Loading...
HomeMy WebLinkAboutSW3160202_HISTORICAL FILE_20160217STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. I DOC TYPE I ❑ CURRENT PERMIT ❑ APPROVED PLANS �D HISTORICAL FILE (❑ COMPLIANCE EVALUATION INSPECTION DOC DATE I ( 76�/Z YYYYMMDD Bfif i�cie:sijffatib 6wi d'e, IE si,a!'61 i's h e�dj in A 65 Irerracon ��e.�,,�„ July 17, 2015 A�7u A' y c `�8.f m ck 7n' 2w 6 b S Cabarrus County Schools g, 4401 Old Airport Road Concord, North Carolina 28205 Attention: Mr. Dave Burnett P: 704-262-6243 E: david.burnett@cabarrus.k12.nc.us Regarding: Proposal for Geotechnical Engineering Services Proposed Mt. Pleasant Middle School Mt. Pleasant, North Carolina Terracon Project No. 71155034 Dear Mr. Burnett: Terracon Consultants, Inc. (Terracon) has completed the geotechnical engineering services for the above referenced project. This study was performed in general accordance to our proposal numbered 71155G058, dated June 8, 2015. This report presents the findings of the subsurface exploration and provides geotechnical recommendations concerning earthwork and the design and construction of foundations and pavements for the proposed project. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service, please contact us. Sincerely, Terracon Consultants, Inc. � /I L - \ Prestons-��d, E.I.T. Geotechnical Staff Professional Reviewed by: David J. Corley, P.E. Enclosures cc: 1 —Client 1 — File Scott W Gutowski, .E. Project Geotechnical Engineer CA R 0'',, QOFESS%pN9� /7 � Q SEAL 40555 -tors S FNGINEEe'c�`F,.` GUSG�."`�` Terracon Consultants, Inc. 2020-E Slarita Rd. Charlotte, North Carolina 28206 NC License No. F-0869 P t7041 509 1777 F [704] 509 1888 lerracon.cont t TABLE OF CONTENTS Page EXECUTIVE SUMMARY.............................................................................................................i 1.0 INTRODUCTION.............................................................................................................1 2.0 PROJECT INFORMATION.............................................................................................1 2.1 Project Description............................................................................................1 2.2 Site Location and Description...........................................................................2 3.0 SUBSURFACE CONDITIONS........................................................................................2 3.1 Geology..............................................................................................................2 3.2 Typical Profile....................................................................................................3 3.3 Groundwater......................................................................................................3 4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION......................................4 4.1 Geotechnical Considerations............................................................................4 4.2 Earthwork...........................................................................................................5 4.2.1 Site Preparation.......................................................................................5 4.2.2 Compaction Requirements.......................................................................6 4.2.3 Grading and Drainage..............................................................................7 4.2.4 Earthwork Construction Considerations....................................................7 4.2.5 Excavations..............................................................................................7 4.3 Foundations.......................................................................................................8 4.3.1 Foundation Design Recommendations.. ................................................... 8 4.3.2 Foundation Construction Considerations..................................................9 4.4 Slab-on-Grade..................................................................................................10 4.4.1 Slab -on -Grade Design Recommendations.............................................10 4.4.2 Slab -on -Grade Construction Considerations..........................................10 4.5 Pavements........................................................................................................11 4.5.1 Pavement Design Recommendations.....................................................11 4.5.2 Pavement Construction Considerations..................................................12 4.6 Seismic Considerations..................................................................................13 4.7 Infiltration Testing............................................................................................13 5.0 GENERAL COMMENTS...............................................................................................14 APPENDIX A — FIELD EXPLORATION Exhibits A-1 a & A-1 b Site Topographic Map & Site Location Map Exhibits A-2a & A-2b Aerial Boring Location Plan & Boring Location Plan Exhibit A-3 Field Exploration Description Exhibits A-4 to A-23 Boring Logs APPENDIX B — SUPPORTING INFORMATION Exhibits B-1 and B-2 Laboratory Testing APPENDIX C —SUPPORTING DOCUMENTS Exhibit C-1 General Notes Exhibit C-2 Unified Soil Classification System Responsive m Resourceful m Reliable Geotechnical Engineering Report ® o 0 1%rrac®n Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, No fGtirolirf a t July 17, 2015 ■ Terracon Project No. 71155034 N ® Cn.3 EXECUTIVE SUMMARY '~ Z Cr C� w w a.� A geotechnical investigation has been performed foQth buildings, parking lot and storm water basin of the proposed Mt. Pleasant Middle School in Mt. Pleasant, North=Carolina. Thirty-two (32) borings, designated B-01 through B-14 and S-01 through S-18, were performed to depths of approximately 4.9 to 28.1 feet below the existing ground surface in the proposed building, parking lot and detention pond areas. Based on the information obtained from our subsurface exploration, the site can be developed for the proposed project. The following geotechnical considerations were identified: ® The major geotechnical concern for this site is the potential for high plasticity soils, including fat clay and elastic silt. These soils can be moisture sensitive and difficult to work. These difficulties can include softening of exposed subgrade soils, excessive rutting or deflection under construction traffic, and the inability to adequately dry and compact wet soil. This soil should not be used as structural fill beneath proposed building areas or within 3 feet of finished subgrades in pavement areas. Moderate plasticity soils were identified in the upper 3.0 feet of Borings B-10 and B-14. We recommend that the contractor be requested to submit a unit rate cost for undercutting as part of the bidding process. s In our opinion, the low to medium plasticity residual soils and partially weathered rock as encountered in our borings at the site are suitable to support the proposed structure on shallow foundations provided the subgrade is prepared as outlined in this report. s The residual soils encountered in our borings, with the exception of any highly elastic or plastic soils, appear to be suitable for re -use as engineered fill. Partially weathered rock may also be suitable for reuse as engineered fill, as long as it is prepared and placed in accordance with the Earthwork section of this report. ® The proposed buildings may be supported on conventional spread and strip footings with a net allowable bearing pressure of 3,000 psf. If footings are bearing on or extended further below existing grades to very dense/hard residual soils and/or PWR, a higher bearing pressure of 5,000 psf may be used for spread and strip footings. The bearing soils should be evaluated by a geotechnical engineer to determine if the footings are bearing on PWR. Further details and recommendations are provided herein. a The 2012 North Carolina Building Code seismic site classification for this site is C. Responsive o Resourceful ■ Reliable Geotechnical Engineering Report 1rCri�c®� Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, North Carolina July 17, 2015 ■ Terracon Project No. 71155034 ■ The residual soils encountered at the boring locations may be excavated with conventional construction equipment, such as bulldozers, backhoes, and trackhoes. However, difficult excavation of very dense/hard residual soils and partially weathered rock may be encountered beginning at the existing grade in the vicinity of specified boring locations, and should be considered if site grading, basement foundations or utility trenches are considered. We recommend that the contractor submit unit rates for excavation of rock in the bid package. This summary should be used in conjunction with the entire report for design purposes. It should be recognized that details were not included or fully developed in this section, and the report must be read in its entirety for a comprehensive understanding of the items contained herein. The section titled GENERAL COMMENTS should be read for an understanding of the report limitations. Responsive o Resourceful o Reliable GEOTECHNICAL ENGINEERING REPORT PORPOSED MT. PLEASANT MIDDLE SCHOOL MT. PLEASANT, NORTH CAROLINA Project No. 71155034 July 17, 2015 1.0 INTRODUCTION A geotechnical investigation has been performed for the buildings, parking lot and storm water basin of the proposed Mt. Pleasant Middle School in Mt. Pleasant, North Carolina. Thirty-two (32) borings, designated B-01 through B-14 and S-01 through S-18, were performed to depths of approximately 4.9 to 28.1 feet below the existing ground surface in the proposed building, parking lot and detention pond areas. Logs of the borings and a description of the field exploration, along with a Site Topographic Map, Site Location Map, Aerial Boring Location Plan and Boring Location Plan are included in Appendix A of this report. The purpose of these services is to provide information and geotechnical engineering recommendations relative to: s subsurface soil conditions ■ groundwater conditions ■ earthwork and excavations ■ pavement design and construction 2.0 PROJECT INFORMATION 2.1 Project Description ■ foundation design and construction ■ seismic considerations ■ slab -on -grade design and construction ■ infiltration rates ITEM DESCRIPTION Site layout See Appendix A, Exhibits A-2a and A-21b Two-story masonry block and brick school buildings, bleachers, Structures tennis courts, baseball fields, track, school bus and vehicle parking areas and access drives. Steel framed structure (anticipated). Building construction Concrete slab -on -grade. Finished floor elevation Unknown. Assumed close to existing grades. Columns: 155 kips (assumed) Maximum loads Walls: 5 kif (assumed) Slabs: 150 psf (assumed) General Site Grading Not provided. Cuts and fills up to 5 feet anticipated. Responsive ■ Resourceful c Reliable Geotechnical Engineering Report 1%rr�e®r� Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, North Carolina July 17, 2015 ■ Terracon Project No. 71155034 ITEM DESCRIPTION Cut and fill slopes Unknown. Assumed to be no steeper than 3H:1V (Horizontal to Vertical). Free-standing retaining walls None (assumed). Below Grade Areas None (assumed). 2.2 Site Location and Description ITEM DESCRIPTION This project is located on Walker Road in Mt. Pleasant, Cabarrus County, North Carolina, The Mt. Pleasant High School campus Location (700 Walker Road) is located on the southern boundary of the subject site. The majority of the property is undeveloped with a few buildings Existing development located on the northeastern property boundary. The majority of the site is covered with grassy areas with some Current ground cover areas covered in moderate to dense vegetation with light to heavy tree cover and underbrush. Based on available information, the site appears to gradually fall Existing topography from a high elevation of about 675 feet to the northeast to a low elevation of about 625 feet in thesouthwest. 3.0 SUBSURFACE CONDITIONS 3.1 Geology The project site is located in the Piedmont Physiographic Province, an area underlain by ancient igneous and metamorphic rocks. The residual soils in this area are the product of in -place chemical weathering of rock. The typical residual soil profile consists of clayey soils near the surface where soil weathering is more advanced, underlain by sandy silts and silty sands that generally become harder with depth to the top of parent bedrock. Alluvial soils are typically present within floodplain areas along creeks and rivers in the Piedmont. According to the 1985 Geologic Map of North Carolina, the site is within the Charlotte Belt. The bedrock underlying the site generally consists of granite of the Salisbury Plutonic Suite. The boundary between soil and rock in the Piedmont is not sharply defined. A transitional zone termed "partially weathered rock" is normally found overlying the parent bedrock. Partially weathered rock is defined for engineering purposes as residual material with a standard penetration test resistance exceeding 100 blows per foot. The transition between hard/dense residual soils and partially weathered rock occurs at irregular depths due to variations in degree of weathering. Responsive ® Resourceful ■ Reliable 2 Geotechnical Engineering Report r����e®p 1 Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, North Carolina al YY �e July 17, 2015 ■ Terracon Project No. 71155034 Groundwater is typically present in fractures within the partially weathered rock or underlying bedrock in upland areas of the Piedmont. Fluctuations in groundwater levels on the order of 2 to 4 feet are typical in residual soils and partially weathered rock in the Piedmont, depending on variations in precipitation, evaporation, and surface water runoff. Seasonal high groundwater levels are expected to occur during or just after the typically cooler months of the year (November through April). 