Loading...
HomeMy WebLinkAboutSW1080102_APPROVED PLANS_20080312STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW IDI�OID DOC TYPE ❑ CURRENT PERMIT �P APPROVED PLANS (❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD m Property Notes: Deed reference: Fowler - DB 820, PG 338. Tax #: 7572-40-2923 The 0.64 acre tract and the 1.53 acre tract are existing parcels of land. The 1.53 acre tract will be the future bank site and the 0.64 acre tract will be an outparcel. Project Data I Information United Community Bank (Cashiers) Commercial Project Total Acreage of Project 2.17 Acres Acreage of Bank Site - 1.53 Acres Acreage of Out Parcel - 0.64 Acres Wetlands: NONE The project is located in : TOWN OF CASHIERS CASHIERS TOWNSHIP JACKSON COUNTY, NORTH CAROLINA Project Calculations Gross Floor Area of Bank Building (1 story) - Approx 4,879 s.f. Parking Provided - 31 Spaces + 2 Handicap Number Parking Spaces Required - 17 Number Handicap Parking Spaces - 2 Spaces Total Onsite Built Upon Area - 30,658 s.f. Total Vehicular Use Area - 25,779 s.f. Total Impervious Surface (Bank Site) - 46% Total Impervious Surface (all) - 32% IMPERVIOUS SURFACE Engineering Certification: The Storm Water Management Plan design was completed by Jeremy D. Cadeau, P.E.. The Storm Water Management plan and details incorporate survey information, site layout, grading, landscaping plan and erosion control design by others. I Jeremy D. Cadeau, P.E. assure that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. Entity Responsible for the Inspection and Maintenance of storm water management systems: United Community Bank P.O. Box 979 Brevard, North Carolina 28712 p0(�2 L = 33 4 = z OVERALL SITE PLAN 0' 20' 40' 80' 120' 1 � SCALE : 1 "=20'-0" LEGEND Description Symbol DOWNSPOUT PIPE 1 CULVERT ............. PARKING LOT POLE LIGHT O LANDSCAPE TREE UP LIGHT - STORMWATER CATCH BASIN DRAINAGE SWALE 12 RIGHT TURN IN ONLY 5IGNAGE IGHT TURN 4T ONLY BEFORE YOU DIG ! CALL 1—800-632-4949 N.C. ONE —CALL CENTER IT'S THE LAW ! N 0 o N 0. m 0 0 U a p a U .c p �'. v u c V h 4 e � c a W z w� N_ 00 00 N +; z s~ �D x °z o U b w > z z d Aa C C CrJ W a 0 � U � Q w a a� E a� ao a � a� Cd E 0 4- ^d N t�U Q 0 � 0 0 N O M I c0 p 7 5 r m w ch Q m Q 0 o z z > o a > V) ¢ a CQ a Q Q Project Number: SHEET NUMBER: Cl Copyright © 2007, Creative Development Solutions, PA NOTE: 1) ALL SOILS ASSOCIATED WITH THE CONSTRUCTION OF DETENTION PONDS SHALL BE CERTIFIED BY A GEOTECHNICAL ENGINEER. COMPACTION TESTING MUST BE PERFORMED AND SOILS WITH MINIMAL SEEPAGE RATES MUST BE USED. (IE: CLAY LINER) 2) OWNER IS TO HIRE LANDSCAPE PROFESSIONAL TO CREATE LANDSCAPE LESS THAN 10' HT. = V TOP WIDTH PLAN FOR PONDS IDENTIFIED WITH PROJECT. LANDSCAPE PROFESSIONAL 10' TO 15' HT. = 10' TOP WIDTH SHALL DETERMINE PLANT SPECIES SUITABLE FOR SOIL, CLIMATE AND HYDRAULIC CONDITIONS. VEGETATIVE COVER WITH SLOPE STABILIZATION EMERGENCY SPILLWAY LANDLOK S2 (IN UNDISTURBED SOIL SPRAY BRIGHT ORANGE PAINT AT LIP OF CONCRETE LINER TO IDENTIFY TYPE 2 BASIN /� CREMIENTSANDUPPER OR CUT SECTION) MAINTENANCE LEVEL IN POREBAYB. OUTLET STRUCTURE RIP RAP REINFORCE SLOPE ABOVE PERMANENT CONC. LINER °y L FREEBOARD T-MIN. z FOREBAYS 10 1 g a OVERFLOwELEVATINELEv.T9o.9 —III—III i— —III—III—III—IIIkil 5 MAX EMBANKMENT STABILIZED V, 1 TEMPORARYPOOL 1, 1 �I=I I�— — —� —� —� �=.III=IWITH VEGETATION x z 2 MAINTAIN SEDIMENT ATEOSgELP III —III —III ISELECTED,FILLI,PLACED INI.