Loading...
HomeMy WebLinkAboutSW6091007_HISTORICAL FILE_20091117STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 1Q22gl U 7 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS I HISTORICAL FILE (❑ COMPLIANCE EVALUATION. INSPECTION DOC DATE'>�lll /7 YYYYMMDD 763 Comtech Drive, Pembroke, NC 28372 P.O. Box 1149 metcon Tel. (910) 521-8013 • Fax. (910) 521-4072 CONSTRUCTION www.metconconstruction.net BUILDINGS • HIGHWAYS • PUBLIC UTILITIES November 13, 2009 Belinda S.-Henson -- Regional Supervisor Surface Water Protection Section Dear'Ms.'Henson In regard to NOV dated October 21, 2009, work was started in late Dec. 2003. When Storage Unit Project was started site was established at less than one acre. Due to unforeseen clearing and grubbing issues site was cleared beyond the one acres limit that - was established in the beginning. Once additional work was realized, the process to obtain a Storm Water Management Permit was started and finally approved on May 26, 2009. During this time great effort was placed on protecting the land surface with managing any run off and capturing any sediment.' While the permit was being reviewed it was determined that the site was in a high quality water zone. During this time a different engineering firm was hired in order to expedite all paper work, and testing. On October 30, 2009 a Storm Water Management Plan was submitted to Mr. Lawyer. I hope this plan finds good favor and all issues are resolved. Sincerely, Greg Hunt h4 Metcon";'Inc Senior Project Manager----....,, Anderson E. P.O. Box 1736 305 North Chippewa Lumberton, N.C. 28359 Licensure No.: C-0793 October 30, 2009 NCDENR-Land Quality Section Attention: Mike Lawyer 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Ref: Metcon Storage Units — Comtech Storage Soluti Mike, Please find enclosed 1) Two copies 2) One copy of 3) One copy of 4) One copy of 5) One 8.5 x'1 6) Two sets of 7) Two sets of 8) Application I trust that this is suffic additional information, Supplement Sincerely, ANDERSON ENGIN ERING & Wesley . Anderson WMA/rrc Enclosures and cc: Aaron Thomas, Metcon, Inc. ineerin2 & Assoc., P.A. your Larry Anderson, P.E. President * ,,;10 you require any National Society of Professional Engineers® NSPEdMeff* . Phone: (910) 671-9530 • Fax: (910) 618-0838 • Email: andersonengineer@bellsouth.net DWQUSE ONLY Date Received Fee Paid Permit Number 0 3o a9 S 1wGtr9h'7 Applicable Rules: (select all that apply) ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina DENR—FRO Department of Environment and Natural Resources ILd� IfY�3 Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM DWQ This forth may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Comtech Storage Solutions, Com Tech Park 2. Location of Project (street address): 805 Comtech Drive City:Pembroke County:Robeson Zip:28372 3. Directions to project (from nearest major intersection): From NC Hwy 711 W (toward Pembroke), turn left onto Comtech Drive. Office is 0.7 mi on Left. 4. Latitude:34° 38' 42.57" N Longitude:79* 10' 01.99" W of the main entrance to the project. H. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New []Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) and the status of construction: []Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control: 5.0 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:NCDENR Erosion Control, Project ID: ROBES-2009-018, issued 5-26-09 5 AC approved disturbed area. III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the Drolect): Applicant/Organization:Township Developers Signing Official & b.Contact information for person listed in item la above: Street Address:763 Comtech Drive City:Pembroke State:NC Zip:28372 Mailing Address (if applicable):PO Box 1241 City:Pembroke State:NC Zip:28372 Phone: (910 ) 521-8013 Email:aaron@metconconstruction.net Fax: (910 ) 521-8014 