Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3140202_HISTORICAL FILE_20140411
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD LJLJLJoLJo MERRICKO 000 & COMPANY TRANSMITTAL Mike Randall Date: February 17, 2014 NC Department of Environmental and Natural Resources - DWQ Document: DQW-Stormwater Application 512 N. Salisbury St. Ref.: Barrington 2 Raleigh, NC 27604 Job #: 8007 919-807-6374 Sent Via: FedEx Ouantity Description ------ —-- ---------- -- - -- ----- ------- V 2 Civil Site Plans — — --- oc �'N4n : �ANn Z' Calculation Packet `— ;YSS UURo �Tinr.. -- - - - 0 o........ -.-.-... 1 Application Packet-SWU-101 SW401 low density;,DRPC !I�l 9q - -----__.—_ .-- --'----------------'VVQ 1 Fee Check $505.00 Check No. r,i_-.-.-.-.-.-.-_-E-G'f7�_.........------------------ 140854 SpUgC�SENT Remarks, Please find enclosed the Civil Plans and Stormwater applications for the residential project Barrington 2, located in Waxhaw, Union County, NC. 0 FEa zo�� Respectfully submitted, Merrick &Company Received by a NR • Wq �Af r �✓ U�Oa 8•_^-•,' TM'attr Branch Claudia Prado, PE Project Manager— Merrick & Company Date: Time: Merrick & Company — Charlotte 1001 Morehead Square Drive Charlotte, NC 28203 704-529-6500 & COM TRANSMITTAL Quantity Description 2 Water Quality Plans Remarks, Please find enclosed the Water Quality plans for the Waxhaw, Union County, NC. Respectfully submitted, Merrick & Company David Chaussard, El Project Manager— Merrick & Company Ory/S/O <A.vN OF Apg) ECE NIAR 3 1 ZOi4 Received by Date: Merrick & Company — Charlotte 1001 Morehead Square Drive Charlotte, NC 28203 704-529-6500 Time: 2, located in Account Login Register North Carolina Elaine F. Marshall DEPARTMENT OF THE: Secretary SECRETARY OF STATE PO Box 29622 Raleigh, NC 27626-0622 (919)807-2000 Date: 1 /30/2014 Click here to: View Document Filings I File an Annual Report I ®A Print a Pre -populated Annual Report Fillable PDF Form I Amend A Previous Annual Report Corporation Names Name Name Type INC SHEA INVESTMENT FUND I, LLC LEGAL NC SHEA ANNISTON LLC PREV LEGAL Limited Liability Company Information SOSID: 1326629 Status: Current -Active Effective Date: 7/5/2013 Citizenship: DOMESTIC Duration: PERPETUAL Annual Report Status: CURRENT Registered Agent Agent Name: STEELE, JON Office Address: 8008 CORPORATE CENTER DRIVE, SUITE 300 CHARLOTTE NC 28226 Mailing Address: 8008 CORPORATE CENTER DRIVE, SUITE 300 CHARLOTTE NC 28226 Principal Office Office Address: 8008 CORPORATE CENTER DRIVE, SUITE 300 CHARLOTTE NC 28226 Mailing Address: 8008 CORPORATE CENTER DRIVE, SUITE 300 CHARLOTTE NC 28226 Officers/Company Officials This website is provided to the public as a part of the Secretary of State Knowledge Base (SOSKB) system. Version: 2266 High Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000 and S.L. 2006-246, the Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. I, Mike Shea acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number as issued by the Division of Water Quality under the Stormwater Management Regulations. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area per lot is 4100 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the following: 6. The maximum built -upon area per lot, in square feet, is as listed below: Lot # BUA Lot # BUA Lot # BUA Lot # BUA This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. Each lot will maintain a 30** foot wide vegetated buffer between all impervious areas and surface waters. **50 foot for projects located in the 20 coastal counties. 8. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required to provide these additional measures. Form DRPC-3 Rev.2 05Nov2009 Page 1 of 2 High Density Residential Subdivisions Deed Restrictions & Protective Covenances yy ;� Signat Date: I' I C ZQ 1, _ a/`°"'/trl �!- / �� K /„I ('o ri a Notary Public in the State of /VoI r a-o )L, pia County of / 1P ( KI)e P ka r� do hereby certify that fV /iclhy- % P9m- personally appeared before me this the .�/tk day of Ma rV 20/1/ , and acknowledge the duu execution of the foregoing instrument. Witness my hand and official seal, / ✓� SEAL nature /} Commission expires Q(7,L6,bt/ 3, a616- Form DRPC-3 Rev.2 05Nov2009 Page 2 of 2 DWQ USE ONLY Date Received Fee Paid Permit Number lr61H -5o 5 -SW3lil OdOZ Applicable Rules: (select all that apply) ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph Il - Post Construction ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original / I. GENERAL INFORMATION 4N q�AG1Npq 1. Project Name (subdivision, facility, or establishment name - should be consistent with project n me on plan&P C� specifications, letters, operation and maintenance agreements, etc.): VtNh RI 2. Location of Project (street address): City:Waxhaw County:Union Zip:28173 3. Directions to project (from nearest major intersection): Approximates 933 I F west of the intersection formed by Cutters Spring Drive and NC 16 A r 4. Latitude:80' 46' 16" N Longitude:34' 58' 20" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* "provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different thhaD-cusren proposed, D Inn 4. a. Additional Project Requirements (check applicable blanks; information on req ''ye3atapermitS'can b obtained by contacting the Customer Service Center at 1-877-623-6748): UUUWWWIUUI , ? I' ❑CAMA Major ®Sedimentation/Erosion Control: 17 ac fTisturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts �'-"T'Ynh b.If any of these permits have already been acquired please provide the Project issue date and the type of each permit: it Number, 5. Is the project located within 5 miles of a public airport? ❑No ®Yes If yes, see S.L. 2012-200, Part Vl: http://portal.ncdenr.org/web/wq/ws/su/statesw/rules laws Form SWU-101 Version 06Aug2012 Page I of III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organ Signing Official & b.Contact information for person fisted in item 1a above: Street Address:8008 Corporate Center Dr. Ste 300 City:Charlotte State:NC Zip:28226 Mailing Address (if applicable):Same as Above City: Phone: (704 ) 319-5000 Email:mike.shea@sheahomes.com Fax: (704 ) 543-6327 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Signing C b. Contact information for person listed in item Za above: Street Address:8008 Corporate Center Dr. Ste 300 City:Charlotte State:NC Zip:28226 Mailing Address (if applicable):Same as Above City: Phone: (704 ) 319.5000 Email: mike.shea@sheahomes.com Fax: (704 ) 543-6327 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Chase Kerley Signing Official & Title:As Above b.Contact information for person listed in item 3a above: Mailing Address:8008 Corporate Center Dr. Ste 300 City:Charlotte State:NC Zip:28226 Phone: (704 ) 602-3307 Fax: ( ) Email:chase.kerley@sheahomes.com 4. Local jurisdiction for building permits: Point of Contact:Greg Mahar Phone #: (704 ) 843-2195 Form SWU-101 Version 06Aug2012 Page 2 of IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Two BMP devices, one for each side of the ridge as it naturally drains now (east and west). The west side will be a stormwater wetland (DA2) and the east side will be a combination sand filter within an extended 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph lI - Post Construction 3. Stormwater runoff from this project drains to the Catawba River basin. 