HomeMy WebLinkAboutSW6080601_CURRENT PERMIT_20080703STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO. SW��l1(�h I
DOC TYPE CURRENT PERMIT
APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE 0
YYYYMM DD
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
July 3, 2008
Mr. Jimmy Pierce
P.O. Box 2191
Surf City, North Carolina 28445
Subject: Stormwater Permit No. SW6080601
Wildhorse Plantation
High Density Subdivision Wet Pond Project
Harnett County
Dear Mr. Pierce:
Coleen H. Sullins, Director
Division of Water Quality
AUG 6 20
OENR- FAYEMLLE REGIONAL OFRGE
The Stormwater Permitting Unit received a complete Stormwater Management Permit Application
for Wildhorse Plantation on June 23, 2008. Staff review of the plans and specifications has
determined that the project, as proposed, will comply with the Stormwater Regulations set forth in
Title 15A NCAC 2H.1000 and Session Law 2006-246. We are forwarding Permit No.
SW6080601, dated July 3, 2008, for the construction of the subject project.
This permit shall be effective from the date of issuance until July 2, 2018, and shall be subject to
the conditions and limitations as specified therein. Please pay special attention to the Operation
and Maintenance requirements in this permit. Failure to establish an adequate system for
inspection and maintenance of the stormwater management system will result in future compliance
problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing upon written request within sixty (60) days following
receipt of this permit. This request must be in the form of a written petition, conforming to Chapter
150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings,
P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be
final and binding.
This project will be kept on file at the Fayetteville Regional Office. If you have any questions, or
need additional information concerning this matter, please contact Mike Randall at (919) 733-
5083, extension 545; or lnike.randall@ncmail.net.
Sincerely,
\/ - y�
for Coleen H. Sullins
cc: Chris Rogers, Enoch Engineers, P.A. 1403 NC Hwy. 50 South, Benson, NC 27505
MF yygtteville-Regional-Office> .
Central Files
SPU Files
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-5083
Customer Service
Internet: w .ncwaterauality.ore location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (919) 733-9612 1-877-
623-6748
N'Ne Caroli
Natural/,.
An Equal Opportunity/Affirmative Action Employer —50% Recycled/l0% Post Consumer Paper
I Allqe , p u
State Stormwater Permit
Permit No. SW6080601
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY SUBDIVISION DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Jimmy Pierce
Wildhorse Plantation
Buffalo Lakes Road, Spout Springs, Harnett County
FOR THE
construction, operation and maintenance of a two wet detention pond(s) in compliance
with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter
referred to as the "stormwater rules') and the approved stormwater management plans
and specifications and other supporting data as attached and on file with and approved
by the Division of Water Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until July 2, 2018 and shall be
subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.5 on page 2 of this permit. The subdivision is.
permitted for 753 lots and 46 six -unit townhome buildings
3. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
4. The built -upon areas associated with this project shall be located at least 30 feet
. landward of all perennial and intermittent surface waters.
Page 1 of 8
State Stormwater Permit,
Permit No. SW6080601
5. The following design elements have been permitted for this wet detention pond
stormwater facility, and must be provided in the system at all times.
Drainage Area 1
Drainage Area 2
a.
Drainage Area, ft2:
5,464,166
876,144
Onsite, ft2:
-5,129,626
876,422
Offsite, ft2:
334,977
0
b.
Total Impervious Surfaces, ft2:
2,064,302
311,984
On -site Buildings, ft2:
1,085,761
148,430
Streets, ft2:
623,762
109,145
Parking, ft2:
163,300
29,980
Other including Sidewalks, ft2:
191,479
14,429
Offsite, ft2:
0
0
c.
Average Pond Design Depth, feet:
3.82
3.76
d.
TSS removal efficiency:.
90%
90%
e.
Design Storm:
1 inch
1 inch
f.
Permanent Pool Elevation, FMSL:
338.00
320.00
g.
Permitted Surface Area @PP, ft2:
126,439
21,925
h.
Permanent Pool Volume, ft3:
483,561
82,402
i.
Temporary Pool Elevation, FMSL:
343.00
325.00
j.
Predevelopment 1 year 24 hour:
105.81
26.13
k.
Post development 1 year 24 hour:
178.36
44.04
I.
Controlling Orifice:
3" O pipe
1.25" 0 pipe
m.
Forebay Volume, ft3:
104,145
15,894
o.
Maximum Fountain Horsepower:
3 HP
2 HP
p.
Receiving Stream / River Basin:
Buffalo Creek, Cape
Fear River Basin
q.
Stream Index Number:
WS III 18-23-18
r.
