTION BASINS. RISER STRUCTURE SHALL BE MODIFIED AS SHOWN IN DETAILS. XISTING RISER STRUCTURE IS DAMAGED BY THE CONTRACTOR ''ONSTRUCTION, IT SHALL BE REPLACED BY CONTRACTOR AT 'ZONAL COST TO OWNER. RIP —RAP OUTLET PROTECTION TO BE REPLACED AFTER DRY N BASINS ARE CONVERTED TO WET DETENTION BASINS. it , 1 l• 1 i I 1 i 1 1 I I 1 1 1 1 1 1 1 1 I 1 1 1 1 1 i 1 GRAPHIC SCALE \ C I 0 30' 60' SCALE,.1"- 30' LWni US ARMY CORPS OF ENGINEERS SAVANNAH �IIII� n oz \) w N Z o00 ' Z U Qo N wO m 6} ON F ,yj W U !gob0� r rr♦I w a F % J Z � � OZ(n o3:UN J D m af Um 00) 0 W n U� °o W 0 LwX a Z Lu co �NZ UM 0 Z0 in W W X Q' (n U- fn N F U 13 Dv� wpm coU p W (.9 d'Z_♦Y w(D— Wje 8 ZZo Wao W (7 LLQ m$z Nat ZOz D?:. w z 0 �; _^ QOU U I- z g Q Z F- L Z Oz 0 coQ w0 z Z a FD U 2 O CD X= w F- Z _j F Z w Z o(D of W a cD o 0 CD a L In r r— Z w o LL O U a PLATE REFERENCE NUMBER C2 ✓L E - lT T. owc�o ro cc M oz>,�=�n 2 c .tEE N I� 4 �izr Wit 5EO a EL � U N 0 LN m Rsyl J �Som tS _ 1 2 I 3 I 2 5 G7 C 0 m \ \ \ \ --''------- - ..- __-- _ 7------------------------------- - ?-__ ____-- ---- ------------------- --------- -- - - -7 - -- ---_- -- -- -- --'_;- ----------------------------------- 727-------- - �--------=�-------------- ------ ` - -- _ - --------------------- - - - -_____ ____-------------- S _ Z _ - 11 ------ �KMOb€ STONE �,- ---- ------ 0 -------- it it \ I I I 1 1` V I It A If ETLANDS✓ TY ; / ; / / / 1 % % ' % ' ; ' % % t it If All At I / 1 1 , Rip' R P,P OTECTION 16'1�V, xO'L'1 `', 2' HICK ' » `S+T NOTES 1 ` , ICLA$ .BI 1 1. CONTRACTOR SHALL PUMP ALL WATER FROM EXISTING DRY DETENTION - - 234 BASINS PRIOR TO CONSTRUCTION OF WET DETENTION BASINS. it I t ' THE WATER SHALL BE PUMPED TO A SILT SACK TO FILTER SEDIMENT IN --- PRIOR TO DISCHARGING FLOW OFF SITE. ', �, 2. ALL SEDIMENT SHALL BE REMOVED FROM THE EXISTING DRY DETENTION BASINS AND STORED IN LOCATION AS DIRECTED BY FORT BRAGG. 11 t 11 3. CONTRACTOR SHALL LINE THE ENTIRE WET DETENTION BASIN BOTTOM 111 u' AND SIDE SLOPES, INCLUDING THE FOREBAY WITH A ONE FOOT THICK CLAY 1 1 + ' 11 1 , LINER. THE CLAY LINER SHALL EXTEND FRdM THE BOTTOM ' 1 t t'I '' `' ' ' ELEVATION OF THE POND TO AN ELEVATION ONE FOOT ABOVE THE `' `II `, �•, PERMANENT POOL ELEVATION. THE CLAY LINER SHALL BE ' ' KIR RA , ;OPT E P OTECTION CONSTRUCTED AND COMPACTED SUCH THAT THE INFILTRATION 11' ` 1 it x 'L I' HICK RATE IS NOT MORE THAN 0.01 INMR. , \ I \ 1 4. SEE LANDSCAPING PLANS AND DETAIL SHEETS FOR PLANTING 11', , t�A'�S ., REQUIREMENTS WITHIN AND SURROUNDING THE WET DETENTION BASINS. A1$EE'1''j4OT 6', 'cn 5. EXISTING RISER STRUCTURE SHALL BE MODIFIED AS SHOWN IN DETAILS. ''I I , 1 1 IF THE EXISTING RISER STRUCTURE IS DAMAGED BY THE CONTRACTOR SD DURING CONSTRUCTION, IT SHALL BE REPLACED BY CONTRACTOR AT I NO ADDITIONAL COST TO OWNER. 6. EXISTING RIP —RAP OUTLET PROTECTION TO BE REPLACED AFTER DRY DETENTION BASINS ARE CONVERTED TO WET DETENTION BASINS. I,1 ,1 1 111 '1, 1'1111 ' 11'1 '; 11� - " 2 , ,1 , 1 , S A ,1 111 G 11 \ % ` 1\ +' 1 1 1 t 1 `\ III I 1 I\1All '111 , I ,, •\ 1 \I 1 _ 1 4', tv \ , 1\ ,111 r_ 1 'I ,'`\'`'` \v'` ,`I 1`------- 232 --'11 1 I.. I , 1^,t 1 , 1 % col it \,"A,� �'1 2321 --------------- , 1 3 � 7 -2 it IN \\ J ', 1 \ t \ \ 1 1 I IN �%1 , ,xO', ', \ R P OUTLET PROTECTI % 1, `vI I • `I, I' � 2 - z 451L x 2' THICK "\ B" STONE 1 W %llol 1 fV ;(1(f i r j %%% " E 0 E 6 g\ `, W r loo rMv'l I 1 \\ \ ♦i _- 1, ti ( i I Y `' '1 \ 1 1 1 , I I I I 1 , ..I 1 1 I I I I I I 1 1 Do 1 S ----- ''l'( ' ' I I, 11 1 I I i, I l l l, l , / O O 1 \ I ` } \ ' I , 1 I I 1 1 1 1 I I I , I I \ 1 (, 1\ \ \ \\ 11 S, \ 11. \ \', ° i \ 1 ) ) / \\ I I I I 1 I 1 I 1 I I ' ` ( t\ 1\ \ \ `\ \ \ i `\ \ , \ \\ 11 `t ', 1 + l'{ 1 ,>/ ill,\ \ 1 I 11I III 1 1,\,\,\,`\\\,,\\ \ \ \\, ,,,, 1, 1 \ 1 I 1 I I 1 I ' I I I I I IV %\ IN \ \ \ \ ` \ , ` ` \ ` \ \ ` 1 1 \' 1 i-'- 0 1 , \ 1 1 1 I , , I I I , I I I I � \ `\` \ ` ` \ \ ` \ \ \ \ \ , . `.\ '�' \ 1 ,I 0 1 I I 1 i I I I O \\\ ,\\,,\ \ \ I,\ \ . , I I t\ \ I L '�-i I I I 1 , I I \\ \ \ \ \\ \ \ , \ \ \ \ . \ , \ ` � . . , , \ l 1 Cn L 1 I' I i -� r � I I � I � 1 1 I I 1 ; I I I I I ` \ \ \ \ \ \ \ \ ` . . \ , . , • . ' 1 l 11 i t I I I + 1 I I I I I \\ ` + \\\\ ' \\ `\ `\ `♦`\ `\ `\ �\ . \ ` 'I `, 1 \ 111 ' \ . , , ` ` \ \ \ ` \\ 11\__---- < \\ , `\ `\ ` ` \ \ ` ` \ ` \\ \ \ \ { _--"- o / '� ♦ ' I (0 I I ` i I ; 1 I I / ft\`\ `\ \\,\ \\ \\ ,\\\\ � \\ \I, \ \II ,`,1 \I11t `^\�'.,✓ / /,. ,. \ . \ `\ . .`` \ \`I \ , ` ` , 1 1II- I` % 11, \`\ `\. `. \. `, ���`�` ` . 1 \ 1 1 1 t I t 11 ` ° •\ , `, .\ N. \ ,'\ 111 `II `I .. A II \♦.` / 11 \ / / I 1 I / I , \\}\�}yJ•\V)\'[�]�ry`µ.J+\,yL�`y`'� l 1 ', 't i ' 1 1 ' ' It 1 kill , , 11 I \ u l , �- 1 1 > o J / /%'% % «( % % '' WET D1� `- 1 1�`1 ', `i ; ; I 1 `; J �"- -- 229 �;I, 1 - \ % r l I `\` 1 1 1 1 I 1 i l l i 1 \` `, 1 1 \-------- / 1 , 1 , I 1 1 ' I + I t 1 I I^ 1,,; 11 ; 1 ',t , 1 , \ ;1't \ \ 1 1` , AN I I I I 1 I , I ` \\ \\ , 1 1 ,1 1 1,w'�i l , 1 \1 \ iJ t ; i \ ,', I ', yl ; I I 1\ \\t �\ \\ 1\\ \,, 5 t •% 1 , 1 ' I 1 ` \ , ` •, ' t ` /' '' / '' / / / ,\ i ' i i ' I i I` 'i i I' i i k Y 'I 1 ', D.: '1 ` '\ i�.'.,111 '\ I It I , , , 1 i 1 , , N, , IN + 1 1 I 1 ` `I I t \ Ik 1 1. 1 1 1 t I 1 1 1 1 1 , \ ,\ i , i' iPh \ \ \ 1 y i i 1 � 1� 1 1 1 1\l`-/ I I \ 1 ` \� ; \ `.,: ` ,1-_"" ^' li ' w; 1, 1 1 1 1 1 'I GRAPHIC SCALE n�u // ./ °/ / I I // , I 1 1 I 1 `\ ♦ ♦ \ \ i , I,1 v I '' i\ , J ' i It i 11 11 11 1 1 1 \ ` 1, \ I \ \ 1 I I 1 1 ,\ , � / J I I , � I , I I I , ♦\ \�♦ 1 1 Y 11 1 1 1 1 1 , 1 I I I I I{ 1 I I \ \\ \ 1 i 1 i ` I ' I .\ . ,. , 1 1, 1 d l\ 1 1 1 1 I I I i \ , i 1 � % r �i \\ �\ �, `\ ` \\ 1 11 1 1 I � �+ I I I 1 1 1 1 I I I I `I , t\ Al1 I I . \ , , 11 1 1 1 1,, "i I I I I\ \ \ , I 1 1 I i ' ' 1 I I ' `. \\` ' I I I I I l r I I I I I I I I I I I I \\ \\ \ ` \ ♦. ` \\ \ �. It ( 1 1 +, I , \ \ \, l \ \\ \\ \ I I L �I. I \ f I^ I \ \ \1 `♦ ``, I ' , 'I II '1 ' 1 \ \ I,\\\\\\ ``\\ 0 30' 60' \' `. `\♦.. ♦`. \`. ,, I. ' ' 1 1 \\ \ \ ` MATCHLINE -B- SEE SHEET 7 SCALE:1"- 30' US ARMY CORPS OF ENGINEERS SAVANNAH �em�e IIIIIIII IIII� . CDZ c7 o W 0 W o C. N Z 0 Z o Q O 2 H } u co ❑ U;z WW2 L1J�a� F� J Z H 000 O�UN 111 m af Um p (D u) 11 m U x 0o O � wX J a m z p� p LIJ (n Zp >Q m tj �O W J W X NN p Q' (n -I LL (/) N U Z3 02 owU 0 n=` Xz� W�, (>L WOro Z Z D W¢ o m Nm r zLL< O Z 5 5.rn C)-- }�Z QO(a/J U C6 7 Z (L I- z Z O Z Lu 111 w Q m J [nV 0a/� LU F V O� 2 ZQ W o¢ wit� Lm 0 LL O WV U H O a PLATE REFERENCE NUMBER C3 L SHEET 6 OF 23 i 1 3 4 I 5 0 C 0 0 iO , 1 , 1 \ \ 1 \ , \ 1 1 \ '1 \ 1 I 1 ' 1 ' 20, IWI + SPILLW ' CALSS ' 1 1 , 1 , 1 , 1 , 1 , , , , i / EXIST STRU SEE \ \1 1 1 1 1 1 I 1 I 1 I 1 1 1 I 1 I 1 I 1 1 I I I I 1 i 1 1 1 1 II \ \ / / / / , / / J MATCHLINE -B- SEE SHEET 6 ` \`\ \+ \ I I I I I I^t 1 I I I I I 1 I I♦ `/J 11('\ � \ ` \` \ \ \\\, \ , I I I I I I I I I I I 11 1 1 1 1 \ \` ` A \ I I 11 1 1 I I I I I I I I I W ^'1 1 1 1 1 1 I I I I I I 1 1 1 '\ \ '+ + 11 IN \ 1 1 1 l 1 + ` , A, ` \\ , \ 1 1 + + , , 1 1 + , + + , , 1 \ 60ERdflitl N I + 1 i 1 1\, 1, % 1 I, 1, , E 1 ID ` n I ]I \ —� 1, I 1 I 1,, 1 1,, ` l , 1 \ , , I , , ', `' `, \ , , , , , ', ', `, , , , , , `, `, ',I'+,,`I � N E"` , f 1, j II \ \Y ; +, I , 1 ` II II N%N ', ', 1 \4 1, 1`,'`,'`I''I ,`, '`1 1'1 1 `II \I '\I 'II ',, `, `I `I 11 ' ,, I 1 fl --' ) 1 I / t It // / / I I(vv!