Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3170606_APPROVED PLANS_20170927
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW Y/ 4&4/ 7 DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD DA � RA / _ i- - .- A m+ I GDING LEGEND 0 20 Ac. �" vaOPEary unE r l r / ; ,/: - _1 I .PROP F) °a �• ) 1 I r �%� /r� �• � ,'�� xm•' DA CI-9 c v4'� � __ ' s -�, (34,�6��� ��. � ) ___ wGxTOE.wnv urvfi 'I r // �, �� %,: .i,/��.. - _. owe �. gym• , — — DA CI S`., vEfy-fi'pz-_exrsnNGaae uxE 0.26 A �s 1 me=NTz r — — — cGxEau weuc unurr FABFMENT ' Oi: •%i.'/% / e • / m� � ': I EYIS'IING MINOR CWROUR m 4G nnwa CONTOUR nz vaawsEO MINOR mMaua GO- l t � ,. na vaavasEn rwoR cavrouR ,i ICY Vv -1 `�'ri�_ \ / 11\eGazz-1.. / Mu NG STORM MOPE I E%LSIING GTCX 0451N I \1 - ell, vawosen 5'.. MAN OU Dal e \ `<. , 5 Dii �I-1G3 08 Ae. Y 0 35 AC_. mRO PIPE ulD wwNae �' 1 \\ ' _� P0.oW5E➢R.C. P. b i 0.fA a `,__ � PROPO I DA CI 14i1g) \\ Y PaorosED $LpRM rnxoDwx rs�it s1�cn \ r .. aza m X, CI-11 0;65 Ac PRovosED s.oav ORaNacE MANHOIt // 0.32 ACs. w��)n(� ees� V - Aa'' (♦ RROR DarseIN� (0) PRORSDDUCH INI (or) Y \_ Y ��! gXistin€ 1Yl \ �6 01fi ..,v.. _ 18 wa• _ I DA CI 10 ! � r o e�^ w PROPOSED RAREo wosErnw+ ;d(II I T a tl ep' h @�vq , ITrP. \h�._ PROPOSED RIPPAP MORON SF 1.z6AE_, I4 ;,�1m �,; 11�,'` _ - a e .~�aeJ ,-a_- '9'I 1 � � � N �'�y� .1m) �I \. � TtLPC5E0 PERMANENT SWPlE PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE MTH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES. P.A. ---------------- I GRAPHIC SCALE ,\ I l 1 IN !1� I • Know. what's b@IOW. Cell before you dig. Approvetl: Dale of laaue: -- _ _ - - , 1 ' \o e _ _-;APPROX FRIS ��I �APPROX �... ... �+N - f., �_ F(OOQwq l -RISC MpR ON \ \ —\ - / �5,\< E �Ensr iREEurvE OOO ( m _ CREEK _ /• / / / / / / _ \�\ \ \\ "'`f ')//P ��. - \\ N m+ni. ft GRADING LEGEND DENIAL DETML \ \ N' SYMBOL DFSCRIRION NtOF40.tt LINE ,'/'/' / .�,�, \IFI RIGNT#WRY LINE /' E%ISIING WasIINE ./ ii •/ ,�'•$'i,:/•, - .\ „(1-_- \`` _ ',1`�£/ //i :: f/ = \\`.�`.'\�` \ \� _ GENEML NBIICMLfTY F/SEMENT /ii;'/ii://ii:/i' '�:'' '% �� - Y,: �� \� \�\ `:\l`` 1\ _ .�(f ,•/i i/i �'�/� � '/•� \\ �\`::\�\.� _� / _ FISTING MINgi CONROUR /y,/.i.::1L1�%�� / _ 1. ,\,� \\`,` \ ` ...5/G_ / / f j / 1 \.\,.\•1 ` 'l E%ISTING MAbR CONTOUR .\ 722 Po PROSED MINOR CONTOUR l'A''•-720 PRWRDSFD MAICQ CQYiW fi, DTSTNG STORM PIPE 11 41I i U . 2 9 _ 1 �"/' L / 1 M : - 1- ••.. �.— 8 •:.' \ \l P5 -'.� • PRPoE 6INC OS' YNTTMY �% ) 11 3 1 roSEWER PIKE Po C ulo MGNMOIE A0.FA DA 6 \ ,� 1 . '.. PaosRP. �.a i � DRAINAGE e \ ` \ / \ 1 : •awn },- Ages) t / _"_ �\ �y"'! (3090 C — ' eU \; s�ine,r¢xMn OY PROPoSEO STORM TPAD OWVN TROMORD STORM DMI.GE MFNILOL �¢ 2=. L_. w, v / 'l,a PRwosED wits INET (a) \\ \\i {/.S rs• PROPOSED PuaeD[ T(Do aL / \\ \\\ \ \ \\. U 11 Existing 1 ) t r til 1 m �r _ I �11 1 -t i 1 ID9 ? 3 8 el 11 -..i�a 1 a_+' .1 PROPOSED RlP.RnPnvaoN _ Flpj85B 8] �.• -•1 1 Existing 1 11 ..`, I It 1\ _h _ .- \ ' PROFOSEDRBIENNENT$WKE _ 1 Building 1 1 1 11 ��� ' c, _ `�� \\, 125335E 1 \ 1, _�� u , TT _ _I I 11 v li 11� GGL II _. II ► N 11- E�istin° ilding \�� B`15F 1 1 �' y9 , / �P a s a ►►�� �, L _ Raw'- = \\ — __--- -i r I� w" i..� _=�' �• .00 � GRAPHIC SGdLE Rl`N µ (APP�ox. 6 — r erstate Road w - , I-40 In Know what's b010W. Cal I before you dig. PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: Dole of leaue: --_- - Existing 1� I s 1 1 j �. 1 �, w j ExistingSF 1 1 S \ 1 1 PUBLICATION OR REUSE OF THESE DRAWINGS OR O — \ 1 IDt \MI � F.ay,�J 1 Existing 1 \ l Building 11.531 a M 1 1 35E �. 1 F'FEBs6f) II�M -� I JI 1 n �- �/ ? _ - . - �oq -. —.�•. f . _. _ . ` ROX FRIS q MOR SON EREEK _ � i eDe / ONEI � � DETAIL GRADING LEGEND DETAIL _ f I / SYMKI DESOUw10N -eD+m ' - CSPI I / \ / 1 �\ S PRDFEAm uNB _ pop e o, M/ — wG11roP-wnv uxE a / IXISIING NRB LINE IIDT / 1 �1 GENERPL PDBUC MLIIY EASEMENT .. - WSTING MINOR CONTOUR 6 ESISrIVG MA]OR COMOIIR I� C111 ' \ 1 / >dd PRONSFD MINOR COMWR WW 9 r RD PROPo DMAIORWNTWR E%6TI4G STORM PIPE EATEN BASIN ' 1 �` BssPROPOSED • / i SEWERPIff PND MPNnOI£ RAGE AREA DA 1 e gORAGE i \ PROPOSED R c.P 35F j-` -a 99 Acres) kexa�N15 \'— !'1#\ ♦. Y PROPOSED STORM YARD qWx PRGY(iED STORM DPAINnGE MN11glf �S PRCPogf D NRB IN(a) S es o t PRUtlSED DRCH IMfT (DI) 616 u PROPOSED FLARED END SETnON OF N � ^916 / fa MIN' PROPOSED RIPRPP ANON A b m % �' _ J B,1 PROPOSED PERMANENT S.P JB3n 10 IIIIIIII ,., I 039 939 -� 1 ST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN a I / / I I l I I \ P.A. Owner: GRAPHIC SCALE Know w, is below. Call before you dig. Dote of I..ue: vA jvo� Ahon C"AL= VdIr" OcXL E7"v ,oHP 1Fta' ) APPROX. RIS I �Rok FRISK / / f —_rwP F 00OWe... MORar _ � I U77LMES CONTACTS POWER: STATESVILLE ELECTRIC UTILITIES WATER: CITY OF STATESVILLE PUBLIC WORKS GAS: PSNC ENERGY ROCKY MARTIN 704-878-3564 PUBLIC WORKS DEPARTMENT 301 SOUTH CENTER STREET P.O. BOX 100256 COLUMBIA, SC 29202 STATESVILLE, NC 28216 1 (877) 584-7762 TELEPHONE: AT & T Mr. DEREK SLOCUM Utilities Protection: NORTH CAROLINA ONE Call 1 (800) 559-7728 (704) 878-3567 811 OR (800) 632-4949 ':J `> SEWER: CITY OF STATESVILLE PUBLIC WORKS IF YOU DIG NORTH CAROLINA... PUBLIC WORKS DEPARTMENT CALL US FIRST! a�C `tom 301 SOUTH CENTER STREET 811 or 1-800-632-4949 STATESVILLE, NC 28216 ti Mr. DEREK SLOCUM (704) 878-3567 PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES P.A_ Know what's below. Call before you dig. Owner: ,ws�gx� .. : SITE a N ' ITE eo TS fiai QQ :9tauat,3 tt � ....riT°r-5 VICINITY MAP NO SCALE .� 171MXAr.�&ym/mli*M C-1 EXISTING CONDITIONS AND DEMOLITION PLAN C-2.0 SITE PLAN C-2.1 SITE DETAILS C-3.0 GRADING AND STORM PLAN C-3.1 EXISTING RAW WATER LINE PLAN AND PROFILE C-3.2 - C-3.3 GRADING & STORM DETAILS C-3.4 - C-3.5 BMP DETAILS & SPECIFICATIONS C-4.0 PHASE 1 EROSION CONTROL PLAN C-4.1 PHASE 2 EROSION CONTROL PLAN C-4.2 - C-4.3 EROSION CONTROL DETAILS C-4.4 EROSION CONTROL & GRADING SPECIFICATIONS C-5.0 ONSITE INLET DRAINAGE PLAN C-5.1 EXISTING DRAINAGE PLAN C-5.2 PROPOSED DRAINAGE PLAN C-6.0 LANDSCAPING/PLANTING PLAN C-6.1 LANDSCAPE DETAILS Pt�EPARED BY: ENTGINEER: PIEDMONT DESIGN ASSOCIATES, P.A. Eiv GINEERING/SURVEYING/PLANNING SUITE 101, WESTFIELD CENTER 125 EAST PLAZA DRIVE MOORESVILLE, NORTH CAROLINA 28115 (704) 664-7888 SURVEYORS: PIEDMONT DESIGN ASSOCIATES, P.A. ENGINEERING/SURVEYING/PLANNING SUITE 101, WESTFIELD CENTER 125 EAST PLAZA DRIVE MOORESVILLE, NORTH CAROLINA 28115 (704) 664-7888 PREPARED FOR: OWNER: RANDY MARION CHEVROLET OF STATESVILLE MR. ERIC BROACH 1011 FOLGER DRIVE STATESVILLE, NC 28625 ofld, of �F2 (888)285-2412 ONP" DEVELOPER/CONTRACTOR: %1C A G.L. WILSON BUILDING COMPANY \0,;�k�", MR. JEFF KERLEY�'_''' 109 WILSON PARK ROAD ( 7 27 STATESVILLE, NC 28625 (704) 872-8281 ,'pti ,�. /''10 `\ Approved: Date of Issue: '._' � �_.! ,�_ 6•�.t � :�.: :.:,. ., ,.I:'. _'. •_ _. _.. _ ... It _. _r1`L Flu.. ._._.�- _ _—.___- , PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: `k Site 40 VICINITY MAP NO SCALE EXISTING LEGEND PROPERTY LINE - - RIGHT-OF-WAY LINE EXISTING CURB LINE GENERAL PUBLIC UTILITY EASEMENT - - - - EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING WATER LINE EXISTING FIRE HYDRANT EXISTING GATE VALVE EXISTING WATER METER —ss ssm — EXISTING SANITARY SEWER PIPE EXISTING SANITARY SEWER MANHOLE EXISTING STORM PIPE EXISTING CATCH BASIN GRAPHIC SCALE 100 0 50 100 200 IN FEET ) 1 inch = 100 It, Know what's below. Call before you dig. Date of Issue: zU 'N list a:00 DS A CNr- d r— zyro U o� O o Uzx H b ti L� � => A Q 00 00 3 0� Y U G a 0 U Lo CN Qy 00 N 00 a000 a- z I cV z O _ LLJ 11- � 00 (n U]�U)0 Ld CD Q o w C/) Q L w o' Z 14 Cf)W 0 z� P 0 � E—+ cC p� E-4 C. W O Qx �� ►� �, I� rVT,1 W w `� ' 0 V1 0 4 IWO REVISIONS BY Date: 7/21 / 16 Scale: 1" = 100, Drawn: JCW Necked: DLM Project: 2015-06-03 Job: 2015-06-03 Sheet C-1.0 of Sheet NO CURB THIS SIDE R62.0' NEW V-6" CONC. CURB & GUTTER —_�PP�-�P j s6s 59 PI(DB 10801752) 2 OH v 4; : l IP�OHP 0 I 0 _ _ _ E Cityof Statesville jL N _ ? _ z I P.O. Box 1111, / APP I APPE) \ , Statesville, NC 28677 ,E _ RO `p F _ \ Zoned: O+I-2 X. FRIS 1 �_orlP�� FAO � � I X RISC ' � _ — =-- _OHP _ �OWA 1 MpRRI _ 581°03'16'E I' / SON C / m i / omP�oFIP \ /��' R ^��1 W qP PROPin # 4745149307 V-6" CONC. UTTCURB & \ \ DB 2459-1127 I GER (TYP. \ \ \ Dawn Properties, LLC 1 \ / 220 W. Plaza Dr. R151.5 40 1 ) / (Boc)' / Statesville, NC 28117 / Zoned: B-4 i R10.0' ii VD L.U1CL333 237 9, ' (Boc) 30.4' y 214,1' Dawn Properties, LLC SAWCUT 1 m R P.O. BOX 1559 Statesville, INC 28115 PVMT. EXIST. , Zoned: 6-PAVED ,0j so► 1 AREA 24.6' ► - - � � , ATHIS N1.5CONC. ► _ � go 00 4 - SIDE CURB & UTT R GUTTER � . Exfisting ► ► • Buildin _ , ► _ ►01 EX-CI-12 NEW PAVING SHADE (TYP.) 39,752� ; E iSU116 ; I B ilding ; I 912 SF ► =862.92 �. Pin # 4745247566 DB 96E-493 Phillis W. Edmiston, eta[ 2549 Amity Hill Rd. Statesville, NC 28677 Zoned: B-5 Pin # 4745247240 DB 2404-528 J.P. Hospitality, LLC 703 Gaither Road Statesville, NC 28677 Zoned: B-4 ► rcau"�i, -„ EXISTING PA11115111 MATCH PVMT. ~— P I GRADE AT TIE-IN ow EXISTING CONC. 22,-�- EXISTING TREE I . SIDEWALK -� WALLS (TYP.) N7 '2 °E 70' R/W 0. -15.IT __29530.00 —►wW 0. - —� EXISTING ✓43' I _ - I FIRE HYDRANT r - Roa EXISTING I %� d 1 t ej ' I SIGN _ __-_- �pa16'34 _ _r — 60.0' 300.00-- _ PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: 4pproved: P N Site e y -,�.*' w crm+r�i GAISNER 1-40 �M w� VICINITY MAP NO SCALE SITE DATA: RANDY MARION FORD PROPERTY AREA = 33.99 +/- ACRES PROJECT AREA = 8.79 ACRES PROPERTY ZONED B-4 (BUSINESS) TAX PARCEL ID#4745243304, 4745149307 & 4745142541 DEED BOOK: BOOK 2312, PAGE 2353 (8/11/2014) BOOK 2052, PAGE 56 (3/01/2010) FUTURE BUILDING TYPE: COMMERCIAL FUTURE 1 STORY BUILDING: NONE PROPOSED FUTURE BUILDING AREA = 0 SF FUTURE BUILDING EXPANSION AREA = 0 SF TOTAL FUTURE BUILDING AREA = 0 SF PARKING CALCULATIONS: EXISTING PARKING SPACES: 281 REQUIRED PARKING SPACES: TOTAL PARKING SPACES REQUIRED: 80 SPCS. (2 PER 1000 SF BUILDING) (EXIST.: 39,664 SF) NEW PARKING SPACES: TOTAL NEW PARKING SPACES: 31 (PAVED) TOTAL PARKING SPACES PROVIDED: 312 (PAVED) TOTAL PROP. PRODUCT STORAGE SPACES: 0 STORMWATER: STORM WATER DETENTION: WET POND (2 & 10 YR STORMS) WATER QUALITY: WET POND (1 INCH) EMERGENCY SPILLWAY 25 & 100 YEAR STORMS POST CONSTRUCTION DISTRICT: N/A STREAM CLASSIFICATION: MORRISON CREEK (CLASS C) STREAM BUFFER: 25' (CITY)(EA SIDE OF PERENNIAL STREAM) WATER SUPPLY WATERSHED: N/A (NOT IN A WATERSHED) FLOOD: A PORTION OF SITE IS WITHIN A FEMA FLOOD HAZARD ZONE (Map #3710474500J) (03-18-2008) MAINTENANCE: BY OWNER STORAGE PAVING MATERIAL: GRAVEL (w/sealant) NO RETAINING WALLS WITH THIS PLAN (Future Only) **PAVEMENT SHALL BE CAPABLE OF CARRYING FIRE TRUCK LOADS OF 80,000 POUNDS SITE LEGEND DETAIL DETAIL SYMBOL DESCRIPTION PROPERTY LINE - - RIGHT-OF-WAY LINE - ==--- EXISTING CURB LINE GENERAL PUBLIC UTILITY EASEMENT PROPOSED FUTURE BUILDING PROPOSED CONCRETE SIDEWALK 1)a,, PROPOSED HEAVY-DUTY ASPHALT PVMT. PROPOSED LIGHT -DUTY ASPHALT PVMT. ' GRAPHIC SCALE 40 0 20 40 60 It ( IN FEET ) 1 inch = 40 It Know what's below. Call before you dig. Date of Issue: ZO > v � �H A yiNr- r- W N � o O Uzk A Qw °° > 00orc 004 F.y c 1� `0 a ^1O W O to O 1� 00 Q Y N 00 Q U 0000 I a- zELJ N O J 00 M J I O3�: LLJ 0 o y O w Q � a w Z 1� N0 C110 = Q �P4 O G.