Classification of Water Body:
WS III
II. SCHEDULE OF COMPLIANCE
No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature
(such as swales) shown on the approved plans as part of the stormwater
management system without submitting a revision to the permit and receiving
approval from the Division.
2. The permittee is responsible for verifying that the proposed built -upon area for
the entire lot does not exceed the maximum allowed by this permit. Once the lot
transfer is complete, the built -upon area may not be revised without approval
from the Division of Water Quality, and responsibility for meeting the built -upon
area limit is transferred to the individual property owner.
3. If an Architectural Review Board or Committee is set up by the permittee to
review plans for compliance with the BUA limit, the plans reviewed must include
all proposed built -upon area. Any approvals given by the Board do not relieve the
homeowner of the responsibility to maintain compliance with the permitted BUA
limit.
4. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
Page 2 of 8
State Stormwater Permit
Permit No. SW6080601
5. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
6. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
e. Further subdivision, acquisition, or sale of all or part of the project area.
The project area is defined as all property owned by the permittee, for
which Sedimentation and Erosion Control Plan approval or a CAMA Major
permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
7. The permittee shall submit for approval, final site layout and grading plans for
any permitted future development areas shown on the approved plans, prior to
construction.
8. All stormwater. collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
9.. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
10. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received .
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification.
11. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
12. The permittee shall at all times provide the operation and maintenance
necessary to assure that all components of the permitted stormwater system
function at optimum efficiency. The approved Operation and Maintenance Plan
must be followed in its entirety and maintenance must occur at the scheduled
intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans.
f. Debris removal and unclogging of structures, orifice, catch basins and
piping.
g. Access to all components of the system must be available at all times.
Page 3 of 8
State Stormwater Permit
Permit No. SW6080601
13. Records of maintenance activities must be kept by the permittee. The records will
indicate the date, activity, name of person performing the work and what actions
were taken.
14. The permittee shall submit to the Division of Water Quality an annual summary
report of the maintenance and inspection records for each BMP. The report shall
summarize the inspection dates, results of the inspections, and the maintenance
work performed at each inspection.
15. This permit shall become void unless the facilities are constructed in accordance
with the conditions of this permit, the approved plans and specifications, and
other supporting data.
16. Prior to the sale of any lot, the following deed restrictions must be recorded:
a. The following covenants are intended to ensure ongoing compliance with
State Stormwater Management Permit Number SW6080601, as issued by
the Division of Water Quality under the stormwater rules.
b. The State of North Carolina is made a beneficiary of these covenants to
the extent necessary to maintain compliance with the Stormwater
Management Permit.
C. These covenants are to run with the land and be binding on all persons -
and parties claiming under them.
d. The covenants pertaining to stormwater may not be altered or rescinded
without the express written consent of the State of North Carolina, Division
of Water Quality.
e. Alteration of the drainage as shown on the approved plans may not take
place without the concurrence of the Division of Water Quality.
f. The maximum built -upon area includes any built -upon area constructed
within the lot property boundaries, and that portion of the right-of-way
between the front lot line and the edge of the pavement. Built upon area
includes, but is not limited to, structures, asphalt, concrete, gravel, brick,
stone, slate, coquina and parking areas, but does not include raised, open
wood decking, or the water surface of swimming pools:
g. All runoff on the lot must drain into the permitted system. This may be
accomplished through providing roof drain gutters, which drain to the
street, grading the lot to drain toward the street, or grading perimeter
swales and directing them into the pond or street. Lots that will naturally
drain into the system are not required to provide these measures.
h. Built -upon area in excess of the permitted amount will require a permit
modification.
17. A copy of the recorded deed restrictions must be submitted to the Division within
30 days of the date of recording the plat, and prior to selling lots. The recorded
copy must contain all of the statements above, the signature of the Permittee, the
deed book number and page, and the stamp/signature of the Register of Deeds.
18. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ
personnel. The facility must be in compliance with all permit conditions. Any
items not in compliance must be repaired or replaced to design condition prior to
the transfer. Records of maintenance activities performed to date will be
required.
Page 4 of 8
11
State Stormwater Permit
Permit No. SW6080601
19. Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria:
a. The fountain must draw its water from less than 2' below the permanent
pool surface.
b: Separated units, where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the deepest
part of the pond.
C. The falling water from the fountain must be centered in the pond, away from
the shoreline.
d. The maximum horsepower for the fountain's pump is based on the
permanent pool volume and indicated in Section 1.5.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a completed Name/Ownership Change form signed by both parties, to the
Division of Water Quality, accompanied by the supporting documentation as
listed on page 2 of the form. The approval of this request will be considered on its
merits and may or may not be approved.
2. The permittee is responsible for compliance with all permit conditions until such
time as the Division approves a request to transfer the permit.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such. as the construction of
additional or replacement stormwater management systems.
6. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
7. The permit issued shall continue in force and effect until revoked or terminated.
The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and re -issuance or
termination does not stay any permit condition.
8. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
9. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
Page 5 of 8
State Stormwater Permit
Permit No. SW6080601 ✓
10. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit
as allowed by the laws, rules and regulations contained in Session Law 2006-
246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al.
11. The permittee shall notify the Division in writing of any name, ownership or
mailing address changes at least 30 days prior to making such changes.
Permit issued this the 3`d day of July, 2008.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Division of Water Quality
By Authority of the Environmental Management Commission
Page 6 of 8
State Stormwater Permit
Permit No. SW6080601
Wildhorse Planation
Harnett Countv
Designer's Certification
1, , as a duly registered in
the State of North Carolina, having been authorized to observe (periodically/weekly/full
time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is a part of this Certification.
Noted deviations from approved plans and specifications:
Signature
Registration Number
Date
SEAL
Page 7 of 8
State Stormwater Permit
Permit No. SW6080601"
Certification Requirements:
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf, a
forebay, and the vegetated filter.
15. The required dimensions of the system are provided, per the approved
plan.
cc: NCDENR-DWQ Regional Office
Harnett County Building Inspections
Page 8 of 8
DWQ USE ONLY
Date Recei ed
Fee Paid
Permit Number
t0 `Z3
Soy —
S W b(oo
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
I. GENERAL INFORMATION
1. Applicants name (specify the name of the corporation, individual, etc. who owns the project):
2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance):
3. Mailing Address for person listed in item 2 above:
City:Surf City State:NC Zip:28445
Phone: (910 1 328-5257 Fax: (910 ) 328-5452
Email:homecobuilders@earthlink.net
4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
Wildhorse Plantation
5. Location of Project (street address):
City:(nnear)SSpout Springs County:Harnett
6. Directions to project (from nearest major intersection):
2 miles from the intersection of NC 87 South on Buffalo Lakes Road.
7. fatitude:35° 18' 5.37" N Longitude:79° 3' 13.6" W of project
8. Contact person who can answer questions about the project:
Name:Chris Rimers Telephone Number: (919 ) 894-7765
Email:Chris@EnochEngineers.com
IL PERMIT INFORMATION:
1. Specify whether project is (check one):
S -
❑Renewal ❑Modification
Form SWU-101 Version 03.27.08 Pagel of4
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the
existing permit numbern/a and its issue date (if known)n/a
3. Specify the type of project (check one):
❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other
4. Additional Project Requirements (check applicable blanks; information on required state permits can be
obtained by contacting the Customer Service Center at 1-877-623-6748):
❑CAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit ❑NPDES Stormwater
III. PROJECT INFORMATION
1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project.
Stormwater will be treated thorugh the use of BMP devices. The BMP devices are wet detention basins.
2. Stormwater runoff from this project drains to the Cape Fear River basin.
3. Total Property Area: 293.98 acres 4. Total Wetlands Area:17.47 acres
5. 100' Wide Strip of Wetland Area:14.81 acres (not applicable if no wetlands exist on site)
6. Total Project Area**:154.08 acres 7. Project Built Upon Area:36.96
8. How many drainage areas does the project have?2
9. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
For high density projects, complete the table with one drainage area for each engineered stormwater device.
Basin Information
Drainage Area 1
Drainage Area 2
Receiving Stream Name
Buffalo Creek
Buffalo Creek
Stream Class & Index No.
WS III 18-23-18
WS 11118-23-18
Total Drainage Area (so
5,464,166
876,422
On -site Drainage Area (sf)
5,129,626
876,422
Off -site Drainage Area (so
334,977
0
Existing Impervious* Area (so
0
0
Proposed Impervious*Area (so
2,064,302
311,984
Impervious* Area (total)
37.78
35.60
Impervious* Surface Area
Drainage Area 1
Drainage Area 2
On -site Buildings (so
1,085,761
148,430
On -site Streets (so
623,762
109,145
On -site Parking (so
163,300
29,980
On -site Sidewalks (so
191,479
24,429
Other on -site (so
0
0
Off -site (so
0
0
Total (so:
2,064,302
311,994
* Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
**Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area
percentage calculation. This is the area used to calculate percent project built upon area (BUA).
Form SWU-101 Version 03.27.08 Page 2 of
10. How was the off -site impervious area listed above derived?
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions,
outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot
number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be
downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htm - deed restrictions.
