Loading...
HomeMy WebLinkAboutSW6080601_CURRENT PERMIT_20080703STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW��l1(�h I DOC TYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 0 YYYYMM DD Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources July 3, 2008 Mr. Jimmy Pierce P.O. Box 2191 Surf City, North Carolina 28445 Subject: Stormwater Permit No. SW6080601 Wildhorse Plantation High Density Subdivision Wet Pond Project Harnett County Dear Mr. Pierce: Coleen H. Sullins, Director Division of Water Quality AUG 6 20 OENR- FAYEMLLE REGIONAL OFRGE The Stormwater Permitting Unit received a complete Stormwater Management Permit Application for Wildhorse Plantation on June 23, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2006-246. We are forwarding Permit No. SW6080601, dated July 3, 2008, for the construction of the subject project. This permit shall be effective from the date of issuance until July 2, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for inspection and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Mike Randall at (919) 733- 5083, extension 545; or lnike.randall@ncmail.net. Sincerely, \/ - y� for Coleen H. Sullins cc: Chris Rogers, Enoch Engineers, P.A. 1403 NC Hwy. 50 South, Benson, NC 27505 MF yygtteville-Regional-Office> . Central Files SPU Files North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-5083 Customer Service Internet: w .ncwaterauality.ore location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (919) 733-9612 1-877- 623-6748 N'Ne Caroli Natural/,. An Equal Opportunity/Affirmative Action Employer —50% Recycled/l0% Post Consumer Paper I Allqe , p u State Stormwater Permit Permit No. SW6080601 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Jimmy Pierce Wildhorse Plantation Buffalo Lakes Road, Spout Springs, Harnett County FOR THE construction, operation and maintenance of a two wet detention pond(s) in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until July 2, 2018 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 on page 2 of this permit. The subdivision is. permitted for 753 lots and 46 six -unit townhome buildings 3. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 4. The built -upon areas associated with this project shall be located at least 30 feet . landward of all perennial and intermittent surface waters. Page 1 of 8 State Stormwater Permit, Permit No. SW6080601 5. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. Drainage Area 1 Drainage Area 2 a. Drainage Area, ft2: 5,464,166 876,144 Onsite, ft2: -5,129,626 876,422 Offsite, ft2: 334,977 0 b. Total Impervious Surfaces, ft2: 2,064,302 311,984 On -site Buildings, ft2: 1,085,761 148,430 Streets, ft2: 623,762 109,145 Parking, ft2: 163,300 29,980 Other including Sidewalks, ft2: 191,479 14,429 Offsite, ft2: 0 0 c. Average Pond Design Depth, feet: 3.82 3.76 d. TSS removal efficiency:. 90% 90% e. Design Storm: 1 inch 1 inch f. Permanent Pool Elevation, FMSL: 338.00 320.00 g. Permitted Surface Area @PP, ft2: 126,439 21,925 h. Permanent Pool Volume, ft3: 483,561 82,402 i. Temporary Pool Elevation, FMSL: 343.00 325.00 j. Predevelopment 1 year 24 hour: 105.81 26.13 k. Post development 1 year 24 hour: 178.36 44.04 I. Controlling Orifice: 3" O pipe 1.25" 0 pipe m. Forebay Volume, ft3: 104,145 15,894 o. Maximum Fountain Horsepower: 3 HP 2 HP p. Receiving Stream / River Basin: Buffalo Creek, Cape Fear River Basin q. Stream Index Number: WS III 18-23-18 r. Classification of Water Body: WS III II. SCHEDULE OF COMPLIANCE No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is set up by the permittee to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 2 of 8 State Stormwater Permit Permit No. SW6080601 5. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 7. The permittee shall submit for approval, final site layout and grading plans for any permitted future development areas shown on the approved plans, prior to construction. 8. All stormwater. collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 9.. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 10. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received . from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. Page 3 of 8 State Stormwater Permit Permit No. SW6080601 13. Records of maintenance activities must be kept by the permittee. The records will indicate the date, activity, name of person performing the work and what actions were taken. 14. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 15. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 16. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW6080601, as issued by the Division of Water Quality under the stormwater rules. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons - and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools: g. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. h. Built -upon area in excess of the permitted amount will require a permit modification. 17. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 18. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. Page 4 of 8 11 State Stormwater Permit Permit No. SW6080601 19. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b: Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume and indicated in Section 1.5. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the Division of Water Quality, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such. as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Page 5 of 8 State Stormwater Permit Permit No. SW6080601 ✓ 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. Permit issued this the 3`d day of July, 2008. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Permit Permit No. SW6080601 Wildhorse Planation Harnett Countv Designer's Certification 1, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Permit Permit No. SW6080601" Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Harnett County Building Inspections Page 8 of 8 DWQ USE ONLY Date Recei ed Fee Paid Permit Number t0 `Z3 Soy — S W b(oo State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): 3. Mailing Address for person listed in item 2 above: City:Surf City State:NC Zip:28445 Phone: (910 1 328-5257 Fax: (910 ) 328-5452 Email:homecobuilders@earthlink.net 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Wildhorse Plantation 5. Location of Project (street address): City:(nnear)SSpout Springs County:Harnett 6. Directions to project (from nearest major intersection): 2 miles from the intersection of NC 87 South on Buffalo Lakes Road. 7. fatitude:35° 18' 5.37" N Longitude:79° 3' 13.6" W of project 8. Contact person who can answer questions about the project: Name:Chris Rimers Telephone Number: (919 ) 894-7765 Email:Chris@EnochEngineers.com IL PERMIT INFORMATION: 1. Specify whether project is (check one): S - ❑Renewal ❑Modification Form SWU-101 Version 03.27.08 Pagel of4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit numbern/a and its issue date (if known)n/a 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit ❑NPDES Stormwater III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be treated thorugh the use of BMP devices. The BMP devices are wet detention basins. 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Property Area: 293.98 acres 4. Total Wetlands Area:17.47 acres 5. 100' Wide Strip of Wetland Area:14.81 acres (not applicable if no wetlands exist on site) 6. Total Project Area**:154.08 acres 7. Project Built Upon Area:36.96 8. How many drainage areas does the project have?2 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For high density projects, complete the table with one drainage area for each engineered stormwater device. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Buffalo Creek Buffalo Creek Stream Class & Index No. WS III 18-23-18 WS 11118-23-18 Total Drainage Area (so 5,464,166 876,422 On -site Drainage Area (sf) 5,129,626 876,422 Off -site Drainage Area (so 334,977 0 Existing Impervious* Area (so 0 0 Proposed Impervious*Area (so 2,064,302 311,984 Impervious* Area (total) 37.78 35.60 Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (so 1,085,761 148,430 On -site Streets (so 623,762 109,145 On -site Parking (so 163,300 29,980 On -site Sidewalks (so 191,479 24,429 Other on -site (so 0 0 Off -site (so 0 0 Total (so: 2,064,302 311,994 * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. This is the area used to calculate percent project built upon area (BUA). Form SWU-101 Version 03.27.08 Page 2 of 10. How was the off -site impervious area listed above derived? IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htm - deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Forms can be downloaded from http://h2o.enr.state.nc.us/su/bml2 forms.htm. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401-Permeable Pavement Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement Form SWU-101 Version 03.27.08 Page 3 of VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi maos.htm) Please indicate that you have provided the following required information by initiating in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form (if required as per Part IV above) • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP • Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for LD) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management • Copy of any applicable soils report • Two copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/ project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VIL AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm):Joe E. Godwin Sr. or Enoch Engineers, P.A. Mailing Address:1403 NC Hwy. 50 South City:Benson Phone: (919 ) 894-7765 Email:ioeSr@EnochEn&eers.com VIII. APPLICANT'S CERTIFICATION . State:NC Zip:27504 Fax: (919 ) 894-8190 I, (print or type name of person listed in General Information, item 2) Iohn Pierce certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. _ Date: 5 — t' L/" 09 Form SWU-10i Version 03.27.08 Page 4 of ,t •.� � �. ,. Permit No. (to be provided by DWQ) o�pp W AT§9- ��n NCDENR � � STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This loan must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Project name Contact person Phone number Date Drainage area number Drainage area Impervious area % impervious Design rainfall depth Storage Volume: Non -SR Waters Minimum volume required Volume provided Storage Volume: SR Waters 1-yr, 24-hr runoff depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Basin Elevations Basin bottom elevation Sediment cleanout elevation Bottom of shelf elevation Permanent pool elevation SH WT elevation Top of shelf elevation Temporary pool elevation Jimmy Pierce 910-328-5257 5,464,166.00 ft3 2,064,302.00 It' 37.78 % 1.00 in 186,692.00 ft3 587,640.00 ft3 in ft3 ft3 ft3 ft3 3.06 in 0.35 (unitless) 0.59 (unitless) 2.41 in/hr 105.81 ft3/sec 178.36 ft3/sec 72.55 ft3/sec �xxxrn�a 334.00 It 337.50 ft 338.00 If 338.00 