Loading...
HomeMy WebLinkAboutSW3170801_CURRENT PERMIT_20170912STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATIOWINSPECTION DOC DATE YYYYMMDD Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY September 12, 2017 Mr. Robert Langdon RHGC Spencer, LLC 223 Hwy 70 East Point, Suite 100 Garner, NC 27529 Subject: Stormwater Permit No. SW3170801 Davita Spencer Spencer, North Carolina in Rowan County Dear Mr. Langdon: ROY COOPER Govemor MICHAEL S. REGAN Secretary TRACY DAVIS Director The Division of Energy, Mineral, and Land Resources (DELMR), received a complete Stormwater Management Permit Application for the subject project on August 01, 2017. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 rules. We are forwarding Permit No. SW3170801, for the construction, operation and maintenance of the subject project and the stormwater system. This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes. Per NCGS 143-215(e) the petition must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. After 30 days, this project will be kept on file at the Mooresville Regional Office. Before then, if you have any questions, or need additional information concerning this matter, please contact Richard Riddle at (919) 807-6375; or rick.riddle@ncdenr.gov. Sincerely, OuOvd 44-ed 4 Ro/raad Z RRu(d& �h. for Tracy E. Davis, PE, CPM, Director ec: SW3170801 File, Mooresville Regional Office Matt Johnson, RE, Triad Design Group State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources 1612 Mail Service Center 1 512 North Salisbury Street I Raleigh, NC 27699-1612 919 707 9200 T State Stormwater Permit Permit No. SW3170801 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT QUALITY STATE STORMWATER MANAGEMENT PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO RHGC Spencer, LLC for Davita Spencer °cc 1287 N. Salisbury Rowan County Spencer NC yoo(os /��s�<��0/j FOR THE �ooWaoq construction, operation and maintenance of the 1 Stormwater Control Measures (SCM11n compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans, specifications and other supporting data as on file with and approved by the State and considered a part of this permit. This permit shall be effective from the date of issuance until September 12, 2025, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The SCM is approved for the management of stormwater runoff as described in the application documents and as shown on the approved plans. 3. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 4. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the SCM. 5. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. II. SCHEDULE OF COMPLIANCE During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all time provide the operation and maintenance necessary to assure every SCM functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at Page 1 of 4 State Stormwater Permit Permit No. SW3170801 the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowiny and re -vegetation of slopes and the filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans. f. Debris removal and unclogging of all drainage structures, level spreader, filter media, planting media, underdrains, catch basins and piping. g. Access to the cell and outlet structure must be available at all times. 3. .Records of maintenance activities must be kept for the SCM. The reports will indicate the date, activity, name of person performing the work and what actions Were taken. '4. The permittee shall submit an annual summary report of the maintenance and inspection records for the SCM. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. I it ,h 5. Th@ SCM shall be constructed in accordance with the approved plans and �:"'specifications, the conditions of this permit, and with other supporting data. 6=i'�) Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the SCM certifying that it has been installed in accordance with this permit, the approved plans and specifications, and other supporti t, documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. SCMs impacted by sedimentation and erosion control during the construction phase shall be cleaned out and converted to its approved design state. 8. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of eight years from the date of the completion of construction. 