/�/�// i RISER' / ' / / ,'I 'I �ANN, �'`\ AN It 1, I 'A, \ AN \\1�`\ ` y \ , \ \ , \ I I , 1 \ , 1 \ 1 \ \ \ I \ \ \I , \I \\ , \\ 1 \ 1 1 I 1 N It J\ % ( ( (\ I\ (I ) AN ;, `,I. I \i\p `II 'I `11 `; ,, 11 1I 1, \ It I +i `,, A ,, ,, 'I AN \\` AN ` ,\ `I\ \ ; ,1 II11 ,1 y ,, 111 � % VI, ,I NIX III II ,` 111 AN ,1 AN ,1 ,I ,1 ,1 III \ \ o i 1IN it \v At , I , 1 , 1 , IN 1 + , , 1 J 1 1 `\ \ \ , \ \ \ \ ` \ ` \ \ \ I, ,I NIA 'I \ `\ `\ \ ` I\ ` '\ `\ `I \\ \` '\ \ `\ \\ `I '\\\ IN \ 1 1 I \ 1 1 \ , \ \ `\ \ `, \ \ \ \ `, \ \ \ \ I \ \\ \ `\ \ 1 1 III l 1 I \ \ \ I \ \ , \ \ \ \ \ \ \ \ \ \ , \ , \ \ , \ \ \ I I I C 1 1 1 1 IWI I I 1 l \ \ \ 1 1 1 1 1 \ \ \ \ I 1 1 \ \ \ \ \ ` \ 1 \\ l 1 ` \ \ �------------ --- �/� / 1 I\ \ ,-------------- / 1 \ \ `-------------------- ' ` ♦ `------------------------ 218 / � 1 I J 1 , \ 1 I \ I + \ IN 1 \ I 1NAIAX 7D\. NOTES 1. CONTRACTOR SHALL PUMP ALL WATER FROM EXISTING DRY DETENTION BASINS PRIOR TO CONSTRUCTION OF WET DETENTION BASINS. THE WATER SHALL BE PUMPED TO A SILT SACK TO FILTER SEDIMENT PRIOR TO DISCHARGING FLOW OFF SITE. 2. ALL SEDIMENT SHALL BE REMOVED FROM THE EXISTING DRY DETENTION BASINS AND STORED IN LOCATION AS DIRECTED BY FORT BRAGG. 3. CONTRACTOR SHALL LINE THE ENTIRE WET DETENTION BASIN BOTTOM AND SIDE SLOPES, INCLUDING THE FOREBAY WITH A ONE FOOT THICK CLAY LINER. THE CLAY LINER SHALL EXTEND FR6M THE BOTTOM ELEVATION OF THE POND TO AN ELEVATION ONE FOOT ABOVE THE PERMANENT POOL ELEVATION. THE CLAY LINER SHALL BE CONSTRUCTED AND COMPACTED SUCH THAT THE INFILTRATION RATE IS NOT MORE THAN 0.01 IN/HR. 4. SEE LANDSCAPING PLANS AND DETAIL SHEETS FOR PLANTING REQUIREMENTS WITHIN AND SURROUNDING THE WET DETENTION BASINS. 5. EXISTING RISER STRUCTURE SHALL BE MODIFIED AS SHOWN IN DETAILS. IF THE EXISTING RISER STRUCTURE IS DAMAGED BY THE CONTRACTOR DURING CONSTRUCTION IT SHALL BE REPLACED BY CONTRACTOR AT NO ADDITIONAL COST TO OWNER. 6. EXISTING RIP -RAP OUTLET PROTECTION TO BE REPLACED AFTER DRY DETENTION BASINS ARE CONVERTED TO WET DETENTION BASINS. \ \ \ \ ^m ON IN AN Ax AN,` `AI ,\,\,, ,A % \ I , \ 1� I iI1' ( ; 1 \ ; , I i 5 J 1 , NC IN' 111' 11 1 1 1 11 1 1 + I I I I I 1 I I ^ I I I I I 1 1 1I 1 S 1 EMO { 1 JUNCI MWATEI I 1 1 I P OUTLET PF I \ , I Cv NI % , , ' ------ 1\� I ` --_ -- - + `--' IN \ `\ --- ----- 11 I 1 1 I 1 I I I I I I I 1 1 I 1 I I II I I 11 1 1 1 1 1 1 I I I I I I I 1 1 1 1 1 1 I I I I I 1 1 1 1 1 1 1 1 I I I I 1 1 1 1 1 I I I I I I I I I I \\ \\ \ `\ \\ \` \\ IN y` IN \\\\ \ \I `\ I\\ \ \ -J I 2V'=_ - - -----=------ - __------- FOREBAY 2 AP OUTLET PROTECTION Rn , _-__- ��;`, 18 'L x 2' THIC ., `qWo . '../P-0001010900000001 OF 9, N. �sv- SI PIPE �i`�` • � t♦� y/yA��yy� G � • \ 'LWAY EL 22.0 SS "B"STONE' , S/ ,,,�+FRU cE it If Zi 1 ; jo I / • / , �'� I I I I I 1 , , ; I GRAPHIC SCALE I I \%"ill 0 30' 60' 2 I 7.1 SCALE 1"- 30' �;�z;qNq""y1II)lP�`` \. US ARMY CORPS OF ENGINEERS SAVANNAH III■I@ IIYIII11 O Z mw " o a LLI O N Z Z6OU QO W O � F U o } � co O M F- c\I F O— Ocq Ili W U F- N W d F-% J Z -- � oZ� u>UN Lu LL UIn co of (n II U O w O ((D w ofo- z m w mZ ov (0n�Q�OW N(I LL (n N F- U F- N (n 0-1~ V �_m+ 0 W t7 `n �Z� w VI (n>� LJ ZZo W¢o W= (9 LL Q m�z S2 WOz �3� 0o'a }�Q a W� Q0� U U g a 06 F- z m LLI Z -Z a° Lu a mYU_a Z ii� a OZ 0Z 2 Zo o� of 0 W� am wC� m OLL Z 0Lu H a PLATE REFERENCE NUMBER C4 SHEET 7 OF 93 a uI`ivEd�m z� jo�a c0 m c n 41Z AU.�� Q N - i C O N .> = 'J <C m z 303 yo�mahya�.� Iv! Q.G , 1 1 2 1 3 0 A 0 C I U� Ld~ Z Li.l LLJ J 2 (n U'' QLLJ :2 (f) 0 U I REMOVE RIP -RAP OUTLET PR.OTE TION ----- ,' 20 W x 451 x 2 THI__ CLASS "B" �� ---- "- - TE 6 _ - - -r - -- w H ' W LLJ ---------RIP-RAP OUTLET PROTECTI01\T..,,..._. QLj w 20'W x 30'L x 2' THI mac/) _-- ' ``--CLASS "B" FOREBAY 1 TE / 2 - ---------------------------------------- - _ ��,. REB =':'r NOTES _ _ 1AP OUTLET PROTECTION _ '' f 1. CONTRACTOR SHALL PUMP ALL WATER FROM EXISTING DRY DETENTION ___ 5;'t►K 18 'L x 2' THIC BASINS WATERIMSHALOL BOENPUMPED TO A SILT SATION OF WET CK TO LyAI S ONE 2 -'"' PRIOR T C 0 FILTER SEDIMENT In6 T _ r% - 0 DISCHARGING FLOW OFF SITE. FE.S........_......; N OUTS 22©.bl ' -- .> 2 ALL SEDIMENT SHALL �y -- -- -- _- _- - - -- 2 - I T ALL BE REMOVED FROM THE EXISTING DRY DETENTION TUKt - - _ -- -------- ' BASINS AND STORED IN LOCATION AS DIRECTED BY FORT BRAGG. 'a�-�a�iY� '' - -2� +; -; F-//' 3. CONTRACTOR SHALL LINE THE ENTIRE WET DETENTION BASIN BOTTOM '-' ----_- - - - ---- --- - _ THICK CLAY �,, y � -=� ' // AND SIDE SLOPES, INCLUDING THE FOREBAY WITH A ONE FOOT SS --___ __- _ - ' _ - , -- -"---- LINER. NER. THECLAYLINER SHALL EXTEND FROM THE BOTTOM _ _ 1 ' ' ---- - ;-; THE ------------------- - A HE I I I /- _ .- --- ----- THAT T INFILTRATION ELEVATION ONE 0 ABOVE / PERMANENT POOL ELEVATION. THE CLAY ''_' c" %„d/' - CONSTRUCTED AND COMPACTED SUCH T LINER HALL BTIO I N MORE THAN 0.01 IN HR. / 91jk'WAY EL 1 .� �_,-';-'' -' _ - -, ,-,/,-- ,' 4. SEE LANDSCAPING PLANS AND DETAIL SHEETS FOR PLANTING " �f - - - - -, ;-/' _ REQUIREMENTS WITHIN AND SURROUNDING THE WET DETENTION BASINS. ,CLASS B E_ ------ - - _ , /'' --' '- - S. EXISTING RISER STRUCTURE SHALL BE MODIFIED AS SHOWN IN DETAILS. IF THE EXISTING RISER STRUCTURE IS DAMAGED BY THE CONTRACTOR Qv�' DURING CONSTRUCTION, IT SHALL BE REPLACED BY CONTRACTOR AT ,/ ,-'' \♦ ,/' NO ADDITIONAL COST TO OWNER. 6. EXISTING RIP -RAP OUTLET PROTECTION TO BE REPLACED AFTER DRY DETENTION BASINS ARE CONVERTED TO WET DETENTION A I 2 B S NS. _Y_ ,, ,,,,,,, ,, ,/ � // ,/-' ;,, , `, /; ,, />CONTRACTOR SHALL REMOVE EXISTING RISER STRUCTURE AND PLUG STORM ------------ - - END. - // D AI I I N R T PLEA LY EAL VE TS AT H\ t + 1 1 1 \ WET DETENTION 'tiN C II ill1l� I .-AS to x 1 I / ( 4 ok \vV 1 1 1 1 L 1. , , /i / , ♦\\\\ \ ♦♦ \ I ♦ ♦ ♦ ♦ ' O o I I / 1 0:7 ,*n, `, / r ''-'YTE c�vK',-' , - ,' �,', !'/ GRAPHIC SCALE ��uuuw ---------------- 't i i ,i ' ' / i /' ' `\� `♦ - -----_--- `, i , `, +, , II , 1 1 1 1 `� �Q� ES SI q,. •'9 ��� � � I , + , ' I 1 1 _— l I . / v'"'\ 'G -i r-' - 1 \ _. 1 . 1 1 �I ••NGI NE�'•• SCALE•1"- 30' /�4iiir°►0�� US ARMY CORPS OF ENGINEERS SAVANNAH � M W oz c14 z OOO z ' U �� Qo w U H r eq O o Lu J > <00 � z 0 ¢, o z co U U c♦I J 7 O m� � Um } ow U mW r� O 0(D 6j a ji wm : co m co Z eeTT ❑Z�O2O�W J WX N` Oft 0� W O W u) N H U c � (n 0 U)x U &�� W (7 N 01 2 wz� w0� 6 cr, Z W 0 w = mz a )>t WzLL Oz >>m OAK }coQ ��> _ Q O � ~ U 3 IL z C) Z �Lu a oz w 3o QQZ Lu ~ i a co UU Z � a0 � QOU' O W a 1, Q � 0 W cl) Lm F-: OU- Z O L11 H /n O a PLATE REFERENCE NUMBER C5 SHEET 8 OF 23 i 1 1 2 'q 4 R Lc C A u 238----,... �_---- W - 238 ------- -_ — ---------------- ------------------------ -------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ,- - 2 , / , \ \ 3 RIP -RAP 0 TL ` 30'W x 25' >, C S SEE NOT -- 1 O - 2' THI C NOTES 1. CONTRACTOR BASINS PRIOR THE WATER St PRIOR TO DIS 2. ALL SEDIMENT 3. PUMP ALL WATER FROM EXISTING DRY DETENTION ONSTRUCTION OF WET DETENTION BASINS. 