HomeMy WebLinkAboutSW4170401_HISTORICAL FILE_20170517STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW 4ZM(J) /
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE7%
YYYYM M D D
JAMESTOWN ENGINEERING GROUP, INC.
117 EAST MAIN STREET
JAMESTOWN, NC 27282
lac
Phone (336) 88"S23 Fax (336) 886-5478
TO R1 r—k QIMlP lll'.
nle?, nEc�
1671 Mad ?),ary 1p eenivr
L[EUTEQ OF VQQuVMOVUL
17
•rr.urro.
I heo
gPtIerve of Reg _h P Pi
0
hP
LeXILItan,
iddl
WE ARE SENDING YOU VAttached ❑ Under separate cover via the following items:
❑ Shop drawings ❑ Prints
❑ Copy of letter ❑ Change order
❑ Plans
❑ Samples ❑ Specifications
COPIES
DATE
NO.
DESCRIPTION
of
0 -
THESE ARE TRANSMITTED as checked below:
❑ For approval
For your use
As requested
❑ For review and comment
❑ FOR BIDS DUE
❑ Approved as submitted
❑ Approved as noted
❑ Returned for corrections
❑ Resubmit copies for approval
❑ Submit —copies for distribution
❑ Return —corrected prints
20 ❑ PRINTS RETURNED AFTER LOAN TO US
COPY TO
SIGNED: K I nh OlnvPr'l ei„o
It a.d.aur.. a.a . a..a.d. AI.dIv . Ify .. of onaa. I
AAr" inc.
March 31, 2017
JAMESTOWN ENGINEERING GROUP, INC.
CIVIL ENGINEERS & SURVEYORS
LAND PLANNING • MUNICIPAL CONSULTING
117 East Main Street • P.O. Rnz 365 • Jamestown, N.C. 27282
Telephone(336) 886-5523 Fax (336) 886-5478
www.jamestownengineering.com
Re: Stormwater Management Permit
The Reserve at Regents Center - Phase 2
Lexington, NC
JEG File No. 16-087
Mr. Mike Randall
Stormwater Permitting
Division of Energy, Mineral and Land Resources
NC Department of Environmental Quality
1612 Mail Service Center
Raleigh, NC 27699-1612
Dear Mr. Randall:
RECEIVE®
APR n a 2017
DENR-LAND QUALITY
STORMWATER PERMITTING
With regards to the referenced project, which will add four apartment buildings to the existing
development, we have enclosed the following for your review and approval:
- One original and one copy of the Application
- Supplemental Forms for each of the two BMP's
- Original 0&M agreements for each of the two BMP's
- 1 Application Fee ($505.00)
- Detailed Narrative
- USGS Map showing the site location
- Calculations
- Two sets of plans
- Soils report
- Deeds
- LLC Documentation
If there are any questions or additional information required, please call.
Sincerely,
JAMESTOWN ENGINEERING GROUP, INC.
1oI
homas R. (Rich) Glover, Jr., PE
Enclosures
Stormwater Treatment & Management Narrative
The Reserve at Regents Center Phase 2
March, 2017
The Reserve at Regents Center is an apartment complex that was constructed
around 2003. The complex is located on Regents Center Court in Lexington, NC.
At the time of the original development, no post -construction stormwater
controls were required. Since this time, the City of Lexington has adopted the
NPDES Phase II regulations.
Southwood Realty Company purchased the existing apartment complex in April
of 2015 as well as three undeveloped lots to the northeast of the complex in
March of 2017. Their plans are to add four additional apartment buildings as
indicated on the enclosed plans by Jamestown Engineering Group, Inc.
Construction of the new apartments will take place on high ground that has been
previously graded. No impacts to streams or wetlands will be necessary. An
erosion control plan has been filed with NCDEQ which indicates the measures
that shall be in place to help prevent any off -site sedimentation during the
construction activities. A copy of this plan is also included in this submittal.
Drainage from the existing apartment complex flows into a 42" storm drainage
trunk -line that also captures runoff from US Hwy 52. The 42" pipe discharges at
the base of a fill slope where the flow then travels across approximately 480' of
floodplain where it then flows into Swearing Creek (12-113 Class Q. Drainage
from the three undeveloped lots flow into a storm drainage system within the
right-of-way of Regents Center Court, which then also discharges into the flood
plain of Swearing Creek.
In order to treat the runoff from the new building that is being added to the
existing complex, the runoff will be routed through a bio-retention cell. The cell
will then discharge near the end of the existing 42" trunk -line. The runoff from
the three new buildings on the undeveloped lots will be also be treated with a
bio-retention cell. That cell will then discharge into the existing storm drainage
network within the Regents Center Court right-of-way.
Sediment basins and other erosion control devises will remain in place until site
stabilization has occurred. Once the site is stabilized, the erosion control devises
will be removed and the bio-retention cells will be installed.
Southwood Realty Company will continue to be the owner of these properties
following construction. As such, Southwood Realty Company will be responsible
for the on -going operations and maintenance of the stormwater control devises.
Get Maps topoVew
2009
;��y. He1rt`s
Sapona
Q I: 'spa
r Pines
110
https://ngmdb.usgs.gov/maps/topoview/viewer/# 14/35.7923/-80.2428
1
-------- 2010
Glenwood
Pinecrest \ J
l` N
1`\ 7
/' \
N `1
i
t a`�S
q Meadowviewy�
Lexington
medicale
".-Ic oS5 \ V/ / — r .
I of I
3/30/2017 11:12 AM
HYDRAULIC & EROSION
CONTROL CALCULATIONS
FOR
THE RESERVE AT REGENTS CENTER
PHASE 2
LEXINGTON, NC
PROJECT;
2016-087
MARCH 2O17
=O Q�0F[ssio9`.. y
/ AL
:. �7
elvCINI
JAMESTOWN ENGINEERING CROUP, INC.
117 EAST MAIN STREET P. 0. BOX 365
JAMESTOWN, NC 27282
(336) 886-5523
C — 0626
JAMESTOWN ENGINEERING GROUP. INC.
117 E. MAIN STREET
JAMESTOWN, NC 27282
DESIGN OF BIO-RETENTION CELL.
I. GENERAL
A. DESIGN CRI FERIA
DESIGN IS BASED UPON NCDFO STORMWATER GUIDELINES
6. SITE INFORMATION
THE PROPOSED SITE IS LOCATED WITHIN THE YADKIN PEE-DEE NON -WATER SUPPLY WATERSHED
GENERAL SITE DATA IS LISTED BELOW:
RESERVE
BID RETENTION
at
SITE AREA
3143
OFF -SITE AREA
0.00
TOTAL SITE AREA
33 43
OFF -SITE DRAINAGE AREA
0.87
SITE DRAINAGE AREA
131
DIVERTED AREA
0
DISTURBED AREA
4.2
A UNITS PROPOSED
0
IMPERVIOUS AREA
SF/UNIT
0
FUTURE ALLOWABLE ISA
0,00
STREETS. DRIVEWAYS 8 SIDEWALKS
2.63
TOTAL
2,63
%BUILT UPON (FOR SITE DRAINAGE
AREA)
50.77%
DWACRE (SITE)
0.00
C. DRY POND INFORMATION/REQUIREMENTS
VOLUME REQUIREMENTS OF SNIP 1
50.8% IMPERVIOUS
WATER QUALITY VOLUME
118 PERM BED STORAGE
112 TEMP SED STORAGE
WOV = PRvDA/12
1
1.0 x .22 x
.0 x 5,18 x
.0 x 4.20 x
FIRST 1 IN OF RUNOFF (HIGH DENSITY)
43560 = 9532 CF
3530 0 CF'
3630 0 CF'
D. METHOD OF ANALYSIS
INFLOW HYDROGRAPHS', SMALL WATERSHED METHOD
PEAK INFLOWS: RATIONAL METHOD
POND ROUTING: REGRESSION ANALYSIS FOR STAGE STORAGE RELATIONSHIP
II HMP Pi DESIGN
A. INFLOW HYDROGRAPHS
,1. PRE DEVELOPEMENT
OFF -SITE AREA 0.87 ACRES
(APT LOTS)
C=
i 0.70
ON -SITE AREA 4,31 ACRES
(UNIMPROVED)
C=
0.45
5,2 ACRES
C=
0A9
TIME OF CONCENTRATION
HYDRAULIC PATH VELOCITY LENGTH
TIME
SHEETFLOW 5 fps 267 if
534 sec
CHANNELFLOW 8.0 Ups if
sec
PIPE FLOW 14.0 fps 930 if
66 sec
600 sec
Tc= 10,0 min
PEAK FLOW O=CIA
I(1) = 2.9 inlhr
I(10) = 5,8 inlhr
ill00) = 8,0 iNhr
0(2)74 CFS
0(10)= 14.8 CFS
0(100)= 20.4 CFS
2. POST DEVELOPEMENT
OFF -SITE AREA
(APT LOTS) 0.87 ACRES
C=
070
ON SITE AREA 50.77% IMPERVIOUS
IMPERVIOUS 2.63 ACRES
C=
0.95
LAWN 1.68 ACRES
0.40
DIVERTED AREA 0.00 ACRES
0.8
SITE DRAINAGE AREA AVERAGE
074
COMPOSITE 5.2 ACRES
C=
0.73
TIME OF CONCENTRATION
HYDRAULIC PATH VELOCITY LENGTH
TIME
SHEETFLOW .5 fps 267 if
534 sec
CHANNEL FLOW 8.0 fps If
sec
PIPE FLOW 14.0 fps 930 If
Be sec
600 sec
Tc = 10.0 in
10 YEAR EVENT INTENSITY
PEAK FLOW 0 = CIA
FROM TABLE
10 MIN 5.78
m1hr
I(D ° 2.9 min,
30 MIN 3.56
inlhr
1(10). 5.8 inlhr
120 MIN 1.30
inlhr
I(100)= 6.0 inlhr
6HR 0.58
inlhr
(FROM ROAR)
12 HE 0.35
inlhr
(FROM NOAA)
0(1)= 10.8 CFS
0(10)= 21.9 CFS
1-YEAR EVEN T INTENSITY
0(100) = 30.2 CFS
24 HE 0.119
inlhr
(FROM NOAA)
100 YEAR EVENT' INTENSITY
10 MIN 8.03
m1hr
6HR 0.83
in/hr
(FROM NOAA)
DEPTH OF RUNOFF
PEAK FLOW
RUNOFF 0'
TIME TO PEAK
24 HR 1 YEAR PRECIPATION (P) _ 05 in
045 CPS
.03 in
13 min
10 MIN 10-YEAR PRECIPATON (P) = .96 in
21.9 CFS
.33 m
3 min
30 MIN 10-YEAR PRECIPATION (P) = 1.78 in
13.4 CFS
97 in
16 min
120 MIN 10-YEAR PRECIPATION (P) = 2.61 in
4.9 CFS
171 in
78 min
6HR 10 YEAR PRECIPATION (P) = 3.48 in
2.2 CFS
2.52 in
259 min
12 HR 10-YEAR PRECIPATION (P) = 4.20 in
1.3 CFS
321 in
547 min
10 MIN 100-YEAR PRECIPATION (P) = 1.34 m
30.3 CFS
61 in
5 min
6HR 100 YEAR PRECIPATION (P) = 4.98 in
3.1 CFS
3.90 in
285 min
CN=
91
S = (1000/CN) 10 =
99 in
RUNOFF DEPT HID-) = (P.0.2 x S)^2KP10.8 x S)
TIME TO PEAK = RUNOFF VOLUME/(1.39 x Op)
B. ES'TIMATE STORAGE
1. S=10(PasO.O Pm)) - TP
S= 2766 CF
I:+gl(I', Tal
Itl = DURATION (i I
R
q h
2
127 19
5
101 21
10
185 22
25
220 23
50
246 24
100
213 24
Char-Meck Bioretention Design Guidance (Hahne, 2004)
note: this is provided for you to see an alternative sizing guideline
WATER QUALITY VOLUME (WQv)
Rv = runoff coefficient (Runoff/Rainfall)
Rv = 0.05 + 0.009( 1 ) Where "I" _ % Impervious
("Simple Method" - Schueler, 1987)
NCDENR April 1999 .