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: Fax: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Aaron Thomas Signing Official & Title:Member/Manager b.Contact information for person listed in item 3a above: Mailing Address:Box 1241 City:Pembroke State:NC Zip:28372 Phone: (910 ) 521-8013 Email:aaron@metconcoiistruction.net Fax: (910 ) 521-8014 4. Local jurisdiction for building permits: Town of Pembroke Point of Contact:McDuffie Cummings, Manager Phone #: (910 ) 521-9758 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater will be collected and treated by the installation of a wet detention basin The basin will be designed in accordance with NCDENR, DWO Best Management Practices A forebay will be included 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Lumber River basin. 4. Total Property Area: 5 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0.3 acres y rf . � 7. Total Property Area (4) - Total Coastal Wetlands Area (5) -Total Surface Water Area (6) =Total Project dK b1r o(ts Aree:4.7 acres s A !� Total prgect area shall be calculated to exclude the following the normal pool of impounded structures, the area a'y between the banks of streams and rivers, the area below the Nonnal High Water (NHW) line or Mean High Water e(A4-ce- (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to /s f- calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 24.47 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. BasinInformahon ' '&� _ -Draina e Area'] ' .Drama 'eAiea ." _ Dfaiii e Area' -; _ Diainaoe Aiea Receiving Stream Name Lumber Stream Class * WS-IV,B,Sw,hgw Stream Index Number * 14-(7) Total Drainage Area (so 204732 On -site Drainage Area (so 204732 Off -site Drainage Area (sf) 0 Proposed Impervious Area** s 50.094 % Impervious Area** total 24.47 Im" ` rv�ousa>;;Surface'Ar'ea :: -Draiiia e'Are`a Y, Drairia e A ea - Di•aina e Area' Draina e Area '="` On -site Buildings/Lots (sf) 13939.20 On -site Streets (so 0 On -site Parking (so 36154.8 On -site Sidewalks (so 0 Other on -site (so 0 Future (so 0 Off -site (so 0 Existing BUA*** (so 0 Total (so: 50094 * Stream Class and Index Number can be determined at: http:lAl2o.enr.state.nc.nslbimslreports/rmortsWB html ** Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. n/a Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent .slormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhttr)://h2o.enr.stite.nc.us/su/bmo forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://h2o.enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http:/ /h2o.enr.state.nc.us/su/msi_maps.htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initiated in blue ink. Download the latest versions for each submitted application package from hft://h2o.enr.state.nc.us/su/`­bmp-forms.htm. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. wit" 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants N/p I1111- Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M _ /AN agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/12ages/onestol2express.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify _ elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xl1" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SFIWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: _ 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2I-I.