3E PUMPED TO A SILT SACK TO FILTER SEDIMENT ;ING FLOW OFF SITE. L BE REMOVED FROM THE EXISTING DRY DETENTION IN LOCATION AS DIRECTED BY FORT BRAGG. LINE THE ENTIRE WET DETENTION BASIN BOTTOM INCLUDING THE FOREBAY WITH A ONE FOOT THICK CLAY INER SHALL EXTEND FRAM THE BOTTOM ELEVATION OF THE POND TO AN ELEVATION ONE FOOT ABOVE THE PERMANENT POOL ELEVATION. THE CLAY LINER SHALL BE CONSTRUCTED AND COMPACTED SUCH THAT THE INFILTRATION RATE IS NOT MORE THAN 0.01 IN HR. 4. SEE LANDSCAPING PLANS AND DETAIL SHEETS FOR PLANTING REQUIREMENTS WITHIN AND SURROUNDING THE WET DETENTION BASINS. 5. EXISTING RISER STRUCTURE SHALL BE MODIFIED AS SHOWN IN DETAILS. IF THE EXISTING RISER STRUCTURE IS DAMAGED BY THE CONTRACTOR DURING CONSTRUCTION, IT SHALL BE REPLACED BY CONTRACTOR AT NO ADDITIONAL COST TO OWNER. 6. EXISTING RIP -RAP OUTLET PROTECTION TO BE REPLACED AFTER DRY DETENTION BASINS ARE CONVERTED TO WET DETENTION BASINS. -- _--------- \ sl P OUTLET ION=------------- 6' 20'W x 2' THICK LASS „B" STONE _ ___----- , _____---______ ____________________________ -- __--- _--- __--__:_:;y-==_---___---"_-_-'--__----____'-----'___________-_--_-___ '-_ SEE NOTE 6 ------------ _--_--- -----r---=---------- - -- _------------_------------- _-- - —--------_---------------- 2 V-- ,00 ------------�---------------___------__ ------------_-----------------------------------_------------- <------"_- __1�--_---------=---------------------- -- ___ -- ,Y-, _----__ _ - - -r----------------------------------------------------- _-_--------__-------- _=--- --_----------- ---------------__------- -=_____- ;-___---- - - 26 ----- ------------------------------ - _ - - , LLJ L�J~ __________________ ________________ ____-- __ - -- ____-_=_==^--2_-_----__----__-----____------------------ _ ------------- _ ___ _ ___ --- - --- ----- _ --- �----------- II �—_---�-_f- I may__ __ __-_-_ _- = ---- --_-- __-_-_ --_--�-_----_�---- _ -- _-- = 2 2 a_--_._ ,� - ---- ------------- - f - r- _--____-__ __-____-- J GRAPHIC SCALECARn��nu►/, �l Py --�-- -__ / o � 1\ // / / // L'i// 1 1 I / ,' I I 1 1 I ` • QQ, N � > ° 00 r- Ld ~ Zw L LI J 2 2 U F— LLJ Q LAJ :2V) __ I ' / 1 1 1 1 1 � i /y�� • _ 1 i % �,•'.� NCI NEE;•' �� SCALE:1"- 30' /'fi111111D11\1 US ARMY CORPS OF ENGINEERS SAVANNAH Ili M w Cl Z O Z O a 0 } O(04 = QOmw 0, 0" 111 W L)H N W J CL <0 <00 _I Z6)H 06)<' 0Z (n U 3: U (V ui J a � UM co U 0) of }: 0 U p m U� 00w O� ❑ C9 ww 111 n J (L D co�m Z o fn�<70� zo m5 w W XX' NCV ���mJLL (nN U - Dam (n Ir ~ EsU w (D LL'Z� UJ w ZZo me, wQo W= U' LL< maz 0) Wt WOZ =3° �.o }a-< 2 _'0u U _� F C65 : Z 5 U z W z W (� U) z LUO Z m Q < z J d WF- F W (L 0 a _O I- z 0z 2 z 0 Q < C� O w 1.— w < L m H `� O LL Z O U w O a PLATE REFERENCE NUMBER C6 1 1 2 1 3 4 1 5 A C 0 u o � 1 3 \�----- 'lid ° , ^` f —W G— _—_— 1 _. G. 9 � lTC IP-RAP OUTLE)'�,PROT�TION \ 20'W x 201 x 2THICI __---- 2S( CLASS "B"--- _- 23 \ _-- = RIP -RAP O T�ET PIROTEE TI-tteR._--- ` \`.. `.... -- --- _24 QT/��E_ �--------- ----- SEE -NaTE 6 ` ` \ �� -- - --- - ___---------------------- ;;, ��\ ______---_-_ a S-� _ RIP- __ TtE7 PROTECTION-----------;=__==2 g------------------------------"___ ;___-- 237 -------------------. ''/�; ------------ +----------- --- ' =---------__`Zak-_ ---- _ �,',� �^� ---------------- W � W Ld — ___---- = ------- - - �l ------ -\\ -` '--------------------- _---------------- ---- __---- - - --- - — FOREBAY 2 235 U -------- ---------_____ ______________-"" - Q w _ ---- ---- ---- ------ -- - ------------ ----- ------------- _ __ ---- _--- _---------------------------------- ----- ----- ____--- --r" - - ---�� --- ---------------------- --------- -----------------------------------_--_----------_-----_-----------_----- \ _------------_--------- ---- - _ ------ _ ------ ----- - _- --------------------------- --- _- --- -- --- -- \ - -- _ _------ ----- - -------------- -- ----- -------------------------- - -------------- ----- ---------`--------- ----- --- - ------ --- --- - --- - -- ------ ----- 41 ---------------- U ------ _ 23 =___- ' ' ' / r' 1 W \,, Q W Z` V) SO r\ Sp -------------- ----------- WET DETENTION BASIN D 15 WIDE FOREBAY SPILLWAY EL 233.5' CLASS "B" STONE 00 230 --` ------ -----�' -- _--------- >,-+----------------------- --------- "__.-�� -____ -_` �-\_ ----wf --_—- -----------------------------\ ___-`ill V-r___ _______-_ ----------------------------------- _ - __l�L- •.�---'^--_..\ \ I ------- --ate- -- _ _------------- -- , . __ NOTES ----------------____-_---------------J'� � \\ 1. CONTRACTOR SHALL PUMP ALL WATER FROM EXISTING DRY DETENTION --. '--====� BASINS PRIOR TO CONSTRUCTION OF WET DETENTION BASINS. ---' -' '-_ �__ "� -� `'--_, `----- THE WATER SHALL BE PUMPED TO A SILT SACK TO FILTER SEDIMENT _ �` `- \\ PRIOR TO DISCHARGING FLOW OFF SITE. ` 2. ALL SEDIMENT SHALL BE REMOVED FROM THE EXISTING DRY DETENTION BASINS AND STORED IN LOCATION AS DIRECTED BY FORT BRAGG. 3. CONTRACTOR SHALL LINE THE ENTIRE WET DETENTION BASIN BOTTOM AND SIDE SLOPES INCLUDING THE FOREBAY WITH A ONE FOOT THICK CLAY LINER. THE CLAY LINER SHALL EXTEND FROM THE BOTTOM ELEVATION OF THE POND TO AN ELEVATION ONE FOOT ABOVE THE PERMANENT POOL ELEVATION. THE CLAY LINER SHALL BE CONSTRUCTED AND COMPACTED SUCH THAT THE INFILTRATION c , RATE IS NOT MORE THAN 0.01 IN HR.---------__ 1 4. SEE LANDSCAPING PLANS AND DETAIL SHEETS FOR PLANTING REQUIREMENTS WITHIN AND SURROUNDING THE WET DETENTION BASINS. 5. EXISTING RISER STRUCTURE SHALL BE MODIFIED AS SHOWN IN DETAILS. --`-----__ - _ IF THE EXISTING RISER STRUCTURE IS DAMAGED BY THE CONTRACTOR `- --__ `------__ DURING CONSTRUCTION, IT SHALL BE REPLACED BY CONTRACTOR AT - - NO ADDITIONAL COST TO OWNER. 6. EXISTING RIP -RAP OUTLET PROTECTION TO BE REPLACED AFTER DRY DETENTION BASINS ARE CONVERTED TO WET DETENTION BASINS. 1 GRAPHIC SCALE 0 30' 60' SCALE:1"- 30' kJ111 i 1 N CA US ARMY CORPS OF ENGINEERS SAVANNAH IIIII� INII . Oz M .. �00 w 1110 N Z Z 6 O ~ O �N 0.0 w F F0r ON 6iWU !gg0oO� rc�`I w6 a� H� QOO :1z Om¢, H O z (n U �: U c\I J D af U 000 In ou) CD cn 11 U m� F� wWw a In m(oZ 0M c30mOW N_ O (nJ E (5 N H U �U) 02 U) of � � a ZF-- of w�cn W .=m c�mC) z z 0 W Q o W= U' LL Q 0]az y a t WOz Dim }tea °'_9 �T, _^ Q 0� U z J Z z �a Q Z m :-i J ¢ Z J a- F- O(D XU Of Jof w Z 0Z � Z W Q V O Q V Lm H oLL co O U H O a PLATE REFERENCE NUMBER C7 \ \ TISIR 1 1 2 3 0 5 0 C WI— Z L1..1 LLJ J = U QLLJ LLJ :2 N n I; IV I Al '9// 4/ 1. CONTRACTOR SHALL PUMP ALL WATER FROM EXISTING DRY DETENTION BASINS CONSTRUCTION OF WET DETENTION THE UEO A SILT SCK TONFIBLTER SEDIMENT PRIOR TO DISCHARGING FLOW OFF SITE. 2. ALL SEDIMENT SHALL BE REMOVED FROM THE EXISTING DRY DETENTION BASINS AND STORED IN LOCATION AS DIRECTED BY FORT BRAGG. 