4. Total Property Area: 23.57 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area:.10 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area*:23.47 acres Total project area shall be calculated to exclude the followingg the nornml pool of im ounded structures, the area between the banks of streams and rivers, the area below the Nornnal High Water (NSW) line or Mean High Water (MHW) line, and coastal wetlands landward frmn the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 36.79 % 9. How many drainage areas does the project have?2 (For high density, count I for each proposed engineered stormwater BMP. For low densihj and other projects, use 1 for the whole properhj area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Drainage Area _ Drainage Area _ Receiving Stream Name UT Twelvemile UT Twelvemile Stream Class * C C Stream Index Number * 11-138 11-138 Total Drainage Area (so 324086 370260 On -site Drainage Area (so 324086 367211 Off -site Drainage Area (so 0 1 49 Proposed Impervious Area** (so 1 149411 140699 % Impervious Area** total 42.20 37.18 Impervious' Surface Area Drainage Area 1 Drainage Area 2 Drainage Area Drainage Area On -site Buildings/Lots (so 75390 77185 On -site Streets (so 37396 30511 On -site Parking (so 0 0 On -site Sidewalks (so 21578 18814 Other on -site (so 15047 14189 Future (so 0 0 Off -site (SO 0 0 Existing BUA*** (so 0 0 Total (so: 149411 140699 Stream Class and Index Number can be determined at: http://portal. ncdenr.orgfweb/wq[ps/esu/classi cations Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Report only that anwunt of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version 06Aug2012 Page 3 of 11. Flow was the off -site impervious area listed above determined? Provide documentation. Manual calcution using known collected field survey information and GIS data Projects in Union County: Contact DWQ Central OJrice staff to check if the project is located within a Threatened & Endangered Species watershed that maybe subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from hn://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portalmcdennorg/web/wg/ws/su/maw.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. M\L- 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants M Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed si ed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.htmI for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor_ the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the hAV- receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). _fffit- 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: fAw a. Development/Projecfame. / b. Engineer and firm. c. Location map with named streets and NCSR numbers./ d. Legend. � e. North arrow. I. Scale. / g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NFIW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. / j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished Floor elevations. I. Details of roads, drainage features, collection systems, and stormwater control measures.i on. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. / n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations./ o. Drainage areas delineated (included in the main set of plans, not as a separate document)! p. Vegetated buffers (where required). Form SWU-101 Version 06Aug2012 Page 4 of 6 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xI V copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 6138 Page No: 896 M �� 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC AID Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http:/ /www.secretary.state.nc.us/Corporations/CSearch.aspx [�II����tLi7li Ku" 6191111:040 Lt[�fiuq.Gl►1u67 For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIIL CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provi formation on y ul"behalf for this project (such as addressing requests for additional information). Consulting Engineer:Marcus King,PE Consulting Firm: Merrick and Company Mailing Address:1001 Morehead Square Drive, Suite 530 City:Charlotte State:NC Zip:28203 Phone: (704- 1 529-6500 Fax: (704 ) 522-0882 Email: marcus. kinemerrick.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) 1, (print or hjpe name of person listed in Contact Information, item 2a) iM)�'V�k�l S� Erl certify that I own the property identified in this permit app ication, and thus give permission to (print or hype name of person listed in Contact Information, item Ia)1� S i_A with (print or hype name of organization listed in Contact Information, item la&A A kIWU-b)t)3 ( to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 06Aug2012 Page 5 of As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Date: l( li) IR)14 I, a Notary Public for the State of NO -lb &=t22ijna . County of Gig-�Or, do hereby certify that MI 0-1 ShVa personally appeared before me thisj�rday of JGR_ arLf N , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, e.,f�C� Britney M McCotter Notary Public State of North Carolina County of Gaston Commission Expires 12/11/2018 X. APPLICANT'S CERTIFICATION SEAL My commission expires 1 P(O M iyr j i t Q b l,? I, (print or type name of person listed in Contact tnfonnation, item to) certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 21-I .1000 and any other applicable state stormwater requirements. a Notary Public for the State of . County of do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission Form SWU-101 Version 06Aug2012 Page 6 of a r-ow+� ! lag�2�9 Como, 01 ow9® mqm 9c �jom %! w 0 p '8138* 0896 FILED UNION COUNTY, NC CRYSTAL CRUMP REGISTER OF DEEDS FILED Nov 25, 2013 AT 02:15 pm BOOK 06138 START PAGE 0896 END PAGE 0899 INSTRUMENT # 39561 EXCISE TAX $50.00 AH NORTH CAROLINA SPECIAL WARRANTY AND COMBINATION DEED Excise Tax: $50.00 Parcel Identifier No. Portion of 06186020 to be combined with 06186011 A (See Note Below) Verified by County on the _ day of 20 Mail after recording This instrument was prepared by: Bringewatt & Snover. PLLC (KLP) (no title examination requested or performed) Brief description for the Index: 1.15 Acres on Bonds Grove Church Road THIS DEED made this CQjqAday of November, 2013, by and between GRANTOR Wells Fargo Bank, National Association (successor in interest by merger to Wachovia Bank, N.A.) as Trustee under Agreement with Ralph M. Bell dated June 4, 1981 of a Trust for the Benefit of M. Weathers, L. Moffitt, E. Rankin & E. Alexander, a 47.610684% undivided interest as tenant -in -common Wells Fargo Bank, National Association 401 South Tryon Street, 2nd Floor MAC D1050-026 Charlotte, NC 28202 Attention: Susan W. Causey corporation or partnership. GRANTEE Wells Fargo Bank, National Association (successor in interest by merger to Wachovia Bank, N.A.) as Trustee under Agreement with Ralph M. Bell dated June 4,1981 of a Trust for the Benefit of Mary Ann H. Bell Wells Fargo Bank, National Association 401 South Tryon Street, 2nd Floor MAC D1050-026 Charlotte, NC 28202 Attention: Susan W. Causey Grantor and Grantee: name, mailing address, and, if appropriate, character of entity. e.e The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all of Grantor's interest in that certain lot or parcel of land situated in the Sandy Ridge Township, Union County, North Carolina and more particularly described as follows: SEE EXHIBIT A ATTACHED HERETO AND INCORPORATED HEREBY BY REFERENCE. The property hereinabove described was acquired by Grantor by instrument recorded in Book 5415, Page 909. NOTE: Pursuant to deed recorded in Book 5415, Page 909, Union County Public Registry, Grantor acquired a 47.610684%undivided interest as tenant -in -common, and Grantee acquired a 52.3 89316% undivided interest as tenant -in -common in that certain tract of land 013& 0897 ' containing approximately 24.9956 acres (the "Trust Property") as shown on plat recorded in Plat Cabinet L, File 228, Union County Public Registry. Pursuant to Aeed recorded in Book 5415, Page 905, aforesaid Registry, Grantee acquired the 5.3696-acre tract (Parcel Identification Number 0618011 A) shown on the aforesaid Plat. By deed recorded in Book 6130, Page 840, aforesaid Registry, Grantor and Grantee conveyed a portion of the Trust Property consisting of23.79 acres to Shea Investment Fund I, LLC. See also Certificate of Trust recorded in Book 6130, Page 844, aforesaid Registry. It is the intent of this deed (i) to consummate the conveyance by Grantor of its 47.610684% interest to Grantee (which already owns a 52.389316% interest therein) such that Granirowns all the interest in fee simple in the property described herein; and (ii) to combine the property described herein with the 5.3696-acre tract owned by Grantmee such that it becomes a part of Parcel Identification Number 06186t1 IA. D All or a portion of the property herein conveyed _ includes or X does not include the primary residence of a Grantor. A map showing the above described property is recorded in Plat Book page TO HAVE AND TO HOLD the interest conveyed hereby in the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee that Grantor has done nothing to impair such title as Grantor received, and Grantor will warrant and defend the title against the lawful claims of all persons claiming by, under or through Grantor, except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions: SEE EXHIBIT B ATTACHED HERETO AND INCORPORATED HEREBY BY REFERENCE. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year fast above written. Wells Fargo Bank, National Association (successor in interest by merger to Wachovia Bank, N.A.) as Trustee under Agreement with Ralph M. Bell dated June 4, 1981 of a Trust for the Benefit of M. Weathers, L. Moffitt, E. Rankin & E. Alexander By: �N1�6vyia7 C� V P Susan W. Causey, Vice President State of North Carolina - County of Mecklenburg I certify that the following person personally appeared before me this day, acknowledging to me that she signed the foregoing document: Susan W. Causer name of principal Date: _I/- L2-/3 Official Signature of Notary (Official\$d. MC F o, Notary's printed or typed name ,S/i c�r< 13 • /� —LCye% Notary Public �P O ,� QMy commission expires: / r m poe 14 rountV `= MecV.2�c i'H' Exhibit A Description of the Property Lying and being in Sandy Ridge Township, Union County, North Carolina, and being more particularly described as follows: Beginning at a Mag nail in the center line of Bonds Grove Church Road, said nail being the most northwestern comer of Tax Parcel 06-186-011A, as shown on a recorded plat in Plat Cabinet L, File 228 of the Union County Public Registry, and being a common corner with Wells Fargo Bank National Association (formerly Wachovia, N.A.), Trustee under Agreement with Ralph M. Bell (now or formerly) as described in that instrument recorded in Book 5415, Page 905, aforesaid Registry and running thence with Wells Fargo Bank's western line, South 03 degrees 41 minutes 36 seconds West 652.14 feet to an existing #4 rebar; thence a new line South 88 degrees 04 minutes 14 seconds West 58.83 feet to a point located on the eastern boundary of Lot 129 as shown on plat recorded in Plat Cabinet J, Page 270, aforesaid Registry; thence running along the aforesaid eastern boundary of Lot 129 North 03 degrees 32 minutes 20 seconds East 66.91 feet to a #5 rebar found in the southeastern comer of that property owned by Margie L. McCorkle (now or formerly) as described in that instrument recorded in Book 867, Page 783, aforesaid Registry; running thence along the eastern boundary of the aforesaid property owned by Margie L. McCorkle North 03 degrees 21 minutes 38 seconds East 549.55 feet (passing a bent #4 rebar found at 520.02 feet) to an axle found; thence South 89 degrees 38 minutes 24 seconds West 348.84 feet to a 1-inch rod found; thence North 04 degrees 52 minutes 46 seconds West 26.60 feet to a Mag nail in the center line of Bonds Grove Church Road; running thence North 88 degrees 11 minutes 52 seconds East 415.77 feet to the point and place of Beginning and containing 1.15 acres as shown on ALTA/ACSM Land Title Survey for Shea Bell, LLC dated December 5, 2012, and prepared by Christopher G. Della Mea, PLS L-4157, reference to which survey is hereby made for a more particular description. 813& 08.99 Exhibit B Title Exceptions 1. Taxes and assessments for the year 2013, and subsequent years. 2. All easements, possible gaps and overlaps, the right-of-way of Bonds Grove Church Road (SR # 1307) and other matters disclosed by plat recorded in Plat Cabinet L, File 228, Union County Public Registry. 3. All easements, rights -of -way, covenants, conditions, restrictions and other matters of record. 4. All matters which would be disclosed by a current and accurate survey of the property conveyed hereby. 5. Zoning, land use, building and subdivision laws, regulations and ordinances, and violations thereof, if any. SUMMIT ENGINEERING • LABORATORY- SURVEYING REPORT OF PRELIMINARY SUBSURFACE EXPLORATION BELLS PROPERTY SITE (PROPOSED BARRINGTON SUBDIVISION) BONDS GROVE CHURCH ROAD WAXHAW, NORTH CAROLINA SUMMIT PROJECT NO. 109-13 Prepared For: Shea Homes 3436 Toringdon Way Charlotte, North Carolina 28277 Prepared By: SUMMIT Engineering and Construction Services, Inc. (SUMMIT) 3575 Centre Circle Drive Fort Mill, South Carolina 29715 May 13, 2013 SUMMIT ENGINEERING- LABORATORY- SURVEYING May 13, 2013 Mr. Chase Kerley Shea Homes 3436 Toringdon Way Charlotte, North Carolina 28277 Subject: Report of Preliminary Subsurface Exploration Bell's Property Site (Proposed Barrington Subdivision) Waxhaw, North Carolina SUMMIT Project No. 109-13 Dear Mr. Kerley: SUMMIT Engineering and Construction Services, Inc. (SUMMIT) has completed the preliminary subsurface exploration for the Bell's Property Site (Proposed Barrington Subdivision) located in Waxhaw, North Carolina. This report contains a brief description of the project information provided to us, general site and subsurface conditions revealed during our geotechnical exploration and our general recommendations regarding foundation design and construction. SUMMIT appreciates the opportunity to be of service to you on this project. If you have any questions concerning the information presented herein or if we can be of further assistance, please feel free to call us at (704) 504-1717. Sincerely yours, SUMMIT ENGINEERING AND CONSTRUCTION SERVICES, INC. �%%`" \A CARD 0*0 e`aO%Q ,••E 1p•C �?i,9,iy SEAL E 037883S. s/3/ o r 3 William M. Harrison, P.E. Michael J. Scarlett, P.E. Geotechnical Project Manager Chief Engineer Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 BelI's Property Site (Proposed Barrington Subdivision) May 13, 2013 TABLE OF CONTENTS SECTION......................................................................................................................... PAGE EXECUTIVE SUMMARY.. 1.0 INTRODUCTION.................................................................................................1 1.1 Site and Project Description....................................'.............................................. 1 1.2 Purpose of Study................................................................................................. 1 2.0 EXPLORATION PROCEDURES.........................................................................3 2.1 Field.................................................................................................................. 3 2.2 Laboratory .......................................................................................................... 3 3.0 AREA GEOLOGY AND SUBSURFACE CONDITIONS.......................................4 3.1 Physiography and Area Geology............................................................................ 4 3.2 Generalized Subsurface Stratigraphy..................................................................... 4 3.2.1 Surface........................................................................................................... 5 3.2.2 Residuum........................................................................................................5 3.2.3 Partially Weathered Rock (PWR) and Auger Refusal ........................................... 5 3.3 Water Level Measurements and Estimated Seasonal High Water Level (ESHWL)...... 5 4.0 EVALUATIONS AND RECOMMENDATIONS...................................................6 4.1 General...............................................................................................................6 4.2 Foundation Support .......................................................................................I..... 6 4.3 Low to Moderate Plasticity and Moisture Sensitive Soils ......................................... 7 4.4 Floor Slab and Pavement Areas............................................................................. 7 4.5 Cut and Fill Slopes.............................................................................................. 8 5.0 CONSTRUCTION CONSIDERATIONS............................................................... 9 5.1 Abandoned Utilities/Structures............................................................................. 9 5.2 Site Preparation................................................................................................... 9 5.3 Excavation Characteristics.................................................................................. 10 5.4 Temporary Excavation Stability.......................................................................... 