WQv = -1.0" 12
Fill in Values:
q"A"
"I" =
=
50.8
r
Percent Impervious of Site
5.19
Acres
Answer:
WQv =
0.219 ]Ac. Ft.
9555 Cubic Feet Required
BIORETENTION AREA
Formula:
Af = (WQv)(Df)
Where:
((k) (Hf+Df) (Tf))
Af = Surface area of Rain Garden (S.F.)
From Georgia Design Manual
WQv = Water Quality Volume to be Captured
Section 3.2.3.E
Df = Filter Bed Depth (2 feet minimum)
(Based on Darcy's Law)
k = permeability coefficient of filter media
(use 1.0 ft/day for sandy -loam)
Hf = Average height of water above filter bed
(use 6 inches, which is half of 12" ponding depth)
Tf = Design filter bed drain time in days
(2 Days or 48 hours )
Fill in Values
N" =
Df =
Hf =
Tf =
1
ft./day (1/2"/Hour)
Feet
inches
Days
2
6
2
Answer
Af Square Feet Required
For Bioretention
44 Width Approximate Size
87 Length ip i = r
Permit Number:
rid be provided by DWQ)
AMA
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
BIORETENTION CELL SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information
I IUN
rrolect name
Contact name
Phone number
Date
Drainage area number
The Reserve at Regents Center Phase 2
Thomas R. (Rich) Glover, Jr., PE
March 21, 2017
II. DESIGN INFORMATION
1
Site Characteristics
Drainage area
225,976 u2
Impervious area
114,718 fit
Percent impervious
50,8% %
Design rainfall depth
1.0 inch
Peak Flow Calculations
Is pre/post control of the 1-yr, 24-hr peak flow required?
_y(Y or N)
1-yr, 24-hr runoff depth
2,86 in
1 -yr, 24-hr intensity
__ ____
0,119 in/hr
Pre -development 1-yr, 24-hr peak flow
8.500 ft'/sec
Post -development 1-yr, 24-hr peak flow
13.200 ft'Isec
Pre/Post 1-yr, 24-hr peak control
4,700 ft'/sec
Storage Volume: Non -SA Waters
Minimum volume required
9,555.0 If'
Volume provided
9,607.8 fit
OK
Storage Volume: SA Waters
1 S" runoff volume
ft3
Pre -development 1-yr, 24-hr runoff
it
Post -development 1-yr, 24-hr runoff
ft'
Minimum volume required
0 It,
Volume provided
_—ftJ
Cell Dimensions
Pending depth of water
12 inches
OK '
Ponding depth of water
_
If
Surface area of the top of the biorelention cell
_1,00
4,664.0 ft'
OK
Length:
88 it
OK
Width:
_
53 If
OK
-or- Radius
_
It
Media and Soils Summary
Drawdown time, pointed volume
12 hr
OK
Drawdown time, to 24 inches below surface
_
12 hr
OK
Drawdown time, total,
_
24 m
In -situ soil:
--
Soil permeability
0.2.0 in/hr
Insufficient. Increase infiltration rate or include underdrains.
Planting media soil
Soil permeability
0.52 in/hr
OK
Soil composition
% Sand (by volume)
85%
OK
% Fines (by volume)
1.0%
OK
% Organic (by volume)
_
5%
OK
Total: 100%
Phosphorus Index (P-Index) of media
_ 30 (unitless)
OK
Form SW401-Bioretenti0n-Rev.8
June 25, 2010
Parts I and 11. Design Summary, Page I of 2
Permit Number'
(to be provided by UWQ)
Basin Elevations
Temporary pool elevation
669,81 fmsl
' Type of bioretenlion cell (answer "Y" to only one of the Iwo
following questions):
Is this a grassed cell? -_-Y
_(Y or N)
ON
Is this a cell with trees/shrubs?
n
(Y or N)
Planting elevation (top of the mulch or grass sod layer)
_
668.81 fri
Depth of mulch
0 inches
Insufficient mulch depth, unless installing grassed cell.
Bottom of the planting media soil
_
666.81 fmsl
Planting media depth
X ft
Depth of washed sand below planting media soil
0.33 ft
Are underdrains being installed?
y
(Y or N)
How many clean out pipes are being installed?
9
OK
What factor of safety is used for sizing the underdrains? (See
BMP Manual Section 12.3.6)
4
OK
Additional distance between the bottom of the planting media and
the bottom of the cell to account for underdrains
1 ft
Bottom of the cell required
668,48 fmsl
SHWT elevation
661 fmsl
Distance from bottom to SHWT
1.48 If
OK
Internal Water Storage Zone (IWS)
Does the design include IWS
in
(Y or N)
Elevation of the top of the upturned elbow
0 fmsl
Separation of IWS and Surface
_
668.81 it
ON
Planting Plan
Number of tree species
0
Number of shrub species
Number of herbaceous groundcover species
Additional Information
Does volume in excess of the design volume bypass the
biorelention cell?
Y
N or
(Y )
ON
Does volume in excess of the design volume flow evenly distributed
through a vegetated filter?
Y
N Y or
( )
OK
What is the length of the vegetated filter?
It
Does the design use a level spreader to evenly distribute flow?
N
(Y or N)
Show how flow is evenly distributed,
Is the BMP located at least 30 feet from surface waters (50 feet if
SA waters)?
Y
(Y or N)
OK
Is the BMP located al least 100 feet from water supply wells?
Y
(Y or N)
OK
Are the vegetated side slopes equal to or less than 3:1?
Y
(Y or N)
OK
Is the BMP located in a proposed drainage easement with access
to a public Right of Way (ROW)?
Y
(Y or N)
OK
Inlet velocityfrom
( treatments system)
9,1 ft/sec
Insufficient inlet velocity unless energy dissipating devices arc
being used.
Is the area surrounding the cell likely to undergo development in
__
the future?
N
Y or N
( )
OK
Are the slopes draining to the bioretention cell greater than 20%?
N
(Y or N)
OK
Is the drainage area permanently stabilized?
Y
(Y or N)
ON
Pretreatment Used
_
(Indicate Type Used with an "X" in the shaded cell)
Gravel and grass
(8'inches gravel followed by 3-5 It of grass)
Grassed swale
ON
Forefeet,
X
Other
--
Form SW401-aioretauron-Rev.e
June 25. 2010 Pans I and II. Design Summary, Page 9 of 2
JAMESTOWN ENGINEERING GROUP, INC.
