Loading...
HomeMy WebLinkAboutSW6100901_CURRENT PERMIT_20101004STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW�QID l DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ . COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD �r NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Colleen K Sullins Governor Director October 4, 2010 Sandhills Community College Attn: Richard J. Gough, VP of Administrative Services 3395 Airport Road Pinehurst, NC 28374 Subject: Stormwater Management Permit SW6100901 Sandhills Community College New General Classroom Building High Density Project Moore County Dear Mr. Gough: Dee Freeman Secretary The Fayetteville Regional Office of the Division of Water Quality received a complete Stormwater Management Permit Application for the Sandhills Community College New General Classroom Building project on September 2. 2010. Staff review of the plans and specifications associated with additional information received on September 16, 2010 and September 27, 2010 has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H .1000. Therefore, we are forwarding herewith Stormwater Management Permit SW6100901 dated October 4, 2010, for the construction of the subject project. This permit shall be effective from the date of issuance until October 3, 2020 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) calendar days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 2761 1-7447. Unless such demands are made, this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Mike Lawyer or myself at (910) 433-3300. Sincerely; Belinda S. Henson Regional Supervisor Surface Water Protection Section BSH: ML/ml cc: V Tre Dugal, PE -Wilbur Smith Associates (via e-mail) Brent Lockamy, PE, Town Engineer -Town of Southern Pines (via e-mail) FRO -Surface Water Protection DWQ Central Files Location: 225 Green Street, Suite 714, Fayetteville, North Carolina 28301 One Phone: 91 OA33-33001 FAX: 910486-07071 Customer Service: 1-877-623-6748 NOl tl] CaCO � l lla Internet: vrxw.ncwateraualiN.oro Naturally An Equal Opportunity 1 Affirmative Action Employer I-i STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Sandhills Community College Sandhills Community College New General Classroom Building Moore County FOR THE construction, operation and maintenance of a bioretention area in compliance with the provisions of 15A NCAC 214 .1000 (hereafter referred to as the "slorinwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until October 3, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stonnwater runoff as described in Section 1.6 of this permit. The stormwater controls have been designed to handle the runoff from 94,525 square feet of impervious area. The tract will be limited to the amount of built -upon area indicated in Section 1.6 of this permit and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The following design criteria have been provided in the bioretention area and must be maintained at design condition: a. Drainage Area, acres: 3.08 b. Total Impervious Surfaces, ft2: 94,525 C. Design Storm, inches: 1.00 qL d. Bioretention Depth, inches: 12.0 e. Temporary Ponded Depth Elevation, FMSL: 441.00 Bioretention Bottom Elevation, FMSL: 437.75 f. Bioretention Surface Area, ft2: 1,680 g. Permitted Storage Volume, fts: 1,444 Minimum Required Volume, fl3: 1,432 h. Receiving Stream/River Basin: Mill Creek/Cape Pear i. Stream Index Number: 18-23-11-(1) j. Classification of Water Body: "WS-111;HQW: a " 11. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall, at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including; but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of'slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, catch basins and piping. k. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design conditions prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to. those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transl'er of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project) area is defined as all property owned by the permittee, for which Erosion and Sedimentation Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. This permit shall be effective from the date of issuance until October 3, 2020. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. 111. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions; the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The tiling of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within thirty (30) calendar days. L Permit issued this the foUrtll day of October 2010. NORTH CAROLINA ENVIRONMENTAL NIANAGEMENf COMMISSION Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Storm -water Management Permit SW6100901 c ¢ e�.` . Lott'II �[d �Cc pgtpg O 5+6a 1 p9p UI. IgH�g z a 4p a x r q 3 w 7 Approved StormUyageF Permit Documents Construction in accordance with these documents is required by the sC MP wvater permit. North Cs:olirr, rules requirr: It" i;�'hn ctcrmyiater system de�Jp-;.,. inspect Via; ;rici cFa;u;,r.: coon; certiry cenfonr,it. the plc.ns and snacc,; and certify compliar,ee_ stonn•hafer rule;C . (15:�:,ICA2H, 1008 Permits yer �,te ro`y�t co f $IOn OF \lJ,at�f-;;r i4 Sheet :?_G 4roa.p_ ..__f-revision Da" DWQ USE ONLY Date Received Fee Paid Permit Number -/a 5!�✓fA Oa Applicable Rules: ❑ Coastal SW - 1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina pENR-FRO Department of Environment and Natural Resources Division of Water Quality SEP 0 2 2010 STORMWATER MANAGEMENT PERMIT APPLICATION FOIQ This form may be photocopied for use as an original �✓ �' 1. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Sandhills Community College New General Classroom Building 2. Location of Project (street address): City: Pinehu rst County: Moore Zip:28374 3. Directions to project (from nearest major intersection): From intersection of Airport Road and NC 22 take Airport Road west towards Pinehurst. Turn left into the third entrance to the college and follow the signs towards the Einstein Lot. The new building is being constructed on the existing Einstein Lot. 4. Latitude:35° 13' 16" N Longitude:79° 24' 34" W of the main entrance to the project. II. PERMIT INFORMATION 1.a.Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) _ , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ❑High Density ❑Drains to an Offsite Stormwater System ®Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 3.7 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:Sedimentation/Erosion Control has been obtained on 1& 14, 2010; permit no. MOORS-2010-019. Form SWU-101 Version 07Jun2010 Page I of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Sandhills Community College Signing Official & Title:Richard 1. Gough, Vice President of Administrative Services b.Contact information for person listed in item la above: Street Address:3395 Airport Road City:Pinehurst State:NC Zip:28374 Mailing Address (if applicable): City: State: Zip: Phone: (910 ) 695-3706 Email:goughr@sandhills.edu Pax: (910 ) 692-4794 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/ Signing Official & Title b. Contact information for person listed in item 3a above: Mailing Address: Phone: 4. Local jurisdiction for building permits: Point of Fax: Phone #: Form SWU-101 Version 07Jun2010 Page 2 of IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwa ter runoff will be treated. The stormwater runoff from the net increase of impervious area added due to the construction of the new classroom building and new parking on an existingparking arking lot will be treated in a bioretention cell with a forebay for pretreatment. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 1.32 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Aree:1.32 acres Total project area shall be calculated to exclude the follotoin the nornial pool of impounded structures, the area between tine banks of stremus and rivers, the area belota the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward frown the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal toetlands laudroard of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 9. How many drainage areas does the project have?] (For high density, count 1 for each proposed engineered stormwater BMP. For Iota densitil, and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area l_ Drainage Area _ Drainage Area _ Drainage Area Receiving Stream Name Nicks Creek Stream Class * WS-III Stream Index Number * 18-23-3 Total Drainage Area (so 57,500 On -site Drainage Area (sf) 57,500 Off -site Drainage Area (sf) 0 Proposed Impervious Area** (so 45,738 % Impervious Area** total 80 Impervious** Surface Area Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/Lots (so 26,136 On -site Streets (so On -site Parking (so 17,320 On -site Sidewalks (so 2,105 Other on -site (so Future (so Off -site (so Existing BUA*** (so Total (so: 45,738 " Streann Class and Index Number can be determined at: hltl):/k)(irtal,ncdemnorg aeb/uuj(hrs/csu/dassijicatious Form SWU-101 Version 07Jun2010 Page 3 of 6 impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. * Report only that anount of existing BUA that will rennin after development. Do not report any existing BUA that is to be removed and which mill be replaced by neto BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. No offsite impervious area contributes to the drainage area at the location of the stormwater treatement measure. Projects in Union County: Contact DWQ Central Office .staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from htto://t)ortal.ncdenr.ore/web/wa/ws/su/ban-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available fromhttp://portal.nceienr.org/web/wg/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.orp/web/w(l/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package fromhttp://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part V11 below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to hn://www.envhelp.org/pages/onestopexpress.htmI for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within th mile of the site boundary, include the r/z mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. 7µf? TLf13 _T�" rP-a Form SWU-101 Version 07Jun2010 Page 4 of 6 m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SH WT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x1l" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule o site visit far DWQ to verify the SHWT prior to submittal, (910) 796-7378.) N/A A copy of the most current property deed. Deed book: 6 /V Page No: S IS For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per NCAC 21-1,1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http:/ /www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. . By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Tre Dugal, PE Consulting Firm: Wilbur Smith Associates Mailing Address:421 Fayetteville Street, Suite 1303 City:Raleigh Phone: (919 ) 573-4190 Email:nidugal@wilbursmith.com State:NC Zip:27601 Fax: (919 ) 832-8798 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07Jun2010 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: 1, a Notary Public for the State of County of , do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or hjpe name of person listed in Contact Information, item In) Richard 1. Gough - Vice President of Administrative certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Date: 8/'21-/oZoto I, 1762 in /,1 .v