-1 I I1L PERMANENT POOL ELEV-99.3' UJ_—III—III—III— LAYERS AND OMPACTED _III—I3 _=III=III—III—I I I —I I I —I I I —I I —I I —I I I —I I I —I II —I I I=I 11=I I =III I 1.I=III— Ui 8° Conc, Liner 1%SLOPE MIN. SEE PLAN FOR PIPE SIZING BASED ON Si NO i /\\/\\/\\/\\/\\/\\\\/\\/\\ /\\j\\/\\/\\/\\/\\/\\ \ \ /\\/ \/\\/\ LINER IS REQUIRED \//\/\/\/\/ /\/\/\/\ \/\/\/\/\/\/\/\ 2 /\ \/\/\ \/\/ Construction Sequence FOR THE WET POND 1 The Owner prior to construction on the site must obtain all of the necessary land disturbin \\i\\\/ \\\ \\\ \ 4'x4' ANTI -SEEP P �'Y g .. /�//i \ \/. permits and storm water permits and the Contractor shall verify this prior to denuding the land. CONCRETE ANTI- COLLAR 2) All temporary erosion control measures including silt fences, diversions and mud mats must FLOATATION COLLAR CUTOFF , 2' 10' O.C. STABILIZED be installed prior to construction activities on the site. TRENCH PRINCIPAL OUTLET 3) The temporary sediment traps are located in the vicinity of the permanent storm water EXTEND DOWN SPILLWAY BARREL features and these traps must be cleaned and graded according to the storm management plan \ TO SOIL TIGHT LAYER 1:1 and ground cover must be established as soon as possible after the rest of the site is stabilized. \\\_ 4) Due to the location of the storm water management features they must be installed prior to HOPE PIPE WITH WT JOINTS the final stabilization of the site. Therefore the contractor should take care to divert runoff away from storm water systems until the entire site has been stabilized and the storm management system is ready for operation. WET -T- POND O^ D DETAILS 5) The Contractor is to make sure storm management systems are clean and operating v v correctly before demobilizing from site. PLAN ^ 4'-0" I #6" T-0" VARIABLE "v w co U r a Qco Q > _ � j SIDE 6" FOR CONCRETE # { 8" FOR BRICK ^ 4'-0" FOR CONCRETE (MIN.) { 4'-4" FOR BRICK (MIN.) LO IT T 6° 2.10„ 6" SIDE w 34 FRONT NOTE: FOR CONSTRUCTION OF CATCH BASIN, EITHER BRICK MASONRY SOLID MH COVER OR CLASS "A" CONCRETE MAY BE USED. IN CASE OF CONCRETE, THE 2 3/8 WALLS AND FLOOR ARE TO BE 6" THICK AS SHOWN FOR BRICK, THE WALLS ARE TO BE 8" THICK AND THE FLOOR 6" THICK. NOTE: FOR DEPTH OVER 10' BRICK T-10" WALLS TO BE 12" AND FLOORS TO BE 8" THICK. FOR CONCRETE, WALLS TO BE 8" THICK AND PLAN VIEW OF COVER FLOORS TO BE 8" THICK. NOTE: FOR PIPES LARGER THAN 24" BOX DIMENSIONS MUST BE INCREASED. PER PRECAST MANUFACTURERS SPECIFICATIONS CATCH BASIN — TYPE 2 STEPS ARE REQUIRED IN ALL BASINS Wet Pond Dimensions Basin Elevations Basin bottom elevation 95.00 ft Sediment cleanoutelevation 9 07 