Loading...
HomeMy WebLinkAbout20211107 Ver 1_401 Request Attachment_20211008 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION ENVIRONMENTAL UNIT PO BOX 1150 FAYETTEVILLE, NC 28302 Telephone: (910) 364-0603 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: 421 TRANSPORTATION DRIVE FAYETTEVILLE, NC 28301 October 7, 2021 U.S. Army Corps of Engineers Wilmington Regulatory Field Office ATTN: Liz Hair 69 Darlington Avenue Wilmington, NC 28403 SUBJECT: Application for a Section 404 Individual Permit and Section 401 Water Quality Certification for the widening of I-95 to eight lanes from US 301 (Exit 22) to south of the proposed I-295 interchange, in Robeson County, STIP No. I-5987. WBS 47533.1.1 Ms. Hair, The North Carolina Department of Transportation (NCDOT) proposes to widen existing I-95 to an eight-lane median divided facility on existing location from US 301 (Exit 22) to south of the proposed I-295 interchange in Robeson County, North Carolina (STIP I-5987). The project is approximately 16.06 miles in length. The I-5987 project includes a total of four sections, I-5987A, AA, B and C. Section I-5987AA will construct a weigh-in motion station along I-95. The widening of I-95 from mile marker 36.7 – 40 (I-5987C) is currently in construction under STIP U-2519AA/AB (Fayetteville Outer Loop). The widening of I-95 from mile marker 20-21 will be constructed under STIP I-6064. All sections are included in the I-5987 environmental document prepared for the project. This is a permit application for sections I-5987A and I-5987B only, depicted on the Project Vicinity Map (Attachment A). The purpose of this letter is to request approval for a Section 404 Individual Permit and a Section 401 Water Quality Certification. In addition to this cover letter, the application package includes the following: Project Vicinity Map, ENG Form 4345, a State Stormwater Management Plan (SMP), permit drawings, roadway plans, utility drawings, Division of Mitigation Services (DMS) mitigation acceptance letter, minutes from the 30% Hydraulic Design Review Meeting and the Permit Drawings Review Meeting. 1.0 Purpose and Need Improvements to this portion of I-95, included in the I-5987A and I-5987B sections, will help relieve congestion, improve mobility, and improve the resiliency of this corridor to storm events, such that it can continue to serve as a primary East Coast route through the project design year of 2040. Improvements will be required to accommodate projected future traffic volumes and ensure the highway operates at an acceptable level of traffic service, particularly during the peak hour. Traffic volumes along the I-95 corridor are expected to increase considerably by 2040, creating conditions in which operations degrade and average speeds are below the posted speed limit. Currently, the number of vehicles using the section of I-95 between Exit 20 in Robeson County and Exit 40 in Cumberland County ranges between 56,500 vehicles per day (vpd) to 62,800 vpd. The current Level of Service (LOS) is C or better throughout the corridor. Future traffic volumes (2040 No Build) are expected to range between 88,200 vpd to 96,800 vpd between Exit 20 and future I-295 (Fayetteville Outer Loop). Without improvements, operations along I-95 within the project limits are anticipated to degrade significantly by year 2040. This includes much of the I-95 corridor within the I-5987 project limits operating between LOS C and LOS D between 6:00 a.m. and 8:00 p.m. There are several segments anticipated to operate at LOS E for two hours each day. Widening I-95 to eight lanes as well as interchange reconstruction are proposed to provide the additional Page 2 capacity needed to help relieve congestion and have the corridor within the project area operate at LOS B between 6:00 a.m. and 8:00 p.m. In addition to improving traffic conditions, sections of I-95 within the project limits have experienced significant storm related flooding resulting in total closure of the interstate for multiple days. Roadway and bridge improvements are needed to make the corridor more resilient to future flood events. 2.0 Alternatives Considered The following alternatives to the proposed widening were also considered: • No-Build Alternative • Alternate Modes of Transportation Alternative • Transportation System Management Alternative The No-Build Alternative does not propose any changes to I-95 within the study area aside from projects that are currently under construction or programmed in the 2020-2029 State Transportation Improvement Program. The No-Build Alternative would neither increase the traffic carrying capacity of I-95 within the entire study area nor modernize infrastructure on a large enough scale needed to maintain the integrity of the corridor so that it can continue to serve as a primary East Coast transportation route through the project design year of 2040. Since the No-Build Alternative does not fulfill the primary purposes of the project or address the area transportation needs, it is not recommended. The Alternate Modes of Transportation Alternative would include increasing ridership and freight on mass transportation modes like buses, railroads, and airplanes to reduce the number of vehicles that would use I-95 daily. While this option could reduce congestion on I-95, it would not provide nearly the same level of congestion reduction as the recommended alternative. As well, the Alternate Modes of Transportation Alternative would not modernize the infrastructure needed to support the remaining buses, trucks, and automobiles that would still use I-95. Since the Alternate Modes of Transportation Alternative does not fulfill the primary purposes of the project or address the area transportation needs, it is not recommended. The Transportation System Management (TSM) Alternative includes operational or physical improvements to increase available capacity of a roadway within the existing right-of-way with minimum capital expenditures and without reconstructing or adding additional through lanes to the existing road. Operational changes are largely administrative in nature while physical improvements are typically more capital intensive. Examples of operational changes include traffic law enforcement, speed restrictions, and access control. Physical improvements would include striping, signing, and minor realignments. TSM improvements are best suited for areas with capacity or safety deficiencies in specific locations. The capacity issues and antiquated infrastructure are widespread through the project area and require more intensive solutions than those provided by TSM. For these reasons the Transportation System Management Alternative would not satisfy the project purpose or fulfill the transportation need and is not recommended. Additionally widening to 6 lanes versus 8 lanes was discussed for the project. During planning for the I-5987 project, funding became available for the I-6064, completing the long-range vision for widening I-95 to the south. As traffic volumes are higher on the I-6064 portion, NCDOT wanted to consider an 8-lane cross section for I-95 in the I-5987 study area to avoid potential traffic bottlenecks in Fayetteville and eventually in Lumberton. Due to traffic volumes it was also important keep two lanes open during construction. Adding two lanes in each direction, versus one, allows two lanes of through traffic in each direction during construction and results in less temporary pavement when constructing the project. It was determined that widening this portion of I-95 to 8 lanes was the best option. Additionally, widening to the median throughout most of the project resulted in less impacts by keeping the proposed project footpring narrow to avoid a large number of relocations due to numerous parallel service roads beside I-95. There are some places where the proposed project was widened to the median and to the outside as well. As we knew widening exclusively to the outside would incur more impacts, which were not preferred, a strict calculation for widening to the outside was not prepared. The proposed design is the least impactful and best fit for the project. Page 3 3.0 Project Description The NCDOT is proposing to widen an approximate 16.06-mile portion of existing Interstate 95, comprising of I-5987A and I- 5987B, to an eight-lane median-divided facility on existing location through Robeson County (Attachment A). Section I- 5987A begins just south of Exit 22 between Nelson Way and Liberty Hill Road, where it ties into NCDOT STIP Project I- 6064. Section I-5987A ends where I-5987B begins, just north of Mcduffie Crossing Road (S.R. 1758), and extends to just north of Parkton Tobemory Road (S.R. 1723) where it ties into NCDOT STIP Project U-2519, the Fayetteville Outer Loop. The proposed project is listed in the approved 2020-2029 State Transportation Improvement Program (STIP) as Project Number I-5987A and I-5987B, both of which are federally-funded. 4.0 Summary of Impacts Waters of the U.S.: Based upon Final Permit Drawings for the proposed impacts to jurisdictional areas for the I-5987A and I-5987B sections, there will be 14.144 acres of permanent wetland impacts, 2,099 linear feet (lf) of permanent stream impacts, and 0.26 acres of hand clearing in wetlands for Section I-5987B due to utilities. Table 1. Summary of Water Resources Impacted Section Proposed Let Total # of Wetlands Impacted** Total # of Streams Impacted** Buffer Rule Impacts I-5987A 7/19/22 7 6 NO I-5987B 7/19/22 9 9 NO Totals 16 15 ** Features may be impacted at more than one Permit Site Table 2. Summary of Wetland Impacts Section Total Wetland Impact Area (ac) Impacts Requiring Mitigation (ac) I-5987A 5.500 5.500 I-5987B 8.644 8.644 Totals 14.144 14.144 Table 3. Summary of Stream Impacts Section Total Stream Impact Area (lf) Impacts Requiring Mitigation (lf)** I-5987A 986 620 I-5987B 1,113 1,043 Totals 2,099 1,663 ** Mitigation determination requirements are detailed below for each section. 5.0 Summary of Mitigation NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent possible. The proposed construction of I-5987 will result in unavoidable impacts to 14.144 acres of wetlands (0.291 acres of non-riparian wetlands; 13.853 acres of riparian wetlands) and 1,663 linear feet of jurisdictional stream (1,462 linear feet of perennial stream and 201 linear feet of intermittent stream) that will require mitigation. The Department has acquired the compensatory mitigation for these unavoidable impacts from the North Carolina Department of Environmental Quality (NCDEQ) Division of Mitigation Services (DMS). 6.0 Project Schedule I-5987A and I-5987B will be under construction concurrently; a total of 16.06 miles. The sections of the I-5987 project along with approximate section limits or description, length and proposed construction letting are summarized in Table 4. Should any changes arise resulting in impact changes for the project a permit modification request will be submitted. Page 4 Table 4. I-5987 Project Sections Section Approximate Section Limits/Description Approximate Length (mi) Construction Letting I-5987A South of US 301 (Exit 22) to south of NC 20 (Exit 31) 8.106 July 19, 2022 I-5987B South of NC 20 (Exit 31) to south of proposed I-295 interchange 7.956 July 19, 2022 7.0 NEPA Status NCDOT approved the Categorical Exclusion (CE) Type III for STIP I-5987 on November 14, 2019, covering all project sections, including portions now part of U-2519. A CE was approved for STIP I-6064 on December 29, 2020. NCDOT has conducted a Public Meeting also listed in Table 5. NCDOT has held a 30% Hydraulic Design Review Meeting, and a Permit Drawing Review Meetin on July 13, 2021 also listed in Table 5. Table 5. Milestone Dates Section CE Signed Public Meeting Dates Hydraulic Design Review Permit Drawings Review I-5987A & B STIP I-5987 Type III November 14, 2019 July 22 & 23, 2019 30% - 4/6/2021 7/13/2021 8.0 Logical Termini and Independent Utility The subject project is in compliance with 23 CFR Part 771.111(f) which lists the Federal Highway Administration (FHWA) characteristics of independent utility of a project: 1) The project connects logical termini and is of sufficient length to address environmental matters on a broad scope; 2) The project is usable and a reasonable expenditure, even if no additional transportation improvements are made in the area; 3) The project does not restrict consideration of alternatives for other reasonable foreseeable transportation improvements. 9.0 Resource Status The project study area now falls entirely within Robeson County which is located in the Lumber River Basin and lies within Hydrologic Unit Codes (HUCs) 03040203 (Lumber Subbasin). This project is located within the Middle Atlantic Coastal Plain ecoregion. The project crosses Big Marsh Swamp, Brisson Branch, Buckhorn Swamp, Cowpen Branch, Little Marsh Swamp, Mercer Branch and Tenmile Swamp as well as several unnamed tributaries to waters of the US, and multiple wetlands. Based on field reviews of the delineation of Waters of the US (WOUS), including wetlands, the USACE issued a Preliminary Jurisdictional Determination (PJD) (Table 6). In addition, on January 13, 2020 and February 9, 2021, the NCDWR issued an On-Site Determination for Applicability to the Mitigation Rules (15A NCAC 2H .0506[h]). Table 6. Applicable Jurisdictional Determination Issued by the USACE STIP County Action ID Date Issued/Revised USGS Quad River Basin I-5987 Robeson SAW-2019-01276 April 16, 2020 Saint Pauls Lumber 9.1 Wetland Delineations Wetland delineations were initially conducted for I-5987 in Cumberland and Robeson Counties. Field work for these delineations were carried out in April through October of 2019; findings are summarized in the respective December 2019 Natural Resources Technical Reports (NRTR). Additional wetland delineations were conducted per design changes, resulting in project study area expansion, for the I-95 project. Field work for this delineation was carried out in June of 2021. Findings Page 5 for the expansion areas are summarized in the August 2021 Natural Resources Technical Memo (NRTM). The wetlands within the project study areas were delineated based on the 1987 USACE Wetland Delineation Manual and a preliminary design was prepared to avoid and minimize wetlands to the maximum extent possible. 9.2 Stream Delineations The stream channels within the project study area were identified, evaluated, and classified using the NCDWR stream identification form. Water quality information for the streams within the project study area was derived from available sources provided through NCDEQ. 9.3 Characterization of Jurisdictional Sites 9.3.1 Wetlands Thirty jurisdictional wetland sites were identified within the project corridor. After design revisions (avoidance/minimization and expansion of the corridor right-of-way), there are sixteen jurisdictional wetlands sites that will be permanently impacted by the proposed project. Wetland systems throughout the study area vary in vegetative composition depending on hydrological regime and site-specific disturbances. The project area contains the following North Carolina Wetland Assessment Method (NCWAM) wetland types: Bottomland Hardwood Forest, Headwater Forest, Riverine Swamp Forest, Floodplain Pool, Basin Wetland, Hardwood Flat, and Non-Tidal Freshwater Forest. 9.3.2 Streams Streams within the project footprint with surface water classifications include Big Marsh Swamp, Brisson Branch, Buckhorn Swamp, Cowpen Branch, Little Marsh Swamp, Mercer Branch and Tenmile Swamp. Unnamed tributaries to waters listed above were also identified within the project corridor. Surface water classifications for streams can be found in Table 7. Additional information for the jurisdictional streams within the project area are provided in the NRTRs. There are no waters within the project vicinity classified as High-Quality Waters (HQW). Neither Water Supplies (WS-I: undeveloped watersheds or WS-II: predominately undeveloped watersheds), nor Outstanding Resource Waters (ORW) occur within 1.0 mile of the project area. Streams within the project area are not designated as North Carolina Natural or Scenic Rivers, or as National Wild and Scenic Rivers. No streams within the project footprint are listed on the 2018 303(d) list of impaired waters. Table 7. Water Resources within the Project Corridor Stream Name Stream Index Number Best Usage Class Description Big Marsh Swamp 14-22-2 C;SW From source to Big Swamp Brisson Branch 14-22-1-3-3-1 C;SW From source to Mercer Branch Buckhorn Swamp 14-22-1-2 C;SW From source to Gallberry Swamp Cowpen Branch 14-22-3-1 C;SW From source to Tenmile Swamp Little Marsh Swamp 14-22-1-3 C;SW From source to Gallberry Swamp Mercer Branch 14-22-1-3-3 C;SW From source to Little Marsh Swamp Tenmile Swamp 14-22-3 C;SW From source to Big Swamp 9.4 Impacts to Jurisdictional Resources Tables 8, 9, and 10 summarize the impacts to jurisdictional water resources based on the final design of I-5987A and tables 11, 12 and 13 based on final design of I-5987B. Table 14 summarizes the impacts to jurisdictional water resources for the I- 5987A & B project. Site numbers for each table correspond with each section of the set of permit drawings included within this application in Attachment D. The stream and wetland labels correspond to the NRTRs as noted in each table. A brief description for each proposed final impact site for I-5987A follows Table 10 and for I-5987B follows Table 13. Page 6 Table 8. I-5987A - Wetland Impacts Permit Drawing Site Number1 NRTR Label2 Type Structure Size/Type Permanent Impacts (ac)3 Temporary Impacts (ac) Hand Clearing Mitigation Required4 (USACE) 4 WAB Riparian 8’x7’ RCBC 0.008 -- -- Yes 5 WAB Riparian System Outlet 0.030 -- -- Yes 10 WM Riparian Roadway Fill 3.195 -- -- Yes 10 WM Riparian Utility 0.140 -- -- Yes 12 WK Riparian Roadway Fill 0.755 -- -- Yes 14 WJ Riparian Roadway Fill 0.043 -- -- Yes 16 WJ Riparian Roadway Fill/42” & 48” RCP 0.639 -- -- Yes 17 WJ Riparian Roadway Fill/False Cut Ditch 0.059 -- -- Yes 18 WJ Riparian Roadway Fill 0.043 -- -- Yes 19 WJ Riparian 7’x7’ RCBC 0.013 -- -- Yes 20 WI Riparian Roadway Fill/8’x9’ RCBC 0.280 -- -- Yes 21 WH Non- Riparian Roaway Fill 0.291 -- -- Yes 22 WG Riparian 8’x7’ RCBC 0.004 -- -- Yes Total Riparian: 5.209 -- -- Total Non-Riparian: 0.291 -- -- Grand Total: 5.500 -- -- Notes: - = No impacts 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5987A Wetland and Surface Water Impacts Permit Drawings (August 25, 2021) included in Attachment D. 2. Waterbody labels from STIP I-5987 NRTR/NRTM/JD (SAW-2019-01276) 3. Permanent Impacts include Permanent Fill, Excavation, and Mechanized Clearing in wetlands. 4. Mitigation required for streams and wetlands permanently impacted. Mitigation not required for open water features. Table 9. I-5987A - Stream Impacts Permit Drawing Site Number1 NRTR Label2 Classification (from NRTR) Structure Size/Type Permanent (ac) Temporary (ac) Permanent (lf) Temporary (lf) Mitigation Required3 (USACE/DWR) 1 SM Perennial 7’x7’ RCBC 0.025 0.008 155 36 Yes/No 1 SM Perennial Utility -- 0.005 -- -- No/No 11 Tenmile Swamp Perennial 12’x12’ RCBC 0.220 0.077 120 40 Yes/No 15 SO Perennial 2 @ 48” RCP 0.012 -- 50 -- Yes/No 15 SO Perennial Bank Stabilization 0.006 0.003 58 20 No/No 19 SP Perennial 7’x7’ RCBC 0.018 0.006 82 26 Yes/No 19 SP Perennial Bank Stabilization 0.020 -- 82 -- No/No 20 Cowpen Branch Perennial Roadway Fill/8’x9’ RCBC 0.035 0.025 96 104 Yes/No Page 7 Table 9. Continued Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5987A Wetland and Surface Water Impacts Permit Drawings (August 25,2021) included in Attachment D. 2. Waterbody labels from STIP I-5987 NRTR/NRTM/JD (SAW-2019-01276) 3. Mitigation required for features permanently impacted for USACE and DWR. DWR does not require mitigation for any permanent intermittent stream impacts or for permanent perennial stream impacts less than 300 feet. 4. Total Mitigatable includes permanent impacts to perennial streams and intermittent streams as per USACE requirements, the higher mitigation amount. Table 10. I-5987A – Open Water Impacts Permit Drawing Site Number1 NRTR Label2 Classification (from NRTR) Structure Size/Type Permanent (ac) Temporary (ac) Permanent (lf) Temporary (lf) Mitigation Required3 (USACE/DWR 2 TV Tributary System Outlet 0.003 0.015 -- -- No/No 3 TX Tributary Bank Stabilization 0.002 0.009 -- -- No/No 4 TT/TU Tributary Bank Stabilization 0.005 0.030 -- -- No/No 6 TAA Tributary Bank Stabilization 0.003 0.001 -- -- No/No 7 TAA Tributary System Outlet 0.022 0.001 -- -- No/No 7 TAA Tributary Bank Stabilization 0.001 0.003 -- -- No/No 8 TS Tributary 30” RCP 0.004 0.001 -- -- No/No 8 TS Tributary Roadway Fill 0.024 0.001 -- -- No/No 9 TBB Tributary 66” RCP 0.046 -- -- -- No/No Permit Drawing Site Number1 NRTR Label2 Classification (from NRTR) Structure Size/Type Permanent (ac) Temporary (ac) Permanent (lf) Temporary (lf) Mitigation Required3 (USACE/DWR) 20 Cowpen Branch Perennial Bank Stabilization 0.026 -- 96 -- No/No 21A SAB Intermittent Roadway Fill 0.013 -- 38 -- Yes/No 21A SAB Intermittent Tailditch- Cleanout -- 0.107 -- 488 No/No 22 Cowpen Branch Perennial Bank Stabilization 0.004 -- 14 -- No/No 22 Cowpen Branch Perennial 8’x7’ RCBC 0.006 0.007 22 45 Yes/No 22 Cowpen Branch Perennial Bank Stabilization 0.018 -- 83 -- No/No 23 Cowpen Branch Perennial 8’x7’ RCBC 0.020 0.003 57 10 Yes/No 23 Cowpen Branch Perennial Bank Stabilization 0.010 0.013 33 30 No/No Totals Total Stream Impact: .433 0.254 986 799 Total Perennial Stream Impact: .420 0.147 948 311 Total Intermittent Stream Impact: 0.013 0.107 38 488 Total Perennial Mitigable: 0.336 -- 582 -- Total Intermittent Mitigable 0.013 -- 38 -- Total Mitigable4: 0.349 -- 620 -- Page 8 Table 10. Continued Permit Drawing Site Number1 NRTR Label2 Classification (from NRTR) Structure Size/Type Permanent (ac) Temporary (ac) Permanent (lf) Temporary (lf) Mitigation Required3 (USACE/DWR 9 TBB Tributary Bank Stabilization 0.003 0.002 -- -- No/No 10 TBB Tributary Roadway Fill 0.018 0.003 -- -- No/No 13 TR Tributary System Outlet 0.004 0.001 -- -- No/No 21A TAD Tributary Tailditch- Cleanout -- 0.107 -- 488 No/No 22 TP Tributary Roadway Fill 0.022 -- -- -- No/No Total Open Water4: 0.157 0.174 -- 488 -- Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5987A Wetland and Surface Water Impacts Permit Drawings (August 25, 2021) included in Attachment D. 2. Waterbody labels from STIP I-5987 NRTR/NRTM/JD (SAW-2019-01276) 3. No mitigation required for impacts to surface waters verified as open water (ponds or jurisdictional ditches/tributaries). 4. Total Open Water includes impacts only to surface waters verified as open water (ponds or jurisdictional ditches) Impact Descriptions by Permit Site Below are brief descriptions of impacts to wetlands and surfaces waters based on final designs that will result from the I-5987 A section of the I-5987 project. Details mentioned in each Permit Site description refer to the details found on Permit Drawing Sheet 6 of 33 in the I-5987A Wetland and Surface Water Impacts Permit Drawings (August 25, 2021) included in Attachment D. Permit Site 1 (Sheet 6): The widening of I-95 will result in the removal of an existing culvert and the installation of a new culvert. An existing 48” Reinforced Concrete Pipe (RCP) that currently provides passage for Stream SM will be removed. The flow of Stream SM will be maintained through a proposed 7’x7’ Reinforced Concrete Box Culvert (RCBC) that will be constructed using phased installation. The proposed culvert inlet will be installed on the east side of I-95 in the approximate location of Stream SM. Class I rip rap will be used at the embankment where SM and the beginning of a Special Lateral V Ditch intersect (see Detail L). The removal of 70 lf of an existing 15” RCP will daylight a portion of SM. The proposed culvert will outlet on the west side of I-95 in the approximate location of Stream SM. There will be 20 lf of channel improvement to SM; Class I rip rap will be used at the embankment where SM and the beginning of a special lateral V ditch intersect (see Detail L). The installation of the culvert and the associated ditches will result in 155 lf of permanent impacts and 36 lf of temporary impacts to Stream SM. Additionally, utilities installation will result in 0.0054 acres of temporary impact to Stream SM due to a 12” Water Line and 30” Encasement Pipe. . Permit Site 2 (Sheet 14): The widening of I-95 will result in the removal of an existing culvert and the installation of a new culvert, with impacts associated with the system outlet. An existing 30” RCP that currently provides passage for Tributary TV will be filled with flowable fill. The flow of Tributary TV will be maintained through a proposed 42” welded steel pipe that will be constructed using trenchless installation. The proposed pipe will result in 0.003 acres of permanent impacts and 0.015 acres of temporary impacts to open water. Permit Site 3 (Sheet 14): The widening of I-95 will result in the installation of a 18” welded steel pipe that will be constructed using trenchless installation. The outlet will be installed in the existing channel of tributary TX and will use Class B rip rap embankment (see Detail L). The proposed culvert will result in 0.002 acres of permanent impacts and 0.009 acres of temporary impacts to open water. Permit Site 4 (Sheet 14 & 15): The widening of I-95 will result in removal of an existing culvert and the installation of a new culvert. An existing 2 - 48” RCPs, that currently provides passage for Tributary TT on the east side of I-95 and TU on the west side of I-95, will be removed. The flow of Tributary TU will be maintained through a proposed 8’x7’ RCBC. The proposed culvert inlet will be installed on the west side of I-95 in the approximate location of Tributary TU. There will be 45 lf of channel improvement; Class B rip rap will be used at the embankment where a 15” RCP-IV outfalls into the existing Page 9 channel of TU. The proposed culvert outlet will be installed on the east side of I-95 in the approximate location of Tributary TT. Proposed impacts will also include the installation of an 18” RCP-IV to be installed using trenchless methods, the outlet of which will be installed in the existing channel of tributary TU. There will be 50 lf of channel improvement; Class I and class B rip rap (see Detail L) will be used for bank stabilization. There will be 0.008 acres of pemanent impacts to Wetland WAB due to roadway fill and mechanized clearing. The installation of the culvert and associated pipes with rip rap will result in 0.005 acres of permanent impacts and 0.030 acres of temporary impacts to open waters. Permit Site 5 (Sheet 15): The widening of I-95 