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.ne.us/Corporations/­CSearch.aspx VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from httl2://h2o enr state nc us/su/bml2 forms htmtldeed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Larry W. Anderson PE Consulting Firm: Anderson Engineering and Associates, PA Mailing Address:PO Box 1736 City:Lumberton State:NC Zip:28359 Phone: (910 ) 671-9530 Fax: (910 1 618-0830 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or hjpe name of person listed in Contact Information, item 2a) n/a , certify that I own the property identified in this permit application, and thus give permission to (print or (i/pe name of person listed in Contact Infonnation, itenn In) with (print or type nanne of organization listed in Contact Infonnation, item Ib) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Date: a Notary Public for the State of , County of do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or hjpe name of person listed in Contact Information, item 2) Aaron Thomas certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater Aes under 1�CAC 211,;1000,51.2006-246 (Ph. II - Post Construction) or SL 2008-211. Date: 10 —2q — 0� I, M eAom-le W. M i kker a Notary Public for the State of f3 0VVA CAmb n0. , County of '?%okpe5on do hereby certify that Ag r on -Chomas personally appeared before me this I day of 0tiblxv- 10OR and acknowledge the due exxe�cutiio�n" of the application for a stormwater permit. Witness my hand and official seal, "t � as` � � -1 r ll.xwu�- W. %AOTAQA . o '�'�i30,lc ci SEAL My commission expires Comtech Storage Solutions C/O TWP Developers, LLC mm Narrative: It is proposed to install a stormwater treatment BMP at Comtech Storage Solutions in Pembroke to control runoff and treat all stormwater prior to discharge. The project site is located in the Lumber River Drainage Basin, and is subject to High Quality Water Standards. The BMP will be a wet detention pond and will be designed for 90%TSS removal. Designs are in accordance with the latest version of the NCDENR BMP Manual. A forebay will be utilized for primary settlement and initial treatment. The Basin will be approximately 7 feet deep with a permanent pool of 3 feet. A dewatering device is proposed to limit detention time to 3.38 days. Details of the dewatering device are shown on the plans. A secondary spillway will be provided for emergency situations. The secondary spillway will be constructed of concrete and rip rap. The installation of the basin, as designed, will begin promptly upon approval of the enclosed Stormwater Management Plan. After the basin is in place and functioning as designed, the system will be certified by the Designer. The basin will be permanent, and will remain open for cleaning, debris removal, and maintenance. "STORMWATER RETENTION CALCULATIONS Project: COMTech Storage Solutions By: SJP Date: 10-29-2009 Job #: N/A STAGE -STORAGE FUNCTION (ABOVE PERMANENT POOL) �:LF.I:fry. Yr� u S Z CONTOUR CONTOUR AREA INCR. VOL. ACCUM. VOL. STAGE In S In Z Z est [FTZj [FT'] [FT'] [FT] [FT] 154.50 0 0 0.0 155.00 9258.86 2315 2315 0.5 7.7470 -0.6931 0.49 156.00 10508.30 9884 12198 1.5 9.4091 0.4055 1.58 157.00 11814.29 11161 23360 2.5 10.0588 0.9163 2.51 158.00 13176.83 12496 35855 3.5 10.4872 1.2528 3.40 Constant (y-Intercept) 8.76043 Ks = 6377 Slope (X Coefficient) 1.41407 b = 1.41000 Standard Error of Coefficient 0.06623 R2 = 0.99798 STAGE -STORAGE FUNCTION log -log plot 0.0000�- 8.0000 t � t Seriesl : Linear (Seriesl) - -1.0000 -0.5000 0.0000 0.5000 1.0000 1.5000 In Z Asphalt Area = 0.83 ac Building Area (Root) = 0.32 ac Pervious Area = 3.55 ac Pond Area = 0.30 ac Total Drainage Area = 5.00 ac STORMWATER RETENTION CALCULATIONS Project: COMTech Storage Solutions By: SJP Date: 10-29-2009 Job #: N/A Runoff Coefficient, C: Pre -Development ID Area (ac) C` C x A Unimproved cleared area 5.00 0.35 1.75 Wooded, deep ground litter 0.00 0.10 0.00 Total 5.00 1.75 C� = 0.35 TREATED RUNOFF ID Area (ac) C. C x A Roof, inclined 0.32 1.00 0.32 Street, driveway, sidewalk 0.83 0.95 0.79 Lawn, dense soil, flat 2% 3.55 0.17 0.60 Commercial, Generalized 0.00 0.85 0.00 Total 4.70 1.71 C, = 0.36 'Source: Elements of Urban Stormwater Design by H. Rooney Malcolm, P.E. - Exhibit 1 Storm Intensit o.3es L = 650 ft L3 1 H = 2.75 ft I\ fj 11 T� = 9.39 min T - 128 Say 9 min Design