0 ft Bottom of shelf elevation 98.80 ft Permanent pool elevation 99 0303 ft Top of shelf elevation 1 000 0 it Temporary pool elevation 100.30 ft Volume and Surface Area Calculations SAIDA ratio 2.06 (unitiess) Surface area at the bottom of shelf 1275.00 f? Volume at the bottom of shelf 28 000 0 ft3 Permanent pool, surface area required 1,355ft2 Permanent pool, surface area provided 1,397 ftz Permanent pool volume 4197 ft3 Average depth for SAIDA tables 3.00429 ft Surface area at the top of shelf 3700 fe Volume at the top of shelf 9000 ft3 Forebay volume 830 ft3 Forebay % of permanent pool volume 20 Temporary pool, surface area provided 3,782 fe ^ 4,_0„ #6" T-l0" #6t 1 FRONT ISOMETRIC VIEW ^ ^ ^w^^ A Pt 2`1 114" 3/4" 1'-11 3/4' h � I 4 318' 2'-0 12" 2'-9 i14" SECTION A -A MANHOLE RING NOTE: TRAFFIC BEARING RING AND COVER. MINIMUM WEIGHT 315 POUNDS HALF PLAN OF MANHOLE RING & COVER SECTION A -A MANHOLE COVER VANHOLE RING 8c COVER NOTE: FREE STANDING STRUCTURES OVER 4' TALL SHALL BE CONSTRUCTED AND POURED MONOLITHICALLY OR THE RISER SECTIONS MUST BE SECURELY CONNECTED TO BASE STRUCTURE. TYPE 2 STRUCTURE WITH SOLID FRAME AND GRATE 4X4 CONCRETE BOX ELEV. 101'63' ' ELEV -101' ELEV 100 / IMPERVIOUS / CLAY LINER TEMPORARY POOL 63 / ELEV-100.3' 4" / STAINLESS STEEL / PIPE STRAP TO ANCHOR / 8"HDPE PIPE PVC TO BASIN / 4" SCH 40 PVC / TEE AND FITTINGS / PERMANENT POOL / ELEV-99.3' 'ELEV-99,0' 4" SCH 40 PVC / ' POUR BASE WITH CONCRETE UP TO GLUE GAP AND DRILL /� INVERT. MAKE INVERT FLUSH AT 1" HOLE /° a ELEV. 98.5' °a STRUCTURE BOTTOM ELEV - 97' / IMPERVIOUS POND BOTTOM ELEV - 95' 7� CLAY LINER SUMP IN LOCATION AROUND PIPE —' INLET PROVIDED FOR MAINTENANCE AND REMOVAL OF SEDIMENT OJTLET CONTROL STRUC TJRE #1 See Site Flan for Channel slope 3dc A P�pe Out at to Flat Area W th A 011 Riprap D50 = 15" Dmax: 18" 3, T = 24" � L a� Permanent Riprap Channel Riprap Channe Notes: 1. Line subgrade with Vl,ofi 50OX T geotextile `abrlc prior to placing riprap. Section A —A 2 Channel shall be lined wb° NCDOT ZIILer Blan�et Clcss 1 riprap unless othe,w se noted. 6o7. Iron Woven 3 Provide -iprop li^ed chcnnels whe,e :nd�cated on olons Pipe O.Itlet to Weli 3e4'ned Channel NnFoc STORM WATER MANAGEMENT SYSTEM #1 WET POND Engineering Certification: The Storm Water Management Plan design was completed by Jeremy D. Cadeau, P.E.. The Storm Water Management plan and details incorporate survey information, site layout, grading, landscaping plan and erosion control design by others. I Jeremy D. Cadeau, P.E. assure that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. Entity Responsible for the Inspection and Maintenance of storm water management systems: United Community Bank P.O. Box 979 Brevard, North Carolina 28712 �oQ� Nyo A - S 3 48 ; v RN oFry FCPv, a 3_I _o o Forebays Maintenance 4C from drive thru Forebaye are primary areas for / sediment capture. These areas shall be used as Temporary Sediment traps. Once site has been stabilized the / contractor le to remove sediment from the trap and