will result in the installation of a 30” welded steel pipe that will be constructed using trenchless installation. The outlet will be installed within the wetland boundary of Wetland WAB and will use Class B rip rap embankment. There will be 0.030 acres of permanent impats to Wetland WAB due to roadway fill and excavation. Permit Site 6 (Sheet 16): The widening of I-95 will result in the creation of two Special Lateral V Ditches to facilitate water flow away from the roadway. Rip rap embankment will be placed at the outlet of each Special Lateral V Ditch (see Detail B & M) which will be installed within the banks of Tributary TAA. The proposed ditches will result in 0.003 acres of permanent impacts and 0.001 acres of temporary impacts to open water. Permit Site 7 (Sheet 16): The widening of I-95 will result in removal of an existing culvert and the installation of a new culvert. An existing 18” RCP, that currently is at the headwater of Tributary TAA will be filled with flowable fill. The flow of Tributary TAA will be maintained through a proposed 18” welded steel RCP-IV to be installed using trenchless methods, the outlet of which will be installed in the existing channel of tributary TAA. Class B rip rap will provide toe protection (see Detail AH) along the fill slope near the outlet to prevent erosion. A Special Lateral V Ditch will facilitate water flow away from the roadway. Rip rap embankment (see Detail L) will be placed at the outlet of the Special Lateral V Ditch (see Detail M) which will be installed within the banks of Tributary TAA. The proposed system outlet and bank stabilization will result in 0.023 acres of permanent impacts and 0.004 acres of temporary impacts to open water. Permit Site 8 (Sheet 17): The widening of I-95 will result in alignment changes associated with the interchange at Exit 25. Russ road will be realigned slightly to the east and cross over Tributtary TS, this portion of Tributary TS will be placed in a 30” RCP-IV. Special Later V Ditches (see Detail P) will flow into Tributary TS at the inlet and outlet. The proposed pipe and roadway fill will result in 0.028 acres of permanent impacts and 0.002 acres of temporary impacts to open water. Permit Site 9 (Sheet 17): Per agreement between NCDOT Division 6 and the US Army Corps of Engineers (USACE) and the NC Division of Water Resources (NCDWR), post verification, previously designated Stream SS is now considered as part of Tributary TBB, as TBB exists on both sides of I-95. Tributary TBB now totals 2,055.23 lf within the project study area. This change was reflected in the April 13, 2021 Non-Merger 30% Hydraulic Review Meeting and has been recorded as part of the meeting minutes (Attachment F). The widening of I-95 will result in alignment changes associated with the interchange at Exit 25. The I-95 northbound off- ramp and Russ road will be realigned slightly to the east and cross over Tributtary TBB, an open system. An existing 36” RCP, that currently provides passage for Tributary TBB under Russ road, will be removed. The flow of Tributary TBB will be maintained through a proposed 66” RCP-IV with Class I riprap at the outlet embankment (see Detail L). Special Later V Ditches (see Detail P & V) will flow into Tributary TBB at the outlet. The proposed I-95 southbound on-ramp and traffic circle will be located to the northeast of existing facilities and will cross over Tributary TBB, an open system. The flow of Tributary TBB will be directed to a Lateral 2’ Base Ditch (see Detail AG) before going into a 54” RCP-IV that will go underneath the on-ramp. Bucket Road will be realigned to the north and tie into the traffic circle and will cross over Tributary TBB. The flow of Tributary TBB will be directed to a 42” RCP-IV with Class B rip rap at the outlet. The proposed system outlet and bank stabilization will result in 0.049 acres of permanent impacts and 0.002 acres of temporary impacts to open water. Permit Site 10 (Sheet 17): The widening of I-95 will result in alignment changes associated with the interchange at Exit 25. The proposed traffic circle and Bucket Road tie in, located to the northeast of existing facilities, will be constructed within Wetland WM. Several 15” CSP’s, some with elbows, will be placed around the traffic circle to direct water away from the roadway. Class B rip rap will be placed at the culvert outlets. The proposed roadway fill will result in 0.018 acres of permanent and 0.003 acres of temporary impacts to Tributary TBB and 3.195 acres of permanent impacts to Wetland WM. Page 10 Additionally, utilities installation will result in 0.1402 acres of permanent impacts to Wetland WM from mechanized clearing due to the installation of a 8” Water Line. Permit Site 11 (Sheet 18): The widening of I-95 will result in removal of an existing culvert and the installation of a new culvert. An existing RCBC, that currently provides passage for Tenmile Swamp will be removed. The flow of Tenmile Swamp will be maintained through 3 proposed 12’x12’ RCBC’s. The proposed culvert inlets will be installed on the west side of I-95 in the approximate location of Tenmile swamp. There will be 34 lf of channel improvement (see Detail 2D-1); a portion of the channel will be filled with Class II rip rap. The proposed culvert outlet will be installed on the east side of I-95 in the approximate location of Tenmile swamp. There will be 45 lf of channel improvements (see Detail 2D-1); a portion of the channel will be filled with Class II rip rap. The installation of the culvert and associated with rip rap will result in 120 lf and 0.220 acres of permanent impacts and 40 lf and 0.077 acres of temporary impacts to Tenmile Swamp. Permit Site 12 (Sheet 18 & 19): The widening of I-95 will result in the installation of a 18” RCP-IV. The pipe and outlet will be installed within the wetland boundary of Wetland WK located on the east side of I-95, just south of the proposed RCBC. An existing 18” RCP, that currently diverts stormwater away from the roadway will be filled with flowable fill, located on the east side of I-95, north of the proposed RCBC. The stormwater will be maintained through a proposed 18” welded steel RCP-IV to be installed using trenchless methods, the outlet of which will be installed within Wetland WK. Class B rip rap will be placed at the culvert outlet for bank stabilization. Roadway fill will occur within a portion of Wetland WK located on the west side of I-95, just north of the proposed RCBC. A proposed 18” RCP-IV will be installed to the west side I-95, north of the proposed RCBC. The pipe and outlet will be installed within Wetland WK. Class B rip rap will be placed at the culvert outlet for bank stabilization. There will be 0.755 acres of permanent impats to Wetland WK due to roadway fill and mechanized clearing. Permit Site 13 (Sheet 20): The widening of I-95 will result in removal of an existing culvert and the installation of a new culvert. An existing 18” RCP, that currently provides passage for Tributary TR will be filled with flowable fill. The flow of Tributary TR will be maintained through a proposed 30” welded steel pipe that will be constructed using trenchless installation. The proposed culvert outlet will be installed on the west side of I-95 in the approximate location of Tributary TR. The proposed system outlet will result in 0.004 acres of permanent impacts and 0.001 acres of temporary impacts to open water. Permit Site 14 (Sheet 20): The widening of I-95 will result in impacts within Wetland WJ, located on the west side of I-95. There will be 0.020 acres of permanent impats and 0.023 acres of permanent impacts to Wetland WJ due to roadway fill and mechanized clearing. Permit Site 15 (Sheet 33): The widening of I-95 will result in removal of existing pipes and the installation of two new pipes. An existing 36” RCP and 42” CMP, that currently provides passage for Stream SO will be removed. The flow of Stream SO will be maintained through a proposed 2 @ 48” RCP-IV; both ends of pipes will be buried 0.8 ft. The proposed pipe inlet will be installed on the west side of I-95 in the approximate location of Stream SO. There will be a low flow channel and flood plain bench (see Detail AI) and 30 lf of channel improvements. Class I rip rap (see Detail L) will be placed at the culvert inlet for bank stabilization. The proposed outlet will be installed on the east side of I-95 in the approximate location of Stream SO. There will be a low flow channel and flood plain bench (see Detail AI) and 35 lf of channel improvements. Class I rip rap will be placed on the banks only at the culvert outlet for bank stabilization The proposed pipes and associated bank stabilization will result in 108 lf and 0.018 acres of permanent impacts and 20 lf and 0.003 acres of temporary impacts to Stream SO. Permit Site 16 (Sheet 21): The widening of I-95 will result in the installation of two new culverts that will impact Wetland WJ, located on the west side of I-95. A 48” welded steel pipe will be constructed using trenchless installation, the outlet of which will be installed within Wetland WJ. Class I rip rap will be placed at the culvert outlet for bank stabilization. A 42” welded steel pipe will be constructed using trenchless installation, the outlet of which will be installed within Wetland WJ. Class B rip rap will be placed at the culvert outlet for bank stabilization. There will be 0.639 acres of permanent impats Wetland WJ due to roadway fill and mechanized clearing. Permit Site 17 (Sheet 21): The widening of I-95 will result in the creation of a new Base Ditch that will impact Wetland WJ, located on the east side of I-95. A 8.0’ Base Ditch will be excavated within Wetland WJ in order to divert stormwater away from the roadside, into a nearby pipe. The ditch and roadway fill will result in 0.059 acres of permanent impacts to Wetland WJ. Page 11 Permit Site 18 (Sheet 21): The widening of I-95 will result in impacts within Wetland WJ, located on the west side of I-95. There will be 0.043 acres of permanent impacts to Wetland WJ due to roadway fill and mechanized clearing. Permit Site 19 (Sheet 22): Per agreement between NCDOT Division 6, USACE, and the NCDWR, post verification, previously designated Stream SP now extends 109 lf downstream of the 2 @ 48” RCP, on the west side of I-95, to the project study area boundary. This change was reflected in the April 13, 2021 Non-Merger 30% Hydraulic Review Meeting and has been recorded as part of the meeting minutes (Attachment F). The widening of I-95 will result in removal of an existing culvert and the installation of a new culvert. An existing 48” RCP, that currently provides passage for Stream SP will be removed. The flow of Stream SP will be maintained through a proposed 2@7’x7’ RCBC that will be buried 1’ and will have a beveled headwall. The RCBC will have a 1’ flood bench, the south barrel will hav have a 1’ sill and the north barrel will have a 2’ sill. The proposed culvert outlet will be installed on the west side of I-95 in the approximate location of Stream SP. There will be 20 lf of channel improvement with a 1’ flood bench at the north barrel (see Detail LL). The proposed culvert and outlet will be installed within Wetland WJ. Class I rip rap will be placed at the culvert outlet for bank stabilization (see Detail GG). The proposed culvert inlet will be installed on the east side of I-95 in the approximate location of Stream SP. There will be 19 lf of channel improvement with a 1’ flood bench at the north barrel (see Detail MM). The proposed RCBC and associated bank stabilization will result in 164 lf and 0.038 acres of permanent impacts and 26 lf and 0.006 acres of temporary impacts to Stream SP. There will be 0.013 acres of permanent impacts to Wetland WJ. Permit Site 20 (Sheet 22 & 23): The widening of I-95 will result in removal of an existing culvert and the installation of a new culvert. An existing 7’x7’ RCBC, that currently provides passage for Cowpen Branch will be removed. The flow of Cowpen Branch will be maintained through a proposed 2@8’x9’ RCBC. The proposed culvert outlet will be installed on the west side of I-95 in the approximate location of Cowpen Branch. There will be 20 lf of channel improvement (see Detail NN). The proposed culvert and outlet will be installed within Wetland WI. Class II rip rap will be placed at the culvert outlet for bank stabilization (see Detail GG). An existing 18” RCP, running under I-95 that carries stormwater away from the roadway will be filled with flowable fill. A proposed RCP-IV and stormwater intake will be installed within Wetland WI. The proposed culvert inlet will be installed on the east side of I-95. There will be 40 lf of channel improvement to Cowpen Branch (see Detail OO). Two proposed 18” TB 2GI pipes will be installed to divert stormwater away from the roadway, the outlet of which will be installed within Wetland WI. Class B rip rap will be placed at the pipe outlets for bank stabilization within Wetland WI. There will be 40 lf of channel improvement to Cowpen Branch (see Detail OO). The proposed RCBC and associated roadway fill, mechanized clearing and bank stabilization will result in 192 lf and 0.061 acres of permanent impacts and 104 lf and 0.025 acres of temporary impacts to Cowpen Branch. There will be 0.280 acres of permanent impacts to Wetland WI. Permit Site 21 (Sheet 25): The widening of I-95 will result in the creation of a new Special Lateral 6.0’ Base Ditch that will impact Wetland WH, located on the west side of I-95. The roadway fill, excavation and mechanized clearing will result in 0.291 acres of permanent impacts to Wetland WH. Permit Site 21A (Sheet 25): The widening of I-95 will result in the creation of a new 10.0’ Base Ditch (see Detail JJ) that will impact Stream SAB and Tributary TAD, located on the east side of I-95. The roadway fill and tail ditch cleanout will result in 38 lf and 0.013 acres of permanent impacts and 488 lf and 0.07 acres of temporary impacts to SAB and 0.10 acres of temporary impacts to TAD. Permit Site 22 (Sheet 29): The widening of I-95 will result in removal of an existing pipe and the installation of a new culvert. An existing 54” RCP, that currently provides passage for Cowpen Branch will be removed. The flow of Cowpen Branch will be maintained through a proposed 2@8’x7’ RCBC that will be buried 1’ and will have a beveled headwall. The RCBC will have a 1’ flood bench, the south barrel will hav have a 2’ sill and the north barrel will have a 1’ sill. The proposed culvert inlet will be installed on the west side of I-95 in the approximate location of Cowpen Branch. The wingwall of the proposed culvert will also result in impacts to Tributary TP, that flows north into Cowpen Branch at the roadside. Rip rap will be placed at the inlet for bank stabilization (see Detail GG). There will be 18 lf of channel improvement with a 1’ flood bench at the south barrel (see Detail PP). The proposed culvert inelt will be installed within a portion of Wetland WG. An existing 12” RCP, that also provides passage for Cowpen Branch will be removed. The proposed culvert outlet will be installed on the east side of I-95. Class I and II rip rap will be placed at the culvert outlet for bank stabilization (see Detail GG). There will be 32 lf of channel improvement with a 1’ flood bench at the south barrel (see Detail QQ). The proposed RCBC and associated bank stabilization, mechanized clearing and excavation will result in 119 lf and 0.028 acres of Page 12 permanent impacts and 45 lf and 0.007 acres of temporary impacts to Cowpen Branch and 0.022 permanent impacts to TP. There will be 00.004 acres of permanent impacts to Wetland WG. Permit Site 23 (Sheet 30): The widening of I-95 will result in removal of an existing pipe and the installation of a new culvert. An existing 72” CMP, that currently provides passage for Cowpen Branch will be removed. The flow of Cowpen Branch will be maintained through a proposed 2@8’x7’ RCBC that will be buried 1’ and will have a beveled headwall. The RCBC will have a 1’ flood bench, the south barrel will hav have a 1’ sill and the north barrel will have a 2’ sill. The proposed culvert oulet will be installed on the west side of I-95 in the approximate location of Cowpen Branch. Class I Rip rap will be placed at the outlet for bank stabilization (see Detail GG). There will be 25 lf of channel improvement with a 1’ flood bench at the north barrel (see Detail RR). The proposed culvert inlet will be installed on the east side of I-95. An existing 72” RCP, that also provides passage for Cowpen Branch will be removed. East of the inlet native material (see Detail AA) will be used to fill a portion of Cowpen Branch. Class I rip rap will be placed at the culvert outlet for bank stabilization. There will be 60 lf of channel improvement with a 1’ flood bench at the north barrel (see Detail SS). The proposed RCBC and associated bank stabilizationwill result in 90 lf and 0.030 acres of permanent impacts and 40 lf and 0.016 acres of temporary impacts to Cowpen Branch. Table 11. I-5987B - Wetland Impacts Permit Drawing Site Number1 NRTR Label2 Type Structure Size/Type Permanent Impacts (ac)3 Temporary Impacts (ac) Hand Clearing Mitigation Required4 (USACE) 1 WAF Riparian Channel Improvements 0.174 -- -- Yes 3 WV Riparian 72” RCP 0.10 -- -- Yes 4 WZ Riparian Fill Slope 0.023 -- -- Yes 5 WF Riparian Fill/Cut Slopes 2.392 -- -- Yes 5 WF Riparian Utility -- -- 0.094 No 9 WE Riparian 2@8’x8’ RCBC 0.383 -- -- Yes 9 WE Riparian Temporary Bore Pit 0.030 -- -- Yes 10 WL Riparian 1@6’x7’ RCBC 0.533 -- -- Yes 10 WL Riparian Utility -- -- 0.166 No 11 WN Riparian 1@6’x7’ RCBC 0.018 -- -- Yes 12 WD Riparian Fill/Cut Slopes 3.815 -- -- Yes 13 WC Riparian 3@9’x8’ RCBC 1.176 -- -- Yes Total Riparian: 8.644 -- 0.260 Total Non-Riparian: -- -- -- Grand Total: 8.644 -- 0.260 Notes: - = No impacts 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5987B Wetland and Surface Water Impacts Permit Drawings (August 24, 2021) included in Attachment D. 2. Waterbody labels from STIP I-5987 NRTR/NRTM/JD (SAW-2019-01276) 3. Permanent Impacts include Permanent Fill, Excavation, and Mechanized Clearing in wetlands. 4. Mitigation required for streams and wetlands permanently impacted. Mitigation not required for open water features. Page 13 Table 12. I-5987B - Stream Impacts Note * - See the I-5987B Wetland and Surface Water Impacts Permit Drawings (August 24, 2021) summary sheet for additional notes. 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5987B Wetland and Surface Water Impacts Permit Drawings (August 24, 2021) included in Attachment D. 2. Waterbody labels from STIP I-5987 NRTR/NRTM/JD (SAW-2019-01276) 3. Mitigation required for features permanently impacted for USACE and DWR. DWR does not require mitigation for any permanent intermittent stream impacts or for permanent perennial stream impacts less than 300 linear feet. 4. Total Mitigatable includes permanent impacts to perennial streams and intermittent streams as per USACE requirements, the higher mitigation amount. Permit Drawing Site Number1 NRTR Label2 Classification (from NRTR) Structure Size/Type Permanent (ac) Temporary (ac) Permanent (lf) Temporary (lf) Mitigation Required3 (USACE/DWR) 2 SR Intermittent 42” Welded Steel Pipe 0.011 -- 30 -- Yes/No 2 SR Intermittent Base Ditch 0.006 0.004 50 20 Yes/No 3 SN Perennial 72” RCP 0.012 0.001 65 20 Yes/No 3 SN Perennial Riprap Pad Outlet 0.003 0.001 25 10 Yes/No 5 Big Marsh Swamp Perennial Bents and Causeway 0.001 0.047 10 150 Yes/No 8 SQ Intermittent Rechannelization 0.008 -- 58 -- Yes/No 8 SQ Intermittent Riprap Pad Outlet 0.006 0.005 25 10 Yes/No 9 Mercer Branch Perennial 2@8’x8’ RCBC 0.051 -- 73 -- Yes/No 9 Mercer Branch Perennial Bank Stabilization 0.006 0.005 20 10 No/No 9 Mercer Branch Perennial Riprap in Channel 0.029 0.047 86 100 Yes/No 10 Brisson Branch Perennial 1@6’x7’ RCBC 0.142 0.013 320 40 Yes/Yes 11 SK Perennial 1@6’x7’ RCBC 0.026 0.003 101 23 Yes/No 12 Little Marsh Swamp Perennial Bents and Causeway 0.008 0.289 150 30 Yes/No 13 Buckhorn Swamp Perennial 3@9’x8’ RCBC 0.052 0.029 50 20 Yes/No 13 Buckhorn Swamp Perennial Riprap in Channel 0.048 -- 50 -- No/No* Totals Total Stream Impact: 0.409 0.444 1,113 433 Total Perennial Stream Impact: 0.378 0.435 950 403 Total Intermittent Stream Impact: 0.031 0.009 163 30 Total Perennial Mitigable: 0.324 -- 880 -- Total Intermittent Mitigable: 0.031 -- 163 -- Total Mitigable4: 0.355 -- 1,043 -- Page 14 Table 13. I-5987B – Open Water Impacts Permit Drawing Site Number1 NRTR Label2 Classification (from NRTR) Structure Size/Type Permanent (ac) Temporary (ac) Permanent (lf) Temporary (lf) Mitigation Required3 1 TM Tributary Bank Stabilization 0.010 -- -- -- No 1 TM Tributary Channel Improvemennts 0.062 0.001 -- -- No 6 TJ Tributary 48” Welded steel Pipe 0.001 -- -- -- No 6 TJ Tributary Riprap Channel 0.014 0.003 -- -- No 7 TAC Tributary 2@54” Welded Steel Pipe 0.022 -- -- -- No 7 TAC Tributary Riprap Pad Outlet 0.005 -- -- -- No 7 TAC Tributary Rechannelization 0.142 -- -- -- No 7A TH Tributary 2@ 54” RCP 0.008 -- -- -- No 7A TH Tributary Rechannelization 0.009 0.005 -- -- No Total Open Water4: 0.273 0.009 -- -- No Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5987B Wetland and Surface Water Impacts Permit Drawings (August 24, 2021) included in Attachment D. 2. Waterbody labels from STIP I-5987 NRTR/NRTM/JD (SAW-2019-01276) 3. No mitigation required for impacts to surface waters verified as open water (ponds or jurisdictional ditches/tributaries). 4. Total Open Water includes impacts only to surface waters verified as open water (ponds or jurisdictional ditches/tributaries) Permit Site 1 (Sheet 7): The widening of I-95 will result in removal of an existing pipe and the installation of a new pipe. An existing 36” RCP will be filled will flowable fill. A proposed 54” welded steel pipe, constructed using trenchless installation, will be installed slightly south of the existing location. The pipe will outlet into a Lateral 4’ Base Ditch (see Detail AG) that carries stormwater drainange to Tributary TM. The outlet of the Lateral 4’ Base Ditch will have Class I rip rap (see Detail AV). A Special Lateral V Ditch will also carry stormwater south to Tributary TM (see Deatail G). There will be 445 Cubic Yards (CY) of channel improvements (see Detail BB) to Tributary TM which will also result in impacts to Wetland WAF. The proposed channel improvements and associated bank stabilization will result in 0.072 acres of permanent impacts and 0.001 acres of temporary impacts to Tributary TM, and 0.174 permanent impacts to Wetland WAF. Permit Site 2 (Sheet 7): The widening of I-95 will result in removal of existing pipes and the installation of a new pipe. An existing 18” RCP, that runs under I-95 and currently provides passage for Stream SR will be filled will flowable fill. The flow of Stream SR will be maintained through a proposed 42” welded steel pipe, constructed using trenchless installation, at the approximate location of Stream SR. The pipe will outlet into Stream SR on the east side of I-95. Class I rip rap will be placed at the pipe outlet for bank stabilization. A Standard 4’ Base Tail Ditch (see Detail AT) will extend east, beyond the pipe outlet, and will be constructed within Stream SR. An existing 18” RCP, connecting two segments of Stream SR, will be removed. The proposed pipe and associated base ditch will result in 80 lf and 0.017 acres of permanent impacts and 20 lf and 0.004 acres of temporary impacts to Stream SR. Permit Site 3 (Sheet 40): The widening and realignment of SR 1006 (-Y4) will result in removal of existing pipes and the installation of new pipes. An existing 18” RCP that runs under Great Marsh Church Road, and currently provides passage for Stream SN, will be removed. The flow of Stream SN will be maintained through a proposed 72” RCP-IV that will be buried invert 1.00’. The proposed pipe inlet will be installed on the south side in the approximate location of Stream SN and within Wetland WV. The fill slope along the inlet side will utilize toe protection (see Detail AC) for erosion prevention. The proposed pipe will outlet to the north; Class II rip rap will be placed at the pipe outlet for bank stabilization. A 2’ Base Ditch with Class I rip rap bank stabilization (see Detail AR) ties into Stream SN. The proposed pipe and associated bank stabilization will result in 90 lf and 0.015 acres of permanent impacts and 30 lf and 0.002 acres of temporary impacts to Stream SN. There will be 0.10 acres of permanent impacts to Wetland WV. Permit Site 4 (Sheet 40): The widening of SR 1741 (-SR5-) will result in impacts to Wetland WZ due to the fill slope. These impacts occurred because SR 1006 (-Y4-) was realigned, which caused the intersection of SR 1741 (-SR5-) to be adjusted. Due to the close proximity to the road, within the proposed right of way, the proposed fill and mechanized clearing will result in 0.023 acres of permanent impacts to Wetland WZ. Page 15 Permit Site 5 (Sheet 10 & 11): The widening of I-95 will result in removal of an existing bridge and the installation of new bridge. An existing 3 span concrete bridge, that currently provides passage for Big Marsh Swamp, will be removed. The flow of Big Marsh Swamp will be maintained through a proposed 3 span bridge with 45” prestressed concrete girders (1@52.5’, 1@75’, 1@52.5’) with 2.5’ deep caps that is skewed 100 degrees. A workpad will be required to construct the proposed bridge bents and will result in impacts to Big Marsh Swamp. The proposed southern bent will be installed mostly in the dry, with slight impacts near the downstream face. The proposed northern bent will be installed completely in the dry, above the top of bank. The proposed widening of I-95 and the installation of new bridge causeways will result in fill and mechanized clearing within Wetland WF. Excavation within Wetland WF will occur south of the bridge, west of I-95, due to the creation of a Special Lateral 6’ Base Ditch (see Detail F). There will be 10 lf and 0.001 acres of permanent impacts and 150 lf and 0.047 acres of temporary impacts to Big Marsh Swamp and 1.827 acres of permanent impacts to Wetland WF. Additionally, utilities installation will result in 0.094 acres of temporary impacts to Wetland WF due to the installation of a Duke pole and aerial lines. Permit Site 6 (Sheet 12): The widening of I-95 will result in removal of an existing pipe and the installation of a new pipe. An existing 30” RCP that provides passage for Tributary TJ, will be filled with flowable fill. The flow of Tributary TJ will be maintained through a proposed 48” welded steel pipe that will be installed using a trenchless method. The proposed pipe inlet will be installed on the east side of I-95. The