Loading...
HomeMy WebLinkAboutSW5171002_CURRENT PERMIT_20171128STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW f��/(9D�, DOC TYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE`7l/ Q� YYYYMMDD IC Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY Donald R. Simpson Member/Manager Tripp Cottages Phase 2, LLC 503 Carthage Street Sanford, NC 27330 ROY COOPER MICIIAEL S. REGAN - .. ecrnLny TRACY DAVIS November 28, 2017 NC Dept of Environmental Quality Subject: Stormwater Permit No. SW5171002 Tripp Cottages Phase 2 Siler City, North Carolina in Chatham County Dear Mr. Simpson: FEB 2 3 2018 Raleigh Regional Office The Division of Energy, Mineral, and Land Resources (DELMR), received a complete Stormwater Management Permit Application for the subject project on October 12, 2017. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 rules. We are forwarding Permit No. SW5171002, for the construction, operation and maintenance of the subject project and the stormwater system. This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes. Per NCGS 143-215(e) the petition must be tiled with the OAH within thirty (30) days of receipt of this permit. You should contact the OAF1 with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. After 30 days, this project will be kept on file at the Raleigh Regional Office. Before then, if you have any questions, or need additional information concerning this matter; please contact Richard Riddle at (919) 807-6375; or rick.riddle@iicdenr.gov. Sincerely, 0°c9iral d,y" d 4 ,�icln�d .Cr. middle. /1t. for Tracy E. Davis, PE, CPM, Director cc: SW5171002 File, Raleigh Regional Office cc: Jeremy Thomas, J Thomas Engineering, Inc. State of North Carolina I Enviromnental Quality [ Energy, Mineral and land Resources 1612 Mail Service Center 1 512 North Salisbury Street I Raleigh, NC 27699- 16 12 919 707 9200 T State Stormwater Permit Permit No. SW5171002 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT QUALITY STATE STORMWATER MANAGEMENT PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Tripp Cottages Phase 2, LLC for Tripp Cottages Phase 2 W. Third Street (SR 1107), Siler City NC Chatham County FOR THE construction, operation and maintenance of the 2 Stormwater Control Measures (SCM) in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans, specifications and other supporting data as on file with and approved by the State and considered a part of this permit. This permit shall be effective from the date of issuance until November 28, 2025, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. The SCM is approved for the management of stormwater runoff as described in the application documents and as shown on the approved plans. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 4. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the SCM. 5. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. II. SCHEDULE OF COMPLIANCE During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The permittee shall at all time provide the operation and maintenance necessary to assure every SCM functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at Page 1 of 4 State Stormwater Permit Permit No. SW6171002 the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans. f. Debris removal and unclogging of all drainage structures, level spreader, filter media, planting media, underdrains, catch basins and piping. g. Access to the cell and outlet structure must be available at all times. 3. Records of maintenance activities must be kept for the SCM. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 4. The permittee shall submit an annual summary report of the maintenance and inspection records for the SCM. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection 5. The SCM shall be constructed in accordance with the approved plans and specifications, the conditions of this permit, and with other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the SCM certifying that it has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. SCMs impacted by sedimentation and erosion control during the construction phase shall be cleaned out and converted to its approved design state. 8. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of eight years from the date of the completion of construction. 10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes Page 2 of 4 State Stormwater Permit Permit No. SW5171002 have been made. 11. SCMs that allow stormwater to infiltrate shall not be located on or in areas with contaminated soils. 12. Plats for residential lots that contain SCMs shall include: the specific location of the SCM on the lot; a typical detail for SCM to be used; and a note that the SCM on the property has been required to meet stormwater regulations and that the property owner may be subject to enforcement procedures as set forth in G.S. 143, Article 21 if the SCM is removed, relocated, or altered without prior approval. 13. The O&M Agreement shall be referenced on the final plat and shall be recorded with the county Register of Deeds upon final plat approval. If no subdivision plat is recorded for the site, then the O&M Agreement shall be recorded with the county Register of Deeds so as to appear in the chain of title of all subsequent purchasers. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the State, accompanied by the supporting documentation. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the State, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Page 3 of 4 State Stormwater Permit Permit No. SW5171002 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006-246, Title 15A NCAC 21-1.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 28th day of November, 2017. for Tracy E. Davis, P.E., CPM Director Division of Energy, Mineral, and Land Resources Page 4 of 4 State Stormwater Permit Permit No. SW5171002 Tripp Cottages Phase 2 W. Third Street (SR 1107), Siler City, NC Chatham County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project Name) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL cc: NCDEQ-DEMLR Regional Office Page 1 of 1 _ Operation & Maintenance Agreement Project Name: Project Location: TRIPP COTTAGES PHASE 2 W. THIRD STREET, SILER CITY, NC records shall be kept on the following Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & corresponding O&M tables will Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level SpreaderNFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: 2 Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): CLICK TO UPDATE O&M MANUAL I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: DONALD R. SIMPSON, MEMBER/MANAGER TRIPP COTTAGES PHASE 2, LLC 503 CARTHAGE STREET SANFORD, NC 27330 919-774-6611 PERRYSIMPSON@SIMPSONANDSIMPSON.COM Signature:: &,, �av�— Date: �nt �6''1 [� I, l oyo 17e�1 a Notary Public for the State V County of do hearby certify that 1 lS gnald SI r)�son personally appeared before me this n day of (0cibb�� a O and acknowledge the due execution of the Ope ti ns and haain na Ze q ement . Witness m``Wr�d official seal, (/il�/�A�(fL/// NOTARY PUBLIC Seal STORM-EZ Version 1.4 My commission expires 3� Q 0- a6:p o O&M Manual 9/29/2017 Page 1 of 3 Bioretention Maintenance Reouirements Important operation and maintenance procedures: - Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. - Wheeled or tracked equipment will NEVER be driven over the bioretention planting surface. - Special care will be taken to prevent sediment from entering the bioretention cell. - If standing water is present 2 days after rainfall, conduct an infiltration test of the soil media. After the bioretention cell is established, inspect it quarterly. Inspection activities shall be performed as follows and maintenance activites shall commence immediately to remediate any problems observed per the table below. BMP element: Potential problem: How to remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil to remove the gully, and plant a ground cover and erosive gullies have formed. water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale to smooth it over and provide erosion control swale. devices such as reinforced turf matting or riprap to avoid future problems. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). The pretreatment area Flow is bypassing Regrade if necessary to route all flow to the pretreatment area. pretreatment area and/or Restabilize the area after grading. gullies have formed. Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than three possible. Remove the sediment and restabilize the pretreatment area. inches. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional practices. vegetation show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which can kill the tree if not removed). six months after planting. STORM-EZ 9/29/2017 Version 1.4 O&M Manual Page 2 of 3 I Bioretention Maintenance Requirements (continued) I BMP element: Potential problem: How to remediate the problem: The bioretention cell: Mulch is breaking down or Spot mulch if there are only random void areas. Replace whole mulch soils and mulch has floated away. layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging - remove and replace either just clogged with sediment. the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as recommended per the soil test and pH has dropped or heavy toxic soils shall be removed, disposed of properly and replaced with metals have accumulated in new planting media. the soil media. The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. STORM-EZ 9/29/2017 Version 1.4 O&M Manual Page 3 of 3