117 E. MAIN STREET
JAMES I OWN, NC 27282-
DESIGN OF 610-RETEN TION CELL
I. GENERAL
A. DESIGN CRITERIA
DESIGN IS RASED UPON NCDED STORMWATER GUIDELINES
B. SITE INFORMATION
THE PROPOSED SITE IS LOCATED WITHIN THE YADKIN PEE-DEE NON WATER SUPPLY WATERSHED
GENERAL SITE DATA IS LISTED BELOW:
RESERVE
RIO RETENTION
Y2
SITE AREA
33,43
OFFSITEAREA
0,00
TOTAL SITE AREA
3:343
OFF -SITE DRAINAGE AREA
0.00
SITE DRAINAGE AREA
13
DIVERTED AREA
0
DISTURBED AREA
1.3
IX UNITS PROPOSED
0
IMPERVIOUS AREA
SF/UNIT
0
FUTURE ALLOWABLE ISA
0.00
STREETS, DRIVEWAYS 8 SIDEWALKS
().90
TOTAL
0.90
%BUILT UPON (FOR SITE DRAINAGE
AREA)
69.23 %
DU/ACRE (SITE)
0,00
C. DRY POND INFORMATION/REQUIREMENTS
VOLUME REQUIREMENTS OF DMP 1 WOV - PRvDAII2
69,2% IMPERVIOUS I FIRST 1 IN OF RUNOFF (HIGH DENSITY)
WA I ER DUALITY VOLUME 1.0 x 07 x 43560 - 3176 CF'
1/0 PERM SED STORAGE ,0 x 1.30 x 3630 = 0 CT
1/2 TEMP SED STORAGE .0 x 1.30 x 3630 0 CF
0. METHOD OF ANALYSIS
INFLOW HYDROGRAPHS: SMALL WATERSHED METHOD
PEAK INFLOWS: RATIONAL METHOD
POND ROUTING: REGRESSION ANALYSIS FOR STAGE STORAGE RELATIONSHIP
II IMP Y2 DESIGN
A. INFLOW HYDROGRAPHS
1. PRE-DEVELOPEMENT
OFF SITE AREA 0,00 ACRES
' (APT LOTS)
C=
0.70
ON -SITE AREA 1,30 ACRES
(UNIMPROVED)
C=
O45
1.3 ACRES
C=
045
TIME OF CONCENTRATION
HYDRAULIC PATH VELOCITY LENGTH
TIME
SHEET FLOW .5 fps 267 II
534 sec
CHANNELFLOW 8.0 fps II
sec
PIPE FLOW 14.0 fps 930 It
66 sec
600 sec
Tic = 10.0 min
PEAK FLOW 0 = CIA
I(1)= 2.9In/hr
I(10)= 5,8 inmr
I(100) = 0.0 inlhr
0(2)= 17 CFS
000)= 3.4 CFS
0(100)= 47 CFS
2. POST-DEVELOPEMENT
OFF -SITE AREA
(APT LOTS) 0 ACRES
C=
0.70
ON -SITE AREA 69.23% IMPERVIOUS
IMPERVIOUS 0,90 ACRES
C=
0.95
. LAWN 0,40 ACRES
040
DIVERTED AREA 0,00 ACRES
0.8
SITE DRAINAGE_ AREA AVERAGE
038
COMPOSITE 1 3 ACRES
C=
0.18
TIME OF CONCENTRATION
HYDRAULIC PATH VELOCITY LENGTH
TIME
SHEET FLOW 5 fps 267 II
534 sec
CHANNELFLOW 8.0 fps 11
sec
PIPE FLOW 14.0 fps 930 it
66 sec
600 sec
Tic = 10.0 min
10-YEAR EVENT INTENSITY
PEAK FLOW 0=CIA
FROM TABLE
10 MIN 578
in/hr
I(1) = 29 Inlhr
30 MIN 3.56
on,
1(10)= 5.8 m/h/
120 MIN 1.30
inlhr
(100). 8.0 111
5 HR 0.58
in/nr
(FROM NOAA)
12 HR 0.35
in/hr
(PROM NOAA)
0(1)= 2.9 CFS
0(10)= 5.9 CFS
1 YEAR EVEN r INTENSITY
0(100)= 8,1 CFS
24 HR 0,119
inlhr
(FROM NOAA)
100-YEAR EVENT INTENSITY
10 MIN 8.03
inlhr
SHIP 0.83
in/hr
(FROM NOAA)
DEPTH OF RUNOFF
PEAK FLOW
RUNOFF O'
TIME TO PEAK
24 HR 1-YEAR PRECIPATION (P) _ 051n
0.12 CFS
03 in
13 min
10 MIN 10-YEAR PRECIPATION (P) = .96 in
5.9 CFS
.33 in
3min
30 MIN 10-YEAR PRECIPATION (P) = 1.78 in
3.6 CFS
.97 in
15 min
120 MIN 10-YEAR PRECIPATION (P)= 2.61 In
1.3 CFS
1,71 in
73 min
6 HR 10-YEAR PRECIPATION (P) = 3.48 in
0.0 CFS
2.52 in
242 min
12 HR 10 YEAR PRECIPATION (P) = 4.20 in
0.4 CFS
3.21 in
511 min
10 MIN 100-YEAR PRECIPATION (P) = 1.34 in
8.1 CFS
.61 in
4 min
6 HR 100-YEAR PRECIPATION (P) = 4.98 in
0.8 CFS
3.96 in
266 min
CN =
91
S = (1000/CN).10 =
99 in
RUNOFF DEPTH(0-) _ F 0.2 x S)A2/(P+0.8 x S)
TIME TO PEAK = RUNOFF VOLUMEI(1.39 x Op)
B. ESTIMATE STORAGE
1. S = (0F=) O(Pre)) - Tp
S. 912 CF
I •; g : (li - Te)
Tu = DURATION (MIN,)
R
9 p.
2
127 19
5
161 )1
10
185 22
25
220 23
50
240 2
100
2'/3 24
Char-Meck Bioretention Design Guidance (Hahne, 2004)
note: this is provided for you to see an alternative sizing guideline
WATER QUALITY VOLUME (WQv)
Rv = runoff coefficient (Runoff/Rainfall)
Rv = 0.05 + 0.009( 1 ) Where "I" _ % Impervious
("Simple Method" - Schueler, 1987)
NCDENR April 1999
WQv = 1.0"RVA
12
Fill in Values:
Z
"I" =
"A"
69.6 Percent Impervious of Site
=
1.3
Acres
Answer:
WQv =
0.0" Ac. Ft.
3192 Cubic Feet Required
RAIN GARDEN AREA?
Formula:
Af = (WQv) IDf)
Where:
((k) (Hf+Df) (TO)
Af = Surface area of Rain Garden (S.F.)
From Georgia Design Manual
WQv = Water Quality Volume to be Captured
Section 3.2.3.6
Df = Filter Bed Depth (2 feet minimum)
(Based on Darcy's Law)
k = permeability coefficient of filter media
(use 1.0 ft/day for sandy -loam)
Hf = Average height of water above filter bed
(use 3 inches, which is half of 6" ponding depth)
Tf = Design filter bed drain time in days
(2 Days or 48 hours )
Fill in Values:
"k" _ F--l�ft./day (1/2"/Hour)
Df = 3 Feet
Hf =
6
inches
Tf =
2
Days
Answer:
Af = 1368 Square Feet Required
For Rain Garden
26 Width Approximate Size
52 Length rrI]
Permit Number:_
(to be provided by 0 WO)
® A
NCDENR
e rvnr
STORMWATER MANAGEMENTPERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
BIORETENTION CELL SUPPLEMENT
This form most be filled out, printed and submitted.
The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information.
Project name
Contact name
Phone number
Date
Drainage area number
The Reserve at Regents Center Phase 2
Thomas R, (Rich) Glover, Jr., PE
(336)886-5523 March 21, 20 1 _
II. DESIGN INFORMATION
- 1
Site Characteristics
---------
Drainage area
56,628 ft'
Impervious area
39A19 f12
Percent impervious
69,6%
Design rainfall depth
_%
1.0 inch
Peak Flow Calculations
Is pre/post control of the 1-yr, 24-hr peak flow required?
y or N)
1-yr, 24-hr runoff depth
_(Y
2.86 in
1-yr, 24-hr intensity
0.119 in/hr
Pre -development 1-yr, 24-hr peak flow
1.860 p'/sec
Post -development 1-yr, 24-hr peak flow
2,940 fl'/sec
Pre/Post 1-yr, 24-hr peak control
1.080 ft'/sec
Storage Volume: Non -SA Waters
Minimum volume required
3,192.0 ft'
Volume provided
3,230,1It' OK
Storage Volume: SA Waters
1.5" runoff volume
it3
Pre -development 1-yr, 24-hr runoff
it
Post -development 1-yr, 24-hr runoff
ft3
Minimum volume required
0 it,
Volume provided
_
—ft 3
Cell Dimensions
Ponding depth of water
12 inches OK
Pending depth of water
1.00 it
Surface area of the top of the bioretention cell
1,568.0 it' OK
Length:
56 it OK
Width:
28 ft OK
-or- Radius
If
Media and Soils Summary
Drawdown time, derided volume
12 hr
OK
Drawdown time, to 24 inches below surface
_
12 hr
OK
Drawdown time, total:
24 hr
In -situ soil,
--
Soil permeability
0,20 in/hr
Insufficient. Increase infiltration rate or include underdrains.
Planting media soil.
--
Soil permeability
0.52 in/hr
OK ,
Soil composition
• Sand (by volume)
OK
• Fines (by volume)
_85%
16%
OK
• Organic (by volume)-
5)o
OK
Total: 100%
Phosphorus Index (P-Index) of media
30 (unitless)
OK
Form SW401-aioretention-ReV.B
June 25, 2010
Parts I and II. Design Summary, Pigo I of 2
Permit
(to be prov,ded by OWO)
Basin' Elevations
Temporaly pool elevation
Type of bioretention cell (answer "Y" to only one of the two
following questions):
Is this a grassed cell?
Is this a cell with trees/shrubs?
Planting elevation (top of the mulch or grass sod layer)
Depth of mulch
Bottom of the planting media soil
Planting media depth
Depth of washed sand below planting media soil
Are underdrains being installed?
How many clean out pipes are being installed?
What factor of safety is used for sizing the underdrains? (See
BMP Manual Section 12.3.6)
Additional distance between the bottom of the planting media and
the bottom of the cell to account for underdrains
Bottom of the cell required
SHINT elevation
Distance from bottom to SHWT
Internal Water Storage Zone (IWS)
Does the design include IWS
Elevation of the top of the upturned elbow
Separation of IWS and Sudace
Planting Plan
Number of tree species
Number of shrub species
Number of herbaceous groundcover species
Additional Information
Does volume in excess of the design volume bypass the
bioretention cell?
Does volume in excess of the design volume flow evenly distributed
through a vegetated filter?
What is the length of the vegetated filter?
663,11 fmsl
y (Y or N) OK
in (Y or N)
662.11 fmsl
0 inches Insufficient mulch depth, unless installing grassed cell.
660.11 fmsl
2 it
0,33 it
y (Y or N)
2 OK
4 OK
1 it
658.78 fmsl
656 fmsl
278 it OK
n (Y or N)
0 fmsl
662.11 it OK
0
0
Y (Y or N) OK
Y (Y or N) OK
if
DoesDoes the design use a level spreader to evenly distribute flow? N (Y or N) Show how flow is evenly distributed
Is the BMP located at least 30 feel from sunface waters (50 feet if
SA waters)?
Y (Y or N) OK
Is the BMP located at least 100 feet from water supply wells? _
Y (Y or N) ON
Are the vegetated side slopes equal to or less than 3:1?
_
Y (Y or N) OK
Is the BMP located in a proposed drainage easement with access
to a public Right of Way (ROW)?
Y (Y or Nf OK
Inlet velocity (from treatment system)
Is the area surrounding the cell likely to undergo development in
the future?
Are the slopes draining to the bioretention cell greater than 20%1
Is the drainage area permanently stabilized?
Pretreatment Used
(Indicate Type Used with an X' in the shaded cell)
Gravel and grass
(8'inches gravel followed by 3-5 ft of grass)
Grassed swale
Forebay
Other
7 fllsec Insufficient inlet velocity unless energy dissipating devices are
being used.
N (Y or N) OK
N . (Y or N) OK
Y (YorN) OK
X
OK
Form SW401-BI0retentlon-Rev.8
June 25, 2010 Parts I and II. Design Summary, Page � of 2
TOP
INV
INV
AREA
OIC=CIA
QIO(mwl)
PIPE
I E.CN 'I
G 1
STRLC`. UR-
'1
YI 15
671 00
668.97
FES 1J9
668.81
0.12
03
0.80
10
5.S
0.6
1.5
12
1600
10.11.