outlet will be installed on the west in the approximate location of Tributary TJ. Class I rip rap will be placed at the pipe outlet for bank stabilization and extend south down the channel where a Standard 4’ Base Tailditch (see Detail BD) will intersect. The proposed pipe and rip rap channel will result in 0.001 acres of permanent impacts and 0.017 acres of temporary impacts to Tributary TJ. Permit Sites 7 & 7A (Sheet 13 & 13A): The widening of I-95 will result in removal of existing pipes and the installation of new pipes. An existing 36” RCP, 42” CMP and 42” RCP that provides passage for Tributary TH/TAC, will be filled with flowable fill. The flow of Tributary TH/TAC will be maintained through two proposed 54” RCP-III pipes under -Y5RPA-, continued via dual 54” welded steel pipes that will be installed using a trenchless method. Two Standard 8’ Base Ditches, lined with Class I rip rap, divert stormwater away from the road and into Tributary TH, site 7A. The proposed pipe outlet will be installed on the east side of I-95 in the approximate location of Tributary TAC, Site 7. Class I rip rap will be placed at the pipe outlet for bank stabilization. A Standard 6’ Base Ditch (see Detail K) will extend east down the channel from the outlet, to Sanford Street at a Standard Base Ditch Transition (see Detail BF). An existing 24” RCP, that provides passage for TAC under Sanford Street, will be removed. Flow of Tributary TAC will be maintained under Sanford Street by two proposed 48” RCP-IV. The proposed pipe inlets will be installed on the west side of Sanford Street. The proposed pipe outlets will be installed on the east side of Sanford Street. Class I rip rap will be placed at the outlet for bank stabilization and scour prevention. A Standard Base Ditch Transition (see Detail BF) will extend east from the outlet before transitioning to a Standard 6’ Base Tail Ditch (see Detail K). The proposed pipes, rip rap and rechannelization will result in 0.186 acres of permanent impacts and 0.005 acres of temporary impacts to Tributaries TH and TAC. Permit Site 8 (Sheet 16): The widening of I-95 will result in removal of an existing pipe and the installation of a new pipe. An existing 42” RCP that diverts stormwater away from the roadway into Stream SQ, will be filled with flowable fill. A proposed 66” welded steel pipe, installed using a trenchless method, will divert storwater to Stream SQ. The proposed pipe outlet will be located on the east side of I-95. Class I rip rap will be placed at the pipe outlet for bank stabilization which will extend north into the channel of Stream SQ. The proposed rechannelization and rip rap will result in 83 lf and 0.014 acres of permanent impacts and 10 lf and 0.005 acres of temporary impacts to Stream SQ. Permit Site 9 (17 & 18): The widening of I-95 will result in removal of an existing culvert and the installation of a new culvert. An existing 2@7’x6’RCBC, that provides passage for Mercer Branch, will be removed. The flow of Mercer Branch will be maintained at approximate location through a proposed 2@8’x8’ RCBC. The proposed culvert inlet will be installed on the west side of I-95 within Wetland WE. Class II rip rap (see Detail 1-1), 2’ thick, will be placed at the inlet (25 lf) within the channel and along the banks for scour repair/prevention and bank stabilization, respectively. The proposed culvert outlet will be installed on the east side of I-95 within Wetland WE. Class II rip rap will be placed on the banks only (see Detail 1-2) for bank stabilization. There will be 32 lf of channel improvements to Mercher Branch at the outlet. The installation of a temporary bore pit will result in excavation (due to a bore pit from which the pipe will be installed) and mechanized clearing in Wetland WE. The excavation will be filled once construction is complete (=/- 1 month impacted) and should be considered “temporary impacts to wetlands”. This small area will not require mitigation. The proposed RCBC and pipe installation, bank stabilization, and rip rap in the channel will result in 179 lf and 0.086 acres of permanent impacts and 110 lf an 0.052 acres of temporary impacts to Mercer Branch and 0.946 acres of permanent impacts to Wetland WE. Page 16 Permit Site 10 (20 & 21): The widening of I-95 will result in removal of existing pipes and the installation of a new culvert associated with the realignment of Oakland Road. The five existing 36” RCP’s, in series, that provides passage for Brisson Branch under I-95, will be removed. The flow of Brisson Branch will be maintained through a proposed 1@6’x7’ RCBC, that will be buried 1’ and will have a beveled headwall. The proposed culvert outlet will be installed within Wetland WL, on the east side of Oakland road. Class I rip rap will be placed at the outlet for bank stabilization (see Detail 2-2). Class B rip rap will be placed as toe protection (see Detail AC) at the base of the fill line to the south east of the outlet. The 4’ Special Cut Base Ditch (see Detail A) will be replacing an existing ditch that is being covered by fill. The proposed culvert inlet will be installed on the west side of I-95. Brisson Branch will be diverted to a 6’ Base Channel Change (see Detail AG) before entering the proposed culvert. The proposed RCBC will result in 320 lf and 0.142 acres of permanent impacts and 40 lf and 0.013 acres of temporary impacts to Brisson Branch and 0.533 acres of permanent impacts to Wetland WL. Additionally, utilities installation will result in 0.166 acres of temporary impact to Wetland WL due to the installation of a Duke pole and aerial lines Permit Site 11 (44): The realignment of SR 1726 will result in removal of an existing pipe and the installation of a new culvert. An existing 60” RCP that provides passage for Stream SK, beneath W McRainey Rd., will be removed. The flow of Stream SK will be maintained through a proposed 1@6’x7’ RCBC that will be buried 1’ and have a beveled headwall. The proposed culvert outlet is located to the north east of W McRainey Road and will result in impacts to Wetland WN. Improvements will be made to the outlet channel (see Detail CSR 3-1) and Class I rip rap will placed for channel and bank stabilization.The proposed culvert inlet will be installed to the south west of W McRainey Road, in the approximate location of Stream SK, and will result in impacts to Wetland WN. Class I rip rap will be placed at the inlet for bank stabilization. The proposed RCBC will result in 101 lf and 0.026 acres of permanent impacts and 23 lf and 0.003 acres of temporary impacts to Stream SK and 0.18 acres of permanent impacts to Wetland WN. Permit Site 12 (28-30): The widening of I-95 will result in removal of two existing bridges and the installation of a new bridge. The two existing 4 span bridges, one south bound and one north bound, that provides passage for Little Marsh Swamp, will be removed. The flow of Little Marsh Swamp will be maintained through a proposed 2 span bridge at approximate location of Little Marsh Swamp. A workpad will be required for the construction of causeways and bents for the new structure. Only one workpad will be allowed in place at one time and will not block more than 50% of the channel. The proposed upstream face of the bridge will be installed to the west of I-95 in the approximate location of Little Marsh Swamp and, along with the widening of I-95, will result in impacts to Wetland WD. The proposed downstream face of the bridge will be installed to the east of I-95 in approximate location of Little Marsh Swamp, with impacts to Wetland WD. Wetland WD also runs parallel along both sides of I-95 and will require Class B rip rap toe protection (see Detail AC), north and south of the proposed bridge. The proposed bent, causeways, fill and cut slopes will result in 150 lf and 0.008 acres of permanent impacts and 30 lf and 0.289 acres of temporary impacts to Little Marsh Swamp and 3.815 acres of permanent impacts to Wetland WD. Permit Site 13 (37 & 38): The widening of I-95 will result in removal of a existing culvert and the installation of a new culvert. The existing 3@9’x7’ RCBC, that provides passage for Buckhorn Swamp, will be removed. The flow of Buckhorn Swamp will be maintained through a proposed 3@9’x8’ RCBC at approximate location of Buckhorn Swamp. The proposed RCBC inlet will be installed on the west side of I-95. Class II rip rap (see Detail CSR) will be placed in the channel for stabilization and scour prevention. The proposed RCBC outlet will be installed on the east side of I-95 in the approximate location of Buckhorn Swamp. Class II rip rap (see Detail CSR) will be placed in the stream channel for stabilization and scour prevention, but will not require mitigation. Wetland WC runs parallel along both sides of I-95 and will require Class B rip rap (see Detail AC) toe protection, north and south of the proposed culvert. The proposed RCBC and associated rip rap in channel will result in 100 lf and 0.1 acres of permanent and 20 lf and 0.029 acres of temporary stream impacts to Buckhorn Swamp and 1.176 acres of permanent wetland impacts to Wetland WC. 10.0 Protected Species The United States Fish and Wildlife Service (USFWS) lists five federally-protected species for Robeson County as of August 23, 2021 (Table 14). Page 17 Table 14. Federally-Protected Species in Robeson County Common Name Scientific Name Habitat Present Federal Status Biological Conclusion Vertebrate: American Alligator Alligator mississippiensis Yes T (S/A) N/A Northern long-eared bat Myotis septentrionalis Yes T MA-LAA Red-Cockaded Woodpecker Picoides borealis Yes E No Effect Wood stork Mycteria americana Yes T MA-NLAA Vascular Plant: Michaux’s sumac Rhus michauxii Yes E No Effect E – Endangered T – Threatened MA-LAA – May Affect Likely to Adversely Affect N/A – Not applicable T(S/A) – Threatened due to similarity of appearance The US Fish and Wildlife Service has revised the previous programmatic biological opinion (PBO) in conjunction with the Federal Highway Administration (FHWA), the US Army Corps of Engineers (USACE), and NCDOT for the northern long- eared bat (NLEB) (Myotis septentrionalis) in eastern North Carolina. The PBO covers the entire NCDOT program in Divisions 1-8, including all NCDOT projects and activities. Although this programmatic covers Divisions 1-8, NLEBs are currently only known in 19 counties, but may potentially occur in 11 additional counties within Divisions 1-8. NCDOT, FHWA, and USACE have agreed to two conservation measures which will avoid/minimize mortality of NLEBs. These conservation measures only apply to the 30 current known/potential counties shown on Figure 2 of the PBO at this time. The programmatic determination for NLEB for the NCDOT program is May Affect, Likely to Adversely Affect. The PBO will ensure compliance with Section 7 of the Endangered Species Act for ten years (effective through December 31, 2030) for all NCDOT projects with a federal nexus in Divisions 1-8, which includes Robeson County, where I-5987 is located. At individual project sites where a total of 1.0 acre or more of tree clearing will occur, no tree clearing will occur during the portion of the day that the air temperature is <40 degrees Fahrenheit in order to protect NLEBs that may be in torpor. This restriction is only subject to the known/potential range (30 coastal counties) that is shown in Figure 2 of the 2020 PBO. 10.1 Bald and Golden Eagle Protection (BGPA) In the July 9, 2007 Federal Register (72:37346-37372), the bald eagle was declared recovered, and removed (de-listed) from the Federal List of Threatened and Endangered wildlife. This delisting took effect August 8, 2007. After delisting, the Bald and Golden Eagle Protection Act (Eagle Act) (16 U.S.C. 668-668d) became the primary law protecting bald eagles. Nesting and foraging habitat is present in the project area, however no bald eagle nests or individuals have been seen within a 660- foot radius of the project area. 10.2 Moratoria There is no in-stream work moratorium required for I-5987. 11.0 Cultural Resources 11.1 Historic Architectural Resources The potential effect of the proposed project on historic architectural resources was evaluated in accordance with Section 106 of the National Historic Preservation Act of 1966, as amended. The NCDOT Cultural Resources Group determined that the project would have No Effect on historic resources. Page 18 11.2 Archaeological Resources The potential effect of the proposed project on archaeological resources was evaluated in accordance with Section 106 of the National Historic Preservation Act of 1966, as amended, administered under the 2007 Programmatic Agreement for Minor Transportation Projects (Revised 2015) between the FHWA, NCDOT, the Advisory Council on Historic Preservation (ACHP), and SHPO. The NCDOT Cultural Resources Group determinied that no National Register listed archaeological sites are located within the I-5987 project study area and no National Register eligible sites would be affected by the project. 12.0 FEMA Compliance The project has been coordinated with appropriate state and local officials and the Federal Emergency Management Agency (FEMA) to assure compliance with FEMA, state, and local floodway regulations. 13.0 Mitigation Options NCDOT is committed to incorporating all reasonable and practicable design features to avoid and minimize jurisdictional impacts, and to provide full compensatory mitigation of all remaining, unavoidable jurisdictional impacts. Avoidance measures were implemented to the extent possible during the planning and design phases, and minimization measures were incorporated into the project design. USACE has adopted, through the Council on Environmental Quality (CEQ), a wetland mitigation policy that embraces the concept of “no net loss of wetlands” and sequencing. The purpose of this policy is to restore and maintain the chemical, biological, and physical integrity of the waters of the United States. CEQ has defined mitigation of wetland and surface water impacts to include: avoiding impacts, minimizing impacts, rectifying impacts, reducing impacts over time, and compensating for impacts (40 CFR 1508.20). 13.1 Avoidance and Minimization All jurisdictional features were delineated, field-verified, and surveyed within the study area. Proposed widening of I-95 towards the median in areas where possible has aided in reducing the project footprint and overall impact to jurisdictional resources. The designs were developed in more detail and adjusted to avoid and minimize impacts to jurisdictional areas. Project designs were reviewed during development stages by an interagency review team consisting of 34 representatives from NCDOT, NCDEQ-DWR, USACE, NV5, MI Engineering, Mott MacDonald, Wetherill Engineering, Gannett Fleming and Sungate Design Group. Input from parties concerned have helped develop appropriate and practicable steps to avoid and minimize impacts to sensitive areas. NCDOT employs many strategies to avoid and minimize impacts to jurisdictional areas in all of its designs. Many of these strategies have been incorporated into BMP documents that have been reviewed and approved by the resource agencies that will be followed throughout construction. All wetland areas not affected by the project will be protected from unnecessary encroachment. General avoidance and minimization measures are as follows: • NCDOT’s Best Management Practices (BMPs) for the Protection of Surface Waters shall be incorporated to the maximum extent practicable; • Impacts to wetlands, streams, and open waters were avoided and/or minimized by adjusting proposed alignments and slopes; • 3:1 fill slopes have been used at most stream and wetland crossings to reduce impacts; • Stormwater design velocities entering jurisdictional wetlands have been mitigated to be non-erosive (less than 2 fps); • Stormwater was designed to avoid direct discharge into jurisdictional features to the maximum extent practicable; • Rip rap stabilization on banks of jurisdictional streams will be implemented to prevent erosion; • Minimizing “in stream” activities; • Open shoulder sections were maximized to promote sheet flow from the roadway; • Pipes via Trenchless installation built offline. This provides faster construction in the dry, less time in/around the jurisdictional features, and a safer work area for the travelling public and construction crews; • Utilized “Culvert Avoidance and Minimization Design Guidance” for proposed box culverts, as much as practicable. Page 19 13.2 Compensation The NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent possible as described above. For linear public transportation projects, mitigation shall be required for impacts equal to or exceeding 150 linear feet per stream or one acre of wetlands. Since this project is a linear transportation project and jurisdictional impacts exceed 150 linear feet of stream and one acre of wetland, mitigation is required. Compensatory mitigation requirements for I-5987 jurisdictional features are summarized below in Table 15. This project proposes to permanently impact a total of 2,099 linear feet of warm water streams, including 1,898 lf of perennial stream channel (of which 1,462 lf will be subject to mitigation) and 201 lf of intermittent stream channel (of which 201 lf will be subject to mitigation). The project will also permanently impact a total 14.144 acres of wetlands including 13.853 acres of riparian wetlands and 0.291 acres of non-riparian wetlands. The unavoidable impacts to Waters of the U. S. will be offset by compensatory mitigation provided by the North Carolina Department of Environmental Quality (NCDEQ) Division of Mitigation Services (DMS) at ratios of 2:1 for wetland and perennial stream impacts, 1:1 for intermittent stream impacts. There will be no mitigation required for permanent impacts to streams impacted by bank stabilization. Table 15. I-5987 A & B Jurisdictional Feature Mitigation Summary Streams and Wetlands River Basin HUC Eco-Region Stream (lf) Wetlands (ac) Cold Cool Warm Riparian Non- Riparian Coastal Marsh Impacts Lumber 03040203 NICP -- -- 1,663 13.853 0.291 -- USACE1/DWR2 1,663/320 14.144 Grand Total3 1,663 14.144 Notes 1 Mitigation calculations for USACE includes permanent impacts to Perennial streams and Intermittent Streams. 2 Mitigation calculations for DWR includes permanent impacts to Perennial streams with an impact total of 300 or more linear feet. 3 Grand Total reports the higher mitigation amount required for the I-5987 project. NCDOT is applying for a Section 404 Individual Permit for the entire 16.06-mile widening corridor with final designs from the I-5987 A & B Sections. NCDOT has coordinated with NCDEQ DMS to reserve mitigation credits for the entire corridor and will provide an acceptance letter for impacts the project (Table 16 and 17). An acceptance letter from NCDEQ DMS is attached (Attachment E). Table 16. I-5987A Jurisdictional Feature Mitigation Summary Streams and Wetlands River Basin HUC Eco-Region Stream (lf) Wetlands (ac) Cold Cool Warm Riparian Non- Riparian Coastal Marsh Impacts Lumber 03040203 NICP -- -- 620 5.209 0.291 -- USACE1/DWR2 620/0 5.5 Grand Total3 620 5.5 Notes 1 Mitigation calculations for USACE includes permanent impacts to Perennial streams and Intermittent Streams. 2 Mitigation calculations for DWR includes permanent impacts to Perennial streams with an impact total of 300 or more linear feet. 3 Grand Total reports the higher mitigation amount required by USACE for the I-5987A project. Table 17. I-5987B Jurisdictional Feature Mitigation Summary Streams and Wetlands River Basin HUC Eco-Region Stream (lf) Wetlands (ac) Cold Cool Warm Riparian Non- Riparian Coastal Marsh Impacts Lumber 03040203 NICP -- -- 1,043 8.644 -- -- USACE1/DWR2 1,043/320 8.644 Grand Total3 1,043 8.644 Notes 1 Mitigation calculations for USACE includes permanent impacts to Perennial streams and Intermittent Streams. 2 Mitigation calculations for DWR includes permanent impacts to Perennial streams with an impact total of 300 or more linear feet. 3 Grand Total reports the higher mitigation amount required for the I-5987B project. Page 20 14.0 Indirect and Cumulative Effects Transportation impact causing activities as a result of this project may include: new network connections, an increase in access, or creation of activity centers. This project has a low likelihood to increase development potential and intensity in the areas adjacent to the project corridor. This score is most reflective of the project scope (16.06 miles of widening), public policy in place to manage growth, abundance of available land, presence of notable environmental features, and a lack of travel time savings resulting from the project. The project does not require analysis for direct, indirect or cumulative effects based on the NCDOT Community Studies Screening Tool. 15.0 Essential Fish Habitat The project will not impact any Essential Fish Habitat afforded protection under the Magnuson Stevens Act of 1996 (16 U.S.C 1801 et seq.) 16.0 Wild and Scenic Rivers The project will not impact any designated Wild and Scenic Rivers or any rivers included in the list of study rivers (Public Law 90-542, as amended). 17.0 Regulatory Approvals Section 404: Application is hereby made for a USACE Individual 404 Permit as required for the above-described activities Section 401: We are requesting a Section 401 Water Quality Certification from NCDWR, and providing this application to NCDEQ for their approval. A copy of this permit request and its distribution list will be posted on the NCDOT website at: https://connect.ncdot.gov/resources/Environmental Sincerely, Gregory W. Price, PWS Division Environmental Officer North Carolina Department of Transportation Cc: Hannah Sprinkle, NCDWR NCDOT Permit Application Standard Distribution List Attachments Attachment A: I-5987 Project Vicinity Map Attachment B: ENG Form 4345 Attachment C: I-5987 State Stormwater Management Plan Attachment D: I-5987 Wetland and Surface Water Impacts Permit Drawings and Utility Drawings Attachment E: I-5987 DMS Mitigation Acceptance Letter Attachment F: I-5987 Non-Merger 30% Hydraulic Design Review Meeting Minutes Attachment G: I-5987 Permit Drawings Review Meeting Minutes Attachment H: I-5987 Permit Labels Attachment I: I-5987 PreFiling Meeting Request Attachment J: I-5987 Environmental Document Attachment A: I-5987 Project Vicinity Map . .1,, ...,�. ' l , 'r�.... '+w IP' ._..:, ., ._ U-2519AA/AB ...., •4 T - v r 1{fB e CreekZQuad ' - _ Parkton /' Quad • . Hope Mills Quads ,-: �" Cedar V ' IlliL:. �� � vraii :�{ 1 ` riot, _� _ral ._ nmallwmimIr 1 $1,_•j- l a WEi 1 __ 4-41,1„__Itifii.,,.. rr-4,111,. _4 ..:, 40.4(ors,N-4-1","*.b.le-ti, Iblilb 40' I-5987B — it 4., ftip skL - /140 Rennert Quad !- _e ° ' Samt,Rauls Quad—_��_�_ •-� Nr•Duart Quad \ F ■...,... Orl a 1� l ', , __,_,, J y____ 40 ,11,...„,,, _, ". . _ Northwest Lumberton' Quad• . ,p1*1 1 VI Northeast Lumberton_Quad i ,Tar Heel_Quad t >4 NORTHr ��\ f "- DEPARTMENT OF TRANSPORTATION r_ g � DIVISION 1111471 a,o,,,..ed`• vie A,....i v' .-:.. =:a... i 0 . I-95 Widening from US 301 in Robeson County (Exit 22) to ♦— x StudyArea .ti 1-95 Business (Exit 40) in Cumberland County. i 2.5 1.25 0 2.5 i. Miles 1 inch equals 2.5 miles �' `Southeast.LumbertomQuad'- - , i - STIP Project 1-5987 Robeson and Cumberland Counties 1 PPP Source: ESRI, CALYX Engineers and Consultants Figure Date: 1/18/2019� ., _ -'11 --- _ ,,...�COp Figure 1 - Vicinity Map ' Attachment B: ENG Form 4345 U.S. Army Corps of Engineers (USACE) APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT 33 CFR 325. The proponent agency is CECW-CO-R. FormApproved- OMB No. 0710-0003 Expires: 01-08-2018 The public reporting burden for this collection of for reviewing instructions, searching existing data information. Send comments regarding the burden at whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.ri information, OMB Control Number 0710-0003, is estimated to average 11 hours per response, including the time sources, gathering and maintaining the data needed, and completing and reviewing the collection of estimate or burden reduction suggestions to the Department of Defense, Washington Headquarters Services, . Respondents should be aware that notwithstanding any other provision of law, no person shall a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT EMAIL. be subject to any penalty for failing to comply with RETURN YOUR APPLICATION TO THE ABOVE PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, Section 103, 33 USC 1413; Regulatory Programs will be used in evaluating the application for a permit. local government agencies, and the public and is voluntary, however, if information is not provided reproducible copies which show the location and and be submitted to the District Engineer having System of Record Notice (SORN). The information and may be accessed at the following website: 33 USC 403; Clean Water Act, Section of the Corps of Engineers; Final Routine Uses: This information may be made available as part of the permit application cannot character of the proposed activity jurisdiction over the location of the received is entered into our permit http://dpcld.defense.gov/Privacy/SORNslndex/DOD-wide-SORN-Article-View/Article/570115/a1145b-ce.aQ 404, 33 Rule 33 CFR may be shared a public notice be evaluated nor must be attached proposed activity. tracking USC 1344; Marine Protection, 320-332. Principal Purpose: Information with the Department of Justice as required by Federal law. Submission can a permit be issued. One to this application (see sample An application that is not database and a SORN has been Research, and Sanctuaries Act, provided on this form and other federal, state, and of requested information set of original drawings or good drawings and/or instructions) completed in full will be returned. completed (SORN #A1145b) (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE (ITEMS BELOW TO BE FILLED BY APPLICANT) 5. APPLICANT'S NAME First - Gregory Middle -W. Last - Price Company - North Carolina Department of Transportation (NCDOT) E-mail Address-gwprice2@ncdot.gov 8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required) First - Jennifer Middle -W. Last - Harrod Company - NV5 Engineers and Consultants, Inc. E-mail Address -Jennifer.Harrod@NV5.com 6. APPLICANT'S ADDRESS: Address- P.O. Box 1150 City - Fayetteville State - NC Zip - 28302 Country -USA 9. AGENTS ADDRESS: Address- 3300 Regency Parkway #100 City - Cary State - NC Zip - 27518 Country -USA 7. APPLICANTS PHONE NOs. w/AREA CODE a. Residence b. Business c. Fax (910) 364-0835 10. AGENTS PHONE NOs. w/AREA CODE a. Residence b. Business c. Fax (336) 508-0050 (919) 836-4800 STATEMENT OF 11. I hereby authorize. Jennifer Harrod to act in my behalf as AUTHORIZATION my agent in the processing of this application and to furnish, upon request, supplemental information in support of this permit application. SIGNATURE OF APPLICANT DATE NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions) STIP I-5987 - Widen I-95 to eight lanes from US 301 (Exit 22) to south of the proposed I-295 interchange 13. NAME OF WATERBODY, IF KNOWN (if applicable) Big Marsh/Buckhorn/Tenmile Swamps; Brisson/Cowpen Branch 14. PROJECT STREET ADDRESS (if applicable) Address Robeson County City - Lumberton/St. Pauls State NC Zip- 15. LOCATION OF PROJECT Latitude: oN 34.80138 Longitude: .W -78.99049 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) State Tax Parcel ID Municipality Section - Township - Range - ENG FORM 4345, MAY 2018 PREVIOUS EDITIONS ARE OBSOLETE. Page 3 of 1 17. DIRECTIONS TO THE SITE Please see attached Project Location Map (Attachment H) for general location. 