3. CONTRACTOR SHALL LINE THE ENTIRE WET DETENTION BASIN BOTTOM AND SIDE SLOPES, INCLUDING THE FOREBAY WITH A ONE FOOT THICK CLAY LINER. THE CLAY LINER SHALL EXTEND FRAM THE BOTTOM ELEVATION OF THE POND TO AN ELEVATION ONE FOOT ABOVE THE PERMANENT POOL ELEVATION. THE CLAY LINER SHALL BE CONSTRUCTED AND COMPACTED SUCH THAT THE INFILTRATION RATE IS NOT MORE THAN 0.01 INMR. 4. SEE LANDSCAPING PLANS AND DETAIL SHEETS FOR PLANTING REQUIREMENTS WITHIN AND SURROUNDING THE WET DETENTION BASINS. 5. EXISTING RISER STRUCTURE SHALL BE MODIFIED AS SHOWN IN DETAILS. IF THE EXISTING RISER STRUCTURE IS DAMAGED BY THE CONTRACTOR DURING CONSTRUCTION, IT SHALL BE REPLACED BY CONTRACTOR AT NO ADDITIONAL COST TO OWNER. 6. EXISTING RIP -RAP OUTLET PROTECTION TO BE REPLACED AFTER DRY DETENTION BASINS ARE CONVERTED TO WET DETENTION BASINS. --------------------- --------------------------- ?'---------- --------------------------------//',/',/'/'/'/ ----------------- .JS / ��-_-//77_- __ 1j'�Y___-__-__ _ y_ ________ ________________�__ \ 230 FOREBAY 1 WET DETENTION BASIN D 10' WIDE FOREBAY SPILLWAY EL 233.5' •� '� , CLASS 'B' STONE v rmit djocumentr i✓onstruchon in acoprdan^e Witl? .Sese documents is ;squired by ire stormaaater,v3rmll. North Carolint tiles require that the s+.:rn;q: ys,ert designer lnspec du ring crostruc �n: certify conform' ty with t;x. playa jrc u r .ux' oenr cOrlpliance with the a or )w :( lies (15A NCAC 2H .1008 (1) ) NC DI dslon of Wa 4y#Y erl �- �� Rev�slor GRAPHIC SCALE SCALE:1"- 30' %%M l US ARMY CORPS OF ENGINEERS SAVANNAH 11�1119 O O Z MW O p W O N Z O Z O, ❑ 0 Q O of m� UC6O°r0� } pN wU F-^ t9 o f �- F> zC\IL�a O�UN ozm W J d � O U c}0 O Y Of U M m n U m of F- - O W O� W 2 W d Z m m Z O v p m Zp �Q.70J m� W WX Nc\t Q' p (n J W ( 5 N F- U 0 (l)KU ��m pWof of X z l- Lu WOE>� ZZO w¢o W = O'LLQ 03 z ymt WOZ ��rn 0 >UQ > _ Q 0 � ~ z d W Z w � Z 0z �O (D Q m� uJ �� z 2 Zd W= W 0U ao a HZ 2z ZQ O� of If W � aM L mco � oW O W U H U O PLATE REFERENCE NUMBER C8 1 2 3 m 1 5 If 49 I_1 TOP OF BERM ELEVATION -F EMERGENCY SPILLWAY ELEVATION -E TEMPORARY POOL ELEVATION -D PERMANENT POOL ELEVATION -C MAIN POND SEDIMENT CLEANOUT ELEVATION -B MAIN POND BOTTOM F- ELEVATION -A FOREBAY SEDIMENT CLEANOUT ELEVATION -I, L FOREBAY SPILLWAY ELEVATION -J, M FOREBAY BOTTOM 6' ELEVATION -H, K EXISTING GROUND 10' -I T IIII 1I 11 I- III III--------------=11I1=�I ,.III -III -III ---- _ J-------------- 1 - _ V AR I E S 1 III III III Mr, --' - -h I=II FOREBAY BER VARIL'SI�_ WET DETENTION BASIN CROSS SECTION NOT TO SCALE NOTES: 1. CONTRACTOR SHALL LINE THE WET DETENTION BASIN BOTTOM AND SIDE SLOPES, INCLUDING THE FOREBAY, WITH A ONE FOOT THICK CLAY LINER. THE CLAY LINER SHALL EXTEND FROM THE BOTTOM ELEVATION OF THE POND TO AN ELEVATION ONE FOOT ABOVE THE PERMANENT POOL ELEVATION. THE CLAY LINER SHALL BE CONSTRUCTED AND COMPACTED SUCH THAT THE INFILTRATION RATE IS NOT MORE THAN 0.01 IN/HR. WET DETENTION BASIN TABLE BASIN A BASIN B BASIN C BASIN D A MAIN POND BOTTOM ELEVATION 217.00 209.00 213.00 228.50 B MAIN POND SEDIMENT CLEANOUT ELEVATION 218.00 210.00 214.00 229.50 C PERMANENT POOL ELEVATION 222.50 214.50 219.50 233.50 D TEMPORARY POOL ELEVATION 223.50 215.50 220.50 234.50 E EMERGENCY SPILLWAY ELEVATION 225.00 217.00 222.00 236.00 F TOP OF BERM ELEVATION 226.00 218.00 223.00 237.00 G EMERGENCY SPILLWAY WIDTH 2O.0' 20.0' 30.0' 25.0' H BOTTOM FOREBAY 1 ELEVATION 218.00 209.00 216.00 229.00 1 FOREBAY 1 SEDIMENT CLEANOUT ELEVATION 219.00 210.00 217.00 230.00 J FOREBAY 1 SPILLWAY ELEVATION 222.50 214.50 219.50 233.50 K FOREBAY 2 BOTTOM ELEVATION 218.0 N/A 215.00 230.00 L FOREBAY 2 SEDIMENT CLEANOUT ELEVATION 219.0 N/A 216.00 231.00 M FOREBAY 2 SPILLWAY ELEVATION 222.5 N/A 219.50 233.50 re, OUTLET 1.0' THICK CLASS ''B'' STONE 3' TOP EL. FABRIC LINER EMERGENCY SPILLWAY WIDTH - G EMERGENCY SPILLWAY ELEVATION - E „e-i „ems 1\411 SECTION A -A PROTECTION �NKET DETAIL ,'tJlu4ec..1 ('..-mniz �_vocumentc Gonstructirn in , zi :',ese documents is .Pquifed by fine sa:rrrn ✓+ele,-'rm,tL North Caroline tales require that the si,rrrrva,.r ys,e, designer laap»et during consiruc°ion. certify conformity with the plans ;::1d sDW 3 v,d dirtily compliance with the s'Gre;ws!^r+ulas (16A NCAC 2H. 1008(j)j ^o,-.,',,u_VLl_Q1iO4.-- --- Date a -� ___-.-_ rlc D� ,sion of Water 4�m*v revminr'iate.- SPILLWAY CROSS SECTION NOT TO SCALE US ARMY CORPS OF ENGINEERS SAVANNAH III■@ 11�111�J r, w N O z 6 C) a 0 w_ wF t- U > O-ON o, cb Lli w U F-r-Uo J >= z`:1w�a< UZ 0 0 UN J 0 m o af UU oX COW �z Xm U Fz O ij U0 wW a z 2Nz oA o zp Co:::) w i1iX 0� �< f7O LL (!JN F U L5 F- (1) �w� &�W owV � N=m 2'zF- SLLU w= 1 w V Z z L W < Y w= ULLQ m,z Ln at WOz s�� °� }U)a a W QOU F- g U) LL z Z p J �Q W H w0 ¢ W C) to U U) w X= Jaf H VJ Q 0-0 L 0 W O aq o p Lm � F c o Zu-zG 0 O Q o a m PLATE REFERENCE NUMBER C9 1 FAI Ii 4 1 5 EXISTING TOP OF OUTLET STRUCTURE — (ELEV.=225.0) I NEW TOP OF OUTLET D STRUCTURE (ELEV-223.5) (SEE NOTE 2) C L] NEW 4" ORIFICE (ELEV=222.5) (SEE ORIFICE DETAIL) EXISTING 4" ORIFICE (ELEV-221.0) (SEE NOTE 3) R REMOVE FLASH BOARD RISERS 6"THICK t � TYPICAL 4' m 'X5' CONCRETE FOOTING EXISTING OUTLET STRUCTURE FOR WET DETENTION BASIN A NOT TO SCALE EXISTING TOP OF STRUCTURE (ELEV.=217.0) NEW TOP OF OUTLET STRUCTURE (ELEV=215.50) (SEE NOTE 2) NEW 6" ORIFICE (ELEV-214. (SEE ORIFICE DETAIL) EXISTING 4" ORIFICE (ELEV=21'� (SEE NOTE 3) i BOARD RISERS HICK CAL 5'x5' CONCRETE FOOTING EXISTING OUTLET STRUCTURE FOR WET DETENTION BASIN B NOT TO SCALE EXISTING TOP OF OUTLET STRUCTURE (ELEV.=222.0) NEW TOP OF OUTLET STRUCTURE (ELEV=220.50)— (SEE NOTE 2) NEW 3" ORIFICE (ELEV=219.5) (SEE ORIFICE DETAIL) EXISTING 6 ORIFICE (ELEV=218.0) (SEE NOTE 3) REMOVE FLASH BOARD RISERS ' TYPICAL � S' r 6'x6' CONCRETE FOOTING EXISTING OUTLET STRUCTURE FOR WET DETENTION BASIN C NOT TO SCALE NOTES: 1. THE EXISTING RISER STRUCTURE SHALL BE MODIFIED AS SHOWN ON THE CONTRACT DRAWINGS. IF THE RISER STRUCTURE IS DAMAGED BY THE CONTRACTOR DURING CONSTRUCTION, THE RISER STRUCTURE SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 2. THE TOP OF THE OUTLET STRUCTURE SHALL BE LOWERED TO ELEVATION SHOWN IN DETAILS. AN ANTI -VORTEX TRASH RACK SHALL BE INSTALLED ON THE TOP OF THE RISER. 3. EXISTING ORIFICE SHALL BE PLUGGED WITH A WATER TIGHT SEAL. A NEW ORIFICE WITH A DOWN TURNED ELBOW SHALL BE INSTALLED AT THE ELEVATION SHOWN IN DETAILS. EXISTING TOP OF OL TRUCTURE ELEV.=236.0) NEW TOP OF OUTL STRUCTURE (ELEV.