ft 338.50 If 343.00 It Form SW401-Wet Detention Basin-Rev.4 Parts I. d 11. Design Summary, Page 1 of 2 Permit (to be pmvided by DWQ) IL='DESION'1NFORMATION;,�+ '11' -" Volume and Surface Area Calculations SAIDAratio 2.00 (unitless) Surface area at the bottom of shelf 84,662.00 ft' Volume at the bottom of shelf 320,399A0 8' Permanent pool, surface area required 109,283.00 It' Permanent pool, surface area provided 126,439.00 fe OK Permanent pool volume 483,561.00 ft' Average depth for SAIDA tables 3.82 it OK Surface area at the top of shelf 105,203.00 fl Volume at the top of shelf 415,291.00 ft' Forebay volume 104,145.00 ft' Forebay %of permanent pool volume 21.54 % OK Temporary pool, surface area provided 133,931.00 ft' Drawdown Calculations Treatment volume drawdown time 2.50 days OK Treatment volume discharge rate 3.66 fl'/s Pre -development 1-yr, 24-hr discharge 105.81 fills OK Post -development 1-yr, 24-hrdischarge 3.66 fills OK Additional Information Diameter of orifice 3 in Design TSS removal 90 % Basin side slopes 3.00 A OK Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 It OK Length of flowpath to width ratio 7.00 :1 OK Length to width ratio 7.00 :1 OK Trash rack for overflow & office? y (Y or N) OK Freeboard provided 1.00 It OK Vegetated filter provided? n (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build -out? y (Y or N) OK Drain mechanism for maintenance or emergencies Basin Drain Form SW401-Wet Detention Basin-Rev.4 Pens I. & J. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST«. Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. ials Pagef Plan Sheet No. !Ar- m •z. smr-3� sme-se rmP-z s rinP-z Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planflng shelf, and Filter strip. 3. Section view of the dry detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 4tAd6/41DRAe6 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. SMP" 2 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. smp-t% 7. The supporting calculations. sfAW%4v A6E ARM 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. FPoLM 9. A copy of the deed restrictions (if required). oaM 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.4 Pan III. Required Items Checklist, Page 1 of 1 Permit Number: (to be provided by DWQ) Drainage Area Number: I Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — if the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How 1 will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.3 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: 1 BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.3 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number:_) BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged I Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads A: 2.25 / B: 2.625 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM ill in the blanks) vumnic A-341.50/B:341 0 -ft Min. Sediment Storage Permanent Pool Elevation 338 Permanent Pool Sediment Removal Elevation 334 Volume Bottom Elevation Storage FOREBAY MAIN POND Form S W401-Wet Detention Basin O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Wildhorse Plantation BMP drainage area number: Print Title:Owner Address:P.O. Box 2191, Surf City, NC 28445 Phone:910-328-5257 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 20J) �— U M A/-) , a Notary Public for the State of JypM) roxp),nP County of T I-yl Y-,-tm`l do hereby certify that � ,� t� U pj a y personally appeared before me this th day of , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SSTMIe *OTARY ils A4 My commission expires 61- 10 Form SW401-Wet Detention Basin O&M-Rev.3 Page 4 of l � 1 i� Y.. . gip: —-WILpHORS-E__PLANTAMON High Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000, the Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. I, jimmy plmc , acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number as issued by the Division of Water Quality under NCAC 2H.1000. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area perlotis (sec ncxT) square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the following: 6. The maximum built -upon area per lot, in square feet, is as listed below: Lot # BUA Lot # BUA Lot # BUA Lot # BUA evi-t+ti-vG,vi-tR9 $yc6sr;a►P1+V UWP1•119 apoJ{iwpyipru w�raoo lsoor{ This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required to provide these additional measures. Signature: Date: I, , a Notary Public in the V State of lil7GL County of do hereby certify that personally appeared before me this the ' t day of 20-01L, and acknowledge the due execution of th foregoing instrument. Wit ess my hand and 0 I seal, IL Si ature = *OTARk : My Commission expires O J oUg \L G c,;^ Form DRPC-3 Rev.l Page 1 of 1 m Permit No. (to be provided by DWQ) ® ?.F W^A TFH AWA NC ENR o STORMWATER MANAGEMENT PERMIT APPLICATION FORM `^ 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. 