18. Nature of Activity (Description of project, include all features) The North Carolina Department of Transportation (NCDOT) proposes to widen existing I-95 to an eight -lane median divided facility on existing location from US 301 (Exit 22) to south of the proposed I-295 interchange in Robeson County, North Carolina (STIP I-5987). The project is approximately 15.7 miles in length. 19. Project Purpose (Describe the reason or purpose of the project, see instructions) Improvements to this portion of I-95 will help relieve congestion, improve mobility, and improve the resiliency of this corridor to storm events, such that it can continue to serve as a primary East Coast route. In addition to improving traffic conditions, sections of I-95 within the project limits have experienced significant storm related flooding resulting in total closure of the interstate for multiple days. Roadway and bridge improvements will be needed to make the corridor more resilient to future flood events. USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s) for Discharge Roadway fill, pipe/culvert installation and bridge construction. 21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Type Amount in Cubic Yards Amount in Cubic Yards Amount in Cubic Yards Fill dirt - amount TBD Soil - amount TBD Rip rap - amount TBD 22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres 14.403 acres of Wetlands or Linear Feet 2,099 linear feet of Streams 23. Description of Avoidance, Minimization, and Compensation (see instructions) The project was evaluated for ways to reduce adverse impacts to streams and wetlands. The following have been implemented for the project: NCDOT's BMPs for Protection of Surface Waters to maximum extend possible; Stormwater designed to avoid direct discharge to jurisdictional features to extent practicable; Minimized "in stream" activities; Pipes via Trenchless installation built offline; Stormwater design velocities entering jurisdictional wetlands habe been mitigated to be non -erosive (less than 2 fps). Unavoidable impacts to Water of the U.S. will be offset by compensatory mitigation provided by the North Carolina Department of Environmental Quality (NCDEQ) Division of Mitigation Services (DMS). ENG FORM 4345, MAY 2018 Page 3 of 2 24. Is Any Portion of the Work Already Complete? Yes n No IF YES, DESCRIBE THE COMPLETED WORK 25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody Of more than can be entered here, please attach a supplemental list). a. Address- See Application City - State - Zip - b. Address - City - State - Zip - c. Address - City - State - Zip - d. Address - City - State - Zip - e. Address - City - State - Zip - 26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. IDENTIFICATION NUMBER AGENCY TYPE APPROVAL* See Application * Would include but is not restricted to zoning, building, and flood plain permits DATE APPLIED DATE APPROVED DATE DENIED 27. Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant. SIGNATURE OF APPLICANT DATE SIGNATURE OF AGENT DATE The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, MAY 2018 Page 3 of 3 Attachment C: I-5987 State Stormwater Management Plan 1 Iighvz St� " North Carolina Department of Transportation Highway Stormwater Program �e STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 47533.1.2 TIP No.: I-5987A County(ies): Robeson Pa.e 1 of 3 General Project Information WBS Element: 47533.1.2 TIP Number: I-5987A Project Type: Roadway Widening Date: 8/23/2021 NCDOT Contact: Paul Atkinson, PE Contractor / Designer: NV5 / David Bocker, PE Address: 1590 Mail Service Center Raleigh, NC 27699-1590 Address: 7500 East Independence Blvd., Suite 100 Charlotte, NC 28227 Phone: 704-566-4342 Phone: 919-704-6707 Email: patkinson@ncdot.gov Email: david.bocker@nv5.com City/Town: County(ies): Robeson River Basin(s): Lumber CAMA County? No Wetlands within Project Limits? Yes Project Description _ Project Length (lin. miles or feet): 8.11 Surrounding Land Use: Commercial/Business towards south & rural/wooded/agriculture to the north Proposed Project Existing Site Project Built -Upon Area (ac.) 166.8 ac. 100.0 ac. Typical Cross Section Description: Northbound Lanes - 4 @ 12' Lanes w/ Paved Shoulders & Median Barrier Wall Southbound Lanes - 4 @ 12' Lanes w/ Paved Shoulders & Median Barrier Wall Northbound Lanes - 2 @ 12' Lanes w/ Paved Shoulders Southbound Lanes - 2 @ 12' Lanes w/ Paved Shoulders Annual Avg Daily Traffic (veh/hr/day): Design/Future: 101750 Year: 2042 Existing: 69300 Year: 2022 General Project Narrative: (Description of Minimization of Water Quality Impacts) The project consists of the widening of 1-95 from south of US 301 (Exit 22) to north of SR 1758 (McDuffie Crossing Road) from 2 lanes in each direction to 4 lanes in each direction. Several grade separated bridges will be replaced along the project corridor as well as reconfiguration of the interchange at US 301 (Exit 25). The proposed stormwater runoff from the roadway widening has been conveyed to roadside ditches and storm drainage systems that drain to existing outfalls. Waterbody Information Surface Water Body (1): Tributary to Saddletree Swamp NCDWR Stream Index No.: 14-12 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters (Sw) Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: SM, SO Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Na rative) Highway Stormwater ,,,,—, North Carolina Department of Transportation `'� Highway Stormwater Program .. STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 47533.1.2 TIP No.: I-5987A County(ies): Robeson Page 2 of 3 Additional Waterbody Information Surface Water Body (2): Tributary to Fivemile Branch NCDWR Stream Index No.: 14-12-6 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters (Sw) Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: TX, TV, TU, TT Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Surface Water Body (3): Tenmile Swamp NCDWR Stream Index No.: 14-22-3 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters (Sw) Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: TS, TBB, TR Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Na rative) Surface Water Body (4): Cowpen Branch NCDWR Stream Index No.: 14-22-3-1 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters (Sw) Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: SP, TP Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Na rative) Surface Water Body (5): NCDWR Stream Index No.: NCDWR Surface Water Classification for Water Body Primary Classification: Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer? Deck Drains Discharge Over Water Body? (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Na rative) North Department Transportation �� 1 Iigl1 1V Sion iZr^ Carolina of Highway Stormwater Program �� STORMWATER MANAGEMENT PLAN ^_!•„..- (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 47533.1.3 TIP No.: I-5987B County(ies): Robeson Pa.e 1 of 2 General Project Information WBS Element: 47533.1.3 TIP Number: I-5987B Project Type: Roadway Widening Date: 5/12/2021 NCDOT Contact: Paul Atkinson, PE Contractor / Designer: Wetherill Engineering/ Kevin B. Alford, PE Address: 1590 Mail Service Center Raleigh, NC 27699-1590 Address: 1223 Jones Franklin Road Raleigh, NC 27606 Phone: 919-704-6707 Phone: 919-851-8077 Email: patkinson@ncdot.gov Email: kalford@wetherilleng.com City/Town: Town of St. Pauls County(ies): Robeson River Basin(s): Lumber CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 7.96 Surrounding Land Use: Rural/wooded/agriculture j ME Proposed Project Existing Site Project Built -Upon Area (ac.) 165.0 ac. 93.0 ac. Typical Cross Section Description: Northbound Lanes - 4 @ 12' Lanes w/ Paved Shoulders & Median Barrier Wall Southbound Lanes - 4 @ 12' Lanes w/ Paved Shoulders & Median Barrier Wall Northbound Lanes - 2 @ 12' Lanes w/ Paved Shoulders Southbound Lanes - 2 @ 12' Lanes w/ Paved Shoulders Annual Avg Daily Traffic (veh/hr/day): Design/Future: 92600 Year: 2042 Existing: 63300 Year: 2022 General Project Narrative: (Description of Minimization of Water Quality Impacts) The project consists of the widening of 1-95 from north of SR 1758 (McDuffie Crossing Road) to north of SR 1723 (Parkton Tobemory Road) from 2 lanes in each direction to 4 lanes in each direction. Several grade separated bridges will be replaced along the project corridor as well as reconfiguration of the interchanges at NC 20 (Exit 31) and US 301 (Exit 33). The proposed stormwater runoff from the roadway widening has been conveyed to roadside ditches and storm drainage systems that drain to existing outfalls. Waterbody Information alb Surface Water Body (1): Big Marsh Swamp NCDWR Stream Index No.: 14-22-2 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters (Sw) Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Big Marsh Swamp TH, TM, TJ, SN, SR Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) J- ighWay - `lit Xx111,Nalf'i North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 47533.1.3 TIP No.: I-5987B County(ies): Robeson Pa•e 2 of 2 Additional Waterbody Information Surface Water Body (2): Mercer Branch NCDWR Stream Index No.: 14-22-1-3-3 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters (Sw) Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Mercer Branch, SQ Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) 14-22-1-3-3-1 (If yes, provide justification in the General Project Narrative) Surface Water Body (3): I Brisson Branch NCDWR Stream Index No.: NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters (Sw) Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Brisson Branch, SJ, TF Buffer Rules in Effect: I N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? IN/A Dissipator Pads Provided in Buffer? IN/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) Surface Water Body (4): I Little Marsh Swamp NCDWR Stream Index No.: 14-22-1-3 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters (Sw) Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Little Marsh Swam , SP, TP Buffer Rules in Effect: I N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? IN/A Dissipator Pads Provided in Buffer? IN/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) 14-22-1-2 (If yes, provide justification in the General Project Narrative) OP Surface Water Body (5): Buckhorn Swamp NCDWR Stream Index No.: NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters (Sw) Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Attachment D: I-5987 Wetland and Surface Water Impacts Permit Drawings and Utility Drawings 09/08/99 LU } co 0 a) E 0 C Ln 0_ (C oD —0c N p L O Nam} 0L CO C 0 00 W 1-4 --SR� mr EXIT 22) salll SiIIIIII/ IA Fa 11119.1 Fyo S071 8 ro SR 6cuq TON �R -9 STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS ROBESON COUNTY LOCATION: I— 95 IMPROVEMENTS FROM SOUTH OF US 301 (EXIT 22) TO NORTH OF SR 1758 (McDUFFIE CROSSING RD.) TYPE OF WORK: GRADING, PAVING, DRAINAGE, STRUCTURES, CULVERTS, AND RETAINING WALLS WETLAND AND SURFACE WATER IMPACTS PERMIT SITE 1 SITE 15 BEGIN BRIDGE -Y2- STA. 28+80.29 'SITE 2 END BRIDGE -Y2- STA. 30 + 71.29 BEGIN TIP PROJECT I-5987A —L— POT STA. 67 + 00.00 TIE TO TIP PROJECT 1-6064 —L— POT STA. XXX +XX.XX SITE 8 SITE 10 SITE 6 EXISTING SITE 3 A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF LUMBERTON. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. THIS IS A CONTROLLED -ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. EIGH ATION SITE 4 SITE 5 0 XIT .5 SITE 11 SITE 12 BEGIN BRIDGE -Y1A- STA. 40+34.4 SITE 13 SITE 14 BE N C LVEj -L STA. 10 4 +/- �il�i��J1�1►i� � � F�� 41irwat-V (k, 4k.J L- 1-95 STATE STATE PROJECT REFERENCE NO. RT SHOa TOTAL HEETS N.C. I-5987A 1 STATE PROJ.NO. P. A. PROD. NO. DESCRIPTION 47533,1.2_ PE 47533.2.2 WW, UTIL PERMIT DRAWING SHEET 1 OF 55 END TIP PROJECT I-5987A —L— POT STA. 495 + 00.00 TIE TO TIP PROJECT I-5987B —L— POT STA. 495 + 00.00 BEGIN BRIDGE SITE 18 BEGIN CULVERT -L- STA. 454 + 80 +/- 20LJi�i1`V END CULVE"T -L- STA. 310 64 +/ SITE 9 END BRIDGE -Y1A- STA. 42 + 03.64 SITE 7 SITE 17 END CULVERT -L- STA. 455 + 00 + SITE 20 -Y3- STA. 2 8 + 71.69 t NCO C/A,, .•r 0 ss c � SITE END BRIDGE -Y3- STA. 31 +36.53 SITE 19 SITE 23 TO FAYETTEVILLE SITE 22 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES 50 25 0 50 100 `I I I J PLANS 50 25 0 50 100 `IiII� PROFILE (HORIZONTAL) 10 5 0 10 20 `IiII� PROFILE (VERTICAL) DESIGN DATA ADT 2022 = 69,300 ADT 2042 = 101,750 DHV = 8 % D = 55 % T = 16 % * V = 75 MPH * TTST =13% DUAL 3% FUNC CLASS = INTERSTATE STATEWIDE TIER PROJECT LENGTH LENGTH ROADWAY TIP PROJECT I-5987A LENGTH STRUCTURES TIP PROJECT I-5987A TOTAL LENGTH TIP PROJECT I-5987A = 8.097 MILES = 0.009 MILES = 8.106 MILES N V 5 NV5 ENGINEERS & CONSULTAN75, INC, 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 E 704.537.7300 www,NVS,mm PREPARED IN THE OFFICE OF: ,dh moffatt & nichol ;Bisi Eni-vb'26 VOICE ENO, NC Lfs�1Qm2111 F-0105NO..NO..e69 � 2018 STANDARD SPECIFICATIONS RIGHT OF WAY DATE: MAY 28, 2021 LETTING DATE: JULY 19,2022 STEVE A. DRUM, PE PROJECT ENGINEER CHRIS D. ANDERSON,PE PROJECT DESIGN ENGINEER HYDRAULICS ENGINEER P.E. SIGNATURE; NCDOT CONTACT: CRAIG A. FREEMAN JR.., PE DIVISION PROJECT ENGINEER ROADWAY DESIGN ENGINEER P.E. SIGNATURE: 4N/4,///4f4:464 ''//:.///// /0(9/. 4:4 4 ////. //.66'i /// / //// /./ / //7" • j ",,(� .".R.. ,NV° /X/'max / f�f� ��� / I Jam, ° °'////%/p ° /i. / jw r�i G .w E7 ©/ % 4cs ©1• - MAS=INIMMOAINWASEIDM La- i , ///;;,t,,,,///: ° x p �bj \ / D Z C c la I "�`� f No cwM� � wi ;.. �� \� IH IJ/ �/ / �/ � � L L / I //// O NO CLAM / /' - C:i NO ICWM �iaaM�Y)Qi RC \ae NO CLAM .�i� /" • 9y\ \ I NO CLAM ///f/fe• 4% /1/// /`.// _ RUBErt,9x I TRAFFIC DIAGRAM Ao; zoii /////�/ //// ice, \\a J^✓///// /° �`�/ @TS �V /'ffF \\� d y/ Lb r aP9 .a NOM PO WO ROO a TS STREAM AND WETLAND IMPACTS WiA SITE 1 ROBESON COut=MILT EDUCATOR FOR -I. PROFILE SEE SHEET 41 - 43 FOR -DM- MORf SEE SHM. 8 9 FOR -n LE SEE SHEET 80 FOR -VIRR- PROFILE SEE SHEET 90 FOR -V1RP LE SEE SHEET 91 RPD- PROFILE SEE SHEET 81 FOR DITCH DETAILSn SEE SHEETS ',LAND 20, I-5987AAINV SHEET o PERMMT DRAWING SHEET l OF 55 PLANS F \ srt orur[ uFu*u un�C' TRAFFIC DLAG ADT 2042 IAA `L — 700'-ACC€L£FA11OP4 FOR -I' PROFILE SEE SHEET 41 - 43 FOR SRS- PROFIf SEE SHEET 8 9 FOR -Y1RPA- LE SEE SHEET BO FOR -YIRPB- PROFILE SEE SHEET BO FOR LE SEE SHEET 81 PINED- PROFILE SEE SHEET 81 FOR DITCH DETAILS SEE SHEETS 200.1 AND 20,2 PROJECT REFERENCE NO. SHEET NO. /-5987A RW SHEET NO. SITE 1 -L- STATION 111 + 25 7'X7' RCBC —200 —150' —100' —50' 0' 50' 100' 150' 200' T OP 0 F T BAN P K 0 R F IG BANK IT LE FT 14 13 0 0 12 0) P ROYO STR EAM E D BEF1 FIL CL I STA 111+25 7 x ' RCBC BU 1' WITH BEVELED HEADWALL O 6.6 L� PR P G.P. ELEV NB= 3 SKEW = S8 I7(1STINL, (ROUND / WITH I RIP RAP -P. OVE EXISTING PROLE AL O i CL INV. [LEV — 0.9 SLOPE = 17. 1% 48" CP NG STR CT RE i P R ST 0 R PO S EAM tX ED BE Is D M 24„ G MEM= ■■■■if■■■■■■■■■ CP STREAM R r ED ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLE DO NOT USE FOR TE PLANS tcW ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED N V 5 NV5 ENGINEERS & CONSULTANTS, INC. 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 P: 704 537.7300 www.NVS.com NC license N F.1333 PERMIT DRAWING SHEET 4 OF 55 HORIZONTAL SCALE 50 25 0 50 100 FOR -L- PROFILE SEE SHEET 58 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 REVISIONS H 4+00 SEE SH MATCHLINE -L- STA. 2 1580' ACCELERATION 2000' DECFLERA110N5iOR139E LATI Vas oFTw we vie STREAM AND WETLAND IMPACTS KM vnow w.reiTsw ve..cn suem wx.Fw 0 NO CLAM 4L%4"11. \ WWI PD,ERS HORS CRUSTRIlv / / SITE 2 58 NO CU. "6{%9lSR' lei �T'—�� �z� ___•_L� — SITE 2 TX SITE 3 i' 11001,5 x zi aPazx x x x x ., -------------- -------------------------------------- NO CLAIM T e. i II9 ELAN RUM.. m x �' C \,\ // / /�/xi / 7 N NO CLAIM A D N N N N N N N N ram I-5987A n . I mz/9 LW SLEET 0 'TSE PLANS NIV15 LL / ELL _ TS SITE 4 PERMFS DRAWING SHEET 5 OF 55 FOR-WSRPA- PROFILE SEE SHEET 82 FOR -WWII- PROFILE SEE SHEET 83 FOR -WSRPC- PROFILE SEE SHEET 83 FOR -WSRPD- PROFILE SEE SHEET 88 FOR DITCH DETAILS SEE SHEETS RD-1 AND 2D-3 ELPwS MATCHLINE -L- STA. 243+00 SEE SHEET 15 GRAPHIC SCALE 5.-.0- 6:6 0 PLANS H uJ LIJ V) LL W l/I 0 C1 J LIJ Z /l Pis No 11.00111 9s • 23r 399 Ls • I50OO LT • WI P -WSRPA- ffSb5667 �O •i/ 5/71RTT 0 • T22'i32 R•• 106671 •I 0S • mph RO •150001 i1'SRPB. P/s`Slo 141307 Bs iI23r399 LT • ST C150O7 +001 `P15134257715/01+1525" 7311390 A• T15'16T1LT1 Ba • ZJr397 • 150O0' 0 •TE2132 Ls • 150N' LT • KOOw L • 21524' _ LT • ma 5T • 50Or • tour _ - -; ST • 50or o R 17000d R_ • 500 e RO • 15000' iSSRPC- Pis Sb//IM0I P/ Slo 1258E6 ,01375lo 1+17O3 Os • 23r399 0 • 7*06.51.4 1RT1- as • 23r399 Ls •45000' 0 •• 2TR2O22133 Ls • 15003 n` ,YT10 7 •20217 /ST •� R Y•1� • .8SRPO. ' Sb 000O1 PI5b 12R33 Pis 5l013.9AI5 Os •73T39Y G •6'3T12f UT) 9s •73r399 0 •3'E2132 Ls • 150N' L • 99A1. LT • NAOT T • 9733• • 50Or R • 170000 OS P 50 mpFL 1+ RO • 15000' / N I-5987A 1 /9 /NCU PERMRT 6 OFrO'F' ^SHEE. 09 FOR-WSRPA- PROFILE SEE SHEET 82 FOR-WSRPR- PROFILE SEE SHEET 83 FOR -WSRPL. PROFILE SEE SHEET 82 FOR-WSRP0- PROFILE SEE SHEET 88 FOR DITCH DETAILS SEE SHEETS 20.1 AND 20.3 CHLINE -L- STA. 243+00 S G GRAPHIC SCALE 5.-.0- 6:6 0 PLANS o - 1J w 05 cc o_ >- r co 00 05 E 0 0 w 5/ 51 CC 05 Cri co 2 0, co= / / PROJECT REFERENCE NO. SHEET NO. / 5987A 5 — / RM' SHEET NO. — / NAD 3/NA 2011 / .YI�I ROADWAY DESIGN ENGINEER CS HYDRAULICS ENGINEER // STREAM AND WETLAND IMPACTS INCOMPLETE DO NOT USE FOR PLANS 2<24 ACQUISITION /// TS IN SURFOTES ACE WATER/ O / / IMPACTS IMPORARY ,,,,,,,,/,*NE SURFACE WATER ' I T V ///// DENOTESIN Ln / j' ETLANDTION / DOCUMENT NOT CONSIDERED FINAL DENOTES MECHANR UNLESS ALL SIGNATURES COMPLETED / " " CLEARING 60 & CONSULTANTS, .....9 LC1 ANTHONY BLANKS V- NO CLAIM/ INC. NV5 ENGINEERS 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 P: 704.537.7300 www.NVS.com DB 1233PG 380 166 62 DB 1660 PG 155IT Bcu nseaFiaa SITE 4 RICKY BLANKS PERAWING D CULTIVATED DB 1957 PG 755 SHEET OF 55 w COUNTY OF ROBESON / DB 429 PG 205 58 WOODS NO CLAIM . TS * SPECIAL LATERAL V DITCH SEE DETAIL O 45 L OF CHANNEL • SPECIAL LATERAL V DITCH . ,-dila - IMOVEMENT 411- BILLBOARD SEE DETAIL B BILLBOARD — E -L- STA. 256 + 00 SEE SHEET 16 7r T z.. .. .. 'B' _ /: LASS RIP RAP HW X i� 140 >Ai�I> EST. 2 TONS ' -- SPECIAL pL�A�TERAL V DITCH .-EST.7 �� SEE DEF I� rISG SY GT -_ --5--- _C ? C---_c_---5---_S-_ c__ C -- -- LV L� .. .. .. .. .. .. .. .. .. .. i-- c�i,� 15"RCP-IV P �� P �r - -c �F F F END SBG ' '- _ _ -�_--- r#458= - �iREU-SLR- — — Qi AC m F95 SB 43'BST a 45 INSTALLATION r PLUG & FILL -- -- -- -- — O Iy' I DO"WELD D STEEL r'/I + l REMOVE £ e z r -I---_ - - T z -L-r r-.L- . . r -z = r � B 2GI r T TTB I TB 2GI r MTL M ,ur.v ntir"�"� V ' �T� -L-moil 15"RCP-IV N 15" RCP -IV - _ - _ - RP "dC'* Er r p S TB 2GI Q- 1. N INV=143.52' - TRENCHLESS INSTALLATION L s--r ,___ z i _ _ .RDo aico i 1 --- - -- F -- F F Z — — ---- -- — -- • ���121 EW '// /��i .o:.' � - U i �- Z a,._ _— .- ,.. V;: -. \ X ----- X X X X MATCHLI r .. .. �: -- -. I'�--�-- - -_ �. - __ — . '._ -- 'v vex x - - X X X X X . . - - _X X X X _x_ X X X `C X 59 •LASS 'IV RIP RAP � T. 8 TONS ST. 21 SY GT NO CLAIM DANIEL MAINS WOODS ANTHONY BLANKS DB 1742 PG 230 DB 1233 PG 380 bl w000S NO CLAIM WAB \ / SITE 5 \ WAB \/ \ \ / GRAPHIC SCALE 50 25 0 50 100 PLANS x FOR -L- PROFILE SEE SHEET 82 \ FOR-WSRPA- PROFILE SEE SHEET 82 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 0, 00 co 5 CTI 0 CO z 0 U W ti 00 a r a 00 m 0, 0 7 E 5 0 W 0 0I 00 0 W N o 0= c‘dco= PROJECT REFERENCE NO. SHEET NO. �\v\// / 5987A /5 / ( / 48 RM' $HEFT NO. VT 0�X a^ NAD A Z 7 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER // STREAM AND WETLAND IMPACTS INCOMPLETE DO NOT USE FOR PLANS CPR ACQUISITION / xDENOTES IMPACTS IN SURFACE WATER O / / T00 • U %00 DENOTES TEMPORARY IMPACTS IN SURFACE WATER i DENOTES EXCAVATION O .q m <b / /` // A$ IN WETLAND DOCUMENT NOT CONSIDERED FINAL DENOTES MECHAN LV� UNLESS ALL SIGNATURES COMPLETED 0 * . CLEARING 8b1\ - 60 a & CONSULTANTS, 1L` p` gb ._ NO CLAIM / p w 1p9, ANTHONY BLANKS • N V 5 NV5 ENGINEERS INC. 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 P: 704.537.7300 www.NVS.com Airj� J DB 1233 PG 380 tix 62 cb 1 Rc License# FI 4 148 /96t �a q PERMIT DRWIG OSITE cuLrlvArED z/ ` DB1 57 PG 755 SHEET 8 OF 55 0 N ROBESO - B 29 PC 205 i co oo i � JO 1 ] - 0 C I 48 a T�` ^ ., 0 !/} S ECIAL LATAIL ERAL V DITCH - -- -, EE�ET //: / •. 147-i E 1 ' SPECIAL LAT RA DITC- MATCHLINE -L- STA. 256+00 SEE SHEET 16 W ._ . _ _ _ _ _ :_ X�. 1� n - �►� ev �B' 'IP 2 � /7� RAP �wi�/•L 7T.2 s S bln 48 erg LITERAL V DI 8b X „r . - /�. �EST.7 SY GT gbl\ 5--- SEE DETAIL 81 - 6bi—� -� �,I �y y -�_ _ _ _ bi // W — . _ _ I9I - - _ 94 94I �� -r \F Y_6bI / --- -- - --E -REU-TI:Q 6bi 641 IS 2 --- - -- -- — O //fif 1-95 SB 43'BOT r,;L: ',Sr S INSTALLATION PLUG & FILL — O // —a' �Ir 152 -- _- --15 —? _. _ — ksl iv7/_ --� r - - Z - 152 -_ --_ - -�- -1 -}��TB. ��aa„in _ 49— - __._ -- --�6 ZGI __- - - _ Ir 15Y-r 2G- M ___ _ __ _y _ - _ - - 147-__-_-__ 48 _ __ �. __--- i" 14 ---� '• _ -- _ _ —LN (V — — — — R ZGI__ ��/:) 8 8bi 81I .-, b, k3.'rer....`s.:. T .,,• .-ems...—r_;11 015 T , I€T- 91 5I — - -- CST -- — ---- LJJ _ -- — --- -- — --- ! —— 53 -- — -- — 53 — Z--- —--152 151 -EVT_I 'mil 148 149 151 m . 149 6 49 J 477 48 49-77 48 49 C - - 48 4--- 7 48 46 4146 = 6 46 = ---4 ' 4qE�.•i�. -T-n M.M.S. _ Va 'sue - xI X q � '. - - - co - _l 8 r F LASS ':' RIP RAPI4j 14 C Vi 9 EST.B '•NS '0 a . �`. SC WOODS i_ NO CLAIM / /bt 146 DANIEL MAINS TH Y BLANKS\/ GO DB 1742 PG 230 ti 0 12 PG 380 144 d gat �� bl m W0 Ds l b8�1 NO CLAIM Re' k� b __\/ `�� �l WAB �` o' b O ti -. s9 4 9bt / O 1) 349 .01 co 14 VO 4. m r �A9 7 b1 tea ��� LIT ,,,,,,L? SITE 5 8 b/ O °i \ 48 5, P� Pd /~ I O 9 PJc JSCALE 50 25 0 50 100 ti0 PLANS FOR —L— PROFILE SEE SHEET 82 \ / FOR—WSRPA— PROFILE SEE SHEET 82 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 PROJECT REFERENCE NO. SHEET NO. /-5987A RW SHEET NO. SITE 4 -L- STATION 242 + 85 8'X7' RCBC TO c lr N CO 0 0 0 Z >- r cr m m o` 0 E 0 w 0I 0 w a N, oc� 000r meta P F RANK R R E IGH —2 160 150 T7 �40 MOVE EXIS 00 —150' —100' PRC STR TI N G POS :AM ED 2@ BED 48' RCP L 7 —50' STA 24 +85 8'x7 RCBC BURIED 1' WITH BEVE D HEAD PROP O.P. EV. SB-1 -SKEW =121 EXISTING GR.UND PRO f 5 ALL .4 / i CL 50' 10 IN i V. ELEV. = S OPE G S TR 004 UC 141. T U 3 RE 0' 150' 20 f PROP OS STREAM ED E 0' i TO P F BANK EXISTIN G L ST EFT REAM BE ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLE DO NOT USE FOR TE PLANS t1W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED N V 5 NV5 ENGINEERS & CONSULTANTS, INC. 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 P: 704 537.7300 www.NVS.com NC license N F.1333 PERMIT DRAWING SHEET 9 OF 55 HORIZONTAL SCALE 50 25 0 50 100 FOR —L— PROFILE SEE SHEET 58 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 co co SEE SHEET 15 csci m CC r 0` 0 w In 51 a CULTIVATED SPECIAL LATERAL V DITCH SEE DETAIL M q� 15"RCP-IV 15" RCP -IV INV=146.87 mac araL€Sli -LNTAtLATiO k PLUG 8 FILL ti/ 18" WELDED STEEL INV=146.64' ---8 II 11'�� BLA STA 254+48 p 35' RT dd ELEV 146.32' X TAIL V DITCH SEE DETAIL S CLASS 'B' RIP RAP EST. 3 TONS EST. 10 SY GT RICKY BLANKS DB 576 PG 348 STREAM AND WETLAND IMPACTS 0 RICKY BLANKS DB 1957 PG 755 DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER CULTIVATED BL 122 x x x x x n x x RIP RAP PAD IN JS CLASS 'B' RIP RA SEE DETAIL AR EST. 3 TONS EST. 10 SY GT PROP. TYPE T BARRIER SPECIAL LATERAL V DITCH SEE DETAIL B BEG 47" WW FENCE Wi1SBW TS P RAP AT EMBAN EE DETAIL L I5 CR NAD 8 A 2011 SITE 6 WOODS MARY BURNETTE DB 2057 PG 126 i SPECIAL LATERAL V DITCH SEE DETAIL M ILLBOARD E TB 2CI B 2GI TB 2GIr—T—� 18" RCP -IV L 15"RCP-IV 15' CP-IV 15" RCP -IV PLUG & FILL TOE PROTECTI 868 SEYAIL 61 NO CLAIM DANIEL MAINS DB 1742 PG 230 WOODS SITE 7 TAA 18" WELDED STEEL 78 RIP RAP AT EMBANKMENT SEE DETAIL L 0 END 47" WW FENCE W/1SBW MARY BURNETTE DB 2057 PG 126 0 SPECIAL LATERAL V DITCH SEE DETAIL M PROJECT REFERENCE NO. SHEET NO. /-5987A /6 RAY SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLE DO NOT USE FOR TE PLANS t/AW ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED N V 5 NV5 ENGINEERS & CONSULTANTS, INC. 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 P: 704 537.7300 www.NVS.com NC License N C1333 WOODS PERMIT DRAWING SHEET 10 OF 55 N- N BILLBOARD BEG 47" WW FENCE WASK_I4C..' _-C'__ BILLBOARD 0 1 r LLJ LLJ 2 V) LLJ LLJ Ln 0 0 + 0 N L Q V) J LLJ Z J 2 GRAPHIC SCALE 50 25 0 50 100 PLANS FOR —L— PROFILE SEE SHEET 54 FOR—Y1ARPB— PROFILE SEE SHEET 85 FOR—Y1ARPC— PROFILE SEE SHEET 86 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 co m 0, -0 0 w CC CC r CO m 0 O O N E 0 0 01 w CC 21 a NC C °L o�T °v 0= - c‘d000r 84l 0,@f1�26W BLANKS �JB 460 PG 203 8p� CULTIVATED bbl Z. SPECIAL LATERAL V DITCH DET 581 49- 641 VI TB- 26J — 149 PLUG & FILL 15"RCP-IV 151 15" RCP-` TB 2GI - TB 2GI 4NSTA 18 WEL. STEEL 149 BM"11.4+4: 35' RT TAIL V DIIfF SE€ DETAIL S ,CLAS 7 ' RAP EST TONS EST.10 SY GT 148 RICKY B N DB 576 PG 348 STREAM AND WETLAND IMPACTS 0 N RICKY BLANKS 1957 PG 755 14q o Nc CLAIM DANIEL MAINS DB 1742 PG 230 �49 se DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER p8) 01 8 0 a 08 ATED 15 g4� 14 SPECIAL LATERAL V SEE DE T B 6b1 861 • 81-4V SITE 7 WW— F€NCE1 —WASBW -----_TB 2GI 15" RCP -IV RIP RAP PAD IN J SEE DETAIL AR TB 2C1 19 PLUG & FILL 15"RCP-IV 15' CP-IV 15" RCP -IV RIP RAP SEE LlETAI SITE i —WOODS DBY UR 2057 I , 1I6E S'En.. S� BILLBOARD E V DITCH 5 PROJECT REFERENCE NO. /-5987A R'W SHEET NO ROADWAY DESIGN ENGINEER SHEET NO. /6 HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR t<W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED N V WOODS NV5 ENGINEERS & CONSULTANTS, INC. 