Loading...
HomeMy WebLinkAboutSW5100602_COMPLIANCE_20181002STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATEjlDpaj V YYYYMMDD R • ENGINEERING Designing the Future... Today! Monday October 111, 2018 Sue Homewood NCDEQ- Stormwater Engineering 585 Waughtown Street Winston Salem, NC 27107 RE: ABB Power T & D Co. Inc, Pinetops NC (Permit No. SW5100602) NC Department of Environmental Quality Received OCT 0 2 2018 Winston-Salem Regional Office Dear Mrs. Homewood: The owners of the ABB Power T & D Co. in Pinetops, NC would like to expand their existing facility with a new 32,000 SF building. The existing main building and parking consisted of 265,287 SF of impervious area and was completed prior to 1994. In 2010 there was an expansion of the facility and parking area that added 73,406 SF of impervious area. At that time a State Stormwater Permit was approved (Permit No. SW5100602) and a wet detention pond was built and designed to treat 250,795 SF of existing impervious area. However, only 73,406 SF of impervious from the building and parking addition was required to be treated. Therefore, an additional 177,389 SF of impervious was treated by the pond that had not yet been built or planned. The current proposed building shown in the attached plans is 32,000 SF and the proposed drive and parking will consist of 45,248 SF of impervious area. There is also an additional future expansion planned that will consist of 41,688 SF of impervious area. Currently the active stormwater permit lists the following impervious surfaces: Existing Permit Criteria Proposed Criteria Total Impervious Surfaces, ft2 250,795 250,795 Buildings, ft2 25,600 89,600 Roads/Parking, ft2 32,981 68,541 Other, ft2 192,214 92,654 Offsite, ft2 0 0 We would like to adjust these totals to match the proposed criteria to include the proposed and future development plans. Since the wet detention pond was designed and built to treat 177,389 SF of future impervious these changes will not increase the needed capacity of the wet pond. The proposed building and loading dock are designed to bypass the existing pond. The impervious area is being treated through the pond by treating pre-1994 impervious area. Copies of the proposed plan are attached. The overall site plan can be found on sheet CE-02 while the details of the changes in impervious area can be found on the cover sheet. RECEIVED Sincerely, Ethan Averette Stocks Engineering OCT 08 2018 DENR-LAND QUALITY STORWAIATER PERM11-fING t UtWED Li :PiR; f PLITY J. Michael Stocks, PE 252.459.8196 (voice) 801 East Washington St. 252.459.8197 (fax) PO Box 1108 252.903.6891 (mobile) Nashville, NC 27856 mstocksCcDstocksenoineerino.com Rear Expansion O vmwv Grading and Storm - Drainage Plan GRAPHIC SCALE / / 1 / I I � 4'42'00"E 595.64' eas I iI #A1l - — — - _--- / Pro. Water Quality Pond /See Sheet CE-10 for/details — — — — r / Forebay 9, r r LP -ram 1 �7 R Pr / r— I - i \s �I bFEf 990 9 gs I \ \ \ 10 %s%�VI L/ r/ //aa11111111 Eist'ng Industria Building FFE = 103.45'57/7 / p,A032608 c s 9':fticiNE��,° 4-30-2010 P U � � � 3 0 CL L. C IS a E Q I• Z LJ am a� a- m Q Z LN m f\, M W - .. SCA; 1- — 30' OA7 Nov. 20, 2009 REVISIONS D— 15. 2WP - APn 30. 2010 FILE-P0901C sRFF, E- 6