Form DRPC-1
High Density Commercial Subdivisions
Form DRPC-2
High Density Developments with Outparcels
Form DRPC-3
High Density Residential Subdivisions
Form DRPC-4
Low Density Commercial Subdivisions
Form DRPC-5
Low Density Residential Subdivisions
Form DRPC-6
Low Density Residential Subdivisions with Curb Outlets
By your signature below, you certify that the recorded deed restrictions and protective covenants for this
project shall include all the applicable items required in the above form, that the covenants will be binding
on all parties and persons claiming under them, that they will run with the land, that the required covenants
cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the
sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplement form(s) listed below must be submitted for each
BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status
and availability of these forms. Forms can be downloaded from http://h2o.enr.state.nc.us/su/bml2 forms.htm.
Form SW401-Low Density
Form SW401-Curb Outlet System
Form SW401-Off-Site System
Form SW401-Wet Detention Basin
Form SW401-Infiltration Basin
Form SW401-Infiltration Trench
Form SW401-Bioretention Cell
Form SW401-Level Spreader
Form SW401-Wetland
Form SW401-Grassed Swale
Form SW401-Sand Filter
Form SW401-Permeable Pavement
Low Density Supplement
Curb Outlet System Supplement
Off -Site System Supplement
Wet Detention Basin Supplement
Infiltration Basin Supplement
Underground Infiltration Trench Supplement
Bioretention Cell Supplement
Level Spreader/Filter Strip/Restored Riparian Buffer Supplement
Constructed Wetland Supplement
Grassed Swale Supplement
Sand Filter Supplement
Permeable Pavement Supplement
Form SWU-101 Version 03.27.08 Page 3 of
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the
interactive online map at http://h2o.enr.state.nc.us/su/msi maos.htm)
Please indicate that you have provided the following required information by initiating in the space provided
next to each item.
• Original and one copy of the Stormwater Management Permit Application Form
• Original and one copy of the Deed Restrictions & Protective Covenants Form (if
required as per Part IV above)
• Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP
• Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for LD)
payable to NCDENR
• Calculations & detailed narrative description of stormwater treatment/management
• Copy of any applicable soils report
• Two copies of plans and specifications (sealed, signed & dated), including:
- Development/Project name
- Engineer and firm
-Legend
- North arrow
- Scale
- Revision number & date
- Mean high water line
- Dimensioned property/ project boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VIL AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section. (ex. designing engineer or firm)
Designated agent (individual or firm):Joe E. Godwin Sr. or Enoch Engineers, P.A.
Mailing Address:1403 NC Hwy. 50 South
City:Benson
Phone: (919 ) 894-7765
Email:ioeSr@EnochEn&eers.com
VIII. APPLICANT'S CERTIFICATION
. State:NC Zip:27504
Fax: (919 ) 894-8190
I, (print or type name of person listed in General Information, item 2) Iohn Pierce
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A
NCAC 2H .1000. _
Date: 5 — t' L/" 09
Form SWU-10i Version 03.27.08 Page 4 of
,t
•.�
�
�.
,.
Permit No.
(to be provided by DWQ)
o�pp W AT§9-
��n
NCDENR � �
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This loan must be filled out, printed and submitted.
The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information.
Project name
Contact person
Phone number
Date
Drainage area number
Drainage area
Impervious area
% impervious
Design rainfall depth
Storage Volume: Non -SR Waters
Minimum volume required
Volume provided
Storage Volume: SR Waters
1-yr, 24-hr runoff depth
Pre -development 1-yr, 24-hr runoff
Post -development 1-yr, 24-hr runoff
Minimum volume required
Volume provided
Peak Flow Calculations
1-yr, 24-hr rainfall depth
Rational C, pre -development
Rational C, post -development
Rainfall intensity: 1-yr, 24-hr storm
Pre -development 1-yr, 24-hr peak flow
Post -development 1-yr, 24-hr peak flow
Pre/Post 1-yr, 24-hr peak flow control
Basin Elevations
Basin bottom elevation
Sediment cleanout elevation
Bottom of shelf elevation
Permanent pool elevation
SH WT elevation
Top of shelf elevation
Temporary pool elevation
Jimmy Pierce
910-328-5257
5,464,166.00 ft3
2,064,302.00 It'
37.78 %
1.00 in
186,692.00 ft3
587,640.00 ft3
in
ft3
ft3
ft3
ft3
3.06 in
0.35 (unitless)
0.59 (unitless)
2.41 in/hr
105.81 ft3/sec
178.36 ft3/sec
72.55 ft3/sec
�xxxrn�a
334.00 It
337.50 ft
338.00 If
338.00 ft
338.50 If
343.00 It
Form SW401-Wet Detention Basin-Rev.4 Parts I. d 11. Design Summary, Page 1 of 2
Permit
(to be pmvided by DWQ)
IL='DESION'1NFORMATION;,�+ '11' -"
Volume and Surface Area Calculations
SAIDAratio 2.00 (unitless)
Surface area at the bottom of shelf 84,662.00 ft'
Volume at the bottom of shelf 320,399A0 8'
Permanent pool, surface area required 109,283.00 It'
Permanent pool, surface area provided 126,439.00 fe OK
Permanent pool volume 483,561.00 ft'
Average depth for SAIDA tables
3.82
it
OK
Surface area at the top of shelf
105,203.00
fl
Volume at the top of shelf
415,291.00
ft'
Forebay volume
104,145.00
ft'
Forebay %of permanent pool volume
21.54
%
OK
Temporary pool, surface area provided
133,931.00
ft'
Drawdown Calculations
Treatment volume drawdown time
2.50
days
OK
Treatment volume discharge rate
3.66
fl'/s
Pre -development 1-yr, 24-hr discharge
105.81
fills
OK
Post -development 1-yr, 24-hrdischarge
3.66
fills
OK
Additional Information
Diameter of orifice
3
in
Design TSS removal
90
%
Basin side slopes
3.00
A
OK
Vegetated shelf slope
10.00
:1
OK
Vegetated shelf width
10.00
It
OK
Length of flowpath to width ratio
7.00
:1
OK
Length to width ratio
7.00
:1
OK
Trash rack for overflow & office?