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 P: 704.537.7300 www.NVS.com NC License N F.1333 PERMIT DRAWING SHEET 11 OF 55 1 r uJ 2 LL LL L/) 0 0 T 0 N LQ V) J LJJ Z J 2 V 1- GRAPHIC SCALE 50 25 0 50 100 PLANS FOR -L- PROFILE SEE SHEET 54 FOR-Y1ARPB- PROFILE SEE SHEET 85 FOR-Y1ARPC- PROFILE SEE SHEET 86 I % FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 Vanflg SITE 8 seennxv N rtO MART mums 08 Al k k IA R k A N k k A UK% A A IA R- N A k A A k k k k k A 0_ rr9f" is . •�y m.A k IE k CurrOATED STREAM AND WETLAND IMPACTS /A i REacE wATEa iia>Er,.0 FURra<E..rEa KY/A raOSC REFERENCE N . 1 sneer NO ROE CROFT 0 ' 9 a'okaE �E PL NB NIV15 sEE m m r�wO m 7,70,4 ALL DRIVEWAY RADRARE 30' UNLESS OTHERWISE NOTED. UNIFORMLY TRANSITION ODRIVEWAY POSEMET REL D LE SEE SHEET 55,56 FOR -GA- PROFILE SEE SHEET ]C, 75 FOR SR]_ PROFILE SEE SHEET 76, )) FOR -GARP. PROFILE SEE SHEET 85 FOR-YIARP4 PROFILE SEE SHEET 86 FOR-YIARP0. PROFILE SEE SHEET 87 FOR -DR)- PROFILE SEE SHEET 93 FOR DITCH DETAILS SEE SHEETS 30.1 AND 20.3 PERMIT DRAWING SHEET 12 OF 55 GRAPHIC SCALE N —1 Z x 0 MAY BuRIETTR Mt ER PS LW 292 N NAD 8 A 2011 , m3Re<R NNT // 0 mom FIz6R , .' _ e+.M•r I .I: �.a — ... ail,° , .0 Ix �'� WE° �^..q. ' — _— 1•_� — ,IIIIIli �1 --- ESL ° • zL --- ... _ E �� ate— -- - Tv \�.T� .. ., _ _ - - — — .._ , -�! ._ _. �9 ®ice!^ _— — - _ram - .. ==M _ _ _- '� -- ■ .: ten,,...-,�. - i� - .pIMII.IMiliP��wvlar mmemnnscr— _— NP s.rt—.i > 3A R� �I 220190 veemNce n . 1 sneer No PLANS NIV15 y44/�, SFF S yFFT S'p2. St, /9 0e TB 2 -16'2! Mil STREAM AND WETLAND IMPACTS %iA% ; R arm I'//� >R e°.rME..rE. �:• .:I ° r,eAeN° ° WIT SO PS TS ALL DRIVEWAY RADIIARE 20• UNLESS OTHERWISE NOTED. UNIFORMLY TRANSITION DRIVEWAY REMOVAL D LE SEE SHEET 55, 56 FOR -NA- PROFILE SEE SHEET 74, 75 FOR SR]_ PROFILE SEE SHEET 76, )) FOR -YIARPB- PROFILE SEE SHEET 85 FOR-YIARP4 PROFILE SEE SHEET 86 FOR-YIARPD- PROFILE SEE SHEET 87 FOR -DR2- PROFILE SEE SHEET 93 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-3 e_i PERMIT DRAWING SHEET 13 OF 55 GRAPHIC SCALE PLANS 1 5 0 1 4 0 1 3 0 1 2 0 1 1 0 1 0 0 90 BO 70 60 50 40 30 2 C 1 0 0 1 0 2 C 3 0 40 50 60 7 0 B0 90 1 PROJ. REFERENCE NO. I-5987A 0 SHEET NO. X-333 50 d J >- o cn cr 0 co co w 7-6 uOn fyL — C O O TN O�L MCC 7( FC vwri NL) d do M �� PERMIT DRAWING SHEET 14 OF 55 it° ae__2 mn 111111 111111 11111 m1/ \ � ��'' '— IF. 3 31/ go 1— PO n —{ 3 6 0 0 WETLAND 0,053 0 050 Fn n —t- 3j 4- 7n oko 35 + 00 4" SITE 10 n 10n IPO SITE 10 IFn /fn 1— 0.053 n 0 050 4:7 17( -4 -- n d n 1 50 4 1 30 1 20 1 1 0 1 0 0 90 B0 70 60 3'‘ 50 40 30 es M so 2 C + 00-. 00 35 0.053 34 0.053 �10 t 50 • 0 C50 00 0 4 + 00.00 10 2 C 30 40 3• 50 4 :1 60 70 B0 90- 1 0 0 1 1 0 "10 1-10 1 4 150 70 70 CO CO J 0 cr co 0 cc 00 w uOn fyL oi� 0 s ¢ 0 051W5 10 410 110 '��1111111uLt1 IIIII1.A1IIIIIIIIE�11111111?�11111111"��11111111 �11111111.CL!IIIIIIII��IIIIIIIIJ'.IIIIIIII��IIIIIIIII'.IIIIIIII��11111111tk11 1111giO111111111"��11111111?�IIIIIIIIE�11111111!'�11111111�'�IIIIIIIEI11 . . II i i i hill ■ .J I 0 i II II 1 II 1 I i 1 1 i 0 • I i i .. 01 4 lob z ., 1i II u III rig i i 1 PROJ. REFERENCE NO. I-5987A rInnmr� innnnNi PERMIT DRAWING SHEET 15 OF 55 SHEET NO. X-334 11111111111111111111111111111111 1111111111 1111111111 SITE 10 111 Y 1. ., i i i 1 1 1 1 SITE 10 i i i i i i i I i II II I� SITE 10 111111 111111111111111111111111111111111111111111111111 0 1 4 2 1 f 90 00 70 (40 50 40 30 10 0 10 30 60 70 00 40 PROJ. REFERENCE NO. SHEET NO. I-5987A X-364 111 1IIIIIIEIl1 /80 .. .. .. . WETLAN D .. .. PERMIT DRAWING SHEET 16 OF 55 1111111111111__11 O0 1 1 1 bsn .... ha :1I 1 1 ... ... ... 111 1 1 1 1 1 1 1 1 11 1 1 1 1 1 ... 11 11 11 111 111111111111111111111111 0 0 ..�.. ■■ 11111111111 11 11. • 1I!: 1 111111111 1111111111111111111111111111111111111111111111111�----- t-.1111i111 1 E1111,1 ... ... ... ... .. .. .. .. ... ... ... ... NNE 1 1 1 I.PI 1 1 111 1 1 1 1 1 1 1 1 11 1 1 1 1 1 11 1 1 11 111 • 11111111111111111111111111111111111111111111111111111111111111. 1 .-. .. .. .. •••!!•••••••••• . -_� • 11 11 11111111111-11 SITE 10 1 111 ...-II ...-.. ...-.. ...-.. 111-11 111�11 .... 1111111111111111111111111111111111111111111111111111111111111111111111111111111111 1111111111111111111111111111 IIII II 111 •• minim �III�II 111�11 • .. I IRO v0 /8n 0.021 0.021 • tY "�I �A1111111111111111111111111111111 111111111111111111 SITE 10 DEL • r - - .. _ .-�—. �.... WETLAND .0 ... .... 1111111111 /70 -n 841 /8n .96 27+50.00 /8n Al 0,041 0.041 SITE 10 1. W —3.1 27 +00 00 1-50 0 a 160 15n 50 0 7 0 20 "o 00 -Y/ARPA- 70 !r0 50 40 30 20 10 0 10 20 30 40 50 69 70 99 99 00 1"0 "20 )0 1 4 o •s CO CO on co co cr 7 0 0 co 773 00 fyL oi; 0 ��s COM 0 5 10 '111111 1�1111111141IIIIIIIEI!11111111tAIIIIIIIIAAIIIIIIIIEA11111111?�11111111"��11111111 A11111111�!�IIIIIIII��IIIIIIIIJ'.IIIIIIII��IIIIIIIII'.IIIIIIII��11111111��11111111giA11111111"��11111111?�IIIIIIIIE 11111111!'11111111�'�IIIIIIIEI!1111111111! PERMIT DRAWING SHEET 17 OF 55 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... ................................................... 111111111111111111111111111111111111111111111111... ...........................I 111111111111111111111111 ...........................I 111111111111111111111111 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 1111111111111111111111111111111111111111111111111111 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... 111111111111111111111111111111111111111111111111... •n 111 111 1 i i I 2 9 -I U J 4 7 0 0 0 00 99 7 641 4P 20 0 A ! 1 0 UV A 0 20 30 40 1 a • • i I 50 'Il" 'Il" 7f1 i i 00 1 • . i . SITE 10 0 0 7 0 4 0 5 0 1 S0 140 PROJ. REFERENCE NO. SHEET NO. I-5987A X-367 1,0 120 1 0 100 40 00 70 60 r,0 40 30 20 10 0 10 60 70 90 40 10® 4 0 PERMIT DRAWING SHEET 18 OF 55 1 1 1 R(D 70 ■■ ■■ ■■ ■■ ■■ ■ ■■ ■■ ■■ WETLAND 111 1 ■■ ■■ ■■ 0.020 0.020 12111 111 11111111111 /5n on an WETLAND ■■■ 27 + 50.00 11 ■ 111 ■■■ ... ... 111MEM ■■■ SITE 10 ■■ ■■ ■■ ■■ NM ■■ rro I'r7 Rn 4_ • ■■ SITE 10 ■■ Uri /50 1 ■■ IRO — ■■ ■■ ■■ ■■ tET *10, thn 11 27+00 09 •I gr; R0 111111111111111111111111111111111111111111111111111 111111111111111111111111111111111111 SITE 10 ■■ ■■ ■■ ■■ ■■ ■■ ■■ ■■ 0 ■■ ■■ NM ■■■ n IRO IJ 0 thn is 0 0 0 2 0 a0 150 afir-- ---- ---- a:33 0 /50 2 6 00 0 0 • 50 "40 "20 "0 "00 99 Dq 70 60 50 40 30 20 Y/ 10 A K 0 H 10 20 30 40 50 69 70 99 99 100 0 20 7 0 4 0 5 0 CO c0 N 1 S0 1 4 1 1 70 1 0 1 00 90 D0 70 G0 50 40 30 20 1 0 1 0 20 30 40 50 60 70 D0 90 1 00 PROJ. REFERENCE NO. SHEET NO. I-5987A X-368 1:® 0 oc c >- m o 7 0 0 0 co co 7-0 [10 fyL oi� mC0 PERMIT DRAWING SHEET 19 OF 55 ao t6n r50 4 WET LAN 0 0 2 0 0 20 2 8 1 50 1 1 1 "20 0 1 00 99 99 70 GO SO 40 30 20 Y 1 0 A 0 0 PH 1 0 20 30 40 50 69 7O 1 B9 99 1 00 SITE 10 I7n 0 1 2 0 1 7 0 1 4 0 1 5 0 0 0 0 cip cr 00 cc >- 00 0 00 m m 0 s_ 0 1) E E 0 0 U 00 0I 0 U N 0I 00 cc "fB..4.,,"k,p "v ISBKD PROJECT REFERENCE NO. SHEET NO. �B, ABAND dG vV's„, , ':- A r—I aF S /-5987A l8 • 0 ee' > \� es› ° 7° r SGL PROPERTIES LLC TEFDY :LANK$ // _ L3LDG ,w� RM' SHEET NO. __ �-' 9., F C\ \\ IB 1694 PG 532 �0 DB 617 PG 826 X r- ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER BLDc yak \ \ 8�� LT ISBKD G 00 / "% / /r :`a. ; � \ d ISBKD ISBKD M} NAD 83NA E Ir I 2011 Y! it �� ° 6D. W INCOMPLETE PLANS ;" s\\� f/ cGNo a A '.'ARE�N, LOCK R ` ' 42 1 ONC ' ' k , , DECK SITE 11 DO NOT USE FOR 2�W ACQUISITION .� o JOHNNY JONES //. 'G / DB 94r34 PG"889 I°I *: o <, Q DB 190 PG 50 /j ,Q, \� o to G ,y \ Ok +C al / ' l 4�iIK \.- \\� �k 2 R / IE T 2 i A 1 I I I I r I ALBERTINA RODGERS 1 DB 1508 PG 275 x / , -1= it X Ex10000 R� / 1, ill F I. /II / R. ssmow\ •RP , .. - T I` - I�` ELT 72°WQM1X /F yjw / , : -- -___ _---_ DOCUMENT NOT CONSIDERED FINAL o �_ R / oPo° 85 �/ —_ / ARP , _ soa aR - ____� .; UNLESS ALL SIGNATURES COMPLETED N _ — R _ 4LT _ _ _ _ _ _ - __ _ _ .w_ - ,�,-`- _ } CANOP / F - ; NO CLAIM /d cONc Nc ° BK �.8�( / BLDG / , LINDA JONES Nw o��I ' Py,y. R P I /v �. \ / NSWIx NV5 ENGINEERS& CONSULTANTS, INC. / / DB 1670 PG 323 �_ / i - I I��---- o' `� w EXISTING Ft 1 1 / / IE IE '� N V 5 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 P: 704.537.7300 www.NV5.com LL l •C,y p ISBKD ANOP a }/ .1ECR4 • CONC a h L(T I 11 / / NCLlcense a33 ° 8.6 � CP ©Nri‘ 3E" CONS 30• GONGr'n �, N=1 PER/�¢IT @RAWING EDWARD OXENDINE ISBKD if.I+ 1 / 2 SHEET 20 OF 55 €7 DB 1689 PG 611 ISBKD ISBKD ISBKD WC I 84 LASS TO,.WP RAP • EST.2 JOSEPH SANDERSON JOSEPH SANDERSON 1 1 HARVEY CANADY EST. 7 SY GT 87 _ PUE DB 1491PG 497 \ -. -- -- CALEB RAY LOCKLEAR CLASS 'B' RIP RAP _ S DB 470 PG 234 L� CLASS 'B' IP'RAP /OB 413 Pe277 K EST. 2 T� �'S I SITE 12 MATCHLINE -L- STA. 298+00 SEE SHEET 17 c MB 30 30 PG 76 47" WW DB 1840 PG 443 FENCE -, W/15BW SPECIAL LATERAL V DIT� ❑ ---- __ SEE DETAIL B L-•�, �� S E PUE YIARPA- . +10 STANDARD DFFCH PU 82.34' SEE DETAIL W" - L - ' © 15" RCP -IV _ 1` BILLBOARD !. 1 rallik, EST.2 TONS EST. 7 SY GT 88 ORLANDO SANTOS DB 1787 PG 268 ° �A_ --_ _ V JACOUELINE GRAHAM DB 793 PG 770 E`, m ' ' L SPE CLASS 'B' RIP RAP SEE EST, 2 TONS EST. 7 SY GT - - I + I+ /� I m I+ LORRAINECANAD CLASS 'B' RIP RAP FILL CHANNEL WITH D' EST. 39 TONS EST. 30 SY CLASS II RIPRAP / DB 1195 PG 3'' I TO ELEV-132.2', I' U IAL LATERAL V DITCH IF IEEST. 21l TONS hr1 ASS II 1P'x•' T '� AIL AC I - - 34 LF OF CHANNEI; I IMPROVEMENTS L EE DETAIL SHEET 20-1 \� END 47" F I+ "I+ & IF F P- MATCHLINE -L- STA. 312 +00 SEE SHEET 19 < ©g .� m r,�_m EG 17 WW FENCE BWW PUC RE `� �_ rr 1� - _ - - - - - - C- F'N W� �. '� W/15BVA W/15B .._ _ B 2GI -��.. -... - _ -..-. - .. .;. • CP-IV ';: ,�.., - _ - _ - `a>,p F `; -Y/A ,0 .. 15" RCP ... .4... ._ - .� REMOV wr . PA- 2_ -IV *.%.`,���r EXI TP�.s'ikn. -a: 15" RCP -IV i I Z. TB 2GI ��, . '_ GI TB 2GI TB 2GI \•` - - - - IS RCY_IV --- _-z-L-L—r—MIL�I --- - -- - v _- _ -- i. � ` -- -- Ta 2.0 n 1' I:Me1 _- II 36" RCP -IV 42" RCP -IV+ ---- �8"-RCPJV =B�G1— --- - [ - _ - — - _- — — �— — -� ^ TB 2GI 15"RCP-N \\ 15" RCP -IV -,, _— -- ---- TB 2GI TB 2GI \ REMOVE- �.. TRENCHLESS INSTALLATION TRENCHLESS INSTALLATION\\.1 IIIC e c Irr - .EEL- — m -18 VELI3E3 STEEL _--4.= _�--- - _ 0—z rT-r i---� MIL rv. fn, I77 — s- I_IMir- I - 21'-^�'••,-�"tr+`�r+ X/rRr ONC Bw -YIARPD- .�. '_/" TB 2GI S ' � Is COW?' Jr'?RI _ , coNc ww � 8:1 TAPE T. O T= NS - S RIP'• Pad R T-1 . - ` - ,- _ - - GREU TL 3s�A TOE PROTECTION w SEE DETAIL A �.41L.r �A BEG + tEl't �, x v x x ' '- '- 1 ! Ilrlll r/n' _ iIA —. x x x X y / ��` WW .- — - __----_ _ — ---_-�-- ' © _ LEE46N GODkN C PDPD DB 599 PG 161 - - - - C EST. 2 TONS EST. 28 SY GT 47" WW SPECIAL LATERAL V DITCH FENCE SEE DETAIL M W/1SBW CI-. -Iva-EC 82 $'1 / / K$T. 80 T�A15 CLAD E RIPRAIze l . is EST. 85 SY GEOTEXTILE ;/� � � � K LORRAINE CANADY WOODS 43 DB 1195 PG 339 - MB 30 PG 76 / / REEC1AL LERAL 3' E ' H L . EL WI Q.: / DETA ATAK 1 TO V-1PRA LORRAINE DB 95EPC 339DY / E 00)Y TON CLASS II R LORRAINE CANADY J K- �. �G DB 1195 PG 339 SPECIAL LATERAL 3' BASE DITCH MB 30 PG 76 SEE DETAIL 0 STREAM AND WETLAND IMPACTS ; S I T E 12 DENOTES IMPACTS IN 1 SURFACE WATER I I+ + + I+ + \���Y 45 LF OF ADEf W Ktt5� SEE IL SHEET 2DENTS j�// DENOTES TEMPORARY / Y v a IE-1 F F IF F E IE /�° IMPACTS IN SURFACE WATER I I+ //� DENOTES FILL IN 5 WETLAND p 1÷ IF �' /O . * w DENOTES MECHANIZED / 1÷ CLEARING I in I IE E F I SITE 111i GRAPHIC SCALE 50 25 0 50 100 1 / \;., PLANS /1.3 f 1 ".t / + I+ I+ E r�s FOR -L- PROFILE SEE SHEET 57 FOR—YIARPA— PROFILE SEE SHEET 84 FOR —YIARPD— PROFILE SEE SHEET 87 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 o, co c 0 Z O a U w 6 CC CC a >- m o, m s_ 0` 0 C 0 E 0 0 w In 51 CC 00 C_ N 0= 00cc 0_ cgti-"�:5;.4 -, � ;' ISBKD • �^% 6 PROJECT REFERENCE NO. E SHEET NO. /C� ,. \\9 �\ •- �c J ABAND +^v r iF `�N-. _ I 11 v -5 A �8 r I• 1� s f� 7 0 SGL PR4r" IES LLC TEFDY km BLDG RNJ SHEET NO. -LANKS ® v �04� .B 1694 PG 5 ' �0 DB 617 P 826 CS'L h( ' X , ' ROADWAY DESIGN HYDRAULICS ENGINEER J �\ LT ISBKO G_— • 1/'j%f.� I \ ISBKD ISBKD 0 NAD 8 A 2011ENGINEER , 3 - s N ' 13 E S / / / ! 3 F'A ♦ '• ARE L0 4 / 42 1 ON C - 1 yo.I ,^ DECK SITE 11 DO NOT USE FL. RE �W ACQUISITION �T ((o JO ONES /i i. •�l / DB e 0 70' <n� l i o ' �� S h D: 190 PG 50 / i 0 0 \ IE / L [ _ R \L Q � A ! ALBERTINA RODGERS \°. I ILh DB 1508 PG 2 EXISTIrvG Ri LTGjn',' Y•` \ P I 1 Fi.� \ I l -R P �1 _ -T —' `'�F 72� wX ® / �Riy%b^\�\ ' F --- __5�' cl - —ELT �♦B �• o, "> / DOCUMENT NOT CONSIDERED FINAL /� / Po° \ s�� ----- -- -_ so/L aR_ - �_ _ �J UNLESS ALL SIGNATURES COMPLETED .. / •2°cONc T _ _ IE IF ,���LT} cAToP I NO CLA' d "l �Y)`� -1. ,.. I LINDA JON NW o Y R �• �". Ail�•� � *�� /v 1 / NV5 ENGINEERS & CONSULTANTS, INC. ���/�/• / / DB 1670 'C 23 r- $ 1 11� } 8 �- •' • Lxls Irve aiw ., 3 2 Y V I 1I/ / ��� 4, a / K- F V 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC P 704.537.73008227 www.NVS.com L \ ��s ,* V. BKD T ATOP a `� l(] •Y /L� 1,' / a 111 / NC LlcenseN F1333 4N.,1 �0 � 36" CONC 30• GONG / a _ NG 155 `� �� s EDWARD OXENDINE ISBKD # Est - _ 90 II , , SHEET ET 21 OF ZS Z % DB 1689 PG 611 i ISBKD ISBKDA ISBKD / 0� 3a 84 �• rr' SS 'B'.RIP RAP �Osy/ ,Ic• JOSEPH SANDERSON N -OSr�H SANDERSON �RVEY CANAD �'' EST.7 SY GT f/ T PUE 2, DAB 1491 PG 497 -_ CALE: " • EAR CLASS '' DB 470 PG 234 �� I' RA' P /.l: 413 PG' 277 SITE 12 MATCHLINE -L- STA. 298+00 SEE SHEET 17 �i�♦ �t�- MB 30 PG 76 47j ' DB 1840 PC 443 \ ` SP IAL LATE' L • IT - I N PUf E.�J NC 9 EE •ETAIL B -- __-4' N�c�UE.- N 1 STANDARD V3DRCH .,, �4 © SEE DETAIL W" 5" RCP -IV Z9I f` BILLBOARD IQ■� rr -�_�I_. �'1 '-Ink EST. 2 iQ•eR EST. 7 SY G 9 I 8 ORLANDO SANTOS Q: 1767 PG 266 t -ACOUELINE GRAHAM DB 793 PG 770 p. It m ' I, n / '"SPEC EST.2 TONSP RAP ` :� SEE EST. 7 SY GT CLAS 'B'RI' E T. 39 ES.30 [M TERALI•�1 • Al AC / �� 1 . I� I� IF FILL CHANNEL WITH LORRAI CA •D CLAW1tI 1f E DB n95 PC 339j I TO 21 TON .2 I IEEST. 2ITONS I55 IIIP',•' I� 34 LF E ;ANNEX �PROVEM' TS r E •ETAIL HEET 2b-1 END 47"6ZGgO MATCHLINE -L- STA. 312 +00 SEE SHEET 19 _cTi NCE B�PrE _ - _ 1L A 11.111k , Alleisial -Y/ARpA_ -s.. _. �.... •_ .. ,..� ��. / `����. i -• 51 - - . r REMOVE .Are y C .ice RCB s fl, 4 9EXISTING -- .—Y` TIPARV _ E5i - ZSI ISI - _'✓l I1 - -8"ACFZ VI _ .i— of --- --- _ -TR-9r:� - —_ __&., ZSI - 159RCPaV 15"RCP-IV -1,5" RCP -IV Ud ■ -_ --- TB 2GI TB 2GI \ REMOVE- n a 1 RENCHLESS INSTALLATION -.m0'i 1. I lii-7L YI\IR [ T ' I '� U-- - -- -- --42 -wE DED--s1ta- —o ...- _ 149 -TB-WEL-DE& STEEL _ - _ _ _-_ � - t, JJ - - -- 152 --- --- _ 1 ;� - - TB - Z- ,.. . c 2 -- - - _- � —lei °, • ___-149 - � Lb •- - _- _ g I 0 Ns L9 I Il .}mil. - - �W 84i I ''�.fa•nl�i Wel� b : '', NOV ... - - - � - �6 bl 7 SEE DETAIL A r/I :''� �' wL��� -r _A. • Litt x x X X x - 1.4„ - ,... I � �► � ���• 51 ' 1 .• 0���'��� '�y FENCE m- ' — � _ _ _ _ _ _ --C--- - - —� - - - - - _ _�_ f `- --- � PD PDE ``y�.��_ a Y• '' . 3 'B RIP RAP l '£EST. �-s. >yyD J`ME15BW IE -- C / Oh _ ' - ✓ CLASS 'B' RIP RAP E,, 9,PDWI n �r-" PD' ,PD w II� cc, - - - is�� Y EST. 2 TONS EST. 28 SY GT 47 WW SPECIAL LATERAL V DITCH FE CE SEE DETAIL M /1SBW =� I�-``-D 82 O ,� w� /� r� / ,'^'1 N//��-'/1 m T. 804 RA15 CLAD I17Bppq "' IFS IF �v � EST. 85 $Y GE9TEXTILE \. s - '•IN A AG WOODS ,,p0 e: II• -G 3-' - , M: 30 •/ 1 ,5p ECIAL LLA/yTERAL-3 ASE ✓• •e / � ` - �aa<o 6�E DETAIEAK ' - RIPRAP LORRAl1PC NCAD 33 0.3 +, Vm13"cv )W DB 1195 PG 33 IS / 138 0� TON II R ti LORRAINE CANADY �QE DB 1195 PG 339 SPECIAL LATERAL 3' BASE DIT- - MB 30 PG 76 SEE DETAIL o STREAM AND WETLAND IMPACTS SITE 12 ° g j ' 7I 138 E - - ---"- j // DENOTES IMPACTS IN I SURFACE WATER / F IE E �'�45 LF M ,` t `•CHA 4 L IMP VEMENT' WY 0J SEE D ' IL SH 2D-1 � �'c_ DENOTES TEMPORARY / \ � r R / O / /�// IMPACTS IN SURFACE WATER IE ^ �0 DENOTES FILL IN 5 WETLAND / 3g LE[. �� l3• F IF 3g - �/ ZS • • DENOTELEMECHANIZED / gE1 w o (/lIS / V � O ' 1 I 4 ' 0.a _ a�%•.. SITE 111i. � GRAPHIC SCALE 4 4q• 50 25 0 50 100 49 So� PLANS P «t 0�ti a 4 4 CULTIVATED / IE E \ E g� j ,/ e 3 FOR -L- PROFILE SEE SHEET 57 FOR-YIARPA- PROFILE SEE SHEET 84 FOR-YIARPD- PROFILE SEE SHEET 87 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 7 / / < . cr - c m PROJECT REFERENCE NO. SHEET NO. /-5987A RW SHEET NO. SITE 11 -L- STATION 310 + 73 3@12'x12' -2 15 0 i TOP 14 OF 0 00' -150' -1 0' -50' TCP OF B4N C LEFT BANK RIGHT 7 ll / j J -- PROPOSED STREAM BED CLASS II R FRAP /' FILL / 3UI vv 111111110. 1111MM1NOW C INv iOw�/ SL MN F / RE OV 0' 5C' 1 W' 150' 20 0' L ST• 10+73 3@12 12 BURI-Il 1 W'1' 51 5 VWBEV LED 16/ PLOP .. ELEV SB= SKEW 9 " 49 6 LE`/ 32 6 015% EKIS ING QCB 4.5' TOE WAS (TRUCTJRF FOTFCH TO COORDI ATE) • F IE A LO N 1 WNW • f UMW PILL WITH J SLI—AELE MAT" ■ ST ■ RUC R: 1 • • ■ ■ ■ ■ ■ • • EXSTING ST • POSED AM BED II RIPRAP SCEOTECI-I R EAM BE e"ATE) ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLE DO NOT USE FOR TE PLANS tcW ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED N V 5 NV5 ENGINEERS & CONSULTANTS, INC. 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 P: 704 537.7300 www.NVS.com NC license N F.1333 PERMIT DRAWING SHEET 22 OF 55 HORIZONTAL SCALE 50 25 0 50 100 FOR —L— PROFILE SEE SHEET 58 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 L m U w o9' 9 o_ a 0 a co oo-- Le C 0 s_ 0 0 L 0 0 LI w 4 21 01 o_ N oL o= 00cc \ PROJECT REFERENCE NO. SHEET NO. / / /-5987A /9 \ RM' SHEET NO. \ _ NAD HA 2011 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE DO NOT USE FOR PLANS 2<24 ACQUISITION S SITE 12 / DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED / N NV5 ENGINEERS & TANTS, INC. CONSU 7500 E. LVD, STE 100 704 537.7300 NC 8227E BCLwww.NV5.com P: 0 in PERMIT DRAWING SHEET 23 OF 55 in rn / (\.1 CLASS 'B' RIP RAP InNI EST. 2 TONS EST. 7 SY GT 46 F F / NO CLAIM BRUNSWICK TIMBER LLC DB 1360 PG 690 - 1÷ - 94 IF IF F IC SPECIAL IF IF IE LORRAINE CANAD DB 1195 PG 339 ` K v v LATERAL V DITCH DETAIL B LATERAL / SPECIAL LATEL V DITCH IF IF IF 1 K- IF K- p CL I RIP AP SEE DETAIL C L- IF EK1D 47" K IF 1+ 1 IF IF EST 7 TONS WW FENCE / EST 15 S.Y. GEOTEXTILE 1A. 312 +00 SEE SHEE1 W/158W / COW IF E IF IF IF X x x ,. 326 + 00 SEE SHEET X x—'t/ _ _ Qi ArAffigioriffroArdWow T T T T T T T T T GREU TL-3 B. TAPER -- - ITL7 —_T�—�—.—i RFMCIVF 18" RCP -IV TB 2GI n tlai 15"_RCP-IVY —�— __ TB 2GI --- _---- _ -- - TOP=145.I' NV-1.3S.45 18' ' 15" RCP -IV ..- - --. - - 15" RCP -IV 15" R P-N 1 • r"RCP-IV TB 2GI _- - -- -- - - _- - ._ _ _ __ - -. - _ _. _ - - - - __ - - - - - _- - - -- - __ - -. - - - •_ • •• REMOVE f _ ---_.. - 1H_Z1, IE_2La• [.TPA ---- -- TB 2GI �� — TRENCHLESS INSTALLATION I TRENCHLESS INSTALLATION � - Do-- ESBEB-STEEL "" I I5"-WELDED STLLL --- - MTI r _i $ FILL _ r . Z —• .err-f r ' �. ^ v u..0..u-, W - —PT 300'TAPER /Is_ =+ _ �r�r* �r�rJr Jr* - ..:__- w I IF F - c ---- c----— ---Z J —" c c c --- _ Z---- 48•ww sew X CLASS 'B' RIP P / CL I RIP P EST. 3 TONS / AEST 7 TONS - - -- — X X x X X w J = U Q IF IF F IF IF K- IF EST.40 SY G F IF IF / EST 15 S.Y. GEOTEXTILE x f}3 CLASS 'B' RIP AP SPECIAL LATERAL V DITCH LDRRAINEKCANAD IF IF F IF EST. 7 SONS SEE DETAIL M SPECIAL LATERAL V DITCH EST. 7 SY GT DB 1195 PG 339 0SEE DETAIL C NO CLAIM 95 NO CLAIM IF F b: IE IF F TIMBER Z J R WK BRUNSWICK LLC OB 1360 PG 690 BRUNSWICK TIMBER LLC DB 1360 PG 690 IF IF F F IF / STREAM AND WETLAND IMPACTS IF K- SURFOACE WA ERTS IN PV / 7// M AOCTSS IN TEMPO SURY RFACE WATER //l/ DENOTES FILL IN WETLAND / + * * + DENOTES MECHANIZED CLEARING / SITE 12 GRAPHIC SCALE 50 25 0 50 100 11111 / PLANS / FOR —L— PROFILE SEE SHEET 58 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 c m 0 0 a U Cr 0_ a >- r a� CO m cr m s_ c E E 0 w In 0I 7 0 w N L, O= co= J 6£i�: \ 1 PROJECT REFERENCE NO. SHEET NO. ' / J SHEET NO. \ ,.......,..„.....,/ lr"'9 NAD 8 011 ROADWAY DESIGN D9E ENGINEER HYDRAULICS ENGINEER ,3q INCOMPLETE364E DO NOT USE FOR PLANS 2�W ACQUISITION a 9 / r6----------�... S SITE 12/ DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED L � / NV5 ENGINEERS & CONSULTANTS, INC. 7500 E. INDEPENDENCE BLVD, STE 100 008227 ----- - e u04.5375.;vrn cense # 33 �£[ As \\ PERMIT DRAWING ON SHEET 24 OF 55 � rn _. 4 �.� CLASS' RIP'-' ti� EST.2 ~N4 ~ EST. 7 GT\� �39 r+1 IM I/ bb/ 4 ,Lp`3 3bI_ 9bI w /c� D £I b~ ',} BRUrw K LC� /69 B 36 P 690 4iu' b8ti 1 rani `�� wn et, 84t 6 �P rn m ra "' n a' bl 0q� w V b/� SbI 44 5 39 13q 8£[ l //\\ o V S/�� ZSi 03 IE IE + IF L RAINE CANAD� B n95 PG 339 kf IFWK 139 6ET bt m •o/ , .n b SPE AL LATERAL V DI H - DETAIL C as w �ti ,/ CL RAP b K- IE SPECI E D. � TE DITC / CD K- IF13 EK1D 47" IF IF IF IF 1139 �� F - f ES 7 TONSr ) w / E 15 Y. GEO -° �, WW FENCE •v54/. N -L- STA. 312 +00 SEE SHEE1 , 8� ,.o 8, W/158W 04' .- 6 �� b� ~ IE 00C ...eArri . is E IF . \ bl 8b[ r . -L- STA. 326 + 00 SEE SHEET . _-_ . -�C-u An fdroftw .,.. ` i ._e i0riIr �,47 ��pr , . `,i477,.su 2...'. ���'�/���/����f���� 146 _ s ---- -151 tbl �--� J a _ 7� 1 8 ` - -r 8bI ��--� �- �-� Ibi - _, ` �' 146 /-Zb1 -I biT ---�T -� `, i -- Lb-?. ___ - -err - - - .... - - �s._.rF _ , . _. L -L-q T T T 9b 681 - abT — 6bi -- LsT— .- -- _ -- - lSti '. .trI 9,i 8bI T-T RFMCIVF TB YCI 18" RCP -IV TB 2GI14 .6 tlri " --- r - - L_LP- . - - - — �_�� __ _- Lb5=tCP-FV - 5"R P _. •Rr. = _ EMOVE N TRENCH LESS INSTALLATION II TREN SS INSTALLATION �_ - �5"-WEL�F E� �I 57 — �f; �a -i: -- .? sex,,fe.F _ _ - �..-- —_ 47 bT 6i�.� 8bT� 300' TA' &i _ AeArb" S b• T-- ._ - $=.- ...•i:✓. 9b� .. __ :8b .'' �� % -: .. 6b � 9 A _-. �Ilr �r F'" � _ — -E iF iE 9t iE iE iF - X E �D EbT ---� - - - C --- - - CY- -�_ _ - EST . C _ q�•wW':w X a RIPT P `� IRIP' P — ES . 3 ONS lgq ^• VI. TON a O CT r'T C _�-- ��`- X IJ/ Y Y Y. W _ U Q X J( > X WW IF IF IF IF EST. SY IF J. 1 ,rA EST - S. GEO + LE �� g / a ,9 �y� b 38 3 b� m CLASS '9' RIP P SPECIAL TERAL V DIT S 53 54 w / bt gg EST. 2 TONS Ab SEE DET L M ��g£L C RAINE�CA EI m S IAL LATE', L V DITCH Ny EST. 7 by ti EE DETAIL C ,-p '• 38 DB 1195 PG 3 `/ O IM xi' q NO CLA* 451, IE F�a' If IF IF IF E.-0 : T �kf Z 2 U j /'/ W 11C` WICK C 69 S �, `J OB 1360 G 690Ai :'d /WICK TIMER LL� 4 1. STREAM AND WETLAND IMPACTS av A 0 0 ro '�� / DENOTES IMPACTS IN [9l p' SURFACE WATER J cn S''. Z ` �j\ 80' ,04.E a % DENOTES TEMPORARY `\ ti 8EI m %// S IMPACTS IN SURFACE WATER TSI //l/ DENOTES FILL IN WETLAND + * * + DENOTES MECHANIZED CLEARING I '1,1t £8[ / , SITE 12 � ti�� ---. GRAPHIC SCALE £[ / 50 25 0 50 100 PLANS �1 A 111 °� 5 FOR -L- PROFILE SEE SHEET 58 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 'i III 0 5 10 PROJ. REFERENCE Na SHEET Na ■ ■ ■ ■ ■ I-5987A X-94 ■■rl 11; PERMIT DRAWING SHEET 25 OF 55 iii. �C... PM [.1 J■■ •A M EMM I/d.1 C9 D1 ■■IIWN _ li RERE■PPPPPPP •PYRE■ 1 11 WI 11 .MPml1■■■PI 'i1.0 rl ��iMl ■ �lLj`j ... - ° �11111Njir�'�i11111!!!11lL'zcca �1ppe`iOd111111IigiiilIW11iNOR111""!1 !!IIIjjjiIIIIF ■.rl.w ■ .7= - - - — - ==C7C=C=GGir. - - - - - =iG=C=G=i=i=MG.fi - P'11■. 11 r EW.'I. . haft:JIIlI.lI: ai r41i; i. ,151 iri 111L_111J II ii, 11 1 .%1111■■ ■■MIHI;. SITE 11 11 II I►fa IMIMI.] " 111L'iIJ■■■IIIIMIPAL,i' 1111 11 EPP 1::1 II.1:eM... 71JI1E. ■■r1411;1 .aG.G.imiG.O6G.id.06G.iddG=G.id=iGRG=i=i=iGOCIC.1!m!RP!!1C7C7C'000GGi=iG.1CCGGi=ii - - .m. - - UHUMM d66=ddCM6Cdd.22.2. .id6G.ii T1:..1...■r1.-m■r11'- A■.1lP-!=III■1■■11■I Illill;.■■ \1'.I9 -LL^.L.l.- 1..1 • 1 ■■rldlli. 1_ 11 11 I 1 1111 IY7111■■ SITE 11 'rl IIIrlIF1111 . 111Lllll■■■11.1■■■I[IL "' -...=:_ - - 111 'Imams , _: P7m - .�.,.. G 11 PPP ■■r1L'1111 ■■r1'ill;l 11 11 7777C77MCCC=77C76177C'7l67iG0 _ _ _ _ _ _ •l n• nui nui n.. .Giiii=...:CGCrC.C7C766iddE-E.Z. _ _ _ - -- _ _. _ - - - - _ _ i IL'71/■■ _ _ _ _ C:CCCC!_! _ _ _ 9C7l1.17. =7:aG=m-m-m- i.alas m m- _17 I■I.1.■■.I:nl■l.11l•I Il1-2 I■.IL.. _morn.= 11411i.■■ \'0/dill l.A1'1, IYIII/■■ ■■IAllil SITE 11 � �i'Illl III.I11111 - lLL•II.J■■■IIII••■I11L•L0' 1111 :. H., -- IRE .■ '=, -- 1 - _ _ - �r•'Iccl,.-. ::NIRE.� I1 ' G IL'1i11■■ ■■r1L'11;1 _ 7CCP_771CC7C7CC=.7.iG=G.6imi000.6i.iC7000iiMi■■■MG=6777! _ CiY EE--lClC7C7GClC<C7C7G.'�CCIC!!9C■JP_P_1C7C7C _ P_1C7C76G.=.M.SEEJPPM9■JPP_1C7C76G.i.=:iGCG:G:i:=:iG:G.i.idG. II■r.1■■■■'II1■1■'111- RErraiil 7 ❑I EJI IR1 C11 111 PaI l.; ,Milli..■ ■■,o.ii;. _- --I r47.1 II111'r7.1 7r.71■■■nII IYIII/■■ - -_ _ ..11:1I .iC7P-P-!!9C7G71E!!!!9C7G7P_1C7.72■i■iddG■i■iddG■G.67.7C7!_ • Ir.1:111111 - 11 11111.111 III}lip.. i - - '!L'!.'1J■■■1111 SITE 11 11- ...I,.._ :� ---_ '_=- _ ■■r1ill;l RE.r..... ■■IW119 !!!!!9!•'JP_!C=...C.7...7C..C.M.2C7CCGGii !C==G !_ 1.7776C.i.iC7CCCC!!!!9G7C-C.id.766i.7.0C.C.i. - 7 a.T ,11 JI.� •Lil 1..r1.1■r..I. ■L•RCCfrl ML_i]LJLL .11 I ■ 1■ o I1■ 1 IM.II;.■■ 11 11 11 IIIl1IL'III .1. l • "' O11110/ll 102111111 uirlm.■.IUIRE■rilr. 'L1 LJ■■■Illl rO■■■IIUli1/■■ SITE 11 _' - II-111,=-'= .._�_ .I __= - -__= -:._ .. 1.1l11 _ iI .'.C2Jd R9=l6M II. i II - - C 9PP19P7CCCP19P _ !1C7C7C7P1!1! - -=i=i=MGifiiiii•G=G.1.7C7CCG:GGii -.E.SE.CC177C7C7GCP1C9C7CC1C1.7i - .Am... ..7.m■r..I. 11■C:I!!!. 1.1■1■ 111■1 ■■■■GRG=ii ■■rl.11l IlIll.■■ , ,, . �.. �7 .• . •. . •. .. .. ,. ,. ^' - II Cr >- r m 0 7 0 LLJ w C C O i A 0 TN O=, COCL CO CC U 0 5 10 PROJ. REFERENCE NO. SHEET t` III I-5987A X-251 . 2 PERMIT DRAWING SHEET 26 OF 55 1 111111111111111111111111111111111111111111111 IIIIIII 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111I111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ... ..............IIII111111111111111111111111111111111111111 """""""""""IIIIIIIIIIIIIII ...111111111111111111111111111111111111111111111 1111'111111111111111111111111111111111 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ::::::::::::::::::::::::::::::::::::■■■■■■■■■ 1 •ui n. Mt/ 11111111111111111111111111111111111111111111111 1111111111111111111111111111111111111111111 1111111111111111111111111111111111111 ..r,r1i�....l...1111; ►SA•e1.1"■I■1■"10JL • ., - ,. • urilMii .lean. ,r,i !l . v _ -- !l=aCCGGir GG6"7C===Ci' CG=l=!!!P-J..... 11111 ■■■■ "" .... � 1111111 - -fii■■- vooc■pon -a■■a�.n¢n ■n,eri; 111111111!1!11I1111!=_Il11!I1l11111111111 ..,.r....r..I....r.. 111111111111111111:Iiiiia=a='""'' GiCiCCGGiGir GiGiGii•GGG..a=a! 1111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 111111111 1111111111111111111111111111111111111111 111���1111111111111111111111111111111111111111111 1 11111111111111111111111111111111 IIIIIII "IIIIIII' I 11111111111111111111111111111111111■■■■■■■IIIIIII 11111IIII11111IIIIIIIIIIIIIII11111111111111111111111111111111III111111 1111111111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII��������■■■■■■■■■■■■■■■■■111111111111111111111!!;; liiiiiiiiiiiiiii1 11111111111111111111111111111111111111111111:111111111111111111111111111111111111111111111111111111111111111111111111!!!!1:::1111111111111111111111111111111111111111III'i1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111' 1111111111111111111111111111111111111 111/1111111111111111r IIII:if1111GJ7!nIII111111Ir1 ! ;]IIIIIIU r 1 ;1 =■- ■■■■��1r■■■ - ■■■■■■■■■■■■■■■■■■r1_6_N11111111111111111111111111111111I11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111��L�JL�JLJ11111111111111111111111111111111111111111111111 IIII ---- A■-_ ■IIIIIIIIIIIIIIIIIIIIIIL-` ■.■ _____--..-. -",...