10 5.5 Structural Fill.................................................................................................... 11 5.6 Engineering Services During Construction........................................................... 11 6.0 QUALIFICATIONS OF REPORT......................................................................13 LIST OF APPENDICES Figures 2 Boring Logs 3 Laboratory Test Results Report of Prelitninary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 112013 EXECUTIVE SUMMARY SUMMIT has completed a Preliminary Subsurface Exploration for the Bell's Property site (Proposed Barrington Subdivision) located in Waxhaw, North Carolina. Eight (8) soil test borings (B-1 through B-8) were performed at the approximate locations shown on Figure 2 — Boring Location Plan provided in Appendix 1. The soil test borings were performed using an ATV -mounted CME 550 drill rig and extended to depths ranging from approximately 8.6 to 15 feet below the existing ground surface. Hollow -stem, continuous flight auger drilling techniques were used to advance the borings into the ground. Water level measurements were attempted at the termination of drilling. The following geotechnical engineering information was obtained as a result of the soil test borings: • Surface — Topsoil was encountered in all of the borings to depths of approximately 6 to 12 inches below existing ground surface. • Residual - Residual (undisturbed) soils were encountered underlying surface soils in all of the borings and extended to boring termination depth or Partially Weathered Rock. The residual soils encountered typically consisted of sandy silts (ML and Mli) with N- values ranging from 6 to greater than 50 bpf. • Partially Weathered Rock (PWR) and Auger Refusal — Partially Weathered Rock was encountered in three (3) of the borings (Boring Nos. B-6 through B-8) at depths ranging from approximately 3 to 8 feet below existing ground surface. Auger refusal conditions were encountered in Boring No. B-8 at a depth of approximately 8.6 feet below existing ground surface. • Low to Moderate Plasticity and Moisture Sensitive Soils - Based on our boring results, near surface low to moderate plasticity and moisture sensitive soils were encountered in a majority of our borings. These materials, in their present state, are suitable for direct support of the proposed building foundations. However, these fined grained soils are moisture sensitive and can become soft when increased in moisture content. Consequently, some undercutting and/or reworking (drying) of the near -surface soils may be required depending upon final site grades, site management practices, and weather conditions present during construction. Should these materials be left in -place, special consideration should be given to providing positive drainage away from structures and discharging roof drains a minimum of 5 feet from the foundations to reduce infiltration of surface water to the subgrade materials. Laboratory test results indicate that soils were encountered with Plasticity Indexes of 37, which is towards the higher end of moderate plasticity. If during construction soils with plasticity higher than those tested by our laboratory are encountered, then additional recommendations can be provided including, undercutting, providing separation, or lime stabilization. • Groundwater was not encountered, as measured at the time of drilling, in any of our borings. Moisture conditions of the soil samples retrieved were generally moist. Very moist and/or wet samples were encountered in Boring Nos. B-2 and B-8 at depths of approximately 12 and 3 feet below ground surface, respectively. Hole cave depths ranged Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 13, 2013 from approximately 7.1 to 13.5 feet below existing ground Surface. At times, hole cave may be indicative of the presence of groundwater. Additionally, there is a pond (near Boring No. B-2) and stream on site and, depending upon excavation depths, groundwater and/or soft soils may be a concern near the ponds. Water levels tend to fluctuate with seasonal and climatic variations, as well as with some types of construction operations. Therefore, water may be encountered during construction at depths not indicated during this study. Estimated Seasonal High Water Level (ESHWL) assessments were made in Boring Nos. B-2 and B-7 at depths of 3.5 and 14 feet, respectively. • Bearing conditions depend upon amount of cut and/or fill expected. We do not have information regarding the final elevations of proposed building pads. The near -surface soils encountered in all our borings are suitable for a net allowable bearing capacity of 2,000 psf provided the recommendations in this report are implemented and provided the soils are not moderate to high in plasticity (as determined by the Geotechnical Engineer at the time of construction). • Based on the results of our soil test borings, it appears that the general shallow excavation will be possible with conventional excavating equipment such as pans, backhoes, bulldozers, and front end loaders. Depending on the location, excavations deeper than approximately 3 feet may require specialized equipment and procedures. Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 13, 2013 1.0 INTRODUCTION 1.1 Site and Project Description The Bell's Property (Proposed Barrington Subdivision) site is located in Waxhaw, North Carolina and is south of Bonds Grove Church Road, and east of and accessible from the existing Barrington Subdivision, as shown in Figure 1 — Site Location Map provided in Appendix 1. Based on observations made during our site visit and review of aerial photography (GIS), the site is mostly undeveloped consisting wooded areas. Though not observed on -site. Union County GIS shows a structural outline on the north side of the subject site. We understand proposed development activities will be to construct one- and two-story residential structures and associated appurtenances. We have assumed the structures will be built using slab -on -grade or crawl -space construction requiring net allowable bearing capacities of no greater than 2,000 psf. Based on site topography, we have assumed that maximum cut/fill will be on the order of 5 feet. The following evaluation and recommendations are based upon an understanding of the proposed construction, our assumptions, and the field exploration performed. If the above -described project conditions are incorrect or changed after this report, or if subsurface conditions encountered during construction are different from those reported, SUMMIT should be notified and these recommendations should be re-evaluated based on the changed conditions. 1.2 Purpose of Study The purpose of this study was to obtain general geotechnical information regarding the subsurface conditions and to provide general recommendations regarding the geotechnical aspects of site preparation and foundation design. This report contains the following items: • Executive Summary, test procedures and findings; • Site and Test Location Plans; • Boring Logs; • A general review of the subsurface soils and geological stratigraphy; Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 13, 2013 • A general evaluation of the site considering the proposed building construction and subsurface conditions encountered; • Geotechnical recommendations for design and construction of suitable foundation support systems; • Recommendations regarding slab -on -grade system support; • Recommendations for site preparation and construction of compacted fills; and, • Recommendations regarding excavation conditions. 