y
(Y or N)
OK
Freeboard provided
1.00
It
OK
Vegetated filter provided?
n
(Y or N)
Design must be based on 90% TSS removal
Recorded drainage easement provided?
y (Y or N)
OK
Capures all runoff at ultimate build -out?
y
(Y or N)
OK
Drain mechanism for maintenance or emergencies
Basin Drain
Form SW401-Wet Detention Basin-Rev.4 Pens I. & J. Design Summary, Page 2 of 2
Permit
(to be provided by DWQ)
III. REQUIRED ITEMS CHECKLIST«.
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
ials
Pagef Plan
Sheet No.
!Ar-
m •z.
smr-3�
sme-se
rmP-z
s rinP-z
Plans (1" - 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Basin dimensions,
- Pretreatment system,
- High flow bypass system,
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Overflow device, and
- Boundaries of drainage easement.
2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing:
- Outlet structure with trash rack or similar,
Maintenance access,
Permanent pool dimensions,
Forebay and main pond with hardened emergency spillway,
Basin cross-section,
Vegetation specification for planflng shelf, and
Filter strip.
3. Section view of the dry detention basin (1" = 20' or larger) showing:
Side slopes, 3:1 or lower,
Pretreatment and treatment areas, and
Inlet and outlet structures.
4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified
on the plans prior to use as a wet detention basin.
4tAd6/41DRAe6 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay,
to verify volume provided.
SMP" 2 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the
entire drainage area is stabilized.
smp-t% 7. The supporting calculations.
sfAW%4v A6E
ARM 8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
FPoLM 9. A copy of the deed restrictions (if required).
oaM 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County
soil maps are not an acceptable source of soils information.
Form SW401-Wet Detention Basin-Rev.4 Pan III. Required Items Checklist, Page 1 of 1
Permit Number:
(to be provided by DWQ)
Drainage Area Number: I
Wet Detention Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
❑ does ® does not incorporate a vegetated filter at the outlet.
This system (check one):
❑ does ® does not incorporate pretreatment other than a forebay.
important maintenance procedures:
— Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks).
— No portion of the wet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated shelf.
— Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
— if the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum extent practical.
— Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a
Coastal County). Records of operation and maintenance should be kept in a known set
location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How 1 will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the wet
Areas of bare soil and/or
Regrade the soil if necessary to
detention basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Vegetation is too short or too
Maintain vegetation at a height of
long.
approximately six inches.
Form SW401-Wet Detention Basin O&M-Rev.3 Page 1 of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number: 1
BMP element:
Potentialproblem:
How I will remediate theproblem:
The inlet device: pipe or
The pipe is clogged.
Unclog the pipe. Dispose of the
swale
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged.
Erosion is occurring in the
Regrade the swale if necessary to
swale.
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
The forebay
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design depth for
possible. Remove the sediment and
sediment storage.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The vegetated shelf
Best professional practices
Prune according to best professional
show that pruning is needed
practices
to maintain optimal plant
health.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The main treatment area
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design sediment
possible. Remove the sediment and
storage depth.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Algal growth covers over
Consult a professional to remove
50% of the area.
and control the algal growth.
Cattails, phragmites or other
Remove the plants by wiping them
invasive plants cover 50% of
with pesticide (do not spray).
the basin surface.
Form SW401-Wet Detention Basin O&M-Rev.3 Page 2 of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number:_)
BMP element:
Potentialproblem:
How I will remediate theproblem:
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankment.
remove the tree.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair.