Storm: 10 year Location: Lumberton, NC Duration Intensity [min] [in/hr] 5 8.10 9 110 10 6.48 So, 110 = 6.80 TREATED QP = C x 110 x A = 11.51 cfs STORMWATER RETENTION CALCULATIONS Project: COMTech Storage Solutions By: SJP Date: 10-29-2009 Job #: N/A Estimate Volume of Runoff. V• P1,10 = 2.58 in SCS CURVE NUMBER: Soil Type: Rains Sandy Loam Storm: 1-hr 10 yr Location: Pembroke, NC Hydrologic Soil Group: B/D ID Area (ac) CN* CN x A Impervious - Roof 0.32 98 31.36 Impervious - Parking lot, Sidewalk 0.83 98 81.34 Lawn, Good condition 3.55 80 284.00 Commercial & Business 85% Impervious 0.00 95 0.00 Total 4.70 39E CNeff= 84 *Source: NC Erosion and Sediment Control Planning and Design Manual - Tables 8.03(e) - (9) - 1000 S-CN-10 S = 1.90 in V=Q*xA= E(P-0.2�S�Z P+0.8•S Q. = 1.18 in 20104 cf Imp. Area ID Area (ac) % Imp (ac) Impervious - Roof 0.32 100% 0.32 Impervious - Parking lot, Sidewalk 0.83 100% 0.83 Lawn, Grass Medians 3.55 0% 0.00 Commercial & Business 85% Impervious 0.00 85% 0.00 Total 4.70 1.1 s Time to Peak. T.: T V ° 1.39•Q� SIMPLE METHOD RD = 1.0 in Rv=0.05+0.9*IA IA= 24% V=3630*RD*Rv*A Rv= 0.27 in/in V = 4610 cf Tp = 4.8 min (Using Simple Method) STORMWATER RETENTION CALCULATIONS Project: COMTech Storage Solutions By: SJP Date: 10-29-2009 Job #: N/A Allowable Discharge (Pre -development Conditions Qa11= Qpre = Cpre x 110 x A Cpre = 0.35 ho = 6.80 cfs A = 5.00 ac Qa11 = Qpre = 11.91 cfs Peak Inflow* = 12198.30 cfs Peak Pond Outflow* = 0.05 cfs Peak Elevation* = 155.31 ft Top of Pond El. [ft] = 158.00 Peak Storage* = 4742 cf Storage Avail.[cf] = 35855 Allowed Actual cfs cfs 0.05 < 11.91 OKI *See Storm Routing on Next Page OK! OK! STORM ROUTING Pipe (Orifice) V-Notch: Input Data: N 1 Q = C[tan(0/2)]H5i2 op 11.51 cfs Cd 0.6 C = 2.5 Tp 5 min D 1.5 0 = 0 degrees AT 1 min Zi 154.50 0 = 0.0000 radians Weir: Invert = 154.50 feet Ks 6377 Cw 3.0 b 1.41 L 10.0 ft Zcr 156.00 ft INFLOW STORAGE STAGE ORIFICE V-NOTCH WEIR OUTFLOW 0 0.00 0 154.50 0 0.00 0.00 0.00 1 1.10 0 154.50 0.00 0.00 0.00 0.00 2 3.98 66 154.54 0.00 0.00 0.00 0.00 3 7.53 304 154.62 0.01 0.00 0.00 0.01 4 10.41 756 154.72 0.02 0.00 0.00 0.02 5 1151 1379 154.84 0.03 0.00 0.00 0.03 6 10.41 2068 154.95 0.04 0.00 0.00 0.04 7 8.10 2691 155.04 0.04 0.00 0.00 0.04 8 6.24 3174 155.11 0.04 0.00 0.00 0.04 9 4.81 3546 155.16 0.05 0.00 0.00 0.05 10 3.71 3832 155.20 0.05 0.00 0.00 0.05 11 2.86 4052 155.22 0.05 0.00 0.00 0.05 12 2.21 4220 155.25 0.05 0.00 0.00 0.05 13 1.70 4350 155.26 0.05 0.00 0.00 0.05 14 1.31 4449 155.27 0.05 0.00 0.00 0.05 15 1.01 4525 155.28 0.05 0.00 0.00 0.05 16 0.78 4582 155.29 0.05 0.00 0.00 0.05 17 0.60 4626 155.30 0.05 0.00 0.00 0.05 STORMWATER RETENTION CALCULATIONS Project: COMTech Storage Solutions By: SJP Date: 10-29-2009 Job M N/A 18 0.46 4659 155.30 0.05 0.00 0.00 0.05 19 0.36 4684 155.30 0.05 0.00 0.00 0.05 20 0.28 4702 155.31 0.05 0.00 0.00 0.05 21 0.21 4716 155.31 0.05 0.00 0.00 0.05 22 0.16 4726 155.31 0.05 0.00 0.00 0.05 23 0.13 4732 155.31 0.05 0.00 0.00 0.05 24 0.10 4737 155.31 0.05 0.00 0.00 0.05 25 0.08 4740 155.31 0.05 0.00 0.00 0.05 26 0.06 4741 155.31 0.05 0.00 0.00 0.05 27 0.04 F ;z4742 155i31 0 OS ter;; 0.00 0.00 Om05 28 0.03 4741 155.31 0.05 0.00 0.00 0.05 29 0.03 4740 155.31 0.05 0.00 0.00 0.05 30 0.02 4739 155.31 0.05 0.00 0.00 0.05 31 0.02 4737 155.31 0.05 0.00 0.00 0.05 32 0.01 4735 155.31 0.05 0.00 0.00 0.05 33 0.01 4732 155.31 0.05 0.00 0.00 0.05 34 0.01 4730 155.31 0.05 0.00 0.00 0.05 35 0.01 4727 155.31 0.05 0.00 0.00 0.05 36 0.00 4725 155.31 0.05 0.00 0.00 0.05 37 0.00 4722 155.31 0.05 0.00 0.00 0.05 38 0.00 4719 155.31 0.05 0.00 0.00 0.05 39 0.00 4716 155.31 0.05 0.00 0.00 0.05 40 0.00 4713 155.31 0.05 0.00 0.00 0.05 41 0.00 4710 155.31 0.05 0.00 0.00 0.05 42 0.00 4707 155.31 0.05 0.00 0.00 0.05 43 0.00 4704 155.31 0.05 0.00 0.00 0.05 44 0.00 4701 155.31 0.05 0.00 0.00 0.05 45 0.00 4698 