3.2 Typical Profile Based on the results of the borings, subsurface conditions on the project site can be generalized as follows: Surficial materials include approximately 3.5 to 9 inches of topsoil encountered in each of the borings at the ground surface. Below the surficial materials, residual soils were encountered to depths ranging from about 2.0 to 13.5 feet below existing grades. Residual soils encountered consist of silty sands, silts with varying amounts of sand, sandy elastic silts, sandy lean clays and sandy fat clays. These soils visually classify as SM, MIL, MH, CL and CH, respectively, in accordance with the Unified Soil Classification System (USCS). Standard penetration test values (N-values) in the silts and clays ranged from 4 to 79 blows per foot (bpf), indicating a soft to hard consistency. N-values in the sands ranged from 12 to 77 bpf, indicating a medium dense to very dense relative density. Partially weathered rock (PWR) was encountered in Borings B-01 through B-14, S-03 through S-05, S-07, S-17 and S-18, at depths ranging from the 2 to 28.1 feet below the existing grade. PWR is defined for engineering purposes as residual material with a standard penetration test resistance exceeding 100 blows per foot. Auger refusal materials were encountered in Borings B-03, B-07, B-11 and B-13, at depths ranging from approximately 10.9 to 28.1 feet below existing grades. Conditions encountered at each boring location are indicated on the individual boring logs. Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in -situ, the transition between materials may be gradual. Details for each of the borings can be found on the boring logs in Appendix A of this report. 3.3 Groundwater The boreholes were observed during and after completion of drilling for the presence and level of groundwater. Groundwater was neither observed while drilling nor during the short amount of time (less than 1 hour) the borings were left open after drilling. Long-term measurements may be necessary for accurate groundwater levels. Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff and other factors not evident at the time the borings were performed. Therefore, groundwater Responsive ® Resourceful ® Reliable 3 Geotechnical Engineering Report lrerrac®9 E Proposed Mt. Pleasant Middle School m Mt. Pleasant, North Carolina July 17, 2015 m Terracon Project No. 71155034 levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project. 4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION 4.1 Geotechnical Considerations The major geotechnical concern for this site is the potential for high plasticity soils, including fat clay and elastic silt. These soils can be moisture sensitive and difficult to work. These difficulties can include softening of exposed subgrade soils, excessive rutting or deflection under construction traffic, and the inability to adequately dry and compact wet soil. This soil should not be used as structural fill beneath proposed building areas or within 3 feet of finished subgrades in pavement areas. Moderate plasticity soils were identified in the upper 3.0 feet of Borings B-10 and B-14. We recommend that the contractor be requested to submit a unit rate cost for undercutting as part of the bidding process. In our opinion, the low to medium plasticity residual soils and partially weathered rock as encountered in our borings at the site are suitable to support the proposed structure on shallow foundations provided the subgrade is prepared as outlined in this report. We recommend close examination of the bearing materials be performed during construction to confirm stable soil conditions. The residual soils encountered at the boring locations may be excavated with conventional construction equipment, such as bulldozers, backhoes, and trackhoes: however, very dense/hard residual soils and PWR were encountered at depths ranging from the 2.0 to 28.1 feet below existing grades, and may be encountered at similar depths in other areas across the site. Relatively deep excavations, such as for underground utility installation, may encounter hard excavation and potential bedrock which may require blasting or hammering to remove efficiently. Smaller equipment may have difficulty excavating PWR. A larger trackhoe or bulldozer equipped with a single -tooth ripper may be required to excavate these materials. Some PWR, especially in confined excavations, and rock will require blasting or impact hammering to efficiently excavate. Based on the results of our subsurface exploration, it is our opinion that the proposed building may be supported on conventional spread and strip footings with a net allowable bearing pressure of 3,000 psf. If footings are bearing on or extended further below existing grades to very dense/hard residual soils and/or PWR, a higher bearing pressure of 5,000 psf may be used for spread and strip footings. The bearing soils should be evaluated by a geotechnical engineer to determine if the footings are bearing on PWR. Further details and recommendations are provided herein. Responsive m Resourceful m Reliable 4 Geotechnical Engineering Report 1iC'r��c®� Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, North Carolina July 17, 2015 ■ Terracon Project No. 71155034 4.2 Earthwork 4.2.1 Site Preparation Site preparation should begin with the demolition of existing structures and debris removal. As part of the demolition, buried utilities and footings should also be removed. Existing utilities that are to be abandoned should be removed or filled with grout. The excavations resulting from utility and footing removal should be properly backfilled with compacted engineered fill as described in the following subsections. Utilities that are to remain in service should be accurately located horizontally and vertically to minimize conflict with new foundation construction. Existing vegetation, topsoil and any otherwise unsuitable material should be removed from the construction areas prior to placing fill. The exposed subgrade soils in areas to receive fill or at the subgrade elevation in cut areas should be proofrolled to detect soft or loose soils and other unsuitable materials that may be present. Proofrolling should be performed with a moderately loaded, tandem axle dump truck or similar pneumatic -tired construction equipment weighing approximately 10 to 15 tons in the proposed building areas. A Terracon representative should observe this operation to aid in delineating unstable soil areas. Proofrolling should be performed after a suitable period of dry weather to avoid degrading an otherwise acceptable subgrade. Soils which continue to rut or deflect excessively under the proofrolling operations should be remediated as recommended by the geotechnical engineer. Based on the results of our laboratory tests, medium plasticity soils were identified in two (2) of our borings. Medium to high plasticity soils can be moisture sensitive and difficult to work. These difficulties can include softening of exposed subgrade soils, excessive rutting or deflection under construction traffic, and the inability to adequately dry and compact wet soil. If subgrade soils are unsuitable, they will require removal and replacement; however, if they are unstable due to excessive moisture, the most economical solution for remediation may be to scarify, dry and recompact the material. This remediation is most effective during the typically hotter months of the year (May to October). If construction is performed during the cooler period of the year, the timeline for scarifying, drying, and recompacting typically increases considerably and may lead to alternative remediation solutions. These solutions can include overexcavation of some or all of the unstable material to be backfilled with either approved engineered fill or ABC Stone. Potential undercutting can be reduced if the site preparation work is performed during a period of dry weather and if construction traffic is kept to a minimum on prepared subgrades. We recommend that the contractor submit a unit rate cost for undercutting as part of the bidding process. The soils encountered in our borings appear to be suitable for re -use as engineered fill. Based on the moderate plasticity soils encountered in Borings B-10 and B-14, there is a potential for high plasticity soils at the site that are not suitable for re -use in the building area. Responsive a Resourceful a Reliable 5 Geotechnical Engineering Report 1��r���®� Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, North Carolina July 17, 2015 ■ Terracon Project No. 71155034 Enqineered fill should meet the following material property requirements: Fill Type' USCS Classification I Acceptable Location for Placement On -site Low to Medium ML, CL, SM, MH, CH All locations and elevations Plasticity Soils (ILL < 60 & PI < 30) On -site High Plasticity MH, CH Nonstructural areas and at depths greater than 3 Silts and Clays (ILL >_ 60 & PI >_ 30) feet below pavement subgrade elevations 2 ML, SM Below the upper 2 feet in building pad. At any On -Site PWR (LL<50 & PI<20) depth in pavement and non-structural areas. ML, CL, SC, SM, GM Imported soils (ILL < 50 & PI < 20 with a All locations and elevations minimum 15% passing No. 200 sieve) 1. Controlled, compacted fill should consist of approved materials that are free of organic matter and debris. A sample of each material type should be submitted to the geotechnical engineer for evaluation. 2. Partially Weathered Rock may be used as engineered fill if it is broken into pieces smaller than 3 inches and thoroughly blended with soil prior to placement. 4.2.2 Compaction Requirements We recommend that engineered fill be tested for moisture content and compaction during placement. Should the results of the in -place density tests indicate the specified moisture or compaction limits have not been met, the area represented by the test should be reworked and retested as required until the specified moisture and compaction requirements are achieved. Engineered fill should meet the following compaction requirements: ITEM DESCRIPTION 8 to 10 inches or less in loose thickness when heavy, self-propelled compaction equipment is used Fill Lift Thickness 4 to 6 inches in loose thickness when hand -guided equipment (e.g. jumping jack or plate compactor) is used 95% of the materials maximum standard Proctor dry density (ASTM D 698) Minimum Compaction Requirements The upper 12 inches in pavement and building areas should be compacted to at least 100% of the materials maximum standard Proctor dry density (ASTM D 698) Within 3% of the optimum moisture content value as Moisture Content Requirements determined by the standard Proctor test at the time of placement and compaction Responsive o Resourceful ■ Reliable 6 Geotechnical Engineering Report 1r�iC��C®� Proposed Mt. Pleasant Middle School a Mt. Pleasant, North Carolina July 17, 2015 ■ Terracon Project No. 71155034 4.2.3 Grading and Drainage Final surrounding grades should be sloped away from the building on all sides to prevent ponding of water. Gutters and downspouts that drain water a minimum of 10 feet beyond the footprint of the proposed building are recommended. This can be accomplished through the use of splash - blocks, downspout extensions, and flexible pipes that are designed to attach to the end of the downspout. Flexible pipe should only be used if it is daylighted in such a manner that it gravity - drains collected water. Splash -blocks should also be considered below hose bibs and water spigots. 4.2.4 Earthwork Construction Considerations Upon completion of filling and grading, care should be taken to maintain the subgrade moisture content prior to construction of on -grade slab and pavements. Construction traffic over the completed subgrade should be avoided to the extent practical. The site should also be graded to prevent ponding of surface water on the prepared subgrades or in excavations. If the subgrade should become frozen, desiccated, saturated, or disturbed, the affected material should be removed or these materials should be scarified, moisture conditioned, and recompacted prior to on -grade slab and pavement construction. The geotechnical engineer should be retained during the construction phase of the project to observe earthwork and to perform necessary tests and observations during subgrade preparation and just prior to construction of building slabs and pavements. 