HDPE
2.03
i
CI 12
675,76
672.46
CI II
671,87
0,94
0.9
030
10
5,8
3.8
3.8
15
1 59,00
1.00%
RCP
3.3C
CI 11
67507
67 L67
CI 10
670,78
0.28
1.2
090
10
5.3
1.5
5.3
15
89.24
1.00%
RCP
340
Cl 13
675.04
671.38
CI i0
670.78
0.37
04
0.70
10
5.S
1.5
1.5
15
5997
1.00%
RCP
i66
CI 10
674,18
670.53
C13
669.78
0.19
1.8
090
10
5.8
1.0
T3
18
93.59
OSO%
HDPE
365
Ci9
677.93
674,22
C17
673.07
097
LO
0.70
10
5.8
3.9
3.9
15
11498
1.00%
RCP
3.61
C17
676,27
672.87
C16
67223
038
1.4
0.80
10
5.8
1.8
5.7
15
63?9
1.01%
RCP
3?0
C16
67598
67198
Y15
671.66
0,75
2.1
O.SO
10
5.3
3.5
9.2
18
3953
0.81%
HDPE
3.90
Y15
675.36
671?6
Cl3
669.73
0.35
2.5
0.80
10
5.8
1.6
10.8
18
209,61
0.80%
HDPE
390
C13
6T36
669.53
CI
669.16
0.24
4.5
0,90
!0
5.8
1.3
19.8
24
62.00
0.60%
RCP
3.83
Ci2
67336
668.96
FESI
668.81
1 040
49
0.80
i0
5.8
19
21.7
24
2500
0.60%
HDPE
440
4.87
21.7
YI 21
1 668.20
665.71
YI 20
66429
0,13
0.1
070
10
5.3
0.5
OS
12
78.701
1.80%
HDPE
2?9
20
.
66665
66409
Ci 19
663.86
0.15
0.3
0.70
10
5.8
0.6
1.1
12
2Y1
1..00%
HDPE
256
19
667.95
663.66
CI 18
662.53
0.09
0A
090
.
10
5.8
05
1.6
IS
.
319
1.00%
429Cl2
66645
66.
CI IS
662.
4
0.5
0.80
IC
.
SS
2.I
2.1
15
62C
1.00%C
RCP
3,30
CI IS
666,45
662.33
FES 17
66111
32
1.1
0.90
4
HDPE
4,12
YI 24
66490
662.33
FES 23
662.! I
0.16
0.2
0.90
10
5.8
0.8
0.8
12
2200
1,00%
HDPE
2.37
G:\2004\2004012\S10rmca Ics. xis
3/30/2017
0< ARS
Circular Channel Analysis s Design
Solved with Manning's Equation
Open Channel - uniform flow
Worksheet Name: RESERVE BID N1
Comment: INLET FES 1
Solve For Actual Depth
Given Input Data:
Diameter..........
Slope .............
Manning's n.......
Discharge.........
Computed Results:
Depth .............
Velocity..........
Flow Area.........
Critical Depth....
Percent Full......
Full Capacity.....
OMAX @.94D........
F'roude Number.....
2.00 ft
0.0060 ft/ft
0.009
21.70 cfs
1.43
ft
9.06
fps
2.40
sf
1.6"!
ft
71.30
S
25.31
cfs
27.23
cfs
1.39 (flow is Supercriti.cal)
Open Channel Flow Module, Version 2.01 (c) 1990
Haestad Methods, Inc. ' 37 Brookside Rd ' Waterbury, Ct 06708
Circular Channel Analysis 6 Design
Solved with Manning's Equation
Open Channel - Uniform flow
Worksheet Name: RESERVE BIC 02
Comment: INLET FES 17
Solve For Actual Depth
Given Input Data:
Diameter..........
Slope .............
Manning's n... ....
Discharge.........
Computed Results:
Depth .............
Velocity..........
Flow Area.........
Critical. Depth....
Percent Full ......
Full Capacity.....
QMAX @.94D........
Froude Number......
1.25 ft
0.0090 ft/ft
0,010
5.40 cfs
0.75
ft
6.98
fps
0.71
sf
0.91
ft
60.35
6
7.97
cfs
8.51
cfs
1.55 (flow is Supercritical)
Open Channel Flow Module, Version 2.01 (c) 1990
laestad Methods, Inc. ' 37 Brookside Rd ' Waterbury, CL 06708
RESERVE AT REGENTS CENTER
SUPPLEMENTARY BIO-CELL CLACULATIONS
BIO-CELL 41
FLOW
21.7
CFS
INLET VELOCITY
9.1
FPS
PLUNGE POOL
1.0
FT
WEIR LENGTH
36
FT
WEIR HEAD
0.34
FT
OVERFLOW VELOCITY
2.6
FPS
BIO-CELL 42
NEED < 4.0 (FOR SOD)
h= (VA 2/2g)
Q=CwLFIA(1.5)
V=Cw(1.83 7) (S QRT(.667 H) )
FLOW
5.4
CFS
INLET VELOCITY
7.0
FPS
NEED < 4.0 (FOR SOD)
PLUNGE POOL
0.6
FT
h=(02/2g)
WEIR LENGTH
24
FT
WEIR HEAD
0.18
FT
Q=CwLHA(1.5)
OVERFLOW VELOCITY
1.9
FPS
V=Cw(1.837)(SQRT(.667H))
VOID RATIO RANGE
AVG.
%VOIDS
%COMP.
REL. DEPTH
VOID DEP'[11
0.3-0.6
0.45
31%
GRAVEL 100%
0.67
FT
0.21
FT
0,29-0.74
0.52
34%
WASHED SAND 100%
0.33
FT
0.17
1:'1'
0.30-0:75
0.53
35%
SAND 86%
1.7
FT
0.60
FT
0.261.28
0.77
44%
FINES 10%
0.2
FT
0.09
FT
0.74-2.23
1.5
60%
ORGANICS 4%
0.1
FT
0.05
F'1"
1.05
F'1'
MEDIA DEPTH
2.0
FT
WASHED SAND DEPTH
4.0
IN
GRAVEL DEPTH
8.0
IN
SKIMMER SEDIMENT
BASIN #1
SKIMMER SEDIMENT
BASIN #2
C (UNDISTURBED AREA)
0.40
0.40
C (DISTURBED AREA)
0.50
0.50
1-10
5.8
in/hr
5.8
in/hr
TOTAL AREA
5.70
ac
1.70
ac
DISTURBED AREA
3.60
ac
1.70
ac
Q(10)
Q=CIA
15.31
cfs
4.93
cfs
REQUIRED VOLUME
V=1800 x DIST. AREA
6480
cf
3060
cf
REQUIRES SURFACE AREA
SA=325*(Qlo)
4976
sf
1602
sf
DEPTH
2
ft
2
ft
TOP POND DIMENSIONS (W x L)
58 ft x 88
ft
29 ft x 58
ft
BOTTOM POND DIMENSIONS (W x L)
50 ft x 80
ft
21 ft x 50
ft
VOLUME PROVIDED
9104
cf
2732
cf
SURFACE AREA PROVIDED
5104
sf
1682
sf
AVERAGE AREA
4552
sf
1366
sf
WEIR LENGTH REQUIRED (Q10)
L=Q(10)/(3 *h^.5)
where h = 0.5'
15
ft
5
ft
SKIMMER SIZE (ORIFICE)
2.5" (2")
2" (2")
SWALE
NO.
AREA
I
(10)
C
Q
(10)
BOTTOM
WIDTH
LT
SS
RT
SS
LINING
SLOPEF MATERIAL n
DEPTH
VEL
ALLOW
VEL
OK?
SHEAR
STRESS
ALLOW
SHEAR
OK?
WP
A
1
0.04
5.8
0.7
0.16
0.5
3 : 1
3 : 1
2.0%
NAG S75
0.066
0.04
1.06
4.00
YES
0.05
1.55
YES
0.8
0.1
1
0.04
5.8
0.7
0.16
0.5
3:1
3:1
2.0%
GRASS
0.035
0.03
1.72
4.00
YES
0.04
1.55
YES
0.7
0A
2
0.03
5.8
0.7
0.12
0.5
3 : 1
3 : 1
2.0%
NAG S75
0.066
0.04
0.98
4.00
YES
0.04
1.55
YES
0.7
0A
2
0.03
5.8
0.7
0.11
0.5
3:1
2:1
2.0%
GRASS
0.035
0.03
1.45
4.00
YES
0.03
1.55
YES
0.6
0.1
3
0.10
5.8
0.7
0.38
0.5
3 : 1
3 : 1
2.0%
NAG S75
0.066
0.08
1.36
4.00
YES
0.10
1.55
YES
1.0
0.3
3
0.10
5.8
0.7
0.38
0.5
3 11
3:1
2.0%
GRASS
0.0351
0.05
2.16
4.00
YES
0.06
1.55
YES
0.8
0.2
3A
0.10
5.8
0.7
0.38
0.5
3 : 1
3 : 1
20.0%
EXCEL PP5-10
0.066
0.04
3.10
7.00
YES
0.44
2.30
YES
0.7
0.1
3A
0.10
5.8
0.7
0.38
0.5
3 : 1
2 : 1
20.0%
EXCEL PP5-10
0.035
0.03
4.77
12.00
YES
0.34
8.00
YES
0.6
0.1
4
0.04
5.8
0.7
0.15
0.5
3 : 1
3 : 1
2.0%
NAG S75
0.066
0.05
1.09
4.00
YES
0.06
1.55
YES
0.8
0.2
4
0.04
5.8
0.7
0.15
0.5
3:1
2:1
2.0%
GRASS
0.035
0.03
1.64
4.00
YES
0.04
1.55
YES
0.7
0.1
5
0.07
5.8
0.7
0.28
0.5
3 : l
3 : 1
2.0%
NAG S75
0.066
0.07
1.27
4.00
YES
0.08
1.55
YES
0.9
0.2
5
0.07
5.8
0.7
0.28
0.5
3:1
3:1
2.0%
GRASS
0.035
0.04
1.98
4.00
YES
0.05
1.55
YES
0.8
0.1
6
0.17
5.8
0.7
0.69
0.5
3 : 1
3 : 1
2.0%
NAG S75
0.066
0.13
1.57
4.00
YES
0.16
1.55
YES
1.3
0.5
6
0.17
5.8
0.7
0.64
0.5
3:1
2:1
2.0%
GRASS
0.035
0.09
2.50 1
4.00
YES
0.11
1.55
YES
1.0
0.3
7
0.11
5.8
0.7
0.41
0.5
3 : 1
3 : 1
2.0%
NAG S75
O.0661
0.09
1.39
4.00
YES
0.11
1.55
YES
1.0
0.3
7
0.11
5.8
0.7
0.41
0.5
3 : 1
3 : 1
2.0%
GRASS
O.0351
0.05
2.21
4.00
YES
0.07
1.55
'YES
0.8
0.2
8
0.06
5.8
0.7
0.23
0.5
3 : 1
3 : 1
2.0%
NAG S75
0.066
0.06
1.19
4.00
YES
0.07
1.55
YES
0.8
0.2
8
0.06
5.8
0.7
0.23
0.5
3:1
2 : 1
2.0%
GRASS
0.035
0.04
1.85
4.00
YES
0.05
1.55
YES
0.7
0.1
8A
0.06
5.8
0.7
0.23
0.5
3 : 1
3 : 1
20.0%
EXCEL PP5-10
0.066
0.03
2.63
7.00
YES
0.31
2.30
YES
0.7
0.1
8A
0.06
5.8
0.5
3 : 1
2 : 1
20.0%
EXCEL PP5-10
0.035
0.02
4.07
12.00
YES
0.25
8.00
YES
0.6
0.1
9
0.04
5.8
0.5
3 : 1
3 : 1
2.0%
NAG S75
0.066
0.04
1.04
4.00
YES
0.05
1.55
YES
0.8
0.1
9
0.04
5.8
!0.L02
0.5
3:1
3:1
2.0%
GRASS
0.035
0.03
1.66
4.00
YES
0.03
1.55
YES
0.7
0.1
10
0.12
5.8
0.5
3 : 1
3 : 1
2.0%
NAG S75
0.066
0.09
1.41
4.00
YES
0.11
1.55
YES
1.1
0.3
10
0.12
5.8
0.5
3 : 1
2 : 1
2.0%
GRASS
0.035
0.07
2.27
4.00
YES
0.08 -
1.55
YES
0.9
0.2
Circular Channel Analysis 5 Design
Solved with Manning's Equation
Open Channel - Uniform flow
Worksheet Name: RESERVE
Comment: BIO-CELL 42 OUTLET
Solve For Actual Depth
Given Input Data:
Diameter..........
