Loading...
HomeMy WebLinkAbout20130967 Ver 1_401 Application_20130913DURHAM CITY OF DURHAM Public Works Department 101 CITY HALL PLAZA I DURHAM, NC 27701 919.560.43261 F 919.560.4316 www.DurhamNC.gov 1869 CITY OF MEMNE September 5, 2013 NCDWQ, Webscape Unit 1650 Mail Service Center Raleigh NC 27699 -1650 20)30967 VIA CERTIFIED MAIL RETURN RECEIPT REQUESTED RE: Pre - construction notification /Minor Water Quality application for Rocky Creek bank stabilization Dear Sir /Madam: The City of Durham Public Works Department is administering a contract for stabilization of stream banks of Rocky Creek, a tributary of Third Fork Creek. The stream banks and adjacent stream buffer areas were damaged recently. The goal of this project is to restore the buffer area and stabilize the stream bank by using brush mattress. I have previously discussed this project with Cherri Smith of your division. Please let me know if you have any questions or concerns. I can be reached at 919 -560- 4326 ext 30271. Sincerely, Sujit Ekka, P.E., CFM Civil Engineer Suiit.EkkaCaD_durhamnc.Qov Encl: 1. Five (5) copies of the application 2. Check for $240.00 payable to the NC Division of Water Quality c: Eric Alsmeyer, US Army Corps of Engineers Dana Homkohl, Civil Engineer �� � , . ` � � •� 4 i �".� OF W AT�OG fq o 20130967 Office Use Only. Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: T © Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Q Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): 0 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: Q Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes Q No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes Q No 2. Project Information 2a. Name of project: Rocky Creek Bank Stabilization 2b. County: Durham 2c. Nearest municipality / town: Durham 2d. Subdivision name: N.A. 2e. NCDOT only, T.I.P. or state project no: N.A. 3. Owner Information 3a. Name(s) on Recorded Deed: Triangle Sports Broadcasters LLC p F=M F1 3b. Deed Book and Page No. 7308/770 3c. Responsible Party (for LLC if applicable): Katherine and Robert Zarzour S E P - 9 2013 3d. Street address: 1824 Nixon St NR - WAM OUALITY 3e. City, state, zip: Durham, NC %WdkA sw maw n 3f. Telephone no.: 251 -895 -2312 3g. Fax no.: N.A. 3h. Email address: I N.A. Pagel of 10 PCN Form —Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent Q Other, specify: 4b. Name: Sujit Ekka 4c. Business name (if applicable): City of Durham Public Works Department 4d. Street address: 101 City Hall Plaza, 3rd Floor 4e. City,.state, zip: ; ' T ,.� Durham, NC, 27701 0. Telephone n o-'=- ° 919- 560 -4326 x 30271 4g. Fax no.: 919 - 560 -4316 4h. Email address: SUJIT.EKKA@DURHAMNC.GOV 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 0830 -10 -37 -2229 1b. Site coordinates (in decimal degrees): I Latitude: 35.58 Longitude: 78.53 1c. Property size: 8.658 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Rocky Creek 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The proposed site is the stream bank of Rotary Creek and adjacent buffer area. General land use in vicinity of the project is residential. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 670 3d. Explain the purpose of the proposed project: The purpose of the proposed project is to stabilize bank of Rotary Creek and restore the stream buffer areas. 3e. Describe the overall project in detail, including the type of equipment to be used: The project will provide bank stabilization by installing brush mats. Woody debris in the channel will be removed Trees planted to restore buffer areas. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes Q No ❑ Unknown Comments: AeriaK NWI dons show wetlands. Proj on named strm 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Yes Q No ❑Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes Q No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands Q Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes /No W2 - Choose one Choose one Yes /No W3 - Choose one Choose one Yes/No VV4 - Choose one Choose one Yes /No W5 - Choose one Choose one Yes /No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary m 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 39• Impact length (linear feet) S1 P Stabilization Rocky Creek PER Corps 19 52 S2 - Choose one - - S3 - Choose one - S4 - Choose one - S5 - Choose one - S6 - Choose one - 3h. Total stream and tributary impacts 52 3i. Comments: Width is provided for channel bottom. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Wager Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If Pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded I Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: Sh. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet ) 6g. Zone 2 impact (square feet B1 - Yes /No B2 Yes/No B3 - Yes/No B4 - Yes /No B5 - Yes /No 136 - Yes /No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Contractor will be required to follow all erosion and sediment control requirements per NCDENR erosion and sediment control planning and design manual as well as buffer planting recommendations by NCDWQ. For example, staging and access area will not be in the work area and specific trees such as Sycamore and River Birch will be planted in the buffer area. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The brush mats are a revegetation technique that provides protective covering to an eroding slope or stream bank as soon as it is installed. The construction techniques use a combination of equipment and hand work. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes Q No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Yes No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑ Yes ❑ No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local overnment's jurisdiction is this project? 3b. Which of the following locally- implemented stormwater management programs apply (check all that apply): ❑ Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 4. DWQ Stormwater Program Review 4a. Which of the following state - implemented stormwater management programs apply (check all that apply): ❑Coastal counties ❑HQW ❑ORW ❑Session Law 2006 -246 []Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8of10 PCN Form — Version 1.4 January 2009 . . F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal /state /local) funds or the ❑X Yes ❑ No use of public (federal /state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes Q No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes Q No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes Q No or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after - the -fact permit application? ❑Yes Q No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes X❑ No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 i sp,a r. G-a,„ra t—.A M V_& "A i t i i flow — — f", pr 6/1 rya ­A, N Mlb•+.. ssacr o rW Avs wc+. as .urata w ryca .so-.rsr -" SYy I (Yiv IAe d�ara afad� .++c M. bar. b ,e..e ay.�», m. rn. mu•..ar ac or.� -dY- ,�nr�+v BRUSIi MATTRESS \\\\\0 H t ICA /'// /i R0 ESS�'• li _Z Q y: a AL 037 3 8 _ `r6,'- INE� BRUSH MATTRESS NOTES: 1. REMOVE DEBRIS FROM THE STREAM AND SLOPES 2. FINE GRADE TO PREPARE SLOPE OF STREAM BANK. DON'T DISTURB SLOPE OR BANK MORE THAN NECESSARY. 3. EXCAVATE HORIZONTAL TRENCH 8 " -12" DEEP AT TOE 4. LAY CUTTINGS FLAT AGAINST GRADED SLOPE, SLIGHTLY CRISCROSSED WITH BASAL ENDS PLACED DEEPLY IN TRENCH 5.CONTINUE TO LAY CUTTINGS ALONG FACE OF BANK UNTIL 80% GROUNDCOVER IS ACHIEVED. 