Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6090803_COMPLIANCE_20090928
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW���w 3 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATEZ��%` YYYYMMDD I 5 4 3 I 1 US ARMY CORPS OF ENGINEERS SAVANNAH DISTRICT D 4' 0 5' 10' 15' 20' GRAPHIC SCALE NLL Gry „ 8 P V 1113 s �V Q Z O y Q J W Q W = Z COO Z ZJg U z 0 amp J BOO 0 Q W O Q O 0 N d m u- O Q 1n u I w-A 5 4 1-2855 F.F. EL 330.87 UNGi RIM 330.55 BLDG T- 5 F.F. EL 330.84 SAM MH INV IN 324.41 i CONC. INV IN 3, \ GRAVEL 330. 330.4 INV OUT 324.40 330.4 CONC. C INV OUT CLOTHES LINE i AC 330.4 SAN MH - --------------- OH 329.7 NIT GRAVEL UNIT INV IN 3, lien 11: all. INV our MEOW T 72 331.0 lei CONC- saw 58 r 1 1 1 1 • 1 ■ 1- • Y .I - v� I�OIW MOWN� :. ,• 1 ONC. RIM 332.02 INV IN 327.� T-2662 INV • 1 1 I"=�v' l�rain�t�L Afe4 Msf, 1 0 ir11�Vt• 1 . o' Lawyer, Mike From: Dave Vaughn [dvaughn@mkrinc.com] Sent: Monday, September 28, 2009 1:52 PM To: 'Dave Vaughn'; mike.lawyer@ncmail.net Cc: Haag, Charles M.; Jeff Reitzel; jdanderson@transystems.com; lee.p.ward@us.army.mil Subject: RE: Infiltration BMP Ready Building i FYI, to clarify, The 145,856 SF Impervious and the treated impervious are not equal. The site had previous impervious of 36,434 SF. 36434 Previous imp + 8712+6098+10019+25395+54198+5000 = 145,856 total Impervious. David E. Vaughn, PE, PLS Moorman, Kizer & Reitzel, Inc. 115 Broadloot Ave. Fayetteville, N.C. 28305 910-484-519115192 Fax 910-484-1200 -----Original Message ----- From: Dave Vaughn [mailto:dvaughn@mkrinc.com] Sent: Monday, September 28, 2009 1:21 PM To: 'mike.lawyer@ncmail.net' Cc: Haag, Charles M.; Jeff Reitzel; jdanderson@transystems.com; 'lee.p.ward@us.army.mil' Subject: RE: Infiltration BMP Ready Building Mike As requested the following is a brief on the drainage area of Phase III AND IV OF ROWE as well as the area treated by each measure. Total DA Phase III and IV Combined is 416,433 SF Total impervious area Phase III and IV Combined is 145,856 SF Percent impervious = 35.0% Bio Basin 1A treats 8712 SF Impervious Bio basin 1 B treats 6098 SF Impervious Bio Basin 2 treats 10,019 SF Impervious Bio basin 3.0 treats 25,395 SF Impervious Infiltration Basin treats 54198 SF Impervious Infiltration Trench treats 5000 SF Impervious. I believe this is the Summary that you were looking for in order to complete the approval. Best Regards, David E. Vaughn, PE, PLS Moorman, Kizer & Reitzel, Inc. 115 Broadloot Ave. Fayetteville, N.C. 28305 910-484-519115192 Fax 910-484-1200 -----Original Message ----- From: Dave Vaughn [mailto:dvaughn@mkrinc.com] Sent: Thursday, August 13, 2009 3:37 PM To: 'mike.lawyer@ncmail.net' Cc: Haag, Charles M.; Jeff Reitzel; jdanderson@transystems.com; 'lee.p.ward@us.army.mil' Subject: Infiltration BMP Ready Building Mike, I am sending these your way to make you aware of what we are doing. I have all the info prepared for submission on my end. I need the other consultants info, which I should receive early next week. We are working hard to satisfy the NOV. Thanks for your input and patience. Please let me know if you have any comments. The SWMP.pdf is the ready building plan with the infiltration device detail. Also supplements and O&M for Ph IV. The 201<13 doc is infiltration trench calc Lee please have the appropriate parties sign the application as well as the O& M agreements. It was my understanding that notary was not required. David E. Vaughn, PE, PLS Moorman, Kizer & Reitzel, Inc. 115 Broadfoot Ave. Fayetteville, N.C. 28305 910-484-519115192 Fax 910-484-1200 V-,a_ DEPARTMENT OF THE ARMY I`�� ���• US ARMY INSTALLATION MANAGEMENT COMMAND HEADQUARTERS, UNITED STATES ARMY GARRISON, FT BRAGG 2175 REILLY ROAD, STOP A REPLY TO FORT BRAGG NORTH CAROLINA 28310-5000 ATTENTION OF August 20, 2009 rj�� DE1�I]�IpI �}�j WY ¢—FRO Directorate of Public Works Ms. Belinda S. Henson WIM North Carolina Department of Environment and Natural Resources Division of Water Quality 225 Green Street — Suite 714 Fayetteville, North Carolina 28301-5043 Dear Ms. Henson: This letter is in response to the Notice of Violations, NOV-2009-OP-0049 & NOV-2009-OP-0050, issued by your office on July 20, 2009 for failure to apply and secure a Stormwater Management Permit according to North Carolina General Statute (G.S.) 143-214.7. The Notice of Violations were issued for the Special Operation Force (SOF) Rowe Training Complex Phase III and the SOF Rowe Training Complex Phase IV. Construction began on the SOF Rowe Training Complex Phase III project on September I, 2005. The project scope involved the construction of four 12,011 square feet ready -state isolation facilities (totaling 48,044 SF), utility upgrades, the relocation of a C-130 mock-up site and the demolition of four existing ready -slate buildings, an instructor building, and a repelling tower. Fort Bragg's Directorate of Public Work's (DPW) stormwater management directive for the project was for post -construction storm water runoff to not exceed pre- devclopmcnt storm water runoff and be designed for the 25-year, 24-110111- storm