155.31 0.05 0.00 0.00 0.05 46 0.00 4695 155.30 0.05 0.00 0.00 0.05 47 0.00 4692 155.30 0.05 0.00 0.00 0.05 48 0.00 4689 155.30 0.05 0.00 0.00 0.05 49 0.00 4686 155.30 0.05 0.00 0.00 0.05 50 0.00 4683 155.30 0.05 0.00 0.00 0.05 51 0.00 4680 155.30 0.05 0.00 0.00 0.05 52 0.00 4677 155.30 0.05 0.00 0.00 0.05 53 0.00 4674 155.30 0.05 0.00 0.00 0.05 54 0.00 4671 155.30 0.05 0.00 0.00 0.05 55 0.00 4668 155.30 0.05 0.00 0.00 0.05 56 0.00 4665 155.30 0.05 0.00 0.00 0.05 57 0.00 4662 155.30 0.05 0.00 0.00 0.05 58 0.00 4659 155.30 0.05 0.00 0.00 0.05 59 0.00 4656 155.30 0.05 0.00 0.00 0.05 60 0.00 4653 155.30 0.05 0.00 0.00 0.05 61 0.00 4649 155.30 0.05 0.00 0.00 0.05 62 0.00 4646 155.30 0.05 0.00 0.00 0.05 63 0.00 4643 155.30 0.05 0.00 0.00 0.05 64 0.00 4640 155.30 0.05 0.00 0.00 0.05 65 0.00 4637 155.30 0.05 0.00 0.00 0.05 66 0.00 4634 155.30 0.05 0.00 0.00 0.05 67 0.00 4631 155.30 0.05 0.00 0.00 0.05 68 0.00 4628 155.30 0.05 0.00 0.00 0.05 69 0.00 4625 155.30 0.05 0.00 0.00 0.05 70 0.00 4622 155.30 0.05 0.00 0.00 0.05 STORMWATER RETENTION CALCULATIONS Project: COMTech Storage Solutions By: SJP Date: 10-29-2009 Job M N/A 71 0.00 4619 155.30 0.05 0.00 0.00 0.05 72 0.00 4616 155.30 0.05 0.00 0.00 0.05 73 0.00 4613 155.29 0.05 0.00 0.00 0.05 74 0.00 4610 155.29 0.05 0.00 0.00 0.05 75 0.00 4607 155.29 0.05 0.00 0.00 0.05 76 0.00 4604 155.29 0.05 0.00 0.00 0.05 77 0.00 4601 155.29 0.05 0.00 0.00 0.05 78 0.00 4598 155.29 0.05 0.00 0.00 0.05 79 0.00 4595 155.29 0.05 0.00 0.00 0.05 80 0.00 4592 155.29 0.05 0.00 0.00 0.05 81 0.00 4589 155.29 0.05 0.00 0.00 0.05 82 0.00 4586 155.29 0.05 0.00 0.00 0.05 83 0.00 4583 155.29 0.05 0.00 0.00 0.05 84 0.00 4580 155.29 0.05 0.00 0.00 0.05 85 0.00 4577 155.29 0.05 0.00 0.00 0.05 86 0.00 4574 155.29 0.05 0.00 0.00 0.05 87 0.00 4571 155.29 0.05 0.00 0.00 0.05 88 0.00 4568 155.29 0.05 0.00 0.00 0.05 89 0.00 4565 155.29 0.05 0.00 0.00 0.05 90 0.00 4562 155.29 0.05 0.00 0.00 0.05 91 0.00 4559 155.29 0.05 0.00 0.00 0.05 92 0.00 4556 155.29 0.05 0.00 0.00 0.05 93 0.00 4553 155.29 0.05 0.00 0.00 0.05 94 0.00 4550 155.29 0.05 0.00 0.00 0.05 95 0.00 4547 155.29 0.05 0.00 0.00 0.05 96 0.00 4544 155.29 0.05 0.00 0.00 0.05 97 0.00 4541 155.29 0.05 0.00 0.00 0.05 98 0.00 4538 155.29 0.05 0.00 0.00 0.05 99 0.00 4535 155.29 0.05 0.00 0.00 0.05 100 0.00 4532 155.28 0.05 0.00 0.00 0.05 101 0.00 4529 155.28 0.05 0.00 0.00 0.05 102 0.00 4526 155.28 0.05 0.00 0.00 0.05 103 0.00 4523 155.28 0.05 0.00 0.00 0.05 104 0.00 4520 155.28 0.05 0.00 0.00 0.05 105 0.00 4517 155.28 0.05 0.00 0.00 0.05 106 0.00 4513 155.28 0.05 0.00 0.00 0.05 107 0.00 4510 155.28 0.05 0.00 0.00 0.05 108 0.00 4507 155.28 0.05 0.00 0.00 0.05 109 0.00 4504 155.28 0.05 0.00 0.00 0.05 110 0.00 4501 155.28 0.05 0.00 0.00 0.05 111 0.00 4498 155.28 0.05 0.00 0.00 0.05 112 0.00 4495 155.28 0.05 0.00 0.00 0.05 113 0.00 4492 155.28 0.05 0.00 0.00 0.05 114 0.00 4489 155.28 0.05 0.00 0.00 0.05 115 0.00 4486 155.28 0.05 0.00 0.00 0.05 116 0.00 4483 155.28 0.05 0.00 0.00 0.05 117 0.00 4480 155.28 0.05 0.00 0.00 0.05 118 0.00 4478 155.28 0.05 0.00 0.00 0.05 119 0.00 4475 155.28 0.05 0.00 0.00 0.05 120 0.00 4472 155.28 0.05 0.00 0.00 0.05 STORMWATER RETENTION CALCULATIONS Project: COMTech Storage Solutions By: SJP Date: 10-29-2009 Job #: N/A;' Y@tlo< DRAWDOWN TIME: C A 2 HH�TVOLJME * 1MIN * 1HR # 1DAY = Q 60S 60MIN 24IIR CD = 0.6 A = 0.0123 sf g = 32.2 ft/sec2 TPE = 156.00 fmsl PPE = 154.50 fmsl Ho= 1.5 ft Hd3 = 0.5 ft 0 = 0.0418 cfs VOLUME = 12198 cf T = 3.38 days STAGE -STORAGE FUNCTION (TOTALI S Z CONTOUR INCR. ACCUM. CONTOUR AREA VOL. VOL. STAGE In S In Z Z est 149.00 0 0 0.0 150.00 2418.01 1209 1209 1.0 151.00 3053.18 2736 3945 2.0 152.00 3737.18 3395 7340 3.0 153.00 4480.06 4109 11448 4.0 154.00 5231.10 4856 16304 5.0 154.50 7018.87 3062 19366 5.5 155.00 9258.86 4069 23436 6.0 156.00 10508.30 9884 33319 7.0 157.00 11814.29 11161 