2 Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 13, 2013 2.0 EXPLORATION PROCEDURES 2.1 Field Eight (8) soil test borings (B-1 through B-8) were performed at the approximate locations shown on Figure 2 — Boring Location Plan included in Appendix 1. The borings were located in the field by others. The soil test borings were performed using an ATV -mounted CME 550 drill rig and extended to depths ranging from 8.6 to 15 feet below the existing ground surface. Hollow -stem, continuous flight auger drilling techniques were used to advance the borings into the ground. Soil samples were obtained during our field exploration in general accordance with ASTM D 1586. Water level measurements were attempted at the termination of drilling. The collected soil samples were transported to SUMMIT'S office to be visually examined and classified in general accordance with ASTM D 2488. The classification symbols are depicted on the attached boring logs provided in Appendix 2. Standard Penetration Tests (SPTs) were performed at designated intervals as the augers were advanced to evaluate the strength characteristics, and relative density of the soils encountered. The SPT "N" value represents the number of blows required to drive a split -barrel sampler 12 inches with a 140-pound hammer falling from a height of 30 inches. The results of these tests are presented on the individual boring logs provided in Appendix 2 at the respective test depth. 2.2 Laboratory The collected soil samples were transported to SUMMIT's office to be visually examined and classified in general accordance with ASTM D-2488. The classification symbols are depicted on the Boring Logs provided in Appendix 2. To aid in the classification of soils and estimate their engineering properties, Atterberg Limit testing was performed in general accordance with ASTM D-4318 on one (1) soil sample, Boring No. B-4 at a depth of 1 to 2.5 feet below existing ground surface. Laboratory test results can be found in Appendix 3. Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 13, 2013 3.0 AREA GEOLOGY AND SUBSURFACE CONDITIONS 3.1 Physiography and Area Geology The property is located in Waxhaw, North Carolina, which is located in the south central Piedmont Physiographic Province. The Piedmont Province generally consists of well rounded hills and ridges which are dissected by a well developed system of draws and streams. The Piedmont Province is predominantly underlain by metamorphic rock (formed by heat, pressure and/or chemical action) and igneous rock (formed directly from molten material) which were initially formed during the Precambrian and Paleozoic eras. The volcanic and sedimentary rocks deposited in the Piedmont Province during the Precambrian era were the host from the metamorphism and were changed to gneiss and schist. The more recent Paleozoic era had periods of igneous emplacement, with at least episodes of regional metamorphism resulting in the majority of the rock types seen today. The topography and relief of the Piedmont Province has developed from differential weathering of the igneous and metamorphic rock. Ridges have been developed between the more easily weathered and erodible rock. Because of the continued chemical and physical weathering, the rocks in the Piedmont Province are now generally covered with a mantle of soil that has weathered in place from the underlying parent bedrock. These soils have variable thicknesses and are referred to as residuum or residual soils. The residuum is typically finer grained and has higher clay contents near the surface because of the advanced weathering. Similarly, the soils typically become coarser grained with increasing depth because of decreased weathering. As the weathering decreases through the residual soil profile, the residual soils generally transition into PWR that tends to resemble the parent rock. 3.2 Generalized Subsurface Stratigraphy General subsurface conditions encountered during our geotechnical exploration are described herein. For more detailed soil descriptions and stratifications at a particular soil test boring, the boring logs provided in Appendix 2 should be reviewed. The horizontal stratification lines designating the interface between various strata represent approximate boundaries. Transition between different strata in the field may be gradual in both the horizontal and vertical directions. 4 Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 13, 2013 3.2.1 Surface: Topsoil was encountered in all of the borings to depths of approximately 6 to 12 inches below existing ground surface. 3.2.2 Residuum: Residual (undisturbed) soils were encountered underlying surface soils in all of the borings and extended to boring termination depth. The residual soils encountered typically consisted of sandy silts (ML and MH) with N-values ranging from 6 to greater than 50 bpf. 3.2.3 Partially Weathered Rock (PWR) and Auger Refusal: Partially Weathered Rock was encountered in three (3) of the borings (Boring Nos. B-6 through B-8) at depths ranging from approximately 3 to 8 feet below existing ground surface. Auger refusal conditions were encountered in Boring No. B-8 at a depth of approximately 8.6 feet below existing ground surface. 3.3 Water Level Measurements and Estimated Seasonal High Water Level (ESHWL) Groundwater was not encountered, as measured at the time of drilling, in any of our borings. Moisture conditions of the soil samples retrieved were generally moist. Very moist and/or wet samples were encountered in Boring Nos. B-2 and B-8 at depths of approximately 12 and 3 feet below ground surface, respectively. Hole cave depths ranged from approximately 7.1 to 13.5 feet below existing ground surface. At times, hole cave may be indicative of the presence of groundwater. Additionally, there is a pond (near Boring No. B-2) and stream on site and, depending upon excavation depths, groundwater and/or soft soils may be a concern near these features. Water levels tend to fluctuate with seasonal and climatic variations, as well as with some types of construction operations. Therefore, water may be encountered during construction at depths not indicated during this study. Estimated Seasonal High Water Level (ESHWL) assessments were made in Boring Nos. B-2 and B-7 at depths of 3.5 and 14 feet, respectively. 5 Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 13, 2013 4.0 EVALUATIONS AND RECOMMENDATIONS 4.1 General Our evaluation and recommendations are based on the project information outlined previously and on the data obtained from the field and laboratory testing program. If the structural loading, geometry, or proposed building locations are changed or significantly differ from those outlined, or if conditions are encountered during construction that differ from those encountered by the soil test borings, SUMMIT requests the opportunity to review our recommendations based on the new information and make the necessary changes in writing. 4.2 Foundation Support Bearing conditions depend upon amount of cut and/or fill expected. We do not have information regarding the final elevations of proposed building pads. The near -surface soils encountered in all of our borings are suitable for a net allowable bearing capacity of 2,000 psf provided the recommendations in this report are implemented and provided the soils are not moderate to high in plasticity (as determined by the Geotechnical Engineer at the time of construction). Exterior foundations and foundations in unheated areas should be designed to bear at least 12 inches below finished grade for frost protection The foundation bearing area should be free of any loose or soft material, standing water, and debris. Concrete should not be placed on soils that have been softened by precipitation or frost heave. We recommend that the bearing soils be evaluated by the Geotechnical Engineer using hand auger borings with Dynamic Cone Penetrometer testing equipment or other suitable methods prior to concrete placement. Any unsuitable soil encountered during this evaluation should be undercut or repaired as directed by the Geotechnical Engineer. The subgrade materials can be sensitive to moisture variations: therefore, foundation excavations should be opened for a minimum amount of time, particularly during inclement weather. Soils exposed to moisture variations may become highly disturbed and undercutting may be required prior to placing foundations on these materials. If the excavation remains open overnight or if 3 Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 13, 2013 rainfall becomes imminent while the bearing soils are exposed, we recommend that the foundation excavations are deepened and that a 2 to 4-inch thick "mud -mat' of lean (2,000 psi) concrete be placed on the bearing soils before placement of reinforcing steel Based on the general stratigraphy in the building area, past experience with similar projects and the anticipated magnitude of the building loads, it is our opinion that the total and differential settlement potentials for the building should be on the order of 1 inch and 1/2 inch, respectively. These conclusions are contingent upon compliance with the site preparation and fill placement recommendations outlined in this report. 