event. This requirement was achieved by designing and constructing grass -lined channels and biorctcntion areas to the specifications outlined in the North Carolina Division of Water Quality Stormwater BMP Manual. . Construction began on the SOF Rowe Training Complex Phase IV project on September 28, 2006. The project scope involved the construction of one five bay single story post -selection ready -state (isolation unit) building that would occupy approximately 12,050 square feet and a two-story 12,480 sq ft ready -state building. As for Rowe Phase IV, the stormwater management directive for the project was for post -construction storm water runoff to not exceed pre -development storm water runoff and be designed for the 25-year, 24-110ur storm event. This requirement was achieved by designing and constructing grass -lined channels and an infiltration basin. Stormwater Management Plans for both the SOF Rowe Training Complex Phase III and the SOF Rowe Training Complex Phase IV were mandated in the initial scoping package by the Fort Bragg DPW/Water Management Branch. The projects were required to meet the in-house DPW installation policy of post - construction storm water runoff not to exceed pre -development storm water runoff for the 25-year, V .(. -2- 24-hour storm event (modeled per NC DWQ requirements for High Quality Water Zones). The projects were reviewed, evaluated, and fulfilled this requirement. However, the stormwatcr management plans were never submitted to the NC DWQ to obtain the necessary permits for construction projects that take place in a designated High Quality Water Zone. The primary reason for this error can be attributed to the early planning stages of the two projects. Although stormwatcr management was required for the projects, it was not accurately conveyed and documented in either the planning charrette or the request for proposal that a permit from the NC DWQ would have to be obtained before construction. The omission of the requirement at this critical juncture allowed the project to proceed into design and ultimately into construction without any knowledge to the development teams (design firms, construction contractors, project managers, etc.) that a problem existed. When the notifications for the necessary permits were received (2006, 2007) from NC DWQ, the respective projects were complete or nearing completion. By this time, contracts with the development teams had been fulfilled and the permit package preparation and permit fees required the existing contracts to be modified and negotiated. The required permit application has been prepared and will be submitted to your office for your review. The events that have resulted in this situation have been evaluated and our processes have been revised. All of the construction projects in this sensitive area, since this incident, have sufficiently identified the requirement in the planning stage and acquired the necessary permit. Your understanding and cooperation in this matter has been greatly appreciated. Sincerely, Gregory G. Bean Director of Public Works CAMP mACKALL (;dt,a,,ovili & Page 1 Bradi.-w- ssn[ d km n Google Earth: Directions 8/12/2009 f Po'b Fd9eimes, l4eabs � . Ma<rs ALW e _ [9 impnaryNttes [L AtlAmdCwYy Se Sirey, 1911 JwwPaaeu •;[id fmpaili WPb L+tea.. Pned� wee Neri m�ssdldds bathe welts GA� — I;' Y j NJLLY9l'Lr I Cumberland and Hoke Counties, North Carolina 149 TABLE 15-PHYSICAL AND CHEMICAL PROPERTIES OF THE SOILS --Continued Soil name and Depth Permeability .ilable; Soil Shrink -swell map symbol water ;reaction; potential , , ;capacity , , Ld_______________; 1 0-7 ; 0.6-2.0 ;0.14-0.1814.5-5.5 ;Low____________ Lenoir 7-72 1 0.06-0.2 :0.13-0.1514.5-5.5 :Moderate ------- Le --------------- ; 0-19 6.0-20 ;0.02-0.05:3.6-5.5 :Low _-___-______ Leon 19-42 0.6-6.0 ;0.05-0.1013.6-5.5 ;Low ------------ ; 42-80 0.6-6.0 ;0.02-0.05:3.6-5.5 :Low ------------ Ly--------------- ; 0-10 i 2.0-6.0 ;0.09-0.13:3.6-5.5 ;Low------------ Lynchburg 10-72 0.6-2.0 ;0.12-0.16;3.6-5.5 ;Lou------------ Me -----------"---; 0-7 ; 0.6-2.0 ;0.12-0.16:4.5-7.3 ;Low------------ McColl 7-17 0.2-0.6 10.13-0.17:4.5-5.5 ILow------------ ; 17-43 0.06-0.2 10.07-0.11;4.5-5.5 ;Low------------ ; 43-72 0.2-2.0 ;0.08-0.12;4.5-5.5 .Low------------ Na---------------; 0-7 2.0-6.0 ;0.15-0.20:4.5-6.0 ;Low------------ ' -72 ;nO6 ;0.15-0.20:3.6-5.5 :Low ___-________ NOA, NOB------ -; 0-12;0.06-0.11:4.5-6.0 210.10-0.1514.5-5.5 ;Low ------------ Norfolk 12-152 :Low ------------ 52-72;0.10-0.15:4.5-5.5 ;Low------------ Pa---------------; 0-26 6.0-20 ;0.05-0.10:4.5-6.0 ;Low------------ Pactolus ; 26-82 ; 6.0-20 10.03-0.0714.5-5.5 :Low ------------ `Pg--------------- ; 0-19 ; 2.0-6.0 10.10-0.20:3.6-5.5 :Low ------------ Pantego 1 19-58 0.6-2.0 ;0.12-0.20:3.6-5.5 ;Low------------ ; 58-72 ; 0.6-2.0 ;0.15-0.20;3.6-5.5 ;Low------------ Pt*' Pits. 