10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes Page 2 of 4 State Stormwater Permit Permit No. SW3170801 have been made. 11. SCMs that allow stormwater to infiltrate shall not be located on or in areas with contaminated soils. 12. Plats for residential lots that contain SCMs shall include: the specific location of the SCM on the lot; a typical detail for SCM to be used; and a note that the SCM on the property has been required to meet stormwater regulations and that the property owner may be subject to enforcement procedures as set forth in G.S. 143, Article 21 if the SCM is removed, relocated, or altered without prior approval. 13. The O&M Agreement shall be referenced on the final plat and shall be recorded with the county Register of Deeds upon final plat approval. If no subdivision plat is recorded for the site, then the O&M Agreement shall be recorded with the county Register of Deeds so as to appear in the chain of title of all subsequent purchasers. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the State, accompanied by the supporting documentation. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the State, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Page 3 of 4 State Stormwater Permit Permit No. SW3170801 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006-246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 12th day of September, 2017. or racy E. Davis, P. ., P Director Division of Energy, Mineral, and Land Resources Page 4 of 4 State Stormwater Permit Permit No. SW3170801 Davita Spencer 1287 N Salisbury, Spencer, NC Rowan County Designer's Certification I, as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project Name) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL cc: NCDEQ-DEMLR Regional Office Page 1 of 1 €Z l DDL-►t :.DEMLR,USEONLY.. .'..... .... .: . .. ;. ate Received Fee Permi Numb r i + Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 1913h 11 -Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - shou specifications, letters, operation and maintenance agreements, etc 2. Location of Project (street address): DENR-LAND QUALITY Ci ty:Spencer County: Rom 3. Directions to project (from nearest major intersection): Zip:28144 From Salisbury head north on US 29 through Spencer. Site is on North Side of Spencer at corner of N Salisbury Ave/US 29 and Sowers Road. 4. Latitude:35° 42' 21" N Longitude:80° 24' 48" W of the main entrance to the project. II. PERMIT INFORMATION: a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt iReuemnls With umrlifncations also requires SWLI-102 - Renen al Application Forrn b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsile Stormwater System ❑Other 3. if this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): []LAMA Major ®Sedimentation/Erosion Control: ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts ac of Disturbed Area b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part VI: littp:llportal.ncdefir.org/web/`lt-/­ruies-ajid-regLli',)tiOlIS Form SWU-101 Version Oct. 31, 2013 Pape I of 6 III. CONTACT INFORMATION I. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the oroiect): Applicant/Organization:RHGC Spencer LLC Signing Official & Title:Mr. Robert Langdon - Managing_ Member b.Contact information for person listed in item la above: Street Address:223 Hwy 70 East Point, Suite 100 City:Garner State:NC Zip:27529 Mailing Address (if applicable): City: State: Zip: Phone: (919 1 662-1001 Fax: (919 ) 662-1002 Email:rlangdon@langdoncpa.com c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the properly that the project is located on): Property Owner/Or Signing Official & Ti b.Contact information for person listed in item 2a above: Street Address: Sta Mailing Address (if applicable): City: State: Zio: Phone: Email: Fax: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Matt Johnson, P.E. - Triad Design Group Signing Official & Ti b.Contact information for person listed in item 3a above: Mailing Address:4807-C Koger Blvd City:Greensboro State:North Carolina Zip:27407 Phone: (336 ) 218-8282 Email:miohnson@triad-desig_ngrottp.com 4. Local jurisdiction for building permits: Town of Spencer Fax: (336 ) 218-8010 Point of Contact: Phone #: Form SWU-101 Version Oct. 31, 2013 Page 2 of 7 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the slormwater runoff will be treated. All runoff from proposed impervious Surfaces will flow to and be treated by a proposed wet detention pond deisgned to NCDEO standards. 