slope .............
Manning's n.......
Discharge.........
Computed Results:
Depth .............
Velocity..........
Flow Area.........
Critical Depth....
Percent Full......
Full Capacity.....
QMAX @.94D........
Froude Number.....
1.50 ft
0.0100 ft/ft
0.009
6.20 cfs
0.67 ft
8.15 fps
0.76 sf
0.96 ft
44.52 %
15.17 cfs
16.32 cfs
2.01 (flow is Supercritical)
Open Channel Flow Module, Version 2.01 (c) 1990
Haestad Methods, Inc. ' 37 Brookside Rd ' Waterbury, Ct 06708
Appendices
NEW YORK DOT DISSIPATOR METHOD
FOR USE IN DEFINED CHANNELS
(Source: 'Bank and channel lining procedures", New York Department
of Transportation, Division of Design and Construction, 1971.)
Note: To use the following chart you must know:
(1) Q full capacity
(2) Q10
(3) V full
(4) Vio
where Q = discharge in cfs and V = Velocity in FPS.
ESTIMATION OF STONE SIZE AND DIMENSIONS FOR
CULVERT APRONS
Step 1) Compute now velocity Vo at culvert or paved channel outlet.
Step 2) For pipe culverts Do is diameter.
For pipe arch, arch and box culverts, and paved channel outlets,
Do=Ao, where A.= cross -sectional area of flow at outlet.
For multiple culverts, use Do=1.25xDo of single culvert.
Step 3) For apron grades of 10% or steeper, use recommendations
For next higher zone. (Zones 1 through 6).
25
—�
20 r-
a1-
5
0, t �' S' 10' 1520' 25'
DIAMETER (R.)
Figure 8.06.b.1
Rcv. 12F)3
8.06.5
w
Z
2APRON MATERIAL
0 PF TECT C=ERT
L1
TO PREVENT SCOUR
ROLE ISE L2 ALWAYS
L2
1
STONE FILLING (FINE) CL. A
3 x Oo
4 x Da
2
STONE FILLING (LIGHT) CL. B
3 x Do
6 x Do 1
3
STONE FILLING (MEDIUM) CL. I
4 x 00
8 x Do
4
ISIOINE FILLING (HEAVY) CL, 1
4 x 0.
8 x Do
5
STONE FILLING (HEAVY) CL. 2
5 x Do
10 x Do
6
STONE FILLING (HEAVY) CL.2
6 x Do
10 x Do
7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING
BASIN OR LARGER SIZE STONE).
Fig. 8.06.b.2
Width = 3 times pipe dia. (min.)
DETERMINATION OF STONE SIXES FOR DUMPED STONE
CHANNEL LININGS AND REVETMENTS
Step 1) Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12
Fps=20" or 5501bs.
Step 2) Use figure 8.06.b.4 to determine acceptable size range for stone �—
(for 12 FPS it is 125.500 lbs. for 75% of stone, and the maximum
and minimum range in weight should be 25-500 lbs.)
Note: In determining channel velocities for stone linings and revetment, use
the following coefficients of roughness:
Diameter Mannin's Min. thickness
(inches) "n, of lining (inches)
Fine 3 0.031 9 12
—z> Light 6 0.035 12 18 F—
Medium 13 0.040 18 24
Heavy 23 0.044 30 36
(Channels) (Dissapators)
8.06.6 Re,. 12.93
Excel Civil & Environmental Associates, PLLC
625 Huntsman Court
Gastonia, North Carolina 28054
NC License No. P-0129
Telephone:(704) 853-0800
Facsimile: (704) 853-3949
Internet: www.excelengr.com
January 11, 2017
Mr. William Ratchford
Southwood Realty Company
Post Office Box 280
Gastonia, North Carolina 28053
Re: Limited Subsurface Evaluation
The Reserve at Regents Center
100 Regents Center Court
Lexington, North Carolina
Excel Project Number 2016103
Dear Mr. Ratchford:
Excel Civil & Environmental Associates, PLLC (Excel) has performed a limited subsurface
evaluation of the above -referenced site in Lexington, North Carolina. As requested, Excel
personnel mobilized to the site on December 1S, 2016 to evaluate the existing soil conditions in
regards to capable bearing capacities at various locations as requested by the client. Drilling
activities were conducted in order to determine the soil and bedrock conditions in the
proposed construction area and to evaluate pertinent physical properties of the soils
encountered
Fourteen (14) soil borings were completed and tested in approximately 2-foot depth intervals
beginning at grade level. The test locations were evaluated by utilizing a Dynamic Cone
Penetrometer (DCP). When testing, the technician records the number of strikes required to
drive the point through three increments of 1.75-inches and records the average number of
strikes in the second two increments as the penetration resistance at that depth. The
penetrometer reading is similar to the Standard Penetration Resistance "N-value" as defined by
ASTM D1586. When properly evaluated, the penetrometer test results provide an index for
estimating both soil strength and relative density.
ExCEL CIVIL & ENVIRONMENTAL ASSOCIATES, PLLC
www.excelengr.com.
Limited Subsurface Evaluation January 11, 2017
The Reserve at Regents Center
Lexington, North Carolina Excel No. 2016103
General Soil Conditions
Borings B-1 thru B-3, B-6, B-7, B-9, B-10, B-12 and B-13 were completed to a total maximum
depth of ten fbgl. Borings B-4, B-5, B-8, B-11 and B-14 were completed to a total maximum
depth of seven fbgl. Field personnel visually examined the samples collected from the borings
to estimate the distribution of grain sizes, plasticity, organic content, moisture condition and
color. The observations for soil samples collected from select borings are summarized on the
attached Boring Logs included in Appendix A.
During the site visit, the property was observed to be an existing apartment complex with the
proposed apartment building locations to be open, grassy areas. The topography of the
property was generally sloping downward from northeast to southwest. Residual materials
were encountered beneath the subgrade for borings B-3 through B-12 consisting of clay, silty -
clay and silty -sand observed from grade to approximately ten fbgl. Organic materials were
encountered at borings B-1, B-2, B-13 and B-14. Soil borings B-1 and B-2 had an organic layer
from approximately five fbgl to the boring termination depth of ten fbgl. Soil borings B-13 and
B-14 had an organic layer from grade to a depth of approximately three fbgl. Results from DCP
testing indicated the soil bearing capacity of subsurface soils at all testing locations ranged, at
various depths, from 0 pounds per square foot (psf) to greater than 4,S00 psf.
Groundwater was not encountered at the subject site during drilling activities to a depth of 10-
fbgl or the boring termination depth at any of the boring locations, meaning that the soils were
not observed to be considerably wet, soft or loose at a specific depth. However, it should be
realized that the water content of the near surface soils at the site could significantly change
between the time our report is submitted and construction is initiated at the site.
It should be noted that some of the material excavated from borings B-1, B-2 and B-6 through
B-13 on the property was classified as being either moist or saturated. This condition may be
due to recent precipitation and these areas should be monitored during construction activities
for any moisture -related problems related to excessive moisture in the soil. This can create a
situation in which water is absorbed into spaces between soil particles and the soil becomes
less dense, which reduces its ability to support a load.
For more detailed soil descriptions and stratifications at a particular boring location, the
respective boring log should be reviewed.
Laboratory Data
One Standard Proctor Compaction Test was conducted in the laboratory with the sample
collected from soil boring B-11. The Standard Proctor Compaction Test is used to determine
the maximum dry unit weight and optimum moisture content, which can be used for
specification of field Compaction. The sample was classified as a yellow silty CLAY and had a
EXCEL CIVIL & ENVIRONMENTAL ASSOCIATES, PLLC
www.excel6ngr.com
Limited Subsurface Evaluation January 11, 2017
The Reserve at Regents Center
Lexington, North Carolina Excel No. 2016103
maximum dry density of 84.7-pcf with an optimum moisture content of 31.2% (see Appendix
A).
Limitations
The surface soils encountered at this site are of a type that will soften significantly if the soil
water content should be increased for any reason. Such increases in soil water content
normally cause difficulties in proper soil compaction. Sources of increased water content in the
surface soils could include, but are not limited to, rainwater, improper surface drainage during
earthwork or site grading, and broken or leaking utility lines. It should be realized that the
water content of the near surface soils at the site could significantly change between the time
our report is submitted and construction is initiated at the site. Unanticipated soil conditions at
a construction site are commonly encountered and cannot be fully predicted by soil samples,
test borings, or test pits. Such unexpected conditions frequently require that additional
expenditures be made by the owner to attain a properly designed and constructed project.