��i""""""""'''''"''""''""'''''����1111111111111111111111111111111111111111111111111111111111111:111111111:111111111111iii:°I1111�1111l1`1�I�III�1111111I9�I IIIIIIIIIIIIIIIIiir ilr111111111111111111111111111:111111111111 I I II I11 1I111111 111 11:(fillllllllli11I11111111111111111111111111111111111111111111111111111111111111111111111111111111111 ■ . _ _ 1� ..I _ i ij,A III II11 _ _I 001 ,• r ��L311L.:400 C1.. ■■rlrlii' `i`iid 11:1�II11il1iiii■■■■■■ 1 ;ii■■■■■■;■■■■■ii��iiin■■ ■■■11111111i`'M1111111111�EM111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 � fr �$r I ■■■: IIIIIIIII=i'"" 1 -_-- IIIIIIYIIIIIIIIIIIIIIIIIiiiiii'' nnnnnnn ■■■■■ ■ ■■■■ _ ----_, ____•___„ -_ - IIii■'■I,I 11 ■ 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 SITE 11 M MM o0 ■■■■■■■■■■■■■■■. - - 111111111111111:1■■■■■■■■■■■■■ _ III I III I III 1!IIII1l11111111111111111111111111IIIIIIIIIII I IIIIII I IIIIIIIIIIIIIIIIIIIIIIIIIIIII III III I I 111111111111111111111111111111111111111111` ���� �� ���� IIIIIIIII IIIII ■■ r Iil 1 111 I I 11I1111111111111111111111111111iii1111iii1 11■ 1.==■`II•1■`1 ■1 IIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII11111111111I1I111111III11111111i1i1i111111111 ::::::::::::1:::::::::::::::::::::::::::::::::::::::::::::::■■■■■■■■■■■■■■■■■ 111'11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111IIIII:IIIIIIIII1111111111111111111111111111111111111111111111111111111111111111IIIII"111111IIIIIIIIIII:IIIIIIIIIIIIIII1111��11111111��11111111��1111IIIII IIIII1111��11111111��11111111��11111111��11111111��1Ir,1 . .......................................................................................... 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■. ............ 111111111111111111111111111111111111111111111111111111111 ,11'IIIII•"'"" 1111111111111111111111111111111111111111111111111111111111111111111111.... "MTV' 111 .......IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIC,l3LHp, " ■M NM _ ..ac■.. --- ,-- SITE 11 pppp ,■■■■■'■■■■■■■■■■■■I■■..■■■........■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■....■■■....■■■■■■. ...•i^..■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ................... ------- ■■■■ IIII 1111111111111111�111-IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII■■■■■■■■■■■■■■■■■■■■■■■■■■■■■"111:■r----------■■■■■■■■■■■■a::: -';---------------------------------------- ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■---------------------------- "1''��'91111111111111111111111111111111111111111111111111"IIIIII;;111ii1:1!1!41AI1111IIIIIIIIIiIIII-111111111111111111111111111111111111111111111111111111111■■:;"""■■■■■■■■■■■■■■■■■■■■■■■■■■■"■'■■■■■■"■■■'■■■■"■■■■■■■ "■■■■■■■"■■r' ■■■■■■■■■ .iC=G_!_!_ _ _ _ _ _ _ -i-i-G --i ■■�■ ..dGiiiGaGG6iG7��P_PiddBiiaG... -i�-iGGG-i-■■■- G Ga=lP4� -iC- �� ::IIIIll::::lllllllllllllllllllllllllllllllllllllllll'■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■' �tir 1111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 �� �� I I 11IAlAlllllllll IIIIIIIIIIIIIIIIIIIIIIIIIII :::::::::::::::::::::::::::::::::::::::::::::::::::::::::1111111111111111111111111::11111111::IIIIII::111111111111111111::11111111::11IIIIII::IIIIIII:::IIIIIIIIIIIII IIL''iYllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll llllllllllllllllllllllllllllllllllllllll llllllllllllllllllllllllllllllllllll 111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII iiiiiiiiiiiiiIII �nu_a1n,cli�r IIC IIIIl!I!:"IIIIII!!Il!IIIIIIII,IS!IIIIIIIIIIIII !!!IIIIIIIIIIIIIIIIIIIC!!IIIIIIIIIIIR1AIf A111111111111111I1111 .111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111I11I1::����I111111111111111111111111111111111111111 SITE 11 IIII :::: IIIIIIIIIe�■.■...__........■_a=oG■cc: - - - - 11111111111111iiuo!_Gii111111111111111111111111111111111:11111111111111111iiii�lll■■■■■■■■■■■■■■■■111 1 ■=z�=� ■IIIIIII!111111111111u■■■■■■■■■■■■■■■■■■■■■:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: 11llifii�lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllIIIIIll!!!iiC111:1!44!1111111111`111III:_:1:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII111111111111111111111111111111111111111111111111111111111ii11111111ii11111111ii1111111111111111111111111111::::::::::ii::::::::ii:::::::::11111 - GaoaG=a=iG.G ---- ■.■■■■.■■■■■.■■■ ■■■■■■■■■^�^■_�■■■■r=.=�■r.�.=.■■■■■■....................................................■■........■■ i ► 1 IP1 IIIIIi 111111111111111111111111111111111111 I I.■hi I• - nI• " I I I I I IIIM I I I I I I I IY'1 I I I I I I I IrM I I I I I I I Y1Y I I I I I I I M'1 I I I I I I 171`1 I I I I I I I MY I I I I I I I MY I I I I I I 11`I I I I I I I I MY I I I I I I I PI`1 I I I I I 111YY1 I I I I I 111Y1 I I I I 11111'1 I I I I 111YY'1 I I I I 111`1'1 I I I I 111YY'1 I I I I 111YY'1 I I I I 1111Y'1 I I I I 111YY'1 I I I I 11111'1 I I I I 11'fY'YI I I I I 11trY1 I I I I 11'tY1 I I I I 11' fl-'1 I I I I 11'fTY1 I I I I 1191 YI I I I I 1199'YI I I I I 11'fiYl I I I I 1111'YI I I I I I I1TYI 1 1 O. 0 n 0 �fl n n n fl n n n n n 0 n n n 0 01 W N CC CC S Q 0- 0) In 0) C O C N 0 W 01 01 w 00 moo' 0I CO= \ \ PROJECT REFERENCE NO. SHEET NO. /-5987A 20 \ RNJ SHEET NO. --- \ ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER \----....,,,.,,,,....„..,, INCOMPLETE PLANS AND WETLAND IMPACTS DO NOT USE P00 2�W ACQUISITION WA\ DENOTES IMPACTS IN \ SURFACE WATER NAD 834NA 2011 ��° /, %z7//� DENOTES TEMPORARY \ IMPACTS IN SURFACE WATER //�/ y DENOTES FILL IN WETLAND DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED T R DENOTES MECHANIZED CLEARING \ NV5 ENGINEERS & CONSULTANTS, INC. C CHAR E. INDEPENDENCE BLVD, STE 100 * * N V J CHARLOTTE, 28227 P:704.537.7300 www.NV5.com SITE 13 . NC license N F1333 33 \ PERMIT DRAWING SHEET 27 OF 55 \ o o InNI NI fr, SITE 14 �-----,..., 96 97 97 NO CLAIM NO CLAIM II NO CLAIM D. BAXLEY WOODS WOODS DELLA 5PC 69D. BAXLEYG3Z BRUNSWICK TIMBER LLC DELLA 55P DB 1360 PC 690 DMB236 G 695 DMBz36 5 SHEET 21 CN I— RIP RAP PAD IN JS SPECIAL LATERAL V DITCH SEE DETAIL AR SEE DETAIL C CLASS RIP RAP CLASS 'B' RIP RAP EST. 20 ITONS \1 J W LLJ W i� Mory EST. 8 TONS SPECIAL LATERAL V DITCH EST. 39 SY GT Exlsn e, R/w SEE DETAIL M _ j. EST. 21 SY GT V) W X /: Ai x >< x x ,C ,C ,rS. x , 48 WISBW -L LATERAL V DITCH TS a. '4,,x = mN __._ .. x x � �� .f T ..= ! N--- --�--- -CT.--Ri�� -Jr JF JF at W W N --- --- --- 0 --- ------�---- iYi" if I _MEW 30 WELDED STEEL TRENCHLESS INSTALLATION NV=141.74' 0 M� `-, 42" WELDED STEEL I - 0 18" R ._ -- — -EL SBL- -- IIIuIII Q TB 2GI1� TB �G. IIII �/� �y N - _ - •• - - - •_ - 15"RCP-IV - - -_ - INv '0.28 - - --- --- ----_ TB 2GI-A 42" RCP IV _ 30" RCP -IV - RCP - IV -TB 2GI CABLE III N J M TB 2GI 18" RCP -IV -EL NBL- I a PLUG & FILL INSTALLATION TRENCHLESS INSTALLATION ---II m Q-30"�VELSEI4 -- .r_—TRENCHLESS STEEL -42" WELDED STEEL IIII — — — W 1-- ---- I III Z a 1 V=196.19' o J < .. -' _> HW < ' ., -. W wr`u`'-"'-" l < - < U IJJ ---'' `� -- -. C _I --2---- -r- -- U+oN -- — xx, >< >< >< x x ZI El - - ---- i xlsTNc R A —I = V Q E TING SPECIAL LATERAL V DITCH .. -- SEE DETAIL M BRUNSWICK TIMBER LLC DB 1360 PG 690 0DMBz36 NO CLAIM R/W D SPECIAL LATERAL V DITCH SPECIAL LATERAL V DITCH - 48 SEE DETAIL C SEE DETAIL M SPECIAL LATERAL V DITCH SEE DETAIL C SPECIAL LATERAL V DITCH DELLA D. BAXLEYGp 98 SEE DETAIL M DMBz36 PG 695 DELLA 5D. BAXLEYG3Z 695 WOODS CULTIV0A)[N➢b FIELD ' BM16 ELEV = 155.96' GRAPHIC SCALE 10 50 2$ () 50 0 N 357803 E 2001230 BL STA 326,77 - 357'RT RRS IN 12" PINE \ PLANS \ FOR -L- PROFILE SEE SHEET 59 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 o- m co L 0 z CC 0_ a >- r Q CO CO E L 0 w 0I w N o= co=_ / 6 / PROJECT REFERENCE NO. SHEET NO. -143 � F9 „ I / 5987A 20 NO. \ \ 0 \ p1 ROADWAY DESIGNRNJSHEET ENGINEER HYDRAULICS ENGINEER ZbI / INCOMPLETE PLANS STREAM AND WETLAND IMPACTS V DO NOT USE FOR 2<24 ACQUISITION / �C T £V` i A SURFOACE WATERY$ IN \ bbI NAD A 2Q11 w ` �., DENOTES TEMPORARY A IMPACTS IN SURFACE WATER \ , bbi �bI , r� /// / DENOTES FILL IN WETLAND w a ' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED \� T K Jx, DENOTES MECHANIZED CLEARING _ NV5 ENGINEERS & CONSULTANTS, INC. C 7500 E. INDEPENDENCE BLVD, STE 100 -- NVCHARL0nE.NC28227P: JSITE 704.537.7300 www.NV5.com 13 NC license N F-1333 F�46 ,c�� c,4 SITE 14 /43 PERMIT DRAWING � gbV 9sj SHEET 28 OF 55 3 , I bT ti \ Ln /� q dr� v SHEET 21 bV m bA< I RUN- C TIMBER LI D 0 G 690 o 1� CP gb•t N• CLAI f S3�LLA D. BAXLEY 5 G 3Z WOODS OMB z3 F. 5 Q a 1) o m <bT i 8 r - 14v 142 v C ti N 2s ` gat �� I~/ r 43 a kti \ 0 C, M e LL.. D. BAXLEY 42 1—III SPECIAL LATERAL V e T RIP r IN yy1 � N 66[ SE DEV IL :. qb\ WJ W SEE DETAIL C q�, t \ CLASS RIP .T.. e �� , EST.: •NS SPECIAL LATERAL V r TCH ES . SY GT i 4. �� DETAIL 1..� ap EST. 1 Y GT !b I \ ...I� , A vJ W LLJ_ Ai Y `ter \ Toi . �,* .- .. -_ • if L''�YY w/9®/OP ��. `^TSEE �� O N \ --� i.„ _ `O�'T 5---- �r - lir' \Jd. +r - --- ---� --� -�-- -----�'--- /JJ/� __�- - - >. LLJ AA' 'IF- W - - 14. . - N BE bbi 1 MIllla'a'-• co o Gl 1R' RCP-IVTO 4C1 _ 95I - To G. Q 15 4 C8 GI I Z F— cP-IV III -� n M bCi_ TB 2GI 18" RCP -IV EL NBL mi. I PLUG & FILL TRENCHLESS INSTALLATION TRENCHLESS-114ALLATION� �54 — 4----a W lea 1 ____- 15 T -T5a 152 I. - 1o2 ----1� ,1 R III - N pi "- EV - 2 bl - 6b[ 6bT 8bI- 6bI _. - H bb TS 85I 9 _ - W C,---� -�� JiA -_- --_4 _ —� —�— I C bSI �_ ��bsi ----- s"iiI' Z ' XI N ii11111141A"luapP1111111111iAirAC ill J = V 1� r Q ry� '�" CIAL SEE DETAIL O 03 .. 14 .. �. r• L V DITCH 6' .-voliwAriMpArir4pWriciWPECIAL LATERAL V DITCH SPECIAL LATERAL V DITCH SEE DETAIL C SEE DETAIL rn SPEOVAL LATERAL V DITCH ( \85k�� BRUNSWICK TIMBER LLC w SEE DETAIL 5 U DB I36C�7G 690 Q 98 ` D DELLA PG D. BAXLE ti OMB236 IV N•,. ' SPE L LA E L V DIT H ETAI C A y d Lb gq\L- DELLA SD. B p DM8236 P 695 $ wooDs R />'= FOR-L-PROESEESHEET59 \ /h \ / % 1\ FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 PROJECT REFERENCE NO. SHEET NO. 1-5987A 2/ Vj / DEN INS WETLANDTION PERMIT DRAWING � DENOTES FILL IN SHEET 29 OF 55 RSHEET NO. ROADWAY DWESIGN HYDRAULICS / WETLAND ENGINEER ENGINEER POWERS DENOTES MECHANIZED CLEARING CAROL LIFE ESTATE NAD 83/NA 2011 INCOMPLETE DO NOT UM POR PLANS R/W ACQUISITION 0 NO CLAIM DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SITE 16 4700 FALLS OF KUSE ROM SLIM 300 „h,„offOff & nlchol ,,• ,License c••. NC NO�F-0105 MI �1 ,e, aLIENGINEERING�+r�eW e,,,o UM ER P-0e O (N W =ENOCLAIM SITE 18 \ WOODS DELLA D. BAXLEY \ CLASS 'B' RIP RAP ...� 97 EST. 24 TONS \ CLASS 'I' RIP RAP EST. 34 SYYNS GEOTEXTILELLJ WOODS EST. 57 SY GEOTETILE / IF IF F IE E E E IF IE IE f E / /\ ! N N N E E E IE E I\E\E �FF ` / ON MnT_ (LINE -L- STA 340+00.00 ,S-E IF K_ F IE K— k x IE E E "� � • iF F ILINE -L- STA 353+00.0 EE . #14414.11544#144414444114 141 1 / "' ** —,,. , .rirAreAr './-.//.1/Ii�.a,,3 4.arh � ��'i .t. /r,AM����/�L�/,•' �./,,/�. �%.J��/�/►illi .br' 11 FES INV=139 57' r riIKea,4eadr//%� 1L+2K�kr"� �'` #I dr./ regal.' Xi611aV,/i �#�1�`' 1.�13irr T 'R• T ',wow-. - I 1111— PLOWABLE FILL FLOWABLE FILL,4� �RENEHLESSiNSTAttAit9N 48" WELDED STEEL /-95 58 51857 --- - ter, INV•19U.S6' 1 1 TOP-146 MOVE LUG TB 2 IB 2L,1 Iy 15" RCP -IV 15" RCP -IV T�_ —�x-�1 2G 15" RCP -IV 78 rrREESMcOVE DUE 10 SILT/DLBRIS 11k I I TB 2GI TOP -I 6 .79 N O'29'38.5 E -L- 18 I I 2(al 1L INV=I40.63' II PLUG 'TB m1 15" RCP -IV RCP -IV 15" RCP -IV TB 9f,1 � P-I* — � —PLUG B 2GI C LE � 1 11 224- ._ I -CIS Ala 38'Plc, FLOWABLE FILL\Ip FLOWABLE FILL ?�yG .r.' T� B 2GI >tir•W±:`1-. . TRENCHLESS INSTAL TIO \ v�����.. 16 WELDED STEEL - Air '. NCH INSTALLATION SSTRENCHLESSINSTALLATION E EEL b LDS` STEEL PLUG ��mv .sy.an INST INSTALLATION WELDED STEEL 16E WELDS• TSELL� lw- .' . .�,,i{{�� JAIII T T - •,• ! / SPECIAL LATERAL B / 8.0' BASE DITCH FALSE CUT E •'"SIP _ E SEE DETAIL BB 8.0'BASE DITCH SPECIAL LATERAL SEE DETAIL DD E SPEC LATE / SP IAL LATERAL DITCH = U W� SEEDETAILKK SEE' ,ETa SEE DETAIL AAA 0 W �NV=146.30' CLASS 'B' RIP RAP SPECIAL LATERAL / ' �� _,` EST. 2 TONS SPECIAL IATE: 8.0' RASE CHCLASS P RAP - --IL BB EST.2 TONS EST. 7 5Y GEOTEXTILE SITE 17 DELLA D. BAXLEY 98 6.0' BASE DITCH r'- -__ =__ -_ EST.7 SY GEOTEXTILE SEE DETAIL AA Op" CLASS 'B' RIP RAP _______ ______ P RAP WO ONO EST.7 SYO GEO7EXTILF� / INV=146.60' _________ CLASS 'B' ST.2 TONS EST. 7 SY GEOTEXTILE WOODS _--- / / k • O ,------- SOIL I/-- / NHL/-.-.-.L!///1 BMI7 ELEV = 152.37' 8 .. DANNYppNN��CHAVIS / / N 359820 E 2001156 EILEEN CHAiis / / I WILLIAM A. BRYANT, JR. BL STA 346+92 - 258'RT ET ALS RRS IN 24• PINE TR 50' 0' 5C' 100' 150' ■••••••••• \ GRAPHIC SCALE FOR —L— PROFILE SEE SHEET 60 5- a' O' co 'f 1 x / z� /� ? -� ` ��w , `/ , 3G '� / \�.V/ / I \• �<'---,/ J , \ J,—,7 ( / \.2 l z.2 /'• r PROJECT REFERENCE NO. SHEET NO. / I-� (/, <,l I/\Zr,��! \�.��//i\i \/ 1��j / yyyyr��// I-5987A 21 \ \\ \ I\ �t�i r-- V//// Il�2 / \/�\ t" 1 I DENONE WEXCAVATION PERMIT DRAWING RLW J \ \\\ r—�\ >_—/ I I�/—/ / 1'j \� ,l,l /'� L / ,'1' I I'� I \ \ \ ('+z '� / 1 /�/ DENOTES FILL IN SHEET 30 OF 55 SHEET NO. ROADWAY DESIGN HYDRAULICS \ / / 1 CC / / / /` r r l / WETLAND r+?7 N\/ //\ .� J /\\ f �\ �\ ENGINEER ENGINEER /\ - -�LV L \ / i 1 \ `1-- ,l` I L-� l �S / /\ \ \/ \ \\ ✓ -r \\ / I \ \ I l i POWERS • • •• • C\ DENOTES MECHANIZED CLEARING _ CARPL RIFE ESTATE / / \ /(--)r / „I " r / \ 1-Z`` \ � -% "L -- \ // \-� \ / \�' / f �(- \ \-- NAD 83NA 2011 `-\\ \_—_, /✓ _ \J �� / V S_\\'_) \ I , / \ INCOMPLETE DO NOT USE FOR PLANS 2/w ACQUISITION -/ / - Z \ \ \ „/1 \ / (' // ✓\ I \ / I /' \ J G ^-.-� .I U il �� \\ ' / \ �r`\�/ )7 \ I / >~ I -•Z\ ( �> �� !\ > /\ I J✓ I\ / � / s /is / //j \ ( - \` CLAIM 1 `--s 1 2 / r �(\ ��\J y7/ /1/// </ - . \\ 1 ,\ er J , I L✓--/ \\'iz I I/J ..1 /l r 5r / )I / / \ � J - � / �/ /*' . L •-, f �J I 1, 1 `, L DOCUMENT NOT CONSIDERED UNLESS ALL SIGNATURES COMPLETED \; _ /—I ��'� `� -' �' r/ SITE 16 --\� �1,4700 /ram ^,,„\---� 5\ \- ( , ��) l j �zbr�l' 1 2, 1 I �;/\ /___? \v \\ \I • NC bLicense 1104 •F-G105M SLIM �F 1I11 moffa 11 & nichol �r� rz.�cpi.°on`�.i °s�"�r°':� .. rl`) / I�-- /� l/ J 1 \f //\ — \a J/� l -\ �\- \ /., / / > ,� I 1 \ / / I ✓ l \) 1,°, MIN ENGINEERING G. GAPE trN Zg 0 N LLI W \I-_,1Y / /' �\ , ,;/, ,/ J Ili"' —� l',_/ J"----,,_, - ^ / DELL/ AXLEY_ / I \� /\// \ -- .- ...,,,/ -,,,,,..1_,, - �/ ( i Q]� " II \ NO CLAIM I \/ _ -„z _ems \_/ \�. \2 L/ SITE 18 \ i�� 1// / ��—/� 1 woo``44s Lr ,� / I Lz-/� ) /^ sr// /l\ / I I . I / / CLASS 'B' RIP RAP II // / J,, / / EST. 13 TONS / / �/ \ CLASS'I' TONS �P / / EST. 34 SY GEOTEXT1LE I \ // ESy. 57\SY GEOTEXTILE II ( / WOODS , I / . 1 / J IF IF IE * I ( IE IF IE IE IE IE k- P/ 1. I . -_ ++� \ + i N CNI to I- /---K- DEL It— // _ / J/—>/ Th / u ' / / / • \ / / \ A / - \,1 WJ / ) ' ���_ �� II /-:11 / I IN C ILINE -L- STA 340 + 00.00 ,SEE 9 ` / ILINE -L- STA 353+00.0 EE 4== _ �a.4>ri�� J� i.�/�..�.��ii�.�,� � s` �I�+��`/ t�1%� /'.�J�/7�► �'� � a �'�,9�lir �. .�"� i�'� "'P��vr ,/�IP�/�//�•�/ri%� � A' r^� / rams - .. -. yo 9, a., . ,..... Aar — i it _ _ �, T T �, . .I J ( ' J_.i / \/ — _ ------� __ --.L.l---� Sol L1----961 --901--- 501---- ------_'J6I ----L.I--- — — — _ _ 1� PLOWABLE 1F L� LE --- _ - PLOWABLE FILL�.1 �� -------au---------. - 48" WELDED STEEL \ \T 1-95 SLi Jr es, - - - - �_ / - - - —'� —It, vT< TIN -,. '91 -/ ,r,.^____ H9- - V-44tt.S nn4•- I - T P-1AF . C1i I l 2T r l : "L — �B�•F �r - _ , LUG1 9- 15"-RCP- V 15" RCP -IV - - - �`" &4Br1 - -. �R'FE'SM�OV{ESSEdt -D�TO SILT DEBii1S IN I �zG roP=i��p�T9 r - - - oNE. ZGL - - - — _ — -__ - - - - -15G- - — — -- —_ —_ - ._ - 'q 29 385" E I y u9 ./ . eco- 7N_1Ft40a'3i LPLL16- __ 15" R RCP -IV �5^ RCP-IV�A 9f.1 _ _- 121 PLUG _ --- bsl hB -C �LZL-�•� Tr-95 _ -- AIR9MR 1-,-`/ PLOWABLE FILL - - - - - -_�L FLOWABLE FILL- - - - - .--_ - P!0- 1i9— - - - - - - _ 1i9r _ _ _ -1I9 -149 ---199 �7r �_ ------119-_- - _— —_ -149 --------'14G_------1 _-- - _ 4-- -_14G- [� _ -._ _--.�4---__ ___-_149-----_------------ 1AO__ -- Iq _-_. _ I�f)_-- -- ---��_---_�-11)---- '�,q --- - -- -__ If= - -� •� 4 ..'/5Y1\ ._. J 1 -. !.4�..v:.�".' i44----,_ 144-- ALIATJ • NL-ESS 1NSTALCR + �iLENCtIL�SS-INST t - - -16' WELDED- STEEL / - EL-DED-STEEi ._ PLUG -' ---_ \ .• -.--- I� r- -' ��-S EL -�i-9 -1 ---- _ I LTA O •'' 9.1 42" WEsDED'`$�TE L REN DFS•S-IN$TALL�GTION / 42" WELDED � \/ ` SPECIAL LATERAL E ' /" �'�7 8.0' BASE DITCH VALSE CUT * \_/ - o LT' /-\1 `\_ -, \ 1 1 /' - SEE DETAIL BB 0' BASE DIICN' I 1 SPECIAL IATERAL DETAIL DD ) V DITCH'L/ \EESPEC LA///SPIAS LATERAL\�,�EE L L/ b 0' DITCH (' U1---/ C i SEE DETAIL KK.' / ) / ( / / / \ _ % ; _ _, i \- -, `\ / I-S E DB E AIDRMCH \ -. / 4, SEE' ° AIL AA ccam�,, \•/ 1 "-`..I ` - / / - --1 L 4Y ) W NV'144.36� CLASS 'B' RIP RAP uql SPECIAL LATERAL ( SPECIAL HATE:NS / I / \ ) i 8.0' BAS H \ • -1 L : 1 / CLASS 'B' RIP RAP l ( 1 \ / EEST. 2 ST. 7 SYO GEO ILE / 1 / I I / / / / 1) s // \ �� //��JI//"f \ � I- 1 I \\ \\,- \\ � `_ / SITE 17• / \ N. \ _ , \ ( , \ --sb, ( V. _rrl— J < 1\\\ 1\ 1. / \/ �1 ,_./ �.- � ( / \ 1 %. /' L- �' \ \ I \ 1 1 C `n l 1 l)^ A�1 r \ rt! 1 ,.\/� J\( (^\ 1 '�+9J J` \ r / (b r l/ \v \7 \JJ)r/\`_s.r -� �, DELLA D. BAlfl l'-� r \�,)�`1\ ✓. ` ( _ \ — -�� \�7 / �^ \•4 \ �/r I��� )�/14 <V, �'\� \` 4 l• \\\`,1 ^ yLa / ---� t-� r \p\,'/1 I..- J JJ 1 I ) n _ )\ /-\`- / \�� \ \ \ �— ( \\ / ( '-' \`— \ "+4 I/ \-I` '�ce1 \) i /\ -��,\/ /(1 (Iv 1 \~ =`_ _ _ESTiSY GEOTEXTILE , 1� 6.0' BASE DITCH J /1 P i- m/%` h / ,iEFtBET, AI�C7iA� .✓ Lr - _CLASS-IVRIP RAP \ J _ ^\� / \ - / CLASS P RAP / w0 EST. 2 TONS e / INV=146.60'-V ---•--_-.,.,___-:r ___ \ / EST. 2 �S 1' ^ ^ EST. 7 SY GEOTEXTI`F� / �11 / I / \ 1 - 1 ' � WOOD$ EST. 7 SY GEOTEXTILE / \, / ^ / / 1 + 0.- 1�^I— /—),,_-,bbl-//�-.��-._i�\_ `� --� </{ iI — 'll� /4 I/l 07 �%`�,- � L��'l//`\ J/��I /^\/\/ (, -`�.q'CHL // �I� j 3'I I.�t .I- ._iAS{L1R��.-/ ; \/ , / \_, ' II _ /� /, .. :A-N:NY:C- HA/VIS I // I w\/\/ /�BMI7 L t 2.3T < �N�L- 7 / / N 35982-81-y�OB56 \ EILEEN CHA�IS - - I l 1 / WILLIAId�A -BRYANL Ak2: / _ \ ,�i! T \ /\�L STA 3v.p�9$ 258' RT \,/ �� I rs, / \, /� C?\� \/ �. ,ev -RR�S IN 24' IN�E \/ JJ JIB J/ / \\ l lI D \ / \ ( 1 LL <S \ 7 f j1 / ®p \ -- ` \v~ � f` / J �/ �) 1 I =--1 JI ! / I(ll /) / 1\ \si mil \ / ^\ / J\ c ) v11 a 5I)� -J � /5 149 s `\Ir I / / \ \\' '�\ %-\ I '151\I \ I /� �\ \I • \J 1 ( \ II \� G L ! /L \ —/ /_ 1 I ---ex h `- \- �\ \\// `1 i I 1 I \/ ��4 1 'o_• i���_. \ V ''( /-\\-. (/ `_( i f/ \) 50'• • S J' LO' (�/ / ■ ■ ■ \`` ^I =-r \I (\ `� / ���J \\\ r'' .--\\� -, ; 1 / I \ /i\,1.` S\-�. , /�•� `� -4 _ , 7f n I GRA•PH•IC •SC• ALE� 2 1r\ --I �5 I \iJ ✓ \\4; I \\_ \�\ L� \ I k` /l //� '` / I ✓` I , I d /) � ` L^ \ \ -I I \/ ik J <\ �✓ ) \ _- S \ ( 4 \ L l / 1 (/� \ 4. POR -L- PROFILE SEE SHEET 60 1 0 5 10 PROJ. REFERENCE NO. SHEET NO. I-5987A X-105 j j1 IJ r j r 1 ' 10 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111!': 101 D1 I�CW- i. IT IN ' I ET 31 OF 55 III ,60 11111111111111U1 lUl111.. 111111111111111111 '111111....■■...d'■■■ 1"111"n"111u1.1.n1p11er1' 1"1_11-G 1-- p:USi�R1ommINIIII11111111111111111111111111111111111111 111111111111111111-11-1111"am1 1•11• 111111111111.1111 1111111u1111G1m 11111n 11nu11n 1-1Gu1-iu■-R■iug-gO7ui- 1—nn-- 1W- 1-1�__-�-_ rC1G-ti- u-u--uYW� 1 ■U■,U.9U .0■!U1 .....1 ■_■-■■■■■_ .■111111•11•11• ■.I-tt1t■t1U-uIRIIarI N� u -111ii1111111111111111111111111111111111111111111 11■ 1U1 Rene -!•!•7•m.i.1!1!11111111111111....■'111e1r........................a G277e!U..u■UGr.!1!..i711»■iin!n.o■■■■■■■■■■■■■■■■■■■■11111111111111::■■■■.1111111111111111111!•!r!li:li11111111 nIGiaG5G2 W■G::tr■i o m1 ,! 111 IIIII1II1IIIIII IIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII (IIIIIIIII Illllllllllllllllllllllllllllli � IIIIIIIIIIIIIIIIIIII11111111111111111II!1111111t11111"■•111111 IIII11111111111111111r.Oil: ..IIY11% MiA1!IIl11111111111111111111111111111IIIIII IIt1t1111111111111IIII!l1111111!G'111111111, G f1111111111111111111 II_ C= _ _u — - - .=zC2 2GGCG. n.z.r�.=l---- -- ■L.Iro• M. nm/o _ VITi111I - - _'- - = 111111111111111111111111111111111111111I1111111111111111111111111111111111111111 11111111111111111111111111111111111 ■ �r.ii _ _- c u_oelvl IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII'JIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII. _l-7e7eMe_!e!• ..■1 ° .v Ir•.,1.,.•III '.. 'I II..'■- 111 I.1 I. 11jiff iiil■■11111111111111111111111111111"'`1 . i _ - 111■�■111111ttt1111��t1111111 tl��111111111111111111■■■■■■■■■■■■■■Uuuurr■I,11■iu■►��y�o►�■�■■■■IIIIII•.uuuu..i...II'IIIIIIIIIIIIIIIIII11111111111111111111111111 11 IIIIIIII������1����1�����II�iiil1111:111W�::JJ:::::::u■::::::::���::������� :::::::::::::::fi■ ::g■::::::::::::::::��:����'••....,....,..... 111111111111111111111111111■I........������:.::..1IIIII " `n ■■n1II1••••••••••••■•••••••• iiii■ ,,,, Illll.:i 11�IIIII1111111111111111111111111111111111111111111111■..■III ; ;;;;;;;;; ; ;:: 111111111111111 11111t1�IIIIIIIIIIII........IIIIIIIIIII II II ,IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIII I IIIIIIIII IIIIIIIIII1111111111111111111111111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII',,u,,,,,,,,,"' I .11l■■ IIIIIIIIIIIIIIIIIII 11111111lIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I 111111111111111111111111111111111111������ 1111111111111!!!IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII i ............... �.......■d...■ 1111111111crLLrI1Lr11111111111111111111111111111111111111111111111IIIIIt1�II111IlIII11 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIL: 711111111111111111111111111IIIIII::..1:.�111111llini111111111111111111111111111111111111111111111 1 11 ••• :� •••� yy :::::::::,,,: ������������■■■!/ll/411..■WIIIIIIfII■.. 11'■r.7■d111E1;I}r 11 III IIIIL.IIIIIII�IIII111■I11111111I1111I11111I11111111 111111111111111111/11«Lnr1rr11116111 _.r 1„/,• r mi _�_ -i---=.a■■■■■.In�■■■111r11111 1minI111fI�Y/11 ti IIIIIIIIIIIIIIIGrr tiour:f�.e: • IllllllllllllllllllllA�iiirllll� 111!1:11111111111111 C!! GIIIIII.IIIIIIINI!.I77C.C.6i.iIL.„. _ _ _ ■■ ■■■■■■■■■■■■■■■■■■.r•-r.■■■ ...I! !6iiG7eeP_Pl�Ii7eee:1:::i•000GGirr■r■•••■•-7ri000 __ i■ ■■■■■■■■■■ r IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIILIIIIIIIIIIIIIIIIIIIIIIIIIII111111111111111111111111III_II_II_II_IIIIIIIIIIIIIIIIII_II_II_II_III ■■I,111r ■■■■■■■■■■I •1I1.•I ..,.1 r.I,111111111 '.11.1IP_I_ 11■1 I■ 1■J■uMll■CSACLC\S1' 1 ■1I■■11L'1irl■■ 11111111111111111111111111111111111111111111111 ..Ili]i% 1111111111111111111111111111111111111111111 111�■I I:. [IliL. 7P7■IT.1- 1 I d1.'_11.12 I■■'/Ill _ MAC ill lll•Li11 Iiil ' 1l'111111I■■■IlII ■111111L111 - - - ^1r AG ' - -i. ■uunoou■•1 . -.0 - ■■Ilc:ii 1■1 IIi l-7-7IJC-L. i.r -a _ _ _ - _ 7-7I-C-1-a-a_-Je _____ _ ee_ __ _____ ___ _G e ! ! 7- .0 2 i�7_7I7C_C_l-7-a.7e ! ! _ _2 _ ^U7.►I.....'_' ]_.:■■ •11 1r■ • a 111■l'I 11 � \' I■■Ili 1iil■■ _ I'- III■■ rrrlrliil ■■I,' -fir =■111: ■■■ ■ ♦I41.t\I-MAI I—fi_1 002 0.040■aA L� I' --- 1 1 i — — - -__— _I-A—C_t _I rrrrlrliilrr � 1 II , ■. Gi:4G _ II _7 ;Ir11ii 11 i .Woo 147.25 W.... EN lI7G�iGGGGGGii:iG7I76C-C_!_7e�e•JP_ - !e�!!!. _ _7.G66i.i�7I7e�P_P_. !!ele7eMe !!_i_7e7ele_!el�7e7L•eee!•!•!=�r�E_C.i.i.a.2G. - 343 + 50.00 140 ■ EMI ..Il.Ii%I , ■11 1■1... y1r.►.un -- Ii�n:nr4 rw\ -- - -- -_ 211 REM tr11.r,1 IIIIIIIr, �L 7III '(]IIIIIIIII -- - !Tie!. liI■■ 111 AM 1111E1 . :r �— - _ - - ---------a. a.-------- s ae� II MA ..I�'•iiGGiG1G1GQGGGGiG - - -2-7-7Ce•!•l99-GGG■■■rrirGGC-CAP2• -%!ill-a-a. 92GLiiaGr G000CC- '!It'1! il1I\1l rIIIII..IA-1i%IM 711■■eii IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 0 5 10 PROJ. REFERENCE NO. SHEET NO. I-5987A X-262 10 0 10 2cI 3D 40 5. 6G 70 �C, 9K 100 110 170 130 1�0 130 1Q0 170 180 190 200 210 220 730 240 250 200 2'0 $ 200 ... .. PERMIT DRAWING �n �n SITE 17 SHEET 32 OF 55 WETLAND WJ • o.ob b,040 oA20 0 020 • 0.030 0 040 ... . gn 141 75 ion 1 11 — - iMl l— � R 1 1 1 I WTSJ'Ifr1�tfl _ II_ i■ 1 III II I /MI —'•'1r I W_I\ IVAMLlI MN MENEM IIrIy 11MINIIIIMMINIV711 -- I' _ IIIII— 11111 INT. � .A+c11 rl I--'iO —.— - �� _ - --- — E.11— _ _ _ _ __ _ lt? NMI — VI. .■y". • Z MEN IMMEMINIv.—.VOIC .ai II - - - - - - — - - - _.-_ - - - - - _ - - - - L1ilMi1 1RI T I•t II It I iI LiI V'1Iri — MEN ■I■t■I■ MI—� MN MEN MEN __I III C-Jr. SNI►111YI 11.AMENBA Ma—__ VI/ - 1 ___—_ I1111/1. •1111/ _ Y.Y.Wolin %AIL 1I rIl����i --_- .... ri NM LIT �'A �I =M C::• I I,i ? \ �� L VIP,/ _ni - MEN MEN L ice. 1•I6 III1 -AMIUIa'--•� — IMIEN/ 0 MN CY r l a Wm I - V a . I ClJP1 L1i MEN MEN MEN !MI 11 I MENEM II C I.ALV •A114i—I11W1IIIMMENVIIVEMINIIW >f I_ --- —_--------__ - �_ �_ _--------- —_—__-1 rI!_�— ___� _ MII --1 M -flMEN CS■11 i ili— iI wommlimmpererwmmormcr. IAIL1'ImmI AlL. IiMIZL tL. III III—r 1ri — --- • _ mgIMBIOMI -- —1 I _ ` - _ — _ _ _ _ _ - _ _ _ _ sn MCI 340 + 50.00 o.oao o.cao 0.02o o.oao 0.ose o 040 A 10 aA - 'IA t e r. -An _ 11 1 1 1 1 1 1 I'M II II IYI I I I I I I I I'M 11 1 1 1 1 11``11 1 1 1 1 1 1 M`1 1 1 1 1 1 1 1 11`1 1 1 1 1 1 1 1 Mi 11 11 1 1 M`11 1 1 1 1 1 1 PM I I I I I m I I I I I I I 171111 I 1 1 11YY1 1 1 1 1 1 1 1171 1 1 1 1 1 114Y1 1 1 1 1 1 11YY1 1 1 1 1 1 117Y1 III 1 1 11/1'1 1 1 1 1 1 11YY1 1 1 1 1 1 111Y1 1 1 1 1 1 11YY1 I I I I I 111Y1 1 1 1 1 1 11YYI 1 1 1 1 1 IfHATTYI I I I I IYYYI 1 1 1 I 1 14YY1 1 1 1 1 1 191Y1 1 1 I1 III 0 5 10 PROJ. REFERENCE NO. SHEET NO. I-5987A X-108 1 1 1 . „ 1 1 1 1 1 II n 1 II U II • II 11 . II 1 11 1 III 1 -,1 /,,1 •,1 ,1 ,1 ,1 i' !I D N G I I�:[24RAW! ;rlll- 1- 33 OF 55 /70 1 ' b:1IIIIIIIIIIIIIIIIIIIIIIIIIIIII ,:11 Fl1 l l !l!1111�I111111• 1111111111111111111111111111i1111111111111111111111- 111111 1111111111_ 111111111111111111-- 1111111111111111111111111111_ 1111- inim±iI1RAI IRGminmi11IN8�111, T IIIIIIIIIIIIIIIIm1IIIIIIIIIIIIIIIIPli"a. 1 .....■■s..-I....ILr.G.......■r----■■------------111L..11111 :...... •••r❑ ,-MG- - 111111111111111111III11111111IIIIII11111111IIIIIII4!II1IIIIII111111 II.. ■■rrr -2-AIM I•l...,-9!5!_1=i=1=a=BG=P_2-....... IIBIY111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1111111111111111111111111111111111111111ti1111111i:-!'!_1=aG.G ' GGi==='7G�.i. - 111111111111111111111111111inum11111111111111--`= 111111111111111111111111111111111111111111111111111111111111 ,\•,I m-� 111111111111111 ■■■■ .. ■■■■■■■■■■■..■■■■■■■■■ II'I11_19■■11111f IIt111111111 �a� -•GALA M 1.111I■■ 11111111111111111111111111111111111 ■■If..:l' ■■�Isl:i 11111111111111111111111111111111111111111111111 •• IIIII:IIIII 11ni IIII■ 111111111111111111111111111111111 1 r 11111111111111111111•.................::■■n:.:::luu■ll:in......u■■■1• �:::::"':::�'1:::111 1111111111 ' "' 41111111111111 ;•nl 1 IIi ILI01lll it . 1 7W■■.1 , , ■■IIII 1 i- - .I ■■IIIIIIIII :1;� ....■ ■■IAIIIM l-C7i. P1-12072G5.2.i.i. - - - - L:JC1- - - - - - - -1-a-7G. - Ilrl:il■■ " . G - - - - - Yi C=- s= _ 7a=i.aG. G=G.i.i=7000.irl!Ir'.!r. ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ II.II■-21.111•II■IVII■■■er.,■■ uII!!I�111111111111111111111111111��������!I••••••• IIi111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111iiiiii11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111"""""""""""""""""""""""""""""""111111111111111111111111 ... = :i IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII!11::.......uiiiiiiiiiiiiiuiiiiiiiiiiiiiiiii.......11111111111111111111111111111 •• 1 .. . .............••••••••••••••� �, ���� ■■■.......■■■■■■■■■■■■■■■■■■■■■■■■■ .IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII■■IIII .,:l■■ immummunim11111111111111111I111111111111111111111111111111 :::.111111111111 "91111111111111111 IIIIIIIIIIIIIIIIIIII�l1,II . IIII ..