4.2.5 Excavations The residual soils encountered at the boring locations may be excavated with conventional construction equipment, such as bulldozers, backhoes, and trackhoes; however, very dense/hard residual soils and PWR were encountered at relatively shallow depths in many of the borings and may be encountered during site development. The depth and thickness of PWR, boulders, and rock lenses or seams can vary dramatically in short distances and between the testing locations. Smaller equipment may have difficulty excavating PWR. A larger trackhoe or bulldozer equipped with a single -tooth ripper may be required to excavate these materials. Some PWR, especially in confined excavations, and rock will require blasting or impact hammering to efficiently excavate. We recommend that unit rates for mass rock and trench rock be included in the .bid package to limit disputes, in the case that rock -like materials are encountered. It is our opinion that a clear and appropriate definition of rock be included in the project specifications to reduce the potential for misunderstandings. A sample definition of rock for excavation specifications is provided below: Mass Rock is defined as any material that cannot be dislodged by a Caterpillar D-8 Bulldozer, or equivalent, equipped with a single tooth ripper, without the use of impact hammers or drilling and blasting. Trench Rock is defined as any Responsive a Resourceful o Reliable 7 Geotechnical Engineering Report ®^ 1��r��c Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, North Carolina 6 July 17, 2015 ■ Terracon Project No. 71155034 material that cannot be dislodged by a Caterpillar 325 hydraulic backhoe, or equivalent, without the use of impact hammers or drilling and blasting. Boulders or masses of rock exceeding % or/< cubic yard in volume shall also be considered mass or trench rock, respectively, during excavation. These classifications do not include materials such as loose rock, concrete, or other materials that can be removed by means other than impact hammering, but which for any reason, such as economic reasons, the Contractor chooses to remove by impact hammering. As a minimum, all temporary excavations should be sloped or braced as required by Occupational Safety and Health Administration (OSHA) regulations to provide stability and safe working conditions. Temporary excavations will probably be required during grading operations. The grading contractor should be responsible for designing and constructing stable, temporary excavations and should shore, slope or bench the sides of the excavations as required, to maintain stability of both the excavation sides and bottom. All excavations should comply with applicable local, state and federal safety regulations, including the current OSHA Excavation and Trench Safety Standards. Construction site safety is the sole responsibility of the contractor who controls the means, methods and sequencing of construction operations. Under no circumstances shall the information provided herein be interpreted to mean that Terracon is assuming any responsibility for construction site safety or the contractor's activities; such responsibility shall neither be implied nor inferred. 4.3 Foundations In our opinion, the proposed structure can be supported by shallow, spread footing foundation systems bearing within suitable residual soils, new properly compacted fill, or partially weathered rock. Design recommendations for shallow foundations for the proposed structure are presented in the following sections. 4.3.1 Foundation Design Recommendations DESCRIPTION Column Wall Net allowable bearing pressure''' 3,000 psf 3,000 psf Minimum dimensions 30 inches 18 inches Minimum embedment below finished grade 18 inches 18 inches Approximate total/differential settlement < 1 inch < 3/4 inch over 40 feet 1. The recommended net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation. Assumes any fill or soft soils, if encountered, will be undercut and replaced with engineered fill. 2. If footings bear on or are extended further into dense/hard residual soils and/or PWR, a higher bearing pressure of 5,000 psf may be used for spread and strip footings. Responsive a Resourceful o Reliable 8 Geotechnical Engineering Report �rerr�c®� Proposed Mt. Pleasant Middle School a Mt. Pleasant, North Carolina July 17, 2015 a Terracon Project No. 71155034 4.3.2 Foundation Construction Considerations The foundation bearing materials should be evaluated at the time of the foundation excavation. A representative of Terracon should use a combination of hand auger borings and dynamic cone penetrometer (DCP) testing in conjunction with visual observations to determine the suitability of the bearing materials for the design bearing pressure. The base of all foundation excavations should be free of water and loose soil and rock prior to placing concrete. Concrete should be placed soon after excavating to reduce bearing soil disturbance. Should the soils at bearing level become disturbed, saturated, or frozen, the affected soil should be removed prior to placing concrete. Exposure to inclement weather can introduce unwanted moisture into the footing subgrade. If construction occurs during inclement weather, and concreting of foundations is not possible at the time they are excavated, a layer of lean concrete should be placed on exposed bearing surfaces for protection. Where high moisture conditions are encountered . at footing bearing elevations, the bottom of the excavations could be stabilized with a relatively clean, well -graded crushed stone or gravel, or a lean concrete mud mat to provide a working base for construction. If unsuitable bearing soils are encountered in footing excavations, the excavations should be extended deeper to suitable soils. The footings could bear directly on the soils at the lower level or on lean concrete backfill placed in the excavations. The footings could also bear on properly compacted structural fill extending down to the suitable soils. Overexcavation for compacted structural fill placement below footings should extend laterally beyond all edges of the footings at least 8 inches per foot of overexcavation depth below footing base elevation. The overexcavation should then be backfilled up to the footing base elevation with well -graded granular material placed in lifts of 10 inches or less in loose thickness and compacted to at least 98 percent of the material's maximum standard Proctor dry density (ASTM D-698). The overexcavation and backfill procedures are described in the following figure. Design %v r 1: Deslg Foodng Level Footir LEAN . CONCRETE' Reccrnnnehded Roca .Excavation Level _•�.u_.. Exca� Lean Concrete Backfill Overexcavation / Backfill NOTE: Excavations in sketches shown vertical for convenience. Excavations should be sloped as necessary for safety. D = Depth of overexcavation to suitable soils, as determined by a Terracon representative during construction. Responsive o Resourceful a Reliable 9 Geotechnical Engineering Report Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, North Carolina July 17, 2015 ■ Terracon Project No. 71155034 4.4 Slab -on -Grade _ 4.4.1 Slab -on -Grade Design Recommendations Irerrac®n ITEM DESCRIPTION Recompacted site soils or new engineered fill Slab -on -grade support compacted in accordance with Earthwork section of this report' 150 pounds per square inch per inch (psi/in) for Modulus of subgrade reaction point loading conditions 4 inches of free draining granular material (< 5 Aggregate base course/capillary break percent passing the No. 200 sieve) 1. Slab -on -grade should be structurally independent of any building footings or walls to reduce the possibility of slab cracking caused by differential movements between the slab and foundation. As previously outlined, the exposed subgrade soils should be proofrolled to detect soft, loose soils or unsuitable fill in the slab areas. The proofrolling operations should be observed by a representative of the geotechnical engineer. If excessive deflection or rutting is observed, the geotechnical engineer should be contacted for stabilization options. We recommend on -grade slab subgrades be maintained in a relatively moist yet stable condition until slabs are constructed. If the subgrade should become excessively desiccated or wet prior to construction of on -grade slabs and pavements, the affected material should be either removed and replaced or scarified, moisture conditioned, and recompacted. Upon completion of grading operations in the building areas, care should be taken to maintain the recommended subgrade moisture content and density prior to construction of the on -grade slabs. Saw -cut control joints should be placed in the slab to help control the location and extent of cracking. In addition, we recommend separating the slab and foundation using isolation joints to allow for differential movement. For additional recommendations refer to the ACI 330R-1. 4.4.2 Slab -on -Grade Construction Considerations Upon completion of grading operations in the building area, care should be taken to maintain the recommended subgrade moisture content and density prior to construction of the building on -grade slab. On most project sites, the site grading is generally accomplished early in the construction phase. However as construction proceeds, the subgrade may be disturbed due to utility excavations, construction traffic, desiccation, rainfall, etc. As a result, the slab subgrade may not be suitable for placement of base rock and concrete and corrective action will be required. We recommend the area underlying the on -grade slab be rough graded and then thoroughly proofrolled with a loaded tandem axle dump truck prior to final grading and placement of base Responsive a Resourceful s Reliable 10 Geotechnical Engineering Report l��rp.�c®� Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, North Carolina tltl July 17, 2015 ■ Terracon Project No. 71155034 rock. Particular attention should be paid to high traffic areas that were rutted and disturbed earlier and to areas where backfilled trenches are located. Areas where unsuitable conditions are located should be repaired by removing and replacing the affected material with properly compacted fill. All slab subgrade areas should be moisture conditioned and properly compacted to the recommendations in this report immediately prior to placement of the base rock and concrete. 4.5 Pavements 4.5.1 Pavement Design Recommendations Following the stripping of deleterious materials, we recommend the proposed pavement subgrade be prepared and compacted in accordance with the recommendations provided in the Earthwork section of this report. Proofrolling and recompacting of the upper 1-foot of subgrade is recommended immediately prior to stone base placement. Soft or unstable areas delineated by the proofrolling operations should be undercut or stabilized in -place to achieve the appropriate subgrade support. Potential areas for encountering unsuitable or unstable soils are in the vicinity of drainage features and in the low lying areas of the site. Traffic patterns and anticipated loading conditions were not available; however, we anticipate that traffic loads will be produced primarily by automobiles, school buses, and occasional delivery and trash removal trucks. We have assumed approximately 10 trucks per day and automobile traffic for the drive lane along the alignment. If heavier traffic loading is expected, this office should be provided with the information and allowed to review these pavement sections. A design life of 20 years was assumed to develop the total traffic used in thickness design. Based on our borings and assumed grading, we anticipate the on -site silts or similar imported materials will be present at subgrade elevation. Two flexible pavement section alternatives have been provided. Light duty for areas expected to receive only car traffic and heavy duty for truck access areas. Recommended flexible pavements, summarized for each traffic area, are as follows: Material NCDOT Grading Pavement Section (inches) Light Duty Heavy Duty Asphalt Surface Course S — 9.513 3* 1.5 Asphalt Binder Course I — 19.0B 2.5 Aggregate Base Course ABC 6 8 "Should be placed in two equal lifts. Rigid pavement can be used as an alternative to flexible pavements. Our recommended light and heavy duty sections are as follows: i Responsive u Resourceful a Reliable 11 Geotechnical Engineering Report �r�rr�c®Y 9 Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, North Carolina July 17, 2015 ■ Terracon Project No. 71155034 Material NCDOT Grading Pavement Section (inches) Light Duty Heavy Duty Portland Cement 4,000 psi 5 6 Concrete For areas subject to concentrated and repetitive heavy duty loading conditions such as dumpster pads, truck delivery docks and ingress/egress aprons, we recommend using a Portland cement concrete pavement with a thickness of at least 8 inches underlain by at least 4 inches of crushed stone. Prior to placement of the crushed stone the areas should be thoroughly proofrolled. For dumpster pads, the concrete pavement area should be large enough to support the container and tipping axle of the refuse truck. ACI 330R-01 provides recommendations for control joints, joint spacing, and joint construction. Concrete slabs should be separated from other structures or fixed objects within or abutting paved areas with expansion joints to offset the effects of expected differential horizontal and vertical movements. The minimum pavement sections outlined above were recommended based on assumed post - construction traffic loading conditions for this type of development. These pavement sections do not account for heavy construction traffic during construction. A partially constructed structural section that is subjected to heavy construction traffic can result in pavement deterioration and premature failure. Our experience indicates that this pavement construction practice can result in pavements that will not perform as intended. Considering this information, several alternatives are available to mitigate the impact of heavy construction traffic on the pavement construction. These include using thicker sections to account for the construction traffic, using some method of soil stabilization to improve the support characteristics of the pavement subgrade, or by routing heavy construction traffic around paved streets. 