> M G> Z 4 E"1 1- �i Qi w WL L4 b L REVISIONS BY REVISED PER NEW BLDGS JCW 9/14/16 REVISED PER STORM & GRADING CHANGES JCw 10/7/16 REVISED PER OWNER NO BLDGS.-NO WALLS JCW 02/24/17 Date: 7/21 / 16 Scale: 1 " = 40' Drawn: JCW Checked: DLM Project: 2015- 66-03 Job: 2015-06-03 Sheet C-2.0 of Sheetsl 1 "-61" 24'-0 " 1' -6" (PA VED HOULDE VARIES A D C SLOP- - 2 09 f VARIES 24.0' MIN. 18'-0' 2�1 SLOPE (DRIVE LANE) (PARKING) (COMPACTED) DITCH A" k 7 B DISTANCE VARIES 2'-0'" 27'-0" B C TO BIC VARIES 1 "-6" VARIES VARIES EXIST. (EXIST PVML) 2' 0" 13'-6'" 13'-6" 2'-0" SHOULDER STORM I I'� '- STORM DISCHARGE 1 -6" SHOULDER 1'-6' 12'-0" 12"-0" 1'-6" SHOULDER BLDG. STRUCTURE I PT. 17A 2 �1 SEED (SEED) CI-16 A - CP P/PE �` D - C D SLOPE 1� AFT 3 3 EXISTING SLOPE 2.0%t WET �1 1r SURFACE A COMPACTED SUBGRADE --„ -, ,,�1 �' C (95% STD. PROCTOR) >n POND 1 N �I B I COMPACTED SUBGRADE-/ B COMPACTED SUBGRADE (95% STD. PROCTOR) I I 6"• (95% STD. PROCTOR) 6" —� COMPACTED SUBGRADE B 6" AO 2.0" S9.5 B SURFACE COURSE I I (957. STD. PROCTOR) © 6" OF ABC STONE RCP PIPE AQ 1.5" OF S9.SA NORTH AMERICAN GREEN AEXISTING PAVEMENT ©l'-6"" STANDARD CURB & GUTTER YSTORM 6" OF ABC STONE P300 PERMANENT MAT 6" OF ABC STONE OD 2.0'" OF WASHED STONE C 1'-6" STANDARD CURB & GUTTER OMANUFACTURER (INSTALLED PER SPECS) © l'-6" STANDARD CURB & GUTTER @ 1"-6" "SPILL'" TYPE CURB & GUTTER (OR EQUIVALENT) STRUCTURE CI-2 STORAGE AREA SECTION I REAR DRIVE SECTION 2 UPPER LEVEL IMPROVEMENTS SECTION 3 N.T.S. N.T.S. N.T.S. `� %%uNOTES: OF 24" E TO OF W. III TRENCHNIMUM MUST BE ALLOWED FORTSIDE COMPACTIONEOFOFI L MATERIAL. BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER FINISH 2" SURFACE COURSE GRADE TYPES 9.5B III- P THE PIPE IS LAID. THE FILL AROUND THE PIPE SHALL BE PLACED IN Z", LAYERS NOT TO EXCEED 6". UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS .i _ _ BEEN PLACED. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY THE 2• III I III USE OF MECHANICAL TAMPS ONLY. EACH AND EVERY LAYER OF BACKFILL II III SHALL BE PLACED LOOSE AND THOROUGHLY COMPACTED INTO PLACE. y xa�,a - �....._ �.-_ .� OUTSIDE DIAMETER III- JIB 8" -III III- 2. ALL BACKFILL MATERIAL SHALL BE CLEAN SUITABLE MATERIAL AND =L SHALL HAVE AN IN PLACE MINIMUM 98% STANDARD PROCTOR COMPACTION. 2, III 3. THE FINAL 2' BELOW FINISHED GRADE SHALL BE 100% COMPACTION. 8" BASE 6" COURSE ABC -I ir, VARIES (15" MIN) II 4. ALL TRENCHING OPERATIONS SHALL MEET OSHA STANDARDS. COMPACTED 24 4 5. BACKFILL MATERIAL BENEATH ROADWAY SHALL BE SELECT BACKFILL SUBGRADE MATERIAL. CARRY BASE COURSE 6" NOTES PIPE SHALL BE PLACED BEYOND SURFACE COURSE T APPLY DUAL BINDER COURSE IF ASPHALT BASE ON SUITABLE MATERIAL AT LOCATIONS WITHOUT CURB AND GUTTER LAYER WILL SIT OVER WINTER PRIOR r0 FINAL SURFACE COURSE. LIGHT DUTY ASPHALT PAVING TRENCH DETAIL FOR STORM DRAIN PIPES N.T.S. N.T.S. FINISH 3" INTERMEDIATE 2" SURFACE COURSE GRADE BINDER COURSE TYPE TYPE S 9.58 —19.08 -� } v 10" BASE 6" COURSE ABC COMPACTED SUBGRADE NO CARRY BASE COURSE 6" 1. SEE SPECIFICATIONS FOR OTHER BEYOND SURFACE COURSE REQUIREMENTS. AT LOCATIONS WITHOUT 2. APPLY DUAL BINDER COURSE IF ASPHALT BASE CURB AND GUTTER LAYER WILL SIT OVER WINTER PRIOR TO FINAL SURFACE COURSE. HEAVY DUTY ASPHALT PAVING N.T.S. '/z Rwlus 1. TE CON 6" 1'-0" 1. CONTRACTION JOINTS SHALL BE SPACED AT 10-FOOT INTERVALS. FOR VALLEY GUTTER, A 15-FOOT SPACING MAY 3- RADIUS BE USED WHEN A MACHINE IS USED. JOINT SPACING MAY BE ALTERED BY THE ENGINEER TO PREVENT UNCONTROLLED CRACKING. 1/8" RADIUS 2. CONTRACTION JOINTS MAY BE INSTALLED THE USE OF V iv OR FORMED BY OTHER APPROVED METHODS F.P.. WHERE SUCH JOINTS ARE NOT FORMED H'I TEMPUTES, A WHERE U m MINIMUM DEPTH OF 1 1/2- SHALL BE OBTAINED. 3. ALL EXPANSION JOINTS SHALL BE SPACED AT 90 FOOT INTERVALS, AND ADJACENT TO ALL RIGID OBJECTS. JOINTS STANDARD CURB AND GUTTER SHALL MATCH LOCATIONS WITH JOINTS IN ABUTTING SIDEWALK. JOINT SEALER- 4. TOP 6. OF SUBGRADE BENEATH THE CURB AND GUTTER RECESSED 1/8" TYP. SHALL BE COMPACTED TO 100% STANDARD PROCTOR DENSITY. SURFACE OF GUTTER 1/8'R TYP 5. CURB SHALL BE DEPRESSED AT INTERSECTIONS TO PROVIDE FOR FUTURE ACCESSIBLE RAMPS. r 6. CONCRETE COMPRESSIVE STRENGTH SHALL BE 3600 P.S.I. IN "....� ...,. •.,. 28 DAYS. JOINT FILLER t1/2" TRANSVERSE EXPANSION JOINT 1'-6" CONCRETE CURB DETAIL N.T.S. Location: PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: Date of Issue: Z o U Q~ fJ.T a: C A �N00 CIS lz {A 1 0 •lv U O Q t� U Z iC �w A Q I > KXJ 00 0 1 Q a 0 Ln G 00 — Q Y N of U N N Z LLj I- O _J 00 C/) _ I O � w o Q o o w a_ LL w n b L ON CIO W CIO +� 4r Vl �F•i �w0 1--I w O a �Q w z E-4 V1 0�`` 10 REVISIONS BY Date: 07/21 / 16 Scale: AS NOTED Drawn: JCW hecked: DLM Project: 2015-06-03 ,lob: 2015-06-03 Sheet C-2.1 Of Sheet �. � .1 5 .. • ...r .. .. Ire etl i� � 6 �.. .., . 0 o_ m CL 1D ,n LMI v n 0 N 0 m 3 v m 0 c N v X 0 0 0 m U c T 0 tD O LA O i Ln 0 v a tM c 41 c c P OHP j oHP�-OH TEMP. SILT FENCE \ NG� I _ _ i� / STONE DAM /� v GAT OF_ /�/\�Q' __ ' 1 738 / APPROX. F T wAY ( APpROX. ` `' \ , TEMP. TREE PROTECTION 7as RIS F I I FR \ FENCING (ORANGE) / , 7� LIMITS OF CLEARING/ GO �� C ' \ 7sz DISTURBED AREA OHP�� - OO�^ �QR _ 3 oHP�etL � ry y ' RISOIV - _ _ EMERGENCY 794 1 ' �--OHP \ \ I�C 7as ,Y CRCF SPILLWAY - ep3 L 796 T - '1 �j- ` TEMP. SILT FENCE _ / / ROw 7 Ok 9a g0 � \ � � `` \ STONE DAM TEMP. DOUBLE SILT FENCE PROP. V-6" CONC. CURB AND GUTTER PROP. V-6" - CURB & GUTTER 1 TEMP. TIRE & CONC. WASH PAD AREA I 791 Sob �. 792 a0s o_g15 t ? O 1 j 793 GaBz-\ O �, PROP. 1' 6" CONIC. CURB o FES Pl l 80 82 a13 AND GUTTER Bib '2.3"/0 `.: S �. 796 BIH, �- ^B� 8I \ 7s7 G epz 82s-r - I \ \ BIS ° \ ' 79e ,- ll o PEOL 3.4 -1STRUCTUR \ 62O\ J' �7sa o E 1 �•� 62 az3.o0 2 eo z SHELf 806 ." I eo°i � \ - titi• ' so3 ' rQ LIT 808p4A� CS-P1 824 ;DI-7 \n, r g0.. - s00.50 TEMP. 3" SKIMMER 8.._. 8 82? STORM STORM \ 805 _ DIMENT� 1 DRAWDOWN INV. =800.4 6:6 "NETWORK'A' NETWORK 'A' , , _ •TEMP• S (CONNECT TO PERM. STRUCTUI P 1 (SEE SHT. C-4.2) RM B2 TEMP. BLOCK ANDGRAVEL INLkj, PROTECTIONtWP.) ' \ S e FIE -1 802=803'804�805�806 PROF`. V-6" CONC. CURB !j _ sza.o �w� AND GUTTERS M SHELF . 807 1 EXIST. POWER POLE zz.90 ORAL. -808- (') (TO BE RELOCATED) \ 1 81 z o ^ pj 810 809 (ApINTENAN PAN 1 811- 824:60 (O. DiTCH IN) e°' 813 \ NEW PERM. DITCH a,9e9 (USE PERM. MAT) m� , "' CI-15 (20' WIDE -NAG SC-250) v °�� a 15 Rtp i r > :`�• PROP. GRND. 821.18 N $25 EXIST. GRND.=811.94 825.E ' vQ 1a" RCP 1 30" STORM INV. 81168 .68 � a 8" DIP WATER TOP=803.76 24" RCP CI-13 STORM - ,y a2 BIB CI-2 NETWORK 'A' PROP. 1-6 00 ${� • I \ 822 PROP. 1' 6 1PRORCURB 822� \ CI-3 m STORM 1ND C CURB &GUTTER titi 830 6 e{8 ' i TOPO`FPIPE=EL.808.85 m NLET(TYP.) NETWORK'A' N m O 1 $35 2S EX. DEPTH = -6.24 FT. r e{9 PROP. DEPTH = -13.30 FT. O m m s a45 ryo e3 �'t&PH 2 sti ' 8Z3' BIB N� Bz3PROF Bso F I o> es ° I �_ n n TOTAL DISTURBED t • 8 S TIE INTO EXIST. 18" e� 82F EXIST. 30" WATER MAINN m 5ToRA A _ 8.79 AC. 1 o d' 66 g FO MANHOLE MH-19 g23' L W/30' UTILITY EASEMENT m ��� � jA4 � DISTURBEDJAREA 'La o.o' asx SS ez4 .STORM ` • - �s 824---�- (REMOVE ANY REMAINING �N - g5 (Boc) EXIST. STORM O 824 B ' TREES AND SHRUBERY NOT w� 8S� 863 PIPING (REMAINS) �� NETWORKC' 82z PREVIOUSLY REMOVED) 848.00 ♦ 8 (CL DITCH'A') g5A '•... �. N STORM -' ZS\ , '' ' 820 6°1 - LIMITS OF CLEARING/ DISTURBED AREA 809 TEMP. SILT FENCE an 821 B22 ■ TE MATCH EXIST. MATCH GRADES AT �,�? NETW 825 PE TEPRIP-RAP r _ woop CONSTRUCTIO GRADE EXIST. BACK OF CURB ti PERM. RIP -RAP ' �' 824 STORMRIPE DISCHARGE PT. 17A s?2 1 ENTRANCE s ' I - 6 ei 625 TOP OF PIPE=EL 8Fr.18 854 85 '.- 1 926 ' EX. P. PTHDEPTH = -6.-7 Fi. - -16 823 Existing 1 � _woop 1 9. # 826 1 ?& PROP. DEPTH = -7.67 FT. c 3 • � \ - 826 H ,L .1 Building 1 1 10 EX-CI-12 s 879 e 8?a -----------626 39,752 I pg:858.87 1 1 Existing 1 a32 879 � . eta 1 Bu lding 1 833 827 PROP. V-6" WOW s5s i e $ 834 1 STORM CURB & GUTTER _ SF I Z 835 r4 NETWORK'B' OP. 1'-6" CONIC. CURB woo _ WOOD1 12,533 37 1 ? .0; �> 836 lkl SS _ AND GUTTER esl 1 856 D ca a37 0 628 STORM 38 1 NETWORK 'B' �, aza asa 1 1 852 41 � w �N 839 840-1 3p 82s snow .4 859 1 1 ° I' 92e g41� o /a 535 N NCDOT PARCEL V eQ I _ 1 861 1 CO830_. 1 - •. -4.6:1 moom xisting 1 1 2.0:1 I 862 � MONO woo_ B99ds g 1 o -8S 845 0 02 s �s FFE-862.9� 1 m m TOP OF PIPE -EL. I 831.06 m EX. DEPTH = -5.85 FT. �` 39 1 PROP. DEPTH = -13.16 FT. (/ EXIST. PAVED AREA MATCH EXIST. (REMAINS) GRADE E, Oslo Sfix .