Loading...
HomeMy WebLinkAboutSW3170502_COMPLIANCE_20170527STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 17�s'v2, DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE D, -7 Z2� 7 YYYYMMDD Randall, Mike From: Randall, Mike -- Sent: Saturday, May 27, 2017 12:31 PM JUN 9 2017 To: 'Sean P. Gleason' Cc: Joel Smith; David Goracke DENR-DEMLR Subject: RE: 4276- Heritage NCDENR stormwater Add itidrmldrQggjWtNntRequest Attachments: Heritage Wet Pond A Checklist & Calculation .QWC,stct 6"gACt"Y#nd B Checklist & Calculations.doc Sean, The Division of Energy, Mineral, and Land Resources (DELMR) received a Stormwater Management Permit Application for the subject project on May 17, 2017. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review. For Wet pond A: WET POND SPECIFIC MINIMUM DESIGN CRITERIA 5: FOREBAY Forebay volume shall be 15 to 20 percent of the volume in the main pool. The application did not provide information on the volume of the forebay. Please verify the volumes for the forebay and main pool. n kVET POND SPECIFIC MINIMUM DESIGN CRITERIA 6: VEGETATED SHELF The main pool shall be equipped with a vegetative shelf around its perimeter. The minimum width of the vegetated shelf shall be six feet and the slope shall be no steeper than 6:1 (horizontal to vertical). On plan sheet C-911 and C-910 it appears that the vegetative shelf is well below the permanent pool elevation. Please correct and resubmit plan sheet C- 911 and C-910. 7DND SPECIFIC MINIMUM DESIGN CRITERIA 7: DRAWDOWN TIME The design volume shall draw down to the permanent pool level between two and five days. Although the calculations page 2 of 2 indicate a 3.24 inch orifice, the plan, sheet C-910 and C-911, indicate a 6 inch PVC Pipe, calculations. Fora 6 inch orifices the Days to discharge = Water Quality Treatment Volume Provided 82,532 ft3 / the discharge rate 1.47 ft3/sec) / seconds /day 86,400 = .65 days For wet pond B. Information was not provided in the calculation submittal —so I could not complete my review of Wet Pond B. The Minimum Design Criteria (MDC) can be found at: 15A NCAC 02H .1050 MDC for All Stormwater Control Measures 15A NCAC 02H .1053 MDC for Wet Ponds The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143- 215.6A. Please reference the State assigned project number SW3170502 on all correspondence. If you have any questions concerning this matter please feel free to call me. Mike Randall Stormwater Permitting Program NC Division of Energy, Mineral and Land Resources (DEMUR) Land Quality Section Stormwater Permitting 1612 Mail Service Center Raleigh, NC 27699-1612 Office:919-807-6374 Cell: 919-389-7801 Email correspondence to and from this address may be subject to public records laws From: Sean P. Gleason[mailto:sgleason@colejeneststone.com) Sent: Friday, May 05, 2017 3:15 PM To: Randall, Mike <mike.randall@ncdenr.gov> Cc: Joel Smith <jsmith@colejeneststone.com> Subject: 4276- Heritage NCDENR stormwater Mike, Thanks so much for talking with me this afternoon, you provided a wealth of information. I understand that you'll email Joel and I the checklist and some information on Monday. We will look to have you some plans, the application, and a check for $505 early next week. My contact information is below, thanks for all the coordination and assistance. Thanks, Sean P. Gleason, PE Senior Associate I Senior Project Manager COLEJENEST & STONE, P.A. D 919-645-5985 C 919-414-8088 www.coleFeneststone.com Land Planning + Landscape Architecture + Civil Engineering + Urban Design