4.5.2 Pavement Construction Considerations Materials and construction of flexible pavements for the project should be in accordance with the requirements and specifications of the North Carolina Department of Transportation "Standard Specifications for Roads and Structures". Materials and construction of rigid pavements for the project should be in accordance with the requirements and specifications of ACI 330.1. Base course or pavement materials should not be placed when the surface is wet. Surface drainage should be provided away from the edge of paved areas to minimize lateral moisture transmission into the subgrade. Preventative maintenance should be planned and provided through an on -going pavement management program in order to enhance future pavement performance. Preventative maintenance activities are intended to slow the rate of pavement deterioration, and to preserve the pavement investment. Responsive ■ Resourceful u Reliable 12 Geotechnical Engineering Report �{���,r��®� Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, North Carolina July 17, 2015 ■ Terracon Project No. 71155034 Maintenance consists of both localized maintenance (e.g. crack sealing and patching) and global maintenance (e.g. surface sealing). Preventative maintenance is usually the first priority when implementing a pavement maintenance program. Additional engineering observation is recommended to determine the type and extent of a cost effective program. Even with periodic maintenance, some movements and related cracking may still occur and repairs may be required. 4.6 Seismic Considerations Code Used Site Classification 2012 North Carolina Building Code (NCBC)' I C 1. The 2012 NCBC requires a site soil profile determination extending a depth of 100 feet for seismic site classification. The borings performed for this report extended to a maximum depth of 28.1 feet, and an average weighted N-value in the soils below this depth has been assumed based on experience in the region. The subsurface materials are not considered subject to liquefaction under the magnitude of seismic events predicted for the area. 4.7 Infiltration Testing We understand that a storm -water detention area is proposed at the subject project site. Infiltration testing was performed at two of the SPT boring locations (S-16 and S-17) as shown on the Boring Location Plan (Figure A-2b). After drilling, the borings were cleaned out with hand auger equipment, filled with water to a depth of 24 inches, and allowed to pre-soak for 24 hours. After 24 hours, water was added to the borings to bring the water level back to 24 inches. The drop in the water level was monitored for 1 hour and the change in the water level was recorded. This process was repeated for a total of four times. Upon completion of the infiltration testing, the borings were backfilled with the soil cuttings from the drilling operations. The table below provides a summary of the infiltration rate measured during the final (fourth) test at each location. Boring Number Infiltration Rate (inches per hour) S-16 I < 0.12 S-17 I 1.68 Responsive m Resourceful m Reliable 13 Geotechnical Engineering Report 1r�r���®�,q Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, North Carolina tl 11I1 HH July 17, 2015 ■ Terracon Project No. 71155034 5.0 GENERAL COMMENTS Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications. Terracon also should be retained to provide observation and testing services during grading, excavation, foundation construction and other earth -related construction phases of the project. The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this report. This report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing. Responsive ® Resourceful s Reliable 14 Co.'d Spnn9s N r n Watts Crossroads Mc P4ram't it 2 miles - - O 2015 Microsoft Corporation 0 2015 HERE DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS AERIAL PHOTOGRAPHY PROVIDED NOT INTENDED FOR CONSTRUCTION PURPOSES BY MICROSOFT BING MAPS RojectMmaBer: Project No. SWG 71155034 SITE LOCATION MAP Exhibit DfiM9 by: PDM $[BIAS HOWN 1rerracon Checked by: File Name: Mt. Pleasant Middle School SWG A-26 2020E Starlta Road Walker Road A-1 b Approved by: DJC Date: 5/15115 Charlotte, INC 28206 Mt. Pleasant, NC N it B-01 S-03 S-02 B-02 B-03 S-01 B-04 S-04 8-14-B-05 B-06 B 08 B-07 B-09 S-06 S-16 B 11 B-10 S-05 S-18 S-17 B-13 B-12 S 1 S-07 S-09 S-08 S-11 S-12 S-13 S-14 5-15 LEGEND: = Approximate Location of Soil Test Borings Project Manager. Preleet Na. BORING LOCATION PLAN EXHIBIT SWG 711550S, Drawn by: Scale: 1 rerracon PDM N.T.s. Mt. Pleasant Middle School DIAGRAM IS FOR GENERAL LOCATION Chtt4ed by: File Nam¢: SWG A-2b 2020-E Starita Road Walker Road ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES APProved by: Date: Charlotte, NC 28206 Mt. Pleasant, NC DJC 7/16f2015 Geotechnical Engineering Report ��erB ��®� Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, North Carolina July 17, 2015 ■ Terracon Project No. 71155034 Field Exploration Description The boring locations were laid out on the site by Terracon personnel utilizing a site map provided by Cabarrus County Schools and a handheld GPS, accurate to within approximately 30 feet. Right angles for the boring locations were estimated. The locations of the borings should be considered accurate only to the degree implied by the means and methods used to define them. The borings were drilled with a track -mounted rotary drill rig using hollow stem augers to advance the boreholes. Samples of the soil encountered in the borings were obtained using the split -barrel sampling procedure. In the split barrel sampling procedure, the number of blows required to advance a standard 2 inch O.D. split barrel sampler the last 12 inches of the typical total 18 inch penetration by means of a 140 pound hammer with a free fall of 30 inches, is the standard penetration resistance value (SPT-N). This value is used to estimate the in -situ relative density of cohesionless soils and consistency of cohesive soils. An automatic SPT hammer was used to advance the split -barrel sampler in the borings performed on this site. A significantly greater efficiency is achieved with the automatic hammer compared to the conventional safety hammer operated with a cathead and rope. This higher efficiency has an appreciable effect on the SPT-N value. The effect of the automatic hammer's efficiency has been considered in the interpretation and analysis of the subsurface information for this report. The samples were tagged for identification, sealed to reduce moisture loss, and taken to our laboratory for further examination, testing, and classification. Information provided on the boring logs attached to this report includes soil descriptions, consistency evaluations, boring depths, sampling intervals, and groundwater conditions. The borings were backfilled with auger cuttings prior to the drill crew leaving the site. A field log of each boring was prepared by the drill crew. These logs included visual classifications of the materials encountered during drilling as well as the driller's interpretation of the subsurface conditions between samples. Final boring logs included with this report represent the engineer's interpretation of the field logs and include modifications based on laboratory observation and tests of the samples. Exhibit A-3 BORING LOG NO. B-01 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina o o O LOCATION See Exhibits A-2a 8A-2b Latitude: 35.41186- Longitude:-80.48141° DEPTH wz wF a > 3m O d" J a to _ W J O w or r tiro r O (/J w w LL� V wz 4 3 0 O ATTERBERG LIMITS z H Z ¢ a LL-PL-PI TOPSOIL, 4 inches of topsoil SANDY SILT WILL brown, tan, and dark gray, stiff to hard, residuum 8 7-6-7 N=13 12 12-15-21 N=36 s.5 5 SILTY SAND (SMI, fine to coarse grained, light gray, tan, and dark gray, 16 11-12-20 N=32 dense, residuum 14 12-14-20 N=34 1 — 13.5 PARTIALLY WEATHERED ROCK (PWRI, sampled as dark gray and tan 10 32-50/5" silty sand 15 19.0 6 50/6" Boring Terminated at 19 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of Feld Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Abandonment Method: Boring backfilled with soil cuttings upon completion. WATER LEVEL OBSERVATIONS ����1111 p Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO during au erin �� 11I1ff�� e0�pNN0 s con 2020E Starita Road Charlotte, North Carolina Drill Rig: Diedrich D-50 Duller: J. Cain Project No.: 71155034 Exhibit'. A4 - Dry Cave -In at 14 feel BORING LOG NO. B-02 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina co LOCATION See Exhibits A-2a 8A-2b m w z c10 .� " H e ATTMITS LIMITS m z O >- Won S Latitude: 35.41159° Longitude:-80.48196' F K> > W zW QF r z p im w w 3 zz LL-PL-PI (e w O 4 ow 3 p :2 y tt O d toLL DEPTH TOPSOIL, 5.5 inches of topsoil SILT/ SAND (SMI, fine to coarse grained, brown, medium dense, residuum 6-6-7 4 N=13 3.0 PARTIALLY WEATHERED ROCK (PWR), sampled as gray and brown 5 50/61, sandy silt 5.0 5 SILTY SAND (SM), gray and brown, very dense, residuum 10 25-31-43 g NP 32 N=74 12 28-34-43 N=77 1 5 13.5 AM PARTIALLY WEATHERED ROCK (PWR), sampled as gray, brown, and 8 42-50/5' 14 tan sandy silt Boring Terminated at 14.4 Feet Stratification lines are approximate. to -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS Boring Started: 7/2/2015 Boring Completed: 702015 NFWO during aughering IRi e®rac®n 2020-E Starks Road Charlotte, North Carolina Dnll Rig: Diedrich D-50 Duller: J. Cain Project No.: 71155034 Exhibit: A-5 JM Dry Cave -In a1 12 feet a 0 y 0 a 0 0 0 BORING LOG NO. B-03 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina O LOCATION See Exhibits A-2a 8 A-2b w z a ATTERBERG LIMITS w O Latitude: 35.4116' Longitude:-80.48088' ^ u_ Oow wQ tt F wz F w F w O ❑ 3 LL-PL-PI 1Z O ❑ m0 w LL O o O of DEPTH V) rc a TOPSOIL, 4.5 inches of topsoil SANDY SILT (ML), dark gray, gray, and tan, very stiff to hard, residuum 10 6-12-15 N=27 10 19-34-32 N=66 5 4 6-12-24 N=36 8.0 PARTIALLY WEATHERED ROCK (PWR), sampled as gray silty sand 8 32-50/3" 1 0s 4 50/5" Auger Refusal at 10.9 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backflled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS CCCC���.� p �'Up �'�etr@�Iq ac®� 2020-E Starts Road Charlotte, North Carolina Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO during augenng Drill Rig: Diedrich D-50 Driller J. Cain Project No.: 71155034 Exhibit: A-6 Dry Cave -In at 6.5 feet 7 3 0 z 0 0 f- rt a E N 0 w c� BORING LOG NO. B-04 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina O LOCATION See Exhibits A-2a 8A-2b wp a ` F o ATTERBERG LIMITS w - W U Latitude: 35.41148° Longitude: -80.48137° i a z Q ILL- z 2 a F w tc5 F W J d j p �y w w 3 z LL-PL-PI to U 0 3m ¢ to LL� o U r[ a p v K DEPTH TOPSOIL, 4.5 inches of topsoil SILTY SAND (SMI, fine to medium grained, brown and white, dense to very 9-27-21 dense, residuum 8 N=48 12 21-20-51 N=71 5 6.o PARTIALLY WEATHERED ROCK (PWR), sampled as tan and white silty 12 37-50/5" sand 7.5 SILTY SAND (SM), fine to medium grained, tan and white, dense, residuum 10 11-12-24 N=36 1 13.5 PARTIALLY WEATHERED ROCK (PWR), sampled as tan and white silty 2 50/2" sand 15 18.7 2 5012" Boring Terminated at 18.7 Feet Stratification lines are approximate. lmsitu, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS ��werrac®n Boring Started: 7/2/2015 Boring Completed: 7/2/2015 NFWO duringauenn 2020-E Shuttle Road Charlotte. North Carolina Drill Rig: Diedrich D-50 Driller. J. Cain Project No.: 71155034 Exhibit: A-7 JEJ Dry Cave In at 13 feet BORING LOG NO. B-05 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina �_ w5 U' LOCATION See Exhibits A-2a & A-2b Latitude: 35.41132° Longitude:-80.48197° DEPTH v w w z O < K> r at a m 30 w ¢ m c of W to t- Min O� W u- w- Fz 3 i O 0 ATTERBERG LIMITS w a` z w K a LL-PL-PI TOPSOIL, 4 inches of topsoil 5 1 SILTY SAND (Still, fine to medium grained, tan and dark gray, very dense, residuum 3.0 8 ' 9-24-36 N=60 i PARTIALLY WEATHERED ROCK IPWRL sampled as tan, gray, and dark gray silty sand, no recovery from 13.5'to 13.8' 13.B 15 25-45-5014" 8 34-50/5" 12 26-36-50/3" i Boring Terminated at 13.8 Feet 0 50/3" Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: Hollow Stem Auger See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Notes: - Abandonment Method: Boring backfilled with soil cuttings upon completion. WATER LEVEL OBSERVATIONS ((((����IIII �q Irer� r�iY'c®tll �p m 11�1 2020.E Starita Road Charlotte, North Carolina Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO duringspearing Orill Rig: Diedrich 0.50 Duller: J. Cain Project No.: 71155034 Exhibit: A-8 IM Dry Cave -In at 9 feet s T BORING LOG NO. B-06 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina o LOCATION See Exhibits A-28&A-2b .. Wz wa v F ATTMITS IMITS w LLLu O w e wz Z O i Latitude: 35.41137` Longitude:-80.4809' i a r r z r w K> w Ja > O ow w w a Z LL-PI.