- 0 _ o L_1570y0 -w1hl 71 a� d e _ - 0a _ 8 - " - - aithe R - - - R p W) _ 60 _-- - (ApProx. �o m NO RETAINING WALLS TO BE INSTALLED WITH THESE PLANS SEE SHEET C3.2 FOR 30" WATER MAIN PROFILE PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: nfNnd STORM STRUCTURE TABLE STR. NAME: DETAILS: PIPES OUT NETWORK RIM = 821.09 CI-2 INV IN = 809.50 78' OF 36" RCP @ 10.30% Storm Network A INV IN = 814.60 INV OUT = 805.00 RIM = 821.21 CI-3 INV IN = 810.80 70' OF 30" RCP @ 1.57% Storm Network A INV OUT = 810.60 RIM = 820.52 CIA INV IN = 811.50 48' OF 30" RCP @ 1.05% Storm Network A INV OUT = 811.30 RIM = 821.79 CI-5 INV IN = 812.95 144' OF 30" RCP @ 0.52% Storm Network A INV OUT = 812.25 CI 9 RIM = 827.74 39' OF 18" RCP @ 11.84% Storm Network A INV OUT = 1322.80 RIM = 821.06 CI-13 INV IN = 815.30 89' OF 24" RCP @ 0.56% Storm Network A INV OUT = 815.10 RIM = 821.06 CI-14 INV IN = 816.00 88' OF 18" RCP @ 0.57% Storm Network A INV OUT = 815.80 CI 15 RIM = 821.06 „ OF 15 RCP @ 0.59% Storm Network A INV OUT = 816.50 RIM = 820.34 DI-6 INV IN = 814.00 16T OF 24" RCP @ 0.51% Storm Network A INV OUT = 813.80 RIM = 821.20 DI-7 INV IN = 816.50 126' OF 24" RCP @ 1.59% Storm Network A INV OUT = 816.00 RIM = 823.00 DI-8 INV IN = 818.20 94' OF 18" RCP @ 1.59% Storm Network A INV OUT = 818.00 FES 1 RIM = 802.00 Storm Network A INV IN = 797.00 STORM STRUCTURE TABLE STIR. NAME: DETAILS:RIM PIPES OUT NETWORK CI-16 =8 '19 64 OF 18 RCP @ 6.24% Storm Network B INV OUT = 32.00 RIM = 832.82 CI-17 INV IN = 828.00 40' OF 18" RCP @ 0.99% Storm Network B INV OUT = 826.40 FES-18 RIM = 827.71 Storm Network B INV IN = 826.00 STORM STRUCTURE TABLE STIR. NAME: DETAILS: PIPES OUT NETWORK FES-20 RIM = 825.30 Storm Network C INV IN = 828.00 MH-19 RIM = 827.34 25' OF 18" RCP @ 0.98% Storm Network C INV OUT = 828.25 GRADING LEGEND DETAIL DETAIL SYMBOL DESCRIPTION PROPERTY LINE - - RIGHT-OF-WAY LINE - - - EXISTING CURB LINE - - GENERAL PUBLIC UTILITY EASEMENT EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR 722 PROPOSED MINOR CONTOUR 720 PROPOSED MAJOR CONTOUR 4°r ut EXISTING STORM PIPE EXISTING CATCH BASIN -� PROPOSED 6" PVC SANITARY SEWER PIPE AND MANHOLE - PROPOSED R.C.P. YO PROPOSED STORM YARD DRAIN OD PROPOSED STORM DRAINAGE MANHOLE PROPOSED CURB INLET (Q) PROPOSED DITCH INLET (DI) ® PROPOSED FLARED END SECTION ® PROPOSED RIP -RAP APRON PROPOSED PERMANENT SWALE GRAPHIC SCALE 40 0 20 40 80 ( IN FEEI' ) Know what's below. I „z�h = 40 It. Call before you dig. Approved: Date of Issue: z cd A � 00 A ram* W C� H . N p� zfG .� as o u 0 0 $ Uz x LA LA CIS vow Q W 00 0 3 4 � o vl y Jc a ~ Q y 00 N 00 Q C-) 00 0- Z N Z O _j 00 U) c:) J J I > �h cn O LLJ r� o w (n Q d W 0_ d Z 0-4 r---4 0 v, /1W�1 �1 CIO cn O w v 1 O 1+1 M �0J A� Ic- 1 E4 W O V L A� E-I V � ```Iluuulg7 �77777u1�i�n� � �?``• REVISIONS BY REVISED PER NEW BLDGS 9/14/16 JCW REVISED PER STORM & GRADING CHANGES 10/7/16 JCW REVISED PER OWNER NO BLDGS.-NO WALLS 02/24/17 JCw Date: 7/21 /16 Scale: 1' = 40' Drawn: JCW Checked: DLM Project: 2015-06-03 Job: 2015-06-03 Sheet C-3.0 of Sheet 7 O PRe��1 V P Q � 100 1s.T a: A v>Nr- W col l- tic Im TO 1E Flam TOFM PlLL TMMFILL 4tay „y Wr M.9 RACAOF CI atdR .03 tXEp 'R --__ T -Ca -_-. v @adlW R6TB5. 4 •y Imo. i-i [�. •f T !- -f H I R•C" YR aEPTN NSit slcRa TE' L{a• ••e' ,qd { X Pswzat? At Cc of GsttfS pTd r \ �/ O e` WALL a" MALL S' TAAY.L. ~ V y NH O @ $ ' ON LYN`ILX. VNN ITEM IMI(A0,11 c RIIR dne IRRRFW M K m @ . v • -' ro pP"• 9 aPTIGVp:. TRUCYAW IKKiI.tlti[G PIM. Y RRTMY, m W 8AA ODEIS AT f.L i 0 p'TI^y MNau uRE R -_a QM)AW t.tA[ 4 - - aRG.W ui •-�_.. M ®""'-._'.�., LLJ ' H m T •1 8' WALL ;yJpGr�i OT „�'E Y c ,I 1 + iS" C£"As AS DIRECTED a TRI LEPEIK^ER. u,��0 •.yy� � b,� w N'2yS➢--'�,-'^-' - �t---..'`. _ O. m�Z H� C}{?IyiS2 .Z'-f ➢ °_ a 1. Sam (aAMN PSA ii¢ 4WPa31pKYI�A RE THE 8@Rp1 DLfO, CC9 ,T '� 0C .,,.....�� ..... w--' So SR y _ _�.__ a ..-�-®..-.-. "~- ..._ �_ W LL, I5•.� m {t,.�... 4" a' el.i tF,. O C� • It %I COOKIE PIPE ID UT IN WIN "Is, sm, Nm ';C Etta i1i U. 0C _� m .IOWA' 4GiMM''^^O� 2 8^-+i 8 ..-.r j 9".--"j 9„BCyT1*Q -xm R .n eAud+ar am W. uR.m. QUO s �00 ax T f WMADT AFOR � TAFFORD I Za•s r I .. -tI f ii I� OW zSH 0-In U TYRE^E". i`,Wa `b'GMYRs iN6t98 OtNNMt&f4iICnTBa. ;,...::'�:.:: OAy PDX. it-0' fN ReTaRT M i.iTM Uf!4 A` NALI.5 Afm MY`011 NLAH.. 4VEA �� HJ „�,) O AgIF'd dp�� Rp TYPE tY f� �T--� RR q i' .; '.'x - .. ..., .., ?,f•.`_:S -••,, •- , . E � CI -a' T@ ae'•a' IR REIIN+T ME d'- WLLLT ANa EaTYWI %A6. A40118I C ........ p Jq {y -I .. . .. Fetl SCE y ✓ ::..+'-:U .•- Sx J.• 8 N!Y' Q g PILL ,-• .rs:•-•.• , IV 1XNAFiFTIE9 itCWRItAst,YR W �O n -�' H i Z.D.te YEN. • H " FH C¢.iaRN4CT Nr TR PIPE FPA - I.O./r HIM. �J , _.d erc .- e. N,- THAN C' •1_ 1R 1. f"'-fM,ti f G , L i I }+-=•-►i "" -"'�'I W q "^ O • X ^SOE NatC 4!sW`RR Atc IMWREp 30XNbAR i'. •3 W O �' IDf f.di 7HM N - .•.,• Nut LSSt TINR e• PER mim m f G 2• 8E6TYON iS_R ~I" Wr m "Al r. O !lDRYAL EARTH FOUNDATION mo; NEW__i:ji L tITu '- - _- a.R.. M• -„' PART SECTION PART SECTION PART SECTION PART SECTION ' r HOCK FON�ATIDNS" WALL r WALL WiTN 4 UP ON WALE- ON WALL WITN4" LIP m -UNSUITABLE MATERIAL FOUNDATION I�' TRP or FILL- PIPE IN TRENCH �- TABLES OF QUANTITIES FOR PIPE SET IN PAD .. aTePa - STD. W, sa.M _..".�. _.� H _"^�_.^•.. I__.�_ a" e^ TO fLNATt• a TO OF FILL - TDP M Nsm___-^ ._ M 4" a. "N" "WY' 'T" 11RIVI e C IS ¢ m 4 O � ` = cal -_-^- f. �, �a A ss S r ^ Y.-. D nw OUR 12 T$^ 2R^ q r R. E M M.7 H .+•r""--� pT J >a Q ,.e+, .00 Z .y R, a.e Nn. D.e Tne LY f r!I Wi Rx R R F M sQ" f -7Ta a'-77a" d.a" o, 0.�7 a.Wa 6n ti cf v, .• T S x < ts, ^� RMINa LIIE ie, 4.R• �P� L[YE A E' , "Z eRNAE uNE °•._ _ _ '- zA .iuNN.RIr _ _ , Phi y a`'2x E" $Ef.T3S&i Y_X R' a d" >r Z a ts- ,'•3Sb" a'sia" o.aae a, ooe n.o10 iNpu rxE - , y a III M •,; :. D ' , I T .. _ WNdiDI Arced .., ;m a L 1 t; x m o ii _ . • .. r.>.: w r3T�n -, �.' •i,A• _. -PIR za rN.FMD- > ..:.. a , : � { o W r,. ayA„ a'.YWb" o,ax.. a.aa7 a.oTa a. oil O I %W q F'v � rf F.pAr¢ W-�- v 1_t.D-lM M. fFu aiNt°w [f YI FART SECTION Is j ��;( E/,. $$$ WTa, 24" f'-did^ 1'-04, 0'�21' a.aEi o.ota 0.0td p W � � � y � t� } F `� � � � ({) ON -----II A[REA li � .L ` .0+ MH I.s.rr HE L_as oxsccrER OF END ELEVATION g T a O iAp1 ' ' sei'im Isms If" « " MDP LSSS rwlt a" a; s.D SaN. D.O. NY deMNEEd �" � a�Nf i, f i•-234" a'-9L$" a.ai4 a.ott a-a23 H � •�" I e" � i TI � m ^' • ^".: N." *C yx- � `- ;I y Fare n nAceD �I rew FasT of ` 1- G fb 30" Y-aA" {C a S S " N T� ROCK FOUNDATION ri�kLFiH sI 1A M C 5ME f•"r p .. 'a eFsdE sa' to 54' Ptrs sa vNeR TIFM M.M +n W - Y 00 NORMAL EARTH FOUNDATION �p1 x O t'I a �a" r-aaa" a• -a• a.ot7 O.az9 a. o2s x Q -o W a "D'e IK iv N SUITABLE MATERIAL FDlHNOATICN •17 T 51s" C BEIxAA�. WTEN: J Q T d2" 2'-7i+d" 0.0 0.035 tfi V m s. fr" Ta 3a' FIFE is 1aEa x FBI as � � Q MERE aa' ra Da° P3PE sA uSLR Ir, I? .- Y-� Q U DD r H �Fy 22 t -7' D'-64j" 0.025 fJ� nzsen as. 1.-- "...., J 1M� 0- z Y W PRT DPEMTE WRIT E1WERWNI DER ART PIPE CILNTRY 0WIL TE PIPE WLVENT Ms Z XT Q "(' J to {,� l-+--I CN p I.D.. THE W1NE MIUMMAL IRSIEE DIAMLTEA MIM1010. MR, N%n M s M RPILIED AM CMIMI 101e AT LIAMT a PUT IF AK40M NATIM[W. I qi ad" 2 -f 04" 1 ^ 0` •S'•�I" 0.028 D.iI;Ee a. a47 W � jI - ... - f On 'A 9.a.. THE WIIPE tEESYONIRL W783m DIAMETER I)MIN M. - • - • - MIGRAINE OF Pitt44 r� = N -TIE PILL NEIER SSANCRED VEMTCALLY AT un Y92NP MLEDI SUMILL wwIAL CAM III M CLASS St, 3 Sa" $•-aJ.s^ T' faI•$• a' -sill' a. W5 a.0a7 a.OSS ` ° A J W WERE TIRE PIK PWN THE TO a ISIE PSFE TO 11E TO ® MWP ORIMLIM, ( GENERAL NOTES: 4 'i ® F -1 a ) J W iNE YEAMIEED AT TRAIT POINT. PAPMevEp MEUNE tsarK ddIERIAL ADDIE WOM.IM. j USE THIS STANDARD WITH ALL DRAINAGE ST N0• 0�. gam^ 2' Off" a' -SSA" 0.04 a.asa 0.071 "- � / O J TRIP P,M, W e,,,y COW ERn OR NM W PIPE OEMFILL. ,�-�ysngw GA4TN NATERML YMIP REINFORCES CONCRETE PIPE SET IN BASE RENe a`i' YR SA, PIPE Is WEo ,'- r.- > > 0 Os' $'•R" a'-alt" a'-71€" a. aSO D.017 D.Os4 t'. V Ll > to .:a LRRMLY PLINK MLEDI MTERG EANN III M G.rME II, IKE f .' P ., 1� LtJ O �';I.S.• PIPE eeLEL'T MTeHTAt CLAM V iN V3 eM rOUNATEEN �DFTIN{pd. EMMPMATe ET a OF 1 FlCA PIPE dW@IM. LEAVE eECTTW MXECTI.T te3FXTN MITN HINTfESSaIE rASSIL M OIRKF®W TXE BN[MMII. Nt Y ET IIMWII"mm FM Pipe SMTaAN AW MpEi" MLL Tin l'-aL5^ a•- '• 0••78d"' D.OS9 O.a7$ D.o9e ET 1 OF 1 - ( T I ac E _ PLC n ^ LI�E� .. Er t # a (� ~� 300.01 Rag M SSN IAENC IM. 300.0� 840.00 840 , 00 840.02 840.02 E�� o w a a w O S•'0-i 6Rl+ANSIai JDxxxa NS" j '�" -E AN. ca Q`ooI i q „,• Y0T€: uBE. SrPE "€`. "P" o" GRATE q# ZI DETAIL SHOWING T}PE5 OF GRATES j ;�,NrH {��^I s^ E� a•.. ,. ^ ` E- to �' umktss OTEM ISE ° {7( P...x.Ii} P' oa �7jy USE ACCORDING TO WATER FLDIIN itsORSfl' s• sro.. FRAEE IJ- Ha yTa ' .E _- T d_M� g 4.�gg � �H _•F � � �'� � tuJ n-f� H -4 JP- 9 EMAIL MAWS L ' IIt" nit" flA 0w0 Ig N ••f iP 8 [(AiiI� n)y ' D iN "� « HOB � n ,t •, A A o f „ 'I''°E LL- ~� Q� 7 pp yy..l '" �tA L' yy TYPE B" TYPE E" TYPE F" ^ 'ei S r I"' OCiP peOI x F- 0t - 'R 3" "� �" i-g I (j9T.$ F4m0� _ DIin,*"rg�'Pr nLi TICR. .. N i9 P'--: �'-`$^ ,. e'Pt .L-'')(L' PJy~uF 0-4F.�) �•-a . i%GG•> yyi f,. ae ---+x. WATER FLOW --a-� BAB �- WATER FLSU -�- � � � • r O *j f•-p+ rC ;, A dLIOYI t WITH INSII E I • �.>0.„C MA WITTER MTN CAfM 4IR Iea AtItO • tllm �1' • co 'Of WILL to AEL1104 I. {El�k� 0ao L---------------------------------- A . Ce 2' < x _... ISRAC 1I4k"TYtR- " - • �w- j 2 R E t1M QR FLAT @LFV. UNDERGRAME AM dAP'ApRIQI JDSp£ Y x 1 F .. �.L_J-♦.{# 7�$ ���R�•(( -----_-.--___.-.____.----._. A•Rr T/•n `/ SEPRESSEO 9VTTEN ISNd-_,,, f 'Ti01e -. IBf SECTION 8-8 r i v 1 wee/ S EAPAMIUSN JDlNT " -� �FiSS� PLAM OF TIIF SLAB C #MN. S-S 'D tM�IF .3.",.i }+- a ---------------------------_-__-___ m i.%42f ►z•M NaRATT, d. AgS'Y ' �4s .,, 7i Ptt i WT `ate ..D NOMtAt OLNE ANa WYTEd CNi itaNt :Ia_ .,,....,.«,_.. -..I- ?5 a WATER FLOW --•- SAB-...,_- WATER FLOW O O � Q y' .r, m p SECTION A -A _ 1E,�y. +� r^' to = En s• -R' eAMs Na eNw eFCPA.fBc oaNr fARdM. romRD ildE m M yP ,_..._ 3_ T - i'i tT «'E "F" TYPE "E" TYPE "B" ITV= - E " s- d -=jW .- _ '®"` s : •� EA y RAISEDFLORI ARROW Ink 6G - SSESSEO 0OT'YEA LIAN Kt = OK L r !C rE rIIY ay i RAISED FWW ARRDR *-Ia"+� HIGH- �#. ,taINT > •• ;3 i _.-dA - p a yE" HiOti ! I � a r* itki M - n ?gyI q Irk"A..) v � � F i �f � i Coy ° i. t, p � � � R. �'�) H SECTION R-R QW6 AND SUTTER ON YTS€@ TA iY x ? L L 0 > m° H M zg ' ETMUNM INW AW PM GlNd1 eANIM MAMA M A. RNkER M MM diuA • `P' , ► BEGT20M d.1 fA �` = i . r DIREtESOR AW 1IRe 8. aaNC N Xrz. - taNE ,~j i d OA J i7i F i T r Fes-` y� C 0�4 ICI m Y AR P:IDTN OWU MAN 01.. REtwr at PCH N:M-U RM6-V °M tdfAt tDP ND'TM am PIPE 9 0 C. y P 'Fei Td LNb, ati$ aLAe C.N. i5^ 5 D .D^ .. ..•�- ._ -. a_ann D.wN ;B ".• .,, - -g j 2 2'-it$t'" i a yg„ P'-T13:" I W B- e.DRN -�" ,• I 9--- " S ... �. a^ <' s I^ • . r- ui s.sNR R.12r I. 3 .ily' M I t" ' sS a' ,.D'-TD a- T.S` a f`-zr- a', A'.^ Aa a. z5a .fx R.TR 111.4 (`) D. Y- f..E` f A. ra]" -Y d.,.Y OJaX D. bD .NI$ •a-4fi "�P ♦ ' :.. T r t. E�1 a Y-a' •.R° 1teT -, a. DaT etas D.sfT TIC" SECTION A-k Y-11` of D_iROa.aW r R. R.aar 's€T aF T A T 1 TYPE - P sit 2 -...E a Imo. ;� SECTION A -A • nfBiR Rie .T2S Ol�tc T 0P ETE PER EWt HE.tENR 840.02 84O O3 ..EUiYAT1Mi aieTEtLI i1R O3 840.03 'TYPE G M� r7-E ERRR4 - - - �o -- - - --- - --- - - - - - - - --- - - - - m 2' WEP HOLES DCX4RM wvES: r v rI „ G,_BN > c1 Y Use ER It, 'HNM`H y aC v 1 .'