'Tarboro ---------; 0- ; 6.0-20 ;0.0-0.015.1-6.5 ;Low------------ ; 10-82 Bz ; >zo ;D.o2-o.o6;s.1-b.s ;Low ------------ F> �ga--------------- ; 0-9 2.0-6.0 ;0.08-0.1214.5-6.5 ;Low ------------ rRains 9-46 0.6-2.0 10.10-0.15:4.5-5.5 :Low ------------ 46-:3 0.6-2.0 ;0.10-0.15:4.5-5.5 ;Low------------ ;t ; 63-72 0.6-2.0 10.10-0.15:4.5-5.5 ;Low------------ , floe: --.,''Roanoke --------- ; 0-8 0.6-2.0 10.14-0.2014.5-5.5 :Low ------------ :y 8-55 0.06-0.2 ;0.10-0.1914.5-5.5 ;Moderate ------- ' ; 55-80 1 0.06-20 10.04-0.14:4.5-5.5 ;Moderate------- ,, `%Mehee-----------; 0-6 ; 0.2-2.0 ;0.15-0.20;4.5-6.0 :Low ------------ ;a 6_45 0.06-0.2 I0.12-0.20;3.6-5.5 ;Moderate------- '+. ; 45-65 1 0.2-0.6 ;0.12-0.20;3.6-5.5 :Moderate ------- Moderate------- c.1 i i i i 'lua: i poenoke--------- ; 0-8 ; 0.6-2.0 ;0.14-0.2014.5-5.5 ;Low ------------ 1 1 8-55 0.06-0.2 10.10-0.1914.5-5.5 ;Moderate ------- ".< 55_80 i 0.06-20 10.04-0.14:4.5-5.5 ;Moderate------- Urban land. h `5 I a6--L_______-----; 0-10 ; I 6.0-20 ; 10.06-0.1113.E-5.5 ;Low------"----- =Dtullings 10-44 2.0-6.0 10.10-0.1513.6-5.5 ;Low ---------- __ -��-_ 44-72 ; 2.0-20 ;0.06-0.15;3•b-5.5 ;Low ---------- D_ 0-10 ; 6.0-20 ;0.05-0.09;5.1-6.5 ;Low ------------ _____________; i0rbard 10-82 ; >20 ;0.02-0.0615.1-6.5 ;Low ------------ �6 rhunta--------; 0-14 1 2.0-6.0 10.10-0.15;3.6-5.5 ILow------------ 14-4646 2.0-6.0 ;0.10-0.1513.6-5.5 ;Low ------------ "- 46-72 ; 6.0-20 1 <0.05 ;3.6-6.5 !Low ------------ ee footnote at end of table. Organic matter 0.37 5 2-4 0.32 0.10 5 .5-4 0.20 0.17 0.20 5 .5-5 0.20 0.24 5 1-8 0.24 0.24 0.32 0.43 5 2-4 0.43 0.20 5 .5-2 0.24 0.24 0.10 5 •5-2 0.10 0.15 5 4-10 0.28 0.28 ; 0.10 5 1 •5-1 0.10 0.20 i 5 1-6 0.24 0.28 0.28 0.37 4 .5-3 0.24 0.24 0.28 5 i .5-5 0.28 0.28 0.37 4 .5-3 0.24 0.24 0.10 5 ; 1-4 0.17 0.17 0.10 5 •5-1 0.10 0.15 5 3-10 0.15 0.10 ENGINEERS a PLANNERS 0 **FAX**FAX**FAX**FAX** SURVEYORS MOORMAN, KIZER & REITZEL, INC. 115 Broad(oot Avenue — PO Box 53774 Fayetteville, NC 28305 Telephone: (910) 484-5191 Fax: (910) 484-0388 DATE: I- C 2 - ©G] TO: Mltt&- U FROM: Vavt- VG1vl REF:2� NUMBER OF PAGES, including cover sheet: COMMENTS: UtNH-FRO V�. DWO `Z * If fax is illegible, please call (910) 484-5191 immediately* E TNK G u AR> Ale 41S,- o� G�ac�2y I a W t� <N x 4 CDEN North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary" JuIv 20, 2009 CERTIFIED MAIL: 7006 2150 0005 2109 8334 RETURN RECEIPT REQUESTED Directorate of Public Works Attn: Gregory G. Bean 2175 Reilly Road, Stop A Fort Bragg, NC 28310-5000 Subject: NOTICE OF VIOLATION NOV-2009-OP-0050 Failure to Obtain State Stormwater Management Permit SOF Rowe Training Complex Phase IV Camp MacKall-Richmond County Dear Mr. Bean This letter is to notify you that you are in violation of Title 15A North Carolina Administrative Code (NCAC) 2H .1003 in accordance with North Carolina General Statute (G.S.) 143-214.7 for failure to apply for and secure a Stormwater Management Permit. On May 28, 2009, Mike Lawyer of the Fayetteville Regional Office observed thee completion of the subject development project known as SOF Rowe Training Complex Phase IV located on Special Forces Way at Camp iMacKall, Richmond County, North Carolina. A review of DWQ files has confirmed that letters were sent via Certified Mail dated July 6, 2006 and May 9, 2007 regarding the location of the subject project being within the one -mile watershed of I-ligh Quality Waters and the requirement to obtain a Stormwater Management Permit prior to the construction of built -upon areas. Copies of these letters as well as the Certified Mail Return Receipts are enclosed for your reference. As of the date of this Notice, a Stormwater Management Permit has not been issued for the subject project prior to construction of impervious surfaces as described above. As a result of the site insPection and file review, the following violation is noted: Failure to Obtain a State Stormwater Management Permit Title 15A NCAC 2H .1003, in accordance with G.S. 143-214.7, requires a State Stormwater Management Permit for development activities that require a Sedimentation/Erosion Control Plan and are within one mile of and draining to High Quality Waters (HQW). The inspection and DWQ file review confirms that a State Stormwater Management Permit was not obtained prior to construction of impervious surfaces at the subject site as described above. Required Response This Office requests that you respond to this letter, in writing, within 30 calendar days of receipt of this Notice. Your response should be sent to this office at the letterhead address and should address the following items: 1. Please explain when construction (excavation, grubbing, and clearing) began at the site. LOCatlen: 225 Green Street. Suite 714, Fayetteville. NC 28301 Phone. 910-433-33001 FAX: 910-485-0707 1 Customer Service. 1-877-623-6748 One, Inlomet vmww ;cwalerpalltyorg Nol tt�h]�}Carol11pla to Eaual Opportunity 1A1Srmallve Action Employer ��LIY GLd SdAb�t� .� M m Er Ar°em r p ra Postage $ ru Certifietl Fee ul O Return Receipt Fee (Entlorsement Requirso) p Restricted Delivery Fee p (Entlomemenl Requiretl) ul ra Total Postage & Fees $ M1 ,. a/. aoo9 Postmark Nov �o0 9 0� Dodo PS Form 3800, August 200�V�/ /See Reverse for Instructions 2. Please clearly explain why the StormNyater Management Permit was not secured. 