The analyses, conclusions, and/or recommendations contained in this report are based on site
conditions as they existed at the time of our field investigation, a limited number of soil borings,
and further on the assumption that the exploratory borings are representative of the sub-
surface conditions throughout the site, that is, that the sub -surface conditions everywhere are
not significantly difficult from those disclosed by the borings at the time they were completed.
If, during construction, different sub -surface conditions from those encountered in our borings
are observed, or appear to be present beneath excavations, we must be advised promptly so
that we can review these conditions and reconsider our recommendations where necessary. If
there is a lapse of time of more than one year between submission of this report and start of
the work at the site, if conditions have changed due either to natural causes or to construction
operations at or adjacent to the site, or if building locations, structural loads, or finish grades
are changed, we urge that we be promptly informed and retained to review our report to
determine the applicability of the conclusions and recommendations, considering the changed
conditions and/or time lapse.
Further, we request that our firm be retained to review those portions of the plans and
specifications for this particular project that pertain to earthwork and foundations as a means
to determine whether the plans and specifications are consistent with the recommendations
contained in this report. In addition, we are available to observe construction, particularly the
construction of foundations as recommended in this report, and such other field observations
as might be necessary.
This report has been prepared for the exclusive use of Southwood Realty Company for specific
application to sub -surface conditions associated with the property located at 100 Regents
Center Court, Lexington, North Carolina. The only warranty made by us in connection with the
services provided do reputable members of our profession practicing in the same or similar
EXCEL CIVIL & ENVIRONMENTAL ASSOCIATES, PLLC
www.excelengr.COM
Limited Subsurface Evaluation January 11, 2017
The Reserve at Regents Center
,Lexington, North Carolina Excel No. 2016103
locality exercise that we have used that degree of care and skill ordinarily under similar
conditions. No other warranty, expressed or implied, is made or intended.
Sincerely yours,
EXCEL CIVIL & ENVIRONMENTAL ASSOCIATES, PLLC
C. ---
Aaron C.Long
Engineer In Training
Z Michael T. S forth, P.E.
Project Engineer
EXCEL CIVIL R ENVIRONMENTAL ASSOCIATES, PLLC
j.... � . .
www.excelengr:com .
FIGURES
EXCEL CIVIL & ENVIRONMENTAL ASSOCIATES, FLLC
WwVV,excelengi.com
o - Soil Boring Location
��e
yJ -
i� / / � r$ - _ - ..+Oyu'' F �9' �-.-w�_,F ••-- -- ` \ � :� o . .
.-
(
12
essA„9 0"= Note. Boring Locations Approximate
EXCEL CIVIL S ENVIRONMENTAL
ASSOCIATES, PLLC Figure 2 —Boring
625 HUNTSMANCOURT Locations Map N
GASTOTONIA, IA, NCNC 28054
(704) 853-0800 Source: As -Built Footing Survey (See Anow.Above)
SOIL BORING LOGS
EXCEL CIVIL & ENVIRONMENTAL ASSOCIATES, PLLC
www.excelengr,com.,
, r
Boring Log
Well Construction Permit Number
I. D, Number:
Project Name:
Project No:
B-1
--NA-. .—.Q4
� �aJ
r...rcIAI ... ...
Purpose: Geotechnical Assessment
Southwood - Lexington Apartments Contractor:
2016103 Registration No:
Field Personnel: A. Long, C. DeVane Driller:
Start Date: 15-Dec-16 Complete Date: 15-Dec-16 Equipment:
ECEA
C.DeVane
Mobile Drill -rip, DCP
BORING ID p
DEPTHb1STED,
BLOWS
NCREMENT/.�
OMPARATIV
C SPT VALUE E
E CAPACI rY (PSFI) G
VISUAL SOIL CLASSIFICATION
0
--
--
--
Brawn clayey SILT, damp
1'
5,10,12(11)
8
3,000
Same As Above
1.5'
--
--
--
Same As Above
2'
--
--
—
Brown silty CLAY, damp
3'
10.12,12(12)
8
3,000
Same As Above
B-1
4'
--
--
--
Black organics, moist
5'
4,5,5 (5)
--
--
Same As Above
8
--
--
--
Same As Above
7'
6,6,6 (6)
--
--
Same As Above
8'
--
--
--
Same As Above
S'
--
--
Same As Above
10'
-
--
Same As Above
/iron Gird P]n irvunrw.ml r6.o..'vuo'A"=Pon'ni,¢ I ode +e101et
Boring Log
Well Construction Permit Number
L D. Number:
e
zecea
Purpose: Geotechnical Assessment
Project Name:
Southwood- Lexington Apartments
Contractor:
Project No:
2016103
Registration No:
Field Personnel:
A. Long, C. Deloane
Driller:
Start Date:
15-Dec-16 Complete Date:
15-Dec-16 Equipment:
ECEA
C.DeVane
Mobile Drill -rig, DCP
BORING ID M
DEPTH TESTED.
(bgl)
BLOWS PER 1'/."
INCREMENT
���
COMPARATIVE
SPT VALUE
EXPECTED BEARING
CAPACITY (PSF)
VISUAL SOIL CLASSIFICATION
-
--
--
Tan, brawn silty CLAY, damp
(6)
4
1,200
Same As Above
-
--
--
Same As Above
-
--
--
Same As Above
8 (B)
6
2,000
Same As Above
-
—
--
Reddish brown silty CLAY, damp
13-2
0 (10)
7
2,500
Same As Above
-
--
--
Reddish brown silty CLAY with trace organics, tlamp
10 (10)
7
2,500
Same As Above
L—JERDT
-
--
--
Black organics, moist
-
--
--
Green silty CLAY with organicsmoist
-
--
—
Same As Above
/-,I I laird 4.uru'omnwnrJ.l u'o. irrru�Ur,�-Nw'i1, loll 211M 1113
Boring Log
Well Construction Permit Number
I, D. Number:
B-3
Purpose:
Project Name:
Southwood- Lexington Apartments
Contractor:
Project No:
2016103
Registration No:
Field Personnel:
A. Long, C. DeVane
Driller:
Start Date:
15-Dec-16 Complete Date:
15-Dec-16 Equipment:
A @ecea
x-q . r 2 M1 . c:C'e .torTY
Geonchnical Assessment
C. DeVane
Mobile
BORING ID #
DEPTH TESTED.
b I
( g)
BLOWS PER 1'/."
INCREMENT
1
COMPARATIVE
SPT VALUE
E%PECTED BEARING
CAPACITY (PSF)
VISUAL SOIL CLASSIFICATION
0
--
--
--
Tan, brown silty CLAY, damp
1'
8,9,9 (9)
7
2.500
Same As Above
L5'
--
--
--
Same As Above
2'
--
—
—
Same As Above
3'
8,11,11(11)
8
3000
Same AS Above
B-3
<'
--
--
—
Reddish brown silty CLAY, damp
5'
8,10, 10(10)
7
2, 500
Same As Above
6
--
—
—
Same As Above
7
9,11.11(11)
8
3,000
Same As Above
8'
--
--
--
Same As Above
9'
--
--
--
Same As Above
10'
-
-
--
Same As Above
Ern- Civil fanii—e nul d.vx innul>,r-Hm-iux l qca Nllelel
Boring Log
Well Construction Permit Number
I. D. Number:
c
isle.
NA--
k; Lea a.ua [ew«M.exi a„«ar.,
Purpose: Geotechneal Assessment
Project Name: Southwood - Lexington Apartments Contractor:
Project No: 2016103 Registration No:
Field Personnel: A. Lone. C. DeVane Driller:
Start Date: 15-Dec-16 Complete Date: 15-Dec-16 Equipment:
ECEA
Mobile Drill -rig, DCP
BORING ID p
DEPTH TESTED,
b
BLOWS INCREMENT 1 •
COMPARATIVE
SPT VALUE
EXPECTEDBEARING
T`/)
VISUAL SOIL CLASSIFICATION
0
--L50
Tan, brown silty CLAY, damp
1'
7
Same As Above
1.5'--
Same As Above
2'--
Reddish brown silty CLAY, damp
B-4
M7,9,9
3'
7
Same As Above
4'--
Same As Above
5'
5
Tan, yellow silty CLAY, damp
6'—
Same As Above
1.1,11('I'il A—xLng• ]elGllp
Boring Log
Well Construction Permit Number
_NA__
e F ea
I. D. Number: B-5 Purpose:
Project Name: Southwood- Lexington Apartments Contractor:
Project No: 2016103 Registration No:
Field Personnel: A. Long, C. DeVane Driller:
Start Date: 15-Dec-16 Complete Date: 15-Dec-16 Equipment:
Geotechnical Assessment
ECEA
DeVane
Mobile Drill -rig, DCP
BORING ID #
DEPTH TESTED,
(bgl)
BLOWS PER 1'/."
INCREMENT
COMPARATIVE
SPT VALUE
EXPECTEDg) BEARING
CAPACITYYPSFPSF
VISUAL SOIL CLASSIFICATION
0
--
--
--
Tan, brown silty CLAY, damp
l'
25+
13
4, 500
Same As Above
1,5'
—
--
--
Same As Above
2'
--
--
--
Tan, yellow silty SAND, damp
B-5
3'
25+
13
4, 500
Same As Above
4'
--
--
--
Same As Above
5'
--
--
--
@ 4 f/i Auger Refusal (Hard Soil)
1i11/( M/ I(raimnnnw¢d d.00alo, 11,—)? ng 1,og,'0/14111
Boring Log
Well Construction Permit Number
I. D. Number:
B-6
Purpose:
Project Name:
Southwood - Lexington Apartments
Contractor:
Project No:
2016103
Registration No:
Field Personnel:
A. Long, C. DeVane
Driller:
Start Date:
15-Dec-16 Complete Date:
15-Deo-16 Equipment:
e
'I t.. c. ae i •vi r., iou,
Geotechnical Assessment
ECEA
C. DeVane
Mobile Drdi-ria. DCP
BORING ID #
DEPTH TESTED,
(bgl)
BLOWS PER 1%"
INCREMENT
���
COMPARATIVE
SPT VALUE
EXPECTED BEARING
CAPACITY (PSF)
VISUAL SOIL CLASSIFICATION
0
--
--
--
Tan, brawn silty CLAY, damp
l'
6, 12, 13(12)
8
3.000
Same As Above
1.5'
--
--
--
Same As Above
2'
--
--
--
Same As Above
3'
9,12, 12(12)
8
3,000
Same As Above
A
--
--
--
Same As Above
B-6
5'
8,7,7 (7)
5
1,700
Tan, yellow silty CLAY, moist
6
—
ame AsAbove
TSame
As Above
L'
L
Tan, yellow silty CLAY, saturated
Same As Above--
--
Same As Above
l,"I C'lril E.. 11 nno,,,0,"x'uun.U,u-IIun,WLEA'+2016103
Boring Log
Well Construction Permit Number
I. D. Number:
Purpose:
Project Name: Southwood- Lexington Apartments Contractor:
Project No: 2016103 Registration No:
Field Personnel: A. Long, C. DeVane Driller:
Start Date: 15-Dec-16 Complete Date: 15-Dec-16 Equipment:
Geotechnical Assessment
ECEA
C. DeVane
Mobile Drill -rig, DCP
BORING ID p
DEPTH TESTED
(bgl)
BLOWS INCREMENT.