_�..i a"morR etdn� LAvoliP+°.X„e r:�,R''x°YIIe,a pdw'Iw as M. %t0t,, /j 1" DEPRESSION „ i€!'B° {}./- �i -"•i l`-I�$" F 'J � pmO Id + R A R AN04ORED O a' m �i }H F-_-� 00 x 2E S GRATE AND =HAKE GRATE AND FRAME SF.ATE AND FRAME 2. x^ \1111111! r a0 _ po pp I 'pI. E j'. ° i`- " i- LL' aH2 m -1 tt� H 2 x 3Mw. (PRpTMILT1fW - a, TM xic �'z•R s° nE.nr of Pt w WNao RT I� yrys Hp�pjy ➢ ,.. i yP epp-+ ����33}I -p-It --i' DIA. 00 x H •M y➢ Wr aERTMR AM WMalsa Nr YRE or AF S W 00 x91 �y - •� I I i ql� x ]P RI 1-". H Ali. Ifl +Y C I R W P�IC TYE cEieTRlt*ION t# Tr MN sL qt3 Flq-G O� S SRm j �7I- �-ja I� t E �'-* o ; �z •--AP@RovEo a IF MINP E PIn as SIT id SLAB OP 000, AW TO WINE '� w ffi f5 .� rn E- x v W s CONCRETE �C I As mwR m sY As. Rw ro. w "T-H to j I g ym s 'n BRICK EPDXY xH DDI QJ w cI L_ _-J _-_ - OH n��i MASONRY WALL V1LLQJ _ f i< H W WTR�CT MTN Km isAPIPS MTGNtNe P (P a2s p SEE ET W OM e+0 a PM AT -NdNT 0 MARK Asti NM.TES ART . �� }�LN W �- WALL PRECAST �OIry6 y :NaYALL s• fEEPeMad As D:Rc W S« '"L 001,1NNU, CONCRETE: H • - I- IMNTAiL RYtMi[ WR A, N . RVARRI W CAtID MIT EP M. 74* STINT IN A 43 ERH f 1 dp i ' WALL IN I q 6: 6 PCWVR PANNEC tV0 0R MIN. M EACN NCr Cd AR OIREOTW NT fHA #NRIWEA. W tAVMfEX ALL E - Wn.LSS ,". a Y' +V 2e Y ! WHIN WT'+@NChf.E. PLAN OF FRAME BRICK lIAASONRY ONCRETE PRE LT E q n O \ ' SECTION G-G H ' •.., I' -a 7F.4y " F GO AMATION CONSTNUCTION DNST ' ID \P• WITH amft S tSA1E 3 '0 m 1'- " f'-7 CAST IRON !//!lIIIII\\\\\ BAIC% WPINaE,NaEtIEMAti ,� O m PLAN OF GRATIN H DETAILHQWING_}��Q,r�GE OF to m FR F0 6i�lTE�I DROP INLET REVISIONS BY m Tat ELEVAITOH Q * "d a O O Mryt �Ti L- E7 P x u. W. rL '2'_g CAST IRON W OC j 7C GT LL Ny? s ES r STD. Rf0.16 FWVIE M H o PRECAST 2 �- A a adATe s" s � RAN H EA WE Xad Z o o NOTE: GRATED DROP INLET 7D COINCIDE WITH NORMAL CONCRETE y CA 6, t7 -E yF hP ySN, �„ �'8a aE y DA 9UPERELEVATED SHOULDER bR PAVEMENT SLOPE. D4NSTRUCTIOH trt� x 9'N s s G p 1 x T rr T rr i :r O rn is Nj CONCRETE W q In TRLCTION q CA w 3'•8�t" 4`-3 rrd " as C3 4 PG ',D Ci i \�--✓•' j Qx CA 0 Ike° i" t] E"TI �: O c "f ElRZCii MASONRY I Q fAA Ems- - . 'QO { TAR € 9 W -a L m ., ,: v N c }_ ty !! 4- 4„ CONSTRLCTION w SECTION H-H �, " _ �� aH w asN NRrE zFMN•LtaEE NaTEs wtv. rsae fI,IR Mas - ,R• (a Ix 2YS 3, 2" E- ZyB I '- a I y • O$" DIA. p s�� IA a p 19 .'MGM E 1R- X v s aY�d...: t -4 , ''{}1�- " x _S� -' DIA. O iMENS, ON8 TETIES F INLE tlASER aN MN. HE TOHT H) ; T C9 }� W T IIfS�IaRB a' Sax t. PIPE CLau YAM WINSTIONS read 3' T�" a �" �21 "' � tM O as � � I Ps@E drAN NIDTH .MIN. IEI cmrc. IN SITU ONE PIPE � O � � � MASONRT ANCHOR C RETE ANCH PRECAST FN.AIME AND 6R;�TE INMALW10 WY'T'ftNl MLL PER w Aw .0 D A d N SLAM tT. AT. d C.r. R•C s. 4%" DIA. BOLT WITN PLATE $" DIA. BENT BAR CONCRETE ANCNOR FOR NDR#1A1. Cti9 AND j nr^ a'•O R -O" Y A 0.22N Q,d22 0'aw a.a?R 0.0PR Ch 4 ,$ a-sas a.05S D 0Sd fae a 2 o Dqd ( SECT ION E - E SECTION F - F i U. �6n DIA. (SENT BAR F R UEYATED SECTIONS Date: 07 f 21 � 16 24` o �0 O.NEa 0.09@. a, I 2R $ -a 2`-D a •e p.2a2 D. R2D p.42s O.IN2 a.f2T i 1 j Eli i 1 840.14 840.14 84O«18 840.16 840.25 840.25 AS NOTED IF I EI t aE I Scale: --- -- - ------ -. ---- -- ---------- -- -- Drawn: J CW hecked: DLM Project: 2015-06-03 ,lob: 2015-06-03 Sheet C-3.2 Location: PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: Date of Issue: of Sheet - --r- T- i. _ -- -- -._. - - �9 (-a CT FIT2'�S A FNSTTkLL ALL STEPS PROTRUDING 4- F INSIDE FACE OF STRUCTURE WALL. STEPS DIFFERING IN OINENSIONS, CONFIGURATION OR MATERTALS ERSN THOSE MAY ALSO USED PROVIDED THE CONTRACTOR HAS FURBISHED THE ENSINEER WITH DETAILS OF THE � STEPS AM HAS RECEIVED WRITTEN APPROVAL PROW THE ENGINEER PON THE USE OF. SUCH STEPS , im+ i- ��„ sE� t) O•ZZ0 f7jSS O P.t �Hp� ,mj 2'TyE a � I E OFF BGIt ritl�� ! OSO jS�'' <-4 MZ'#�I CCS �p�6yyNO �+-�-�7 L.-.I CENTFOU), atM ataE _ j e• I E. `H. -.yam O siCO SLZ w',Si t7}� °#-O 9"x0 ^lR{GS�m DOI at`a � I� t^FS� �'� i`o[A, i b e "pTA. Qom �HLLw CI ++Z 'may - 0 `~ �{� '.E• SEW POST 1ETli MAKE FACE OUNn01tAIL "DIED OFFSET#LOCK rim StWONA1L IBDBETBIC VIEWlow ~M� dp •+ ) {jj(PJ.f'% yy ti a., < f�i. W 1 "® I 1 ±A{ S� fM a 3 .. ' i SIDE ELEVATION to �E WTE 'A' C ',., - } , ±` .. --- �... (� $Oi PLATE A TEE rim � FIT � SIDE ELEVATION er{G. i � : to o° An c EEE NOTE x= 40 WTI •A' \Al Y' @EPA I ¢Z gO S3m as BLOCK tB JJJ E POTS POSTS) -" �a !^ 1E AA i _ U. M I T`D' 1 I E �v, m i - - M '� r o ^ E" . `... " • N sn -I CAST iFiaT6 LL. YL ATI°N CASTIflON €LEYATIaN Ep-N i ar .' ux •SJ F s i T j, ///j f * e rim 1 o ' q 1••. . LC I� =fi 6$t' • t 5R 8R BAA am SAL. C >_ Mp _ ',aeon," POST ¢Z � I"E ( I % M M = O1 j '� � @• ,� Y M ¢Z �$ M Ts .e va. t@TS M. IS `n G - SHORTLiu 4 ... -I ° a O SIDE ELEYA TION r SIDE ELEVATION . M At 0 i Z SOLME PACE GUARDRAIL. We'TSTETO OFPOET BLOCK T UP �pp Y S m BREAKAWAY PQ8 "7 i BIDE FRONT LH I 4 FROM xti Em t n « '. p) REINFORCING STEEL NOTEBc A Ee' 01A. WtTON BEAD SPLICE MET ife• LONG 1@ RED. PER SPUCE E - W DIP. NOTION HEAD BOLT PI2"/9" VOW WITH! NO Pon BOLTING . INT), 8.1$- ► OM OPPSET IS= TO STEEL POETS, j j NG PLATE :H' THIOK RATE Of BLOCK OSI➢E Y�M STEEL POST NOTE. C - VETO WAIONVIS OF HOURS INTO 'MMOIAIL AS OI�CTEO eY THE ENDINSxe E$YA.TiJ F r2" OD NOT !� IN SANITARY SSW" Es.. 862.02 nPT E T 862.02 SYSTEM PARTS T a e T SHEEN a OF T 862.02 ET , EET f O I 840.66 a62 02 • fiLU1 N A -A ELEYATION 840.66 d jxa yyM. y„�O wz-i�P~• '.. •• DOH�O� m,N 2..yyyyrCpnEa I j W...i�r+� IL yFsjxZ E,�t0' �-e ��a 's•S" THICK END PLATE)"q WITH 1Srg DTA. ROLE I EpOCENTERED PTATEITpPLATE.NE EffL�P~LI' TO ANCHOR PLATE, ?g, I r; g6.xf M1-W" SPLICE BEST SLOTS R/O q 'y,'4 hg-'6 O�-Q{QI K.=�s ®®� ~ 'T rn cs I ! ' I SREAKABGIY TEId1INAL ..... F OL•y 4 rr gEY > pT TIT^I _E7 ,,, ��t zb • @S• ' w �• �! w hE" fua. lIL KO¢O S '"O Z 'OiE ,g ED m S Ob n E 3 — L4 'ql-art N •2 P O � -f o N2 = gE f / h- 5B I —!i 7�("#14" PORT SPIT SLOT s� ` 1 i 3 t t 1 v EXIST. PIPE I I ' PROP. PIPE D a. q w I3 9'@" RE% «F.Nt @0LT WiM WSINiN WNOEn NOT ($ REOLINED PER ANSEBBLY) �.' AUGH98 PLATE AMMLY P I YY• � � L.,_ NEUtRAL AKTSSPLICE BOLT SLOTS E E t I .-. -. ,- .- - - ,- .... I � - - - -. -- ._ - m,- - - -. - - - - ®r-- SECTION X-X IN • T«Nat NPA+eOt DETAIL OF $TANOARO WASHER STANDARD WAEiBRi� TYPICAL. IIBE UNDER BUT MTAE W00D PST " EH.. Eke" ¢Q {j v F 2 3 j �y G «r G+ 2•'S2'�" BL" f'-@T$" 1'-. " LAP NEUTRAL ANIB ! I ---®'---- -- --- Ci Z O {LLB F Z t 'J ITT S E F p u` ri z VAR.v~, 4l" DNA, EiK 9 OALY.OGAB4E �IItA CABLE 00 s M PI E M = C) POST �.T SLOT I p 'Fi a S +M"4ta" s" A• n Zn (� p z/+ = M CA 9 a p a ". ELEYATIOk SIDE ELEVATTok o J p O U , NAIL OF STANDARD HEX BOLT AtW NUT y%y'\ o o " o o n M Nam' Z _________ 4ta' i 14 I —� ... _.-_ _. _ x M' � 49 m i cEN AAL NETFB: "NEPAL FOR EXIENRIM IOE E @ P eD. YE. 0,SE2@ tR` TO- 0,30,07 - r yW M d _4 Fs9b" M Q 4 1" S 9AS. YA" T - ��33yy j---I I .,.. 1 Sa B° i sR <? !i - .4 -' AX2 J T? z D f*i3 'B PIPEPCULVEERRTSAAT LOCATIONS SHDWNU $ OR OZRECTED 9Y THE ENGINEER, THIS INCLUDES EXTENDING a RIPER WI DIFFERENT ' EXISTING PIPES WITH O T @R:AtS. TB" 2+"' iE" tY` 0-- TE" 1E" 6-85 tE" a.ENM,� YJ -a w..TH7 ._ . . _ o 0 OIAWLES 64" :• P, - (AN@TRUCT THO PIPE mL..IAR @IT« DLASS ^s" Oe BETTER CINICREYE. OO" t2'" t8" D-TBM - ' @IA. Y Y, STEEL PLATE A,�ICNOR PLATE m o OST BOLT SLOT T" OIA. HOLES FOR hE" DNA. eDETs OBSERVE At L. MQUIREWENTS Of SECTION @aP OF 'ME ETANMRR SPECTFICATTOW. 42" a@" Ba" t2" ten @" t?' D.883S t?" t.as?E 8' 2.576E NAIL OF BUTTON HEAD BOLT AND NWT ABLE ASSEBfLY ''� I 1W"xiYB"T �T CDT USE t2 AN 1 DIAMETER VALUES FOR PIPE CIAME-IRS LESS TFNW fE INCR. E0" i@" t@" 214306 ET TERMINAL Ek@ SECTION TYPICAL END SHOE _ D. fSO7 E " 34116 T F T DF $Y6TEJN PART$ a62.aa s6a.oa $YSTEIM FARTS -GENE USE eeii HI1862.021 e62,o2 aao,72 aao.ia Location: PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: Date of Issue: 7 O V BF�w�I t Q � • Q N 'If-`� I.I e 00 � scVr- W Cr- pV f4 v - U e v 0 0 �o� Uzx Q 00 h 00 4 (A O 00 3 004 �u1 Y o v� y O a O z.7 Ln LL H� �n-- Y 00 \— N 00 Q a,bj Do z N O _j DO [n O _j 5 0 Cf) O W I� O E' 0 I� F 0 w (n Q d w a V 1 7 Q) 1`---�T r~�N W�C^n`` W �A.Or�• �7 4-4 N y w F Z 1� O F�1 [~� V L Q w Fri V i 4-/ ((. O `\. ''�II,II'VIIt nI``` REVISIONS BY Date: 07/21 /16 Scale: AS NOTED Drawn: JCW Necked: DLM Project: 2015-06-03 ,lob: 2015-06-03 Sheet C-3.3 of Sheet 4 TOP VIEW TRASH RA TOP OF I CAST IRON VALVE BOX AND SLEEVE To BE LOCATED IN FOREBAY BERM. SEE PLAN OF WET POND FOR LOCATION POND MAINTENANCE INFORMATION MUST BE POSTED AT SITE. FIELD CONFIRM LOCATION OF SIGN WITH OWNER. INFORMATION FROM DETAIL 3 SHALL BE REPRODUCED ON 18"X12" ALUMINUM (0.08) SIGN MOUNTED ON 6' METAL U-CHANNEL POST 1 SEDIMENT 1� FOREBAY - - - - - - - - - FORD BERM SEDIMENT REMOVAL ELEV.=805.25 SH RACK DEBAR TOP TRASH RACK DETAIL N.T.S. Location: 6" 2'-O" 6" OE. . \L SOLID PRECAST CONCRETE STRUCTURE SIDE SECTION TRASH RACK (ONLY) HAND WHEEL TO BE INSTALLED ABOVE THE GRATE AND PROVIDED WITH CHAIN AND LOCK FOR SECURITY WATER QUALITY ORIFICE -MAINTAIN 6" CLEARANCE BETWEEN PIPE AND SLOPE 2'X2'X4" CONCRETE PAD CENTERED BENEATH INTAKE OF ORIFICE 1. DRAIN INV.=801.5 - SEDIMENT STORAGE ELEV.=801.5 4" THICK CONC. SLAB (4'X4'X4") J AROUND PERM. DRAIN PIPE 6" PVC POND DRAIN 6" GATE ;ED STO. EL.=803.0 IOTTOM EL. T802.0 STORM HGL ELEVATIONS POND 2 YEAR 10 YEAR 25 YEAR 100 YEAR 1 808.41 809.05 809.41 810.04 Q (CFS)* 10.72 39.61 42.00 37.35 TOTAL Q 10.72 39.61 42.00 44.24 * - DISCHARGE Q FROM CONTROL STRUCTURE ONLY r-FOREBAY BERM - SEE DETAIL ON THIS SHEET 10' WIDTH LITTORAL SHELF BOTTOM OF SHELF EL. = 806.00 NORMAL POOL EL. = 806.50 TOP OF SHELF EL. = 807.00 CONTROL STRUCTURE CS-P1 SEE DETAIL THIS PAGE WATER QUALITY ORIFICE TEMP. POOL 807.61 PERM. POOL EL.=806.50 z - P.P. DEPTH MAIN POOL - - - - - - - - - - - - - - - - - - - - - SED. STORAGE EL_=802.0 BOTTOM EL. 801.0 SEDIMENT REMOVAL ELEV.=804.25 TOP OF DAM = 837.0 TRASH RACK (SEE DETAIL ON SLIT. C4.3) 3' X 4' (EXTERIOR) PRE CAST CONCRETE STRUCTURE WITH 6" THICK SOLID WALLS. CONCRETE SHALL BE 4,000 PSI MINIMUM. WALL REINFORCEMENT 800.40 TIED TO SLAB (PER MANUFACTURER) OUTLET PIPE (REAR WALL) 4.0' X CONC. SLAB (14" THICK) CONTROL STRUCTURE ELEVATION DETAIL STRUCTURE NOTES: 1. STRUCTURE HOLES SHOWN FOR VISUAL CLARITY ONLY. HOLES & WEIR TO BE INSTALLED OPPOSITE OF DISCHARGE PIPE. 2. PRE -CAST CONCRETE STRUCTURE TO BE TIED TO CONCRETE ANCHOR WITH REBAR. 3. THE RISER/BARREL SHALL BE DESIGNED TO CARRY THE 25-YEAR STORM. 4. SEE GENERAL NOTES UNDER SKIMMER BASIN DETAIL. 5. ANTI SEEP COLLAR TO BE PROVIDED ON OUTLET PIPE (BARREL) OF POND. 6. ONCE SITE STABILIZATION IS ACHIEVED, THEN ALL SEDIMENT TO BE REMOVED AND TEMPORARY SEDIMENT BASIN TO BE EPDXY COATED, CONVERTED TO WQ/PERMANENT DETENTION BASIN. NON -SLIP STEPS CAST INTO STRUCTURE AT 14" 0/C. 79 LF- 24" RCP (CLASS III) W/ 0-RING GASKETS AT 0. 