3. Submit a complete permit application with a completed supplement form, a signed OS-iM agreement, sealed calculations, and two sets of detailed plans along with the processing fee currently set at 5505. Please note that a Designer's Certification is also required upon project completion. Thank you for your immediate attention to this matter. This office requires that the violation, as detailed above, be properly resolved. Should you have any questions regarding these matters, please contact Mike Lawyer or myself at (910) 433-3300. Sincerely, Belinda S. Henson Regional Supervisor Surface Water Protection Section Enclosures cc: Lee Ward -Water Management Branch (via e-mail) John Hennessy- NPSACOU FRO -Surface Water Protection Central Office Files UNITED STATES POSTAL SERVICE First -Class Mail I I Postage 8, Fees Paid USPS Permit No. G-10 I • Sender: Please print your name, address, and ZIP+4 in this box NORTII CAROLINA DEPARTMENTOF FNVIRONM V�NTp/'� AND NATURAL RE'SOURCI3S �r•���_�4"f,0.J DIVISION OF WATFIZ QUALI"I Y/S Ulrl^ C41idWATF.R PROTI-CI'ION MIKE LAWYER 225 GR86N STREET , SIJITFI 714 ' FAN'Ll'I'l-VILLE NC 28301-5043 DVVQ I, I I I I l r I I I I I I I I I I H 111311311 L IL„ L 1111 L, II, L, I, 111111111 I I I f I I 1 Michx]l F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Nan1mJ Resources Alan W. 1Qimek, P.B. Director Division of Water Quality 1v4zy 91 2007 CERTIFIED D1A IL: 7001 2570 0006 9498 8701 RETURN RECRIPT REQUESTED Department of the AITny Attu: Gregory G. Bean, Directorate of Public AVoiks Bldg. 3-1631 Butner Road Fort Bragg, NC 28310-5000 SUB.IEcr: Stortmvater Management Permit Application SOF Rowe Training Complex. Phase IV Camp JYtacKall-Fort Bragg -Richmond County Dear Mr. Bean: I3nctosed is a copy of the letter sent 10 VOL] from this office by Certified Mail on July 6, 2006. In that letter, it Was explained that the subject project might be within a l-hoh Quality Water zone and subject to the requirements for obtaining a StormWater Management Permit. prior to the construction of built -upon areas (buildings, pavement, gravel roads and parking areas, etc.). As of the date of this letter, our office has not received the Water Quality ClassiCIC,16011 Request. Form that was enclosed with the .June 21, 2006 letter nor an application for the permit. Ile advised that construction of any built -upon areas prior to issuance of the permit will be considered a violation of Title 15A NCAC 0211 .1003. You should submit to this office your application package, or a schedule of construction if the. project has not begun, within 15 calendar clays from receipt of this letter. If you have any questions regarding this matter, please contact Mike Lawyer or myself at (910) 433-3300. Sincerely, Belinda S. Benson Regional Supervisor Surface Water Protection Section 13S7-1:1v41-/ml Enclosure cc: Moorman, Kizer &'Reitzel, Inc. FRO -Surface Water Protection FRO -Land Quality NoRhcuolina Water Oualitv Central Files 7Vnlrrrally North Carolina Division of Water Quality 225 Green Street -Suite 714 Fayetteville, NC 28301 Phone (910) 433-3300 Customer Service Tinemet uywFax (910) 4 8 6-0707 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50 % Recycled110% Post Consumer Paper R t Postage $— P- Certified Fee IT- Postmark Return Receipt Fee Here (Endorsement Required) CJ O Restricted Delivery Fee p (Endorsement Required) ' o Total Postac Departnlent of Ute Armv a. FT-Be,Attn: Gregory G. Bean Bldg. 3-1631 Butner Rd. Fort 13rae� NC 25310-5000 Bragg, f� a Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ® Print your name and address on the reverse so that we can return the card to you. ® Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: Department of the Army Attn: Gregory G. Bean 131da. 3-1631 Butner Rd. Dort Bragg; NC 28310-5000 7 t 1 ). (fir '( au ±l�lv xv.r.i'u _ A. Signature') X z-agent B. Received by ( Printed Name) C. Date of Delivery D. Is delivery address different rfrom item 1? ❑h'ev4 If YES, enter delivery address below: ❑ No 3. Service Type ❑ Certified Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail O C.O.D. 4: Restricted Delivery? (Extra Fee) ❑ Yes - 2. Article Number 7001 2510 0006 9498 8701 (Transfer from service label) PS Form 3811, February 2004 Domestic Return Receipt 102595 02 M-1540 M1 t 1 I r � Postage $ �----__.---- 13 Q— Certified Fee Postmark Return Receipt Fee Here (Endorsement Required) C3 Restricted 0of "ly Fee p IEndorsamont Req,,od) o Total Postal Department of the Army a . u, [Sent reT. Atin: G ru gor} G. Bean a ssee�;aprNr Bldg. 3-1631 Butner Rd. p PO Box No T� CRy Siate. Zll Fort Bragg, NC 28310-5000 f� R.1..:.,'g..i:,v,ff�..�i�f'4'- ia2.tCi�ip �+' a Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. e Print your name and address on the reverse so that we can return the card to you. 13 Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: Department of the Army AW). Gregory G. Bean Bldg. 3-1631 13utner Rd. Port Bragg, NC 28310-5000 A. Signature` X �� , ent R. Received by (Printed Name) C. Date of Delivery 4r/i Jq�A :`)f (i 171n D. Is delivery address different from item 1? ❑ Ye `7 If YES, enter delivery address below: ❑ No 3. Service Type ❑ Certified Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number 7001 2510 0006 9498 8701 (Tiansler from service /abeQ tPS Form 3811, February 2004 Domestic Return Receipt 102595-02-M 1540 �or.