2. a.lf claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulations) the project has been designed in accordance with: ❑ Coastal SW —1995 ® Ph 11— Post Construction 3. Stormwater runoff from this project drains to the Yadkin-PeeDee River Basin River basin. 4. Total Property Area: 8.19 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area (4) — Total Coastal Wetlands Area (5) — Total Surface Water Area (6) = Total Project Area-: acres Total project area shall be calculated to exclude the following: the nornml pool of impounded stnmttres, the area betzoeen the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landzard from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BL1A). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total impervious Area / Total Project Area) X 100 = 13.92 % 9. How many drainage areas does the project have?l (For high density, count 1 for each proposed engineered storrrrzoater BMP. For lozv density and other projects, use 1 for the zohole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin information Drainage Area 1 Draina e'Area Drainage Area -Drainage Area Receiving Stream Name Grants Creek Stream Class * C Stream Index Number * 12-110 Total Drainage Area (sf) 94,750 On -site Drainage Area (sf) 82,394 Off -site Drainage Area (sf) 12,356 Proposed Impervious Area** (sf) 46,790 % Impervious Area** (total) 49.38% im ervious"'Surface. Area ,• ; ,Draiha' e Area._ Drainage Area,_ Drainage Area:_ 'Drainage Area _ On -site Buildings/Lots (sf) 9024 On -site Streets (sf) 0 On -site Parking (so 34,497 On -site Sidewalks (sf) 3,137 Other on -site (sf) Future (sf) 2,937 Off -site (sf) 5,820 Existing BUA*** (sf) Total (sf): 49,595 Stream Class and index Number can be determined at: ltttp://portal.nedenr.orghoeblwrl[ps/csnlclassifications *" Lnpervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version Oct. 31, 20t3 Page 3 of 7 'Report only that amount of existing BLIA that Will remain after development. Do not report any existing BLIA that is to be rentoved and which will be replaced by new BLIA. 11. How was the off -site impervious area listed above determined? Provide documentation. T000graohic Topo Survey and CAD software Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that inay be subject to more stringent stornnvater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state slormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from littt_k:////kiortal.ncdenr.org/web/wq/ws/stt/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from httu:////portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at Itttp://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http//portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. M WZ 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VIl below) 3. Original of the applicable Supplement Form(s) (sealed signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to hup://wT ww.enviielp.org/pages/onestopexpress.htmI for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within'h mile of the site boundary, include the'h mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. ,� #` -kV-),T Mw Form SWU-101 Version Oct. 31, 2013 Page 4 of 7 • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). < 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to venfy the SH WT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: `-1 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC (-w Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. littl2://www.secret,iry.state.nc.tis/Cori2orations/CSearch.aspx VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. if lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from htto://12orta1.ncdenr.org/web/ir/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VHI. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Matthew W. Johnson, P.E. Consulting Firm: Triad Design Groan, PC Mailing Address:4807-C Koger Blvd City:Greensboro State:NC Zip:27407 Phone: (336 ) 218-8282 Fax: (336 ) 218-8010 Email:mjohnson@triad-designgrotil2.com Form SWU-t01 Version Oct. 31, 2013 Page 5 of 7 IX. PROPERTY OWNER AUTHORIZATION (if Contact 6 f rmation, item 2 has been filled out, complete ibis section) 1, (print or type name of person listed in Contact Information, item 2a) certify that 1 own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal properly owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise 1 will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of , County of do hereby certify that personally appeared before me this _ day of . and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission Form SWU-101 Version Oct. 31, 2013 Page 6 of 7 X. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in Contact Information, item Ia) certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Signature: v[ � (Date: F -21i-�7 1, a No ry Public for the State of n �a County of do hereb certify �• .Gslla/s✓ 1'Z personally appeared h before me this day of o2�/7, and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, L24/t G� (,,V OPuC,tl�� ''Vz O a WotorY Pub11C 5 = Franttlin GounN ?DAY CommtDbbn ExW�` s 11126117 q����QR�HtC AaQ`•x`s�� SEAL My commission expires //'.16'17 Form SWU-101 Version Oct. 31, 2013 Page 7 of 7 d Ig111111n J1y � d � y0 ~ OF!riliQ VIC1IOi1 s VlnuoJ nclAnol9 - _ealto�3 nolaalmmoD vm s 9 C/OSIOs�if r uto '" R n urlii`i Operation & Maintenance Agreement Project Name: Project Location DaVita Spencer Spencer NC maintenance recoras snail De Kept on the Touowing bmrtsl. i ms maintenance recora snail De Kept to a iog in a Known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & correspc Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level SpreaderNFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: 1 Disconnected Impervious Area Present: No User Defined BMP Present: No O&M tables Location Location Location Location Location Location Location Location Location Location Location Location Location Location Location will be added automatically): (s): (s): (s): (s): (s): (s): (s): (s): (s): (s): (s): (s): (s): 1287 N. SalisburyAve (s) (s): I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. ` Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: County of personally appeared before me this Mr. Robert Langdon RHGC Spencer, LLC 223 Hwy 70 East Pointe, Suite 100 Garner NC 27529 919-662-1001 riangdon@langdoncpa.com Date: ( a Notary Public for the State of !21 [- , do hearby certify that day of �e ,?U/% and acknowledge the due execution of the p r 'oils and Maintena cce__Agreement . Witness my.hand and official seal, K Notary Publlo Franklin Counter commission Is$ 1112612017 C Version 1.4 My commission expires 11-26 -17 8T2r2017 Page 1 of 5 le .0 qvo, Vroroa Om vrnu�J n119nv�� _lOtiq�� (1012almT0;J V41 { iPSldSlf i 0. .armm W% c , Wet Detention Pond Maintenance Requirements The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. Important maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). The forebay Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design depth for will not cause impacts to streams or the BMP. sediment storage. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. STORM-EZ 8/2/2017 Version 1.4 O&M Manual Page 3 of 5 I Wet Detention Pond Maintenance Requirements (Continued) I he main treatment area Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design sediment will not cause impacts to streams or the BMP. storage depth. Algal growth covers over 50% Consult a professional to remove and control the algal growth. of the area. Cattails, phragmites or other Remove the plants by wiping them with pesticide (do not spray). invasive plants cover 50% of the basin surface. The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and consult a professional to remove beaver activity is present. beavers. A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. STORM-EZ 8/2/2017 Version 1.4 O&M Manual Page 4 of 5 I Wet Detention Pond Design Summary I -,� Wet Pond Diagram WET POND ID FOREBAY MAIN POND Wet Pond No 1 Permanent Pool El. 736.5 Permanent Pool El. Temporary Pool El: 737.75 Temporary Pool EIPretreatment other NoClean Out Depth: 4.5 Clean Out Depththan IM forebay? Sediment Removal El: 732 Sediment Removal El:Has Vag. Filter? No Bottom Elevation: 731 Bottom Elevation: STORM-EZ 6/2/2017 Version 1.4 O&M Manual Page 5 of 5 SUPPLEMENT-EZ FORM COVER PAGE Please indicate the types, quantities and locations of SCMs that will be used on this project: I Quantity I Location(s) Infiltration System Bioretention Cell Wet Pond 1 Stormwater Wetland Permeable Pavement - Sand Filter Rainwater Harvesting Green Roof �. Level Spreader -Filter Strip Disconnected Impervious Surface Treatment Swale Dry Pond Designer information for this project: Name and Title: I Matt Johnson, PE Civil Engineer Organization: ITriad Design Group Street address: I4807-C Koger Blvd City, State, Zip: IGreensboro NC 27407 Phone number(s): 336-218-8282 Email: mjohnson@triad-deisgngroup.com SEAL 30521 Dates Applicant: Project Name: DaVita Spencer Address 1287 N Salisbury Ave City / Town Spencer NC Company: IRHGC Spencer LLC Contact: IMr. Robert Langdon Mailing Address: 1223 Hwy 70 East Pointe, Suite 100 City, State, Zip: Garner NC 27529 Phone number(s): 919-662-1001 Email: Certification Statement: I certify, under penalty of law: that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; - that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing violations as well as a report being made to my professional board. Cover Page 1 11:19 AM 9/5/2017 P 1 ., �. � .y . �.�; r �4� `��� .�� '� �.- p. al �'. y;. M , yi ti r:J C� � - 4i, �1 .:� , i 9 :'� tI y .. .,1. „e` .uuu����''� WETPOND DaVita Spencer THE'DRAINAGE AREA Drainage area number - 1 Break down of BUA in the drainage area both new and existing): Total coastal wetlands area (sq ft) at - Parking / dnveway (art ft) 29574 at Total surface water area (sq ft) sf -Sidewalk (sq It) 2251 at Total drainage area (sq ft) 97139 at - Roof (sq ft) 9121 at RUA associated with existing development (sq ft) 5663 sf - Roadway (sq M at Proposed new BUA (sq ft) 40946 at - Other, please specify in the comment box below (sq ft) at Percent BUA of drainage area 21% Total BUA aq ft) 40946 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stortnwater pr ram(s) that sops (please specify): Design rainfall depth (in) 1.0 in Phase II Minimum volume re oved (cu ft) 5018 ct Design volume of SCM ice ft) 8524 cf GENERAL MDC FROM 02H .3050- #1 Is the SCM sized to treat the SW ham all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H:V)? 3:1 #9 Does the drainage easement comply with General MDC 9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC 10)? #4 Are the inlets, outlets. and receiving stream protected from erosion (10-year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC 11)? Yes #5 Is there a a bypass for flours in excess of the design flow? Yes #12 Is there an 08M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatenng the SCM for maintenance? Drawdown Onfice #13 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 021-1.1053 #1 Method used SA(DA #6 W don of the vegetated shelf (feet) loft #1 Surface area of Me main permanent pool (square feet) 5660 sf #6 Location of vegetated shelf Q Normal Pool #1 Volume of the main permanent pool (cubic feet) 13179 cf #6 Elevafion of top of shelf (tress) 737 ft #2 Average depth of the main pool (feet) 3 ft #6 Elevation of bottom of shelf fmsl) 736 ft #2 Was Me vegetated! shelf included in the calculation of average tlepth? Yes #6 Slope of vegetated shelf (H:V) 10:1 #2 Elevation of the bottom of the permanent pool hasp 732 If #7 Diameter of drawdown orifice (inches) 1.0 in #2 Elevation of Me top of Me permanent pool fmsl 737 ft #7 Drawdown time for the temporary pool hours) 52 hrs #2 Elevation of Me top of Me tempos pool Imsp 738 If #7 Does Me orifice drawdown from below Me top surface of Me permanent peal? No #3 Depth provided for sediment storage (inches) 12 in #8 Does Me pond minimize impacts to the receiving channel from the 1-yr, 24-hr storm? Yes #4 Are Me ialet(s and outlet located in a manner that avoids shodcmad ng? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, Mat will be taken to improve the flow path: #9 If yes, is documentation provided per Wet Pond MDC (9)? Storm Drain inlets into pond on opposite side of Me outlet structure. In addition a Stone Baffle Just Below Nroma Pool 910 Is a (rash rack or other device provided to protect Me outlet system? Yes #5 Volume of the foreba (cubic feet) 1 2375 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of Me volume in the main pool? Yes #11 Species of turf Mat will be used on Me dam and embankment Fescue or Bermuda #5 Depth of forethay at entrance (inches) 24 in #11 Describe the planting plan for the vegetated shelf: #5 Depth of forelpay at exit (inches) 60 in #5 Does water flow out of the foreba in a non -erosive manner?Yes #5 Clean -out depth for foreba (inches) 12 in #5 Will Me tomboy be cleaned out when Me depth is reduced to less than Me above? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about this wet pond that you think is relevant to Me review: Wet Pond 2 11:19 AM 9/5/2017 & Maintenance A Project Name: Project Location: DaVita Spencer Spencer NC Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that e Bioretention Cell Dry Detention Basin Grassed Swale Green Roof Infiltration Basin Infiltration Trench Level SpreaderNFS Permeable Pavement Proprietary System Rainwater Harvesting Sand Filter Stormwater Wetland Wet Detention Basin Disconnected Impervious Area User Defined BMP O&M tables wi Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. - Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Mr. Robert Lan don RHGC Spencer, LLC 223 Hwy 70 East Pointe, Suite 100 Garner NC 27529 919.662-1001 riangdon@langdoncpa.com Signa q�Q 2�lii Date: 9�5' 1, , a Notary Public for the State of A no County of �� , do hearby certify that �14( ` Ls9��� personally appeared before me this S day of /JG L Xe,, 2017 and acknowledge the due execution of the.,.,O0��pJp���r//r��Nt1ons andd Ma�iinttena cp Agreement . Witness my.hand and official seal, �j97r,.�4 L: /�s2C.(r<x. HptWy Public f1cown County ut commlulo 1112612011 W r .? . °PJN CAa°` 1.4 My commission expires 11-24 -17 BrMO17 Page 1 of 5 I Wet Detention Pond Maintenance Requirements The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. Important maintenance procedures: _ Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). _ No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. _ Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. _ If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be its in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trashldebris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The Inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). The forebay Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design depth for will not cause impacts to streams or the BMP. sediment storage. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it an the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it o the plants rather than spraying. STORM-Pl 8/212017 Version 1.4 O&M Manual Page 3 of 5 t Wet Detention Pond Maintenance Regwrements (Continued) 1 The main treatment area Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design sediment will not cause impacts to streams or the BMP. storage depth. Algal growth covers over 50% Consult a professional to remove and control the algal growth. of the area. Cattails, phragmites or other Remove the plants by wiping them with pesticide (do not spray). invasive plants cover 50% of the basin surface. The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and consult a professional to remove beaver activity is present. beavers. A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. STORM•EZ a2201I Jersion 1.4 O&M Manual Page 4 or 5 I Wet Detention Pond Desian Summary I Wet Pond Dlaarem WET POND ID Wei Pond No 1 FOREBAY MAIN POND Permanent Pool El. Permanent Pool El. 736.5 Temporary Pool EI: Temporary Pool El: 737.75 Pretreatment other Clean Out Depth: RN Clean Out Depth: q.5 than forebay? I:H Sediment Removal El: Sediment Removal El: 732 Has Veg. Filter? No Bottom Elevation: Bottom Elevation: 731 STORM-EZ 8/2/2017 ✓ersion 1.4 O&M Manual Page 5 of 5 WET POND DaVita Spencer THE DRAINAGEAREA' 1 Dralrape area rarer i 1 Break Mown of BUA in the drairung. area lboth new and existing): Total coislal wednila arealw 4) M -PaM1og/dnveway(so al 29574 sf Talal wlfaCe wane area(a, rt) sl - SiMawalk(eo a) i251el Total droma9u area('e n) 97139s1 -Roof(W e) 9121 s1 BUA essoanted won a.