51% 1 24" INV. OUT=800.40 ANTI -FLOATATION BLOCK (4'X5'X14")(1.5 SAFETY FACTOR) 1 $ TOP OF POND UNWASHED #57 STONE WALKWAY TO STRUCTURE FROM SLOPE. WALKWAY SHALL BE 5' WIDE MIN. SEE PLAN FOR LENGTH OF WALKWAY CONTROL STRUCTURE CS-P I DETAIL N.T.S. DISCHARGE PIPE I I FLOW \ RCP PIPE WITH '0' RING GASKETS (ASTM C-443) ANTI -SEEP COLLARS SIZE, CITY. AND SPACING VARIES (PROVIDE ANTI -SEEP COLLARS (THROUGH BERM ONLY) LOCATED A MINIMUM OF 3 FEET AWAY FROM EACH PIPE JOINT WITHIN THE BERM) 10' MIN. r__�l CLASS 1 RIP -RAP. HEIGHT OF 5, RIP -RAP ON BERM SHALL NOT EXCEED EL. 833.60. CONTRACTOR LEVEL SHALL PROVIDE WEIR IN RIP -RAP PER PLAN ON THIS SHEET. 0 PERMANENT PDOL - 2 RIP -RAP SHALL FOREBAY �1 MAIN POOL. EXTEND TO BOTTOM EMERGENCY SPILLWAY OF MAIN POND BAY (10' WIDE © ELEV. 809.50)� INV.=802.0 4" FOREBAY DRAIN EMBANKMENT PLACED IN 0.5% SLOPE MINIMUM LIFTS AND COMPACTED INV.=801.50 TO STANDARD PROCTOR. ANTI -SEEP COLLARS =BARREL DIAMETER PLUS 3' 18" RCP _ WET DETENTION POND I SECTION N.T.S. VEGETATED SHELF MAINTENANCE SCHEDULE: SOIL DESCRIPTION METHOD FREQUENCY TIME OF YEAR INSPECT AND REPAIR EROSION VISUAL MONTHLY MONTHLY ORGANIC LAYER REMULCH ANY VOID AREA BY HAND WHENEVER NEEDED WHENEVER NEEDED REMOVE PREVIOUS MULCH LAYER BEFORE APPLYING NEW BY HAND ONCE EVERY TWO OR LAYER (OPTIONAL) THREE YEARS SPRING ANY ADDITIONAL MULCH ADDED BY HAND ONCE A YEAR SPRING PLANTS REMOVE AND REPLACEMENT OF ALL DEAD AND DISEASED SEE PLANTING 3/15 TO 4/30 VEGETATION CONSIDERED SPECIFICATIONS TWICE A YEAR AND BEYOND TREATMENT 10/1 TO 11 /30 TREAT ALL DISEASED TREES MECHANICAL OR. N/A VARIES, BUT WILL AND SHRUBS BY HAND DEPEND ON INSECT OR DISEASE INFESTATION WATERING PLANT MATERIAL SHALL TAKE PLACE AT THE END OF EACH DAY FOR BY HAND IMMEDIATELY AFTER N/A FOURTEEN CONSECUTIVE DAYS COMPLETION OF PROJECT AND AFTER PLANTING HAS BEEN COMPLETED REPLACEMENT OF SUPPORT STAKES BY HAND ONCE A YEAR VE KES ON IN T THLY E SPRING REPLACE ANY DEFICIENT STAKES AND WIRES BY HAND WHENEVER NEEDED WHENEVER NEEDED SUITABLE STRUCTURAL SOIL COMPACTED TO 95% STANDARD PROCTOR; STRUCTURAL FILL SHALL BE APPROVED, PLACED AND COMPACTED UNDER THE DIRECT SUPERVISION OF A GEOTECHNICAL ENGINEER MAW'IENAWE NOTES THE FOLLOWING ITEMS SHALL BE INSPECTED/MAINTAINED BY THE CONTRACTOR UNTIL THE PROJECT IS FULLY COMPLETE AND THEN WILL BE INPSECTED/MAINTAINED BY THE OWNER. A. VEGETATION A.1. GOOD GRASS COVER SHALL BE MAINTAINED AROUND THE POND PERIMETER TO PREVENT EXCESSIVE SEDIMENT FROM ENTERING THE POND. THE POND PERIMETER SHALL BE MOWED ON A QUARTERLY BASIS. (DO NOT MOW WETLAND PLANTS) A.2. TO PRESERVE THE HYDRAULIC CAPACITY OF THE POND SYSTEM AND TO PREVENT RUNOFF FROM BACKING UP, INLET AND OUTLET AREAS SHALL BE KEPT CLEAR OF HEAVY VEGETATION. B. EROSION PROBLEMS THE ENTIRE POND AREA SHALL BE INSPECTED QUARTERLY FOR SIGNS OF EROSION, PAYING SPECIAL ATTENTION TO THE FOLLOWING AREAS: 1. RILL EROSION OF THE POND EMBANKMENT SHALL BE REPAIRED BY FILLING THE SMALL CHANNELS WITH SUITABLE SOIL, COMPACTING, AND SEEDING. INSPECT FOR, AND IMMEDIATELY REPAIR, ANY EROSION ON THE DAM EMBANKMENTS. 2. ERODED AREAS AT PIPE INLET OR OUTLET AREAS SHALL BE FILLED NTH GOOD COMPACTABLE SOIL AND COVERED WITH GEOTEXTILE AND RIP -RAP 3. OPEN CHANNELS WITH ERODED AREAS SHALL BE SEEDED/SODDED AND PROTECTED WITH TEMPORARY VELOCITY DISSIPATION (SUCH AS EXCELSIOR MATTING, STRAW BALES, ETC.). C. BLOCKAGE OF OUTLETS THE WET DETENTION POND'S ORIFICE(S), PRINCIPAL SPILLWAY, AND THE EMERGENCY SPILLWAY SHALL BE INSPECTED FOR BLOCKAGE THAT WOULD IMPAIR THE PONDS WATER QUALITY AND HYDRAULIC FUNCTIONALITY. 1. THE LOW FLOW ORIFICE SHALL BE INSPECTED FOR BLOCKAGE TWICE A MONTH AND AFTER LARGE STORMS. 2. TO ENSURE THE HYDRAULIC CAPACITY OF THE SPILLWAYS, SPILLWAY SHALL BE INSPECTED FOR BLOCKAGE ONCE A MONTH AND AFTER LARGE STORMS. VEGETATIVE GROWTH IN THE RISER SHALL BE REMOVED PROMPTLY SO THAT THE DESIGN CAPACITY OF THE SPILLWAY IS MAINTAINED. THE OUTLET PIPE SHALL BE CLEAR OF TREE LIMBS, SEDIMENT ACCUMULATION, ETC. D. SEDIMENT ACCUMULATION THE FOREBAY MUST BE DREDGED WHEN SEDIMENT DEPOSITION IN THE FOREBAY EXCEEDS THE DESIGNED SEDIMENT STORAGE CAPACITY FOR THE FOREBAY. AN INDICATION OF WHEN THE SEDIMENT BARS ARE VISIBLE NEAR THE INLET DISCHARGE OR WHEN THE SEDIMENT LEVEL AT THE INLET TO THE POND IS LESS THAN ONE FOOT BELOW THE NORMAL POOL SURFACE. DEPTH MEASUREMENTS RELATIVE TO THE NORMAL SURFACE ELEVATION (BOTTOM OF WATER QUALITY ORIFICE) SHALL BE TAKEN AT SEVERAL LOCATIONS AROUND THE POND (TYPICALLY FOREBAYS WILL NEED TO BE DREDGED EVERY 5 TO 10 YEARS) DREDGING OF THE FOREBAY (AND PERMANENT POOL AREA, IF NECESSARY) WALL BE ACCOMPLISHED BY USING A DREDGE LINE, "GRADE ALL" OR SIMILAR PIECE OF MACHINERY. E. MAINTENANCE D 1. SEE ABOVE FOR VEGETATED SHELF MAINTENANCE SCHEDULE. OMD MAIIAITCAIAKlfr C AUG 'j- [71t PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: FOREBAY BERM SECTION B-B POND BERM KEY EXIST. GRADE REMOVE ROOT MAT. & ORGANIC MATERIAL VARIES I 10, I VARI 2 2 �1 SPILLWAY INV. tr ELEV: - 809.50 SPILL AM SECT/0/V B-B NOT TO SCALE SPILL AYAY PLAN MEAV NOT TO SCALE VARIES I TOP OF BERM EL. 811.0 A q TOP OF BERM SPILLWAY INV. ELEV: = 809.0 \ EXTEND CONCRETE 1 3 LGGROUND & WALLS TO N L �t � 7- SPILLWAYEIR LINING" � TO BE 3000 PSI CONC. �� // W/ 1OX10x10/10 WWM. IF CALLED FOR ON PLAN SPILL AVAY SECTION A -A RIP RAP OUTFALL PROTECTION. NOT TO SCALE (SEE RIP -RAP CHART ON SHEET C4.2) STORMWATER BMP PERM. EMERGENCY SPILLWAY DETAILS N.T.S Approved: Date of Issue: O U y y N Q � a. a 00 00 CA «7 I p �{ N4-1 yUo 0 0 Uzi '5: 00 Q Q 00 3 04 O: Vc A LLI C) to 0 N Q y ao N Do Q a- U 00 z I N 0 _J DO (n O - I LLJ � o o � o LJ (n Q a w Of O O ` w o O C5 [� E--i M� V1 ''7jTTT71�1'i I11�OV`S REVISIONS BY Date: 07/21 /16 Scale: AS NOTED Drawn: iCW Checked: DLM Project: 2015-06-03 Job: 2015-06-03 Sheet C3.4 of Sheet TOP OF BERM BOT. OF POND ZONE 2 PLANTING WATER DEPTH: 0' (PERIODICALLY INNUNDATED) ZONE 1 PLANTING -I WATER DEPTH: 0.00' TO 0.50' BMP PLANTING NOTES: 1. IF BARE ROOT SPECIMENS ARE NOT TO BE USED WITHIN 4 DAYS, THEY SHOULD BE PLANTED IN SUITABLE BEDS WITH THE ASSUMPTION THAT IT WILL BE A WHILE BEFORE THEY CAN BE USED, AND THEY SHOULD BE PROVIDED WITH CONDITIONS MAKING IT POSSIBLE FOR THEM TO SURVIVE AND GROW AS OPTIMALLY AS POSSIBLE. 2. CONTAINER PLANTS WALL NEED TO BE WATERED REGULARLY (SEVERAL TIMES DAILY WHEN WEATHER IS HOT) 3. PIN ALL SUBMERGED/FLOATING PLANT MATERIAL SECURELY TO THE BOTTOM OF POND WITH 12" BENT WARE PINS. 4. CUT BACK TALL AND EASILY BROKEN LEAVES AND STEMS AT THE TIME OF TRANSPLANTING. 5. NEWLY RECEIVED NURSERY STOCK AND DISTURBED TRANSPLANTS SHOULD NOT BE EXPOSED TO DIRECT SUN ANY MORE THAN NECESSARY UNTIL THEY ARE PLACED IN THEIR PERMANENT POSITIONS. 6. INSERT DRY FERTILIZER TABLETS OR SPIKES NEAR THE PLANTS AT THE TIME OF TRANSPLANTING. 7. FENCE ENTIRE PLANTING AREA WITH 36" TALL PLASTIC FENCING WITH 1.5"X2" OPENINGS. PLASTIC SHALL BE UV STABLE. COLOR SHALL BE BLACK. INSTALL WITH STEEL POSTS SPACED AT 10' O.C. MAX. PIN THE BOTTOM LAYER OF THE FABRIC TO THE GROUND WITH 10-12" PINS. FENCING TO REMAIN IN PLACE FOR A PERIOD OF ONE YEAR POST INSTALLATION OF PLANT MATERIAL 8. STAKE 9" AND 18" PLANTING ZONES PRIOR TO INSTALLATION AND VERIFY AREAS ON PLAN. 9. PLANTS ARE TO BE INSTALLED IN A RANDOM ARRANGEMENT WITHIN THEIR RESPECTIVE ZONES. INDIVIDUAL SPECIES MAY BE PLANTED TOGETHER IN GROUPS OF 3 TO 5. PLANTS MAY ALSO BE PLANTED INDIVIDUALLY. 10. PLANT QUANTITIES ARE TO BE VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION. PLANTS SHALL NOT BE COMPLETELY SUBMERGED WHEN PLANTED. 11. IN THE INITIAL PLANTING ONLY TO ESTABLISH PLANTS IN THE LITTORAL SHELF AREA, APPLY 10-10-10 COMMERCIAL FERTILIZER AT A RATE OF 20 LBS./1000 SF. LITTORAL SHELF PLANTING GUIDE 0 N.T.S. NINE Deep Pool Planting, 1 Gallon Size (One Species) Shallow Water Planting, 1 Gallon Size (One Species) Shallow Land Planting, 1 Gallon Size (One Species) - -LOWER EDGE OF SHELF - �2' O.C. ova TYPICAL� Now ZONE 1 Mo J �f 2' O.C. ouY ZONE Ty t' O.C.1 cid TYPICAL I UPPER EDGE OF SHELF Plantings to be placed once site has been stabilized & pond has been converted to a permanent structure. Littoral shelf shall be planted during peak planting times of Late September through Late November or as directed by nursery. Soil shall be amended per recomendation by nursery specialist. LITTORAL SHELF PLANTING DETAIL 0 N.T.S. ZONES 1-2 PLANTING SCHEDULE SIZE PLANTING KEY QTY BOTANICAL NAME COMMON NAME REMARKS ZONE COND Nuphar Yellow n o Full Specimen Zone 1 NL 332 lutea Pond-Lil 24" oc 2' Plu Zizaniopsis _ Giant n a Full Specimen NWL ZM 352 miliacea Cutgrass 24" oc 2"x5" Plug Rhynchospora Star Rush I n a Full Specimen Zone 2 JE 373 colorata 1Whiteto 24" oc 2' Plu LITTORAL SHELF PLANTING CHART Contractor shall verify specific plant species used for each littoral shelf zone and plant spacing as recommendation by jurisdictional environmental inspector, landscape inspector or by nursery specialist. A Table 9-1 Stormwater Wetland Plant Recommendations DEEP POOL Botanical Name Common Name Floating Aquatic Plants Lemna spp. Nelumbo lutea Nuphar lutea ssp. polysepala Nuphar Lulea ssp. advena Submerged Aquatic Plants Eleocharis acicularis Elecidiaris quadrangulata Elodea canadensis Elodea nuttallii SHALLOW WATER Duckweed American lotus Rocky Mtn Pond -lily Yellow Pond -lily Needle spikerush Squarestem spike-rush Canadian waterweed Western waterweed Botanical Name Common Name Herbaceous Plants Acorus subcordatum Alisma subcordatum Hydrolea quadrivalvis Iris virginica Juncus eff tsus car, pylaei or solutuS Ludwigia spp, Peltandra virginica Pontederia eordaia Sagittaria latifolia Sagittaria landfolia Saururus cernuus Schoenoplectus tabernaemontani Schoenoplectus americanus Schoenopledus pungens var. pungens Scirpus cyperinus ZiZaniopsis miliacea SHALLOW LAND Sweetflag Water plantain Waterpod Blue flag iris Soft rush Primrose willow Arrow arum Pickerelweed Duck Potato Bulltongue Lizards tail Soft stem bulrush Three -square bulrush Woolgrass Giant cutgrass Botanical Name Common Name Herbaceous Plants Aselepias incarnata Swamp Milkweed Carex tenera Quill sedge Chelone glabra White TuTtlehead Eupatoriadelphus dubius Dwarf Joe Pye Weed Eupatoriadelphus ftstulosus Joe Pye Weed Eupatoriadelphus maculatus Spotted trumpetweed Hibiscus eoccineus Scarlet rose malloKt Hibiscus lae7* Halberdleaf rosemallow Kosteletzkya vir&ica Seashore Mallow Lobelia cardinalis Cardinal flower Lobelia elongata Longleaf lobelia Lobelia siphilitica Great blue Lobelia Rhynchospora colorata Starrush whitetop Saccharum baldwinii Narrow plumegrass Shrubs Aronia arbutifolia Red Chokeberry Cephalanthus occidentalis Common Buttonbush Clethra alnifolia Sweet pepperbush Cornus amomum Silky dogwood Cyrilla racemi flora TiTi Gordonia lasianthus LA,)blolly Bay Hypericum densif .orum Bushy St. Jobnswort Ilex deciduas Possumhaw Ilex glabra h kberry Rea virginica Virginia Sweetspire Rosa palustris Swamp Rose Vacciniunt crassifolittm Creeping Blueberry Viburnum nudum var. nudum Possumhaw LITTORAL SHELF PLANTING LIST N.T.S. BMP CONSTRUCTION SEQUENCE: 1. INSURE SITE IS FULLY STABILIZED PRIOR TO BEGINNING CONVERSION FROM EROSION CONTROL BASIN TO PERMANENT WET POND BMP. 2. PRIOR TO CONVERSION CHECK AND REMOVE ALL SEDIMENT FROM EROSION BASIN PRIOR. CHECK CONTROL STRUCTURE FOR DAMAGE OR LEAKS AND REPAIR AS IS FUNCTIONING AS DESIGNED. REPAIR ANY DAMAGES FOUND ON CONTROL STRUCTURE. 