° "C.19 ,.n..,,.wi .unoicY, vovem Ot William G. Ross R., Secreno v �. North Carolina Department of Hnvlronment. and Natural Resources Alan W. Klimek, P.E. Director < Division of Water Quality. July 6, 2006 CERTIFIED MAIL: 7001 2510 0006 9500 5643 RETURN RECEIPT REQUESTED Gregory G. Bean, Directorate of Public Works .Bldg. 3-1364 Butner Road Fort Bragg, NC 28310-5000 SUBJECT: REQUEST FOR STREAM CLASSIFICATION SOF Rowe•Training Complex Phase IV Camp MacKall-Fort Bragg Dear Mr. Bean: On July,5, 2006, the Fayetteville Regional Office of the Division of Water Quality received a copy of the Letter of Approval with Modifications dated July 3, 2006 for the SOF Rowe Training Complex Phase IN' project located at Camp MacKall. A review of the location of this project shows that it may be within a High Quality Water zone. -State regulation 15A NCAC 02H .1003 requires that any development activity that is required to obtain either a CAMA major permit within the twenty coastal counties or an approved Erosion and Sedimentation Control Plan in which the project is draining to Outstanding Resource Waters or within one mile of and draining to High Quality Waters to apply for and obtain a Stormwater Management Permit. In order to determine if a Stormwater Management Permit will be required for this project, this office must verify the classification of and distance to the receiving waters. Please return the enclosed classification request form with a color copy of that portion of the USGS quad sheet with the project and the closest downslope named receiving waters clearly identified. Upon classification of the receiving waters by this office, you will be sent either a Stormwater Management Permit application via certified mail or a letter stating that a Stormwater Management Permit is not required for this project. The local governing authority for compliance must review projects that drain to Water Supply Watersheds. Please be advised that construction of any built -upon areas prior to receipt of a Stormwater Management Permit, if required, will be considered a violation of the North Carolina Administrative Codes. If you have any questions concerning this matter, please call me at 910-433-3329. Sincerely, �� � Michael Lawyer Environmental "Technician Enclosure North Carolina Division of Water Quality 225 Green Street, Suite 714 Fayetteaille, NC 28301->043 Phone (910) 433-3300 Imemet waay ncwaternuality.ore Fax (910) 486-0707 An Equal Oppmtuniry!Aflirmalive Action Employer — 50% Recycleo110% Post Consumer Paper NorthCarolina Customer Service 1 -877-623 -6748 State of North Carolina Department of Environment and Natural Resources Division of Water Quality WATER QUALITY CLASSIFICATION REQUEST FORAI This form omy be photocopied for use as an original. In order to determine whether a State Stormwater,Management Permit will be required for a project located within a High Quality Water (PIQW) or Outstanding Resource Water (OR W) zone, the classification of the closest downslope surface waters (the surface waters that any sheet flexor overflow from the project would flow toward) must be determined. h is required that the same authorized person that obtained the Approved Erosion and Sedimentation Control Plan complete only Sections and If below. Division of Water Quality staff will determine the receiving stream classification, complete Section III and return the completed form to you. 1. PROJF,CT INFORMATION 1. Project Name: County: 2. Authorized Contact Person (print): 3. Mailing Address: 4. City. State: zip code: Phone #: 5. Name of closest downslope surface water: 6. Signature of Contact Person: Dale: (To be signed by the same person or AWhon zed Agent as on the Approved Erosion'& Sedimentation Control Plan) 7. Is an Erosion & Sedimentation Control Plan required? Yes_ No IL REQUIRED ITEMS An 8.5" x I I" copy of the appropriate portion of a USCS quad sheet clearly showing the project's property boundaries, receiving stream, major roads or State Road mmtbers and the nearest town or city. 1.11. CLASS IFI CATION REQUEST(To be completed by Regional Office personneq I . Name of surface water: 2. River Basin: Stream Index: 3. Classification (as established by the Environmental Management Commission): 4. Proposed Classification, if applicable: 5. Approximate distance in feet from project site if classification is HQW: 6 State Stormwater Management Permit required? Yes_ No_ 7. Signature of Regional Office personnel: Date: m s T— — .� 0 F CD Postage $ 3 O ^ 4 0 L tD Certified Fee 17 Postmark (� Return Receipt Fee Here _0 M (Endorsement Requiretl) o M Restricted Delivery Fee O (Endorsement Required) a Total Postage & Fees Y'• y� Sao, To Flu -.. --- htx, --. -------------------------- Oorreef, Apt. �'y O or PO Box No.o. ... IJ. (t, Cfg Stara nP C 'Jt ry TL C' K[c 08,310 sao) 4 e •;uo l+'.