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
I Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
outlet.
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads 4 feet in the main pond, the sediment
shall be removed.
When the permanent pool depth reads A: 2.25 / B: 2.625 feet in the forebay,
the sediment shall be removed.
Sediment Removal
Bottom
BASIN DIAGRAM
ill in the blanks)
vumnic
A-341.50/B:341 0 -ft Min.
Sediment
Storage
Permanent Pool Elevation 338
Permanent Pool
Sediment Removal Elevation 334 Volume
Bottom Elevation
Storage
FOREBAY
MAIN POND
Form S W401-Wet Detention Basin O&M-Rev.3 Page 3 of 4
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:Wildhorse Plantation
BMP drainage area number:
Print
Title:Owner
Address:P.O. Box 2191, Surf City, NC 28445
Phone:910-328-5257
Signature:
Date:
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
20J) �— U M A/-) , a Notary Public for the State of
JypM) roxp),nP County of T I-yl Y-,-tm`l do hereby certify that
� ,� t� U pj a y personally appeared before me this
th
day of , and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal,
SSTMIe
*OTARY
ils A4
My commission expires 61- 10
Form SW401-Wet Detention Basin O&M-Rev.3 Page 4 of
l
�
1
i�
Y.. .
gip:
—-WILpHORS-E__PLANTAMON
High Density Residential Subdivisions
Deed Restrictions & Protective Covenances
In accordance with Title 15 NCAC 2H.1000, the Stormwater Management Regulations, deed restrictions and
protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and
sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective
covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the
design criteria used to size the stormwater control facility.
I, jimmy plmc , acknowledge, affirm and agree by my signature below, that I will
cause the following deed restrictions and covenants to be recorded prior to the sale of any lot:
1. The following covenants are intended to ensure ongoing compliance with State Stormwater
Management Permit Number as issued by the Division of Water Quality under
NCAC 2H.1000.
2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to
maintain compliance with the stormwater management permit.
3. These covenants are to run with the land and be binding on all persons and parties claiming under
them.
4. The covenants pertaining to stormwater may not be altered or rescinded without the express written
consent of the State of North Carolina, Division of Water Quality.
5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence
of the Division of Water Quality.
6. The maximum allowable built -upon area perlotis (sec ncxT) square feet. This allotted amount
includes any built -upon area constructed within the lot property boundaries, and that portion of the
right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not
limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does
not include raised, open wood decking, or the water surface of swimming pools.
OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the following:
6. The maximum built -upon area per lot, in square feet, is as listed below:
Lot # BUA Lot # BUA Lot # BUA Lot # BUA
evi-t+ti-vG,vi-tR9 $yc6sr;a►P1+V UWP1•119 apoJ{iwpyipru w�raoo lsoor{
This allotted amount includes any built -upon area constructed within the lot property boundaries, and
that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area
includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and
parking areas, but does not include raised, open wood decking, or the water surface of swimming
pools.
7. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be
accomplished through a variety of means including roof drain gutters which drain to the street, grading
the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them
into a component of the stormwater collection system. Lots that will naturally drain into the system are
not required to provide these additional measures.
Signature: Date:
I, , a Notary Public in the
V
State of lil7GL County of
do hereby certify that personally appeared
before me this the ' t day of 20-01L, and acknowledge
the due execution of th foregoing instrument. Wit ess my hand and 0 I seal,
IL
Si ature = *OTARk :
My Commission expires O J oUg \L G c,;^
Form DRPC-3 Rev.l Page 1 of 1
m
Permit No.
(to be provided by DWQ)
® ?.F W^A TFH
AWA
NC ENR o
STORMWATER MANAGEMENT PERMIT APPLICATION FORM `^
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information.