=, aM elapmenl Iw III 5663 sf . Roadway lea 4t at Propossea new BUA (w III 40946 sI -Omel, please speak kl me OOMMWO t pee below I'g 4) at Pertain BUA of trdnage area i 21% Total BUA pp rt) ( 409a6 el COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Sldnlwatd s)UtM all (laaaa.sped Devgn rainfall Modi(in) i 1.0IS Phase 11 Mdmurn solurre roamed Iw rtl i Will d peagn vollme of SCM (w M) i 8524 d GENERAL MDC FROM ON 1050 a1 Is mte SCM elaod to Omat me SW horn all surfaces y land.17 i Yea a? M appor le. wM m SCM to demred do attd cottsplcpon? Yes 92 Is ma SCM IKalea an or Ma mmammataM inat? i No 06 DOIa ma rrmMMunce xseeb wim Gme!W MDC 9r! Yee a3 Ydat are Ore We mopes of me SCM IH.VT? 3:1 a9 Does me &2WQQ0 easement 00I win Gonna, MDC 9? i YW sG Don Me SCM nave reeuen walls, gation. walk or nine, an rend ildo slopes? i NO 010 lift SCM is ten a le lardl Id -deaf Me - al,om w 0 (neneal MDC 00)? i b Are me ldeW, pudel3, and rppmwrp,Maan Pretpcled hem w06ibn (19-yea! itpltlll? i Yes all is mine an OSM A MM mat LCmpina Wpm Csen MDC 111)? i Yale a5 Is mere e a bypass br lmra in stews of me deelgn aow? i Yea 012 is mere an OAM PWn m01 cnnpkn with General MOC (12)? i Yro RB Wnm W me memoo for dew Me SC,1 W MMnenmtce? i Orawddwn On5ro 013 Was ere SCM designed by an NC acenyted arolasslenal? i Yea WET POND MDC FROM O2N .1053 at MelndMused i SADA a6 WgmdNe salad srdl hell i Ica at Swan area ell ee main petnanent pod aguma fedl 5660 sl a6 L w of WIea spelt i @ Normal Pod a1 Volume of me mums lelnanant pad[OLIO: fed) 131?9ot 06 Elenmonole olmolfiM1tW) i ?37n 0 Average dlpm of the mart pool ifeen 3 a a6 FJevabon al aonom d Snell lMrW 1 i 736 a 92 Was mo veFmtw shelf nc wed in Me calwlaaan d average depm? i Yes 96 Slope of vegetmem, Snell (H:V) i 10:1 a2 FJeranan d Mro bosom d ins naa hint i 732 A a? Dlemeld Of mewilwn onece fncrwnn 1.0In 92 Eilevalldn of We lop of me pemWneN pout (final) i 7370 te? Drewrlown pine W me lempore nWR) 52 Ns 92 Elevmnn of men al me impomry poon (ansl) 73a 4 a? Doe, de one. Orawdavn Mani below me top surfxe of Ma pannarom pool? i No a3 Depot nnwillecl lor sManem smra Inctles i 12 in a6 0. the pail minlmixe imp.m to me receiving channel Man me 1-yr, 2441r stone? i Yes 04 Are andnOOV.)ale eudet located m a manna mat avoios enpn-Cvctk ? Yes a9 Are fonlan" pral"Mad? i No a4 Detonate anymeawtn. well as banns ter Eaftna, mat wW W Wken IO improve me flaw am: M 1f yes, n Mdwmbnaban prewded per Wet Portl IjDC (9)? i nine Drain "M kee pond an oppolow side of me MAN,'bltpare. In add'Mon a Stoll Bame tual Below W. Paai 910 ls e Mean nick or olnd dawte provided ro orptact de dmet eystam7 Yea a5 Vdlae of Me bread plod: tell 2375 all Are me oam and emaaMmant pone W nonrJumping NM grade? Yes a5 Is M. 15-20%Of the whams in me main pod? i Yes .11 Soodea al lW dal wa il ldM an the dam antl EmaanFmant i Fesate d Bemum 0 Deem d fereba al andante fleas,) i 24 m all Dosrnbp mo pldnang pan for mC vegeldtod sndl: 95 Down of brenov al e+M(Mrmesl i 60M tl5 Goes worm sow out Of ale been in a ngmerpsrva rtlamart i Yes 45 Cjwnaut dam fer lorooa (terns') i 12 e 0 Wm the forebay W aeaneo ON wren me Mepm is remtoed to ass pan me ammo? ) Yes ADDITIONAL INFORMATION %eaeo u5a Otis space to denote any oddgonal bomaam aaota Ma, wee Pena Mat yoO pink ie re,,o, a ma renew: Wet Pond 2 11:19 AM 9/5/2017 SUPPLEMENT-EZ FORM COVER PAGE Please indicate the types, quantities and locations of SCMs that will be used on this projer : Quantity I Locations) Infiltration System Sioretention Cell ! ! Wet Pon 1 I Stormwater Welland I Permeable Pavement ' - Sand Filler Rainwater Harvesting I _ Green Roof j Level Spreader -Filler Strip i Disconnected Impervious Surface I Treatment Swale I Dry Pond II Designer information for this project: Name an Title: Mad Johnson, PE Civil Engineer Organization: 'Triad Design Group Street address: 4807-C Koger Blvd City. State, Zip: iGreensbom NC 27407 Phone numbeds): :336-216$282 Email: Imjohnson@biad-deisgngroup.com SEAL 30521 `Fn'GINEEP� Smon igna Designer '110.611 } Dates Applicant: Project D DaV'da Spencer Address 1287 N Salisbury Ave C !Town Spencer NC Company: IRHGC Spencer LLC Contact: .Mr. Robert Langdon Mailing Address: 223 Hwy 70 East Pointe. Suite 100 City State. Zip: (Gamer NC 27529 Phone number(s): I919-582-1001 Email: Certification Statement: I certity, under penalty of law. that this Supplement-EZ form and all supporting information were prepared under my direction or supervision: - that the information provided in the torn is, to the best of my knowledge an belief. we, accurate, an complete: and that the engineering plans, specifications. operation and maintenance agreements and other supporting information are consistent with the information provided here. I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing violations as well as a report being made to my professional board. Cover Page 1 11:19 AM 915/2017