�I�`7%'teo.1 _. kr xtt�'^e�.z'r �e"}y _;_igl at3s4u, '.;�Y�i1 u?=3 ® Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ® Print your name and address on the reverse so that we can return the card to you. ® Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: Ghkcliax-H R BAgent B. Receiv�ed,by (Printed Name) ✓ C. Date of Delivery Lr Iv�yP- ��U<49fJ �CGGI-E� l D. Is delivery address differen from ttem 11' ❑Yes If YES, enter delivery address below: ❑ No �1 3. Service Type ArCenified Mail ❑ Express Mail J J ❑ Registered ❑.Return Recelpt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes z. Articlensferumm , 7001 2510 0006 9500 5643 .(Transfer /rom senripe label) . PS Form 3811; February' 2004 Domestic Return Receipt T 102595-02-M4540 : HCDE R North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H, Sullins Dee Freernan Governor Director Secretary .July 20, 2009 CIiRTIFIED MAIL: 7006 2150 0005 2109 8327 RETURN RECEIPT REQUESTED Directorate of Public Works Attn: Gregory G. Bean 2175 Reilly Road, Stop A Fort Bragg, NC 28310-5000 Subject: NOTICE OF VIOLATION NON'-2009-OP-0049 Failure to Obtain State Stormwater Management Permit SOF Rowe Training Complex Phase I I I Camp MacKall-Richmond County Dear Mr. Bean: This letter is to notify you that you are in violation of Title 15A North Carolina Administrative Code (NCAC) 2H .1003 in accordance with North Carolina General Statute (G.S.) 143-214.7 for failure to apply for and secure a Stormwater Management Permit. On May 28, 2009, Mike Lawyer of the Fayetteville Regional Office observed the completion of the subject development project known as SOF Rowe Training Complex Phase III located on Special Forces Way at Camp MacKall, Richmond County, North Carolina. A review of DWQ Files has confirmed that letters were sent via Certified Mail dated June 21, 2006 and May 9, 2007 regarding the location of the subject project being within the one -mile watershed of High Quality Waters and the requirement to obtain a Stomtwater Management Permit prior to the construction Of built -upon areas. Copies of these letters as well as the Certified Mail Return Receipts are enclosed for your reference. As of the date of this Notice, a Stormwater Management Permit has not been issued for the subject project prior to construction of impervious surfaces as described above. As a result of the site inspection and file review, the following violation is noted: Failtu-e to Obtain a State Stormwater Management Permit Title 15A NCAC 2H .1003, in accordance with G.S. 143-214.7, requires a State Stormwater Management Pemtit for development activities that require a Sedimentation/Grosion Control Plan and are within one mile of and draining to High Quality Waters (HQW). The inspection and DWQ file review confirms that a State Stormwater Management Permit was not obtained prior to construction of impervious surfaces at the subject site as described above. Required Response This Office requests that you respond to this letter, in writing, within 30 calendar clays from receipt of this Notice. Your response should be sent to the letterhead address and should address the following items: Please explain when construction (excavation, grubbing, and clearing) began at the site Location: 225 Green Street Suite 714. Fayetteville, NC 28301 Phone: 910 433-33001 FAX :910-486-0707 1 Cusiomer Service. 1-877-623-6748 �i 11C Internet: mn v.ncwaterpalily ,org North atGt!1 a Ai Enu.JOn{nrlurity l AGrtmative Aclioo Employer 2. Please clearly explain why the Storntwater Management Permit was not secured. 3. Submit a complete permit application with a completed supplement form, a signed O&M agreement, sealed calculations, and two sets of detailed plans along with the Processing fee currently set at 5505. Please note that a Designer's Certification is also required upon project completion. Thank you for your immediate attention to this matter. "rbis office requires that the violation, as detailed above, be properly° resolved. Should you have any questions regarding this matter, please contact Mike Lawyer or myself at (910) 433-3300. Sincerely, Belinda S. Henson Regional Supervisor Surface Water Protection Section Enclosures cc: Lee Ward -Water Management Branch (via e-mail) John Hennessy-NPSACOU FRO -Surface Water Protection DWQ Central Files F N'"rF Q f� Michael F. Easley, GOvema � William G. Ross h., Secretary �( ) r North Carolina Department of Environment and Natural Resources � e ✓W�'� O G Alan W. Klimek, P.E Director Division of Water Quality May 9, 2007 CL12'1lF1ED MAIL: 7001 2-510 0006 9448 8715 Izi-,Ju 2N RECEIPT REQUESTED Department of the Anny Attn: Gregory G. Bean, Directorate of Public Works Bldg.3-1031 ButneiRoad Port Bragg, NC 23310-5000 SUBJECT: Stor nwaler Management Permit Application SOF Rowe Training Complex Phase Ill Camp MacKall-Fort Bragg -Richmond County Dear Air. Bean: Enclosed is a copy of the letter sent to you from this office. by Certified Mail on .tune 21, 2006. In that letter, it. was explained that the subject