A E a Notary Pubic for the State of /V L County of p !'1 001C do hereby certify that tCf t'.L"61 �• (7fl uS personally appeared before me this�'day of A L44U ),0 10 and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, Ll /1 �Lt IL. IAOTAO , my OOMMI SION XPIRES "03LIG SEAL My commission expires / 0 l / P //: Q / V Form SWU-101 Version 07Jun2010 Pa_e 6 of 6 Permit Number: _5- i /Q r (to be provided by DWQ) Drainage Area Number: Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will be taken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW401-Bioretention O&M-Rev.3 Page 1 of 4 BMP element: Potentialproblems: How I will remediate theproblem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch ' layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic time shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401-Bioretention O&M-Rev.3 Page 2 of 4 BMP element: Potentialproblems: How I will remediate theproblem: The underdrain system Clogging has occurred. Wash out the underdrain system. if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 1 733-1786. Form SW401-Bioretention O&M-Rev.3 Page 3 of 4 Permit Number: 5-6yrI l60go (lobe provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Sandhills Community College New General Classroom Building BMP drainage area number Print name:Richard J. Gough Title:Vice President of Administrative Services Address:3395 Airport Road, Pinchurst, NC 28374 Phon Sign; Date Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, dean /q . 6 1 u e— , a Notary Public for the State of NC , County of A tuwt. , do hereby certify that 6 cho, a✓ f. 6o.I = personally appeared before me this day of AAJu St , AO 10 , and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, AoTAR y My n PuBoo SEAL My commission expires 16 /1gLt 0/y Y Cc n In, /g'L "e— Form SW401-Bioretention I&M-Rev.2 Page 4 of 4 Permit Numberc/W WIT (to be provided by DM) O4' W ATFF,eG ��A h r NCDENR ° STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Sandhills Community College New Classroom Building Contact name Tre Dugal, PE Phone number 919.573A190 Date Drainage area number Outlet from Basin p8 II.DESIGN INFORMATION Site Characteristics Drainage area 134,164 ft' Impervious area 94,525 it' Percent impervious 70.5% % Design rainfall depth 1.0 inch Peak Flow Calculations Is prelpost control of the 1-yr, 24-hr peak Sow required? N (Y or N) 1-yr, 24-hr runoff depth in 1-yr, 24-hr intensity in/hr Pre -development 1-yr, 24-hr peak Sow ft'/sec Post -development 1-yr, 24-hr peak Sow It3Isec Pre/Post 1-yr, 24-hr peak control ft'/sec Storage Volume: Non -SA Waters Minimum volume required 1,432.0 ft3 Volume provided 1,444.0 ft' OK Storage Volume: SA Waters 1.5" runoff volume ff' Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ff3 Minimum volume required 0 ff' Volume provided ff' Cell Dimensions Pending depth of water 12 inches OK Pending depth of water 1.00 ft Surface area of the top of the biorelention cell 1,680.0 fe OK Length: 53 ft OK Width: 32 If OK -or- Radius ft Media and Soils Summary Drawdown time, ponded volume 6 fir OK Drawdown time, to 24 inches below surface 12 fir OK Drawdown time, total: 18 hr In -situ soil: Soil permeability 7.50 Whir OK Planting media soil: Soil permeability 2.00 inlhr OK Soil composition • Sand (by weight) 88% OK • Fines (by weight) 8% OK Form SW401-Bioretention-Rev.8 Juy 30, 2009 Parts I and II. Design Summary, Page 1 of 3 4 Permit Number5"/Ao Ito be Provided by DAD) % Organic (by weight) 4% OK Total: 100% Phosphorus Index (P-Index) of media (unitless) Form SW40i-Biofetention-Rev.8 My 30, 2009 Parts I and II. Design Summary, Page 2 of 3 Permit Number: 5 "✓/�V 6r (to be provided by DWO) Basin Elevations Temporary pool elevation 441.00 fmsl Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? Y (Y or N) OK Is this a cell with trees/shrubs? (Y or N) Planting elevation (top of the mulch or grass sod layer) 440 fmsl Depth of mulch 3 inches OK Bottom of the planting media soil 438 fmsl Planting media depth 2 It Depth of washed sand below planting media soil 0.25 it Are underdrains being installed? N (Y or N) How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and 0 ft the bottom of the cell to account for underdrains Bottom of the cell required 437.75 fmsl SHWf elevation 435.67 fmsl Distance from bottom to SHWT 2.08 it OK Internal Water Storage Zone (IWS) Does the design include IWS Y (Y or N) Elevation of the top of the upturned elbow fmsl Separation of IWS and Surface 440 (t Planting Plan Number of tree species Number of shrub species Number of herbaceous groundoover species Additional Information Does volume in excess of the design volume bypass the Y (Y or N) OK bioretention cell? Does volume in excess of the design volume flow evenly distributed (Y or N) through a vegetated filter? What is the length of the vegetated filter? B Does the design use a level spreader to evenly distribute Bow? N (Y or N) Show how flow is evenly distributed. Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP localed at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an'X' in the shaded cell) Gravel and grass (8'inches gravel followed by 3-5 it of grass) Grassed swale Forebay Other Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 9.67 f /sec Insufficient inlet velocity unless energy dissipating devices are being used. N (Y or N) OK N (Y or N) OK Y (Y or N) OK X OK Form S W401-Bioretention-Rev.8 Jury 30, 2009 Parts I and II. Design Summary, Page 3 or 3 r 6 � e- r,•- �a ea 5 a I ®rke Ix ents its is _. the pans r,nd spa::e; and certiry cornpliar,cr; storrnwater rules (15A NC.4C 21-I, 1008 (J�j Perbq mit S 4(tv el Date �� �f — -�0 _ NC Division of Vdat ::Iiy Shee[:F G _O Revis;on Da,-