4.3 Low to Moderate Plasticity and Moisture Sensitive Soils Based on our boring results, near surface low to moderate plasticity and moisture sensitive soils were encountered in a majority of our borings. These materials, in their present state, are suitable for direct support of the proposed building foundations. However, these fined grained soils are moisture sensitive and can become soft when increased in moisture content. Consequently, some undercutting and/or reworking (drying) of the near -surface soils may be required depending upon final site grades, site management practices, and weather conditions present during construction. Should these materials be left in -place, special consideration should be given to providing positive drainage away from structures and discharging roof drains a minimum of 5 feet from the foundations to reduce infiltration of surface water to the subgrade materials. Laboratory test results indicate that soils were encountered with Plasticity Indexes of 37, which is towards the higher end of moderate plasticity. If during construction soils with plasticity higher than those tested by our laboratory are encountered, then additional recommendations can be provided including, undercutting, providing separation, or lime stabilization. 4.4 Floor Slab and Pavement Areas Slab -on -grade floor systems and pavements can be adequately supported on the non -high plastic residual soils or newly compacted fill, provided the site preparation and fill placement procedures outlined in this report are implemented. Immediately prior to constructing the floor slabs, we recommend that the areas be proofrolled to 11 Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 13, 2013 detect any softened, loosened or disturbed areas that may have been exposed to wet weather or construction traffic. Areas that are found to be disturbed or indicate pumping and/or instability during the proofrolling should be undercut and replaced with adequately compacted structural fill or as directed by the Geotechnical Engineer. This proofrolling should be observed by a staff professional or a senior soils technician under his/her direction. Proofrolling procedures are outlined in the "Site Preparation" section of this report. We recommend that special care be given to providing adequate drainage away from the building and pavement areas to reduce infiltration of surface water into the base course and subgrade materials. If these materials are allowed to become saturated during the life of the slab or pavement section, strength reduction of the materials may result causing a reduced life of the section. 4.5 Cut and Fill Slopes Permanent project slopes should be designed at 3 horizontal to 1 vertical or flatter. The tops and bases of all slopes should be located a minimum of 10 feet from structural limits and a minimum of 5 feet from parking and drive areas. The till slopes should be adequately compacted, as outlined below, and all slopes should be seeded and maintained after construction. A one -month waiting period is recommended for areas where fill heights exceed 10-ft, to allow for settlement. 8 Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 13. 2013 5.0 CONSTRUCTION CONSIDERATIONS 5.1 Abandoned Utilities/Structures We recommend that all existing utility lines and foundations be removed or abandoned from within proposed building areas if present. The utility backfill and foundation material should be removed and the subgrade in the excavations should be evaluated by the Geotechnical Engineer prior to fill placement. The subgrade evaluation should consist of visual observations, probing with a steel rod and/or performing hand auger borings with Dynamic Cone Penetrometer tests to evaluate their suitability of receiving structural fill. Once the excavations are evaluated and approved, they should be backfilled with adequately compacted structural fill. 5.2 Site Preparation The entire building and parking areas should be stripped of all topsoil, organic laden soil, and other deleterious materials to a minimum of 10 feet outside the structural limits. Upon completion of the stripping operations, we 'recommend that areas to provide support for the foundations, floor slab, parking areas and structural fill areas be proofrolled with a loaded dump truck or similar pneumatic tired vehicle (minimum loaded weight of 20 tons) under the observations of a staff professional. After excavation of the site has been completed, the exposed subgrade in cut areas should also be proofrolled. The proofrolling procedures should consist of four complete passes of the exposed areas, with two of the passes being in a direction perpendicular to the proceeding ones. Any areas which deflect, rut or pump excessively during proofrolling or fail to "tighten up' after successive passes should be undercut to suitable soils and replaced with approved structural fill. Some undercut may be required, especially in the near surface soils exposed to the elements for more than six months. Undercutting of any unstable soils discovered during initial grading construction should be conducted as soon as possible. The extent of the undercut required should be determined in the field by the Geotechnical Engineer while monitoring construction activity. After the proofrolling operation has been completed and approved, final site grading should proceed immediately. If construction progresses during wet weather, the proofrolling operation should be repeated with at a Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 13, 2013 least one pass in each direction immediately prior to placing fill material. If unstable conditions are observed during this operation, then undercutting or scarifying and drying may be required 5.3 Excavation Characteristics Based on the results of our soil test borings, it appears that the general shallow excavation will be possible with conventional excavating equipment such as pans, backhoes, bulldozers, and front end loaders. Depending on the location, excavations deeper than approximately 3 feet may require specialized equipment and procedures. Partially Weathered Rock was encountered in three (3) of the borings (Boring Nos. B-6 through B-8) at depths ranging from approximately 3 to 8 feet below existing ground surface. Auger refusal conditions were encountered in boring B-8 at a depth of approximately 8.6 feet below existing ground surface. However, the depth and thickness of partially weathered rock, boulders, and rock lenses or seams, can vary dramatically in short distances and between the boring locations; therefore, soft/hard weathered rock, boulders or bedrock may be encountered during construction at locations or depths not encountered during this exploration. A rock excavation specification can be provided by SUMMIT upon request. 5.4 Temporary Excavation Stability Localized areas of soft or unsuitable soils not detected by our borings, or in unexplored areas, such as in the existing buildings on site, may be encountered once grading operations begin. Vertical cuts in these soils may be unstable and may present a significant hazard because they can fail without warning. Therefore, temporary construction slopes greater than 5 feet high should not be steeper than one horizontal to one vertical (11-1:1 V), and excavated material, construction equipment and materials, should not be placed within 10 feet of the crest of any excavated slope. In addition, runoff water should be diverted away from the crest of the excavated slopes to reduce the potential for erosion and sloughing. For deep excavations, shoring and bracing or flattening (laying back) of the slopes may be required to obtain a safe working environment. Excavation should be sloped or shored in Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 13. 