6. POUND IN GRID OF 24 " -36" LONG STAKES INTO MATTRESS AT 3' -4' CENTERS 7. SECURE BRUSH MATTRESS BY USING CORD, ROPE, OR 10 -12 GAUGE GALVANIZED WIRE TIED IN DIAMOND PATTERN BETWEEN EACH ROW 8. DON'T LEAVE LOOSE OVERHANGING BRANCHES 9. SECURE TOE OF MATTRESS BY PLACING ROCKS AROUND AND TOP OF BASAL ENDS OF CUTTINGS 10. BACKFILL AROUND AND IN BETWEEN BRANCHES USING MATERIAL EXCAVATED FROM TRENCH WORKING SOIL IN WELL. CONTRACT: SD- 2013 -01 PROJECT: PDAP -007 ROCKY CREEK BANK STABILIZATIO NOTES AND DETAILS SHEET NO. 13.2 STORMWATER AND GIS SERVICES DEPARTMENT OF PUBLIC WORKS CITY OF DURHAM, NORTH CAROLINA JULY 5, 2013 NOTES: 1. REMOVE SMALL AND LARGE WOODY DEBRIS FROM APPROX. 50 FT OF STREAM CHANNEL SECTION. 2. DON'T DISTURB THE STREAM BED. 3. SAWCUT THE TREE TRUNK LEAVING THE ROOT WAD AS -IS SUPPORTING THE BANK SLOPE NOTES: 1. CLEAN AND PREPARE BANK SLOPES TO INSTALL BRUSH MATTRESS (SEE NOTES AND DETAILS ABOVE) NOTES: 1. CLEAN DEBRIS, FINE GRADE AS NEEDED TO REMOVE CLUMPS AND LOW AREAS. RESEED AND MULCH. 2. TREE PLANTING IN BUFFER AREA AS DIRECTED BY ENGINEER OR RESIDENT PROJECT REPRESENTATIVE 0 a • f i WORK AREA AND CONSTRUCTION LIMITS, TYP (±0.25 ACRES) lam, r 11 I I I I I I ' I I I I II I Ell- ❑ I I� SPECIAL FLOOD AZARD AREA I I I FLOOD Z (FU_rURE N TIONS), TYP ► MAP#37 Q083000J I FIRM ID#47 32003100371 I DATES AY 2, 2006 I I / I Ir I� o `+ 0\\��x v i d' t CONTRACT: SD- 2013 -01 PROJECT: PDAP -007 II 20f30967 ROCKY CREEK BANK STABILIZATION VICINITY MAP SHEET NO. 13.1 13 ;��RMWATER AND GIS SERVICES DEPARTMENT OF PUBLIC WORKS CITY OF DURHAM, NORTH CAROLINA JULY 5, 2013 (REVISED AUGUST 23, 2013) 0' 100' 200' GRAPHIC SCALE: 1" =100' PROPERTY N2 _L ELOISE F EDWARDS PROPERTY NO, 2 LOUISE B SIAlS TRUSTEE PROPERTY NQ_ _j TRIANGLE SPORTS BROADCASTERS, LLC PIN DB30 -06 -37 -3669 PIN 0830 -06 -37 -5654 PIN 0830 -10 -37 -2229 DB 350156, PS 350/78 DB 64461168, PB 11146 DB 7308/770, PB 45194 1034 S PLUM STREET 1033 S PLUM STREET SITE ADD: 1824 NIXON ST OKNER ADD:609 FAIRFAX RD KEST 11 If fit" ,6%A CARO NOTES: 00 (ty�'L01`J 1. ALL WORK TO BE COMPLETED WITHIN THE LIMITS OF CONSTRUCTION. 2. DETERMINE ACTUAL LENGTHS, BEND ANGLES, SIZES, ETC. PRIOR TO ORDERING ANY MATERIALS. 3. PORTIONS OF THE PROJECT SITE SHOWN HERE LIE WITHIN A FEMA SFHA. FLOOD AREAS DETERMINED FROM FEMA FIRM 3720083000 J, EFFECTIVE DATE: 05/02/06. 4. AS PER ARTICLE 3 OF CHAPTER 87 OF THE NORTH CAROLINA GENERAL STATUTES, UTILITIES SHALL BE NOTIFIED FOR THE PURPOSE OF LOCATING THEIR RESPECTIVE UNDERGROUND UTILITIES THROUGH THE ASSOCIATION KNOWN AS NORTH CAROLINA ONE —CALL CENTER, PHONE: (800) 632 -4949 OR 811, WEB SITE. http,//�cBll.nlbomc=e.htm 5. ALL WORK SHALL CONFORM TO FOLLOWING CITY OF DURHAM PUBLIC WORKS DEPARTMENT STANDARDS. ALL DOCUMENTS MAY BE DOWNLOADED AT: htto://" hmmcppy /ich /mhwd /ma/Pmco/ConsSpemni. 5.1. REFERENCE GUIDE FOR DEVELOPMENT 5.2. WATER AND SEWER SPECIFICATIONS 5.3. STREET SPECIFICATIONS 5.4. STANDARD DETAILS 6. ALL WORK SHALL CONFORM TO THE NCDOT STANDARD SPECIFICATIONS (CURRENT VERSION) AND APPLICABLE REVISIONS. THE NCDOT STANDARD SPECIFICATIONS MAY BE DOWNLOADED AT: 7. ALL WORK SHALL CONFORM TO THE NCDOT STANDARD DRAWINGS (CURRENT VERSION) AND APPLICABLE REVISIONS. THE NCDOT STANDARD DRAWINGS MAY BE DOWNLOADED AT: http• //nnncdo =/D{(PRECD6MCT /o/atd drat kfoulthtmlL B. ALL WORK SHALL CONFORM TO THE NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (CURRENT VERSION). THE NCDENR MANUAL MAY BE DOWNLOADED AT: httn: / /omtoi.ncdenr.aa //1 /p1✓a 9. IN THE EVENT OF CONFLICTING STANDARDS OR DETAILS, CONTRACTOR SHALL INFORM THE ENGINEER FOR DIRECTION. 10. EXISTING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM CITY OF DURHAM GEOSPATIAL DATABASE AND IS SCHEMATIC AND APPROXIMATE. NO SURVEY WAS CONDUCTED TO GATHER THIS INFORMATION.