44481 8.0 158.00 13176.83 12496 56976 9.0 Constant (y-Intercept) 7.06565 Slope (X Coefficient) 1.68836 Standard Error of Coefficient 0.07563 R2 = 0.99610 STAGE -STORAGE FUNCTION (FOREBAY 7.0976 0.0000 1.02 8.2801 0.6931 2.05 8.9011 1.0986 2.96 9.3456 1.3863 3.85 9.6992 1.6094 4.75 9.8713 1.7047 5.26 10.0620 1.7918 5.89 10.4139 1.9459 7.25 10.7028 2.0794 8.60 10.9504 2.1972 9.96 Ks = 1171 b = 1.69000 S Z CONTOUR INCR. ACCUM. CONTOUR AREA VOL. VOL. STAGE In S In Z Z est [FT2] [FTC] [FT) [FT] [FT] 149.00 0 0 0.0 150.00 345.39 173 173 1.0 5.1515 0.0000 1.00 151.00 560.40 453 626 2.0 6.4387 0.6931 2.01 152.00 795.39 678 1303 3.0 7.1728 1.0986 2.98 153.00 1060.70 928 2232 4.0 7.7104 1.3863 3.99 154.00 1305.85 1183 3415 5.0 8.1359 1.6094 5.02 154.50 1705.90 753 4168 5.5 8.3351 1.7047 5.59 Constant (y-Intercept) 5.15098 Ks = 173 Slope (X Coefficient) 1.84949 b = 1.85000 Standard Error of Coefficient 0.00861 R2 = 0.99996 Drainage Area 4.7 Total Drainage Area 4.7 % of Total 100% Required % of Perm. Pool Volume 20% % OF TOTAL PERMANENT POOL VOLUME 22.0% OK! 12.00 10.00 ME tll w � 6.00 0 LL 4.00 M4111 � �� Chainsaw Routing Results - 10 Year Design Storm 0 10 20 30 40 50 60 70 80 90 100 Time [min] t Inflow —a— Discharge STORMWATER RETENTION CALCULATIONS Project: COMTech Storage Solutions By: SJP Date: 10-29-2009 Job #: N/A STAGE -STORAGE FUNCTION (ABOVE PERMANENT POOL) CONTOUR CONTOUR AREA 154.50 0 155.00 9258.86 2315 156.00 10508.30 9884 157.00 11814.29 11161 158.00 13176.83 12496 Constant (y-Intercept) Slope (X Coefficient) Standard Error of Coefficient RZ = S Z ACCUM.VOL. STAGE [FT'] [FT] 0 0.0 2315 0.5 12198 1.5 23360 2.5 35855 3.5 8.76043 1.41407 0.06623 0.99798 Asphalt Area = 0.83 ac Building Area (Roof) = 0.32 ac Pervious Area = 3.55 ac Pond Area = 0.30 ac Total Drainage Area = 5.00 ac 'l y,.ncce,ny.a In S In Z 7.7470 -0.6931 0.49 9.4091 0.4055 1.58 10.0588 0.9163 2.51 10.4872 1.2528 3.40 Ks = 6377 b = 1.41000 STORMWATER RETENTION CALCULATIONS Project: COMTech Storage Solutions By: SJP rx Date: 10-29-2009 Job #: N/A Runoff Coefficient, C: Pre -Development ID Area (ac) C. C x A Unimproved cleared area 5.00 0.35 1.75 Wooded, deep ground litter 0.00 0.10 0.00 Total 5.00 1.75 C, = 0.35 TREATED RUNOFF ID Area (ac) C' C x A Roof, inclined 0.32 1.00 0.32 Street, driveway, sidewalk 0.83 0.95 0.79 Lawn, dense soil, flat 2% 3.55 0.17 0.60 Commercial, Generalized 0.00 0.85 0.00 Total 4.70 1.71 C� = 0.36 'Source: Elements of Urban Stormwater Design by H. Rooney Malcolm, P.E. - Exhibit 1 Storm Intensit o.3ss L - 650 ft 3 L H = 2.75 ft H T� = 9.39 min T - 128 Say 9 min Design Storm: 10 year Location: Lumberton, NC Duration Intensity [min) [in/hr] 5 8.10 9 I10 10 6.48 So, 110 = 6.80 TREATED Qo = C x 110 x A = 11.51 cfs STORMWATER RETENTION CALCULATIONS e t' .r � Project: COMTech Storage Solutions By: SJP Date: 10-29-2009 Job #: N/A = Estimate Volume of Runoff V: P1,10 = 2.58 in SCS CURVE NUMBER: Soil Type: Rains Sandy Loam Storm: 1-hr 10 yr Location: Pembroke, NC Hydrologic Soil Group: B/D ID Area (ac) CN` CN x A Impervious - Roof 0.32 98 31.36 Impervious - Parking lot, Sidewalk 0.83 98 81.34 Lawn, Good condition 3.55 80 284.00 Commercial & Business 85% Impervious 0.00 95 0.00 Total 4.70 396.70 CN,, = 84 `Source: NC Erosion and Sediment Control Planning and Design Manual - Tables 8.03(e) - (g) - 1000 S-CN-10 S = 1.90 in V=Q'xA= E�P-0.2•S�Z P+0.8•S Q.= 1.18 in 20104 cf Imp. Area ID Area (ac) % Imp (ac) Impervious - Roof 0.32 100% 0.32 Impervious - Parking lot, Sidewalk 0.83 100% 0.83 Lawn, Grass Medians 3.55 0% 0.00 Commercial & Business 85% Impervious 0.00 85% 0.00 Total 4.70 1.15 Time to Peak. T,,: F ad SIMPLE METHOD Rp = 1.0 in RV=0.05+0.9•IA IA= 24% V=3630•RD*RV*A RV= 0.27 in/in V = 4610 cf Tp = 4.8 min (Using Simple Method) STORMWATER RETENTION CALCULATIONS °a Project: COMTech Storage Solutions By: SJP r r Date: 10-29-2009 Job #: N/A Allowable Discharge (Pre -development Conditions Qan = Qp, = Cp,e x [lox A CM = 0.35 ho = 6.80 cfs A = 5.00 ac Qan = Qpre = 11.91 cfs Peak Inflow* = 12198.30 cfs Peak Pond Outflow* = 0.05 cfs Peak Elevation* = 155.31 ft Top of Pond El. [ft] = 158.00 OK! Peak Storage* = 4742 cf Storage Avail.