Loading...
HomeMy WebLinkAboutSW3170901_CURRENT PERMIT_20180220STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE��� YYYYMMDD State Stormwater Permit Permit No. SW3170901 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT QUALITY STATE STORMWATER MANAGEMENT PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Teramore Construction, LLC o � for Dolla; General — #18434 0� 0;, of 120 Grace Church Road, Salisbury NC Rowan County ago P FOR THE construction, operation and maintenance of the 1 Stormwater Control Measures (SCM) in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans, specifications and other supporting data as on file with and approved by the, State and considered a part of this permit. This permit shall be effective from the date of issuance until October 31, 2025, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The SCM is approved for the management of stormwater runoff as described in the application documents and as shown on the approved plans. 3. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 4. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the SCM. 5. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. II. SCHEDULE OF COMPLIANCE During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The permittee shall at all time provide the operation and maintenance necessary to assure every SCM functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at Page 1 of 4 State Stormwater Permit Permit No. SW3170901 the scheduled intervals including, but not limited to a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans. f. Debris removal and unclogging of all drainage structures, level spreader, filter media, planting media, underdrains, catch basins and piping. q. Access to the cell and outlet structure must be available at all times. 3. Records of maintenance activities must be kept for the SCM. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 4. The permittee shall submit an annual summary report of the maintenance and inspection records for the SCM. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 5. The SCM shall be constructed in accordance with the approved plans and specifications, the conditions of this permit, and with other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the SCM certifying that it has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. SCMs impacted by sedimentation and erosion control during the construction phase shall be cleaned out and converted to its approved design state. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of eight years from the date of the completion of construction. 10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes Page 2 of 4 State Stormwater Permit Permit No. SW3170901 have been made. 11. SCMs that allow stormwater to infiltrate shall not be located on or in areas with contaminated soils. 12. Plats for residential lots that contain SCMs shall include: the specific location of the SCM on the lot; a typical detail for SCM to be used; and a note that the SCM on the property has been required to meet stormwater regulations and that the property owner may be subject to enforcement procedures as set forth in G.S. 143, Article 21 if the SCM is removed, relocated, or altered without prior approval. 13. The O&M Agreement shall be referenced on the final plat and shall be recorded with the county Register of Deeds upon final plat approval. If no subdivision plat is recorded for the site, then the O&M Agreement shall be recorded with the county Register of Deeds so as to appear in the chain of title of all subsequent purchasers. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the State, accompanied by the supporting documentation. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the State, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Page 3 of 4 State Stormwater Permit Permit No. SW3170901 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006-246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 31 th day of October 2017. 0%4,w d Q' wa 4 R"axd Z Rcdde, Pi, or Tracy E. Davis, P.E., CPM Director Division of Energy, Mineral, and Land Resources Page 4 of 4 State Stormwater Permit Permit No. SW3170901 Dollar General-#18434 120 Grace Church Road, Salisbury NC Rowan County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project Name) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL cc: NCDEQ-DEMLR Regional Office Page 1 of 1 DEMLRUSE ONLY D4 Re ived Pc it Number Applicable Rules: ❑ Coastal SW -1995 11 Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina pi Jd Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION t 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on specifications, letters, operation and maintenance agreements, etc.): o < C` IL