Loading...
HomeMy WebLinkAboutSW3140201_COMPLIANCE_20150813STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 3��o�l% DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYM M D D F-A MC®ENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Landtec Development Inc. Attention: Mr. Kelvin F Graham 2711 Crane Road Waxhaw, North Carolina 28173 11110- MIKI �liFTii4 Donald R. van der Vaart Secretary August13, 2015 Subject: Compliance Evaluation Inspection Rosecliff Subdivision Stormwater Permit SW3140201 Union County, NC Enclosed is a copy of the Compliance Evaluation Inspection (CEI) report for the inspection conducted on August 11, 2015 by Mr. Samar Bou-Ghazale of this Office. The report should be self-explanatory; however, should you have any questions concerning the report, please do not hesitate to contact Mr. Bou-Ghazale at (704) 663-1699 Ext.2199. Sincerely, Zahid S. Khan, CP , CM PESC, CPSWQ Land Quality Regional Supervisor Attachment Division of Energy, Mineral, and Land Resources Land Quality Section - Mooresville Regional Office 610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115 Telephone: 704-663-1699 / FAX: 704-663-6040 a Internet: http://portal.ncdenr.org/web/Ir/land-quality An Equal opportunity / Affirmative Action Employer— 50% Recycled / 10% Past Consumer Paper Compliance Inspection Report Permit: SW3140201 Effective: 02/18/14 Expiration: 02/17/22 Project: Rosecliff Subdivision Owner: Landtec Development Inc County: Union Region: Mooresville Contact Person: Melvin F Graham Directions to Project: Type of Project: Stale Stormwaler - HD - Other Drain Areas: On -Site Representative(s): Related Permits: Inspection Date: 08/1112013 Primary Inspector: Samar E Bou Ghazale Secondary Inspector(s): Adress: 2711 Crane, Rd City/State/Zip: Waxhaw NC 28173 Title: Phone: 704-552-5338 EntryTime: 03:55PM Reason for Inspection: Routine Permit Inspection Type: State Stormwaler Facility Status: EM Compliant ❑ Not Compliant Question Areas: ED State Stonnwater (See attachment summary) Exit Time: 04:15PM Phone: 704-663-1699 Ext2199 Inspection Type: Compliance Evaluation page: 1 Permit: SW3140201 Owner - Project: Lanotec Development Inc Inspection Date: 08/11/2013 - Inspection Type compliance Evaluation Reason for Visit: Routine Inspection Summary: Wetponds 1 and 2 are still being used as basins for erosion and sedimentation control measures. Site is not ready at this time for these basins to be usde as stormwater ponds. Also, please note that an Ownership Change Form is to be submitted within 30 days in rase of ownership change. page: 2