■■ o 1 -._ fill • 11`7f1Y 111 111}l•l�rl „ • � � .III101...1111...111111If11 11 11111111111111111111111111111="=•I---r• —__ • 1 'I 1111111111111111111111111111111111111111111111111111 II 1 1 !I 11 11 ■■IIYIIII • --- - - - .a- IIYI:iI■■ IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII:11 ■■■ IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 11i:CiiI1I111111111IIIIIIIIIII1111111111111111111111111111 II'Il:.r/Il 111111111111111111111111111IIIIII1111111111111■■■111111111111111111111111111111111111111111111111IIIIII - - -a-aG7GGGL 0J00 GGida7GCi_1_2G •\YI.pf1.I-•II1.1�■Ilil "I'al. IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIrld1111l11r111IIiIIl11iii1111 I.. •Gi:i M■III I■l'■ 1 ■11 111111111111111111111111111 11111111111111111111111111111111111111111111111111111111111111111111111111 1111111111111111111111111111 111111111 m11111111111111111111111111111:Mon IIIIIIIIIIIIIIIIIIIIIIIIIIII■■■■■■■■■■■■■■■■■■■■■ ;;••••••••••••..rr:■■■'.r■■:■■■'■■■■■■■■■■■■■■■ 111111111111111111111111111■■■■■■■■■■■■■■■■■■■■■■■■■■111111111111111111111111111 �. II IIIIIIII 1111111111111111111111111111111111111111 I����� I; IIIIIIIIIIIIIIIIIII■• Il111 I I�IIIIII��������������I����IIII ••••: 111 IIII 1 ■■■II.....■■■■■■■■■1■■■■■■1111111111111111111 IIII111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 ■■■■■■■■■■00■1111111111111111111111111111111111111111111111111111111111111111111111111111111i1,11 11i1i111111111111111111111111111 1111111111111111Illlllllllllllllo•••R:::::::!11111111111111111111111111111111111111 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.■.■■■.....■■ =7.nr\•i`' ♦I.1■■_\\l.1■■1III 1111 11■ILS L• - - IIIIII v. 11=== - IIIIII►/11 /11r. Illl ; r.,1O IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII _ .. 11111111111111111111111111111� I II■■ - 11 1 1111111111111111111111111111111111111111 roe IN:i=:- ■■■■■■■■■■■■■'■■■■■■■■'■■■■■■■■ i-=-° ■■■■■■■■■■■■■■■■■■■IIIIIIIIIL: ZrL1111111111111111 ►IIIIII:IIIIIIIII;1111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII4-l1=a=a_ - - _ aaoGGiiaaG. - - - - .272=2=1=1=3=2====L LI1.d•■■IGGi=a=111E111111111111III """"' ■ ■■■■■■■■■ ■■ 'I" ■■■■■■■■: "S"1.11% ^""1' -eel=aa=e _ _ =cG 1111111111111111111111111111 IIII;III;;;;;;IIII►111111111111111111111111111111111111 ••• ■■■■■■■■■ 111iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii 111111111■■■■■■III ""`"' IIL'iii11111111111111111111111111111111111111111111111111 ■■iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii 11111111 'IIIIII... iiIIIIIIIIl11.• 1111111111111111111111111111111111111111111111111111111 III 1 ■.■■■■■■■■■■■■■■■■■■■■■■••. I111111111111111111111111::■■■■■■■■■■■■■■■■■■.■■■...■�■■■■�■■■ ■■■■■■■ II II II II II II �■■■•llliiillll11111111111IIIIIIIIIIIlIl111I1111 ■■■■ IIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IlII I ..■. 1 Illifli111111111111111111111111111111111111111111111111i 1111111111111111111111111111111111111111■1111111111111111111111111111111111111111111 11 •..11 • 1111111IIIIIIIIIIIIIIIIIIIIIIIIIIII11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 I .f.I.11l, 11}I:Flil , •-- i1 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII:II IIII ::::finrill l' ■lo i•■- ...IYIaI ____ , ,,..II_i•Gumnii�111111111111111111Pl�l����!!� - _i 1- .1:I:1... II■■!■Y.�: - - IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 11111IIIIIII_II_IIIIIIIIIII I iI■■ 11!nc it_�'rCCc _ GGaa_ -=G.G= -G. - _' 11 _ __2__1= 1_2_ ■ 25 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ■■ I- 1 LAILW111 1IIIII■ 11111111111111111111111111111111111111111111111111111111 1111111111111111111111111111P 1; g L-ia ■■■■■1111111111111111111111111111111111111111111111111111111111. IIhiiIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIl 1111111 II I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII';;Ilii� ' 51111111111111111111111111111111111111111111111111111111 111111III1:111111111111111111111111111111111111111111111111111111111111111II11111111111II1111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1 11111111111111111111111111111111111111111111111111111111 111111111111111111111111111111111111111111119E Iliii1111111111111111111111111111111111111111111111111111:111111111111111111111111111111111111111111111111111111111 111111111111111111111111111111111111 ••••••••••• :::::::::::::•••••••••••••••• 111111111111111111111111111111 11111111111111111111111111111111111111111111...I1111111111111111111II11111111111111111111111111111111111111 11'}llL 111 ...1111.IL.::1 • • -F]IIII_IIL'2L_'I_i IIII1111111MGi 111111111111111111111111111111111 !MII- _ ■■■■i.::■r■ ■ 11 1 - s■■;;;IIII'l111 \ 11 u.i.- _ MC C_i_a_i. - - - -7=- IIYIOI■■ ■■IIYIIrI _ _ _ _ _ _ _ :.,! i_i_ _i_ -1_i- _ _ _ C•.!II ��1 111111111111111�1� _ _ _ _1-1-79-�G_C-i-1-a-7�- _ f _ 1_a_7G. Ala-:-..����_i_1_1_=_=e_i_1_1_a_»� _ _ IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiiiiiililiiiiiiIIIIIII ''•;J .- 11111111111111111111111 1 - • :T:I1:l ll l ll ��IIIIIIIIII .... 1111111111111111111111111111 11111111111111111111111111111111 IIIIIIIIIIIIIIIIIIIIIIIIC ! . 1■uil-.:.I,..:....,_I:i... �� 11111 ►IIIIII111::::11111111111111111111111111111111111111111111111111111111111111111111111 111111111111:::: :::: 111111111IIIIil""1111111111IIIIIIIIIIIIIIIIIIIIIIIl1IIIIIIIIIIIIIIIIIII 11111111111111"III ■■■■■IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII'III■■■■■■■■■■■■■■■•IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIino II 111111111111111111111111111111111 111111IIIIIIIIIIIIIIIIIIIIIIIIIIIlili111111ii1111i1 111111111111i1i11111111111111ii111111i1i111i111111 DENOTES MECHANIZED •° •° •°•PERMIT DENOTES IMPACTS IN / PROJECT REFERENCE NO. SHEET NO. • • • • • CLEARING// SURFACE WATER \ DRAWING 1-5987A 22 Yam.//////7 T DENOTES EXCAVATION / SHEET 34 OF 55 WW SHEET NO. �f WETLAND A IMPACTS INE SURFACE WATER ROADWAY DESIGN HYDRAULICS ///� DENOTES FILL IN WETLAND ENGINEER ENGINEER CAROL POWERS LIFE ESTATE / NAD 83/NA 2011 INCOMPLETE DO NOT UM FOR PLANS 2/w ACQUISITION 99 / THAD J. DAVISEE NO CLAIM CHERYL J.FD&VIS CAROL POWERS LIFE ESTATE / I.I CLAIM 20 LF OF CHANNEL EST. 40 TONS CLASS II RIPRAP DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED IMPROVEMENT EST. 53 SY GEOTEXTILE WITH 1' FLOOD BENCH AT NORTH BARREL EST.7 SY GEOTEXTILE SEE DETAIL LL28RIP RAP AT -L- 366+29 EMBANKMENT / oo FALLS OF RUSE xao, sure x ,",moffatt & nicho �9,°� NC LicenseoNO�. °F�0105s F. BURIED V O BURIED RCBC SEE DETAIL GG WITH 1' SILLS / 14-1 WITH BEVELED HEADWALL Fi' ° M, iNte ewec MP Nub s 1nRN asn� EST. 21 TONS EST. 35 SY GEOTEXTILE ' RIP EST.1/ EST.TONS EST. 5 SY GEOTEXTILE CUSS I RIPRAP Ul NT M) RAP CHANNEL IMPROVEMENT CHEVRONS TURNED OFF FOR CLARITY BRENDA B. SMITH -L- STA 354+06 EMBANKMENT BURIED 1' RIPM RAP AT 2@7'x7' RCBC II SEE DETAIL GG WITH BEVELED HEADWALL SKEW-64" N /► S P / TH BARREL TF ANNEL 2' SILL ON Ol' SILL ON URTH BARREL 1 IMPRO20 LF VEMENT WITH 1'FLOOD BENCH \ SEE DETAIL NN SITE 20 N� `-, W ' I°' \ CLASS 'B' RIP RAP ` CHANNEL IMPROVEMENT '/ / EST. 2 TONS CHEVRONS TURNED OFF FILL IN WEfIAND FOR CLARITY N LLI 6�� Airt p'� wJ SPECIAL LATERAL EST. 7 SY GEOTEXTILE 6.0' BASE DITCH WOODS WOODS SS 'B' RIP RAP CLASS 'B' RIP RAP SEE DETAIL AA _ CAS .B. RIP RAP SPECIAL LATERAL ES TONS EST. j� 5Y ILE W W 1 ' / 777jjj 1R�� EST.3 TONS SEE DETAIL AA EIPF EST. 10 SY GEOTEXTILE 6.0' BASE DITCH EST 11 Y GEOTEXTILE Cn _INE -L- STA 353 + 00.00 SEE _ / _8,4/111 I. 'G� E%ISTINC R/W MON �- .INE -L- STA 367 + 00.00 SEE if 1F 7 X�� 4� ". REMOVE EXIS+ Ar.rir ��,,r'/4i" 11VR► 5*- r,ilka'� AND ENDWALL e• 'ei TRENCHLE55 INSTALLATION 18" WELDED STEEL TLLLATION / �f PLUG o:a:Il16 1 � � litil .. H i/ TB°2 I ' 18E WELDED ST H ��Tj I ' MTL LOWABLE FLOWABLE . TILLS 11������991??T 777 --� FILL IF''.�Z^fin ` --- 7-3— �, MOVE N C' 29' 38.5° E TB z I TB 2GI PLUG y x �� �• 15' • `\\ RCS TB2GI � T: 2GI REMOVE o REMOVE s 'EYE--64— aJ �V TI 7 TB 2 .. _. .. .. 0 �+�'�; � OTtaI. ��� i! ©�ry .. < eft ' . � > �. � > .i''�._�--y � fir1 � -'4if �/ I � '�' _- i. '. EX51 R/W- _ T R BAR i4 ..i.i.'/ .. .. .. .. SPECIAL LATERAL �� .. .� _______�,, .. .. .. .. .. AL SPECIAL LATERA ` L 6.0' BASE DITCH IP RAP PAD - - `el:A EST. 4 .. .. .. .. 10'x6'CLASS iis� ' ' jr` = 6.0' BASE DITCH SEE DETAIL AA EXISTING SPECIAL LATERAL - __--- 1L --=---`�"___` �g 6.0' BASE DITCH '" SEE DETAIL AA %%'' `;�� SEE DETAIL AA EST. 6TONG TEXTILE ,� / S'./� � a I 2 VREMOVE 2048" RCP AND HEADWALL CHANNEL IMPROVEMENT CHEVRONS TURNED OFF% i, \N 's RETAIN i� ‘�\ S SEE DETAIL HH �` U Q 2 j "OR CLARITY di�'____ ___ __ __ CD J r WOODS \\,i 40 LF OF CHANNEL / i� i IMPROVEMENT INV=4.9I' \\ %1 SEE DETAIL 00 _t::---: SURFACE WATER IMPACTS RIP RAP AT EMBANKMENT. SEE DETAIL GG 4 ____ %lTi`g ��� 11 REMOVE EXISTIN __--"----- -'��� oAF 11 ii CLASS 'B' RIP P ' 38' 1 I EST. 1 TONS 74' \ i i i EST. 5 SY GEOT LE ti j j /, EXCAVATION IN WETLA iiTEMP SURFACE WATER IMPAC S CHANNEL IMPROVEMENT ' II ii CHEVRONS TURNED OFF 1 i if .. FOR CLARITY %% II p II BB ,I 19 LF OF CHANNEL II II 11 IMPROVEMENT 1 I I CLASS 'B' RIP RAP WITH 1' FLOOD BENCH AT NORTH BARREL EST. 1 TONS EST. 2 TONS CLASS I RIPRAP EST. 5 SY GEOTEXTILE EST. 5 SY GEOTEXTILE SEE DETAIL MM WILLIAM A. BRYANT, JR. ET ALS PATRICIA RpppoTLHLJJ EEMMPSON DAVIDM. IHOMFtON 50' 0' 50' ICO' I-3C' ■ • I■■ • GRAPHAPHICC•SCALE FOR -L- PROFILE SEE SHEET 61 .1 0 ti 0r 0' n oo J y T J I l J \\ \ /I / DENOTES MECHANIZED ��7/I/ // t^�- JC g. ?J J DENOTES IMPACTS IN .//�J// `\� i PROJECT REFERENCE NO. SHEET NO. // \\ // I )/ •'• •'. CLEARING // J/ ," r r- V\ SURFACE WATER �\� n^ r" % —/ / \ I� I r DRAWING 1-5987A 22 ( L / \I - \// j/// DENOTES EXCAVATION �. ��I DENOTES TEMPORARY I / r / / \ \ r // �' r I ) I� / �� \ \ f / ( ( [-PERMIT I SHEET 35 OF 55 PM/ SHEET NO. / \ / IN WETLAND A IMPACTS IN SURFACE WATER / / � S �// / J .. /,,-- \ _ -1/ < / ) j'-- \(*. �`, ROADWAY DESIGN HYDRAULICS /) \ G f / / - ) \IS) y/ /// / / \ ) / DENOTES FILL IN �/ /,.------) \ / \ / WETLAND "'NV / \ / r \ \ ( \ \ / // ENGINEER ENGINEER / �/ n !7 CAROL POWERS LIFE ESTATE / J / / / / ).7 \ \ 1 /� • / / �, ,J ) I / / // ) / / / /� -- I / �)� /� / NAD 83NA 2011 / ri^ ( \\\1 �--\- `�\,f� °� \--�jN/j� j J ,..1ii / sip INCOMPLETE DO NOT USE FOR PLANS 2/w ACQUISITION `^� rj \ \ I n)i 99 J / -'e+) J\./ { THAD J. AVI1 \ ,- )`` (� J`'7 / L' �� (`^' t`���-`.---`(� ,xY� / %�.% / :( / ) v CHERYL g �� 5 !l DAYS 1 1 \ \ \ 1 1( CAROL POWERS LIFE ESTATE\. \. 1 '( y:` I NO CLAIM - r\-�/ c! ___tl / / �., ) \ \ L l 5 .1 / / r .5r,� /- (- /\, J C / ':� -\ \ \ I I( r I y � \� 2 \ %\\\t°'\ }\\J // // / l\mot--mow '•0 \ \// ,r\,_ \ ) _ / \ / /\/ `� L-` / \ \ \ /---. \ \ \ --� \ NO CLAIM 20 LF OF CHANNEL ` I )y 7" r / \ \ ) \ Tq 5-�iIERAP�r \ \/ / / �\ �_ DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED !' IMPROVEMENT Y /\ J > / \ \�EBS7� 3 \T 4 WITH 1' FLOOD BENCH AT 1VOIETH BARREL \./ / r s / ) �\ \ 1 / Jr \ ( / \ \ -�C, 6%\ \ 1 \\\ //� EST. 3 TONS CLASS IRIPRA� \ I f /) i\-' /tl 'Vs" / / \ /J /\ \ N \ \ ,,,,,,,\ - \ RIP RAP qT / JI `l c \ \ \ EST. 7 SY GEOTEXTILE rrc ., / \ 1 - -\ \- / i ) / \ it EMBANKMENT ---1 `'l ) L -• SEE DETAIL LL \ \ / oo r us os xc sc xao suTc ,",moffatt & nichol ,,, ;"; "ate`"";,;;,ei's, FAX r NC License NO.: F-0105 F \ �I /-' ) / ( /� /\r\� �J^\r-_s� \J / ! / //>, i \ n / .---R '1 A16 I/ ) I/\ \ p :2@B'z9 C SEE DET Cifi \ !-- A /\\ 2yt RIED \��,--�J ll I/i > 5 ( .�l1TH 1' 91L /1vE � /' I O -\ / \ 1 WITIj BEVEL AEgDYMLL 3; \/ I ° MI ENGINEERING ,u , NEeoRczisos °° H'uMe°°v R RRM asn �4 ,N EST. 21 TONS C1A55-1 R�PRAP / LT) EST. 35 SY GEOT/EXTILE \ Fry �' /' /) \ / `� L v / Prl ) 1 / \ ` I / \ t ` � \ \ L CLASS 'e' RIP RpRA `' jENrHf15-TUR-PPNBD FF \ '/ / � / ( / /) f .- / % /yam , \� C �-- j I .\ ,/ ✓ \ \ I BRENDA B. SMITH E5T.1 TONS { \ Ser _ 77 /) I l - / I \ \ \ ( EST. 5 SY GEOCTI 'JTY -,",, - - .- /�5-T� l 1 Y \ ./ \ \ \ 2 \ L( r RIP RAP AT '- -,-� T 2@T T RCBC 06 \, ��),\, iw (\ \\ 1 \ � \ -T BRENDA � I ---..- 1 EMBANKMENT /sz BURID 1'1,..-0/ \ / l '� 111 /SEE DETAIL GG /�H-^/ RH BEVELED HE�WALL / / / \ti xuq \ ) I , KEW64" , r<� \ / ^ ■� J 1M ��/� i ) ,e' T'�ILL ON SOUTH REL ( ) \/ / / 0 LF OF CHANNEL / / / /t' T$IkILL ON NORTH L ) / -/ ,,_% 1 \ MPROVEMENT / / / 1 \/ `� \ /1 \ 1\\` EE DETAIL NN (/'/� ��\ C i \ 1 1'FLOOD BENCH,' /� � / / SITE O `/) M /�MII ,,I ` \ / 1 / / 1 / / �)I Jrl / //\ _ / ) CHANNEL IMPROVEMENT ,Li , ^�/ / / `CLAS B RIP RAP/ L,,\ (- L ) / / FI4t IN WE'f1 &N� > ; v 1 "I \ FOR CLARITY CHEVRONS TURNED OFF 1ST. 2 TONS/ r l I I \ �. ) 1 N W W I A - �� <� ' #,Fr ral SPECIAL LATERAL /\ ST. 7 SY GE T6 TILE / _ ..„..0._..--IL ( \ ` I I CLASS ' '' RIP RAP 6.0'BASE DITCH � t / / / SEE DETAIL / . WOODS I ) / W OS / Ii • 'B' R�pJ RAP .S / / '� / -CLASS '8v'RIP RAP / SPEChI� LA�ERAL TONS ) \LE / ( W W tn 1 7"• � 1 / / j / / \ I I' .\ C \ i� } `') EST. 3 NS 56E0E' DETAIL AA Fb71�� C EOTE*TILE ) _/ DETAIL AA EST.1? SY GEOTEXTILE / i 1 / -' J 1 \ L ` 16, ( I _INE -L- STA 353 + 00.00 SEE P� IJ/. _ �C� ExISTINC RrW \. 7 ✓ 1 MON , !� `!-\��� 1 .INE -L- STA 367 + 00.00 SEE �.�—X ETC -ate IF -�.i - _ S F `�- L 15 - - ,. REMOVE EXIST ___-_——_--.-1 _ _ --v-r _---- 149-—---- 19 — 150—119- -��►� - - - - - - - _ e .�_ „ CIILEiwiN —_ r,'��`-AND�ND-V{�1 - - -. - $TADA lT - - _ 149 - - a' ' r� = *A� �a� -sn- - - - - - - - - - - -�- - - .Iq- - _ - -119- - 18" WELDED STEEL - - -uT - - vl- - - - _<s1= 4 _ �� , �, .T�u .14 _ _ _- ....- I - -� Z6 1 W QED %. 661 601 -- - 141 b -e--- -_..i '�� GI 151- IL •TILL — — zs, — - __ -- _ PLOWABLE151A . . �-__. — -zc,— — — — — — — — _ — zsl — — flu — '� •• v _! - r9,b5 _ -_-_- 15I N 029'38.5"E -150— — 150— — 151 151 I 7B 2GI �._ r ItiL m i LUfi_--- -,, �. q„ R'i[v 'Ti>A _ -:-_- - - .!. I,_ �_�1���_+` ��Iw•�'` �•� gip-- -�� - --- -- _ -- y - - - Ism _R.vl ��.,� _ r T 1 — — LLIw I I I -__ --- —Ihe — t52- —� ,52 _—_ ___ - 142" � �—.— --- —_ �L 3T. --_I50 .. _ ,m --_I51 ---- ---151---------- — 4TY------_IS' y�y '.. _ _ _ _ — ----IIG—�-119------------ —119-- — —---119- 119------_=—---."9-- . ". r4,__ t.�_-, --- -,.G1 .--.- .------ ------ .. -_LJ ----In - -----------------1.' T'yN'O�. —�_�.—_ — — — ti —� _-- — d --- — Ol - - - - L--- �'Y^r Tom*' 't {L,�' d'"iI -TB< �.� . ,, _---ul- 61t II/< -- ---06,-�- "-- -1 — `�- ^I�t I-1--- :- \ • _ -'r---1-41r -:' -z-,4 .. !,� 0, • y,y ,.. .- F/` -` � � �f L .�H�� - .■r /- - - - -_-_L zy1--C-r --- ` -_ T' `\'--_r--i--.�---�� ;/- - ��" - �- ..- / . /, C/ f ,PtA - ',!'.IA'3'■1F 1t 1t/gyp . -'�' >� >' > > __ •' - �3"^G I R/ i� ( ) '�. / -/Y•-� -•' REBAR i(I�r�I.r�. r....i�11i,■.'I Ili■ 6POECIAL�TERAL .. .. �.. \`. ".-/.. .. .. .. .. \: tF �/ // .. .. .. .. / L 61,C LATERAL / <� 10'nb'CL45S 'B'RIP pPAD � y EAIC4KCM RqI TONG i � = BBDbAAEESSTT SEE L69A\ REMOVE EXISTIN _ -, 1 SPECIAL LATERAL a-----35DICT="-C'--- y+irx ri�� f I �)\,_'_ 6.0' BASE DITCH /"...".., /� — - — //\\SEE DETAIL AA /,' /i / — C� ` c / I L\--J\I----,5z--- \ // �L\tiil-- /�� / �` /7.6SY TEXTILf� -ES ` /> / J / AA IT - _ ti ( / / ,\/ / r� ,� / / / / I"- l ,'�i,+.6�/��/ ptAr IEI A ••el f J T 1 U - 2@48"RCP AND HEADWALL CHANNEL IMPROVEMENT -��S�FFHEVRONS TURNED OFF r - ). \ .-�'" ) /r ) // // l� `%� J'✓ � rr ( /) //--yy-=_� RETAIN ."\\ . - . r r it Isl- _ -- „ �,_- = i, J fl a / /1N- , `,1c� )/ l -FALSE SUMP I \ / ) ✓� / ) / / rsr- / P ( SEE DETAIL HH A I 1 ) / /- Imo. \ I / } \ / 2 _SN.1_ .CLARITY fi0r-� - _ - ___ 1 --= c �O \l ) / / ;mos /�� I t \ 40 �f F rHANNEL _-```: / // iM,------------ j bOl- Y/� / > — 152\Ll �'15]� ���r� ) / I // / I \ I q C, \ INV- ... l i / / - \ 11 \ \ \\ \ / I ) r� / // \ �, ksn \ I IOVFMENT / �; \\ 1 „ \ SEE DETidL-e I ' � \\ r• ) ( / ) e '/ / i \ SclIK .CE `NAB IMPACTS - �- RIP RAP AT --_-�� EMBANKMENT SEE DETAIL GG -- / ._ - - �Is1_I / I ^ .T'- Li .. II(` �� \ \ � \ I ..z �S .. vl v\ I 1 )I,-� /'®'�)� I II II \_ �. \\ \\ /-\ ) \ (1J < 'I'''.)REMOVE EXIST! RCB �I /.�YE' � � .i - -' -�L � • \\\ \ I p I I / i' /� / , „ � - - - �\\ \ \ \� \ / l C) / ) / I r \CLASS 'S' P� ) / ' / ` . I (�I \ / / // / \ ".^1 \ / \ ( -' \J / ,EST.1 TONS \ 7 ( \ / _ \ \ %% / J ( \ `.\> \ y.l ( %' / / / ,',.'/ // - `h -J'52y, l \ C////`_ / �)) / EST. SY/GEOT L`E / l i 1 / , / I \\ \ a � \\\ )) / n / % �/\) ^ ) / .e1 l'EX ri N IN\WETLA `_ / 1 \ \� \ , I I / / / /jr/ // \ ) \ \ \ TEMP S RFA¢E WATEIM 5 IIIMJNEL IMPROVEMENT \ \ i \,� \\ r \�\ ��`// '1\) I /; �rsr \\sf�)I / ( )1 / ^ i // I - _\ �.. \ / i / /� 5 \ , EVRONS TURNED OFF , \ A\ ~\,. \\// /-�\ \ \, l e`( / / J CLARITY \ 1\ .:\\ 1T „\ 1 i�� / / f// // , .-',..-'7---- I \ ' 1 \.1 II 11/ \ 1 I\ 1 (-,I \ % ft// \\ aJ` . \ \ n \ :/ '-/ ` ^ \--,\\ l\ ) �3 / \ J n (— / /,,„,_ _, -19 LF OF CHANNEL, . ( \ \ I 1 11 I I ` J L I 1 Z 1 / / _ \\ ��_c l� 'c f` ` R' r.„--` \ \ i - \ — z9rl...- ._ 7 `- � ..- �Z 1 \\ '-trc -, "B': RRr �t/R ,, - __' `- ✓ / \ WITH T'FLOQD BENCH A `BARREL-' y-_. __ - - �I--- ,•+Irla \( \ rsi/ ! 5 1T/TOAS '- _ \- EST,.2 FO SSpCCLASS I RIPRAPT R 1 n J 1 ( _ \' -' - % ) $\ ' 1 I\ / \ , \ \((-� \ I\ sE 5 S s OBE _ ,,, �,1 EST. S\SYstGEO7EXTILE \ /\ \ ` j4i (,D 12 \ \ ) 1 Lam% IV I \ /' \ \ \J \ -s.�) \ I \ `\\'1 p�t,.J SEE DETAiL Mny \--/ I\>'r )/\ l»I \IJ �rJ /�^� \� ) \ �--1,..„,, / WILLIAM ET. BR SANT, JR. l S )� 1 P TRI IA R TH PSON e/ /-�\ �� \\ i) ((s �� (l1\I�l C 1 1 // 1%// 1 >/ . f N �/ 1 / )�� AND SEWS rJ \iN / DAVI M. THOM SON ESI / `�.� ( / 1\\ )) / /! t I I /) 11(LISLii/V I 1/_ / \ '� l l i / l,F.r_ Q l/7 / - \� �) / \ --- r / // /J \//( 1 (1 \l--( \ / / k*'—/ i ( / \ /\ l� / ;�� \ / hJ �) / \- \. \ �s( /1/ if I )j 1 V1 S I \ \� \) 1 \ a I �/ l I� �I \ \- \� /\:� 14 1 \- \ (' r/ 111 ) (- r L. ( / ( ` ar'r-y f \ /^� r �� \_- l\ �\ ) I --\ / 1\ \�� I \ -1 )1� Al/� /-(I 1 1 I ( V - r�\, -,/ ( Ik / I �� / \ ) \ I )) <I(R(l �)��/l(� lI J 1 l / - \ Il �) y^ f1 jl/ )il j� %'/ _)J 1 ( \ti / r`-'i^\-153' / /) ( / /� �/ J / I \� `/ /% \, I) r l S 3. 51-/( ( \�s� \ / ��1 I �_, l// /i//�y�� l / I1/-,1- ( L- \ I \� ��/ �`\)� - \r/ \! Lam\ l d /' �/ Esi b� 1_- �)�- ( I C )- VI -„% / /\ s9' so' \ / \\-\ ) -7 f^/// I /I I ��^ \ \ �\ \ J-- \ .... . -\, \ L .- ) / 11 / Il/ I /) r( rJ \ I l- \\--_k) \ \ / \/ > ^ - P I \\/ - �, 1 \i' \ ' l... J /' 1 r C GRAPHF�SCA 4E� / (1 / / i) /) 1 I \ \ \^ I s / 1 r J e / 1 \ III( 1/ </0 ,//)) 0 /-, \ -r� - \s. \ /\ (\ �) ) I -1) �b� A 7 / \/I I 1 / I ) \/ \ \ FOIU-L- PROFILE SEE SHEET 61 oCr of PROJECT REFERENCE NO. SHEET NO. I-5987A 22 R'N SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER _wet Cu11 38.d \I-5987A_H SITE 19 NAD 834\IA 2011 LPERMIT DRAWING SHEET 36 OF 55 INCOMPLE DO NOT USE POR TE PLANS ' / W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ,",moffaff & nlchol ,,,s 78,.4626VOCE g9°„9 FAX °, NC License N0.:F-0105 AECOM -20 0 -150' -10 0' -50' 0' 5 0' 100' 150' 20 0' 1 60' 1 50 3 3 1 TO P OF BAN I< R trim T -L- STA 54+06 9. 7'J' CRC BURIED ' WITH BE ELED HEADWALL PROP G ELEV NB=155.5' SKEW -6 ° 1 SILL O SOUTH BARREL 2' SILL O NORTH BARREL WITH 1' LOOD BENCH NORMAL •1 SKFWFD 7 i I.. 3. 3. 1N 21 ORMAL SKEW _D 0 r OF DANK L rT \NWSE 1 1 I/ 140' P S RO P OSED 1 TREAM BED V E SLOPE LEV 0.� 7 1 42 1' P ROPOSED STREAM B E EXI ST ST REAM BED PROFILE ALON G S T RU C T URE 50' 0' ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ - GRAPHIC SCALE 50' 100' 150' 44 oCr ro PROJECT REFERENCE NO. SHEET NO. 1-5987A 22 RAY SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER 2 SITE 20 NAD 83/NIA 2011 PERMIT DRAWING SHEET 37 OF 55 INCOMP]LE DO NOT USE POR TE PLANS ' / W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ,",moffatt & nlchol ,,, „ s ANC a License NO.: F-01059 r AECOM w -200' -15 0' -1 0' -50' 0' 5 0' 10 0' 15 0' 200' —L— ;566+2' 2@8 x9' RCBC BURIED 1' WITH 1' SILLS WITH RFVFI FI) PROP C P ELEV SKEW = 83 HFAPW —152 6' API 3:1 N ORMAL 15 0 I TOP TOP OF BAN OF K RI BANK GHT, LE FT 31 NORMA 3:1 SKEWED / / 3.1 S KEWED 1-4 PROP SIRE S AM E D BED NWS E 1 41 .9 tii �� _V /n PROPOS STREAM ED BE EXISTING PROPOCED RIG A LKTN 13 0 1NV. E SLOPE L EV. = I 014% 3 /. 4 P ROF-ILE ALO N G S TRU C T UR E 50' 0' ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ GRAPHIC SCALE 50' 10 0' 15 0' Z O / DENOTES MECHANIZED ' PROJECT REFERENCE NO. SHEET NO. . W • . EARING PERMIT DRAWING 1-5987A 23 //� DENOTES FILL IN WETLAND SHEET 38 OF 55 WW SHEET NO. / ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER NAD 83 NA 2011 INCOMPLETE DO NOT USE FOR PLANS 2/W ACQUISITION BRENDA B. SMITH ROBERT A. RUSS / DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SITE 20 ,,,,moffatt & nichol ,, a 6zsxo `�nae000 ms FAx NCLicensecNO.: F-0105x Ln / Imo- 101 MIMnu „oH ZRs G 00 FIRM vE NUMBE.ae]t N N W - FILL IN6.0' WETLAND N. M N'T SPECIAL LATERAL BASE DITCH CULTIVATED FIELD SEE DETAIL CC 010=59.00F5 VI0=1.3FP5 fKCL BI SPECIAL LATERAL CLASS 'e' RIP RAP CULTIVATED FIELD W w WOODS J _ SEE DETAI6.0' BASE DIECCH EST. OTSOYNGEOTEXTILE E -CLASS 'B' RIP RAP LLI N1 \^/ 1 I /IF a. .w. .. .. .. .. .. .. .. EST. 8 TONS EST. 21 SY GEOTEX7ILE 1 .. .. .. .. .. .. _. .-_ r. .. .�_ .� ._ _ - - .w. . .. . - _ _ _ .. E .. E E%i �-d----siw-rM_ .. ExISTNG�/WMON--- E E ILINE -L- STA 380+00.00 SEE - - --- 48'WWISB e� L� _-_�_-__ - �_ - ___ --- _.__S-_5----�-__ '.. ---5---- --- --- -- --- -- - ur-.: TRENCHLESS INS AL 18" WELDED STEEL 1 R 'a _� TB 2GI II ` PLUG '5T FLOWABLE FILL e L II �� a FLOWABLE FILL N ____ ____ I-9..5 SH • EL SBL s.,, — Imo- —-T�(� 367 AV- TR ?Cif15" RCP -IV ID 2 1 -L- N 0` 29' 38.5" E I REMOVE . �.\ F.. 2GI 30" RCP -III IB (I 15" RCP -IV TBO®60.. I 1 R T _.._ ■ I I I ., �a �.— I,- �I L� ,� �, - „„ �— ��y — ,� _ �. — — _ .ytCP_Iv 5` RCf,`iV �J — — — — _ _ —�.. •-RCP ' 2c� CABLE TB gel - TB 2G F�PLUG 2GI \PLUG CA: -TB REMOVE -EL NBL- /B. ---- r-ns ua TA' acr MCA--- -- FLOWABLE FILL N TRENCHLESS INSTALLATION 3 �%'' 30"WELDED STEEL 421r TEEL PLUG _ F1W �F gulf < < — ''' - < .�. - 48' > �� IS TING Ft/ T �•P T 7• Ne-/ -� .. .. .. .. .. .. .. .. .. .. .. .. •t��.-.w. \ If' 01D-9.DCF5 / SPECIAL LATERAL V10=1.SFPS PNITBQUT CL BI 6.0' BASE DITCH FALSE SUMP U w� 10'x6' CLASS 'B' RIP RAP PAD SEE DETAIL AA SEE DETAIL HH EST. 4 TONS EST. 16 SY GEOTEXTILE U 1 WOODS i CULTIVATED FIELD PATRICIA R THOMPSON NEILL D. FOWLER DAVIDDM. THOOMPPON NOCLAIM 50' 1 ICO' 15 C' GRAPHIC SCALE / FOR -L- PROFILE SEE SHEET 62 i Z O /� \\ \/ (\ ��;�\\ ^�/ /1// \ % \ Jn `� • • `����\ /J DENOTES MECHANIZED PROJECT REFERENCE NO. SHEET NO. I \�-, CLEARI/•1G / N \\1� 1 \ \ IL.--i�J < /• \, 1 �l \ PERMIT DRAWING 1-5987A 23 \.- \ I J \ / DENOTES F♦'LL IN / / \ �� I J/ll / /-J \ I I F WETLAN \\= / \ \ \ SHEET 39 OF 55 RAY SHEET NO. . !/ ` / I ,tJ r / \ 1 ��i " \._ \ - / -' - 1 -.\ '+ �/� I / 1 s -. j - \ I.\ / G�� ,�i%�i--�� / / I ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER - 1''� _ / / ( \� _ 1 %/ NAD 83 NA 2011 y - \ I 'q• I / \ ) \ \� INCOMPLETE DO NOT USE FOR PLANS 2/ W ACQUISITION L. l t �, ,� j' BRENDA B. SMITH /g e,' 1 1 r / \ ? / i ---. \ �/ \� � � I /L(�\ „/ i/ z /J/�—_\ \l `• \` ROBERT A.RUSS w` �/ ® / _ , ( / / /m'+`' \\ / \\ �_ DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 1( / Al, �\ /SITE/ / \\ f// C < \ / r� ,,,, moffa J} & nichol aw�r*'xox �.nax0x'l°'vm, " 9;oNC�Licen 9`NO'''F-0105 ��11 I/� \ \ ' > 1 I / \in I■��■ I ENGINEERING CV (V W 11, �1— a \ I \ �� �\ -, > jh� \ 1 1 / I I J/� ;I\ / 1 \ C / 1 1 / 1 SP + \�'TERaL \\ \\ CULTIVATED FIELD /-/ ` v\ ? FILL IN b E PITCH 1,� i/ \ / WETLAND / / Sj Al CC i° I '$ / / / / ` V p= FPG (y L �1 SPECIAL LA�- ` _ _ CLASS 'B' RIP'�A.P 6 / / \ `\ �, IO"{y�n,<C CULTIVATED FIELD - LLI _ CAL 6.0' BASE QTITCH \ E 3 E e L SEE DETAILWA - / -ERSY GEOTEJRILE / C S P RAP LJJ N / \ 50� - - - - / - N W I I� / 1 �\ / .. -\ m .•. ... .. .. .. .. � EST. 1 SY EOTEMILE - 2 N ILINE -L- STA 367+00.00 SEE ._ ... ., .. .. .. .. - : .. �- . .. .. _ T b -• ar ..XS- NGW -o�5tI I DIME\ �Gf ^Gf•Gf M 1_ E E ,— -\__ - w- /."' 8W Q�I ILINE -L- STA 380+00.00 SEE X X -4n X i(_ i( ISB''� 9-_-SG'' 511X�1 - j __- __ ___ ___ ___ ___ _ _ _�--- _ -T s-X _ - 145 AL X_ l i ) . ) -4>-__� ,f2r -- - / y ' � Y Gam— �93 - ,t_ i � _ ! _ .� _ - _ _ - < _ - < \--4 �ISF- r R -- S t _ - - - \< uT ••. .. .. .. .. .. .. .. .. .. .. WELDED STEEL' -- --Ise ,bl� 5,a - - -To-'s%H --------_-__E -GH- bbl 6f - 0cl 601 _ ILL 051- 5l_ i FP1G- �OWABLE FTL _ -51- • rMIL --_ ---.-_ ISI- ----Z51-.._ -=y-----_-------E51-__- tl -- - 65 - _---�_— —141— 15t FLOWABLE fFYLL - - - - - - -- - - - - - / --- Est /-Y5 5tl ISi L L. .i LJL-' �\6, N \ — 15 xLrav 1 - - - 15" RCP -IV - 1 L_ -L- - -151-- I" Q• - - - -- d 153-- ` 2GI 30" RCP -III 1N GI N 29'38.5"E "."------ -REMOVE. -- Isc 15" RCS- V �151 - �Isl TBpyas. ,/ --s R-G4 xc.P-1v="- - -T8-9G1 - LE _ _ TR 7f1 1. JIR.PJ`�"- =16T'� 15�--" -1 z�CP�I+Y- .LUG _ _�`- _ -E�.�_�_y - �cl T�G - , ,,ILL _CAD c - - - REMOVE ` 'NBC- — --E-L- _ y -05 MR xm acr C,o _ ---.��-'-c— ----_ Ica--- _151 —�--- —___ _ --_1 4---_" - _ 149 149- - 149 - - _ _ _I50- - _.------_ - _ -. - lag - _ _t50 151 -151 F- - _ 15015 _ -�----19G- -----------149 - \ _-IIG---- laG -. -- �--_ 19)------_, ------149 ----- - --19_-150--- i� � --- - --Cfl----- ._---bb,--------------bfl--_-_-----------_---bbl-� TION��-..--�/i �7�Ar' -r -j J' __ -- - --- -- --Z 1- - _ - - - _ _ - _ _ TRENCHLESS INSTALIA OAP�ir. - - - - - - _�"_WELDED EEL_ - yR`•dtl -.• -199_ -I -HW- 1 1 _ t _ _ -�I- - .� i+ _ _ — — _ -..._- ..__the - - at� r9BW/ _- ! xSTING , IL ► _ _ qr.41 •tr'.iF FirM .0-.i. '.� _ _ _' ' - / t \I / SPECIAL LATERAL - -� _ / VQIo=1.$FDPSSIIVITHOUT L S) / / IY / / /- 6.0' BASE DITCH FALSE SUMP V _ / A \ �v l 1 �, / L 1 / 10'x6' CLA55 'B' RIP RAP PAD \ \1 / / SEE DETAIL AA \ I- \ SEE DETAIL HH 1 T. / T.4 TOP/IS \ \ 1 \ 16 SY GEOTEMILE \ ` U J/ / / / \ () ' / / IY ( / ( / / / / - \.- ti / / / I 1 S CULTIVATED PIELB- \ - - = \ `I — J l / Ia i r / �-I j I \� I I PATRICIA R THOEgMMPSON \�/j// NEILL D. FOWLER �� \ ( \\ DAVID MST OMPtON \\ ® ,� -......\ \ /_- 1 I \/ \\ l N. NO CLAIM \ I \ 99\ / \i/ \ \ \ ....1 �Y \ N f •- N `\ \ \ \ \\^ CS,, \ \ \ I zyt 50' 0' S0' \ / ICO' hC' �k'— ( t••••t••t••t• / 1 \ 1 GRAPHIC SCALE \ / A / �\ Is- \ \� \` -I \` \ ( • \ FOR -L- PROFILE SEE SHEET 62 0 5 10 PROJ. REFERENCE NO. SHEET NO. I-5987A X-113 c tL ci 0 H T a 10 ..... 2.o. _ PER ' 1: SHEET . .•^. al- 40 1.. RAWING O de' 5 11 :,:; 11 IIIIIL 'lil ,v. [firm 'L' 1111 II 11111IIIII rplr.LEl 1111 a rllrll 1' .•JGCC-Ci - ...MI�—___ =c=e_ -- la. ..IIr1111 _ _ 7G.C.C.i.iC7GGGGIimi.iiiGaGGiGi:iGimaGGGiGim rl :i.� i...l� - 1 •9••P_P!!9• _ Ci-1.9-9G4GlY_1G9G9G9a_lL"_!9•M!4•P•1^I _= 11 _ _ . i ___ i fi i ii i '111 __-_ _� 11YIiII.. �II � _ IIL•lilIIG' - fl.11.. ..II_ 11r .i'.•1.I./'.. .1r-••7 1L.1.1•1I.1.1I .4..A.'•...1I.C.J."In\.i l l..IiU 1�;1 ..II i]ii 11'1l .111I: ■ \I 1.1•.1. .U.., 1\.1.I..LAII V I 1 :11 11.1...11I111II11 11 "!• i1r.LlA1 I:• 11•. 1111 111111 V/ 11 t�1 . 1111 . IA ollrurl 51I:_..___— �roll.ou soin_�- 11 2 11 -1-1-,.1E. J _ _ _ - - -�-� -_---- -.m_ __---_ - Iniilo 11r1�.'1k. _ _ _ .i.i_7_ 9G__ C._ C.i.7.7CMG. m•JCMJI.IG'l.M.ME_.P.E.T.M!MGMG Ci. .i..WG.C=i! 9 C .G�C.i.i.�G.G.i.i.i.aG.;.i.i - _ _ _ . 