-PI U O o 3ca ¢ w LL� w O n of a DEPTH TOPSOIL, 4.5 inches of topsoil SANDY LEAN CLAY (CL), brown and gray, very stiff to hard, residuum 10-12-13 6 N=25 14 32-20-12 61 16 8-12-25 N=37 5 ss PARTIALLY WEATHERED ROCK (PWRI, sampled as light gray and tan 10 28-32-50/4" silty sand 8.0 SILTY SAND (SMI, fine to medium grained, light gray and tan, medium 16 29-12-13 dense, residuum N=25 1 13.5 PARTIALLY WEATHERED ROCK (PWRI, sampled as light gray and tan 5 9-50/6" silty sand 15 12 15-38-50/2" t 9 7 Boring Terminated at 19.7 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: Sae Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled with sail cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS (� �'W qO7 Bonng Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO during au erin erra®®n lye 2020-E Starita Road Charlotte, North Carolina Drill Rig: Diedrich D-50 Dnllec J. Cain Project No.: 71155034 Exhibit: A-9 JW Div Cave -In at 14 feet BORING LOG NO. B-07 Page 1 Of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina O g a W LOCATION See Exhibits A-2a&A-2b Latitude: 35.411180 Longitude:-80.48137° DEPTH w wz O G w� rw 307 O n. ii Q y _ _—O- w > O W r mn r oy ww EL e z aw 3z OU ATTERBERG LIMITS z z W a LL-PL-PI TOPSOIL, 3.5 inches of topsoil SILTY SAND ISM, fine to medium grained, tan and white, dense, residuum 8 8-22-20 N=42 3.0 SANDY SILT (MIL), gray, tan, and white, hard, residuum 15 18-30-37 N=67 5 — 15 17-31A4 N=75 1 14 19-26-29 N=55 3.5 PARTIALLY WEATHERED ROCK (MR), sampled as tan and gray sandy 3 50/3" silt 15 2 50/3" 2 2 50/3" 25 28.1 Auger Refusal at 28.1 Feet 1 50/1" Stratification lines are approximate.lu-situ, the transition maybe gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. Abandonment Method: Boring backfilled with soil cuttings upon completion. WATER LEVEL OBSERVATIONS errac®n 2020-E Stanta Road Charlotte, North Carolina Boring Started: 7/2/2015 Boring Completed: 7Z2015 NFWO dunn au enn Drill Rig: Diedrich D-50 Driller: J. Cain Project No.: 71155034 Exhibit: A-10 IM Dw Cave -In at 22.5 feet BORING LOG NO. B-08 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina m O U LOCATION See Exhibits A-2a&A-21b Latitude: 35.41115° Longitude:-80.48177° DEPTH i w wz wO w w n. ii E K p F r� w w wzof 3 z ATTERLIMIBSRG w z F UU LL-PL-PI Ga-19ES011-, 4 inches of topsoil 13.0 SANDY LEAN CLAY (CLI, tan, white, and gray, very stiff, residuum 10 7 N=26 26 ' 15 43-18-25 58 PARTIALLY WEATHERED ROCK (PWR), sampled as gray, tan, and white, sandy silt 2 50/3" 5 3 50151, 2 50/2" 1 14.0 3 50/6" Boring Terminated at 14 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method', See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (If any). See Appendix C for explanation of symbols and abbreviations. Abandonment Method: Boring backfilled with soil cuttings upon completion. WATER LEVEL OBSERVATIONS Boring Started: 7/2/2015 Baring Completed: 7/2/2015 NFWO during augering errac®n 2020-E Slants Road Charlotte, North Carolina Drill Rig: Diedrich D-50 Driller: J. Cain Project No.: 71155034 Exhibit: A-11 IM Dry Cave-in of 12.5 feet C BORING LOG NO. B-09 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina O Sea LOCATION SExhibits A-2a&A-2b wz a v a ATTERBERG LIMITS w Latitude: 35.41113° Longitude:-80.48088° o r NN z z w K0f I w J o ❑ W 3 Fz LL-PL-PI (') 3 m a w W LL 00i DEPTH O o- -LL TOPSOIL, 6 inches of topsoil LEAN CLAY WITH SAND (CLI, brown and gray, stiff, residuum — 0 N-9 N=9 3.0 SILT WITH SAND (ML), tan and dark gray, very stiff to hard, residuum 18 5-7-10 N=17 5 8 9-13-24 N=37 8.0 SILTY SAND ISM), fine to medium grained, tan and dark gray, very dense, 18 10-22-34 residuum N=56 1 — 12.0 PARTIALLY WEATHERED ROCk IPWRI, sampled as tan and dark gray silty sand 10 32-50/5" 15 8 42-50/3" 2 23.8 3 50/4" Boring Terminated at 23.8 Feet r Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional date (if any). See Appendix C for explanation of symbols and Abandonment Method Boring backflled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS t� 1'IMerr��L�iy®c®n tey Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO duringangering tut 2020-E State Road Charlotte, North Carolina Drill Rig: Diedrich D-W Driller. J. Cain Project No.: 71155034 Exhibit: A-12 Dry Cave -In at 17 feet BORING LOG NO. B-10 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina (0 LOCATION See Exhibits A-2a & A-2b W Z 2 _ F e ATTE ITS MITS at w O f wz Latitude: 35.41084- Longitude:-80.48136' i a~ w of r r z a a Woo r > OU oy w_ aw 3 z LL-PL-PI U KU w p N 3 WorU U W O a DEPTH TOPSOIL, 3.5 inches of topsoil SANDY FAT CLAY ICHI, tan, stiff, residuum 4-5-5 10 N=10 20 51-21-31 66 3.0 SANDY SILT IMLI, tan, gray, and brown, hard, residuum 16 25-31-32 N=63 5 18 19-25-36 N=61 13 22-28-28 N=56 10 13.5 PARTIALLY WEATHERED ROCK (PWR), sampled as tan, gray, and 15 14-18-50/5" reddish -brown silt with sand 15 18.7 2 50/2" Boring Terminated at 18.7 Feet Stratification lines are approximate. In -situ, the transition maybe gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of Feld Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS lrerrac®n Boring Started: 7/2/2015 Boring Completed: 7/2/2015 NFWO during augenniq 2020-E Starita Road Charlotte, North Carolina Drill Rig: Diedrich D-50 Dnllec J. Cain Project No.: 71155034 Exhibit: A-13 3MI Dry Cave -In at 16.5 feel BORING LOG NO. B-11 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina LOCATION See Exhibits A-2a &A-2b w z w e ATTERBERG LIMITS w O Latitude: 35.41061° Longitude:-80.48186° LL o Q >> W X F H w z z r a i r w ¢> w > o ID W ¢W 3 z LL-PL-PI z aq Q W LL 0 W DEPTH TOPSOIL, 4 inches of topsoil SILTY SAND fSMI, fine to medium grained, tan, gray, and black, medium dense, residuum 9 12=N12 3.0 SILTY SAND (SMI, fine to medium grained, gray and tan, hard, residuum 10 18-19-37 7 NP 23 N=56 5 — 6.0 PARTIALLY WEATHERED ROCK MR), sampled as gray, tan, and dark 5 50/6" brown sandy silt 13 27-40-50/5" 1 3.1 Auger Refusal at 13.1 Feet 0 1 50/1" Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS l,re17 W WOco f➢ 2020�E Starts Road Charlotte, North Carolina Boring Started: 7/2/2015 Boring Completed: 7/2/2015 NFWO duringau enn Drill Rig: Diedrich D-50 Duller: J. Cain Project No.: 71155034 Exhibit: A-14 Dry Cave -In of 10.5 feet BORING LOG NO. B-12 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina o LOCATION See Exhibits A-2a&A-2b w0 a _ v r e ATTERBERG LIMITS z J w LJ Latitude: 35.41056° Longitude. -80.48107° v € tt> w Q w z z Q w F w a O w w 3 z LL-PL-PI U (7 O 3m Q to LLX o O K O Ca K a DEPTH TOPSOIL, 4 inches of topsoil SANDY LEAN CLAY ICU, tan, medium stiff to stiff, residuum 0-58 9 10 47-23-24 53 3.0 SILTY SAND ISM), line to medium grained, tan, white, and black, medium 16 9-11-19 dense to very dense, residuum N=30 5 13 17-34-43 N=77 8.5 PARTIALLY WEATHERED ROCK (PWRI, sampled as tan, white and gray 10 41-5015" sandy silt 1 14 3 9 45-50/3" Boring Terminated at 14.3 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method Boring backfilled with soil cuttings upon completion, abbreviations. WATER LEVEL OBSERVATIONS �I pal reirracon Boring Started: 702015 Boring Completed: 7/2/2015 NFWO Bunn angeringI CC�Q 2020-E Starita Road Charlotte, North Carolina Dnll Rig: Diedrich D-50 Dollar. J. Cain Project No.: 71155034 Exhibit: A-15 BE Dry Cave-in of 10.5 feet BORING LOG NO. B-13 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina LOCATION See Exhibits A-2a & A-2b w z a v A LIMITS w LL O tt F y n v 2 Latitud 35.41058° Longitude: -80.48141- a J W r orz FW F KJ W d O O7 w w 3 z LL-PL-PI Z U W am 3 Q to W� O U K to DEPTH C y of o. TOPSOI 4.5 inches of topsoil SANDY SILT (MIL), brown, stiff to very stiff, residuum 5 11-8-7 N=15 13.0 SILT WITH SAND (MU, tan and gray, hard, residuum 15 13-16-23 N=39 5 16 13-17-23 N=40 ! 8.5 PARTIALLY WEATHEED ROCK (PWRI, sampled as gray and tan sandy 8 26-50/4" silt 1 11.8 3 50/4" Auger Refusal at 11.8 Feet Stratification lines are approximate. In-silu, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for desorption of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS Ip� 11'I Boring Started: 7/2/2015 Boring Completed: 7/2/2015 NFWO during, angeringlie racon PtlJ �UssYo//EE 111`7�7hee I� 2020-E Starita Road Charlotte, North Carolina Dnll Rig: Diedrich D-50 Driller J. Cain Project No.: 71155034 Exhibit: A-16 _M1 Dry Cave-in at 10.5 feet BORING LOG NO. B-14 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina 00 LOCATION See Exhibits A-2a 8 A-21a w z Wa F a A L MITSRG z wF v wy r<z U_ Latitude: 35.41153° Longitude:-80.48329- 'Q F u. 2 F w K> F w o- > O in w w aW 3 z LL-PL-PIof Z u . Q W 1 of as o m of UO W o DEPTH OPSOIL, 4 inches of topsoil SANDY ELASTIC SILT IMHI, brown, stiff, residuum 8 21 52-32-19 61 N=14 14 3.0 SILT WITH SAND (ML), dark gray and tan, hard, residuum 10 13-23-33 N=56 5 — 12 12-28-46 N=74 8.5 77K4 50/4" PARTIALLY WEATHERED ROCK fPWRI, sampled as light gray and tan silty sand 10 X 12 8-50/5" 14 a Boring Terminated at 14.4 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled vdth soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS (`fir I r`U raco O 2020-E Starita Road Charlotte, North Carolina Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO during augering Drill Rig: Diedrich 0-50 Duller: J. Cain Project No.: 71155034 Exhibit: A-17 ffi Dry Cave -In at 9.5 feet BORING LOG NO. S-01 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina O LOCATION See Exhibits A-2a 8 A-21, wz 2 c e ATTERBERG LIMITS w O ff H z' U Latitude: 35.41154° Longitude:-80.47878° Q W ¢ H w z a w r w p w r �W z L-PL-PI Z UH ❑ u_m O Of O ado uQi W W DEPTH TOPSOIL, 4.5 inches of topsoil SANDY SILT (MIL), dark gray to tan, hard, residuum 16 7-15-32 N=47 16 19-33-35 10 5u 5 N=88 Boring Terminated at 5 Feet Stratification Imesare approximate. In -situ, the transition maybegradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method' Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS Ire Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO during auQering hI aco O 2020-E Stanta Road Charlotte, North Carolina Drill Rig: Diedrich D-50 Driller: J. Cain Project No.: 71155034 Exhibit: A-18 E. Dry Cave -In at 2.5 feet r 0 0 a a z u ad g O rc BORING LOG NO. S-02 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina o LOCATION See Exhibits A-2a & A-2b w o c F e BERG A LIMITS z in >a o Latitude: 35.41173- Longitude:-80.47948- G~ of F z r Q w Fw d p 3z LL-PL-PI w ce ❑ 3m < w ww LLw p0 w p u ¢ a DEPTH 0.6 TOPSOIL, 7 inches of topsoil SILTY SAND fSMI, fine to coarse grained, tan to light gray, dense to very dense, residuum 8 5-9-28 N=37 16 16 30-32-45 . 5.0 5 N=77 Boring Terminated at 5 Feet Stratification lines are approximate. Imsitu, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backflled With soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS Boring Started: 7/8/2015 Baring Completed: 7/8/2015 NFWO duringau erin rrac®n 2020-E Starita Road Charlotte, North Carolina Drill Rig: Diedrich D-50 Driller: J. Cain Project No.: 71155034 Exhibit: A-19 Illik Dry Cave -In at 2.5 feet BORING LOG NO. S-03 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina O LOCATION See Exhibits A-2a 8A-2b wz 2 5 e ATTERBERG LIMITS w J O _U Latitude: 35.41189° Longitude:-80.48041°wz F 2 F K> Fw J W O �J FW 3z LL-PL-PI Z w (� in O Q m 30 Q W wu, LL O O ad DEPTH w a TOPSOIL, 4 inches of topsoil SILTY SAND (Still fine to coarse grained, tan and light gray, very dense, `z.0 residuum 16 26-25-50/5" 10 PARTIALLY WEATHERED ROCK (PWRI, sampled as tan and light gray silty sand 3.8 4 50/4" Boring Terminated at 3.8 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS ��II Ip �t]eaCpl le( Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO duringsugaring rmac®r�yY LL�p�Iq 202G E Stanta Road Charlotte, North Carolina Drill Rig: Diedrich 0.50 Driller J. Cain Project No.: 71155034 Exhibit: A-20 IM Dry Cave -In at 3 feet n BORING LOG NO. S-04 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina a LOCATION See Exhibits A-2a&A-2b wz c- c f- o ATTERBERG LIMITS bb w 0 Up o wF­ w 0 z Latitude: 35.41144° Longitude:-80.48062- i z aw z o. r w tt> F w ,� a > O ❑y w Up3 z LL-PL-PI cwi 3m a w LL� w O N m a DEPTH TOPSOIL, 4 inches of topsoil SILT WITH SAND (MIL), brown, very stiff, residuum 6-7-10 5 N=17 3.5 PARTIALLY WEATHERED ROCK (MR), sampled as light gray silty sand 16 36-35-50/5" 4.9 Boring Terminated at 4.9 Feet Stratification lines are approximate. lo-situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 far description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO during augerinQ ■■\ N L'! erraco 2020-E Starita Road Charlotte, North Carolina Drill Rig: Diedrich D-50 Driller; J. Cain Project No.: 71155034 Exhibit: A-21 _M Dry Cave -In at 2 feet BORING LOG NO. S-05 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina cs LOCATION See Exhibits A-2a&A-2b wz c- ` F e ATTERBERG LIMITS z U_ Latitude: 35.41087° Longitude:-80.48075° LL cr Q Lu r w z z 2 F w wM F w d W 00 UW w w FW 3 z LL-PL-PI w U m o 3m ¢ w LL� w DEPTH o m a TOPSOI 3.5 inches of topsoil SANDY SILT (ML), tan and light gray, very stiff, residuum 13.0 16 5-9-13 N=22 PARTIALLY WEATHERED ROCK (PWR), sampled as tan and light gray 10 17-50/5" silty sand 5 5.5 SANDY SILT (MIL), dark gray and tan, hard, residuum X12 11-25-34 7.5 N=59 Boring Terminated at 7.5 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS � (((ppp - tII0prV1 Boring Started: 7/8/2015 Boring Completed: 7/82015 NFWO Burin arresting � Ili,err®c®r� 2020-E Starita Road Charlotte, North Carolina Drill Rig: Diedrich D-50 Duller. J. Cain Project No.: 71155034 Exhibit A-22 -M Dry Cave In at 5 feet BORING LOG NO. S-06 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina U' LOCATION See Exhibits A-2a8A-2b �m W z w a c r- ATTl ITS LIMITS m z y >2 � V 2 Latitude: 35.411' Longitude:-80.47999° � Q R'> w ¢ � �N w z�a t- Z