s� oD Dollar General - Salisbury, NC 0,�d 2. Location of Project (street address): City:Salisbury County:Rowan AJ.lyo-n n,"v"IRK pl 4 3. Directions to project (from nearest major intersection): O �O 4. Latitude:35° 36' 55" N Longitud/e:80° 32' 10�"yW� of the main entrant to the project. II. PERMIT INFORMATION: 35 , I 51 J V 1. a. Specify whether project is (check one): ® ew ❑Modification ❑ Renewal w Modification+ iRenewals with modifications also requires SIIVU-102 - Renemnl Application Fonn b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberN/A , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the Stormwater project number, if assigned, N/A and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 1.50 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.lf any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:Erosion Control applied for with Rowan County. 5. Is the project located within 5 miles of a public airport? [�gNo "Ye If yes, see S.L. 2012-200, Part Vl: htto://12ortal.ncdenr.org/web/Ir/rules-and-regulations Fonn SWU-101 Version Oct. 31, 2013 Page I of ill. CONTACT INFORMATION I. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Teramore Construction, LLC Signing Official & Titlejeffrey Lang_ b. Contact information for person listed in item 1 a above: Street Address:1970 Derita Road City:Concord Mailing Address (if applicable): City: Phone: (229 ) 516-4289 Email:ilanQflteramo re.net State:NC Zip:28027 Fax: (229 ) 516-4229 c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ® Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organ izahon:Teramore Development, LLC Signing Official & Title:losh Hufstetler b.Contact information for person listed in item 2a above: Street Address:165 Big Star Drive City:Thomasville State:GA Zip:31757 Mailing Address (if applicable):PO Box 6460 City:Thomasville Phone: (229 ) 516-4289 Email:ioshh@teramore.net State:GA Zip:31758 Fax: (229 ) 516-4229 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/ Organization: BREC, PA Signing Official & Title:iustin C. Church - Principal Engineer b. Contact information for person listed in item 3a above: Mailing Address:126 Executive Drive - Suite 220 City:Wilkesboro State:NC Zip:28697 Phone: (336 ) 844-4088 Fax: (336 ) 609-7726 Eniail:iustin@brec.biz 4. Local jurisdiction for building permits: Rowan County Point of Contact:Thomas O'Kelly Phone #: (704 ) 216-8619 Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 JV. PROJ$CT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. An above ground sand filter will be used to treat runoff from all impervious surfaces of a proposed 9,100 sq. ft. Dollar General store. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Yadkin Pee Dee River basin. 4. Total Property Area: 1.47 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:1.47 acres Total project area shall be calculated to exclude the followiug the normal pool of impounded structures, the area between the banks of streanns and rivers, the area below the Nonual High Water (NHW) line or Meat High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of tlue NHW (or MHW) lithe may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 51.7 9. How many drainage areas does the project have?1 (For high density, count I for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area Drainage Area _ Drainage Area _ Receiving Stream Name Grants Creek Stream Class * C Stream Index Number * 12-110 Total Drainage Area (so 66213 On -site Drainage Area (sf) 50580 Off -site Drainage Area (sf) 15633 Proposed Impervious Area** s 33095 Impervious Area** (total) 50 Impervious** Surface Area Drainage Area 7 Drainage Area Drainage Area Drainage Area _ On -site Buildings/Lots (so 9301 _ On -site Streets (so 0 On -site Parking (so 22270 On -site Sidewalks (so 1524 Other on -site (so 0 Future (so 0 Off -site (sf) 0 Existing BUA*** (so 0 Total (so: 33095 Strewn Class and Index Number can be determined at: httq://portaLucdetnr.or veb uq/ps/cstu/classiftrntiotts Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Report only that amount of existing BUA dust will remain after development. Do not report sty existing BUA dint is to be removed and which eoill be replaced by new BUA. Form S WU-101 Version Oct. 31, 2013 Page 3 of 6 11. How was the off -site impervious area listed above determined? Provide documentation. Field Survey Pro iects in Union County: Contact DEMLR Central Office sta fto check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per I5A NCAC 0213.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from httv://oortal.ncdenr.ore/web/wa/ws/su/bmo-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map athttp://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http:/ /www.envlielp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the lh mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 p. Vegetated buffers (where required). I 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 1287 Page No: 444,447,449 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hU://www.secretaly.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from htto://portal.ncdenr.org/web/lr/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. Vill. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineeraustin C. Church Consulting Firm: BREC, PA Mailing Address:126 Executive Drive - Suite 220 City:Wilkesboro State:NC Zip:28697 Phone: (336 ) 844-4088 EmaiIjustin@brec.biz Fax: (336 ) 609-7726 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) Josh Hufstetler , certify that I own the property identified in this permit application, and thus give permission to (print or type nave of person listed in Contact Information, items 1 a) Teffreu Lang with (print or hype name of organization listed in Contact Information, item 1a) Terarmre Construction, LLC to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days, otherwise I will be operating a stormwater treatment facility without a "valid permit. I understand that the operation of a stormwater treatment facility without a valid per it.is a vi lation of NC General Statue 143-215.1 and may result in appropriate enforcement action including t e ss ssm of ci it penalties of up to $25,000 per day, pursuant to NOSS 143-215.6. Signature: Date: I,� nip tU� a Notary Public for the State of i(;{ County of Ii1t5YVtQ do hereby certify that Tnd1 personally appeared before me this 3l day, of 1 1, and acknowledge the due execution of the application for a stormwater permit. Witness m hand and official s ill,w SEAL,p Mycorn miSSiQ]lr�XF��g�+` I1-1Z- X. APPLICANT'S CERTIFICATION 1, (print or hjpe name of person listed in Contact hifornmh'on, iteni la) Termnore Construction LLC - leffrey Lang , certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Signatu Date: 1, a Notary Public for the State of County of I Y I)AMS , do hereby certify that tIJ personally appeared before me this 31 day of US� .moot land ackno d e the du execution of the application for a stormwater permit. Witness my hand and official %Qaf" t My commi5rslQrlek4*W 11— 1S — Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 B/31M17 Corporations Division North Carolina Elaine F. Marshall DEPARTMENT OFTIAE Secretary SECRETARY OF STATE .a „�s. PO Box 29622 Raleigh,NC 27626-0622 (919)814-5400 Account Login Click Here To: Create Site View Document Filings File an Annual Report Amend a Previous Annual Report Account Print a Pre -Populated Annual Report form Corporate Names Legal: Teramore Construction, LLC Limited Liability Company Information Sosld: 1493493 Status: Current -Active Annual Report Status: Current Citizenship: Domestic Date Formed: 1/26/2016 Fiscal Month: December Registered Agent: RUSSLAW, LLC Corporate Addresses Principal Office: 1970 Derita Road Concord, NC 28027-3355 Reg Office: 2235 Gateway Access Point, Suite 201 Raleigh, NC 27607-3076 Reg Mailing: 2235 Gateway Access Point, Suite 201 Raleigh, NC 27607-3076 Mailing: P.O. Box 6460 Thomasville, GA 31758-6460 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Manager: Jeff Lang P.O. Box 6460 Thomasville GA 31758 Member: Teramore Development, LLC P.O. Box 6460 Thomasville GA 31758 httpsJ/www.sasnc.gov/SeardVprofcorp/11973792 1/1 Project Name:IDollar General Belews Creek Project Location: INC Hwy 65 Belews Creek; NC Cover Page 'Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply Bioretention Cell Qua Dry Detention Basin Grassed Swale Green Roof Infiltration Basin Infiltration Trench Level SpreaderNFS PermeablePavement. Proprietary System Rainwater Harvesting Sand Filter St&mwater Wetland Wet Detention Basin Disconnected Impervious Area User Defined BMP Quantity: Quantity: I111111111orm O&M tables will be added automaticall Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location Location Location(s Location(s)* Location(s): Location(s): Location(s) Locations) Location(s) acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system orprior 'to any changes to the system or responsible party. ' Responsible Party: Title & Organization: Street address City, state, zip: Phone number(s): Email: Signature: Jeff LangT.- Member, Teramore Construction, LLC > z1 1970 Derita Road v. Concord, NC28027 229.516.4289 o t jlang@teramore.net County of I Vi t7Vt/I <k.� personally appeared before me this acknowledge the due execution of the Operations and Maih1 Witness my hand and. official seal, IZ O EXPIRES CEORCr commission expires Date: . 9--'2- a Notary Public for the State of do hearbycertify that y day of �Q O Y/j %4C nd 9/51201;