Loading...
HomeMy WebLinkAboutSW3151103_COMPLIANCE_20190717STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE FCOMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Compliance Inspection Report Permit: SW3151103 Effective: 11/24/15 Expiration: 11/23/23 Project: NC Data Campus Phase B Owner: City of Conover County: Catawba Adress: 3660 Lai Ber Or Region: Mooresville CitylState/Zip: Conover NC 28613 Contact Person: Donald E Duncan Title: Phone: 828-464-1191 Directions to Project: Main entrance to project is located off Thornburg Drive Extension, approximately 2800 ff NW of the intersection of Thornburg Rd and NC Route 16, in between the Tri-City Baptist Church and the Walmad Supercenter. Type of Project: State Stormwater - General Permit Drain Areas: On -Site Representative)s): Related Permits: Inspection Date: 07/17/2019 Entry Time: 10:25AM Exit Time: 12:05PM Primary Inspector: Christopher Graybeal Secondary Inspector(s): Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stale Stormwater Facility Status: E Compliant ❑ Not Compliant Question Areas: State Stormwater (See attachment summary) page: 1 Permit: SW3151103 Owner - Project: City of Conover Inspection Date: 0711712019 Inspection Type Compliance Evaluation Reason for Visit: Routine Inspection Summary: The site appears to be compliant according to the approved stormwater permit. Continue to maintain BMPs according to the site maintenance agreement. File Review Yes No NA NE Is the permit active? ® ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ■ ❑ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? N ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ■ ❑ ❑ ❑ Comment: Required documents are in the file Built Upon Area yes No NA NE Is the site BUA constructed as per the permit and approval plans? ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? ! ❑ ❑ ❑ Comment: BUA appears to be constructed according to the approved plan. Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ® ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ® ❑ DWQ upon request? Comment: BPM's appear to be functional. SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ® ❑ ❑ ❑ Are the inlets located per the approved plans? ® ❑ ❑ ❑ Are the outlet structures located per the approved plans? i ❑ ❑ ❑ Comment: Measures appear to be constructed according to approved plans. page: 2