project might be within a high Quality Water zone and subject to the requirements for obtaining a Stormwaier Management Permit prior to the construction of built -upon areas (buildings, pavement, gravel loads -and parking areas, etc.). As of the date ofthis letter, our office has not received the Water Quality Classification Request Form that was enclosed with the June 21, 2006 letter not in application for the pelmit. Be advised that. construction of any built -upon areas prior to issuance of the permit will be considered a violation of Title 15A NCAC 021-1 .1003. You should submit to this office your application package, or a schedule of construction if the project has not begun, within 1.5 calendar days from receipt of this letter. If you have any questions regarding this matter, please contact Mike Lawyer of myself at: (910) 433-3300- Sincerely, 13rvj,-LJ l ti /I. X7L' Belinda S. 1-lenson Regional Supervisor Surface Water Protection Section BSI-I:1\41-/ml Enclosure cc: Greenhorne & O'Mara. Inc. PRO -Surface Water Protection FRO -Land Quality Water Quality Central Piles North Catolina Division of Water Quality 225 Greesr Street -Suite 714 Fayetteville, NC 28301 11hone(910) 433-3300 Internet wa t.,.ncu�aterauNirv.or F&K (910)486-0707 AD Equal OpportunivylAlflrmative Action Employer —50% Recycled/10% Post Consumer Paper NonhCarolina Awtirally Customer Service 1 -977-623-674 9 `a Postage $ Certified Fee Postmark Return Receipt Fee Here M (Endorsement Required) ED Riestricted Cellvery Fee O (Endorsement Required) ED Total Poll Department of the Army Sent To RU Attn: Gregory G. Bean ,a Street Act. Bld 1631 Butner Rd. .....j 0 or POaoxl g. 1 o c y sf re: Port Bragg; NC 283 t0-5000 ® Complete items 1, 2, and 3. Also complete I A. item 4 ifRestrictedDelivery is desired. X ® Print your name and address on the reverse . so that we can return the card to you. 9 III this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: Dcpartrnent of the Army . Attn: Gregory G. Bean Bldg. 3-1631 Butner Rd. fort Bragg, NC 28310-5000 EkAg by ( Printed Name) I C. Date of Delivery D. Is delivery address different frdm item 1? O/Yei If YES, enter delivery address below: ❑ No 3. Service Type ❑ Certified Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail . ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number — (Transfer from service label) 7 0 01 2 510 0006 9498 8 718 PS Form 3811, February 2004 Domestic Return Receipt 102595-02-hl-1540 -\U iyO �uwam r. naaiey, �ovemur �\• 7 William G. Ross L , Secretary North Caroline Deparlment of E'nvirooment and Natuml Resources :Q 't AlanU vis of wa erlimek, P.E lQt alay June 21, 2006 CERTIFIED iMAIL: 7001 2510 0006 9500 5858 RETURN RECEIPT REQUESTED CregoryC. Bean, Directorate Of Public Works Bldg. 3-1361 Butner Road Fort Bragg, NC 28310-5000 SUBJECT: REQUEST FOR STREAM CLASSIFICATION SOF Rowe Training Complex Phase III Camp N4acKall-Fort Bragg Dear Mr. Bean: On June 14, 2006, the Fayetteville Regional Office of the Division of Water Quality received a copy of the Letter of Approval dated .tune 9, 2006 for the SOF Rowe Training Complex Phase III project located at Camp MacKall. A review of the location of this project shows that. it may be within a High Quality Water zone. State regulation 15A NCAC 021A .1003 requires that any development activity that is required to obtain either a CAMA major pennit within the twenty coastal counties or an approved Erosion and Sedimentation Control Plan in which the project is draining to Outstanding . Resource Waters or within one mile of and draining to High Quality Waters to apply for and obtain a Stormwater Management Pertnit. ]it order to determine if a Stormwater Management Permit will be required for this project, this office must verify the classification of ariddistance to the receiving waters. Please return the enclosed classification request form with a color copy of that'portion of the USES quad sheet with the project and the closest downslope trained receiving waters clearly identified. Upon classification of the receiving waters by this office, you will be sent either a Stormwater Management Permit application via certified mail or a letter stating that a Stomnwatcr Management Permit is not required for this project. The local governing authority for compliance must review projects that drain to Water Supply Watersheds. Please be advised that construction of any built -upon areas prior to receipt of a Stonnvtater Management Pemnit,.if required, will be considered a violation of the North Carolina Administrative Codes. if you have any questions concerning this matter, please call me at.910-433-3329. Sincerely, Michael Lawyer Environmental 'Technician Enclosure o,r, NonhCaroluta Naturnlly North Carolina Division of Water Quality 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Phone (910) 433-3300 Customer Service Intemee vww.ncwaergnalitv.ore Fax (910) 4 8 6-0707 1-877-623-6748 An Equal Oreportunitn4ANirmanve Action Employer - 51Pb Recycled/10% Post Consumer Paper cr, 0 u, 0 0 0 Tote[ Postage & Fees $ 1 -64 � Sent io v �' Il --- ----- ,� Sheep Apt. o or PC Bn No 3 " -I 3 City, ZIP S-C)OL r �v 5 "�•ae1l3 yv.,`wF-,^7''•.K-=���'O.