COMPARATIVESPT VALUE
EXPECTED CAPACITY (PSF) BEARING
VISUAL SOIL CLASSIFICATION
0
--
--
—
Orange, olive silty CLAY, moist
1'
13,13,13 (13)
9
3,200
Same As Above
1.5'
--
--
—
Same As Above
2'
--
--
--
Same As Above
3'
15,15,15(15)
10
3, 500
Same As Above
4'
--
--
--
Same As Above
13-7
5'
25,
13
4, 500
White silty CLAY. moist
6'
--
--
—
Orange. tan silty CLAY, moist
T
14,15,17 (i6)
10
3,500
Same As Above
6'
--
--
--
Same As Above
9'
--
--
--
Same As Above
70'
--
--
Same As Above
P:rrrl ('n it l:urinuun,vunl A..... 1,,g,. ]u1 1113
Boring Log
Well Construction Permit Number
I. D. Number:
Project Name:
Project No:
A
III N Awill, III III
istilisidl ACM
F �I CIMIf Y @ec.,.u
kl�v
Purpose: Geotechnical Assessment
Southwood - Lexington Apartments Contractor:
2016103 Registration No:
B-6
Field Personnel: A. Long, C. DeVane Driller:
Start Date: 15-Dec-16 Complete Date: 15-Dec-16 Equipment:
C. DeVane
Mobile Drill-ng, DCP
BORING ID p
DEPTH jb9ESTED,
BLOWS INCREMENT•
COMPAR SPT VALUE kTIVE
EXPECTE TYD B(PS ING
VISUAL SOIL CLASSIFICATION
0
--
--
--
Tan, orange silty CLAY, moist
i'
5,5,5 (5)
4
1,200
Same As Above
1,5'
--
--
--
Same As Above
2'
--
--
--
Same As Above
B-tl
3
4, 5,5(5)
4
1,200
Same As Above
4'
--
--
--
Tan, brown silly CLAY, moist
5'
77,7(7)
5
1,700
Same As Above '
6'
-
--
—
Same As Above
6.r'nJ Clril h'marvunnemnl A,e,uuime,.l)n.-I4vniA Logy 30I11113
Boring Log
Well Construction Permit Number
I. D. Number:
F��N CiW oecc:cl
Purpose: Geotechnical Assessment
Project Name: Southwood- Lexington Apartments Contractor:
Project No: 2016103 Registration No:
Field Personnel: A. Long, C. DeVane Driller:
Stan Date: 15-0ec-16 Complete Date: 15-Dec-16 Equipment:
Mobile Drilkno. DCP
BORING ID q
DEPTH TESTED
(bgl)
BLOWS PER I%-'
INCREMENT
��T
COMPARATIVE
SPT VALUE
EXPECTED BEARING
CAPACITY (PSF)
VISUAL SOIL CLASSIFICATION
0
--
--
--
Brownish red silty CLAY, damp
l'
14,14.16(15)
10
3,500
Same As Above
1.5'
--
--
--
Same As Above
2'
--
--
--
Same As Above
3'
8,12.12 (12)
8
3,000
Tan, brown silly CLAY, damp
4'
--
--
--
Same As Above
13-9
5'
10,10.10 (10)
7
2,500
Same As Above
6'
--
--
—
Tan, yellow silty CLAY, moist
7
14, 15.15 (15)
10
3.500
Same As Above
8'
--
--
--
Tan CLAY, saturated
S'
--
--
--
Same As Above
10'
--
--
--
Same As Above
/,, d C,,V I.....nn.....,l Aurx'iwn,I),,-HnrinR l ^8• 'eln/0.1
Boring Log
Well Construction Permit Number --NA--
1. D. Number:
8.10
Purpose:
Project Name:
Southwood - Lexington Apartments
Contractor:
Project No:
2016103
Registration No:
Field Personnel:
A, Lonq, C, DeVane
Driller:
Start Date: 15-Dec-16 Complete Date: 15-Dec-16 Equipment:
Geotechnical Assessment
ECEA
C.DeVa0e
Mobile Drill-ng, DCP
RORING ID p
DEPTHbgl)) .
BLOWS INCREMENT 1
COMPARATIVSPT VALUE E
EXPECTED CAPACIB(PSF) O
VISUAL SOIL CLASSIFICATION
0
--
--
Tan, brown silty CLAY, damp
V
12)
6
3.000
Same As Above
1.5'--
--
Same As Above
2'—
--
Same As Above
3'
11)
6
3,000
Same As Above
4'--
--
Same As Above
8-10
5'
7
2,500
Tan, orange silty CLAYmoist
6'--ame
As Above
T11)
63,000Same
As Above
8'----Tan,
JELLL
orange CLAY, saturated
9'----
Same As Above
10'
--
--
Same As Above
Favl Cis 11..riinmmavul d.... 1,I)u,-Hnnn}• 1.11, ]alfila3
Boring Log
Well Construction Permit Number
—NA.-
[.[riC \1 4 lal• [bl�.
I. D. Number:
B-1 t
Purpose:
Project Name:
Southwood- Lexington Apartments
Contractor:
Project No:
2016103
Registration No:
Field Personnel:
A. Long, C. DeVane
Driller:
Start Date:
15-Dec-16 Complete Date:
15-Dec-16 Equipment:
Geetechnical Assessment
C. DeVane
Mobile Drill-ria. DCP
BORING IB #
DEPTH TESTED
( TE
FOWSEMENT/,�
COPT VALUE E
E CA PACIDT(PSF) BEARING
VISUAL SOIL CLASSIFICATION
0
--
--
--
Yellow silty CLAY, damp
l'
11,11,11(11)
8
3.000
Same As Above
1.5'
--
-.
—
Same As Above
2
--
—
—
Same As Above
6.11
3'
19,20, 22(21)
12
4,000
Same As Above
4'
--
--
--
Yellow, orange silty CLAY, moist
5'
16,17,20 (18)
11
3.800
Same As Above
6'
—
--
Same As Above
1:mr1 Co,/ Piu...monortnl A...rcineenP„a-14umg lug[ 21111/1'.
Boring Log
Well Construction Permit Number
I. D. Number:
Project Name:
Project No:
Field Personnel:
Start Date:
rr.N CrvY r (nrYpnm�n!el Yrreelanr
Purpose: Geetechmcal Assessment
Southwood - Lexington Apartments Contractor:
2016103 Registration No:
A. Long, C. DeVane Driller:
15-Deo-16 Complete Date: 15-Dec-16 Equipment:
C, DeVane
Mobile Drill-dg, DCP
BORING ID N
DEPTH 9ESTED,
BL NCREMENTWS PER 1 •
COMPARATIVSPT VALUE E
EXPECTED CAPACITY (PS ING
VISUAL SOIL CLASSIFICATION
0
--
--
--
Brown sandy CLAY with gravel, damp
V
8,8,8 (8)
6
2.000
Same As Above
1.5'
--
--
--
Same As Above
2'
--
--
--
Same As Above
3'
5,66 (6)
4
0
Reddish brown CLAY, moist
4'
--
--
--
Same As Above
8-17.
5'
66.6(6)
4
1,200
Tan, brawn silty CLAY, moist
6'
—ame
As Above
TLL
5Same
As Above
8--Tan,
brown CLAY, saturated
9—Same
As Above
10--
--
Same As Above
Frml Civil Pin irvnmem'd d.worznedbr-Hui1, l ucr 20161 eJ
Boring Log
Well Construction Permit Number
I. D. Number:
B-13
Purpose:
Project Name:
Southwood - Lexington Apartments
Contractor:
Project No:
2016103
Registration No:
Field Personnel:
A. Long, C. DeVane
Driller:
Start Date:
15-Dec-16 Complete Data:
15-Dec-16 Equipment:
e
;., C
' r.oi a.0 a r.we.m.mou�.o.wi..
Geotechnical Assessment
ECEA
C. DeVane
Mobile Drill -no. DCP
BORING ID p
DEPTH TESTED
(bgl)
BLOWS PER 1 %"
INCREMENT
���
COMPARATIVE
SPT VALUE
EXPECTED BEARING
CAPACITY (PSF)
VISUAL SOIL CLASSIFICATION
0
--
--
--
Brown silly CLAY with black organics, damp
1'
7,9,9 (9)
7
2,500
Same As Above
1.5'
--
--
—
Same As Above
2
--
--
--
Same As Above
3'
6, 10,10 (10)
7
2.500
Brawn silty CLAY, damp
4'
--
--
--
Tan, green silty CLAY, damp
8.13
5'
17.17, 17(17)
11
3,600
Same As Above
6'
--
--
--
Same As Above
7'
10,10,10 (10)
7
1,000
Brown CLAY, saturated
6'
—
--
--
Same As Above
9'
—
--
--
Same As Above
10'
--
--
-.
Same As Above
ICnvl (irll Pin a nnnnvool A ... rinrvlhx-Hnrin, l qc, 211161113
Boring Log
Well Construction Permit Number
I. D. Number:
Project Name:
Project No:
B-14
e
--NA-- @ecea
... .. ..-_-_.------
...-._...
U}r '�r4gWv. say'P.�X-.nmxlrt
Purpose: Geotechnical Assessment
Southwood - Lexington Apartments Contractor:
2016103 Registration No:
Field Personnel: A, Long, C. DeVane Driller: C. DeVane
Start Date: 15-Dec-15 Complete Date: 15-Dec-16 Equipment: Mobile Drill -rig, DCP
BORING ID k
DEPT(b9ESTED,
8LOWS PER INCREMENT•
C SPT VALUE OMPARATIVE
E CAPACITY (PSF) G
VISUAL SOIL CLASSIFICATION
0
--
--
--
Brown, black silty CLAY w/ organics 8 gravel, damp
1'
25}
8
4.500
Same As Above
1.5'
--
--
--
Same As Above
2'
--
--
--
Same As Above
13-14
3'
25,
12
4,500
Same As Above
4'
--
--
--
Same As Above
S.