[cf] = 35855 OK! Actual Allowed cfs cfs 0.05 < 11.91 OKI *See Storm Routing on Next Page STORM ROUTING Pipe (Orifice): Input Data: N Qp 11.51 cfs Cd Tp 5 min D AT 1 min Zi Weir: Ks 6377 Cw b 1.41 L Zcr V-Notch: 1 Q = C[tan(0/2)]H112 0.6 C = 2.5 1.5 0 = 0 degrees 154.50 0 = 0.0000 radians Invert = 154.50 feet 3.0 10.0 ft 156.00 ft INFLOW STORAGE STAGE ORIFICE V-NOTCH WEIR u u.uu 0 154.50 0 0.00 0.00 0.00 1 1.10 0 154.50 0.00 0.00 0.00 0.00 2 3.98 66 154.54 0.00 0.00 0.00 0.00 3 7.53 304 154.62 0.01 0.00 0.00 0.01 4 10.41 756 154.72 0.02 0.00 0.00 0.02 5 : s _ 11 51's=ems� 1379 154.84 0.03 0.00 0.00 0.03 6 10.41 2068 154.95 0.04 0.00 0.00 0.04 7 8.10 2691 155.04 0.04 0.00 0.00 0.04 8 6.24 3174 155.11 0.04 0.00 0.00 0.04 9 4.81 3546 155.16 0.05 0.00 0.00 0.05 10 3.71 3832 155.20 0.05 0.00 0.00 0.05 11 2.86 4052 155.22 0.05 0.00 0.00 0.05 12 2.21 4220 155.25 0.05 0.00 0.00 0.05 13 1.70 4350 155.26 0.05 0.00 0.00 0.05 14 1.31 4449 155.27 0.05 0.00 0.00 0.05 15 1.01 4525 155.28 0.05 0.00 0.00 0.05 16 0.78 4582 155.29 0.05 0.00 0.00 0.05 17 0.60 4626 155.30 0.05 0.00 0.00 0.05 STORMWATER RETENTION CALCULATIONS Project: COMTech Storage Solutions By: SJP O Date: 10-29-2009 Job M N/A 18 0.46 4659 155.30 0.05 0.00 0.00 0.05 19 0.36 4684 155.30 0.05 0.00 0.00 0.05 20 0.28 4702 155.31 0.05 0.00 0.00 0.05 21 0.21 4716 155.31 0.05 0.00 0.00 0.05 22 0.16 4726 155.31 0.05 0.00 0.00 0.05 23 0.13 4732 155.31 0.05 0.00 0.00 0.05 24 0.10 4737 155.31 0.05 0.00 0.00 0.05 25 0.08 4740 155.31 0.05 0.00 0.00 0.05 26 0.06 4741 155.31 0.05 0.00 0.00 0.05 27 0.04 x':4742 rn 155?31 i . 0 OS ; 3 0.00 0 00 L^y O OS j 28 0.03 4741 155.31 0.05 0.00 0.00 0.05 29 0.03 4740 155.31 0.05 0.00 0.00 0.05 30 0.02 4739 155.31 0.05 0.00 0.00 0.05 31 0.02 4737 155.31 0.05 0.00 0.00 0.05 32 0.01 4735 155.31 0.05 0.00 0.00 0.05 33 0.01 4732 155.31 0.05 0.00 0.00 0.05 34 0.01 4730 155.31 0.05 0.00 0.00 0.05 35 0.01 4727 155.31 0.05 0.00 0.00 0.05 36 0.00 4725 155.31 0.05 0.00 0.00 0.05 37 0.00 4722 155.31 0.05 0.00 0.00 0.05 38 0.00 4719 155.31 0.05 0.00 0.00 0.05 39 0.00 4716 155.31 0.05 0.00 0.00 0.05 40 0.00 4713 155.31 0.05 0.00 0.00 0.05 41 0.00 4710 155.31 0.05 0.00 0.00 0.05 42 0.00 4707 155.31 0.05 0.00 0.00 0.05 43 0.00 4704 155.31 0.05 0.00 0.00 0.05 44 0.00 4701 155.31 0.05 0.00 0.00 0.05 45 0.00 4698 155.31 0.05 0.00 0.00 0.05 46 0.00 4695 155.30 0.05 0.00 0.00 0.05 47 0.00 4692 155.30 0.05 0.00 0.00 0.05 48 0.00 4689 155.30 0.05 0.00 0.00 0.05 49 0.00 4686 155.30 0.05 0.00 0.00 0.05 50 0.00 4683 155.30 0.05 0.00 0.00 0.05 51 0.00 4680 155.30 0.05 0.00 0.00 0.05 52 0.00 4677 155.30 0.05 0.00 0.00 0.05 53 0.00 4674 155.30 0.05 0.00 0.00 0.05 54 0.00 4671 155.30 0.05 0.00 0.00 0.05 55 0.00 4668 155.30 0.05 0.00 0.00 0.05 56 0.00 4665 155.30 0.05 0.00 0.00 0.05 57 0.00 4662 155.30 0.05 0.00 0.00 0.05 58 0.00 4659 155.30 0.05 0.00 0.00 0.05 59 0.00 4656 155.30 0.05 0.00 0.00 0.05 60 0.00 4653 155.30 0.05 0.00 0.00 0.05 61 0.00 4649 155.30 0.05 0.00 0.00 0.05 62 0.00 4646 155.30 0.05 0.00 0.00 0.05 63 0.00 4643 155.30 0.05 0.00 0.00 0.05 64 0.00 4640 155.30 0.05 0.00 0.00 0.05 65 0.00 4637 155.30 0.05 0.00 0.00 0.05 66 0.00 4634 155.30 0.05 0.00 0.00 0.05 67 0.00 4631 155.30 0.05 0.00 0.00 0.05 68 0.00 4628 155.30 0.05 0.00 0.00 0.05 69 0.00 4625 155.30 0.05 0.00 0.00 0.05 70 0.00 4622 155.30 0.05 0.00 0.00 0.05 STORMWATER RETENTION CALCULATIONS Project: COMTech Storage Solutions By: SJP Date: 10-29-2009 Job #: N/A yFRtN 71 0.00 4619 155.30 0.05 0.00 0.00 0.05 72 0.00 4616 155.30 0.05 0.00 0.00 0.05 73 0.00 4613 155.29 0.05 0.00 0.00 0.05 74 0.00 4610 155.29 0.05 0.00 0.00 0.05 75 0.00 4607 155.29 0.05 0.00 0.00 0.05 76 0.00 4604 155.29 0.05 0.00 0.00 0.05 77 0.00 4601 155.29 0.05 0.00 0.00 0.05 78 0.00 4598 155.29 0.05 0.00 0.00 0.05 79 0.00 4595 155.29 0.05 0.00 0.00 0.05 80 0.00 4592 155.29 0.05 0.00 0.00 0.05 81 0.00 4589 155.29 0.05 0.00 0.00 0.05 82 0.00 4586 155.29 0.05 0.00 0.00 0.05 83 0.00 4583 155.29 0.05 0.00 0.00 0.05 84 0.00 4580 155.29 0.05 0.00 0.00 0.05 85 0.00 4577 155.29 0.05 0.00 0.00 0.05 86 0.00 4574 155.29 0.05 0.00 0.00 0.05 87 0.00 4571 155.29 0.05 0.00 0.00 0.05 88 0.00 4568 155.29 0.05 0.00 0.00 0.05 89 0.00 4565 155.29 0.05 0.00 0.00 0.05 90 0.00 4562 155.29 0.05 0.00 0.00 0.05 91 0.00 4559 155.29 0.05 0.00 0.00 0.05 92 0.00 4556 155.29 0.05 0.00 0.00 0.05 93 0.00 4553 155.29 0.05 0.00 0.00 0.05 94 0.00 4550 155.29 0.05 0.00 0.00 0.05 95 0.00 4547 155.29 0.05 0.00 0.00 0.05 96 0.00 4544 155.29 0.05 0.00 0.00 0.05 97 0.00 4541 155.29 0.05 0.00 0.00 0.05 98 0.00 4538 155.29 0.05 0.00 0.00 0.05 99 0.00 4535 155.29 0.05 0.00 0.00 0.05 100 0.00 4532 155.28 0.05 0.00 0.00 0.05 101 0.00 4529 155.28 0.05 0.00 0.00 0.05 102 0.00 4526 155.28 0.05 0.00 0.00 0.05 103 0.00 4523 155.28 0.05 0.00 0.00 0.05 104 0.00 4520 155.28 0.05 0.00 0.00 0.05 105 0.00 4517 155.28 0.05 0.00 0.00 0.05 106 0.00 4513 155.28 0.05 0.00 0.00 0.05 107 0.00 4510 155.28 0.05 0.00 0.00 0.05 108 0.00 4507 155.28 0.05 0.00 0.00 0.05 109 0.00 4504 155.28 0.05 0.00 0.00 0.05 110 0.00 4501 155.28 0.05 0.00 0.00 0.05 111 0.00 4498 155.28 0.05 0.00 0.00 0.05 112 0.00 4495 155.28 0.05 0.00 0.00 0.05 113 0.00 4492 155.28 0.05 0.00 0.00 0.05 114 0.00 4489 155.28 0.05 0.00 0.00 0.05 115 0.00 4486 155.28 0.05 0.00 0.00 0.05 116 0.00 4483 155.28 0.05 0.00 0.00 0.05 117 0.00 4480 155.28 0.05 0.00 0.00 0.05 118 0.00 4478 155.28 0.05 0.00 0.00 0.05 119 0.00 4475 155.28 0.05 0.00 0.00 0.05 120 0.00 4472 155.28 0.05 0.00 0.00 0.05 STORMWATER RETENTION CALCULATIONS Project: COMTech Storage Solutions By: SJP Date: 10-29-2009 Job #: N/A DRAWDOWN TIME: Q=CD'4 2gH„ CD = A= 9= TPE = PPE = Ho = H J3 = Q= VOLUME = T= T _ VOLUME # IMIN * IHR * ]DAY Q 60S 60MIN 24HR 0.6 0.0123 32.2 156.00 154.50 1.5 0.5 0.0418 12198 3.38 sf ft/sec2 fmsl fmsl ft ft cfs cf days STAGE -STORAGE FUNCTION (TOTAL) S Z CONTOUR INCR. ACCUM. CONTOUR AREA VOL. VOL. STAGE In S In Z Z est r,21 1LT31 ,,31 I- err 149.00 0 0 0.0 150.00 2418.01 1209 1209 1.0 151.00 3053.18 2736 3945 2.0 152.00 3737.18 3395 7340 3.0 153.00 4480.06 4109 11448 4.0 154.00 5231.10 4856 16304 5.0 154.50 7018.87 3062 19366 5.5 155.00 9258.86 4069 23436 6.0 156.00 10508.30 9884 33319 7.0 157.00 11814.29 11161 44481 8.0 158.00 13176.83 12496 56976 9.0 Constant (y-Intercept) Slope (X Coefficient) Standard Error of Coefficient R2 = STAGE -STORAGE FUNCTION (FOREBAY) 7.0976 0.0000 1.02 8.2801 0.6931 2.05 8.9011 1.0986 2.96 9.3456 1.3863 3.85 9.6992 1.6094 4.75 9.8713 1.7047 5.26 10.0620 1.7918 5.89 10.4139 1.9459 7.25 10.7028 2.0794 8.60 10.9504 2.1972 9.96 7.06565 Ks = 1171 1.68836 b = 1.69000 0.07563 0.99610 S Z CONTOUR INCR. ACCUM. CONTOUR AREA VOL. VOL. STAGE In S In Z Z est [FT2] [FTC] [FT3] [FT] [FT] 149.00 0 0 0.0 150.00 345.39 173 173 1.0 5.1515 0.0000 1.00 151.00 560.40 453 626 2.0 6.4387 0.6931 2.01 152.00 795.39 678 1303 3.0 7.1728 1.0986 2.98 153.00 1060.70 928 2232 4.0 7.7104 1.3863 3.99 154.00 1305.85 1183 3415 5.0 8.1359 1.6094 5.02 154.50 1705.90 753 4168 5.5 8.3351 1.7047 5.59 Constant (y-Intercept) 5.15098 Ks = 173 Slope (X Coefficient) 1.84949 b = 1.85000 Standard Error of Coefficient 0.00861 R2 = 0.99996 Drainage Area 4.7 Total Drainage Area 4.7 % of Total 100% Required % of Perm. Pool Volume 20% % OF TOTAL PERMANENT POOL VOLUME 22.0% OKI 12.00 10.00 1:11iI41 EKili7 2.00 M M Chainsaw Routing Results - 10 Year Design Storm 0 10 20 30 40 50 60 Time [min] 70 80 90 100 I Inflow —M— Discharge