HomeMy WebLinkAboutSW5100602_COMPLIANCE_20181002STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW�
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATEjlDpaj
V
YYYYMMDD
R
•
ENGINEERING
Designing the Future... Today!
Monday October 111, 2018
Sue Homewood
NCDEQ- Stormwater Engineering
585 Waughtown Street
Winston Salem, NC 27107
RE: ABB Power T & D Co. Inc, Pinetops NC (Permit No. SW5100602)
NC Department of
Environmental Quality
Received
OCT 0 2 2018
Winston-Salem
Regional Office
Dear Mrs. Homewood:
The owners of the ABB Power T & D Co. in Pinetops, NC would like to expand their existing
facility with a new 32,000 SF building. The existing main building and parking consisted of 265,287
SF of impervious area and was completed prior to 1994. In 2010 there was an expansion of the
facility and parking area that added 73,406 SF of impervious area. At that time a State Stormwater
Permit was approved (Permit No. SW5100602) and a wet detention pond was built and designed to
treat 250,795 SF of existing impervious area. However, only 73,406 SF of impervious from the
building and parking addition was required to be treated. Therefore, an additional 177,389 SF of
impervious was treated by the pond that had not yet been built or planned.
The current proposed building shown in the attached plans is 32,000 SF and the proposed
drive and parking will consist of 45,248 SF of impervious area. There is also an additional future
expansion planned that will consist of 41,688 SF of impervious area. Currently the active
stormwater permit lists the following impervious surfaces:
Existing Permit Criteria
Proposed Criteria
Total Impervious Surfaces, ft2
250,795
250,795
Buildings, ft2
25,600
89,600
Roads/Parking, ft2
32,981
68,541
Other, ft2
192,214
92,654
Offsite, ft2
0
0
We would like to adjust these totals to match the proposed criteria to include the proposed
and future development plans. Since the wet detention pond was designed and built to treat
177,389 SF of future impervious these changes will not increase the needed capacity of the wet
pond.
The proposed building and loading dock are designed to bypass the existing pond. The
impervious area is being treated through the pond by treating pre-1994 impervious area.
Copies of the proposed plan are attached. The overall site plan can be found on sheet CE-02
while the details of the changes in impervious area can be found on the cover sheet.
RECEIVED
Sincerely,
Ethan Averette
Stocks Engineering
OCT 08 2018
DENR-LAND QUALITY
STORWAIATER PERM11-fING
t UtWED
Li :PiR; f PLITY
J. Michael Stocks, PE 252.459.8196 (voice)
801 East Washington St. 252.459.8197 (fax)
PO Box 1108 252.903.6891 (mobile)
Nashville, NC 27856 mstocksCcDstocksenoineerino.com
Rear Expansion
O vmwv
Grading and Storm
-
Drainage Plan
GRAPHIC SCALE
/
/ 1 /
I
I
� 4'42'00"E 595.64'
eas I iI
#A1l
- —
— - _---
/
Pro. Water Quality Pond
/See Sheet CE-10 for/details — — — —
r
/ Forebay 9, r
r LP
-ram
1 �7
R Pr
/
r—
I
-
i
\s �I bFEf 990
9
gs
I \ \ \ 10 %s%�VI
L/ r/ //aa11111111
Eist'ng Industria Building
FFE = 103.45'57/7
/
p,A032608 c
s 9':fticiNE��,°
4-30-2010
P
U
�
�
�
3
0
CL
L. C
IS a
E
Q I•
Z LJ
am
a�
a-
m Q
Z LN
m
f\,
M
W
- ..
SCA; 1- — 30'
OA7 Nov. 20, 2009
REVISIONS
D— 15. 2WP
-
APn 30. 2010
FILE-P0901C
sRFF,
E- 6