1..11PR0JECTjINFORMATION
,
Project name WILDHORSE PLANTATION
Contact person Jimmy Pierce
Phone number 910-328-5257
Date 5/142008
Drainage area number 2
I11DESIGNIINF,ORMATION
Site Characteristics
Drainage area
876,422.00
ftz
Impervious area
311,984.00
ft3
% impervious
35.60
%
Design rainfall depth
1.00
in
Storage Volume: Non -SR Waters
Minimum volume required
27,100.00
ft3
Volume provided
135,564.00
ft3
Storage Volume: SR Waters
1-yr, 24-hr runoff depth
in
Pre -development 1-yr, 24-hr runoff
ft3
Post -development 1-yr, 24-hr runoff
ft3
Minimum volume required
ft3
Volume provided
ft3
Peak Flow Calculations
1-yr, 24-hr rainfall depth
3.06
in
Rational C, pre -development
0.35
(unitless)
Rational C, post -development
0.59
(unifless)
Rainfall intensity: 1-yr, 24-hrstorm
3.71
in/hr
Pre-clevelopment 1-yr, 24-hr peak flow
26.13
ft3/sec
Post -development 1-yr, 24-hr peak flow
44.04
ft3/seC
Pre/Post 1-yr, 24-hr peak flow control
17.91
ft3/sec
Basin Elevations
Basin bottom elevation
315.00
8
Sediment cleanout elevation
316.00
If
Bottom of shelf elevation
319.50
If
Permanent pool elevation
320.00
It
SHWT elevation
320.00
It
Top of shelf elevation
320.50
it
Temporary pool elevation
325.50
ft
Form SW401-Wet Detention Basin-Rev.4
Parts 1.8 It. Design Summary, Page 1 Or 2
Permit
(to be provided by
II: �DESION(INFORMATION,
Volume and Surface Area Calculations
SA/DA ratio
2.00
(unitless)
Surface area at the bottom of shelf
13,464.00
it'
Volume at the bottom of shelf
59,370.00
it'
Permanent pool, surface area required
17,600.00
W
Permanent pool, surface area provided
21,925.00
ftz
OK
Permanent pool volume
82,402.00
ff'
Average depth for SArDA tables
3.76
it
OK
Surface area at the lop of shelf
19,948.00
ft
Volume at the top of shelf
151.092.00
fit'
Forebay volume
15,894.00
it'
Forebay % of permanent pool volume
19.29
%
OK
Temporary pool, surface area provided
30,854. 00
fe
Drawdown Calculations
Treatment volume drawdown time
2.00
days
OK
Treatment volume discharge rate
0.58
ft'IS
Pre -development 1-yr, 24-hr discharge
26.13
ft'Is
OK
Post -development 1-yr, 24-hr discharge
0.58
ft'/s
OK
Additional Information
Diameter of orifice
1.25
in
Design TSS removal
90
%
Basin side slopes
3.00
A
OK
Vegetated shelf slope
10.00
:1
OK
Vegetated shelf width
10.00
it
OK
Length of flowpath to width ratio
3.00
:1
OK
Length to width ratio
3.00
:1
OK
Trash rack for overflow & orifice?
y
(Y or N)
OK
Freeboard provided
1.00
it
OK
Vegetated filter provided?
n
(Y or N)
Design must be based on 90% TSS removal
Recorded drainage easement provided?
y
(Y or N)
OK
Capures all runoff at ultimate build -out?
y
(Y or N)
OK
Drain mechanism for maintenance of emergencies
pump out
Form SW401-Wet Detention Basin-Rev.4 Pans I. & II. Design Summary, Page 2 of 2
Permit
(to be provided by DWQ)
REQUIRED;' ITEM S'.CHECKLIST, '*"'ji'-
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Initials
Pagel Plan
Sheet No.
W-1 1. Plans (1" - 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Basin dimensions,
- Pretreatment system,
- High flow bypass system,
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Overflow device, and
- Boundaries of drainage easement.
<'my-�4� 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing:
smP-s - Outlet structure with trash rack or similar,
- Maintenance access,
- Permanent pool dimensions,
- Forebay and main pond with hardened emergency spillway,
- Basin cross-section,
- Vegetation specification for planting shelf, and
- Filter strip.
jr&%P-"v 3. Section view of the dry detention basin (1" = 20' or larger) shovring:
- Side slopes, 3:1 or lower,
- Pretreatment and treatment areas, and
- Inlet and outlet structures.
Sm� 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified
on the plans prior to use as a wet detention basin.
Sni/tf mw 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay,
to verity volume provided.
SaP- 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the
entire drainage area is stabilized.
M�� 7. The supporting calculations.
.cwr/snR46 C-
f:06? 8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
i t 4 9. A copy of the deed restrictions (if required).
Foot 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County
soil maps are not an acceptable source of soils information.
Form SW401-Wet Detention Basin-Rev.4 Part III. Required Items Checklist, Page 1 of 1
Permit Number:
(to be provided by DWQ)
Drainage Area Number: 2
Wet Detention Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
❑ does ®does not incorporate a vegetated filter at the outlet.
This system (check one):
❑ does ® does not incorporate pretreatment other than a forebay.
Important maintenance procedures:
— Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks).
— No portion of the wet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated shelf.
— Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
— If the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum extent practical.
— Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every stone event greater than 1.0 inches (or 1.5 inches if in a
Coastal County). Records of operation and maintenance should be kept in a known set
location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the wet
Areas of bare soil and/or
Regrade the soil if necessary to
detention basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Vegetation is too short or too
Maintain vegetation at a height of
long.
approximately six inches.