�,y �,y�«rT4�iik�O',�.�r�'7 III Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. u Print your name and address on the reverse so that we can return the card to you. ® Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: A- U gent B. Received by (Printed Name)/ I C. Date of Delivery D. Is delivery address different ftom Rem 1? U Yes If YES, enter delivery address below: ❑ No 3. Service Type IPCertified Mail ❑ Express Mail Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number 7001 2510 0006 9500 5858 (transfer /mm service label) PS Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540 Michael F. Easley, Governor �. William G. Ross Jr, Secretary North Carolina Department of Environment and Natural Resources y -� - Alan W. lUime}y P.E_ Director Division of Water Quality little 21.2006 CERTIFIED (MAIL: 7001 2510 0006 9500 5858 RETURN RECEIPT REQUESTED Qregoiy G. Bean, Directorate of Public Works Bldg. 3-1361 Butner Road Fort Bragg, NC 283 10-5000 SUBJECT: REQUEST FOR STRF,AD4 CLASSIFICATION SOP Rowe Training Complex Phase III Camp MaeKall-Fort Bragg Dear Mr. Bean: On June 14, 2006, the Fayetteville Regional Office of the Division of Water Quality received a copy of the Letter of Approval dated June 9, 2006 for the SOF Rowe Training Complex Phase III project located at Camp MacKall. A review of the location of this project shows that it. may be within a High Quality Water zone. State regulation 15A NCAC 021A A 003 requires that any development activity that is required to obtain either a CAMA major permit within the twenty coastal counties or an approved Erosion and Sedimentation Control Plan in which the project is draining to Outstanding ReSGl1CCe Waters or within one mile of and draining to High Quality Waters to apply for and obtain a Stortwater Management Perrin. In order to determine if a Stormwater Management Permit will be required for this project, this office must, verify the classification of anti.distance to the receiving waters. please return the enclosed classification request form with a color copy of that portion of the USGS quad sheet with the project and the closest downslope named receiving waters clearly identified. Upon classification of the receiving waters by this office, you will be sent either a Stomtwater Management Permit application via certified mail or a letter stating that a Stormwater Management Permit is not required for this project. The local governing authority for compliance must review projects that drain to Water Supply Watersheds. Please be advised that construction of any built -upon areas prior to receipt of a Stormwater Management Pennit, if required, will be considered a violation of the North Carolina Administrative Codes. if you have any questions concerning this matter, please call me at.910-433-3329. Sincerely, Michael Lawyer Environmental Technician Enclosure Noill,Ctu olina Noturnlly North Carolina Division of Water Quality 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Phone (910) 433-3300 CUStOmer Service hnemet Fax (910) 486-0707 1-877-623-6748 M Equal OpportunitylAhmative Action Employer -50% Recycled110% Post Consumer Paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality WATER QUALITY CLASSIFICATION RI?QUEST FORM this form may be photocopied for use as an original. In order to determine whether a State Stormwater Management Permit will be required for a project located within a High Quality Water (HQW) or Outstanding Resource "later (OKkV) zone, the classification of the closest downslope surface waters (the surface waters that any sheet flow or overflow from the project would flow toward) must be determined. It is required that the same authorized person that obtained the Approved Erosion and Sedimentation Control Plan complete only Section I and 11 below. Division of Water Quality staff will determine the receiving stream classification, complete Section ❑1 and return the completed form to you. 1. PROJECTINFORUTATION 1. Project Name: 2. Authorized Contact Person (print): _. Mailing Address: 4. City: County: State: zip code: Phone r: 5. Name of closest downslope surface water: 6. Signature of Contact Person: Date: (To be signed by the same person or Authorized Agent as on the Approved Erosion rC Sedimentation Control Plan) 7. Is an Erosion & Sedimentation Control Plan required? Yes_ No II. REQUIREDITEMS An 3.5" x 1 I" copy of the appropriate portion of a USCS quad sheet clearly showing the project's property boundaries, receiving stream, major roads or State Road numbers and the nearest town or city. Ill. CLASSIFICATION REQUEST(Tobe completed by Regional Office personnel) Name of surface water: 2.- River Basin: Stream Index: 1 Classification (as established by the Ernironmental Management Commissiun): 4. Proposed Classification,ifapplicable 5. Approximate distance in feet from project site if classification is IIQW: 6. State Stormwater Management Permit required? Yes_ No 7. Signature of Regional Office personnel: Date: