Loading...
HomeMy WebLinkAboutSW6090803_CURRENT PERMIT_20091001STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW �7J9�9�0 ti DOC TYPE URRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE.EVALUATION INSPECTION DOC DATE YYYYMMDD North Carolina Beverly Eaves Perdue Governor — m MIMENR Department of Environment and Division of Water Quality Coleen H, Sullins Director October 1, 2009 Department of the Army, Fort Bragg Attn: Gregory G. Bean, Directorate of Public Works 2175 Reilly Road, Stop A Fort Bragg, NC 28310-5000 Natural Resources SUBJECT: Stormwater Management Permit SNV6090803 SOF Training Facility Phase HI & Phase IV - Rowe Training Center High Density Project Camp MacKall-Fort Bragg, Richmond Counh Dear Mr. Bean: Dee Freeman Secetary The Fayetteville Regional Office of the Division of Water Quality received a complete Stormwater \9anagement Permit Application for the SO IT Training Facility Phase I II & Phase 1 V - Rowe Training Center project on August 21, 2009. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC.21-1 .1000. Therefore, we are forwarding herewith Stomhwater Management Pemhit S W6090803 dated October 1, 2009, for the construction and maintenance of stormwater treatment facilities associated with the project. This permit shall be effective from the date of issuance until September 30, 2019, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) calendar days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 2761 1- 7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact iA9ike Lawyer or myself at (910) 433-3300. Sincerely, Belinda S. Henson Regional Supervisor Surface Water Protection Section BSH: ML/ml cc: Craig Lantz -Water Management Branch (via e-mail) David E. Vaughn, PE, PLS-Moorman, Kizer & Reitzel, Inc. (via e-mail) FRO -Surface Water Protection DWQ Central Files Location: 225 Green Street, Suite 714. Fayetteville, North Carolina 28301 Phone: 910-433-33001 FAX 910-486-0707 k Customer Service: 1-877-623-6748 Imernel w .ncwatemuality.orq One NortlhCaroiina ��hn�lfl'Gllhj 41) E^_uel Dn-,Wunrl 1Alfinna6ve Action Employer STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMNVATER MANAGErNIEN'r PERMIT HIGH DENSITY DEVELOPM ENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION 1S HEREBY GRANTED TO Department of the Arnrp, Fort Bragg SOF Training Faciliti, Phase fll & Phase lV — Rome Training Center Camp MacKall-Font Bragg, Richmond Counm FOR THE construction, operation and maintenance of four bio-retention areas, one infiltration basin and one infiltration trench in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water.Quality and considered a part of this permit. This permit shall be effective from the date of issuance until September 30, 2019, and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stornwater system has been approved for the management of stormwater runoff as described in the application, supplement forms and other supporting documentation. The stormwater controls have been designed to handle the runoff from 416,433 square feet with approximately 145,856 square feet, or 35.0%, of total built -upon area. The tract will be limited to the amount of built -upon area as indicated in the application and per approved plans. 4. Because all stormwater collection and treatment systems are located on federally owned land, dedicated common areas or recorded easements are not required. 5. The runoff from all built -upon areas within the permitted drainage area of this project must be directed into the permitted stormwater control system. 11. SCHEDULE OP COMPLIANCE The stormwater management system shall be constructed in its entirety and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall, at all limes, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optinnun efficiency. The Operation and Maintenance Plan submitted with the application package, which is approved and considered a part of this permit, must be followed in its entirety and maintenance must occur at the scheduled intervals. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, the attached Designer's Certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an erosion control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. S. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans; including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CANIA Major permit was sought. f. Filling in, altering, or Piping of any vegetative conveyance shown on the approved plan. 9. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 10. _ A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time ',schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. This permit shall be effective from the date of issuance until September 30, 2019. Application for permit renewal shall be submitted at least ISO calendar days prior to the expiration date of this permit and must be accompanied by the processing fee. Ill. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the patties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The pernuttee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take inunediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours fertile r e purpose of inspecting all components of the permitted stomwater management facility. 6. The permit may be modified, revoked and reissued, or tenninated for cause. The filing of a request for a permit modification, revocation and reissuance, or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. S. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the pennit. 9. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 calendar days. Permit issued this the first day of October 2009. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 7TPIqA ;;D Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Stormwater N anagement Permit SW6090803 SOF Training Facility Phase III & Phase IV - Rowe Training Center Stormwater Management Permit SW6090803 Camp MacKall-Fort Bragg, Richmond County Designer's Certification I; as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the consu-uction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this fonn is a part of this Certification. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date Certification Requirements: The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet/bypass structures are located per the approved plans. 7. A trash rack is provided on the outlet/bypass structures. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. �. .. ... u, DWQ'.USE'ONLY`; :... :.;.., ,- ,... ,...:. Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources t �O Z 2�y, Division of Water Quality flfl�� STORMWATER MANAGEMENT PERMIT APPLICATION FORMbQ This form may be photocopied for use as an original Ire I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): SOF Trainine Facilitv Phase III & Phase IV - Rowe Trainine Center 2. Location of Project (street address) City:Camp Mackall County:Richmond Zip:28347 3. Directions to project (from nearest major intersection): Proceed southwest along US 1 from the intersection of US 1 and Drowning Creek 0.323 miles and turn left on to Special Forces Way in the middle of a curve, proceed 0.95 miles to the entrance to Rowe. 4. Latitude:35.0365° ' " N Longitude:79.4975* ' " W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberN/A , its issue date (if known)N/A , and the status of construction: []NotStarted ❑Partially Completed* ❑ Completed* "provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, N/A and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 9.56 (III&IV) ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:Sediment & Erosion Rowe Phase III 1D Bragg-2005-027 Sediment & Erosion Rowe Phse IV ID Bragg-2006-021 Form SWU-101 Version 07July2009 Page I of 6 Ill. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Fort Bragg, NC Signing Official & Title:Gregory G. Bean, Director of Public Works b.Contact information for person listed in item la above: Street Address:2175 Reilly Road -Stop A City:Fort Bragg State:NC Zip:28310-5000 Mailing Address (if applicable):2175 Reilly Road -Stop A City:Fort Bragg State:NC Zip:28310-5000 Phone: (910 1396-4009 Fax: (910 ) 432-6908 Email:N/A c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( 1 Fax: ( I Email: 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:jennings C. Lantz Signing Official & Title:Director Water Management Branch b. Contact information for person listed in item 3a above: Mailing Address:DPW/ Water Management Branch -Bldg 0-9125 Mckellars Road City:Fort Bragg State:NC Zip:28310 Phone: (910 1396-2301 ext 226 Fax: (910 1 907-2420 Email:iennings.C.lantz@us.army.mil 4. Local jurisdiction for building permits: N/A Point of Contact:N/A Phone #: ( 1 Form SWU-101 Version 07July2009 Page 2 of 6 JV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Rowe Phase III-Bioretention Phase IV Dry Detention Infiltration Basin, Ready Building Phase IV Infiltration 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ® Ph II - Post Construction 3. Stormwater runoff from this project drains to the Lumber River basin. 4. Total Property Area:10 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:10 acres Total project area shall be calculated to exclude the following the normal pool of im ounded structures, the area between the banks of streams and rivers, the area below the Narnml High Water (NSW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = See Below % 9. How many drainage areas does the project have?6 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area RS Drainage Area R Draina e'rr'ea Draina e'Ar`ea't"' Receiving Stream Name Drowning Creek Drowning Creek Stream Class * C; SW,HQW C;SW;HQW Stream Index Number * 14-2-(10.5) 14-2-(10.5) Total Drainage Area (so 289,674 46,434 On -site Drainage Area (so 76,665 46,434 Off -site Drainage Area (so 213,009 1 - Proposed Impervious Area** (so 54,198 41,434 % Impervious Area** total 18.7 .ZI Impervious** SurfaceArea •, Drainage Area, ,Draina e Area" _ ,Drainage Area = Diaina 'e'Area__ On -site Buildings/Lots (so 19,405 13,756 On -site Streets (so - On -site Parking (so - On -site Sidewalks (so - 1,927 Other on -site (so 18,759 25,751 Future (so - - Off -site (so - Existing BUA*** (so 16,034 Total (so: 1 54,198 41,434 * Stream Class and Index Number can be determined at: http://h2o.enrstate.Pic.us/birns/reports/reportsWB.htnd * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. *** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version 07July2009 Page 3 of 6 41. How was the off -site impervious area listed above determined? Provide documentation. Photograph planimetered w/ ACAD Projects in Union County: Contact DWQ Central 0Jf1ce staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp_forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://h2o.enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http:/ /h2o.enr.state.nc.us/su/msi maps.htm.) Please indicate that the following required information have been provided by initiating in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hqp://h2o.enr.state.nc.us/su/bmp_ forms.htm. p In%14J 1. Original and one copy of the Stormwater Management Permit Application Form. als 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants N %k Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M �q J agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to G hqp:/ /www.envhelp.org/pages/onestopexpress.htmI for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor 4v the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the /Z v receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. \X 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: �(V a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Form SWU-101 Version 07July2009 Page 4 of 6 p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x1l" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: WA 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC N I A Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretaly.state.nc.us/Corl2orations/CSearch.asl2x VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htm#deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). \ Consulting Engineer:Phase IV, David E. Vaughn, PE, PLS X�t Consulting Firm: Moorman, Kizer & Reitzel, Inc. Mailing Address:115 Broadfoot Avenue City:Fayetteville State:NC Zip:28305 Phone: (910 ) 484-5191 Email:dvaughn@mkrinc.com Fax: (910 ) 484-0388 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or hjpe name of person listed in Contact Information, item 2a) N/A , certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Information, item la) with (print or hjpe name of organization listed in Contact Information, item lb) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07July2009 Page 5 of 6 .As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the D WQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of . do hereby certify that before me this _ day of Date: County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICA I, (print or type name of person-trted in.Contact Inforniation, item 2) Gregonj G. Bean certify that the informatit n includ4d on this permit application form is, to the best of my knowledge, correct and that the project wil L< constrycted in conformance with the approved plans, that the required deed restrictions and protective o4enants will be record and that the proposed project complies with the requirements of the applicable stQfmwater�rules under NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2005-211. // ' OF- lT-0 9 Signature: Date: a Notary Public for the State of do hereby certify that before me this _ day of County of personally appeared . and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission Form SWU-101 Version 07Ju1y2009 Page 6 of 6 ♦J Permit (to be prowled by DWD) GUA//��,, of WNTFH STORMWATER MANAGEMENT PERMIT APPLICATION FORM ' I�IJIXo NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project Name Contact Person Phone Number Dale Drainage Area Number II. DESIGN INFORMATION Site Characteristics Drainage area 289,674.00 ftZ Impervious area 71,920.00 fit' p. Percent impervious T)&- % Z'-� • 0 �o Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity PredevelopmentA-xx tOwk 25 yr Post -development IA� Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum required volume Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdovm time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area in in/hr (See Attached) J.LJ 14.74 11.49 858.00 rya 3,114.00 ft' ft3 ft' If ft3 ft3 SC/Sp OK for non -SA waters 0.6-2 in/hr 300.00 fmsl 5.00 days OK 3,00 :1 OK 329.75 fmsl OK 330.15 fmsl 8,219.00 fl 333.00 fmsl 215.00 ft 30.00 ft 7,694.00 113 Form SW401-InfinraWn Basin-Rev.4 Pans I. B II. Design Summary, Page 1 of 2 Permit No. Siw6d `}6d'03 (to be prewded by DWQ) Additional Information Maximum runoff to each inlet to the basin? Length of vegetative filter for overflow Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Naturally occurirg soil above shwt Bottom covered with 44 of dean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Pretreatment device provided ac-in 30.00 ft 80.00 it 5,174.00 it NIA ft 30+ 8 30.00 it y (Y or N) NIA (Y or N) y (Y or N) n (Y or N) OK OK OK OK OK OK OK OK OK Must provide bypass for larger Sows Form SW401-InfiltraWn Basin-Rev.4 Parts I. & It. Design Summary, Page 2 of 2 Permit NUmber:cSl�✓� o�d o b�b 3 (to be provided by DJVQ) Drainage Area Number: RS Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged or replace the outlet device. The receiving water -Repair Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 Permit Number. SWL'n� '�&-&62 (to be provided by DN'Q) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:SOF Training Facility Phase IV BMP drainage area number:RS Print name:Gregory G. Bean Date:_ 0 J (-0G/ Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, , a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEAL My commission Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 *Rowe Phase III has Bioretention Basins that treat and store Q25 storm for Phase III area Total DA = 289674 sq ft (Rowe III & IV) DA PH III = 217,754 sq ft (Rowe PH 111) Treatment required for PH III = 71, 920 ft2 However basin is designed to treat I" runoff from entire 289,674 sq. ft. drainage area. (A significant treatment safety factor of approximately 1.75) I 3 Permit No.511'(Z96Q (to be provided by DWQ) ®!/rpry4_1iAArr/e��H MA NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name SOF Training Facility Phase IV Contact person David E. Vaughn, PE, PLS Phone number 910-484-5191 Date 8/102009 Drainage area number R II. DESIGN INFORMATION Site Characteristics Drainage area 46,434.00 ft2 Impervious area 41,434.00 ftZ Percent impervious 89.2% % Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.80 in 1-yr, 24-hr intensity 4.00 m/hr Pre -development 1-yr, 24-hr discharge ft3/sec Post -development 1-yr, 24-hr discharge 2.93 ft3/sec Pre/Post 1-yr, 24-hr peak flaw control 2.93 ft3/sec Storage Volume: Non -SA Waters Minimum volume required 395.00 ft3 Volume provided 395.00 ft3 OK for non -SR waters Storage Volume: SA Waters 1.5" runoff volume ft3 Pre -development 1-yr, 24-hr runoff volume ft3 Post -development 1-yr, 24-hr runoff volume ft3 Minimum volume required ft3 Volume provided ft3 Soils Report Summary Soil type SM/SC Infiltration rate 0.60 in/hr SHWT elevation 302.50 fmsl Trench Design Parameters Drawdown time 2.00 days OK Perforated pipe diameter 12.00 in Perforated pipe length 20.00 ft Number of laterals 2 Stone type (if used) 57 Stone void ratio 35 Stone is free of fines? y (Y or N) OK Form SW401-tnfiltration Trench-Rev.4 Parts I. a II. Design Summary, Page 1 or 2 Permit No. (to be provided by DWQ) Trench Elevations Bottom elevation Storage/overflow elevation Top elevation Trench Dimensions Length (long dimension) Width (short dimension) Height (depth) Additional Information Maximum volume to each inlet into the trench? Length of vegetative filter for overflow Number of observation wells Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Depth of naturally occuring soil above SHWT Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Trench wrapped with geotexblefabric? Pretreatment device provided 322.70 fmsl 326.70 first 326.70 fmsl 22.00 ft 7.50 ft 4.00 It 0.06 ac-in It 1 40.00 it 200.00 it 100.00 it 30.00 ft 30.00 It y (YorN) n (Y or N) y (Y or N) y (Y or N) y (Y or N) n Eon No OK OK OK OK OK OK OK OK Need a recorded drainage easement OK OK OK Fonn SW401-Infiltration Trench-Rev.4 Parts I. & 11_ Design Summary, Page 2 or 2 Permit Number:5 I'V6.6 01-6F03 (to be provided by DWQ) Drainage Area Number: R Infiltration Trench Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the infiltration trench will be carefully managed to reduce the sediment load to the sand filter. — The water level in the monitoring wells will be recorded once a month and after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). The infiltration trench will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash debris is present. Remove the trash/debris. The grass filter strip or Areas of bare soil and/or Regrade the soil if necessary to other pretreatment area erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide time and a one-time fertilizer application. Sediment has accumulated to Search for the source of the a depth of greater than six sediment and remedy the problem if inches. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. The flow diversion The structure is clogged. Unclog the conveyance and dispose structure (if applicable) of any sediment off -site. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. Form SW401-Infiltration Trench O&M-Rev.3 Page 1 of 3 BMP element: Potentialproblem: How I will remediate theproblem: The trench Water is pending on the Remove the accumulated sediment surface for more than 24 from the infiltration system and hours after a storm. dispose in a location that will not impact a stream or the BMP. The depth in the trench is Remove the accumulated sediment reduced to 75% of the original from the infiltration system and design depth. dispose in a location that will not impact a stream or the BMP. Grass or other plants are Remove the plants, preferably by growing on the surface of the hand. If pesticide is used, wipe it on trench. the plants rather than spraying. The observation well(s) The water table is within one Contact the DWQ Stormwater Unit foot of the bottom of the immediately at 919-733-5083. system for a period of three consecutive months. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. Repair or replace the pipe. The emergency overflow Erosion or other signs of The emergency overflow berm will berm damage have occurred at the be repaired or replaced if beyond outlet. repair. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW40 I -Infiltration Trench O&M-Rev.3 Page 2 Of 3 Permit Number:5 (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:SOF Training Facility Phase Iv BMP drainage area number: Print name:Gregory G. Bean Date: 95, (Z-c0 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. County of a Notary Public for the State of do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing infiltration trench maintenance requirements. Wimess my hand and official seal, SEAL My commission Form SW401-Infiltration Trench O&M-Rev.3 Page 3 of 3 Phase IV Ready Building Infiltration Trench Calculations Storage for Ready Building due to increased impervious area of 5000 square feet (Infiltration trench) SIIWT-at least 30 feet below BMP (See Soil Report) Excess to bypass Storm Drain 2 Day drawdown Hydraulic Conductivity 0.60 in/hr minimum (See attached Soil's Map & Permeability) SHWT-30' from surface 0.5% grade max 15' from structure. 1 observation well 12" pipe area=0.25(3.14)D2 = 0.785 sq. ft. 1. Calculate treatment volume: RV = 0.05 + .9(1.0) ; RV=.95 V treatment = 3630 x 1.0" x 0.95 x 0.1147 acre = 395 ft3 % Voids in 4' x 3.5' stone — (0.785 ftZ pipe) x .35 (% voids stone) = 4.625 ft2 Storage volume 12" pipe = 0.785 ft3 Storage volume per ft trench = 4.625 + .785 = 5.405'x cubic feet Volume required = 395 113 =73' of 12" pipe perf. with stone envelope 5.405113 Without considering infiltration If. Calculate effective infiltration based upon 2 day drawdown A= V 2X (K x T) A = 395 = 395 = 164 ftz minimum 2X(.6 x 2) 2.4 Area provided — 22' x 7.5' = 165 sq. ft. > 164 sq. ft. OK