3. BEGIN RE -GRADING POND TO FINAL WET POND DESIGN AND CONFIGURATION. REPAIR AND EROSION AND RILLS ALONG BANKS AND BERMS. 4. CONSTRUCT PERMANENT FOREBAY BERMS WITH VALVE AS SHOWN ON DETAIL (THIS SHEET). 5. CONSTRUCT CONCRETE EMERGENCY SPILLWAY. 6. PLANT LITTORAL SHELF WITH APPROPRIATE PLANTS PER SCHEDULE SHOWN ON THIS SHEET. PLANT PERIMETER BUFFER AREA PER LANDSCAPE PLAN. 7. COMPLETE FINAL GRADING AND STABILIZE POND BMP BERMS AND SURROUNDING SLOPES AS REQUIRED. INSURE ALL RIP -RAPS ARE CLEAN AND FUNCTIONING. CONSTRUCTION SPECIFICATIONS 1. Site preparations - Clear, grub and strip topsoil from areas under the embankment to remove trees, vegetation, roots and other objectionable material. To facilitate sediment cleanout and restoration, clear the pool area of all brush, trees, and other objectionable materials. Stockpile all topsoil or soil containing organic matter for use on the outer shell of the embankment to facilitate vegetative establishment. 2. Cut-off trench - Excavate a cut-off trench along the centerline of the earth fill embankment. Cut the trench to stable soil material, but in no case make it less than 2 ft. deep. The cut-off trench must extend into both abutments to at least the elevation of the riser crest. Make the minimum bottom width wide enough to ermit operation pof excavation and compaction equipment but in no case less than 2 ft. Make side slopes of the trench no steeper than 1:1. Compaction requirements are the some as those for the embankment. Keep the trench dry during backfilling and compaction operations. 3. Embankment - All fill material should be clean mineral soil, free of roots, woody vegetation, rocks, and other objectionable material. Scarify areas on which fill is to be placed before placing fill. The fill material must contain sufficient moisture so it can be formed by hand into a ball without crumbling. If water can be squeezed out of the ball, it is too wet for proper compaction. Place fill material in 6 to 8-inch continuous layers over the entire length of the fill area and then compact it. Compaction may be obtained by routing the construction hauling equipment over the fill so that the entire surface of each layer is traversed by at least one wheel or tread track of the heavy equipment, or a compactor may be used. Construct the embankment to an elevation 10% higher than the design height to allow for settling. Subgrade and fill to be verified and tested by Geotechnical Engineer. 4. Conduit spillways - All conduit materials shall be as called for on the plans (Schedule 40 PVC may be used for sizes < 12" diameter). Securely attach the riser to the barrel or barrel stub to make a watertight structural connection. Secure all connections between barrel sections by approved watertight assemblies. Place the barrel and riser on a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backfill around the pipe or anti -seep collars. Place the fill material around the pipe spillway in 4-inch layers and compact it under and around the pipe to at least the some density as the adjacent embankment. Care must be taken not to raise the pipe from firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2 ft. of hand -compacted backfill over the pipe spillway before crossing it with construction equipment. Anchor the riser in place by concrete or other satisfactory means to prevent flotation. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5. Emergency spillway - Install the emergency spillway in undisturbed soil. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the emergency spillway. 6. Inlets - Discharge water into the basin in a manner to prevent erosion. Use diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency. 7. Erosion control - Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction). 8. Safety - Detention basins may attract children and can be dangerous. Avoid steep side slopes, and fence and mark basins with warning signs if trespassing is likely. Follow all state and local requirements. A PP R-0VE I AU1__ G 11 2017 �- N By Location: PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: ANNUAL INSPECTION/MAINTENANCE PROCEDURES I. Annual Inspection: Annual inspections shall be scheduled by Town of Mooresville and Owner to be performed on the first of June each year. II. Inspection Activities: a) Testing of the emergency drain pipe valve. b) Visual inspection of drawdown orifice. c) Visual inspection of the trash rack at the intake orifice. d) Visual inspection of the emergency spillway. e) Visual inspection of the pond rim and slopes. f) Measurement of the wet pond depth at the dam end of the detention pond (Distance from permanent pond drawdown orifice invert to bottom of basin). g) Visual inspection of all stormwater structures on the served site feeding the detention pond. h) Visual inspection of the total site drainage basin for adequate ground cover to stabilize site. i) Visual inspection of upstream (off -site) areas feeding into the site drainage basin for potential off -site sedimentation sources. III. Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi annually or when depth is reduced to 75% of the original design depth(see table below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3 feet in the forebay, the sediment shall be removed. 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. GENERAL_ NOTES: ALL BMP FILL EMBANKMENTS SHALL BE COMPACTED TO 95% STANDARD PROCTOR. BMP POND AREA SHALL BE USED FOR SEDIMENT STORAGE DURING CONSTRUCTION SOIL TESTING INSIDE POND IS REQUIRED TO ASSURE THAT PERCOLATION RATE DOES NOT EXCEED 0.01 INCHES PER HOUR. EXCEEDING THAT RATE WILL REQUIRE THE NSTALLATIOH OF ADDITIONAL ENGINEERING FEATURES, SUCH AS SLURRY WALLS, LINERS, OR 3THER BARRIERS. WHEN A LINER IS PROPOSED, TOPSOIL FOR VEGETATION MUST BE PLACED ON TOP OF THE LINER. Approved: Date of Issue: O U y U � �a N IZ. a• r1 •� 00 o0 A yj v�Nl\ W 4-0 It It 7 "U y �C> 0 0 Uz V5o 0w w �00 Q ao 4 (*Q 00 o 4 � a o w 0 Lo ~ 00 N Do ~ Q o- U ONO Z I � N 0 J 00 I N O O w H o o w o' a N a- Lu w a- o_ O `Cis � N��y F+1 Fri y„A M W o� U hh++E�� Ir -1 Z W [� 1 E-4 1[� W AA W !+1 V1 `\`\`�hlunlurrr i��rrrrr tY1111�����A REVISIONS BY RENSm PER NCDENR WO DESIGN REaTS 05/11/17 JCW Date: 07/21 / 16 Scale: AS NOTED Drawn: JCW hecked: DLM Project: 2015-06-03 Job: 2015-06-03 Sheet C3.5 5/9/17 o Sheets i NARRATIVE: Randy Marion Company is proposing to make improvements to the existing Randy Marion Ford facility to include additional parking and a large open product storage area. This is an isolated site located off of Gaither Road, down the road from US 21 and across from Interstate (1-40), in Iredell County. The scope of work will include construction of additional parking at the front of the site, with connection to the lower storage area. An interior rear connector road to the lower area and a large storage area for open product storage. The project will also include constructing a permanent wet pond BMP facility. No Turn lane improvements will be required. Erosion stages will include installation of new erosion control features, one (1) temporary several temporary diversion ditchs stripping of sediment basin, some permanent storm piping, p y pp g topsoil, installing storm infrastructure, fine grading and seeding of all disturbed areas. Disturbed areas will be protected by temporary silt fence with rock weirs, construction entrances/exits as shown on the erosion control plans. Upon completion all disturbed areas shall be permanently stabilized with grass as per the seeding specifications. Total onsite Phase 2 disturbed area is 8.79 acres. GENERAL: The work shall consist of furnishing labor and material, equipment and performing all operations necessary for a complete installation of all work as specified herein and as shown on the drawings. 1. Work shall consist of installation of temporary erosion control measures; grubbing; stripping topsoil; rough grading and permanent seeding. All disturbed areas shall be left in a stabilized condition upon completion of this project. 2. The Contractor is expected to examine the site to familiarize himself with site conditions. The Contractor shall carefully read all the specifications and examine the drawings and details in order to thoroughly familiarize himself with the work to be done. Any work shown on the drawings or included in the specifications, or reasonably implied by either, shall be performed the same as if called for by both. EARTHWORK: 1. A temporary bench mark shall be established on site 2. The Contractor shall be thoroughly familiar with the Erosion Control Sequence as stated hereafter and shall follow this sequence to insure that no off site pollution occurs during or after construction. Any deviation from this stated sequence or plans and details shall have prior approval of the Owner's Engineer and Lincoln County Erosion Control Office. 3. Top Soil: Strip any remaining top soil from the area to be graded and stockpile on site for redistribution upon completion of grading. 4. Soil Borings shall be taken in the area of any buildings by a certified soils engineer and the results reported to the Owner's Engineer. This work shall be done if directed by the Owner's Engineer. 5. Fill Dirt shall be placed in the areas indicated on the plan. Fill material shall be free of brush, rubbish, and other material that will be detrimental to construction of a stable fill. All fill shall be compacted to a minimum of 95% Standard Proctor with proper moisture control. Maximum thickness of layers of fill to be compacted shall not exceed 8". No slopes shall be greater than 2:1. The entire sub -grade after compaction shall be smooth and uniform slope. 6. Subgrade and fill to be verified and tested by geotechnical engineer. 7. Cut Material to be excavated is assumed to be earth and other materials that can be removed by power -shovel, bulldozer, motorized pan, or normal excavating equipment; but not requiring the use of explosives or drills. If rock (as defined herein) is encountered within the limits of excavation, the Contract Sum will be adjusted in compliance with provisions for "Changes in the Work" of the "Conditions of the Contract". When rock is encountered, Contractor shall notify the Engineer immediately; and shall not proceed further until instructions are given and measurements made for the purpose of establishing volume of rock and the value of excavating same. Rock is defined hereby as that material which cannot be ripped by a crawler -tractor rated at a minimum of 50,000 lbs. drawbar pull at one mile per hour, pulling a single - tooth ripper. Equipment shall be in good repair, and shall be in proper working condition. Rock is further defined hereby as boulders larger than 1/2 cubic yard in size. No payment will be made on the basis of unit -price for rock unless minimum -sized equipment or better is utilized as required hereinbefore. Rock work is defined hereby as removal of material by drilling, blasting or wedging. Rock shall be stripped for measurement before excavating, and no rock excavated or loosened before measurement will be allowed or paid for as rock. Measurement and payment, therefore, shall be by number of cubic yards required to bring the excavation to the required surface or grade as required by the Contract Documents. The Owner may adjust the grades should excessive rock be encountered. EROSION CONTROL SPECIFICATIONS Requirements of the Contract Documents apply to all work in this section GENERAL: Provide the work of this section for erosion and sediment control as indicated and specified as follows: Construction entrance; inlet protection; permanent seeding, sediment fencing and temporary rock weir outlets. CONTRACTOR'S RESPONSIBILITY: The Contractor shall furnish the Owner a system of temporary controls to minimize soil sediment erosion during the construction period caused by storm water runoff. Work shall be performed as called for on the drawings and as site conditions warrant. OWNER'S RESPONSIBILITY: After the acceptance, it is the Owner's responsibility to properly maintain the work. EROSION AND SEDIMENT CONTROL: The Contractor shall provide erosion and sediment control during the period of construction of this project. The Contractor shall protect and maintain the temporary erosion and sediment control structures which provide temporary sediment pollution control, as shown on the drawings. The Contractor shall protect and maintain the temporary facilities as necessary to trap soil erosion and sediment pollution created by storm water runoff. Maintenance of these facilities shall include, but not be limited to, regrading cnd filling of washed out areas, adding erosion control blankets, adding/repairing sediment fencing, and reseeding and mulching of the swales during the construction period if deemed necessary by the Owner, Owner's Engineer, or the Licoln County Erosion Control inspector. SEEDING SPECIFICATIONS SLOPES 3:1 or FLATTER 1. Apply agricultural lime at the rate of 90 Ib/1000 sf. 2. Apply 10-10-10 commercial fertilizer at the rate of 20 Ib/1000 sf. 3. Seed in accordance with the following schedule and application rate: DATE TYPE Aug 15 - Nov 1 Tall Fescue Nov 1 - Mar 1* Tall Fescue and Abruzzi Rye Mar 1 - Apr 15 Tall Fescue Apr 15 - Jul 30 Hulled Common or Bermuda Jul 15 - Aug 15 Tall Fescue and Brown Millet or Sorghum -Sudan Hybrids PLANTING RATE 200 Ib/ac or 7 Ib/1000 sf 200 Ib/ac or 7 Ib/1000 sf 25 Ib/ac or 1/2 Ib/1000 sf 200 Ib/ac or 7 Ib/1000 sf 30 Ib/ac or 1 Ib/1000 sf 200 Ib/ac or 7 Ib/1000 sf 35 Ib/ac or 7/8 Ib/1000 sf 30 Ib/ac or 3/4 Ib/1000 sf * Heavily mulched during January - March period. Coat applied at the rate of 5-7 gal/1000 sf or 200-300 gal/ac. 4. Mulch with straw applied at the rate of 75-100 Ib/1000 sf. and anchor with asphalt emulsion tack coat applied at the rate of 5-7 gal/1000 sf or 200-300 gal/ac. SLOPES GREATER THAN 3:1 TO 2:1 1. Apply agricultural lime at the rate of 90 Ib/1000 sf. 2. Apply 10-10-10 commercial fertilizer at the rate of 20 Ib/1000 sf. 3. Seed in accordance with the following schedule and application rate. DATE TYPE PLANTING RATE Mar 1 - Jun 1 Sericea Lespediza (scarified) & 50 Ib/ac or 11 Ib/1000 sf Mar - Apr Add Tall Fescue or 150 Ib/ac or 3-1/2 Ib/1000 sf Mar - Jun Add Weeping Lovegrass 5 Ib/ac or 1/8 Ib/1000 sf Jun - Sep 1** German Millet or 40 Ib/ac or 1 Ib/1000 sf Small -Stemmed Sudan Grass 50 Ib/ac or 1.2 Ib/1000 sf Sep - Mar 1 Sericea Lespediza 70 Ib/ac or 1-3/4 Ib/1000 sf (unhulled-unscarified) 150 Ib/ac or 3-1/2 Ib/1000 sf Tall Fescue Millet or Sudan 20 lb/cc or 1/2 Ib/1000 sf ** Temporary - Reseed September 1 at recommended rates. 4. Mulch with 3" straw applied at the rate of 50-90 Ib/1000 sf and anchor with asphalt emulsion tack coat applied at the rate of 5-7 gal/1000 sf or 200-300 gal/ac. ADDITIONAL SEEDING SPECIFICATIONS: 1. ALL OPEN AREAS SHALL BE SEEDED WITH KENTUCKY FESCUE #31 OR SODDED. 2. LIME SHALL BE APPLIED AT 4000/LB PER ACRE. 3. FERTILIZER SHALL BE APPLIED AS FOLLOWS: 10-10-10 AT 1000 LB. PER ACRE AND 0-20-0 AT 500 LB. PER ACRE. 4. SEED SHALL BE APPLIED AT 80 LB. PER ACRE (ADD 30 LB. PER ACRE ANNUAL RYE IF SEEDING BETWEEN NOVEMBER AND FEBRUARY). 5. STRAW SHALL BE APPLIED AT 3000 LB. PER ACRE AND ASPHALT TACKED AT 225 GAL. PER ACRE. C', 7 (15cm) M SKIMMER CONSTRUCTION SPECIFICATIONS 1. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR TIMBER. 2. PLACE THE BARREL (TYPICALLY 4-INCH LAYERS AND COMPACT IT UNDER AND AROUND THE PIPE OR AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM THE FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. PLACE A MINIMUM P DE TH OF 2 FEET OF COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. IN NO CASE SHOULD THE PIPE CONDUIT BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THE EMBANKMENT IS COMPLETE. 3. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURES INSTRUCTIONS, OR AS DESIGNED. 4. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT THE INLET OF THE BARREL PIPE. ATTACH THE FLEXIBLE JOINT TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED PIT OR SUPPORT. BE SURE TO ATTACHA A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN. THIS WILL BE USED TO PULL THE SKIMMER TO THE SIDE FOR MAINTENANCE. 5. REMOVE SKIMMER UNIT WHEN CONVERTING FROM SEDIMENT BASIN TO PERMANENT POND. ASSURE THAT DRAWDOWN HOLE AT BOTTOM OF STRUCTURE IS CLEAN AND FUNCTIONING. CONTRACTOR TO SHALL COORDINATE WITH INSPECTOR REGARDING APPROPRIATE TIME TO CONVERT POND TO THE FINAL POST DEVELOPMENT CONFIGURATION. SKIMMER AND SEDIMENT BASIN MAINTENANCE PLAN 1. INSPECT SEDIMENT AND SKIMMER BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (ONE-HALF INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. PULL THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE VEGETATION GROWING IN THE BOTTOW OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. 2. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OR AROUND THEM. 3. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALYY JERKING ON THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE OF THE BASIN AND REMOVE THE DEBRIS. ALSO CHECK THE ORIFICE INSIDE THE SKIMMER TO SEE IT IF IS CLOGGED; IF SO REMOVE THE DEBRIS. 4. IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER, 5. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREAS. 6. FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE. 2"-5'• 1 iit� T s , ® El11 ii ( III - I - =115- I I I -I I -i I I- IIi-iI1 _ 1iiI-I i CRITICAL POINTS NOTES: A. Overlaps and Seams 'Horizontal staple spacing should be B. Projected Water Line altered if necessary to allow staples to C. Channel BottomfSide Slope Vertices secure the critical points along the channel A A, surface. B C ----� or s loose soils greater t the use of staple or stake lengths greater than 6'(15an) may be necessary to properly secure the Drawing Not To Scale RECP's. NORT14 Disclaimer: �: 4 aar AMERICAN The information presented herein is general design information only. For specific applications, GREEW consult an independent professional for further design guidance. 5401 St. Wendel-Cynthiana Rd. PH: 800-772-2040 Poseyville, IN 47633 www.tensarnagreen.com Drown on: 3.16.11 DITCH MATTING INSTALLATION DETAIL N.T.S. CHANNEL INSTALLATION DETAIL 1. Prepare soil before installing rolled erosion control products (RECPs), including any necessary application of lime, fertilizer, and seed. 2. Begin at the top of the channel by anchoring the RECPs in a 6'(15an) deep X 6'(15cm) wide trench with approximately 12'(30cm) of RECPs extended beyond the up -slope portion of the trench. Use ShoraMax mat at the channellculvert outlet as supplemental scour protection as needed. Anchor the RECPs with a raw of staples/stakes approximately 12'(30cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to the compacted sail and fold the remaining 12'(30cm) portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced approximately 12' apart across the width of the RECPs. 3. Roll center RECPs in direction of water flow in bottom of channel. RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to soil surface by placing stapleststakes in appropriate locations as shown in the staple pattern guide. 4. Place umsecutive RECPs endaver end (Shingle style) with a 4'-6' overlap. Use a double now of staples staggered 4' apart and 4' on center to secure RECPs. 5. Full length edge of RECPs at top of side slopes must be anchored with a now of staplesistakes approximately 12'(30cm) apart In a 6'(15cm) deep X 6'(15an) wide trench. Backfill and compact the trench after stapling. 6. Adjacent RECPs must be ow;dapped approximately 2'-5' (512.5an) (Depending on RECPs type) and stapled. 