2013 accordance with local, state and federal regulations, including OSHA (29 CFR Part 1926) excavation trench safety standards 5.5 Structural Fill The soils to be used as structural fill placed within structural areas should be free of organics, roots or other deleterious materials. Compacted structural fill should consist of lower plasticity (13I<30) material classified as ML, SC. SM, SP, SW, GC, GM, GP, or GW per ASTM D-2487, or as approved by the Geotechnical Engineer. Off -site borrow soil should also meet these same classification requirements. We expect that the majority of non -organic, non -high -plastic soils encountered on -site are expected to meet this criterion. However, successful reuse of the excavated, on -site soils as compacted structural fill will depend on the moisture content of the soils encountered during excavation. We anticipate that scarifying and drying of portions of the on -site soils may be required before the recommended compaction can be achieved. Drying of these soils may result in some delay. All structural fill soils should be placed in thin (8-inch) loose lifts and compacted to a minimum of 95 percent of the soil's Standard Proctor maximum dry density (ASTM D698) within +/- 3 percent of optimum moisture content. The upper I foot of structural fill within the parking and drive and slab areas should be compacted to a minimum of 98 percent of the same standard as above. Some manipulation of the moisture content (such as wetting, drying) may be required during the filling operation to obtain the required degree of compaction. The manipulation of the moisture content is highly dependent on weather conditions and site drainage conditions. Therefore, the grading contractor should be prepared to both dry and wet the fill materials to obtain the specified compaction during grading. Sufficient density tests should be performed to confirm the required compaction of the fill material. The frequency and locations should be determined by the Geotechnical Engineer. 5.6 Engineering Services During Construction The engineering recommendations provided in this report are based on the information obtained from the subsurface exploration. However, unlike other engineering materials like steel and concrete, the extent and properties of geologic materials (soil) may vary significantly. Regardless 11 Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 13, 2013 of the thoroughness of a geotechnical engineering exploration, there is always a possibility that conditions between borings will be different from those at the boring locations, that conditions are not as anticipated by the designers, or that the construction process has altered the subsurface conditions. This report does not reflect variations that may occur between the boring locations. Therefore, conditions on the site may vary between the discrete locations observed at the time of our subsurface exploration. The nature and extent of variations between the borings may not become evident until during construction. To account for this variability, professional observation, testing, and monitoring of subsurface conditions during construction should be provided as an extension of our engineering services. These services will help in evaluating the Contractor's conformance with the plans and specifications. Because of our unique position to understand the intent of the geotechnical engineering recommendations, retaining SUMMIT for these services will also allow us to provide consistent service through the project construction. Geotechnical engineering construction observations should be performed under the supervision of a Geotechnical Engineer from our office who is familiar with the intent of the recommendations presented herein. This observation is recommended to evaluate whether the conditions anticipated in the design actually exist or whether the recommendations presented herein should be modified where necessary. Observation and testing of compacted structural fill and backfill should also be provided by our firm. 12 Report of Preliminary Subsurface Exploration SUMMIT Project No. 109-13 Bell's Property Site (Proposed Barrington Subdivision) May 13, 2013 6.0 QUALIFICATIONS OF REPORT The analyses and recommendations submitted in this report were based, in part, on data obtained from the subsurface exploration. If the above -described project conditions are incorrect or changed after the issuing of this report, or subsurface conditions encountered during construction are different from those reported, SUMMIT should be notified and these recommendations should be re-evaluated based on the changed conditions to make appropriate revisions. We have prepared this report according to generally accepted geotechnical engineering practices. No warranty, express or implied, is made as to the professional advice included in this report. 13 F SUMMIT ENGINEERING • LABORATORY• SURVEYING APPENDIX 1 i—F 33 32 34 31 ` \_ 35i LIE \ (IEE �24''� 42- \ \ \� % 47 48 1 49 \ \ \ 37 \8 V 39\\T 50 5i 52 Figure 2 Bell's Property Boring Location Plan Barrington Subdivision Approx. Soil Test Boring Location i�/��i�/�� I Waxhaw, North Carolina SCALE: NTS S U • a ■ • • ■ T SUMMIT Project No.: 109-13 v � p N D. Neale Lary.. SITE LOCATION - ,pchRd- __ �_ -Bonds Grove Chinch Rd Uo+a Bonds Grove Untied Methodist I& ,. All American . `\\ apwrua Preachool • DecormweCf of Chadoae _ r y( i( Bf bin Ddv, , g.. Clrtters SMf^6 �Re � �- aD i� , Rnad ggggp Cvf I� Pmca ValiantD ' Figure 1 Bell's Property Site Location Map b Barrington Subdivision ' Waxhaw, North Carolina SUMMIT Scale: NTS Project: 109-13 ENGINEERING' LABORATORY- SURVEYING SUMMIT ENGINEERING • LABORATORY• SURVEYING APPENDIX 2 Project: Bell's Property (Barrington Subdivision) Key to Log of Boring Project Location: Waxhaw, North Carolina Sheet 1 of 1 Project Number: 109-13 C 0 y w L n oo E in Y O 6 N E 3 to n O J L 0 MATERIAL DESCRIPTION a y °' 3 m w m > U REMARKS AND OTHER TESTS 1L2J L3i4 Lti 6 7 8 9 COLUMN DESCRIPTIONS Elevation (feet): Elevation (MSL, feet). © MATERIAL DESCRIPTION: Description of material encountered. 2 Depth (feet): Depth in feet below the ground surface. May include consistency, moisture, color, and other descriptive LIJ Sample Type: Type of soil sample collected at the depth interval text. shown. 7 Water Level: The approx. groundwater level from top of bore hole Q Sampling Resistance, blows/ft: Number of blows to advance driven 8 Cave-in Depth (feet): Collapse of boring at depth interval shown sampler one foot (or distance shown) beyond seating interval 9 REMARKS AND OTHER TESTS: Comments and observations using the hammer identified on the boring log. regarding drilling or sampling made by driller or field personnel. 5Graphic Log: Graphic depiction of the subsurface material encountered. FIELD AND LABORATORY TEST ABBREVIATIONS CHEM: Chemical tests to assess corrosivity PI: Plasticity Index, percent COMP: Compaction lest SA: Sieve analysis (percent passing No. 200 Sieve) CONS: One-dimensional consolidation test UC: Unconfined compressive strength test, Qu, in ksf LL: Liquid Limit, percent WA: Wash sieve (percent passing No. 200 Sieve) MATERIAL GRAPHIC SYMBOLS • l Elastic SILT (MH) IIIIII �� � � Partially Weathered Rock 1 Sandy SILT (ML) Topsoil TYPICAL SAMPLER GRAPHIC SYMBOLS OTHER GRAPHIC SYMBOLS ' 2-inch-OD unlined split Shelby Tube (Thin -walled, —= Water level (at time of drilling, ATD) spoon (SPT) fixed head) —� Water level (after waiting) Minor change in material properties within a �• stratum — - Inferred/gradational contact between strata —'+- Queried contact between strata GENERAL NOTES r. Soil classifications are based on the Unified Soil Classification System. Descriptions and stratum lines are interpretive, and actual lithologic changes may be gradual. Field descriptions may have been modified to reflect results of lab tests. 