erosior control features (� must be repaired before operation as / a storm water BMP begins. When converting temporary system to / permanent storm water system a min. of &'I of bottom material must be removed prior to conversion. / rn 18' pipe rip rap outlet protect:o f Entrance w'dth ("3do") = 4S' Erd width ("w') = 145' Length ("la') = Per Plan / dmox rip -rap = 05' Cclass 'b') t- apron thickness = 0,75' Pipe IIF_III / CD 0' of 18" SWCP Outlet Elev - 89.50' / Curb Inlet Structure 'J' Rim Elev. 105 / Inv. In Elev. g9.0 Inv. Out Elev. 9g.8 / Contractor to set / large boulders In place to elongate water flow path towards outlet. / Temporary Fool / Elev. 100.3 Temporary Sediment Area. / Once site has been stabilized the / contractor is to remove sediment from a the trap and erosion control features must be repaired, and the vegetated / shelf must be restored before operation as a storm water BMP / begins. When converting temporary system to permanent storm water system a min, of (all of bottom material must / be removed prior to conversion. Permanent Pool / Elev. g9.3 / I Outlet Control Structure 01 RIm Elev, 101.63' See Deta i Is / Based on SNWT, no liner is reoluired for the Wet Pond 10 Emergency Overflow. Provide rip rap protection Drainage Easement along road ROW's / - - - - - -- �E Contractor to utilize clay to create . E. hardened earthen dam along outer face of 1 A licensed Cxeotechnical Ergineer shall certify the compaction of the pond and the material in this location. The report shall be submitted _" to CDS. 0' 10' 20' 40' 60' OASCALE: 1 "=10'-011Cf 19" pipe ric rap outlet protection Entrance width "'3do') = 4 5' End width ("w') _ength ("la') = Per Plan drlax rlp-rap = 05' (class "b') t= apron thickness = 075' Pipe E-2 12' of 18" SWCF Outlet Elev - 100' �W Ija V-0 1• no _ amPI =E E am 55, or on 12 wcf- MIN Curb Inlet Structure "E" / Rim Elev. Inv. In Eiev. 10 100.50 Irv. Out Elev. 100.50 11S Inlet Structure 'E-1' Rim Elev, 106.4 Inv. In Elev. 103.5 Inv. Out Elev, 1035 Drainage Easement \ In order to establish plant species below �\ permanent pool elevation the water ; table may need to be owered. I Ili Drainage Easement �U 0 ■■■■■ ■ ■ Curb Inl J ro Rim In E � I ut I I CULVERT - 98.6 I�2 _ ■■■ ■■"■■■■■,, ■--- 30' Ve etative 18' pipe rip rap outlet protection g Entrance width ("8da") = 4 t' Curb Inlet Structure 'I' Filter Strip. Do not Dayllght pipe End wdth ('w) = 145' Rim Elev. 102.0 BEFORE YOU DIG ! install until site is Elev. 98.9' Provide Rlp _ength C'.a) 0' nv. In Eiev. 100,3 stabilllzed and Rap outlet protection an drrax rip -rap - 0.5' (cuss "b') out Elev. 100.3 CALL 1-800-632-4949 construction of line channel to slow flow t= apron t'n'Ic'-mess = 075' nv, N.C. ONE -CALL CENTERwet pond has From upstream culvert started. T n N 00 00 N z �- O °z U ,ti Q > W > r. z U U s ��" O O� U v Q h cd a N in cd .CI' U1 N c� O 0 N o N 00 o N T P c w d Z 0 o W W Q 2 w z z O Cn Z Q 0 4 Project Number: SHEET NUMBER: C2 Copyright © 2007, Creative Development Solutions, PA it