1..11PR0JECTjINFORMATION , Project name WILDHORSE PLANTATION Contact person Jimmy Pierce Phone number 910-328-5257 Date 5/142008 Drainage area number 2 I11DESIGNIINF,ORMATION Site Characteristics Drainage area 876,422.00 ftz Impervious area 311,984.00 ft3 % impervious 35.60 % Design rainfall depth 1.00 in Storage Volume: Non -SR Waters Minimum volume required 27,100.00 ft3 Volume provided 135,564.00 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.06 in Rational C, pre -development 0.35 (unitless) Rational C, post -development 0.59 (unifless) Rainfall intensity: 1-yr, 24-hrstorm 3.71 in/hr Pre-clevelopment 1-yr, 24-hr peak flow 26.13 ft3/sec Post -development 1-yr, 24-hr peak flow 44.04 ft3/seC Pre/Post 1-yr, 24-hr peak flow control 17.91 ft3/sec Basin Elevations Basin bottom elevation 315.00 8 Sediment cleanout elevation 316.00 If Bottom of shelf elevation 319.50 If Permanent pool elevation 320.00 It SHWT elevation 320.00 It Top of shelf elevation 320.50 it Temporary pool elevation 325.50 ft Form SW401-Wet Detention Basin-Rev.4 Parts 1.8 It. Design Summary, Page 1 Or 2 Permit (to be provided by II: �DESION(INFORMATION, Volume and Surface Area Calculations SA/DA ratio 2.00 (unitless) Surface area at the bottom of shelf 13,464.00 it' Volume at the bottom of shelf 59,370.00 it' Permanent pool, surface area required 17,600.00 W Permanent pool, surface area provided 21,925.00 ftz OK Permanent pool volume 82,402.00 ff' Average depth for SArDA tables 3.76 it OK Surface area at the lop of shelf 19,948.00 ft Volume at the top of shelf 151.092.00 fit' Forebay volume 15,894.00 it' Forebay % of permanent pool volume 19.29 % OK Temporary pool, surface area provided 30,854. 00 fe Drawdown Calculations Treatment volume drawdown time 2.00 days OK Treatment volume discharge rate 0.58 ft'IS Pre -development 1-yr, 24-hr discharge 26.13 ft'Is OK Post -development 1-yr, 24-hr discharge 0.58 ft'/s OK Additional Information Diameter of orifice 1.25 in Design TSS removal 90 % Basin side slopes 3.00 A OK Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 it OK Length of flowpath to width ratio 3.00 :1 OK Length to width ratio 3.00 :1 OK Trash rack for overflow & orifice? y (Y or N) OK Freeboard provided 1.00 it OK Vegetated filter provided? n (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build -out? y (Y or N) OK Drain mechanism for maintenance of emergencies pump out Form SW401-Wet Detention Basin-Rev.4 Pans I. & II. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) REQUIRED;' ITEM S'.CHECKLIST, '*"'ji'- Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. W-1 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. <'my-�4� 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: smP-s - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. jr&%P-"v 3. Section view of the dry detention basin (1" = 20' or larger) shovring: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. Sm� 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. Sni/tf mw 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verity volume provided. SaP- 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. M�� 7. The supporting calculations. .cwr/snR46 C- f:06? 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. i t 4 9. A copy of the deed restrictions (if required). Foot 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.4 Part III. Required Items Checklist, Page 1 of 1 Permit Number: (to be provided by DWQ) Drainage Area Number: 2 Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ®does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every stone event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.3 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: 2 BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the Swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.3 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: 1 BMP element: Potentialproblem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of damage have occurred at the Contact the local NC Division of Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.25 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM ill in the blanks) V Permanent Pool Elevation 320 323.75 Pe an Pool __ ____--______ Volume Sediment Removal Elevation316 323 -ft Min. Sediment Bottom Elevation 315 Storage FOREBAY MAIN POND mm Storage Form SW401-Wet Detention Basin O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Wildhorse Plantation BMP drainage area number: Print name:Jimmy Pierce Address:P.O. Box 2191, Surf City, NC 28445 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, 'C:2 , a Notary Public for the State of North iOxpIAP r ounty of k:k111 bfm do hereby certify that Irnal1. YI 6rCe, personally appeared before me this i' l' day of , 200`O and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, JISAL My commission expires � io Form SW401-Wet Detention Basin O&M-Rev.3 Page 4 of 4 0 u s i WiE.PHORSE N.Acklrit-110 .. High Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000, the Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. I, TIMMY Pii RGc acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number as issued by the Division of Water Quality under NCAC 2H.1000. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area per lot is (ccs nEXrN square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way bettaeen the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the following: 6. The maximum built -upon area per lot, in square feet, is as listed below: (,VI-ifhrM1C,V1-149 3y6e Sfl WPhi+h+u uPl•119 2SOo rFo WPT•NhrLL WPL 3,0 9500t{ This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required to provide these additional measures. State of a Notary Public in the .! l County of , do hereby certify that T1L.n v ? f%4111�, personally appeared ♦ the i 41 �i,� i) i / ! r�iT� 9 n , crib before ma his day' of _0 and ack. o�aE _ e the due execution of the foregoing instrument. Witness my hand and oggijcial seal, K. l6/jl i Sioature IllyIlly _ SSivii cxpficS n�.�miiii Form DRPC-3 Rev.I Page 1 of 1