2. Descriptions on these logs apply only at the specific boring locations and at the time the borings were advanced. They are not warranted to be representative of subsurface conditions at other locations or times. ALk Project: Bell's Property (Barrington Subdivision) Log of Boring B-1 Project Location: Waxhaw, North Carolina Sheet 1 of 1 Project Number: 109-13 Date(s) May 6-7, 2013 Drilled Logged By Charlie Killian Checked By Will Harrison, PE Drilling Hollow Stem Auger Method Drill Bit 6 inch soil bit Size/Type Total Depth 15 of Borehole Drill Rig CME 550 Drilling SUMMIT Approximate Type Contractor Surface Elevation Groundwater Level Not Encountered ATD and Date Measured Sampling SPT Method(s) Hammer 140 lb, 30 inch drop, auto trip Data Borehole Backfll Cuttings Location See Figure 2 in Appendix 1 c a� d a u, N o m t m C O w d Q C U d J 0 C > fi E E 3 "= > REMARKS AND w p rn rn a 0 MATERIAL DESCRIPTION 3 v OTHER TESTS 0 Topsoil RESIDUAL: Firm Moist Tan Orange Sandy SILT (ML) 7 Very Stiff Moist Tan Orange Sandy SILT (ML) 26 s 24 Hard Moist Tan Orange Sandy SILT (ML) 32 10 12.4 40 15 Boring Terminated at Approximately 15 Feet Below Project: Bell's Property (Barrington Subdivision) Log of Boring B-2 Project Location: Waxhaw, North Carolina Sheet 1 of 1 Project Number: 109-13 Date(s) May 6-7, 2013 Drilled Logged By Charlie Killian Checked By Will Harrison, PE Drilling Hollow Stem Auger Drill Bit 6 inch soil bit Total Depth 15 Method SizelType of Borehole Drill Rig CME 550 Drilling SUMMIT Approximate Type Contractor Surface Elevation Groundwater Level Not Encountered ATD and Date Measured Sampling SPT Method(s) Hammer 1401b, 30 inch drop, auto trip Data Borehole Cuttings BBorehole Location See Figure 2 in Appendix 1 c m m m v w N N N y p N L W C O w F d O c J U N J ❑ a > n E E 3 °' > REMARKSAND w o rn rn a 0 MATERIAL DESCRIPTION 3 U OTHER TESTS o Topsoil RESIDUAL: Stiff Moist Red Brown Sandy Elastic B SILT (MH) Stiff Moist Red Brown Sandy SILT (ML) 14 Stiff Moist Tan Orange Sandy SILT (ML) 14 5 Very Stiff Moist Tan Orange Sandy SILT (ML) 16 17 10 Very Stiff Very Moist Tan Brown Sandy SILT (ML) 13.5 16 5 Boring Terminated at Approximately 15 Feet Below A& Project: Bell's Property (Barrington Subdivision) Log of Boring B-3 Project Location: Waxhaw, North Carolina Sheet 1 of 1 Project Number: 109-13 Date(s) May 6-7, 2013 Drilled Logged By Charlie Killian Checked By Will Harrison, PE Drilling Hollow Stem Auger Drill Bit 6 inch soil bit Total Depth 15 Method Size/Type of Borehole Drill Rig CME 550 Drilling SUMMIT Approximate Type Contractor Surface Elevation Groundwater Level Not Encountered ATD and Date Measured Sampling SPT Method(s) Hammer 140 lb, 30 inch drop, auto trip Data Borehole Backfll Cuttings Location See Figure 2 in Appendix 1 g' c m N N m W w V1 -d 0 L 0 J 0 O y G 0. U J C > n E E 3 "' > REMARKS AND w cl w o a t7 MATERIAL DESCRIPTION 3 6 OTHER TESTS D Topsoil RESIDUAL. Stiff Moist Tan Orange Sandy SILT (ML) 10 Stiff Moist Tan Orange Sandy SILT (ML) B 5 11 12 10 12.2 10 15 Boring Terminated at Approximately 15 Feet Below Project: Bell's Property (Barrington Subdivision) Log of Boring B-4 Project Location: Waxhaw, North Carolina Sheet 1 of 1 Project Number: 109-13 Date(s) May 6-7, 2013 Drilled Logged By Charlie Killian Checked By Will Harrison, PE Drilling Hollow Stem Auger Drill Bit 6 inch soil bit Total Depth 15 Method Size/Type of Borehole Drill Rig CME 550 Drilling SUMMIT Approximate Type Contractor Surface Elevation Groundwater Level Not Encountered ATD and Date Measured Sampling SPT Method(s) Hammer 1401b, 30 inch drop, auto trip Data Borehole Cuttings Bad ckfill g Location See Figure 2 in A 9 Appendix 1 c � 41 w o w w c O H O J ry ❑ > a E E 3 m « > REMARKS AND w o rn rn a 0 MATERIAL DESCRIPTION 3 Q OTHER TESTS o Topsoil RESIDUAL: Firm Moist Red Brown Sandy Elastic SILT (MH) 7 Very Stiff Moist Tan Orange Sandy SILT (ML) 17 5 20 Stiff Moist Tan Orange Sandy SILT (ML) 14 10 — — — — — — — — — — — — — — — Very Stiff Moist Tan Orange Sandy SILT (ML) 12.6 1e 1s Boring Terminated at Approximately 15 Feet Below //6 Project: Bell's Property (Barrington Subdivision) Log of Boring B-5 Project Location: Waxhaw, North Carolina Sheet 1 of 1 Project Number: 109-13 Date(s) Drilled May 6-7, 2013 Logged By Charlie Killian Checked By Will Harrison, PE Drilling Hollow Stem Auger Drill Bit 6 inch soil bit Total Depth 15 Method Size/Type of Borehole Drill Rig CME 550 Drilling SUMMIT Approximate Type Contractor Surface Elevation Groundwater Level Not Encountered ATD and Date and Date Measured Sampling SPT Method(s) Hammer 140 lb, 30 inch drop, auto trip Data Borehole Cuttings Backril g Location See Figure 2 in A 9 Appendix 1 c ur w w O O O N 6 W c O w H y o ; J U m J O C y o. E E 3 °r i REMARKS AND w o to in a c� MATERIAL DESCRIPTION 3 OTHER TESTS o Topsoil RESIDUAL: Stiff Moist Red Brown Sandy Elastic SILT (MH) 12 Stiff Moist Tan Orange Sandy SILT (ML) 13 5 14 Very Stiff Moist Tan Orange Sandy SILT (ML) 16 10 11.7 Very Stiff Moist Tan Grey Sandy SILT (ML) 24 1s Boring Terminated at Approximately 15 Feet Below Project: Bell's Property (Barrington Subdivision) Log of Boring B-6 Project Location: Waxhaw, North Carolina Sheet 1 Of 1 Project Number: 109-13 Date(,) May 6-71 2013 Drilled Logged By Charlie Killian Checked By Will Harrison, PE Drilling Hollow Stem Auger Drill Bit 6 inch soil bit Total Depth 13.75 Method Size/Type of Borehole Drill Rig CME 550 Drilling SUMMIT Approximate Type Contractor Surface Elevation Groundwater Level Not Encountered ATD Sampling SPT Hammer 140 lb, 30 inch drop, auto trip and Date Measured Method(s) Data Borehole Cuttings Boreho Location See Figure 2 in Appendix 1 g' � � Vl m m v U N � � C ia W O J ❑ > a E E 3 ^' > REMARKS AND w o in rn a U MATERIAL DESCRIPTION tj OTHER TESTS D Topsoil RESIDUAL. Firm Moist Tan Orange Sandy SILT (ML) 8 Very Hard Moist Tan Olive Sandy SILT (ML) 52 s — — — — — — — — — — — — — — — Very Hard Moist Tan Orange Sandy SILT (ML) 83 �! Partially Weathered Rock (PWR) - when sampled i : becomes Tan Brown Sandy SILT with Rock 50/6" is Fragments 10 r: r: is is 1 : 50/3" Boring Terminated at Approximately 13.75 Feet Below Ground Surface 15 Project: Bell's Property (Barrington Subdivision) Log of Boring B-7 Project Location: Waxhaw, North Carolina Sheet 1 of 1 Project Number: 109-13 Date(s) May 6-7, 2013 Drilled Logged By Charlie Killian _ Checked By Will Harrison, PE Drilling Hollow Stem Auger Drill Bit 6 inch soil bit Total Depth 13.9 Method Size/Type of Borehole Drill Rig CME 550 Drilling SUMMIT Approximate Type Contractor Surface Elevation Groundwater Level Not Encountered ATD and Dale Measured Sampling SPT Method(s) Hammer 140lb, 30 inch drop, auto trip Data Borehole Baokfll Cuttings Location See Figure 2 in Appendix 1 c m ry yr N N o t v c O v H p a C J O y J 0 C > o. E E 3 °1 > REMARKS AND w O in rn a O MATERIAL DESCRIPTION U OTHER TESTS 0 Topsoil RESIDUAL. Very Stiff Moist Tan Olive Sandy SILT (ML) 23 — — — — — — — — — — — — — — — Hard Moist Tan Orange Sandy SILT (ML) 43 Very Hard Moist Tan Orange Sandy SILT (ML) 70 5 Partially Weathered Rock (PWR) - when sampled 50/6" 4 r- becomes Tan Brown Sandy SILT 50/6" i� is is 50/5.5" :l. 4 ii 10 �i I• ' ii I• 1 � 12.5 is 50/5" Boring Terminated at Approximately 13.9 Feet Below Ground Surface 15 ALk Project: Bell's Property (Barrington Subdivision) Log of Boring B-8 Project Location: Waxhaw, North Carolina Sheet 1 of 1 Project Number: 109-13 Date(s) May 6-71 2013 Drilled Logged By Charlie Killian Checked By Will Harrison, PE Drilling Hollow Stem Auger Drill Bit 6 inch soil bit Total Depth 6 6 Method Size/Type of Borehole Drill Rig GIVE 550 Drilling SUMMIT Approximate Type Contractor Surface Elevation Groundwater Level Not Encountered ATD Sampling SPT Hammer 140lb, 30 inch drop, auto trip and Date Measured Methods) Data Borehole Cuttings Backfill Location See Figure 2 in Appendix 1 c m m w d n N W c: o w L w O r rn J w O > n E E 3 @ > REMARKS AND w p in a r, MATERIAL DESCRIPTION rj OTHER TESTS o Topsoil RESIDUAL: Firm Wet Tan Orange Sandy SILT (ML) 6 �► Partially Weathered Rock (PWR) - when sampled t : becomes Tan Brown Sandy SILT 50/6" :! 5 P: 50/6" is 7.1 ii I• 50/1.5" I! Boring Terminated on Auger Refusal Conditions at Approximately 8.6 Feet Below Ground Surface 10 1s SUMMIT ENGINEERING • LABORATORY• SURVEYING APPENDIX 3 LIQUID AND PLASTIC LIMITS TEST REPORT 60 so 40 x w 0 z 30 U H N g a 20 10 0 0 10 20 30 40 60 60 70 80 90 100 110 LIQUID LIMIT MATERIAL DESCRIPTION LL PL PI %<#40 %<#200 USCS • Red -Brown Pat Clay 66 29 37 Project No. 109-13 Client: Shea Homes Remarks: Project: Bells Property Waxhaw, North Carolina • Location: B-4 @ I'-2.5' Summit Engineering Ft. Mill, South Carolina Figure Dashed line indicates the app/soils / / upper limit boundary for natu / / Tested By: Mimi Hourani � t� I - r n � J •�Y �^ ttl �•��, e� A . ♦ Go(Vglr e rcn