Loading...
HomeMy WebLinkAboutSW4160801_COMPLIANCE_20170426STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW����i2� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Compliance Inspection Report Permit: SW4160801 Effective: 08/16/16 Expiration: 08/15/24 Project: Dollar General#17591 (Graham) Owner: Glendon Forest Equity LLC County: Alamance Adress: Southern High School Rd At Region: Winston-Salem NC Hwy 87 City/State/Zip: Graham NC 27253 Contact Person: George T Barnes Title: Directions to Project: Southeast intersection of Southern Hlgh School Rd and S. NC 87 Hwy. Type of Project: State Stonnwater - HD - Bioretention Drain Areas: 1 - (Big Alamance Creek (Alamance Creek)) (03-06-03) (WS-V;NSW) On -Site Representative(s): Related Permits: Inspection Date: 04/26/2017 Entry Time: 02:OOPM Primary Inspector: Glen White Secondary Inspector(sj: Reason for Inspection: Routine Permit Inspection Type: State Stormwaler Facility Status: ® Compliant ❑ Not Compliant Question Areas: ® State Stormwater (See attachment summary) Phone: 919-459-2601 Exit Time: 02:30PM Phone: 336-776-9800 Inspection Type: Compliance Evaluation page: 1 Permit: SW4160801 Owner - Project: Glendon Forest Equity LLC Inspection Date: 04/26/2017 Inspection Type Compliance Evaluation Reason for Vlek: Routine File Review Yee No NA NE Is the permit active? N ❑ ❑ ❑ Signed copy of the Engineers certification is in the file? E ❑ Cl ❑ Signed copy of the Operation & Maintenance Agreement is in the file? 0 ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? N ❑ ❑ ❑ Comment: Built Upon Area Yee No NA NE Is the site BUA constructed as per the permit and approval plans? 0 ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? E Cl ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? 0 ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? 0 ❑ ❑ ❑ Are the inlets located per the approved plans? N ❑ ❑ ❑ Are the outlet structures located per the approved plans? N ❑ ❑ ❑ Comment: Operation and Maintenance Yee No NA NE Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to 0 ❑ ❑ ❑ DWQ upon request? Comment: Other Permit Conditions Yee No NA NE Is the site compliant with other conditions of the permit? N ❑ ❑ ❑ Comment: Other WQ Issues Yes No NA NE Is the site compliant with other water quality issues as noted during the inspection? U ❑ ❑ ❑ Comment: page: 2