ao- w �' w J a > O w w aF 3 z LL-PL-PI cwi K O am 3 mo U LL� w ran a DEPTH TOPSOI , 4 inches of topsoil SILT WITH SAND (MIL), brown, medium stiff to stiff, residuum — 5-7-6 6 N=13 9 4 3-4-4 N=8 5 — 5.5 SANDY SILT (MIL), dark gray and tan, stiff to very stiff, residuum — 16 446 1111110.0 N=10 16 6-11-14 N=25 1 �— Boring Terminated at 10 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfiiled with sdl cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS �erracon Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO during auffefinq 2020-E Starita Road Charlotte, North Carolina Drill Rig: Diedrich D-50 Duller: J. Cain Project No.: 71155034 Exhibit: A-23 29L Dry Cave -In at 7 feet BORING LOG NO. S-07 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina O LOCATION See Exhibits A-2a & A-2b w z 2 v o ATTERSERG LIMITS z LL O F- U Latitude: 35.41036` Longitude:-80.48045° a tt F to w z r o. i 0-w Cc w a w p D w 3 LL-PL-PI a LLm OU cwto 3M < tt a DEPTH TOPSOIL, 4 inches of topsoil SANDY SILT (ML), tan and dark gray, very stiff, residuum 9 5-11-13 N=24 14.0 12 9-29-5015" PARTIALLY WEATHERED ROCK (PWR), sampled as tan and dark gray 4.9 Sandy Silt Boring Terminated at 4.9 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO duringsugaring ear®mWac®n 2020.E Starts Road Charlotte, North Carolina Drill Rig: Diedrich 0.50 Driller: J. Coln Project No.: 71155034 Exhibit: A-24 JM D Cave -In at 2feet s r BORING LOG NO. S-08 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina O LOCATION See Exhibits A-2a 8 A-2b w z u ATTERBERG LIMITS w ^ y Or >> F Lu U LatiWde: 35.4ID24° Longitude:-80.48093° r tt> W w r� �z z j w w a o w 3 z LL-PL-PI u 0 3m a o wX o O m ¢ w DEPTH TOPSOIL, 4.5 inches of topsoil SANDY SILT (MIL), brown, dark gray, and tan, stiff to hard, residuum off X 8 14=N14 10 1446-26 5.0 5 N=44 Boring Terminated at 5 Feet Stratification lines are approximate.ln-situ, thetransition maybegradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of Feld Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS I rerr p! Boring Started: 7/8/2015 Boring Completed: 7/8/2015 _ NFWO during augering coINS lO 2020-E Starita Road Charlotte, North Carolina D Drill Rig: Diedrich 50 Driller: J. Cain Project No.: 71155034 Exhibit: A-25 Dry Cave -In at 2 feet BORING LOG NO. S-09 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina 0 LOCATION See Exhibits A-2a SA-2b y w w tti ^, c ATTERBERG LIMITS y w 0 LL 0 Z `. H e w Z 0 S Latitude: 35.410250 Longitude:-80.481350 F Q K r z ¢ yw-. z tr> > O ot�i� w nu 3z LL-PL-PI V rot am a w ww oof 0 DEPTH 0 w a TOPSOIL, 3.5 inches of topsoil LEAN CLAY WITH SAND (CLI, gray and tan, soft to medium -stiff, residuum 3.0 8 2-2-2 N=4 SANDY SILT (MU dark gray and tan, hard, residuum J1217-21-29 5.0 5 N=50 Boring Terminated at 5 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO during angering rrac®n 2020-E Starita Road Charlotte, North Carolina Grill Rig: Diedrich D-50 Duller: J. Cain Project No.: 71155034 Exhibit: A-26 ffi Dry Cave -In at 3 feet BORING LOG NO. S-10 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina 0 LOCATION See Exhibits A.2a8A-2b wz a =_ r e ATTERBERG LIMITS z J IL ¢ j wF d'F, ITU Latitude: 35.41028° Longitude:-80.48182- 2 w o= r J z F- 2 a F w K> r w J > U ON w w ¢� 3 z LL-PL-PI z o 3m < ¢ U Or LL 0LU ¢ p p m w tt U p a DEPTH TOPSOIL, 4 inches of topsoil SANDY SILT (ML), brown, dark gray, and tan, stiff to hard, residuum 6-5-7 6 N=12 15 4-6-10 16 N=16 5 12 17-23-34 N=57 7.5 Boring Terminated at 7-5 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS ppp/� Ie� "Irertlr/�Vc®n Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO duringauerin 2020-E Starita Road Charlotte, North Carolina Drill Rig: Diedrich D-50 Duller: J. Cain Project No.: 71155034 Exhlbit: A-27 /ffi D Cave -In at 5 feet BORING LOG NO. S-11 Page 1 Of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina O LOCATION See Exhibits A-2a 8 A-2b w z n. ATTERBERG M$ W y O ff .—`- r V w U Latitude: 35.4P Longitude:-80.48194° i Q W r z H a a- w w J o p w 3 z LL-PL-PI Ur O 3m Q W u_x W DEPTH O N a TOPSOIL, 4 inches of topsoil SANDY SILT WILL brown, dark gray, and tan, stiff to very stiff, residuum 4 7-7-10 N=17 6 3-6-9 N=15 5 18 6-9-14 7.5 N=23 Boring Terminated at 7.5 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS "Irerr Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO during au enn ��Lf'rl co U 2020-E Starita Road Charlotte, North Carolina Drill Rig: Diedrich D-50 Driller: J. Cain Project No.: 71155034 Exhibit: A-28 ZIL Dry Cave -In at 5 feet BORING LOG NO. S-12 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina a LOCATION See Exhibits A-2a 8A-2b wo a c r ATTERBERG LIMITS to NN O Latitude: 35.40995' Longitude:-80.48149' z a Q. W> 'Do _u a j O Orn ww ¢� 3z LL-PL-PI 0 w p m K a DEPTH TOPSOIL, 4 inches of topsoil SANDY SILT (MIL), brown and gray, stiff to hard, residuum 14 13=N13 10 11-17-23 5.0 5 N=40 Boring Terminated at 5 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). Sea Appendix C for explanation of symbols and Abandonment Method: Boring backglled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO duringGuerin acoAnll er 1/ 17ie/■ !r 2020.E Starts Road Charlotte, North Carolina DRig: Diedrich D-50 Driller: J. Cain Project No.: 71155034 Exhibit: A-29 IME Dry Cave -In at 2 feet BORING LOG NO. S-13 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina 0 LOCATION See Exhibits A-2a 8 A-2b w z a c F e ATTERBERG LIMITS to z O Latitude: 35.40989' Longitude:-80.48105- G- O Q > W K F 1 w z r a i w w w J n p w 3 z LL-PL-PI Ur �en Q W LL� OU W DEPTH O u a TOPSOIL, 3.5 inches of topsoil SILT WITH SAND (MU, tan and gray, hard, residuum 14 11 N=48 48 i 16 10-16-25 .5.0 5 N=41 Boring Terminated at 5 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS _prVc®nDrill Boring Slamed7/8/2015 Boring Completed: 7/8/2015 NFWO durin adhering 2020-E Starita Road Charlotte, North Carolina Rig: Diedrich D-50 Driller: J. Cain Project No.: 71155034 Exhibit: A-30 IML Dry Cave4n at 5 feet BORING LOG NO. S-14 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina 0 LOCATION See Exhibits A-2a 8 A-2b w z c- ATTERBERG LIMITS z 0 J wp Lu .` X F wz U M Latitude: 35.40966- Longitude:-80.48103° F Ki J rw-� pJN Z Q w F w a W Q w Q 3 z LL-PL-PI 3w Q w LL� O K w p u w K U a DEPTH TOPSOIL, 4 inches of topsoil SILT WITH SAND fMLI, tan and gray, stiff to hard, residuum 4 11=N11 - 16 10-16-14 N=30 5 8 12-20-26 7.5 N=46 Boring Terminated at 7.5 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS rrac®n Boring Started: 7/8/2015 Boring Completed: 7/8/2015 NFWO Burin au edn 2020.E SMrita Road Chadotte, North Carolina Drill Rig: Diedrich D-50 Driller: J. Cain Project No.: 71155034 Exhibit: A-31 Dry Cave -In at 5 feet BORING LOG NO. S-15 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina J LOCATION See Exhibits A-2a & A-2b w to a 5 ATTERB ERG LIMITS w _O Latitude. 35.40935' Longitude:.80.48159' ^ LL O Q > W Or r e w z Z IL Z s V- w Ki rwto J US u �J F 3z LL-PL-PI W Q4 U' 3to 2i Q W w� �= (j O W DEPTH O u1 ar 0. TOPSOIL, 4.5 inches of topsoil SANDY SILT (MU tan and dark gray, very stiff to hard, residuum / 14 14 N=24 24 10 18-36-43 5.0 5 N=7g Boring Terminated at 5 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger _ procedures. See Appendix B for description of laboratory procedures and additional data (If any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfiIled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS IIIII����� Boring Started: 7/82015 Boring Completed: 7/8/2015 NFWO duringau erfn p� mY 1 IrerPsOl� co S 2020.E Stanta Road Charlotte, North Carolina Drill Rig: Diedrich 0.50 Duller: J. Cain Project No.: 71155034 Exhibit: A-32 ffi Dry Cave -In at 3 feet BORING LOG NO. S-16 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina LOCATION See Exhibits Ala 8 A-2b w o u ou c r a ATL LIMITS w > ad z sa Latitude: 35.41077' Longitude:-80.48491' ¢ W w be rw z ra a O o w 3 z LL-PL-PI U w 0 3m Q w U a p m ad DEPTH OPSOIL, 4 inches of topsoil SANDY LEAN CLAY (CLI, brown to gray and brown, medium stiff to stiff, residuum 6 N=13 13 12 43-21-22 57 15.5 18 2-3-5 N=8 5 SANDY SILT (MIL), trace mica, gray, tan, and dark brown, medium stiff, X 18 3-3-4 17.5 residuum N=7 Boring Terminated at 7.5 Feet Stratification lines are approximate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. Infiltration testing equipment installed to a depth of 7.5 feet. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method Boring backflled with soil cuttings upon completion of abbreviations. infiltration testing. WATER LEVEL OBSERVATIONS l re racun Boring Started: 7/212015 Boring Completed: 702015 NFWO during angering Drill Rig: Diedrich 0.50 Driller: J. Cain 2020.E Stands Road ' Chadotle, North Carolina Project No.: 71155034 Exhibit: A-33 BORING LOG NO. S-17 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina a LOCATION See Exhibits A-2a 8A-2b wz 2 v f- o ATTERBERG LIMITS z O �? } tt wz 2 Latitude: 35.41048° Longitude:-80.48482` i W H� z a w ww a p .w 3z LL-PL-PI U c� - 3m a w LL� Do DEPTH O m a TOPSOIL, 4 inches of topsoil SANDY SILT (MU gray and tan, hard, residuum 15 8-15-16 N=31 3.0 PARTIALLY WEATHERED ROCK (PWR), sampled as dark gray and tan 9 26-50/6" AI sandy silt 5 5.s IX 8 1 29-50/5" Boring Terminated at 6.9 Feet Stratification li nes are a pproxi mate. In-si lu, the transition may be g radual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hollow Stem Auger procedures. Infiltration testing equipment installed to a depth of 7.5 feet. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Baring backfilled with soil cuttings upon completion of abbreviations. infiltration testing. WATER LEVEL OBSERVATIONS {j 1r® Uerrac® Boring Started: 7/22015 Boring Completed: 7/2/2015 NFWO during augering Dnll Rig: Diedrich D-50 Driller: J. Cain 2020-E Starita Road Charlotte, North Carolina Project Ni 71155034 Exhibit: A-34 BORING LOG NO. S-18 Page 1 of 1 PROJECT: Mt. Pleasant Middle School CLIENT: Cabarrus County Schools Concord, North Carolina SITE: Walker Road Mt. Pleasant, North Carolina O LOCATION See Exhibits A-2a&A-2b Wz a c a ERBE ATLMITSRG w J O o F be W F] w O Latitude: 35.410695° Longitude:-80.480205° i W Q a, w r 1LL i1 r z 2 t- w tY tw- w a > O Cl rn w w Q F 3 z LL-PL-PI U O o 3o h ¢ u_m a DEPTH 0 `. 0.5 TOPSOIL, 9 inches of topsoil SILT WITH SAND (MIL), brown, hard, residual 14 5-7-35 N=42 3.0 PARTIALLY WEATHERED ROCK (PWR), sampled as dark gray and tan 16 21-35-50/5" sandy silt MAX 5 6.5 3 50/6" Boring Terminated at 6.5 Feet i Stratification lines are approximate.In-situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Hallow Stem Auger procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Boring backfilled with soil cuttings upon completion. abbreviations. WATER LEVEL OBSERVATIONS r�p ���I/oo�, �,�s w Boring Started: 7/8/2015 Boring Completed: 7/82015 NFIVO duringspearing I➢rerr /�r®d 11 2020-E Stanta Road Charlotte, North Carolina Drill Rig: Diedrich A50 Driller J. Cain Project No.: 71155034 Exhibit: A-35 Dry Cave-in of 4.5 feet Geotechnical Engineering Report l�err�c®n Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, North Carolina July 17, 2015 ■ Terracon Project No. 71155034 Laboratory Testing Samples retrieved during the field exploration were taken to the laboratory for further observation by the project geotechnical engineer and were classified in accordance with the Unified Soil Classification System (USCS) described in Appendix A. At that time, the field descriptions were confirmed or modified as necessary. Moisture content, Atterberg Limits, and wash no. 200 sieve tests were conducted in general accordance with the applicable ASTM standards on selected soil samples and the test results are presented on the boring logs. The laboratory test results were used for the geotechnical engineering analyses, and the development of foundation, earthwork and pavement recommendations. Selected soil samples obtained from the site were tested for the following engineering properties: ■ In -situ Water Content ■ Sieve Analysis ■ Atterberg Limits Descriptive classifications of the soils indicated on the boring logs are in accordance with the enclosed General Notes and the Unified Soil Classification System. Also shown are estimated Unified Soil Classification Symbols. A brief description of this classification system is included in Appendix C of this report. All classification was by visual manual procedures. The Water Content, Material Finer than No. 200 Sieve and Atterberg limit test results are provided on the boring logs. The following table summarizes the in -situ moisture content, wash No. 200 sieve tests, and Atterberg Limits test results. These results are also shown on the boring logs in Appendix A. In -situ Sample %Passing Moisture Liquid Plastic Plasticity Location, Depth (feet) the No. 200 Content Limit, (%) Limit, (%) Index, (%) Depth Sieve (%) B-02 6.0-7.5 8 32 NP NP NP B-06 1.0 — 2.5 14 61 32 20 12 B-08 1.0 — 2.5 15 58 43 18 25 B-10 1.0 — 2.5 20 66 51 21 31 B-11 3.5 — 5.0 7 23 NP NP NP B-12 1.0 — 2.5 10 53 47 23 24 B-14 1.0 — 2.5 21 61 52 32 19 S-01 3.5 — 5.0 10 - - - S-02 1.0 — 2.5 16 - - - - S-03 1.0 — 2.4 10 - - - - S-06 1.0 — 2.5 9 - - - - S-10 3.5-5.0 16 - - - - Exhibit B-1 Geotechnical Engineering Report ��p��p��®� Proposed Mt. Pleasant Middle School ■ Mt. Pleasant, North Carolina ` 7 July 17, 2015 ■ Terracon Project No. 71155034 In -situ Sample % Passing Moisture Liquid Plastic Plasticity Location, Depth (feet) the No. 200 Content Limit, (%) Limit, (%) Index, (%) Depth Sieve (%) S-13 1.0-2.5 11 S-15 1.0 — 2.5 14 - - - S-16 1.0 — 2.5 12 57 43 21 22 1: NP = Non -plastic Exhibit B-2 GENERAL NOTES DESCRIPTION OF SYMBOLS AND ABBREVIATIONS DESCRIPTIVE SOIL CLASSIFICATION Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non -plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse -grained soils are defined on the basis of their in -place relative density and fine-grained soils on the basis of their consistency. LOCATION AND ELEVATION NOTES Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device. The accuracy of such devices is variable. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area. RELATIVE PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE TERMINOLOGY Descriptive Ternri Percent of Maier Component of other constituents Dry Weiaht of Sample Particle Size Trace < 15 Boulders Over 12 in. (300 mm) With 15 - 29 Cobbles 12 in. to 3 in. (300mm to 75mm) Modifier > 30 Gravel 3 in. to #4 sieve (75mm to 4.75 mm) Sand #4 to #200 sieve (4.75mm to 0.075mm Silt or Clay Passing #200 sieve (0.075mm) RELATIVE PROPORTIONS OF FINES PLASTICITY DESCRIPTION Descriptive Term(s) Percent of Term Plasticity Index of other constituents Dry Weight Non -plastic 0 Trace < 5 Low 1 - 10 With 5-12 Medium 11 -30 Modifier > 12 High > 30 Exhibit C-1 Water Initially Encountered (HP) Hand Penetrometer Auger Split Spoon Water Level Aker a � Specified Period of Time (T) Torvane � Water Level Aker to � W a Specified Period of Time F-- (blf) Standard Penetration Z � N Test (blows per foot) Shelby Tube Macro Core W W a Q J � Water levels indicated on the soil boring logs are the levels measured in the ❑ W (pID) Photo -Ionization Detector W borehole at the times indicated. � Q Groundwater level variations will occur ly (OVA) Organic vapor Analyzer Ring Sampler Rock core � over time. In low permeability soils, accurate determination of groundwater . V � levels is not possible with short term water level observations. Grab Sample No Recovery RELATIVE DENSITY OF COARSE -GRAINED SOILS CONSISTENCY OF FINE-GRAINED SOILS (More than 50 % retained on No. 200 sieve.) (50 % or more passing the No. 200 sieve.) Density determined by Standard Penetration Resistance Consistency determined by laboratory shear strength testing, field Includes gravels, sands and silts. visual -manual procedures or standard penetration resistance N Descriptive Term Standard Penetration or Ring Sampler Descriptive Term Unconfined Compressive Standard Penetration or Ring Sampler � (Density) N-Value Blows/Ft. (Consistency) Strength, Du, psf N-Value BlowslFt. W BlowslFt. Blows/Ft. F— Very Loose 0-3 0-6 Very Sofi less than 500 0-1 <3 2 ~ C� Loose 4-9 7-18 Soft 500 to 1,000 2-4 3-4 2 W Medium Dense 10 - 29 19 - 58 Medium -Stile 1,000 to 2,000 4-8 UNIFIED SOIL CLASSIFICATION SYSTEM Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests" Group Symbol Group Name e Coarse Grained Soils: More than 50% retained Gravels: More than 50% of coarse fraction retained on No. 4 sieve Clean Gravels: Less than 5%fines° Cu 2 4 and 1 5 Cc <3 e GW Well -graded gravel Cu < 4 and/or 1 > Cc> 3e GP Poorly graded gravel Gravels with Fines: More than 12% fines ° Fines classify as ML or MH GM Silty gravel '" Fines classify as CL or CH GC Clayey gravel"" on No. 200 sieve Sands: 50% or more of coarse fraction passes No. 4 sieve Clean Sands: Less than 5% fines Cu 2 6 and 1 5 Cc < 3 e SW Well -graded sand Cu < 6 and/or 1 > Cc> 3e SP Poorly graded sand Sands with Fines: More than 12% fines ° Fines classify as ML or MH SM Silty sand °"' Fines classify as CL or CH SC Clayey sand"' Fine -Grained Soils: or more the Silts and Clays: Liquid limit less than 50 Inorganic: PI > 7 and plots on or above "A" line CL Lean clay PI <4 or plats below "A" line` ML Sili Organic: Liquid limit - oven dried <0.75 OL ` Organic clay '"''" Liquid limit - not dried Organic silt '`'"'' passes No.200 sieve No. � Silts and Clays: Liquid limit 50 or more Inorganic: PI plots on or above "A" line CH Fat clay "'`'M PI plots below "A" line MH Elastic Silt"'"" Organic: Liquid limit - oven dried <0.75 OH Organic clay"' My Liquid limit -not dried Organic sill '`'"''° Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat " Based on the material passing the 3-inch (75-mm) sieve e If field sample contained cobbles or boulders, or both, add "with cobbles or boulders, or both" to group name. ° Gravels with 5 to 12% fines require dual symbols: GW-GM well -graded gravel with sill, GW-GC well -graded gravel with clay, GP -GM poorly graded gravel with silt, GP -GC poorly graded gravel with clay. ° Sands with 5 to 12% fines require dual symbols: SW-SM well -graded sand with silt, SW -SC well -graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay e Cu = D,,/Dl, Cc = (D30)2 D, x D6o r If soil contains 2 15% sand, add "with sand" to group name. c If fines classify as CL-ML, use dual symbol GC -GM, or SC-SM. U9 \ 50 d IX 40 LI Z 30 U Q 20 J a " If fines are organic, add "with organic fines" to group name. If soil contains 2 15% gravel, add "with gravel" to group name. If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay. x If soil contains 15 to 29% plus No. 200, add "with sand" or "with gravel,' whichever is predominant. ` If soil contains >_ 30 % plus No. 200 predominantly sand, add "sandy" to group name. m If soil contains>_ 30% plus No. 200, predominantly gravel, add "gravelly" to group name. " PI 24 and plots on or above "A" line. ° PI <4 or plots below "A" line. ° PI plots on or above "A" line. - ° PI plots below "A" line. For classification of fine-grained soils and fine-grained fraction —of coarse -grained soils \cey e � w0 Equation of "A" - line Horizontal at PI=4 to LL=25.5. — then PI=0.73 (ILL-20) °t G� Equation of "Ll" - line Vertical at Li 6 to PI=7, then PI=0.9 (I L-8) IOiOV GI — I MH or OH ML or OIL CG - MC 10 7 4 0 11 0 10 16 20 30 40 50 60 70 LIQUID LIMIT (LL) 80 90 100 110 Exhibit C-2 .LC Date: February 4, 2016 To: Bradley Bennett, From: Michael B. Westcott, PE Supervisor Westcott, Small & Associates, PLLC NCDI:NR 125 S. Elm Street, Suite 606 1612 Mail Service Center Greensboro, NC 27401 Raleigh, NC 27699-1612 We are sending you ® attached ❑ under separate cover the following items: ❑ Shop Drawings ❑ Estimate ❑ Disk ® Prints ❑ Specifications ® Other ❑ Contracts ❑ Copy of Letter # COPIES DRAWING NO DESCRIPTION DISPOSITION 2 Mt. Pleasant Middle School For Approval Plans 1 New Permit Application and For Approval Supporting Documents 1 Check $505.00 For Review Fee REMARKS: cc: File R E, -: CEll V FEB o 8 2016 125 S. Elm Street, Suite 606 a Greensboro, North Carolina 27401 e phone: 336-310-9722 9 web: www.wsaaengxom Mount Pleasant Middle School Mount Pleasant, NC CABARRUS County Yadkin River Basin RAINFALL & CALCULATION DATA Project County: CABARRUS Project City: Mount Pleasant Rainfall Source: Charlotte Loaded Rainfall: Charlotte Design Storm: P90 Discrete SCS Method, Calculation Method Pre - Post (Minimum Design Storm = P90 for non -SA, 1-yr, 24-hr for SA) 100-yr, 24-hr NOTE: Please use the Storm-EZ calculation sheets to document the stormwater design and create the O&M Agreement. Highlighted Storm is Design Storm ern NCDENR PROJECT INFORMATION - 1 Total Property Area 0.00 acres Total Coastal Wetlands Area 0,00 acres Total Surface Water Area 0,00 acres Complete the breakdown of impervious area for the project Basin Information - - Entire Site Receiving Stream name UT to Adams Creek Stream Class Issified Adam Stream Index Number N/A Total Drainage Area 968774 On -Site Drainage Area (sf) 968,774 Offsite Drainage Area s 0 Proposed Impervious Area s 453,459 % Impervious Area total 47% impervious Surface Area Entire Site On -Site Buildings/Lots s 131,713 On -Site Streets s 107,778 On -Site Parkin s 115,226 On -Site Sidewalks s 60.552 Other On -Site s 33,859 Future s 4,331 Off -site s 0 Existin BUA s 0 Total 453.459 Total Impervious Area 10.41 acres li Project % impervious area 47 ALL AREAS ARE IN SQUARE FEET Use Worksheet Da[a? Yes Data in italics is derived from application forms and land use data worksheets and cannot be changed by user. STORM-EZ 1/25/2016 Version 1.4 Project Data Page 1 of 1 Complete the breakdown of impervious area for the project Basin Information - - Entire Site Receiving Stream name UT to Adams Creek Stream Class Issified Adam Stream Index Number N/A Total Drainage Area 968774 On -Site Drainage Area (sf) 968,774 Offsite Drainage Area s 0 Proposed Impervious Area s 453,459 % Impervious Area total 47% impervious Surface Area Entire Site On -Site Buildings/Lots s 131,713 On -Site Streets s 107,778 On -Site Parkin s 115,226 On -Site Sidewalks s 60.552 Other On -Site s 33,859 Future s 4,331 Off -site s 0 Existin BUA s 0 Total 453.459 Total Impervious Area 10.41 acres li Project % impervious area 47 ALL AREAS ARE IN SQUARE FEET Use Worksheet Da[a? Yes Data in italics is derived from application forms and land use data worksheets and cannot be changed by user. STORM-EZ 1/25/2016 Version 1.4 Project Data Page 1 of 1 Total Impervious Area 10.41 acres li Project % impervious area 47 ALL AREAS ARE IN SQUARE FEET Use Worksheet Da[a? Yes Data in italics is derived from application forms and land use data worksheets and cannot be changed by user. STORM-EZ 1/25/2016 Version 1.4 Project Data Page 1 of 1 Mount Pleasant Middle School Mount Pleasant, NC CABARRUS County ®�� t Area River Basin NCDENR Drainage Area # �1� of ��� PRE -DEVELOPMENT LAND USE CALCULATIONS Pre -Development Land Us Note: Enter BUA Draining to Permeable Pavement Below User Defined Drainage Areas: Existing Permeable Pavement (Infiltration): SCN10 Description too[ —NIA Existing Green Roofs: SCM k Soil Gravel Total Orifice Orifice HSG Pavement Area Additional BUA In0lVatio VOitl Space Gravel Dia. Height BUA% Has Synthetic D.S. nRate Depth Liner! BMP (s0 (ar) Onmd (%) (iN (in) (iN C 1 0 1 0 0 1 0% o 1 0 1 0 0% NO 0 l.mi Ilse Summnrv, DS SCM N Area far I Notes From Land Use Tables: 968,]]4 22.24 cues Permeable Paveme2 +Additional BUA: 0 000 dues Green Roots: 0 0.00 acres Preserved $unite Waters 6 Non-0Odslal Wetlands: 0 000 attes Preserved (baslal Wetlands: 0 0.00 acres Total Site Area: 968,774 22.24 acres Pre -Development SCMs: SCM N SCM Type 200 "No BMP" WO Volume Provided Drains a Area Downstream SCM Im 0 en si I (sf HSG 1 14374 1 954400 0 C 1 0 1 0 Rainfall Volume= 31A4 acre -inches = 113,024 cf Runoff Reduction Components: Natural Infiltration & ET = -26.22 acre -inches = -102,424 cf Disconnected Impervious Surfaces = 0.00 acre -inches = 0 cf SCM Infiltration = 0.00 acus4nches = 0 cf Permeable Pavement Infiltration = 000 acre -inches = 0 cf Green Roof ET = 0 00 acre -inches = 0 cf Post Filtration Discharge = 0.00 acre -Inches = 0 cf Total Runoff Reduction = .28.22 acre -inches = -102,424 cf SCM Treatment: Treated SCM Outflow = 0.00 acre -inches = 0 cf Untreated Surface Runoff = 2.92 acre -Inches 10,599 cf The Pre -Development project area contains 14374 at of built upon area, resulting In an overall density of 1,48%. STORM EZ 112512016 Version 1.4 Pre -Development Page 1 of 1 act p a00 Mount Pleasant Middle School AA Mount Pleasant, NC CABARRUS County ©�6a Yadkin River Basin NCDENR Drainage Area# 1 of 1 POST -DEVELOPMENT LAND USE CALCULATIONS Permeable Pavement: PavemenlArea .ddaional RUA InliXrto Void Space Total Gravel ryas Orifice nrifiro Down- Detention Pvmt Type Rale DopiM1 SLi�nRc Dia. Ha9M1lstC LI.N.Ilan CXec CM1ech p0 (acres) (s0 (ecresl Onmp (%) 6N [n) [ ) 000 oao No award? I "ZZ; Comments Evehadin RhV and dedlutedo Leta— pot .is Maz lmplLat %imp Woods l Lot Open space l Lot Avg Lot size (aq pit (s0 (50 (s) Oco Romemine Land Use: Area HfiG Land -Use Imrvua CC aCN.0 4540 04 0A % OpanSpace(MpbpenGpaca) 740 515 3.191 Permeable NIA 0 000 000% Green Roof.: NIA 0 000 000% Subtotal: 966]]4 n24 1)0.00% LandExcludeE or Panlall Exclutletl from Volume Calculation: sl. 5unacewalen6 Npn .neater Wauanea: o oao coaalal wan.Ma: 0 oao Tolalsite Ama: 969]]4 1 22.24 Rainfall Volume= 31,14 acre-incnee- 113,024 Runoff Reduction Components: Natural Inlillralon B ET= -1747 acre inches= -63,409 ct De;cconecmd Impervious Surfaces= OW .trenches = 0 n SCM Infiltration = .068 acre -inches = -2481 ct Permissible Pavement lnhitretlon = 0.OR por, ravwa o ct Gteen R00I ET = 0.00 one -inches = o aPos( Filiralion Discharge = 0X aarenwea = 0 n Total Runoff Reduction = -13.15 acn:nches = -55,890 et STOPM£Z ln5 016 Version 14 Peal Dwelognent Page 1 of 2 Mount Pleasant Middle School Mount Pleasant, NC CABARRUS County ©�n Yadkin River Basin NCDENR Drainage Area# 1 of 1 POST -DEVELOPMENT LAND USE CALCULATIONS Treated SCM Outflow = -12.98 .,rcnes =-47,134 Untreated Surface Runoff= 000 acre-nc6as 0 cf Pre -Development Runoff = 2,92 acre -inches - 10,599 Of DMerence= 292 ec mcnps = -10599 Cr The Post -Development project area contains 453459 st of built upon area, resulting in an overall density of 46.81%. STORM EZ 1QM016 Version 1 d Puts Development Page 2012 Mount Pleasant Middle Mount Pleasant, NC CA9ARRUSCounty ®'Ss Yadkin River Basin NCDENR Ovens, Area# 1 of 1 PROPOSED SIPS B STRUCTURAL RUNOFF VOLUME CONTROLS Enter only runoff volume below that will be infiltrated or drawn down over 2 to 5 days. Additional volume provided in devices should not be entered in this worksheet. Drawdown time requirement applies to all storm events. olArex TnaleIe mceltias 0 sf Son wamini numaae midi Foa 1.l T.Rl Rollo.' slnn9e 'Arm n,a µolscm mcewbue Fenlwe vo.me mseln k— Vol— ET oumow oumaw Area Alx 77�-r--1 . an Icn Ice Ice Ice 11,ou. amhrx1. IIXM mrpreebeSH]9stroMeLIdNupnNcue [ yw afe east aMe rprRcue Stan, Slat. Runoff Fale Summery: Rainfall Volume= 31.14 Mo.