Form SW401-Wet Detention Basin O&M-Rev.3 Page 1 of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number: 2
BMP element:
Potentialproblem:
How I will remediate theproblem:
The inlet device: pipe or
The pipe is clogged.
Unclog the pipe. Dispose of the
swale
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged.
Erosion is occurring in the
Regrade the Swale if necessary to
swale.
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
The forebay
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design depth for
possible. Remove the sediment and
sediment storage.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The vegetated shelf
Best professional practices
Prune according to best professional
show that pruning is needed
practices
to maintain optimal plant
health.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The main treatment area
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design sediment
possible. Remove the sediment and
storage depth.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Algal growth covers over
Consult a professional to remove
50% of the area.
and control the algal growth.
Cattails, phragmites or other
Remove the plants by wiping them
invasive plants cover 50% of
with pesticide (do not spray).
the basin surface.
Form SW401-Wet Detention Basin O&M-Rev.3 Page 2 of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number: 1
BMP element:
Potentialproblem:
How I will remediate the problem:
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankment.
remove the tree.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair.
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
damage have occurred at the
Contact the local NC Division of
Water Quality Regional Office, or
outlet.
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads 4 feet in the main pond, the sediment
shall be removed.
When the permanent pool depth reads 2.25 feet in the forebay, the sediment
shall be removed.
Sediment Removal
Bottom
BASIN DIAGRAM
ill in the blanks)
V Permanent Pool Elevation 320
323.75 Pe an Pool
__ ____--______ Volume Sediment Removal Elevation316
323 -ft Min.
Sediment Bottom Elevation 315
Storage
FOREBAY MAIN POND
mm
Storage
Form SW401-Wet Detention Basin O&M-Rev.3 Page 3 of 4
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:Wildhorse Plantation
BMP drainage area number:
Print name:Jimmy Pierce
Address:P.O. Box 2191, Surf City, NC 28445
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, 'C:2 , a Notary Public for the State of
North iOxpIAP r ounty of k:k111 bfm do hereby certify that
Irnal1. YI 6rCe, personally appeared before me this i' l'
day of , 200`O and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal,
JISAL
My commission expires � io
Form SW401-Wet Detention Basin O&M-Rev.3 Page 4 of 4
0
u
s
i
WiE.PHORSE N.Acklrit-110 ..
High Density Residential Subdivisions
Deed Restrictions & Protective Covenances
In accordance with Title 15 NCAC 2H.1000, the Stormwater Management Regulations, deed restrictions and
protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and
sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective
covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the
design criteria used to size the stormwater control facility.
I, TIMMY Pii RGc acknowledge, affirm and agree by my signature below, that I will
cause the following deed restrictions and covenants to be recorded prior to the sale of any lot:
1. The following covenants are intended to ensure ongoing compliance with State Stormwater
Management Permit Number as issued by the Division of Water Quality under
NCAC 2H.1000.
2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to
maintain compliance with the stormwater management permit.
3. These covenants are to run with the land and be binding on all persons and parties claiming under
them.
4. The covenants pertaining to stormwater may not be altered or rescinded without the express written
consent of the State of North Carolina, Division of Water Quality.
5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence
of the Division of Water Quality.
6. The maximum allowable built -upon area per lot is (ccs nEXrN square feet. This allotted amount
includes any built -upon area constructed within the lot property boundaries, and that portion of the
right-of-way bettaeen the front lot line and the edge of the pavement. Built upon area includes, but is not
limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does
not include raised, open wood decking, or the water surface of swimming pools.
OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the following:
6. The maximum built -upon area per lot, in square feet, is as listed below:
(,VI-ifhrM1C,V1-149 3y6e Sfl WPhi+h+u uPl•119 2SOo rFo WPT•NhrLL WPL 3,0 9500t{
This allotted amount includes any built -upon area constructed within the lot property boundaries, and
that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area
includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and
parking areas, but does not include raised, open wood decking, or the water surface of swimming
pools.
All runoff from the built -upon areas on the lot must drain into the permitted system. This may be
accomplished through a variety of means including roof drain gutters which drain to the street, grading
the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them
into a component of the stormwater collection system. Lots that will naturally drain into the system are
not required to provide these additional measures.
State of
a Notary Public in the
.! l
County of ,
do hereby certify that T1L.n v ? f%4111�, personally appeared
♦ the i 41 �i,� i) i / ! r�iT� 9 n , crib
before ma his day' of _0 and ack. o�aE _ e
the due execution of the foregoing instrument. Witness my hand and oggijcial seal,
K.
l6/jl i
Sioature
IllyIlly _ SSivii cxpficS
n�.�miiii
Form DRPC-3 Rev.I Page 1 of 1