7.In high flow channel applications a staple check slot is recommended at 30 to 40 foot (9 -12m) intervals. Use a double row of staples staggered 4'(10an) apart and 4'(10an) on center over entire width of the channel. 8. The terminal end of the RECPs must be anchored with a row of staples/stakes approximately 12' (30an) apart in a 6'(15cm) deep X 6'(15cm) wide trench. BaWN and compact the trench after stapling. Location: PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: MAINTENANCE DESCRIPTIONS: GENERAL EROSION: THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE NCDENR SO THAT PERIODIC INSPECTIONS CAN BE CONDUCTED AT APPROPRIATE STAGES OF CONSTRUCTION. GRAVEL CONSTRUCTION ENTRANCE: MAINTAIN THE GR AVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2' STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. BAFFLES: INSPECT BAFFLES AT LEAST WEEKLY AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL. TAKE CARE TO AVOID DAMAGING BAFFLES DURING CLEANOUT. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE AND STABILIZE IT. INLET PROTECTION: INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2- OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. EROSION CONTROL MATTING: INSPECT ROLLED EROSION CONTROL PRODUCTS (RECP) AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2- OR GREATER) RAINFALL EVENT, REPAIR IMMEDIATELY. MAINTAIN GOOD CONTACT WITH THE GROUND, PREVENTING EROSION BENEATH THE RECP. REPAIR AND STAPLE ANY AREAS DAMAGED OR NOT IN CLOSE CONTACT TO THE GROUND. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, FIX AND PROTECT THE ERODED AREA. MONITOR AND REPAIR RECP AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. TEMPORARY DIVERSION DITCH: INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. CHECK DAM: CHECK SEDIMENT BASINS AFTER EACH RAINFALL. REMOVE SEDIMENT AND RESTORE ORIGINAL VOLUME WHEN SEDIMENT ACCUMULATES TO ABOUT ONE-HALF THE DESIGN VOLUME. SEDIMENT SHOULD BE PLACED ABOVE THE BASIN AND ADEQUATELY STABILIZED. CHECK THE STRUCTURE FOR EROSION, PIPING, AND ROCK DISPLACEMENT WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINSTORM AND REPAIR IMMEDIATELY. REMOVE THE STRUCTURE AND ANY UNSTABLE SEDIMENT IMMEDIATELY AFTER THE CONSTRUCTION SITE HAS BEEN PERMANENTLY STABILIZED. SMOOTH THE BASIN SITE TO BLEND WITH THE SURROUNDING AREA AND STABILIZE. ALL WATER AND SEDIMENT SHOULD BE REMOVED FROM THE BASIN PRIOR TO DAM REMOVAL. SEDIMENT SHOULD BE PLACED IN DESIGNATED DISPOSAL AREAS AND NOT ALLOWED TO FLOW INTO STREAMS OR DRAINAGE WAYS DURING STRUCTURE REMOVAL. SLOPE DRAIN: INSPECT THE SLOPE DRAIN AND SUPPORTING DIVERSION AFTER EVERY RAINFALL, AND PROMPTLY MAKE NECESSARY REPAIRS. WHEN THE PROTECTED AREA HAS BEEN PERMANENTLY STABILIZED, TEMPORARY MEASURES MAY BE REMOVED, MATERIALS DISPOSED OF PROPERLY, AND ALL DISTURBED AREAS STABILIZED APPROPRIATELY. SILT FENCE: INSPECT SILT FENCE AT LEAST WEEKLY AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES 0.5' FULL. TAKE CARE TO AVOID DAMAGING SILT FENCE DURING CLEANOUT. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE AND STABILIZE IT. THE ENGINEER MAY DIRECT THAT ADDITIONAL SILT FENCING OR EROSION CONTROL MATTING BE INSTALLED AT ANY TIME PRIOR TO FINAL ACCEPTANCE. OUTLET PROTECTION/RIP RAP APRON: INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. GRASS -LINED SWALE: DURING THE ESTABLISHMENT PERIOD, CHECK GRASS -LINED CHANNELS AFTER EVERY RAINFALL. AFTER GRASS IS ESTABLISHED, PERIODICALLY CHECK THE CHANNEL, CHECK IT AFTER EVERY HEAVY RAINFALL EVENT. IMMEDIATELY MAKE REPAIRS. REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATIONS TO MAINTAIN THE DESIGNED CARRYING CAPACITY. KEEP THE GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIMES, SINCE IT IS THE PRIMARY EROSION PROTECTION FOR THE CHANNEL. STREAMS: DURING CONSTRUCTION OF THE IMPROVEMENT S SPECIFIED BY THESE PLANS, THE DEVELOPER SHALL MAINTAIN THE STREAM BED OF ALL STREAMS, CREEKS AND CHANNELS IN AN UNOBSTRUCTED STATE, AND SHALL REMOVE FROM THE CHANNEL AND/OR ITS BANKS, DEBRIS, LOGS OR OTHER ACCUMULATIONS AS REQUIRED TO FACILITATE PROPER DRAINAGE. STONE DAM IN SILT FENCE: INSPECr STONE DAM IN STILT FENCE AT LEAST WEEKLY AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. REPAIR OR REPLACE DAMAGED STONE BACK TO ORIGINAL HEIGHT AND WIDTH AND DRAINING CAPABILITY. SHOULD THE FABRIC COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS IN FRONT OF DAM WHEN IT REACHES 0.5' FULL. TAKE CARE TO AVOID DAMAGING SILT FENCE DURING CLEANOUT. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE AND STABILIZE IT. PERMANENT BMP OUTFALL SWALE: BMP SHOULD BE INSPECTED PER NCDENR INSPECTION CRITERIA (TYPICALLY ANNUALLY) BY AN APPROVED INSPECTOR. IN GENERAL, REMOVE SEDIMENT IN FRONT OF SWALE BAFFLE WHEN ACCUMULATION IS COVERING OR IMPEDING DRAIN-THRU HOLES. REPAIR AND REPLACE STONE AS NEEDED TO ORIGINAL DRAINING CONDITION. AMENDED SOIL TO BE REPLACED WHEN PERCOLATION CAPABILITY HAS BEEN REDUCED OR STOPPED. GRASS SHOULD BE REPAIRED OR SEEDED (NO SOD) WHEN BARRON. PERMANENT BMP DETENTION POND: BMP SHOULD BE INSPECTED PER NCDENR INSPECTION CRITERIA (TYPICALLY ANNUALLY) BY AN APPROVED INSPECTOR. IN GENERAL, AREA SHOULD BE PERIODICALLY CHECKED FOR SEDIMENT. REMOVE SEDIMENT PER DRY POND DETAIL ON SHEET C11.4. CHECK CONTROL STRUCTURE FOR DAMAGE AND LEAKS AND REPAIR IMMEDIATELY AS NEEDED. CHECK DRAWDOWN HOLE FOR CLOGGING AND CLEAN AREA TO ASSURE FUNCTIONING DRAINING IS OCCURING. CHECK GRATES AND TRASH RACKS AND REPAIR OR REPLACE AS NEEDED. RE-ESTABLISH EMERGENCY SPILLWAY TO ORIGINAL DESIGN IF ERODED, REPLACING SPILLWAY RIP -RAP. REGRADE ANY DISCRPENCIES IN POND BERM TO ORIGINAL DESIGN AS NEEDED. NIEW STAIMLZ TION TNEFRAJWS Site Area Description Stabilization Tinnefratne Exeeptions p Perimeter dikes, sales, ditches and slopes 7 days None High Quality tyWatert HOW) Zones 7 days None Slopes steeper than 3:1 7 days If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed. d Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50' in length, ® All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HOW Zones. Approved: Know what's below. Call before you dig. Date of Issue: O U V aC A N �Nr- W qr- •� u u u O 0 o� uz� Q 0 W , 000 00 'A 004 t` C Pr C ~ QY 00 �- N 00 l� Q CN U Do N z Z O LIJ _J Do Cl) C) _J J I co O o o Q o W of a Q m D` m 0 Z �-� a Icy � O N�y M+i 1"a�M L) Cn � 0 A lei Q 0 114 ee 14 Zsee F�1 0 cn O W T� V1 d.,;>`l� 'r A .,: ,}} \ ijvyyyfflt111 REVISIONS BY Date: 07/21 /16 Scale: AS NOTED Drawn: JCW hecked: DLM Project: 2015-06-03 ,lob: 2015-06-03 Sheet C-4.4 of Sheet to 1 NEW PAVIN ' DE (TYP. - I DA CI-17 _ 0.05 Ac. w �, UA (a-16 I ace m-mm, ° PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: GRADING LEGEND DETAIL DETAIL SYMBOL DESCRIPTION PROPERTY LINE - - RIGHT-OF-WAY LINE __- EXISTING CURB LINE GENERAL PUBLIC UTILITY EASEMENT EXISTING MINOR CONTOUR EXISTING MAIOR CONTOUR 722 PROPOSED MINOR CONTOUR PROPOSED MAIOR CONTOUR 720 m1m MM ME MM OR 5OR EXISTING STORM PIPE EXISTING CATCH BASIN —� PROPOSED 6" PVC SANITARY mill SEWER PIPE AND MANHOLE - PROPOSED R.C.P. YO PROPOSED STORM YARD DRAIN O PROPOSED STORM DRAINAGE MANHOLE PROPOSED CURB INLET (CI) PROPOSED DITCH INLET (DI) ® PROPOSED FLARED END SECTION PROPOSED RIP -RAP APRON PROPOSED PERMANENT SWALE GRAPHIC SCALE 30 0 15 30 60 ( IN FEET ) I inch = 30 ft- Know what's below. CaII before you dig. Date of Issue: 7 O U F�1 V 00 A Cd H � N O V -0 0 Uz x H �o ai w > Go 00 00 .. U 0 4 °o v Omni ~o 04 o C O S.. a 0 LLB 17 p 11� N O Q y 00 N 00 ~ Q a_ U 00 Z N Z O L I� J 00 (n _J J I 0Ld o 00 Q w af w w o- w o � N�y C/O 1�1 O Cry-' 4 h+.l C� [� WO�w 14 1 E W 10 -4 E__4 Cn � z E4 O :0 typl 00 4 - vo REVISIONS BY REVISED PER STORM & GRADING CHANGES 10/7/16 JCW Date: 7/21 / 16 Scale: 1" = 201 Drawn: JCW Necked: DLM Project: 2015-06-03 Job: 2015-06-03 Sheet C-5.0 of Sheet ' --- --- -T --. ..---- ---- -- -. - _.— -_�� GRADING LEGEND DETAIL DETAIL SYMBOL DESCRIPTION PROPERTY LINE — — RIGHT-OF-WAY LINE EXISTING CURB LINE GENERAL PUBLIC UTILITY EASEMENT EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR 722 PROPOSED MINOR CONTOUR 720 PROPOSED MAJOR CONTOUR ®—; EXISTING STORM PIPE EXISTING CATCH BASIN PROPOSED 6" PVC SANITARY SEWER PIPE AND MANHOLE — PROPOSED R.C.P. O PROPOSED STORM YARD DRAIN OD PROPOSED STORM DRAINAGE MANHOLE PROPOSED CURB INLET (CI) PROPOSED DITCH INLET (DI) ® PROPOSED FLARED END SECTION PROPOSED RIP -RAP APRON PROPOSED PERMANENT SWALE GRAPHIC SCALE 30 0 15 30 60 �nrr ( IN FEET ) I-40 Interstate inell � �en - 30 ft. E l m PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: Know what's below. Call before you dig. Date of Issue: z O U y � �~ 00 Q C N t- W Qt- v N OMB ' O O o Uzx Q >00 4 � o4 0 a O U r) CIA Q Y 00 N Q U N 1D a z Z N Lj O Z U) _j 00 J 3�: W O o o Q o cf) w a w ch a F� 04 p� o Cd C �W p 4 2-4 W �O cj W � �� Tn y F� E� �.4 W U� ���Nnwrrf J -. xs REVISIONS BY Date: 07/21 /16 Scale: AS NOTED Drawn: JCW hecked: DLM Project: 2015-06-03 Job: 2015-06-03 Sheet C-5.1 of Sheets 1 12,533 SF ' �Slzllo��''� III pFli--856.37 m _ 1 11 gs2 4 �TM �� — Of WOWI 1 I 830 � Aisting I o i \ 1 Blilding 1 1 _ _ _ - u BS�oz >845_�__---Fa 12 SF o / 1►2s \862.92' I / -, 'a rov of vlve �. s31.o6 �g ' t \�/ EX DEPTH 5 85 Fr. PROP. DEPTH = -13.16 Fr. a 0111111111 MATCH WMT. o +DE AT T1E-IN o aft a r— I 11 am 500 e �� \ I t 11 o _ they R R-°a Cai VV) 0_ DETAIL SYMBOL GRADING LEGEND DETAIL DESCRIPTION PROPERTY LINE - - RIGHT-OF-WAY LINE - ,__ — EXISTING CURB LINE GENERAL PUBLIC UTILITY EASEMENT - EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR 722 PROPOSED MINOR CONTOUR 720 PROPOSED MAJOR CONTOUR ••- :'ors ate:: EXISTING STORM PIPE EXISTING CATCH BASIN low PROPOSED 6" PVC SANITARY SEWER PIPE AND MANHOLE - PROPOSED R.C.P. O PROPOSED STORM YARD DRAIN O PROPOSED STORM DRAINAGE MANHOLE PROPOSED CURB INLET (CI) PROPOSED DITCH INLET (DI) ® PROPOSED FLARED END SECTION PROPOSED RIP -RAP APRON PROPOSED PERMANENT SWALE GRAPHIC SCALE L30 0 15 30 60 ^ p oad IN FELT > APPROvED Interstat 1 inch = 30 It. tI-40 C' Stor to PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: Know what's below. Cal I before you dig. Date of Issue: Z o U 'y P P • Q E 1� a OD A�N00 W.�r Vi i z •� y�0 0 U0z ao Q Q 00 �r- 3 04 Q 0 a 0 Lo�CO Q Y 00 N 1--+ Q U N �:D z I N O (n __j 00 J I 3: W O 0 � r� Q 1� O o (n w a w Ir a w � V 4-4 0 7 >w0 A��Z A� W c14 o E4 � V1 REVISIONS BY Date: 07/21 /1 6 Scale: AS NOTED Drawn: JCW hecked: DLM Project: 2015-06-03 ,lob: 2015-06-03 Sheet C-5.2 of Sheet