-nee • 113,034 of Runoff Reduction Componenre: Natural lnfillration& ET= -RO one-mcnes• 63,a0a Deuxonne[ted hin,nnIo. Alan= OW an—hm- 0 cl SCM lnfillration= a6e —he. - -Z411 of PenneaOle Pavement lnNlration = .ad xn.znee • c Groan Rotor ET= pad xrswaroa• a of PoSt Retain. 0isGle9e= a ecre.wlwe - 0 d Total Runoff Reduction= -nra aanaldwa- -65,e90 of SCM True enC TnRled SCM OUMow= -11 as•c—.s• -07,134 Cr Untreated Surface Runoff = o.w aoeaanee 0 of Per-Oevelopmeto Runoff = 190--Im 10599 of Deference .2Q.— .a -10,599 of "BASIC TREATMENT MET" Tile PollO pvnnent project arm corns eSLsa slat wilt upon arm. reau'6rq man overdo century of asa1%. Nd.. I.e...r.a. eevkx. as wWfin eneiNan to., ccest umd—a-. o,.., extra may nawe ca^6lowne aalWwon. Tile-11. r.Iau.xne Nwk In. p,wleee In xemm le M. ew..6•am1 STORM EZ 5lolmwder Cwmc6 1Ry1016 V— I a Paee I on [ Mount Pleasant Middle school MountPl•aaant,NC CABARRUS county Yadkin RMr 9aain OninaB•Area 0 t of t ®NA NCDENR ' FATE OF RAINFALL Salts storm: P80 BASIC TREATMENT SCALE Com lia ca to P80 St.. ainfall Depth m lAinches "o'notm•m Th nMld VOLUME MATCHING SCALE 80 Stom, -Rainfall Da Ih=1A aches vd4me matmvTw<a4ou FATE OF RAINFALL GRAPHS cola Pre Development Fates Post Development Fates looa -- sm m4a„w•wn.loruae n«wowlm.n•m ems-4n . ar • m .. . r • .WnFW �tl l • rMrnre aum� r • o-eaq•wu •Avm•�4tl aG—Pue".rY-4tlr m — Inbo-.,, and re.ra •m wr.anaad ammarm mn..ex..on.on ..o.rn ra . o„.4n T e.r •in rnMn Mn�lYle •.amw arwmrnl ar rn n. • nnnN•no•rWrinlgrnM�on •4r•s•wrFrawlram>Mn�aC enl ,tley,Nx•e 4WTMNd-,.1o5n., planin rumxam4angb Ms hynnquo h• 1rwvnw•o..r [loemwaler IM'F•1•dPaiflelvYOW/0aR/bdapeW mwupem1. a4alepin STORM£Z gvyy FM Gap1 IrzY1018 Verbs 14 ppe I of l Mount Pleasant Middle School e Mount Pleasant, NC CABARRUS County so Yadkin River Basin NCDENR Drainage Area # 1 of 1 ADDITIONAL CALCULATIONS - TIME OF CONCENTRATION CALCULATIONS: Pre -Development Channel Flow: Channel Flow: Post Development Channel Flow Channel Flow: Pre -Development Sheet Flow: Sheet Flow: Shallow Flow: Shallow Flow: Length (ft) Slope (fVft) Surface Cover T, (hrs) 100 0.0317 Grass 0.19 1414 0.03W Unpaved 0.14 Length (ft) Slope (ftlfq n-value Flow Area (ftrl Wetted Perimeter (ft) T, (hrs) Pre -development T.= 19.79 min (Minimum smaoresl Sheet Flow: Sheet Flow: Shallow Flow: Shallow Flow: I,-- Length (ft) Slope (ftlft) Surface Cover T, (hrs) 100 0.0317 Paved or Bare Soil 0.02 Length (ft) Slope (ftlft) n-value Area (ftr) WettedPerimeter (ft) T, (hrs) 7414 0.317 0.013 3.1 63.0 0.04 Post -development T,= 5.00 min (Minimum 5mmures) Analysis Area = 22.24 Acres (0.035 sq. miles) F.F. P90 P95 1-Yr 2-Vr 10-Vr I 25-Yr I 50-Yr 100-Vr Rainfall in = 1.00 1.40 1.86 2.78 3.36 4.89 5.80 6.53 7.27 O'„ = 0.03 0.13 0.34 0.80 1.17 2.31 3.06 3.67 4.32 CNad = 76 75 75 75 74 74 74 74 74 Post Development F.F. P90 P95 1-Yr 2-Yr 10-Yr 25-Vr 50-Yr 100-Yr Rainfall (in )= 1A0 1.40 1.86 2.18 3.36 4.89 5.80 6.53 7.27 O'r = 0.00 0.00 0.00 0.66 1.12 2A4 3.26 3,93 4.62 JCNa,j 1 67 1 59 52 71 74 76 77 77 77 Analysis Area = 22.24 Acres (0.035 sq. miles) F.F. P90 P95 1-Yr 2-Yr 10-Yr 25-Yr 50-Vr 100-Yr Pre -Development O' (in) 0.03 0.13 0.31 0.80 1'.17 2.31 3.06 q (csm/in) Q (cfs) Post Development Q' (in) q, (csm/in) 3.67 4.32� 227.58 227.58 396.02' - 443.64 536.70' 536.70 536.70- 536.70 536.70 0.27 1.04 4.22 12.31 21.89 43.12 56.98 68.54 80.55 0.00 0.00 0.00 0.66! 1.17 - - 2.44' 3.26 -'3.93 - 4.62 385.00 385.00 STORM-EZ 112512016 Version 1 4 Peak Flow Calcs Page 1 of 2 "Note: To decrease Post -development peak flows -increase storage volume being drawdown or infiltrated orlengthen post. development time o/concentration. See LID HELP formore information. STORM-EZ 1/25/2016 Version 1.4 Peak Flow Calcs Page 2 of 2 FILE COM GATE: Tit''.. BOOK: PAGE: REGISTER OF DEEDS, CABABROS GO, RC Tax Lot No. Parcel Identifier No. 5650-87-4724, 5650-98-2166 Verified by County on the day of by Mail after recording to Richard M. Koch (ROD Box 74) This instrument was prepared by Richard M. Koch Brief description for the Index Two Tracts 440 Walker Road NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED made this day of January . 2016 ,by and between KENNETH R. MISENHEIMER (Individually and as Executor CABARRUS COUNTY of the.Estate of Roy Banks Misenheimer, Deceased) Post Office Box 707 and wife, PATTI M. MISENHEIMER, Concord, North Carolina 28028 JUANITA M. MULLIS (unmarried) Enter inappropriate block for each party, name, address, and, if appropriate, character of entity, e.q, corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. W ITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, a one-half undivided interest in and to those certain parcels of land situated In , No. 8 Township, Cabarrus County, North Carolina and more particularly described as follows: See Exhibit A, attached. Grantor conveys all land still owned by them described in the deeds referenced below. �'i61r A LEGAL DESCRIPTION -(PIN: 5650-87-4 724 LYING AND BEING IN THE NUMBER 8 TOWNSHIP, CABARRUS COUNTY, NORTH CAROLINA, WEST OF WALKER ROAD, BEING THE PROPERTY CONVEYED TO CAREY HEINTZ AND RAY MISENHEIMER (DB. 240, PG. 3, CABARRUS COUNTY REGISTER OF DEEDS), AND BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEING AT A FOUND MAG NAIL IN WALKER ROAD (S.R. 2710), BEING THE TRUE POINT OF BEGINNING, HAVING NORTH CAROLINA NAD 83(2011) GRID COORDINATES OF N: 608,150.89' E: 1,559,594.77', ALSO BEING THE SOUTHEAST CORNER OF U.S. BANK, N.A. (DB. 11270, PG. 180, CABARRUS COUNTY REGISTER OF DEEDS): THENCE RUNNING FROM THE TRUE POINT OF BEGINNING 528013'37"W 78.45' TO AN EXISTING MAO NAIL IN SAID WALKER ROAD; THBNCE 529013'46"W 470.39' TO A SET RAILROAD SPIKE N SAID WALKER ROAD; THENCE WITH CABARRUS COUNTY (DB. 4015, PG. 181, CABARRUS COUNTY REGISTER, OF DEEDS) TWO (2) COURSES AND DISTANCES AS FOLLOWS: I. 530024'57"W 845.75' TO AN EXISTING #5 REBAR; 2. N71010'28"W 1814.20' TO AN EXISTING 2" PIPE, ALSO BEING THE NORTHWEST CORNER OF SAID CABARRUS COUNTY; THENCE NI1044'S9"E 188.06' TO AN EXISTING I" IRON PIPE, ALSO BEING THE SOUTHEAST CORNER OF DIATZIKIS, EVANGELOS VASILLIOS (DB. 604, PG. 213, CABARRUS COUNTY REGISTER OF DEEDS; THENCE WITH SAID DIATZIKIS, EVANGELOS VASILLIOS N12004'35"E 19.82' TO AN E)GSTING 1" IRON PIPE; THENCE WITH SAID DIATZIKIS, EVANGELOS VASILLIOS AND CHARLES WAYNE HATLEY (DB. 10150, PG. 40, CABARRUS COUNTY REGISTER OF DEEDS) NI 9-3 462.64' TO A 49" OAK TREE; THENCE N32018'20"E 159.60' TO AN EXISTING 1" IRON PIPE; THENCE N85013'13"E 272.30' TO A COMPUTED POINT, ALSO BEING THE SOUTHWEST CORNER OF TROY L. MILLER (DB. 502, PG. 244, CABARRUS COUNTY REGISTER OF DEEDS); THENCE WITH SAID TROY MILLER (DB. 502, PG. 244), TROY MILLER (DB. 455, PG. 130, CABARRUS COUNTY REGISTER OF DEEDS), TROY MILLER (DB. 6.02, PG. 671, CABARRUS COUNTY REGISTER OF DEEDS), DAVID M. YARBOROUGH SR (DB. 5624, PG. 13, CABARRUS COUNTY REGISTER OF DEEDS) AND NED KRIMMINGER MILLER (DB. 1499, PAGE 171, CABARRUS COUNTY REGISTER OF DEEDS) N85003'15"E (PASSING AN EXISTING ANGLE Cabarrus County Register of Deeds P.O. Box 707 Concord, NC 28026 (704)920-2112 Wayne Nixon, Register of Deeds Receipt For: LAW OFFICES OF RICHARD M KOCH PA Instrument Type : COM-D Receipt # Instrument # : 00784 Date Book/Page : 11748 / 0275-00280 Pages : 6 Document 1st Grantor: RHONDA M. EARNHARDT COMR 1st Grantee : CABARRUS COUNTY Description: T8 Receipted By: Melissa Lilly 2016-295621 01/13/2016 09:33am 1 of 2 Description Qty Unit Cost Extended Deed - first 15 pages 1 26.00 26.00 EXCISE TAX STAMPS 1 700.00 700.00 Document 1 726.00 Instrument Type: DEED Receipt # : 2016-295621 Instrument # : 00785 Date: 01/13/2016 09:33am Book/Page : 11748 / 0281-00285 Pages : 5 Document : 2 of 2 1st Grantor : KENNETH R. MISENHEIMER 1st Grantee : CABARRUS COUNTY Description: T8 D_ Qty Unit Cost Extended Deed - first 15 pages 1 26.00 _ _ 26.00 EXCISE TAX STAMPS 1 600.00 600.00 Document 2 626.00 Grand Total 1,362.00 Check 5102-1,226.00 Check 5103-126.00 Balance 0.00 ustomer Copy McGee, Superior Court Judge on January 8, 2016 and filed in Superior Court on January 8, 2016, 3. There were no upset bids and the purchase price has been fully paid. The Grantor, acting as Commissioner under authority of the Order of Court, and in consideration of the purchase price of $350,000.00 has bargained and sold and by these presents does bargain, sell and convey to Grantee and its successors and assigns a one- half undivided interest in the property described in Exhibit A and all of Grantor's interest in the real property described in Exhibit B, both Exhibits A and B attached and incorporated by reference. These are the lands of Carl Carey Heintz as described in Book 304, page 265; Book 240, page 3; Book 338, page 265 and Book 700, page 264 in the Cabanms Public Registry. TO HAVE AND TO HOLD such lands and premises, together with all privileges and appurtenances thereunto belonging to the Grantee and its successors and assigns in as full and ample a manner as said party of the first part as Commissioner is authorized and empowered to convey the same. IN `VITNESS, the Grantor acting as Commissioner has set her hand and seal, the day and year first above written. L&J11,111 �Gi/�I4�1l (SEAL) RH DAM. EARNHARDT, COMMISSIONER Grantor, and Guardian of the Estate of Carl Carey Heintz STATE OF NORTH CAROLINA COUNTY OF CABARRUS I, I&Cw l, l- fin'o%n , a Notary Public of the County and State aforesaid, hereby do certify that Rhonda M. Earnhardt, Commissioner, Grantor and Guardian of the Estate, personally appeared before me this clay and acknowledged the due execution of the foregoing instrument, for the purposes herein expressed. WITNESS my hand and official seal this the II -day of January, 20I6. NOTARY 0 ` NOTARY PUBLIC ��°6B@ 6 U My Commission Expires: ..=1C3/S> IRONAT A DISTANCE OF 99.34'; ALSO PASSING AN EXISTING ANGLE IRON AT A DISTANCE OF2709" ALSO PASSING AN'EXIST INC! ANGLE IRON AT A DISTANCE OF 330.68', ALSO PASSING AN EXISTING AXLE AT A DISTANCE OF 402,84') FOR A TOTAL DISTANCE OF 1569.01' TO AN EXISTNG M5 REBAR, ALSO BEIINm THE NORTHWEST CORNER OF SAID U.S. BANK, N.A.; THENCE S20614'30E,243.63' TO AN EXISTING 95 REBAR, ALSO BEING THE NORTHEAST CORNER OF WILLENE HEINTZ MORRELL AND CARL CASEY HEINTZ (DB. 304, P.G. 265, CABARRUS COUNTY REGISTER OF DEEDS); THENCE WITH SAID WILLENE HEINTZ MORRELL AND CARL CASEY HEINTZ S84021'28"W 118.75' TO A SET 45 REBAR, ALS 0 BEING THE NORTHEAST CORNER OF WILLEM HEINTZ MORRELL AND CARL,CASEY HEINTZ (DB. 338, PG. 265, CABARRUS COUNTY REGISTER OF DEEDS); THENCE WITH :8AID WILLENE BENTZ MORRELL AND CARL CASEY BLINTZ (DB. 338. PG. 265,) FOUR (4) COURSES AND DISTANCES AS FOLLOWS: 1. S88°16'41"W203.27'TOANEXISTING I"PIPE; 2. S25915TIV 118.17' TO ANEXISTNG V PIPE; 3. S61944'22"E 103,55' TO AN EXISTING #3 REBAR; 4. N79027'27"E 200;50' TO AN EXISTING 5/8"IRONROD, ALSO BEING THE SOUTHWEST CORNER OP SAID WILLENE HENTZ MORRELL AND CARL CAREY HEINTZ (DB. 304, PG, 265); THENCE WITH SAID WILLENE HENNTZ. MORRELL AND CARL CAREY HEINTZ (DB. 304, PG. 265) N77912' I4"E 126,75' TO AN EXISTING''/z" IRON ROD, ALSO BEING THE SOUTHWEST CORNER OF SAID U.S. BANK, N.A.; THENCE WITH SAIDU:S. BAND, N.A. N8I°32'04"E 23119' TO A POINT, THE TRIM POINT OP BEGINNING, CONTAINING 53.207ACRES, AS SHOWN ON A PLAT OF SURVEY ENTITLED "BOUNDARY AND TOPOGRAPHIC SURVEY OF HEINTZ PROPER TV", COMPLETED BY CESI LAND DEVELOPMENT SERVICES DATED ON AUGUST 8, 2015, CESI JOB NO. '150251.000, 1EGAL;DE8CRIPTION - (PN: 5650-98-2166) LYING AND BEING IN'THENUMBER 8 TOWNSHIP, CABARRUS COUNTY, NORTH CAROLNA, WEST OF WALKER ROAD, BENG THE PROPERTY CONVEYED TO WILLENE HEINTZ MORRELL AND CARL CAREY HEINTZ (DB. 304, PG. 265, CABARRUS COUNTY REGISTER OF DEEDS), AND BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT A FOUND MAG NAIL N WALI(ER ROAD (S.R. 2710), HAVING NORTH CAROLINA NAD VI(2011) GRID COORDINATES OFN: 608,150.89' E: 1,559,594,77" ALSO BEING THE SOUTHEAST CORNER OF U.S. BANK, N.A. (DB. 6rt 1w 9 LEGAL DESCRIPTION — (PIN: 5650-98-0173) LYING AND BEING IN THE NUMBER 8 TOWNSHIP, CABARRUS COUNTY, NORTH CAROLINA, WEST OF WALKER ROAD, BEING THE PROPERTY CONVEYED TO WILLENE MINTZ MORRELL AND CART, CAREY HEINTZ (DB. 338, PG. 265, CABARRUS COUNTY REGISTER OF DEEDS), AND BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT A FOUND MAG NAIL IN WALKER ROAD (S.R. 2710), HAVING NORTH CAROLINANAD 83(2011) GRID COORD MATES OFN; 608,150.89' E: 1,559,594.77'; ALSO BEING THE SOUTHEAST CORNER OF U.S. BANK, N.A. (DB. 11270, PG. 180, CABARRUS COUNTY REGISTER OF DEEDS): THENCE S81032'04"W 232.19' TO AN EXISTING %" IRON ROD, AND THEN S77612'14"W 126.75' TO AN � ISTING 5/8" IRON ROD, BEING A CORNER OF CAREY HEINTZ AND I2AY IvIISENHEIMER (DB. 240, PGA, CABARRUS COUNTY REGISTER OF DEEDS), ALSO BEING THE, TRUE POINT OF BE, THENCE FROM THE TRUE POINT OF BE, FOUR (4) COURSES AND DISTANCES AS FOLLOWS: 1. 879027'27"W 200.50' TO AN EXISTING #3 REBAR; 2, N61044'22"W 103.55' TO AN EXISTING 1" IRON PIPE; 3. N25-15'd1"E 118AT TO AN EXISTING 1" IRON PIPE; 4. N88016'41 "E 203.27' TO A SET #5 REBAR, ALSO BEING THE NORTIiWEST CORNER OF SAID WILLENE HEINTZ MORRELL AND CARL CAREY HEINTZ -(DB. 304, PG. 265); THENCE WI`II-I SAID WILLENE BEINTZ MORRELL AND CARL CAREY HEINTZ (DB. 304, PG. 265); S15°29'32"E 130.06' TO THE TRUE POINT OF BEGINNING, CONTAINING 0.805 ACRES, AS SHOWN ON APLAT OF SURVEY ENTITLED "BOUNDARY AND TOPOGRAPHIC SURVEY OF HEINTZ PROPERTY", COMPLETED BY CESI LAND DEVELOPMENT SERVICES DATED ON AUGUST 8, 2.015, CESI JOB NO. 150251.000.