= (SEE NOTE 2) NEW 4" ORIFICE (ELEV=233.5. (SEE ORIFICE DETAI EXISTING 6" ORIFICE (ELEV=232.1 (SEE NOTE 3) ^MOVE FLASH BOARD RISERS THICK PICAL CONCRETE FOOTING EXISTING OUTLET STRUCTURE FOR WET DETENTION BASIN D NOT TO SCALE OUTLET S' DRAWDOWN ORIF (SEE NOTE 1) PERMANENT POOL ---- 1-------------- NOTE: 1. THE DRAWDOWN ORIFICE SHALL BE CONSTRUCTED WITH PVC (SCHEDULE 40 or SDR 35. CONTRACTOR SHALL PROVIDE WATER TIGHT SEAL CONNECTION TO RISER STRUCTURE. ORIFICE DETAIL NOT TO SCALE #4 BARS - WELDED IN SYMMETRICAL PATTERN (WITH LOCKABLE HATCH FOR ACCESS) OUTLET STRUCTURE TRASH GUARD NOT TO SCALE O[1 mctiu l �>u docu't ents tr: eguler by tie aro9ec tiles requirR th r y r+es finer '2 pr r dv nq re .AnfOr i 4 at, twv- 13 � p'.;Jr e "dp 19 ,r;, Srlccoll0y �, 2�&�u QGL t. •sr-, 1AV4,, r: a_ CIO US ARMY CORPS OF ENGINEERS SAVANNAH nm� �IIII� I�III . o z M .. o W N Z6O Z6 7u�� w0F w m } co w � ��C90 °' _ >� z04W °U�UN ozin w J a 0 m af UU U)Z UCO }(9 m UW �� Lij O w w 0-1a mm Z L] M o zp m5 w W X 0 U LL (n N ♦- U d — �° 0« U) of ~ w°o�`� = 0 LuOwo = Qmt m�Z z 7a°�F� L z a W of z Z) Z o W U w0 z 75C) m �J x= w ~Q CL 20z 2 W o ()6V0 rW^ Q Q O Q Q K Lm Z o� Z Q O U N IL F Q O a PLATE REFERENCE NUMBER C10 1 2 I 3 5 C C t \ , Wet Detention Basin A Planting List Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quart " Zone 1 Shallow Water/Permanent Pool Elevation (PPE) Emergent Herbaceous Peltandra virginica Arrow arum' 1 gallon; 1' x 1' 20% 4000 0.14 560 Scirpus cypennus Bulrush` 1 gallon; 1' x 1' 20% 4000 0.14 560 Rhynchospora glomerata Beak rush' 1 gallon; 1' x 1' 15% 3000 0.14 420 Juncus of usus Soft rush' 1 gallon; 1' x 1' 15% 3000 0.14 420 Orontium aqua6cum Goldenclub' 1 gallon; 1' x 1' 15% 3000 0.14 420 Sagittana engelmanniana Duck potato' 1 gallon; 1' x 1' 15% 3000 0.14 420 Totals 100% 20000 0.14 2800 Distance between individual stems in feet 1 ' Indicates species selected from Fort Bragg DPW Emergent species table. Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quantity Zone 2 Saturated/Inundate d Vegetative Shelf Wetland Herbaceous Sarracenia flava Yellow Pitcher Plant 1 gallon; 1' x 1' 20% 4000 0.16 640 Enocaulon decangulare Pipewort 4%8" container; 1' x 1' 20% 4000 0.16 640 Eleochans tubercu/osa Spike -Rush 4%8" container, 1' x 1' 20% 4000 0.16 640 Xyns dilformis Yellow -eyed Grass 4%8" container, 1' x 1' 20% 4000 0.16 640 Arundinana tecta Switch Cane 1 gallon; 1' x 1' 20% 4000 0.16 640 Totals 100% 20000 0.16 1 3200 Distance between individual stems in feet 1 l I I/ U I 1 1 ' 1 1'BV I t I /� 1 I 1 /'' " ' '' /l 1 1/ I II 1 I I /t '/'' ; I I'1 i I/ , I , 1 1 1 I 1 I \ \ I \ II 11 I u 1 I I 1 11 \ \\ I \ I 11 1 l 1 I ❑ \ \ I 11 1 \ I If - \\ \ ;� i \� `� 1 l N Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quanti Zone 3 Wet Pond Slopes Wetland Herbaceous Carex lunda Shallow Sedge 4"-8" container; 1' x 1' 10% 1090 0.79 861 Carex stricta Tussock sedge 4"-8" container; 3' x 3' 10% 1090 0.79 861 Osmunda cinnamomea Cinnamon Fern 1 gallon; 2' x2' 15% 1635 0.79 1291 Osmunda regalis Royal Fern 1 gallon, Tx 3' 10% 1090 0.79 861 Andropogon gerardii Big Bluestein 1 gallon; 2' x 2' 25% 2725 0.79 2152 Arundinaria recta Switch Cane 1 gallon; 1' x l' 30% 3270 0.79 2583 Totals 100% 10900 0.79 8611 Distance between individual stems in feet 2 / I / ' / 1 � / 1 � / I � � 1 � 1 / 1 i I , / in I I , 1 1 I �I 1 , I 1 , I 1 , ,' co ZONE 3 'I 1 1 (N `f J I 1 \ \ 1 1 1 I f) I 4 I II 1 'I FOREBAY 1 it IIILLLi' 1 '1-ZONE 4 Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quantitv Zone 3 Wet Pond Slope Wetland Shrub Myrica cenfera Wax myrtle 3 gallon; 8' x 8' 30% 523 0.79 412 Clethra alnifolia Pepperbush 3-5 gallon; 8' x 8' 30% 523 0.79 412 Illex glabra Inkberry 3-5 gallon; Tx 3' 10% 174 0Y9 137 Lyonia ludda Fetterbush 3 gallon; 6' x 6' 10% 174 0.79 137 Zenobia pulverulenta Zenobia 3-5 gallon; 8' x 8' 1 20% 348 0.79 275 Totals 100% 1742 079 1376 Distance between individual stems in feet. 5 Zone Location Type Species Common Name Species Percent Quantity /Acre Acreage Total Quantitv Zone Buffer Area Upland tree Pinus palustris Longleaf pine 3-5 gallon; 20'x 20' 100% 218 0,40 87 Totals 100% 218 0.40 87 Distance between individual stems in feet 14 Zone Location Type Species Common Name Size and Spacing Species Percent Quantity lAcre Acreage Total Quantity Zone 4 Buffer Area Upland Grass Andropogon gererdii Big Bluestein 1 gallon; 2' x 2' 10% 762 0.40 304 Schizachyrium scoparium Little Bluestein 4"-8" container; V x 1' 20% 1524 0.40 609 Andropogan 14rginicus Broomsedge 4"-8" container, 1' x 1' 20% 1524 0.40 609 Anstida snicta Wlregress 4"-8" container, V x 1' 40% 3048 0.40 1219 Muhlenbergia capillalis Muhly Gress 1 gallon; X x 3' 10% 762 0.40 304 Totals 100% 7620 0.40 3048 Distance between individual stems in feet. 2 IV , , 1 1 , , 1 / I I � I / I I C In , ' I I 1 \ , 1 I \ /)I I I I 1 II n II u r I I uo+ , n 4N , IF t I 1 1 I 1^ 1 1 1 I I 1 1 1 I , \ 1 I It, 1 n y I I 1 I 1 1 / , 1 1 1 1 I 1 1 1 NI t,_J I 1 1 1 y l ♦• It I ;�\j I I I I r I I I I 1 I IIII I 1 ti II Y 1 1 1 I / I it 1 1 1 1 I / / I I I I I I I l llilt I 1I 11 1. �/1 lilt 1 n I I I J I l I; � 1 1 1 I I ! '1 1 / I I t i l l l 1 , l 1 I t I I 1 1 1 1 r l 11 1 l l,�l yII I I 1 I, 1 l l l 1 ZONE 1 ZONE 2 ZONE 3 WET DETENTION BASIN A ZONE 1 -144 wayj t, I►pp�� 11`/ 1� • I I p�� �1. I fg/ ItAi aati i• ,�' •�/ anIVAN WAW �•i Iv�' //111//7.► '1 //►/IE1/i�� a 11/11/111,• I�L�I��l►ie- aw,1 //1�LV Iput�� O'N 11►.11.r�'M ntl �A 1 • • /,1 1t�t MATCHLINE -A- SEE SHEET 15 I 1 1 1 1 1 , 1 1 , 1 1 1 1 1 1 1 1 1 l 1 1 1 1 , 1 1 , 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 '1 1' 1 1 1 1 '1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 r�1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 , 1 i I 1 1 1 1 , 1 1 1 1 1 /1 1 / 1 , I 1 1 1 1 1 I , 1 I 1 1 I 1 1 I 1 1 I 1 1 1 1 1 I 1 1 I 1 1 1 1 1 I 1 1 1 1 It'1 11 I1 1 I 1 1' 1 1 1 l 1 , F- 1 1 1 It 1 I 1 1 11 LEGEND 1 11 1 ZONE 1 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / GRAPHIC SCALE 0 30' 60' SCALE:1"- 30' / / / / / / / / / / / 1```11'I11 �N....... CA� 2171h19 10�i 9••';�'yGI NEED •o"45* O liltI I1 n US ARMY CORPS OF ENGINEERS SAVANNAH nn� III■ 1119 �Z M o� W . N Z Z O 70<Ca4 �O wQ Uoob } Ocw U (14 U o Ld d am 1-- Z a0O 0Zrn a M U�iUN < w Z) � U � DO m UW 00w O� wX w a 52 CI m �(n cD 5 Z0 W W UM W X OW ��(__iLLM rnN F 13 U �U) �« fn�0 ir�a om= pw WF 7- OfZ W C7 � UJ ci t ZZO uJ W= U LL a m9z y m t W0Z �30 °�� rina af ~ U Z 3 Q F w Z ofa w U)Z 0Z a QQ LUW Q ma (1) 0 0 W^ F X L LU Q F a LI rQ 2 ZU 0 U f; X W (n a(D Q 0 Hr) WZ t m F- Q oIFL Z F_J O U W 0 a PLATE REFERENCE NUMBER L1 L SHEET 1d OF 23 I I 1 2 MATCHLINE -A- `; 5 C A F, SEE SHEET 14 , 1 1 , 1 1 1 , 1 , , 1 1 1 , 1 1 1 1 1 1 , 1 , 1 1 1 1 1 1 1 , 1 1 1 1 l 1 1 1 1 1 1 1 1 1 , I l 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 LEGEND GRAPHIC SCALE r---------------- V US ARMY CORPS OF ENGINEERS SAVANNAH I�IIIIB O Z coW o p LLl o NZ Z60 QO p N X 1.- } uiW O FN W� a� I-> ¢O O O F o Z in U 3: U cal 6i J a 0 O pu) }o to 11 m Ua 00w O� W p (� W 2 J a Z m W m Z p V co p Zwu)p m3 W W 04 a' p< �� LL (n H U � — �W 02 Cna'C) W U r Kim Z RI-- W6o WZ5U) ZZp 0>� Lu< W= U'LLQ mDz ymt WOz oEK �u)Q Q O rj) ~ Z g Q mmmmN a Z z U Z w Q OZ w m J w 0 z Z ~ Q /W^ LL X 2 W _O f— Q A� Z U a.o W U) �o W Z �LL o � J C m F I— z W oLL O U F U) O EL PLATE REFERENCE NUMBER L2 u Wet Detention Basin B Planting List 2 C 4 5 C I� Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quanti Zone 1 Shallow WatPool Elevation Pool Elevation (PPE) Emergent Herbaceous Peltandra virginica Arrow arum' 1 gallon; Vx 1' 20% 4000 0.16 640 Scirpus cypennus Bulrush' 1 gallon; I'll V 20% 4000 0.16 640 Rhynchospora g/omemla Beak rush' 1 gallon; Vx 1' 15% 3000 0.16 480 Juncus elfusus Soft rush' 1gallon; Vx 1' 15% 3000 0.16 480 Oront/um aqua6'cum Goldenclub' 1 gallon; Vx 1' 15% 3000 0.16 480 Sagittana engelmanniana Duck potato' 1 gallon; 1' x 1' 15% 3 () 0.16 480 Totals 100% 1 20000 0.16 3200 Distance between individual stems in feet. 1 ' Indicates species selected from Fort Bragg DPW Emergent species table Zone Location Type Species Common Name Size and Spacing Species Percent Quantity (Acre Acreage To Quan>.v Zone 2 Saturated/Inundate d Vegetative Shelf Wetland Herbaceous Sanacenia flava Yellow Pitcher Plant 1 gallon; V x 1' 20% 4000 0.17 680 Enocaulon decangulare Pipewort 4"-8" container, Vx 1' 20% 4000 0.17 680 E/eocharis tuberculosa Spike -Rush 4"-8" container; Vx 1' 20% 4000 0.17 680 Xyns dilformis Yellow -eyed Grass 4"-8" container, Vx V 20% 4000 0.17 680 Arundinana tecta Switch Cane 1 gallon; Vx 1' 20% 4000 0.17 680 Totals 100% 1 20000 1 0.17 3400 Distance between individual stems in feet 1 Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quanti Zone 3 Wet PondSlopes Wetland Herbaceous Carex lunda Shallow Sedge 4"-8" container, 1' x V 10% 1090 0.52 566 Carex stncta Tussock sedge 4"-8" container; 3' x 3' 10% 1090 0.52 566 Osmunda cinnamomea Cinnamon Fem 1 gallon; 2' x 2' 15% 1635 0.52 850 Osmunda regalis Royal Fern 1 gallon; Tx 3' 10% 1090 0.52 566 Andropogon gerardii Big Bluestem 1 gallon; 2' x 2' 25% 2725 0.52 1417 Arundinana facts Switch Cane 1 gallon; Vx 1' 30% 1 3270 1 0.52 1 1700 Totals 100% 1 10900 0.52 5668 Distance between individual stems in feet 2 Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quantity Zone 3 Wet Pond Slope Wetland Shrub Myrica cenfera Wax myrtle 3 gallon; 8' x 8' 30% 523 0.52 271 Clethre alnifolia Pepperbush 35 gallon; 8'x8' 30% 523 0.52 271 Illex glabra Inkberry 3-5 gallon; Tx 3' 10% 174 0.52 90 Lyonia lucida Fetterbush 3 gallon; 6' x 6' 10% 174 0.52 90 Zenobia pulverulenta Zenobia 3-5 gallon; 8' x8' 20% 1 348 1 0.52 1 181 Totals 100% 1 1742 1 0.52 1 906 Distance between individual stems in feet 5 Zone Location Type Species Common Name Species Percent Quantity /Acre Acreage Total Quanti Zone4 Buffer Area Upland tree Pinus palustns Longleaf pine 3-5 gallon; 20'x 20' 100% 218 0.64 139 Totals 100% 218 0.64 1 140 Distance between individual stems in feet 14 Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quantity Zone 4 Buffer Area Upland Grass Andmpogon gerardii Big Bluestem 1 gallon; 2' x 2' 10% 762 0.64 487 Schizachyrium scopanum Little Bluestein4"-8"container, 1' x 1' 209'0 1524 0.64 975 Andropogan virginicus Broomsedge 4"-8" container; Vx 1' 20% 1524 0.64 975 Anstida stlfcta Wregrass 4%8" container; Vx 1' 40% 3048 0.64 1950 Muh/enbergia capillaris MUNy Grass 1 gallon; 3' x 3' 10% 762 0.64 487 Totals 100% 1 7620 0.64 4877 Distance between individual stems in feet '2 ro / / 1 ?, I 1 1 1 , • ..11 awl 1 y iw'�-. � ao•rto ctctc•ati �►/r .tat..•.1 _.tea l/l�� rotarta.r •nN•U•I %r I�.a • t1Ut ttub,•• . ' i�.a�t•otn' iaattll r 0040410 DOi Wtttprot t�• •m�t� atna•a MOWN ra i�i'.�.•iil' Ltai' i l•. ! IFA A' o lr// //I /II/ aa'ril I%I !/// a%i► .• fi/ _ �a� �,VLLEI !ON Is I G■rtl■■ 1rCyUNME I►tl;1R!■■ /iWO■■■ ■ENNE■ vliwlwmiowp 041111 .1EM,►ln�� N.■tea,,.. •• YI. . r i■ram;.; ;•:\■■W� I �• ■yam'•' • • �'�'vi�\\ �lyp!474•: NI�O�:�:�II\■1\1 4 all ••a ,•: ■y:•: lika1t\\1\ Sale till S -SD �= 1�10 S � S \ ` G Pl 1 1 _________________________________ \ E S J ' 1 '4 `J ' `N 1 1 1 I 1 \ 1 1 1 ' t NE 4------ - - - - -- -- 1 - 1 Ln 2 3 2' ------------------------------------------- ` , `, r _y • f J _ 231 \ 1 \ ,1 ItIx 1 \ 1 ING 1 \ \ 1 1 -. 23 1 Ln 1 , 22g'--� 1`` 1 S< LEGEND ZONE 1 GRAPHIC SCALE 0 30' 60' SCIl 30' US ARMY CORPS OF ENGINEERS SAVANNAH L IYI II� Z M go W WO O N Z 000 Z ' C) Qo K� H-�} co ON N = W Lli W L) H N W a H> J Z 0U o z U) U cv J }0 of U 0 Y (1 m to.1I K m W LLJU F- W Of uj IL ZQ Pm Z Zp � m� W ILIX N ° Q' 0 (A _i 1L (n 04 H U D U) X W 02 (7n5 W �Z� Lu -- LJ ZZ� Lu W= �ILQ m9z D Z0Z �m 0�r }COQ _� Qom ui Z L co Z z LU Z 0? QJ ¢ Cd 16- �-, M Z W x= W OU. ZU oZ Q(9 o W F-o oq WZ L m f - ol~L U) �J O W PLATE REFERENCE NUMBER L3 N IF w� N d E 2 JU�d CUC ) C L .. rnT v E� Ip S Sat'-g: zr S Em - _= J 76 N ` ca.-3i H o2dgti'o;�JI'... �c Q�3c E�e 1 2 3 I 4 I 5 C 0 W W J M MATCHLINE -B- SEE SHEET 16 ��—� 1 1 1, iiij,1' 1 ,fill 1 1 1 ('A� 11 1 I I I I I I I 1 1 I 1 1 1 11 1 I I 11001 111;1 I I 1 1 1 i;; I I I I I , CNI 1 11 1 1 1 1 1' 1 1 1 ICNI I 1 1 1 1N' I I I I I I I 1 I 1 I I I 11 1 1 I I 11 1 1 1 I I I I I 1 1 1 I I' ' I I I I I I I 1 1 1 1 1 1 1 fill' 1 I 11 I (1 11 (, 11 '', 1j 'vv \ ` `1'I ` ; II 1 1 1 1 +, + , ,1 1 1 , l + , , \ \ 1 1 `, 111 1 , , , 1 1 1 1 \ `\', 1,,, %t 111 \I \I 11 11 11 1.` ,` , , I+ \1 I' , t `0 �ETE0T�d( BA IIV I 1 , 1 \ + ,1 ,1 ,'\ 1`1 , 1 , ' '1 '\ `1 `1 `1 `+ `1 i i,,iii 1, '1ii11 i /, l iii f ,�i fi fi , , , , , , , , , ' r It r r,, r,, 00 11' r, fffff 1II/tttt/t(\jIItII/ 11 1 I I 1 1, 1 1 1 1 1 1 1 1 1 f f f /� IIIII II 11111111(�IIII I 11, 11 O +'` \ 1'11`, ,11'1III1i1 11 ' II 1' II 1'� 1V j It\\\\ \\',\\ zc ' '1 1 ` 1 ` ' \ \ \ \\ \ \ �Q \\ 31i \ ZONE 1„1 \�\\ \` \\ \\ \ \ 1 I ` \ \ ` \ \ \ \ \ \ , \I It \ \ \ \\ \\ 1 1 1 If 1 1 I 1 1 I 1 I 1 _ 1 , it ----------- ---,- 218 --- J r1 ' ' I 1 , 1 + \ \ \ • 1 '\It, \`\ I It A. 1 `. I \ \ ` o 0 1 0 \ \ \ \ \ i as=MIN--M FddQ�� - L46_ Z01 , E 3 e- 10,� .aQs�aeeei�-- ,.�zeee�•--- t�!■ig■'fi/�� . - : . ♦ i i v , I I • • i TURF I. 1 ( ANNEUMM' AM I■■■■\\\r... nv M/Pop a%aN■1►_1palNr/op ��.❖.;.•,.. ■N&7:■■e■■i!■a%i%pp��►v .❖ Noffifflamoomps .► ■; r'''�� JM • I , *W141 7 \AM1 iM MR S ••:�• •�•' i 17,, 001 .❖obi /� ,❖'v.:aill� �••�� �;ti ■■ III II ZONE 1 •••••••••••••••• ................. ................ ................. ................ ZONE 2 ZONE 311I■■■■■■■■■ ZONE 4 GRAPHIC SCALE 0 30, 60' SCALE:1"- 30' US ARMY CORPS OF ENGINEERS SAVANNAH n�une III�II� I�IIII�� O Z co O p W O N Z O ZOO � Q O N w co � } p �O U, uN Lij W U 0 6 —J �>� ¢OO z�F�ar OIrQ, p z in U 3:0 c♦1 L11 LL m Ir 0M ow c� In i r U ca pWWLjj d �mZ M pv p Zp m5 W W X pof p� InUJ LL (nN U �In 0v� Hof M= �N= pWU ww of w=0 /z_1- WV- 1L Z Z p W¢ o m (JLLQ wOz No r Dam °�� rina _� Qin U ui z U LL C16 z z co � _ 07J WO ¢ z Qa- ~Q `AL) 2 mW W = Of za H ao w ¢ o¢ U Z Z 06 w Q w o ¢frQ mW LLoz�J O 0 U O a I PLATE REFERENCE NUMBER L4 LSHEET 17 OF 23 I 1 I 2 I 3 I 4 L•, C I U� LdLd Zw LLJ J _ V) U LIJ cQ L.L.I L M 0 ZQNE 3 / / , S` -__-- ZONE 2 ZONE _-NE - ifi••e icy• �91 r•••P•e n••esa. / ic•••eci• _ ara••ee .lailfl•.ia • r1 a....aso tIfl;Y.l��rl _��//Sd 1•esa.lwa �f'' I�.�.�5■�■%'fib/�-- M.'il �� ��.I•�%"tiG9dSQitiii+�.-- ��SGI�SQ■�/' i _ s .............rr....... _tea■z■�Is�.Ph li���o�s. .....J... �,............ it _���■'■■■L'�Gf�P21u�yz��;.v..;.❖.•....... a••••••••..aa/lsQll�■'ice i ! •-• � • • > •.. - • � ••••••••.alai, ::.c.': 9'■Tidd_zlTiii� q\d■/%/��,.,. ;�•.,•.�hl'if6tii �/Im FA FA ) \229 .... OF � .ICE FA Oil wd=1111MM_S_Qid11110 : iiiiiIIIIIIIIIIIIIIIIIIIII :'i"• lr!4 ��..• SyO'j►-/d�9 ��Ss'i �,.�e■i■�]zi�� � // / I ���;• . � • . yam► � ��r•�i .•�r i�• /y .':` .�.:.•OyQ/�I�I�i`I i,'•�i1•ii.•'.; •i ••1 a%I�Qi�I� i/_i/%/%■%�/_i/ ��,�•�•!' ..❖:•�'i0���/Ql�ii�/- •••�ii1•••i • Ill l O�►�IC719� .• • ---- y♦ ♦ ♦ 1 ♦♦. ♦� 1 l'v 1 I 1 ,11 •cars. . /0/ice■0///// � .v4.> •4>. �t►�yt�Sii3E/• � i1/•�c�r`Scsiz' //�/�/�`.,u�..,r.►'►!!►•'•�•%•�J•�`•-•� /i0%•f�0�!��.i�Ql%� , .esa••�ra�alzzi SAVE 23, WF 00-0 i/9/mzw■Ni/i// �D�i•i'•�'tl• .ail-._,� �Ii,>•••�♦�5��/i 06 IIIF ! ■ IMPS / /oil ��•.�•�••� > ,. �I �/ � .�••��� !� � . �� pit _ s Zane Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quantity Zone 1 Shallow Water/Permanent Pool Elevation (PPE) Emergent Herbaceous Peltandra virginica Anowarl 1 gallon; Vx V 20% 4000 0.22 880 Scirpus cyperinus Bulrush' 1 gallon; V x V 20% 4000 0.22 880 Rhynchospora glomerate Beak rush' /gallon; VxV 15% 3000 0.22 660 Juncus et/usus Soft rush' 1 gallon; 1' x V 15% 3000 0.22 660 Omntium aquaticum Goldenclm 1 gallon; V x V 15% 3000 0.22 660 Sag/ttana enge/manniana Duck potato` 1 gallon; V x V 15% 3000 0.22 660 Totals 100% 20000 0.22 4400 ° \ / p ° o � ♦ t -- Distance between individual stems in feel 1 �♦. _ 2 `Indicates species selected from Fort Bragg DPW Emergent species table \ _ / Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quantity Zone 2 Saturated/Inundate d Vegetative Shelf Wetland Herbaceous Sarracenia flava Yellow Pitcher Plant 1 gallon; 1' x 1' 20% 4000 0.23 920 Enocaulon decangulare Pipewort 4"-8" container; V x 1' 20% 4000 0.23 920 Eleochans tuberculosa Spike -Rush 4"-8" container; V x V 20% 4000 0.23 920 Xyns diMormis Yellow -eyed Grass 4"-8" container; V x 1' 20% 4000 0.23 920 Amndinana tecta Switch Cane 1 gallon; 1' x 1' 20% 4000 0.23 920 Totals 100% 20000 0.23 4600 \ 0 0 O O \ / \\ i \ \ Defence between individual stems in feet 1 , 1 1 Ml:�::=::a r r• • r�ri 1 "140*111/.iri••liu iai� • NNN• 1•���i.• �•1'���i er1�•� •�!� 1q•IYL1 •.� rr••�•r•••^U��y-•r•1••rrr 1r •r1 � } • •••�./�I'�'Ili/Q�l�••`�j��••7�G••wj1�••�1•••1K•y/11•: r1�•11 •�•�•• . •,��r�,!i.,,•�iiwii•%.i°'fy�i`ii••ioi�•rri•i••v?9 iiN1r•�i••• • Y .!',�i�%mow!:•-'�• 1~ •rr•••!1rr•!o1.0 •.ri1r•�j�rr�• r WAX�r • ,`.•' •a �•�•••••1� �fii •1�•• a Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quant' Zone3 Wet Pond Slopes Wetland Herbaceous Cansz lunda Shallow Sedge 4"-8"container, VxV 10% 1090 1.01 1100 Camx sbicta Tussock sedge 4"-B" container, 3' x 3' 10% 1090 1.01 1100 Osmunda cinnamomea Cinnamon Fem 1 gallon; 2'x2' 15% 1635 1.01 1651 Osmunda regalis Royal Fern 1 gallon; Tx 3' 10% 1090 1.01 1100 Andropogon gerardii Big Bluestem 1 gallon; 2' x 2' 25% 2725 1.01 2752 Arundinana tecta Switch Cane 1 gallon; 1' x 1' 30 % 3270 1.01 3302 Totals 100% 10900 1.01 11009 .Distance between individual stems in feet 2 - - cu BONE 2 --------------- ' /' , / /'� ♦ / / , / / / / / , O ,' '? l I r' 0 Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quantity Zone 3 Wet Pond Slope Wetland ShnRl Mynca ceniera Wax myrtle 3 gallon; 8' x 8' 30% 523 1.01 527 Clethra ainifolia Pepperbush 3-5 gallon; 8' x 8' 30% 523 1.01 527 /Ilex glabra trlcbeny 3-5 gallon; 3' x 3' 10% 174 1.01 175 Lyonia lucida Fetterbush 3 gallon; 6' x 6' 10% 174 1.01 175 Zenobia pulverulenta Zenebia 3-5 gallon; 8x 8' 20 % 348 1.01 351 Totals 100% 1742 1.01 1759 Distance between individual stems in feet 5 , / Zone Location Type Species Common Name Species Percent Quantity /Acre Acreage Total QuanC Zone 4 Buffer Area Upland tree Pinus palusMs Longleaf pine 3-5 gallon; 20' x 20' 100% 218 1.31 285 Totals 100% 218 1.31 286 / i Distance between individualstems in feet 14 LEGEND Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quant' Zone 4 Buffer Area Upland Grass Andropogon gerardii Big Bluesism 1 gallon; 2' x 2' 10% 762 L31 998 Schizachydum scol Little Bluestem 4"-8" container, V x 1' 20% 1524 1.31 1996 Andmpogan virginicus Broomsedge 4"-8" container; l' x 1' 20% 1524 1.31 1996 Ansbda stdcia Wiregrass 4"-B" container, V x 1' 40% 3048 1.31 3992 Muhlenbergia cal Muhy Grass 1 gallon; 3' x3' 100/ 762 1.31 998 Totals 100% 7620 1 1.31 9982 1 1 1 1 1 1 1 Distance between individual stems in feet 2 GRAPHIC SCALE 0 30' 60' SCALEll 30' US ARMY CORPS OF ENGINEERS SAVANNAH 1111�9 0 M W wo oz N Z Oo0 Z ' O} U <L �O Oc�l N = go& 0- O w U H..1 06 �r a - 1-- z �� 000 O6U v lii J tL ZD O m0 Of U UW U �i 0}0 U IY m Oil 0 wW a Z m �m Z �V 550 11 U)� 3: m � OJ W w X NN p/ rn J LL Ill N H U c w l F- tJI WF W U O 0J 0 5 M (7 rn of�Zr�� cc 2 w=M LL1wVU ZWO �]L ZI m¢z W y t Iz z � 3 m LL raa O�> _ QO W U ~ z 3 z U Z (ifa W U' Z J w0 A- m �U < xx ILL W _ Q a (L0 Q 00 0 0� W it a� u) Z m J o� z O L~II F 0 LL PLATE REFERENCE NUMBER L5 L SHEET 18 OF 23 1 2 4 1 5 238 ----- w �... - J --- --------- --- 2 _------------ D------------------------ -------, C `------- ------ -_- - - - - - - - - ------------------------------------------ -_-- - - / / I I / / I I I I / / I N .1-1- 9- LEGEND GRAPHIC SCALE p .• SCALE*1"• 30' W �-- Z_ W J W U V) �W QW :2(n US ARMY CORPS OF ENGINEERS SAVANNAH 0 mw 0 7004 OZ N 000 Z U w� co 04 co uiwU FOD N W6 w CL F> � Z'- ¢00 oZ v, O&)¢� U Uc14 111 J d D m af U cl � cD u, n m U� mw O� Ll wa a Z w In z o v o Zp m� W wx Q' 0 LL co N F (S U aoo v A C$) UKF W ow- Z_^ of (DW= of of 0>L w0T ZZ0 W It w¢o = �LLQ WOZ in Z Dat ]fig o0K >-5-Q 2�> _� Q 0 ~ 7 Z a U F W z Q W U) L Q J w 00 F- W Z Q m 556 2 Z W X= W o d Q 0Z m z U U0U of W U) QQ W Z L m F Q oLL z F J O U w 0 EL PLATE REFERENCE NUMBER L6 1 2 3 El 5 J C L /0 I U cy) I11 Z Ld Ld J = U LI..I cQ l LJ L L / -------- 241 '--------------- —_ — — — — ----- ---- - - - - - - - ---i- - --- -- - _ -- - - - - - - -- -- -- -- --- ZONE 4 ---------------------------------- -------------- - ------241' �. _ --------------- ------------------ INN INN <I ♦ -I-- \ — \ ♦ __ ZONE ` T L------- - ZONE ------------ \ -_, ----; ZONE 1 ruct )n 3 lumvplb Is S : i � '1 r _ !j CMiOI fY vi Ih th4 . - n IMP swclonx_ "Da LEGEND GRAPHIC SCALE 0 30' 60' SCALE:1"- 30' 1 � N LIJ F— Z Lj J LL.I 2 = U V) < W Ld V) US ARMY CORPS OF ENGINEERS SAVANNAH �i IIIYII� CD 0 Z r� C, W w o o N z 0 00 z ' U Qo H 6 } co ❑ N Ww U N W a� H> ¢OO J z O�¢� F U z ch C) 04 J D m � Um (D U) ji m U a 00 w OO .- or W w� Kw � aJ m z oa o LLI zo 0 cn5 w WX N oft l(n w U)04 F U c 02 coat ��m Z 2� Lu w0Lo zzo (9 w¢o W= (ALL ¢ O]az y mt WOz D3::.v ��r }UZ ��� _� QO� U F- W z J 0 CL w U) Z J ¢ I L � of Q Zw 55U m 0 CL w = w I— Q 2z w U)af F- o L) a o w Z ¢< O Q r m F- J ou- z w O U U) v) O a PLATE REFERENCE NUMBER L7 1 2 3 I 4 5 U C h W W J M 2 45' 7ALrr A 7nL IC' 7 Itj i40 / I / / Y I I I r V V) Wet Detention Basin D Planting List Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quantity Zone 1 Shallow Permanent Pool Elevation Pool Elevation (PPE) Emergent Herbaceous Peltandra virginica Arrow arum' 1 gallon; 1' x 1' 20% 4000 0.17 680 Scirpus cypennus Bulrush' 1 gallon; 1' x 1' 20% 4000 0.17 680 Rhynchospore glomerata Beak rush' 1 gallon; 1' x l' 15% 3000 0.17 510 Juncus effusus Soft rush' 1 gallon; Tx 1' 15% 3000 0.17 510 Orontium aquaticum Goklenclub` 1 gallon; V x 1' 15% 3000 0.17 510 Sagittana engelmanniana Duck potato' 1 gallon; 1' x 1' 15% 3000 0.17 510 otala [To 100% 20000 0.17 3400 iI I j i / V' Distance between individual stems in feet 1 rv`Indicates species selected from Port Bragg DPW Emergent species table / t i If S,till Q1 1 \ \ - �- Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quantitv Zone 2 Saturated/Inundate d Vegetative Shelf Welland Herbaceous Samacenia Oava Yellow Pitcher Plant 1 gallon; V x 1' 20% 4000 0.18 720 Enocaulon decangulare Pipewort 4"-8" container; 1' x 1' 20% 4000 0.18 720 Eleochans tuberculosa Spike -Rush 4"-8" container; 1' x 1' 20% 4000 0.18 720 Xyns diflormis Yellow -eyed Grass 4"-8" container; 1' x 1' 20% 4000 0.18 720 Arundinana recta Switch Cane 1 gallon; 1' x 1' 20% 4000 0.18 720 Totals 100% 20000 0.18 3600 4Distance between individual stems in feet. 1 23 _ -----' Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quantity Zone 3 Wet Pond Slopes Welland Herbaceous Carex lunda Shallow Sedge 4"-8" container; V x 1' 10% 1090 0.74 806 Carex stacta Tussock sedge 4"-8" container; 3' x 3' 10% 1090 0.74 806 Osmunda cinnamomea Cinnamon Fern 1 gallon; 2' x 2' 15% 1635 0.74 1209 Osmunda rega/is Royal Fern 1 gallon; Tx 3' 10% 1090 0.74 806 Andropogon gerardii Big Bluestem 1 gallon; 2' x 2' 25% 2725 0.74 2016 Arundinana tecta Switch Cane 1 gallon; 1' x V 30% 1 3270 0.74 2419 Totals 100% 1 10900 0.74 8066 Distance between individual stems in feet. 2 Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quanti Zone 3 Wet Pond Slope Welland Shrub Mynca cenfera Wax myrtle 3 gallon; 8' x 8' 30% 523 0.74 386 Clethm alnifolia Pepperbush 3-5 gallon; F x 8' 30% 523 0.74 386 Max glabm Inkberry 3-5 gallon; Tx 3' 10% 174 0.74 128 Lyonia lucida Fetterbush 3gallon; 6'x 6' 10% 174 0.74 128 Zenobia pulverulenta Zenobia 3-5 gallon; 8' x8' 20% 348 0.74 1 257 Totals 100% 1742 0.74 1 289 Distance between individual stems in feet 5 ----------------------- Zone Location Type Species Common Name Species Percent Quantity /Acre Acreage Total Quantity Zone 4 Buffer -Area Upland tree Pinus pa/ustris Longleaf pine 3-5 gallon; 20' x 20' 100% 218 1.23 268 Totals 100% 218 1.23 268 Distance between individual stems in feet. 14 Zone Location Type Species Common Name Size and Spacing Species Percent Quantity /Acre Acreage Total Quantity Zone 4 Buffer Area Upland Gress Andropogon gemrain Big Bluestem 1 gallon; 2' x 2' 10% 762 1.23 937 Schizachyhum scopanum Little Bluestem 4"-8" container; 1' x 1' 20% 1524 1.23 1874 Andropogan vlrginicus Broome 4"-8" container; 1' x 1' 20% 1524 1.23 1874 Arlslida stncta Wregress 4"-8" container; l' x 1' 409/. 3048 1.23 3749 Muhlenbergia capillans Muhly Grass 1 gallon; Tx 3' 10% 762 1.23 937 Totals 100% 7120 1.23 1 9373 Distance between individual stems in feet. 2 m MAIM 0 00A iiiiiiiiiniiiinww"�MPA4, rEfiEr i.��a�,�'��a- �--•`sue ........�. \�\■III/, .ear ..ate•_._..::.::-:': "•'�'�'%':�:►:�:::::'•'•••'•'-'' •_'-'•:�:•. �a■1r� • xx •lNrIIDrA////1. x.Va .�.i/111//1 ��08FO 11 OhlWET DETENTION BASIN D vuu. �► i loop ,uv.nl.a !E �'.. RE ..❖. y0 PI ..❖.�- �1a9lsii me ZONE 1 LEGEND cr al lrl ern uocument 'lire c y Ir sf documents is ryuved by [ne s+�r� a, Ir 1, North Carolm; fJles require th'rt th r :a Ys,ei designer ine��«ct dwir q oes. e .ify conformity with th:: Dior ar to a u-';If; COmpliance with the 1008(o) n,Y+clL(0 _Dale Z U p--- - NCG� ision of Water qusiq}- �.,;:r G8 GRAPHIC SCALE 0 30' 60' SCALE:1"r 30' US ARMY CORPS OF ENGINEERS SAVANNAH ') LU N Z Z 6 O Q O ❑m W� �= ¢H06} a°b0 0' tjj W U F N 0 0- 1 F> J Z 0Z(Un 03:0Cl ui J a � m0 of Um U to II UOf mw O� O U LLI J Z Wad ILL a 2 00 Z IT c+l O Z 0 In 5 Z) 0 W W X Nq 17rj) 0< LL (n N H U c - m Kim U) EiWU ofZaf O Lu W ZZO > L W¢O W= U' LL Q m9z N W c WOZ QOQ UCn F� rn Z d Z Z 0� QJ Q ma W0 Z Oa = X J H- Q a0 ¢ U WUj o� 2 QOf U)oa L m LL W I- J F 0 Z 0 IUJ > N 0 LL PLATE REFERENCE NUMBER L8 L SHEET 21 OF 23 1 _ _ I{ .. _ _ a ...._ '_..:d s_'i_'`._. �._. _.... _ I. .. �. c. � _. _. .L_I�-Li.li::y. ._mil � __--_ _ — � - —. .� i; l — �—� � T s _ �_.. _ _ ��i �:il i � '' i REFORESTATION PLANTING PROCEDURE WITH KBC/OST BAR (DIBBLE BAR) J C C 9 �= w e ,� 1. INSERT THE PLANTING BAR STRAIGHT DOWN INTO THE SOIL TO THE FULL DEPTH OF THE BLADE AND PULL BACK ON THE HANDLE TO OPEN THE PLANTING HOLE. (DO NOT ROCK THE PLANTING BAR BACK AND FORTH AS THIS CAUSES SOIL IN THE PLANTING HOLE TO BE COMPACTED, INHIBITING GROWTH.) 2. REMOVE THE PLANTING BAR AND PUSH THE TREE ROOTS DEEP INTO THE PLANTING HOLE. PULL THE TREE BACK UP TO THE CORRECT PLANTING DEPTH. GENTLY SHAKE THE TREE TREE TO ALLOW THE ROOT TO STRAIGHTEN OUT. DO NOT TWIST OR SPIN THE TREE OR LEAVE THE ROOTS J—ROOTED. 3. INSERT THE PLANTING BAR SEVERAL INCHES IN FRONT OF THE TREE AND PUSH THE BLADE HALFWAY INTO THE SOIL. TWIST AND PUSH THE HANDLE FORWARD TO CLOSE THE TOP OF THE SLIT TO HOLD THE TREE IN PLACE. 4. PUSH THE PLANTING BAR DOWN TO THE FULL DEPTH OF THE BLADE. 5. PULL BACK ON THE HANDLE TO CLOSE THE BOTTOM OF THE PLANTING HOLE. 6. PUSH FORWARD THE HANDLE TO FIRM SOIL ON TOP OF ROOTS AND TO CLIMINATE AIR POCKETS AROUND THE ROOT. 7. INSERT PLANTING BAR 2 INCHES FROM LAST HOLE. 8. PUSH FORWARD, THEN PULL BACKWARD TO FILL PREVIOUS HOLE. 9. REMOVE THE PLANTING BAR AND FIRM UP THE OPENING WITH THE HEEL. 10, FIRM THE SOIL AROUND THE TREE WITH THE FOOT. BE CAREFUL TO AVOID DAMAGING THE TREE. PLANTING PROCEDURE WITH HOEDAD O n 1. STRIKE BLADE ALMOST VERTICALLY, FULL DEPTH OF BLADE, INTO THE SOIL. PULL UP ON THE HANDLE TO BREAK THE SOIL LOOSE AT THE BOTTOM OF THE HOLE. CAUTION - AVOID RAISING THE HANDLE MORE THAN A FEW INCHES. OTHERWISE THE HOLE WILL FILL WITH SOIL AND THE TREE WILL BE SHALLOW ROOTED. 2. SLIDE HAND DOWN HANDLE ALMOST TO THE BLADE. PULL BACK AND DOWN ON THE HANDLE TO FORM A POCKET ON THE FAR SIDE OF THE BLADE. WITH THE OTHER HAND, IMMEDIATELY PLACE THE TREE ROOTS INTO THE POCKET TO THE FULL DEPTH OF THE HOLE, 3. HOLD TREE IN PLACE WHILE SLIDING THE HOEDAD BLADE OUT OF THE HOLE, LOOSE SOIL SHOULD FALL INTO THE HOLE, HOLDING TREE IN PLACE. 4. PULL BLADE COMPLETELY OUT OF THE HOLE AND PUSH SOIL AGAINST PLANTED TREE WITH THE TIP OF THE BLADE. FOOT T FIRM THE I AGAINST TH 5 USE 00 0 E SOILE TREE. DO NOT STEP ON OR BRUISE TREE WITH YOUR FOOT. REFORESTATION PLANTING CRITERIA ROOT COLLAR PROPER PLANTING N.T.S. ROOT COLLAR ROOT COLLAR TOO DEEP ROOT COLLAR TOO SHALLOW RnnT rnl I na ROOT COLLAR ROOTS BENT (J—ROOT) AIR POCKETS ANGLED PLANTING UNACCEPTABLE PLANTING N.T.S. G TLC - t 92i7E" Idl]d LY _l _ JT.eills fy '13" r w4(4106 to c APO .••Q�FE e7 Q . 2i71h19 i I � a US ARMY CORPS OF ENGINEERS SAVANNAH 91�1119 O O z M O w 0 W O N z Z 9 O CD Q 04 WO ~ao} U OM 2~ w � O (.96 O- J w w >� U F z04w ¢OO ❑zu) Orn¢a U5C)N w J LL 7 m 0 0U (9 } u) Z m U O 0OJ ww a z m w Z U a Zo m 5 w W X Q� �0 LL 0) N U aoo �U owv wz� Lu Warn>_ zzo uw¢o W= zLL¢ m�z Nmr 0 z ]ern w °gym r`/)a _� w0� U z g LL Cn z z J_ 0¢ w w w QOz Luo ¢ �a z ¢ UU 0 JF- W It (Lo a oZ Q ¢ o ¢W Lm � p o� Z O ZQ U � J O LL PLATE REFERENCE NUMBER L10