20,20.22 (21)
12
4.000
Orange silty CLAY, damp
6'
—
Same As Above
Beet Chit E ..... nrnrnrol A,..rx iortaOac-Bnrurg Lug, 2010103
STANDARD PROCTOR COMPACTION CURVE
EXCEL CIVIL & ENVIRONMENTAL ASSOCIATES, PLLC
www.excelengr.com
Southwood Lexington
100 Regents Center Court, Lexington, NC
90 20.2 M
w 19.7 E
85 19.2 Y
t 18.7
80 18.2
17.7
75 17.2
16.7
p p�
70 15.7
15 20 25 30 35 40
Water Content (%)
i-
! -
Maximum Dry Density = 84.7 Ib/ft3
-1_ Optimum Moisture = 31.2 %
Yellow clayey SILT
�
�A) FILED DAVIDSON COUNTY, NC DAVID T. RICKARD, REGISTER OF DEEDS 4/15/2015 2:34:44
?M BOOK 2177 PAGE 54 - 56 INSTRUMENT 112015000007047 Recording:$26.00 Excise
Tax:$14800.00 Deputy: MYATES
Drawn by: George S. lltomas, Dailey & Thomas P.A., P 0 Box 52 Winston-Salem NC 27102
NOTITLE SEARCH RLOUI]STED OR PERFORMED
Mail After Recording"fo: Grantee at P. 0. Box 280, Gastonia, NC 28053-0280
Revenue Stamps$ 1_4,800, 00
GRANTOR DID NOT RESIDE IN THIS PROPERTY. ?ZD 113430000000 `FF
NORTH CAROLINA GENERAL WARRANTY DEED
A
THIS DEED made thisls day of April, 2015, by and between
GRANTOR
TRQ, LLC,
A North Carolina limited liability company
1292 S. Stratford Road
Winston-Salem. NC 27103
GRANTER
Southwood Realty Company
A North Carolina corporation
165 S. York Street
Gastonia, NS 28052
The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and
assigns, and shall include singular, plural, masculine, feminine or neuter as required by context.
WI'I NESSET1 I, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is
hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee
simple, all that certain lot or parcel of land situated in Davidson County. North Carolina and more particularly
described as follows:
All of Tract 1, containing 32.063 ;cores, shown on plat of Regents Center recorded in Plat
Book 34, Page I, Davidson County Registry, more fully described in Deed Book 1953. Page
583, Davidson County Registry.
LBK: 2177 PG: 55
For further reference, see Private Easement Deed Book 1953, Page 583, Davidson County
Registry, subsequently dedicated as public right-of-way as shown on final plat of Regents Center
recorded on March 16, 2007 in Plat Book 49, Page 87, Davidson County Registry.
TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto
belonging to the Grantee in fee simple.
And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to
convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor
will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions
hereinafter stated.
Titic to the property hereinabove described is subject to the following exceptions:
I. Ad valorem taxes for the current year and subsequent years, casements mid restrictions of record, and
any local, County, state, or federal laws, ordinances, or regulations relating to Zoning, environment,
subdivision, occupancy, use, construction, or development of the subject property
IN WITNESS WHEREOF, the Grantor has hereunto set its hand and seal the day and year first above wi iuen.
fRQ, LLC
By: The Resource Company, Inc. (Manager)
'Et
V-)
Kathy . artung, �r.(
BK: 2177 PG: 56
NORTH CAROLINA - FORSYTII COUNTY
I certify that the following person personally appeared before me this day, acknowledging to me that
he voluntarily signed the foregoing document for the purpose stated therein and in the capacity
indicated: Kathy T. Naming President of The Resource Company Inc.,as member -manager of TRO
LLC
April 13 )'k,2015.
Not Pubub t� /JAB
Print/ Fype Notary Name: John W. Koment
My Commission Expires: 01-19-2019
Place notary seal below this line:
JOHN W. KOMENT
Notary Public - North Carolina
Forsyth County
'Ay EMpmb January 19, 20:9
FILED DAVIDSON COUNTY, NC DAVID T. RICKARD, REGISTER OF DEEDS 3/20/2017
12:47:54 PM BOOK 2261 PAGE 823 — 825 INSTRUMENT #2017000005885
Recording:$26.00 Excise Tax:$700.00 Deputy: ERECORD
NORTH CAROLINA GENERAL WARRANTY DEED
)3ltcise Tax: S700.00
Parcel Identifier No.: 6714-02-58-8252, 6714.02-58-7379, and 6714.02-58.4366
Remrn after recording to:
Mail tax bills to Grantee: PO Box 280, Gastonia, NC 29053
This instrument was prepared by: Robert W. Porter
Brief description fbr the Index: 6714-0.-58-825*2, 6714-02-58-7379, and 671d-02-53-4366
Lens 1, 2 and 3 Regmis Center
G
GRANTOR
CUMORAII VENTURES, LLC
A North Carolina limited liability company
GRANTEE
SOIYTIIWOOD REALTY COWANY
A North Carolina Corporation
Mailing Address:
Po Box 280
The designation Orvntor rnnd Grantee as used herein shall include said Parties, their hefts, successors, and assigns, end shall include
singular, plural, masculine, feminine or herder as required by context.
WfCNESSETH, that the Ormdor, for a valuable consideration paid by the Grantee, 0to receipt of which is hereby acknowledged,
has and by those presents dues grant, bargain, sell and convey tmto the Great= in fee simple, all that certain lot or parcel of haul
situated in Davidson County, North Carolina and moro particularly described its follows:
BEING LoWos. 1,2, and 3, Regents Center, as recorded inthe.Davidson County Registry in Plat Book 49,
Page 87,
REFERENCE: Deed Book 1207, Page 1293 in the Office of the Register of Deeds for Davidson County,Notth
Carolina.
Tax .Identification Number: 6714-02-58.8252, 6714-02.58-7379, and 6714.02-58.4366
Properly Address: Regents Court Lexington, NC
As attested by their signatures) hereto, the Grantor(s) cerilry, that the property conveyed hereby does p, does not
ix J Include the primary rosidenco of the Grantor(s).
The property heieinabove described was acquired by Grantor by Irisnvmcats recorded In Book 1207, Page 1293 Davidson County
Reglsny,
A map showing the above described property Is recorded in Plat Book 49 Page 87
Submitted electronically by "stott Hollowell Palmer d Windham, LLP"
in compliance with North Carolina statutes governing recordable documents
and the terms of the submitter agreement with the Davidson county Register of needs.
6K: 2261 PG: 924
TO 14AVE AND TO HOLD the aforesaid lot m- parcel of land and all privileges and appurtenances thereto belonging to the
Grantee hr feosimpic,
And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has die right to convoy the same In
fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the
lawful claims of all persons whomsoever, other than the following exceptions, Subject to all easements, rights -of -way and
restrictions of record, If any, and ad valorem taxes for the current year.
IN WITNESS Wk1ERSOF, the Gruntor has duly executed the Ibregoing as of the day and year first above written.
Cumornit Venhtre
Ry: _.... _ _ _ ! (SEAL}
G'WO TON tAON6til AANageR
(SEAL)
State of North Carolina, County of Forsyth
l certify that the following pdrsan(s) personalty appeared before me this day, each acknowledging tonic that he voluntarily signed the
foregoing document for the purpose stated heroin and in the capacity indicated: _RCoc.cs S ..G.v_(� C'
Mpnagtng Metnumnrah Vgptm aq LLC;" a North Carolina Lim lied Liability Company, and that by authority duly given and
as the act of the entity, he executed the foregoing Instrument in its name and on its behalf as its act and deed.
Data: �= c/ —1 -7
S)r,nKec Cc,- NC NeeaR"Public
Calm
No Notary Public I M Comml9skn t0 " 2
My Commnission 6xpires; /0 -a `� — D
BK: 2261 PG: B25
BEING LotNos. 1,2, and 3, Regents Center, as recorded in The Davidson Couniy Registry in Plat
Book 49, Page 87.
RUE.RENCE: Deed Book 1207, Page 1293 in the Office of the Register of Deeds for Davidson
County, North Carolina.
Tax Identification Nwnber : 6714.02-SW252, 6714-02-58-7379, and 6714.02-58-4366
Property Address: Regents Court Lexington, NC
NORTH CAROLINA
Department of the Secretary of State
CERTIFICATE OF EXISTENCE
I, Elaine F. Marshall, Secretary of State of the State of North Carolina, do hereby
certify that
SOUTHWOOD REALTY COMPANY
is a corporation duly incorporated under the laws of the State of North Carolina,
having been incorporated on the 27th day of .January, 1977, with its period of duration
being Perpetual.
I FURTHER certify that, as of the date set forth hereunder, the said corporation's
articles of incorporation are not Suspended for failure to comply with the Revenue Act of
the State of North Carolina; that the said corporation is not administratively dissolved for
failure to comply with the provisions of the North Carolina Business Corporation Act.;
that its most recent annual report required by N.C.G.S. 55-16-22 has been delivered to
the Secretary of State; and that the said corporation has not filed articles of dissolution as
of the date of this certificate.
IN WITNESS WHEREOF, I have hereunto set
my hand and affixed my official seal at the City
of Raleigh, this 22nd day of March, 2017.
Scan to verity online.
Certification# 100084881-1 Reference# 13647657- Page: 1 of 1 Secretary of State
Verify this certificate online at http://www.sosne.gov/verification
MINUTES OF ANNUAL MEETING
OF DIRECTORS OF
SOUTHWOOD REALTY COMPANY
Gastonia, North Caroling
January 31, 2012
This being the time and place for the 2012 annual meeting of the directors of
Southwood Realty Company and all of the directors having waived notice of the annual
directors meeting, but all are in fact present at this annual directors meeting. Said
waiver is adopted as a part of these minutes.
By unanimous vote Herman E. Ratchford. Jr. was elected Chairman of the
meeting and Chairman of the Board of Directors. Herman E. Ratchford, Jr. was also
elected President of the corporation.
By unanimous vote Dan W. Ratchford, was elected Vice President and Secretary
of the corporation.
By unanimous vote Herman E. Ratchford, Jr. was elected Treasurer of the
corporation.
By unanimous vote William Ratchford was elected Asst. Vice -President of the
corporation.
By unanimous vote Katie Ratchford was elected Asst. Secretary of the
corporation.
By unanimous vote the President was directed to take charge of and continue
the business of the corporation and to spend money as he deemed necessary.
There being no further business, the meeting was adjourned.
This the 31" day of January, 2012.
He man E. Xatchford, Jr.
W.
Dan f� rd