1.1111. IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ..II'ili; r r117 ■.rAm r.C= =11nr.r i L1..61A I 'i /.11 ■'11 k ' 1111■ 1 ', I.. ILl 1 - 11 1%J11..EMA10111 IIIIi , 1r.L1,1 it'!L•Gi 111 J1111...►'!l•!.'1.' 11 11 . ..Ilrllll I1 11_L l' l A - ...E _— - _ — ••1� - - _ _ . --- - _-...IIIil1;I.. - - I. . 11 I. i 4 G 7. (Ir11.1i.7. _ _ GiC7G4• -.MG.C.i.77.7G.G.6id7CCC.C_!_1_9G7CCiiii _ N-1-Mr_r-Z-2-7.76C.ii.i.RG.G.C.i.7. . 1r...1...rl.I.I.1.I.♦.1 1.I.C' !MINION -.'IL...I:- I.L 1.41JL ■- ..II711r I'"All.. ..I1111I1 wh'I.. ..Ilar .III II mMI.l I ULiI.. J I■ iJtl - iif1:f11 11111F1i1 nlb l. llIIRiil1' '" -•"!1'L'S�i1...1111..Gl' 11i - _ - _ _ -- — — _. -.. - ..Ilrlll ■ I1 ___ii .lam t 11 - _ _...Illi]IiI.. - _ _ _ - aC7C7C_PlGIM1171•! ' _ i .i.i.i.i..'IG.G.i.i.i.MGaG.i.imi.iGZG.C.i.1.7_7G-L!_'J_7.7C.C.i.i.i. .i.i.MGmGmi. .lr..b ..r1.I.1.1.I.1.,1 �.�JL...II.\=iil0\m.� ..IJIIII 1 '.N.rlll JaI.. ..Loa' 'i'I 1..'•1 011.1.\'.'I' 1 i.liI.. .\\. . •I 11 -.'1...■•1f11111 1YI11FIn1 AN 1111 40Gi'11...IIII..R'I/I'G1' _ ii _ Ci.ii. EWE m a _ 2MGGCCLiiiimmG.G.C.17C7G@Gi\i\iimiC.7CGC!C!!!9!MPCC7.7.7CCCCimimiiinaGCCGC.1.9.GCC _ - - GiGiGTRGGGii .1 mmmmm nn.ad..11111141/1'1 ••nilae.. 0 5 10 PROJ. REFERENCE NO. SHEET NO. I-5987A X-270 7 7- ' �O ��, IA t :` .1.!n .o . n n n n r o o r. n 7. J . iJ■■■■■■CTJJ■■■■■■CSJJ■■■■■■CSLJ■■■■■■ 11 club ■■■■■■CliJ, 11 i i...1 . 1 .1 . 7' 1I 11 II...I�r1- ,'1. VA1I Ir ...l ..\1 ..r '.r 1/ 71 11 `71 II N...i 1 ■i..1.11 • lI'I' 1111�1111.-...II II...IJ.LL\`=ALLIJ..L=IL\i.LaI1l.JIJ.J\�i II ••L.l' .. 11 7..IJ II1 11 -rlaJ�7- 11 - - ..a.: II.GL7.. wal�o _ Whi I nrl UII iIu.''I 1 r.l'.1.a1 iur9112aii;oPel ueio _ iu.e'i 1iii.i"11I 1111 ►u1/ICED at - 1 1 1 11 11 11 mom .. " L•Lir1...1111...1°I • • '• i i i ly1f. n 11 11 ..IIr I•r1...• -ii��ill.r�. 11 I .Irbil.. -_ 11 ��11 IIr[lr_II '- ._ _9777222C271_.!9!495_27777_7P_!5 _ - P_2 I 7 MR P_2 79999C91•_P- - _ .. _M. .661-177C_ i =i=i====i= Gi= 7 - ■■MCA •1I.I1I Ill.i.i111 1111I....r1.171.1 IllII 11r1.. -...I ■1. ' 1111'4.r .I111L'7.f. i111 'u la 1'l -11 .': i \ 1.1.I'1.911 I IAI •11I I/.■.`I1.Il.at GI 1 • ' 1111 IIIl ` inir.wIl I111r.L7.1 - .iL•N1.1 11'1fir.Inl...\s.11 _LL^.L11� 9 • f..11J_ .... ..IlYlli _- m m_ _- mm _ __— — _— _ - - - -_— - -II ___- _.__..10 I1...1: - -_ i ra__. _ _ 11 11 11 11 11 a :_ _ CCPP 96 C7GGG.i.i=711 !!! .5.2-2--=2-2-2-2-2-7 L•• C_i_17_4 _ ... IrUL. ..Li,' ollaii IIIIIIIIIIIIIIIIIIIIIIIIIIIII ..11.2_'._ 7.A.7ICm,.N.LnI�IC\ma.7 1121.1111 III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIRr11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 . _ _ _ _ - _ _ 1C7722 ; sui... •••••••••L�.r'LL 7. llll 1111 n Tr.lo....iii.r191 i1111iwju1 r vi n m..I -as-.1.1r. J L1.LrJl l . -0.040 i _ .00 -le.o nrc.L, o■ G7521 uam.aw'• I -. _ II _ _-� G -=.12-662.2G02=2-2-29� :7I7r- =1r12572- ISII.■5r !7-2cG2=2_1! - - 1-1-=G-2-2-2-2-=G-C-2-1 7-7f•-!• ..IGil,1..r.J.'J•....II.I.1.'IIrI.J.'I 1C71i1.. ...Lill; UIISME IIIIIII1111111 _ 1111 Inns►r.l...lilt...In\I11f11o....1111117411 IIII11.I11 .11- ^all ...� IIIIIl1 i - 111 .. - 7. _••i■ T - VALE.... - 1 - .oil= :rrliio 1 �11 ll o J 1517. 19.1 - •i :_ el7aca=��- - -ems.- _caaaccc=cca=a=ee_eee=1_ac - - - -c-ems 4mr.1m Iu71 .a .n.I.7., ::m - _ _ _ _ 11,4.114. _ - ca-7e a-.- _cc _ - olrc:4i4o►-•-v..1uluI-■JvcL-ir ..II:III L1.1I11._'!9L.l i17I .1111 r.-I rIo r:11i1.. 9 1111 i401411 I IIIII I I1 ...1111...I 111 l r 1II MO. r f1- - - -1 ..1,1: UI _ 11Z0511' _ -...c:,v - _ - • _ _ 5 !1.7_7C76Ci7-7G7Ci.i. - - - - - 26.' - 05_501G " 1111111111111111111111111 - =aiir 1,1:11i1.. AN, r I, ..i1.►.1111 M:,:71■III MI 7I II I SJR. 2.I1" 71i1..\-d ..Ii IIi -I.LI.W.\-7..7IC\-4 it III I f'11122 ie11122 ❑J1.D11i.o1111o.i1111iL1h ___ .o20 1071.101 1 oldliil - __ ___ 1111 - - - � - _SIR -mm •• .co • ■ -_ rCC . "\UI..I 12I• L11112r2i/11 -uuu■■■■' lillllllllllllllltl!lI1� ............... r r 1 1 1 1 1 1 1 1 I11 1 1 11 1 1 1 IYI 1111111 1?1 11111111`M 111 11 1 1 YM 1 1 1 1 1 1 111M 1 1 1 1 1 1 1 /11 1 1 1 1 1 1 PM I I I I I I I PM 1 1 1 1 1 11 119111 1 1 1 1 PM 11111111YY1 1 111 1 111Y1 1 1 1 1 1 114Y1 1 1 1 1 1 11YY1 1 1 1 1 1 117Y1 1 1 1 1 1 1111'1 1 1 1 1 1 11YY1 1 1111111Y1111 1 1 11YY11111111iY1 1 1 1 1 1 11M 1 1 1 1 1 If1Y1 1 1 1 1 1 11tY1 1 1 1 1 1 11111 1 1 1 1 1 111YI 1 1 1 1 1111YI 1 111111'YYI 1 11 1 1 191Y111 1 1 1 I1YYI 1 1 1 1 1 11TYI 1 1 1 1 1 1 1 PROJECT REFERENCE NO. SHEET NO. / DENONE WETLANDTION PERMIT DRAWING 1-5987A 25 DENOTES FILL IN SHEET 42 OF 55 WV/ SHEET NO. //� WETLAND ROADWAY DESIGN HYDRAUUCS r•.•.• • DENOTES MECHANIZED CLEARING ENGINEER ENGINEER DAVID C. WHITE NAD 83NA 2011 ET ALS INCOMPLETE DO NOT USE FOR PLANS 2/w ACQUISITION '(\\ 0 NANCY L. WHITE / CULTIVATED FIELD SEPTIC DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SITE 21 1ANiP// ale. FALLS OF KU. ROM SLIM 300 s NC •L,....c NO: rF-0105r, F ,",mof fait & nic hoI ,., ,"" "r1SE 00.: F- 05 NiP Lo \ M \ \ MI ENGINEERING 1011 SCHAUB DRIVE, SUITE 100 RALEIGH,NUNCMBER 27606 (919)851-6606 FIRM PE : P-0671 N \ pla JOSEPH G. RIDDLE \ ANDGAIWIFE W O9i / ,o4 ti BEG 47" WW FENCE "tom P/ WOODS WOODS WASBW RIP RAP CL 'B' AT 5 0� SPECIAL LATERAL EMBANKMENT EE DETAIL V1� N W LLJ SPECIAL LATERAL 6EE BASE DITCH END 47" WW FENCE WH 6.0' BASE DITCH GG _ _T�% 0 SEE DETAIL AA RETAIN �� .O NO TURB W 1 �/� VI SEE DETAIL AA SEE DETAILT WiSBW. ____M__ BST 47".' FEN* Y `,0 _ `^ _____________________________ _ _ SOIL _________________ � t T 1 (n y�________________________L_ - r _ .a. .a. .a. IIIIM-- W.VW W .li.. _4 •2. r. r�,w- ..-.ram _� E ', ','➢F�DiJi 48'WWISBW - - _� - _ _ s- - - - S - - - s- - - - C s- 5- :�.aN . 111f!�}i9[��,Q�♦ilr _ �" # Y�- 1t 1F 1t 1t 1F 3E BF BI Bt BF BF . - BE BF BI % BI BF BI BF BI 2F 1F 1E BF 2E BE II- ***** -* it BE JE * BE 3E BE 3F 1F 1t ��- . . W/� < < < --- ---s s �� —..���� a LLJ �LJJ .41111. �� V I . .. .. .. .. .. .. .. . .. .. .. .. .. .. .. .. .. .. .. .. .. i !�> Jam. �j ��/ f �' �•- �T ilr, l�� ��". T ' HW N .. -�- o- -.- aW 7'A{/V/�� Air T T T T - III' TRENCHLESS INSTALLA • 36" WE LDED STEEL TION HLINE -L- STA 406+00.00 _TLISWABCL?ICL_ ro ` I Or _4MIL T^rDZP P� ¢E"4 vE REMO _IIn `� - --_ D TB 2L,I TB P 1L _0 -0- - IL Ir - - -0 15" RQ�IV�-'� V, L UG 18 2GI - B GI ?,&. LJRCFIY 0 - -ti - -D_ _ 1L - L 0- JL ,SO -[I- _Al_ Q ��seuiF-O- JL - - _D _, 0- JL ___0 I- 0- - - __➢ - NCI- JL _ _n. _ -0- 2 BCPFAI_11 tl 6AtlLE ^ I RCP -IV TR 2GITR RCP -IV 15" RCP -IV PROP.TYPE T BARRIER TR 2c41 7GI 15" RCP -IV PLUG � o���-- --- -- —lN n,r IpI_ o - , 0 FLOWABLE FILL � _.._-FLOWABLE FILL a , o ' i '- T-.IBL-209 , BL-208 i MTt I u PWG +74.98 TREN IO -' ,1^�� .. .. .. .. .. 61.94 - 18" . - EE - - / ....! +78.61 + 1 TRENCHLESS .. .. .. .. .. .. .. .. .. .56 36" WELDED INS STALL LATION a. It } .-. Z - ---- , --- -- .. < ,__- .. _ _- v Lr- vv_ 4WIµ_ .. .. .. .. .. .. .. .. EXIST NG RW . —�_ SBWW FENCE ' ' z. 410S1 END 47" WW FENCE SPECIAL LATERAL 47" WW FENCE 6.0' BASE DITCH W/ISgV.J SPECIAL ERALCH �• lipityllel SEE DETAIL AASE L ITMCH6.0' SPECIAL LATERAL W/1 SBW EST. 3 BASE DITCH CLASS 'B' RIP RAP SEE DETAIL AA EST. 10 SOYNGEOTEl01LE MATCHLINE SEE THIS SHEET TADoftitti:: D_5 y WOODS I Olt 10.0' BASE DR SEE DETAIL 1J C1A55 'B' RIP RAP 1.A'�EST. 2 TONS F EST. S ' GEOTEXTILE X�� 0,,4 G ELVINP'AND WIkEMBOUNDARY�il�GENEVIEVE C. MELVINI.�I I / W AYM W ONES LU ,... TRIBUTARY/STREAM %�r� ��[_XT2'CBL i $� X XFRANKLIN o ® I,� / AND WIF. MYRA WJ NES SAB 0s� p FRANKLIN G MELVIN AND WIFE. M GENEVIEVE C. MELVIN 10.0' BASE MC SEE DETAIL JJ o1 /I� A 1 1'� III •• R ® pr , �I �� RAY AND WIF.EEJ.�ONES MYRA W. J6NE5 CO 50' 0' 50' 100' 150' I.I W /�IiIr p or1 I- SIT: 21A ,i'll I, • tir 7I W o CI W GRAPHIC SCALE TD 1- �� MATCHLINE SEE THIS SHEET FOR -L- PROFILE SEE SHEET 64 1 0' 0' co \ / \ \ PROJECT REFERENCE NO. SHEET NO. \ _ / I \"i\ ----// \ L % ri`//� DENOTES EXCAVATION IN WETLAND PERMIT DRAWING 1-5987A 25 /\ \ % \ \F DENOTES FILL IN r SHEET 43 OF 55 RW SHEET NO. \ \ -156- \ %\ - l ` \ - J //� WETLAND )\ „ C \ \ ^ ROADWAY DESIGN HYDRAULICS \ ✓ / -/-- /\ \ 1 / / I . .•.•. J/ DENOTES MECHANIZED ` CLEARING \ - \ J ENGINEER ENGINEER k DAVri I 4-HITE� �.%\�/\�� --I/ /1 \1 �/ j 1 / NAD 83NA 2011 1/ J^/ \�� \/ T 1 I Vt ti \/ \ //� / INCOMPLETE DO NOT V66 FOR PLANS 2/w ACQUISITION //-te /\ lam_/ 4S' ,) l / 'I55�-\..' \ \J '\ ' �� / �_�._-I / V <4^ / r\1 i� \ -§+ \ it I \, /_---" \ / ✓ \ //` seL \ j \�` I NANCY\L.WHITE /k / _ -y-v-v�✓~ /'� \,1-/\ A `\ -\ / igs \ /// I '^ &\'/ N It) / \\- j I II CULTIVATED FIDI,0 0 --. >'/ �r I �---% �jJ ��-II l\\ \_/ \/ ll \�\\\ \�\S1pNR / DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED /// C \\ \r -/ / gr �' / � I ~I \ \ \ (\ I 1 \ J\ ^ ` SITE 21 _ ' \ iP 1 \\�...- `s. F ,",mof fort & nichol 19191 NC •Licensee No.: F-0 I05ale. FALLS OF KU. ROM SLIM � nK 4 I</\\i\, ) J /J \VI /_,\ `\ �1�/ 1�.�,✓ / ) \\�gij ___ \/ oi, \ \ \/l Y I $y \ v `yyt-\i \--7 �\ J/ l� 1 ( O L \ \ \ \ / / (r\ O / \ \ �y ./ J._/F7 / / �L- f�'\f . CI 1 V- \/4 /1 \` \ \ /V' \ ^ ` LG I J\ Iy V \ \ \ \ MI ENGINEERING 1011 SCHAUB DRIVE, SUITE 100 RALEIGH, NC 27606 (91 851-6606 FIRM PE NUMBER : P-0671 NI'/ N \ % �� 1 �� I /�� \/� \S �/ ', ` _rs9 \ �` / /./ / J 1 / / ti( W 158W RIP RAP CL 'B' AT _ .1/0/ / � -L V / / BEG 47" WW FENCE ✓��� / � / �Q 0� / WOODS \, - __- r WOODS / I EMBANKMENT - - -- 5 // i; % �.6A �RIDdLE 0 /Oi/ /r + / r N W/ / y y SPECIAL LATERAL ) b _ > - / 6.0' BASE DITCH � - FEND-47"--WW-FENCE / L WH SPECIAL LA _ / /r L IV-, SEE DETAIL AA DETAIL ' ti L ' BASE -ES AIL GG / _� r I P (f� - / / ` I 1 EE // 5 / (F''''t) ✓ \ / j / � �' / �i i '^ O RBLLI W SEE DETAIL AA _ � ,� / Ti�iN� F Mr SEE -� W/15BW. -. \i.. .. .. .. .. .. .. .. .. .. .<^-_- /\ - _ -DETAIL H �� 47" N76' r` r �$T l/ N- -T FJ!�r � -- i-� 50 iy�yr�1.� - - 3 _ _ J. J .4 i 1'T '1 //' sup �.. VI .:` — - = ._� . E ,�.r� _ k.�. Tc+rio..v�' ��LiF�-al���+�#IffIiEY"� _ W - ----� --MP; --C- = _ _= ---- ----- s-�---- '- -� T ' I - LLJ ---s- ,� w ate LuILI yT- -_- -P'��f < �. ` _ < < _ �I fd ritC 747;F Tar -ZailWagiV arT-F� <:fLarAw.i - / -1.-.s ----. •1 ---- _ '- - �_i '-� ..- _ _.. .-"��. _ .. .. .. _ _ .. .. T _! `o i ./.� '1� dim -` \ - > Jam. �.! i - HW (%� E -L- STA 393 + 00.00 _ _ ----, i- - _ ON \ esi esl -**,._WELDED -STEEL 7gg E -L- STA 406 + 00.00 ------ ssr - - ._I Syl nsI 9S'BSI _ ---- ��— At.- =-- — — — — 65 _ — _ - bl -��� _ -TS'r RE'vOvE �'- �� n _ . ... _ --IB-2G1 Itl 2 JUG TB 2G1 - "'a- - TB GI _ l,L c �ry 3 ' _ 71 M - � D- -� _ - -:..w �'L^li' @ ��..` `_ ■fPdrL I58 $ =�1 _� L 1581�1L 4LGl1l�l " 1L 0 - -� 1 - �- �159�_� D=�-' _ -�_+M� � la YfPJ11-�L �» IL-2 • L - -D _C- - _]S" - -D- -F—D— _ _ .16 -� --PLUS ilk - es1 69B 2� 4'-IV RCP -IV_ _ _ - 75' SCP_-J EROPY%PE-T-BARRIER TR 2-- 15" RCP IV 001 _ - - - -b __ _ _ _ _ - - -bsl - - -e*"y -`'"'-c- o — -s' --- s"I ----al a +f--- o --n FLOWABLE FILL 00 - - - - —I=o - - Is/ --�■�`. Is9 -- _ 1 . �=' O — _ __ -158— 158----- . BL'21D8--_ -- _ - 159 __ 11- ,..158------------- -158- - -158-—_�--MTi---=" l '[().9-159 _158--_---- per --JL—OL .�—_ _ -•. ISJ ---- --193 —-155—__- -156 _— _ � _ -I5S----- - —7—=- .--_— 153— / 155z- —-+74:98 TREK 10 - • _----1.91 -- {- -- ab _ - __' --_EL _---- _ --- �_— — 153--.. __ — — -' _ - - 153- - - +78.61 - - _ -- ---� - - -._ - -. .� - - _ __ --- -- - 58.56 + "%r� - - .. .. .. .. . \ J _ __ ALIATIGN E[--�- - ! - ' n � < < - ----�- -�---- - < _ _ --- ram 3, - J Ammirat �� ` L -i = - _ - Z�YY�T�-a' �_� V ii 4� ���A 1 �`l Tr,�I \ Z�. -.. ..� v .-.. ..-..�.. X—� YVY TvK _.. EXISoINGR// r' -- Y• .' �$ BELT" WW 19ENC © _ / 1 \ }II��'' I WASBW 7 J/ I 1iz, J Ij 1/ / , hi AO ' // J 1 END 47" WW FENCE _ IIAAII , //\3'OCBa5E DIETCW/� W/1SWW FENCE %� �I� /: /� I SSE 4ETAIL M 6. BAS L ITCH T 1 U SPECIAL LATERAL W/158W 6.0' BASE DITCH CLASS 'B' RIP RAP SEE DETAIL AA EEST. 3 ST. 10 SYGEOTEXTILEMATCF tee` =i / I E/ iE E THIS SHEET / TAD ��, E D ^ L AA yy`II i III\\ � ; \ E „ I U ^ �, 1 WOODS I—�giitilkit)/I - l \ v'-' j / �� \ \-/`�� \_ •/ — / \ �/ x sr 10.0' BASED q ( SEE/DETAIL JJ \ `VI CLASS 'B' RIP RAP - / ,`FI .I �. I EST. 11 TONS ,� / / /( \ ���/ / EST. 28 SY GEOTEXTILE \ x c-. \ /�\ Ys.7FRANI �NyC� ELVIN�\ V-`GEN€V E C. ELVIN 61 \ \ _01411 I0 �'\v/ / /\ / \'� AY pN� ` / \ L TRIBUTARYiSTp�-�A•A•v BOUND ! / / .x' — \ L✓ ~ ( 1,�i� 1 I� � 1 rl'I .I2I1 u/ �_ \ X x72'CHL X x /{j i `' \ - -\I,r ) \ I( AND WIFONES MYRA W. JOONES - A AB / \ Or I ,\ / T /(\ /1✓ \) FRANKLIIN G,MELVIN I-�� ) I ' j i-' GENEVIEVE C. MELVIN //(- "'/ /\ /�-- ' � \��\ \ SEE DETAIL JJ �� -_ �® ) 19- ® I)l -Psr C� /� 1 \ `? J )\L \-re'M�Re \ \ ., I�I _ �� ``�' O EJ-ONES \ W.I'I`CENES lII / II f/ \� f •�\ \� _ f> / \ \L 1" /^\ c ( /k•-• r f \. > / 50' 0' 50' 100' I50' \ (>��_\\•g5 \ /�#!1SITE \ \\ 10ArAlit ill W VIV s\/ l II'II /�`> I / \ `1r/\� ` �J \ / <� ,{ J\\\ { ) , 1 f- W CD -_-I5S/-- _. W r \ v\ L.- y- •■ •■ •■ ■ •■ —_ \ W 0 ✓ > / W iJl \ I u Y�/, l // —1��� \ IJ`�� f\1 �` GRAPHIC■SCAIE�_-� / \ / �a ,/r �( LJ / \ ,// / 1537 n --,—.\ /> \ /^I ---- < 1 :Zy F- -/ I )II, MATCHLINE SEE THIS SHEEN FOR -L- PROFILE SEE SHEET 64 0 5 10 PROJ. REFERENCE NO. SHEET NO. I-5987A X-125 !i 'b 1 17 ...MS, MA MA . . . . -. 20 E 1 ERMIT HEET 10 onus DRAWIN ie 44 OF 55 mo mom 1u1 1 lie .00 170 r �7r.L IIII 11}l- 1r.vr,l rlllr Dl'i YrILm..r7r.2. IIII ..II'.111 -- - ---- I'- - - M. . -- - - m-----cl.._ _ — er li - - - - ::macRoeGe=i=aaoeeeesei_aeaeeee:_:_7_7eeeeee:ae7ool•.. = c = eec 111 W .m. ..Ilrllil o.ala , 1. :..II /I•i.IL7J11 .1 ilI r71 ^..1J.l'7■.1AAI1 II• 1 • + 00.00 /50 m ,r a... Im -1 I I_7r.1 1111R111 I I I n �r1���� ..II.Iii 11 __— a��--- __— - -2•7•ee_eesoa_a_7ese.....::.am .—.Isi. r.dam . ... - - - - --a-aG7cGC=a!a: -i- G7! WAGS. 1 _ -- _.i _ _ _ .. .a.i_7C ! ! _ !_ 7_ Ily[4•l.:. a _ IIINI■l'll MISCHA '...I I■I..■11■L_I M11.1 ■. L I..II1:Iiil.. 3.r II SEMI I.Ir.l.r /111.1.' I ...Jlla --I. ' 11SI== 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111T�!i1MMV1111711111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 11 .■..A I'AI .11 I•aI I:II....I:I:I■ r I rlillf.Y r III I.101\'1 " Tom III ! 11111C11I1...1111 rll I iin� . ,� - - - - -. _. .l.li7!a!9CnL'!1i..7..■.-� I I1� r 11 --_ ■'� 1':1iiA. .-JC!P!!rlC7C7CCP!i7C7GMPP!!7!ITME.!.!!7!9!TPPV.I.N.P...... I.I. ...-: i - - ..T _ Mimi-7C_!_ 'l MAI _G:t.Mi - - _ ..Illlllll ,..r1J1..rl.r i 1.11.1,E I M I.AGi:JI ■ 111 1.i .l'.1111 1../II:Iii1 ..Cali% -R-ram- JIIi�1.. II II r171a.-dl.l. Al' .`III I I C7r:.nvl UI1..IIC1•1..11.I. m ..i .:o Ili 11 r Yria I1111111'll Ill Ell /l11 rI,lrl/.Lll...ul. ... II II II 11 -- loll: r _— _- . •' " - _ — — - - - • ii -- __— - I Il...ltl•4.' -_ - --�= --__ -�- - ...I.IIr II 1 11 i��- .... 1'.:IiI.. I1 11.r•' .. .ESE-._._ II _ 7C_ _ - _ II IIMP-a a 5 Li- YIL-Y■LAI ..Ill:lii. r■iE;C7C.!!. 1:r " II r Ir..Y I■.■■r.rl.l■rnr '..11■I.==.■11■1.111 I MINN ■1 ..IJEM 7L7- C17.. JI1.1.. ,11 -. VII 1'111iylllv:Ili ..i. �.11a1Jr1-o llr...1,l' I. ,, •'L rnll.Ylll 111/111/11 IIII hire ..Ii:Iii m IL11.C11I • _ --1 - --_ - 1..m.I111...I / UL1!J m .11....E-_-- _ _ _ - RT. .ii .i.ia.r. _ _ 7C7C !- _ _ _ _ _ _ 7C CC-i-L7-CCCP_!! _ :co:. a - ECM .. - • _-i : SR- _ i 157.13 ■ ..II■IIil r MAC 150.0 00. , , m m ..MUM' 11,II/ .1 11•11•-1\1.1..111111 01 . 1 II 11 iJ.I1 I i.1!17 17■\/711111 Jlliil.. 11 1 II 11 11 11 11 r11r.L1I1 1i'11:IG11 r,lr.4r,1 •. rll.r MS Yrll ERII `2LLi^J...IIIL..IIUIIL 0'J oll: .• 11 11 11 _ — - 11 a - -- - ---------------- ----_— _ -..1 li-__c.._ - - - -■.I. . ...Vaimo - 11 II .S.2.RRa - - --acmc-CCl�7!7.. _� 11 'SLEW-- - - 11 __ - _ _ _C_i- GaG76C_1_7C7C71.r_!_i.7_9C:l.!!7.7-7P..R.E.M.IPT ..... _ _ 11.`r.Il': Ir...Ci ..IIYI111 ' Ir. AIM -.:\.r=■v,..IIe1l,1.. AIM. "7L.\.1 I.1 I.1 II i.rl,l..C.. 1 1 1 1 1 1 1 11TYI 1 11 11117YI 11111111Y111111111YI 1 1 11 1 111YI 1 1 1 1 1 I‘rTYI 1 1 1 1 1 111T1 1 1 1 1 1 111Y1 1 1 1 1 1 1trY1 1 1 1 1 1 14YY1 1 1 1 1 1 11TY11111111YY1 1 11 1 1 111Y1 1 1 1 1 1 11YY1 1 1 1 1 1 1111'1 1 1 1 1 1 117Y1 1 1 1 1 1 11YY1 1 1 1 1 1 111Y1 1 111 1111`r1111 1 1 11YY11111111'M 1 1 1 111 1 Fi`11 1 1 1 1 1 1 199 1 1 1 1 1 1 1 r1`11 1 1 1 1 1 1 h'M 1 1 1 1 1 1 1 IIM I I I 11111/11 1 1111119111 11 I I 1 1' 111111 1 1 IYI 1 1 1 1 1 1 1 1'M 1 1 1 1 1 1 1 1 II ,II .._...�..._..iC 1.d a1I.17\11r■■Iu...' .',111\1 .......i .OAL I .11... _11 ZARL' [ III \M ■ 1C1 Z3J...R111 .I 1 ....I 1.... 11'\...' .... • I\.. b7.11 .1 ..I I..I. 1MO....1•F.1I IMAM a TAIL DITCH PROFILE -L- STATION 404 + 00 RT W \ 1I MI .1111'MMI..I ..I II1.1 ..�.YY.YYW.....Y ..1 a;Il1III 02U1:0111i1' - i 77966ir7Rg-7e=C M.,_ _ _ - !9 11 .7137 a 11 [c: c.caUMW: Eqr 35 L Yan 1 Jl W OF CL [ JUN) cr I:rUl LI}Glib;i M:I.e; 11o1:.77 AMR WEI PROJECT REFERENCE NO. SHEET NO. /-5987A ROADWAY DESIGN ENGINEER TO 404 RT HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ,d„moffatt & nlchol 4700 19 CE NC Llcen ecN0. IF-01051 it. MI ENGINEERING 1011 SCHAUB DRIVE, SUITE 100 RALEIGH, NC 27606 (919)851-6606 FIRM PE NUMBER : P-0671 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7,7 c0 cr PROJECT REFERENCE NO. SHEET NO. /I //y I DENWETLANDLL IN PERMIT DRAWING / 5987A 29 I v/ 11 DENOTES EXCAVATION SHEET 46 OF 55 WV/ SHEET NO. IN WETLAND ROADWAY DESIGN HYDRAUUCS Y� JOSEPH G. RIDDLE A DENOTES TEMPORARY AND WIFEg� WA IMPACTS IN SURFACE WATER ENGINEER ENGINEER GAIL A. RIDDLE I'/!/// DENOTES IMPACTS IN �/�- SURFACE WATER N� 3/NA 2OU INCOMPLE'ICE PLANS DO NOT UMPOR 2/w ACQUISITION ® SITE 2 2 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ,", MO fa tt & nichol ,,, „ ANC °License L NO. �F-0105� la MI ENGINEERING E0000i s0 FIRM 1 COBURIED O N w 2 N � \ \ L 454+90 WITH BEVELED HEADWALL 18 F OF CHANNEL 1' WOODS 1' SILL ON NORTH BARREL 'ROVEMENT 2' SILL ON SOUTH BARREL TH 1' FLOOD SOUTH BARREL CULTIVATED FIELD \\\ WITH 1' FLOOD BENCH T. 2 TO. I RIPRAP : SPECIAL LATERAL a 6.0' BASE H RIP RAP AT \ SEE AIL PP EXTILE EXCAVATION SEE DETAIL AA EMBANKMENT IN WETLANN FALSE SUMP SEE DETAIL GG CHANNEL IMPROVE I P PAT ' " 1.6' HIGH SPECIAL LATERAL EMBANKMENT CHEVR•. SEE DETAIL GG SSP R BB SEE DETAIL HH 6.0' BASE DITCH ��,,r���T71,;�� SEE DETAIL AA y. .�.�'"Y.1 ,� T ..•BABY. '/AE SPECIAL LATERAL REMOVE EXISTING K.M. BIGGS, INC. 6.0' BASE DITCH WOOD$ 54" TO 72" RCP `1i'► IMPA DETAIL AA EXIST X4 It/IV •.���. .�. _ w _ AND HEADWALL ' ' U_i w N n RSEE —7( n�n 48'W SBW ^ - - - w M10110.11,0� � h x X .. .. _ _ CLASS O RIP RAP �I J.1, EST. 3 TONS �� S!� > u ESL.. SY GEOTEXTI E w _ Sys. >-�.,r:..i.. LLJ > > .- > i > > > 0LLJ 0 �•r�� -q 5" RCPIV Q 0 iw..wllA �^•" -- --^',: TB 2GI TB 2GI �`._ ' WG o + PLUG 701,16E : B 2GI lO TB 2GI 15" li x.. 15" 1B 2GI —L— N 4° 03' 14.3" E TOP.I61.7' IB 2GI 15" •, v,Esa7a 15" TB 00 _0_ n_ 0- IL _1-O--_EL -_D-MCP-1 _ d° IR <a 4r 1§1-1V D- -JL 0- _II -D- D- IL -D--JLA-L_Ll-_D --D_5"Rgf-IV Tf2.0I,1'„_�": 7GI� TBD7G1---.In RCT-IV KEW�130"_a- In N= —\\f PLOWABLE PILL - - LL TB 2GI M� - �� - � �'r � N N —I16" 6" E INSTALLATION WELDEDSTEEL PLUG 4INv=I58.62' -` _ 9 -- ----- p lr� ,11`� Z< 48'WWISBY, F Y ` Z 2 v Y. X X X X EXISTING /w SPECIAL LATERAL CLASS 'B' RIP RAP �� CLASS 'B' RIP RAP SEE DETAIL6.0' BASE DITCH EST.2 TONS ' k EST.7 SY GEOTEXTILE EST.. 1 SYGEOTEXTILE CLASS 'B' RIP RAP EST. 2 TONS EST. 7 SY GEOTEXTILE • L.) QjEST. 2 32 or CR EL IMPROVEMENT CHANNEL IMPROVEMENT WITH 1' FLOOD BENCH AT SOUTH BARREL 2 TONS CLASS I RIPRAP CHEVRONS TURNED OFF FOR CLARITY EST. 5 SY GEOTEXTILE SEE DETAIL QQ FILL CHANNEL WITH CLASS II RIPRAP TO ELEV=154.0' WOODS j/. . . EST. 10 TONS CLASS II RIPRAP EST. 22 TONS CLASS I RIPRAP EST. 35 SY GEOTEXTILE CULTIVATE[ RIP RAP AT EMBANKMENT SEE DETAIL GG / 8 BM22 ELEV = 162.95' N 369710 E 2001345 BL STA 446+03 - 246' RT RRS IN 10' HICKORY TEMPORARY SURFACE WATER IMPACTS JOSFtND iF RIDDLE K.M. BIGGS, INC. / GAIL A. ID LE NO CLAIM I 50' 0' 1 IC0' Luc' ..... GRAPHIC SCALE / FOR -L- PROFILE SEE SHEET 68 .1 - \ (/ - --- \ PROJECT REFERENCE NO. SHEET NO. --/ _/ ���� DE WETLAND IN PERMIT DRAWING /-5987A 29 /-- / Yj/ DEN / SHEET 47 OF 55 RW SHEET NO. / / Ct A INE WEETXICAANDDTION ROADWAY DESIGN HYDRAULICS -164/ / Y� y�y�,JI \ / ' JOSEPH G�..I� RIDDLEE�/\ y�//�,' �d DENOTES TEMPORARY ^I \'/ AND Yl IMPACTS IN SURFACE WATER ENGINEER ENGINEER GAAN A. // I I' I 3 \ I Vy�I�/� DENOTES SURFACE IMPACTS IN A —I 20)) •\ r -' ^ I/j�� NAD $ INCOMPLETE PLANS \ , / / \ o DO NOT USE FOR 2/w ACQUISITION \ / / \\V \ \ I _ _ '' A —\ \ �/ ) / / \ `—\ f\ S -- / - - / \/ \ , r 0---f-�/J/� /^�/ SI DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED -- /// \ \ LL 7 / \/ / \- \--J /------_ /\/1 \ \ n\---/ I1 / ( / V r ` ��-� / / / 1/11moffatt & nichol ,,, a"� s's"°a,E ..",.°,'n,,,,, "NC'License L NO-, F-)105 r I I L13 / IG4- / \/ / %u \ /•I / -! \� `�/\ I-N. 10 MI ENGINEERING FIRM 10111MVITPan1� M W N W w N / /// / I / - \ CULTIVATED FIELD - -/� ! �) FA 1.6 E}�It'V'I�P SPECIAL LATERAL SEE DETAIL HH SPEC BASE LATERAL DITCH\G3 SEE DETAIL AA SPECIAL LATERAL -ire,- FNTCR 1. � �,� E%ISTN (/ \ / \ �' \ \ \ u WITH BEVELED HEADW L- 1---. \ \ \ 18 F OF CHANNEL1 ry / WOODS \\•.• BURIED 1' "ROVEMENT �,. \ / > 1' SILL ON NORTH- �ARREL \\\ L 2' SILL ON 50 `arrt BARREL / TH 1' FLOOD,'' ' SOUTH BARREL �� \ l WITH 1' FLOOD,\BENCH / 57. 2 TO. FRIPRAP i-- : 6PECIAL LATERAL DITCH RIP RAP AT 1L\ \ / ' > / - .. SEE . `AIL PP E�ILE I • SEE NL !/ r, i EMBANKMENT \ \ , - // I / - - / SEE DETAIL GG \ / 'IP P _.,// "- n- d/. \ -, • / '" CH C�MPROVE ,% ENT ii // / / L- �.-- I - /^ ) / CyEVR .. ^ E -/ /� SEED AILy P / �% 'I , I / �.':lF.;"Y.;� rya. .Y f'/`.�.- J G-/ l \ J F'� 1 V�LEMGVE EXISTING �.MK�IGG�-M1C: \ WOODS (~ �x / 54" O 72" RCP > 1,..---', Riw W �l� l lst_ -.._ _ I 1 �WW�i-� AND HEADWALL ! b ti i�J \\ �- W LLI N - �� .c SBW " w - r^...n .. .- /--5----� Ii ,` CLASS'B' RIP------------ -es,____ L�..I -- +�-1 C IG4_ -_- - �.�' '1' f J EST. 3 TONS/ ` .��� / w --a ��----5-------5----� ------S_---�_---5- o�t�N� V -5--� _ • eAw - s.; � T�lDJ �G `��•\ ES- c^,-1G3.------ _ _ — �i --3— - '"� - -, 1G ,a.Tr1�•3 W N) .c� — -- z- - Rs.- --_---- -i' - - ,GI - - _!.- _— )i _IGI---- i-- _�_ / '- .--�- _ t ---IGI ' r---IGB' �� 5),G♦�^V`�R.t a Vi OZGI --IGI_ ---------- _- --IGI- E91 69 MI - 91• �" 19\� - I91 `------_ - - =1 91- -- - - - - -291- _- ��� �,�li ',�J-(j�* TP ^1®fir i.Ms�� _ - .I' -I - - - - O SUI GGI - - __ __ .... --� —fir. GG — — --_.--IGG--PLUG---------- TBP-161..•: -^- - �ypy�-- _- ---- 16) MG - _ _--__.—_._-6G_-- =� --- --_ _---.--_-- IGG--_--__ _ --- art ' -- �/iy-165------ - - � - lCi - ZB -FIG/ LC i T8-2G1 a = -- rs s• �•AL le, ."a - —L— N O3'14.3"E — _-TOp-I6t7-' ,// UL 2GI ---,G4---- - L5�7W.-- ls"00 C _ 91 11- ---s-- �-- ISYR P -� IC.- � an, 1. I ' .,._� _ _ ___ 0- 1L- �___0_ -_ _ 1 I IV. -Jt.-�. -�[-��- �5" R�-1 -- I "It -0-- -- - a -i ---- _---991 - - GGI -�--B° =bCABLEI1LR-o-� - -.�-_� I 99I _ --- _ - - 9.I r� �� ----__—_ ��.,13B°"-----.1 - _ — �2 9 6'— -------------166- .rc-\\<19R3WABIF}YL -' -x.� -_ ---_ - ----ICE= ,-' --_ r- --o "u�� - •._ ' - V VI J GI 6,1 IG21G3 1ft- INL- $$DED—STEESTALLA- TIO : 11INV IS .Ti2 - _ r G4 IG2 1G3 — — - - �� e3 09�i — - _—' _^ / —� — - % L / 7 — I , - —MR `--- _ ^s -—_�--�� --—�/�y�L= # � URI . �' _\ TvsW* _--- —Ica -- -- —` W Z it <1 )/�� ,/ 48'WWISBW /-7 )v < x Y Y Y Y Y v \ C ".� w ''1/�;5� `� �----- - _- - T .n-- W Y, X MX' - TC Z Z 2 U / 1/ —,,,,,,,/ Y. X X X a X X X X X X X l Y 7f X E%SYNC /W '' — —19' -.sr.. 5 IAL LATERAL ( \ �CLOS 'B' P RAP / ) \ , _ - / /1 % /. ' CLASS 'B' RIP RAP - -1r-i- —� / - - ¢p.�0'�A .E DITCH /T�OyR6j l''' / %' /, EST. TONS V / `.R' " $E�PETAIL AA L%� ) I IST. 7 $Y G I _ / ff. EOTEXTILE \ ,, L- EST. .SY GEOTEXTILE - 65' ( / •J ) I /- -`s S �B' RAP -IGz- �/ / ,.--T \ C I \g) '? //J \ ( E5T.7 YO OTEXfIL� :/,- f \ 1 / fIMPJIOVEMENI A / / - `� \ 11 N \ ) ( ! EST. 2 TONS CLASSNCH AT I R PRAP SOUTH BARREL - _� / , CHEVRONS TURNED / EST. 5 SY GEOTEXTILE -! -/J \ FOR CLARITY r / " !� /=. SEE DETAIL QQ / / sG, FILL CHANNEL WITH /% // /-/A-- \V r /fir O ELEV-754 0' SIIRIPRAP //� /�� `� 5c,�, / W00DS \ //��I I // / /�� - ` / li EST.10 TONS CLASS II RIPRAP / cs//-- -J 4 I /) I \ �,^✓J N.,—* /) ! ///�aJ \^ `—) (� EST. 35 TOGEOTEXTILERIPR�E�_, / / s `j1 �cG, < COS— I \ `.'-, / ) //\ /'i .- .. / l LTIVATE[ \ / / J -\ ) / /// �/ / , �K.. RIP RAP AT 1 / // �i! \ ✓/ / ) \\ \'- \\ ! <j \ /,/ �; /- `__-\„ I SEE DETAIL GG BANKMENT I�'� \- (/ / �� \\ -' ) \\ \ El BM22 ELEV = 162,95' S-- - �' I ' \ \\ I \j' CN \ \ / N 369710 E' 200_05-- -1 -0 I-. . f/!) )._ l \ / I \ ''\ ! / 1�" \ / r /`, BL STA 446+03"�2NN66\17 \\� V\___ \/% l .. II�L \) \/ti \B\ J ! 57 / `'.JT \ \ (-' > \ RRS IN 10' HIC R \� l/ &J ( \ l /// L \ / \ )- TEMPORARY SURFACE WATER IMPACTS \ s' ^ A V ( / II I \ 4s / A / - / ) 'LGL� V ) IK.M. BIGGS. IN \ \ \i l / -/"' f� ti/ L/ \ \ \�JGSFPµIt RID E'L_ I \ I / \> ! /(/ r//� -i \) l / \� '<—J / // , -\ j �" -� I\B\GAIL i1: VD* \I \ /^�L\ / \ / /Jl/ / \�1w I l ( \\ \) �� /�°G -�1V� -/I r \ `� x' ( 1,/!� \ /�-%�/ / / I / j \ --,// J \ ( /� -� \\\/\ NO CLAIM \\ r/�/ J�J/ (&, � -7 \\✓ \J .IN) ( / \L^ \ / -\ / M `:. I - l I '� 1 I ) s//(/ _ \ \ \ c f c I / \ i / \ / I \ r \ P _ 1✓'\ ( /\ I / ///, ) ..�f - / 1) N. —, s0\�c 0' ( ) v Ico' 15C' \\ / I- / e> \ \ \'/ \ / \ �� `� / /\ f �� J A\.--4' ,-�/1 \ / / °\ \\\ GRAPHIC ALE \� �rc p \ C// �) l ,, 1 )--^/J� ,--'�-tom-- Imo— \ �/ � i) --)/'C ,- \ -I (//�/ / L \\ l \�---\ -/�_ ea( ( i_ c .t.`_ _/,-- �L-'�.__\1 ,- ,r�n-s •-1I 1 ./ 1 -i r FOR -L- PROFILE SEE SHEET 68 i 0 ro PROJECT REFERENCE NO. SHEET NO. /-5987A 22 RNO SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER m_w et_Cu13_5m SITE 22 SITE 23 NAD 83'NA 2011 PERMIT DRAWING SHEET 48 OF 55 -250 -200' -150 -100' -50' 0' 50' 00' 150' 200' 250' 170' 160' 150' •L•L a'o 117i 111, 1.7/11 4/11711 6111:Y 1111o.1 Y. :!3: .IJ'- :IDI' r1.T.1'1.- ..CYMALG ENT.e 3fr11711F33.. 11 11 11 II 111 ! ii-i-ate 111 II 1111 II 111 1 1111 .oir «olol i --- 9iAGrG.G- - E. 0 r �WW171i�YW.n 11 ...SL'A19LLi19.9ArJ 1il•Jr....1......................1 1..11 11.. -i-.i.dANN. -a9E4! 2M, , _-.1G-i-i- 11 11 Ali2 •hmak-L,AmiL 11 1 e -P17T■7 vemn►'..nm-Cr.1-C7.T1. 4.,Ial• 1....11..1 h' 1 11.1 ■1��...1.11. 11 I._.YKBW1/]Y.r1G1 L 41a N IW.9iL'SL.uL' Y911Y PLuomi TrirffRIMFIEMMUTIM aLu1.L 11 ALMA IM.I.NIY17.m3T ... 11 11 11 llurac 11:1:ur1 11 ,7.n. 11 11 11 11 11 11 11 11 01 n .i 29MOG-C1199A1...P'G-.99- 11 11...1 ■ X YI...I.J..u..L•0J III 11...11.11..MMMENE2. nr..GG 'ummmgLP.RT. wimmmS1.1 ■I I1...1 .111.11 IIL.I11.1Jr 1:1..1:IPy';;I 11T11 1•L•ISl.9.u•E • 1 it 50' 50' 100' 150' GRAPHIC SCALE INCOMPLE DO NOT USE FOR TE PLANS 0/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ����moffatt nlchol ,,, s Aalicense NO c & . F-0105 99A, NC l AECOM ,.,%° 0• 0' n c0 PROJECT REFERENCE NO. SHE30NO. MARGARET R. RU DENOTES TEMPORARY IMPACTS IN SURFACE WATER PERMIT DRAWING SITE 23 j// SHEET 49 OF 55 DENOTES IMPACTS IN / WW SHEET NO. // SURFACE WATER ROADWAY DESIGN HYDRAULICS ��� �• ' _ 3.0'LATERAL O r7 BASE DITCH � SEE DETAIL FF ENGINEER ENGINEER o�!� SEE DETAIL GRIP RAP AT BANKMENT nj `\\�� EST. A TONS CLASS I RIPRAP NNAD 2011 I S CLASS I INCOMPLETE DO NOT USE FOR PLANS i/w ACQUISITION `� �\ ��Ii:•\y �� EST. 35 SY X O � �'"�� �.'�� li UPSTREAM AND DOWNSTREAM CHANNEL IMPROVEMENT CHEVRONS TURNED OFF FOR CLARITY eYiS/j�,6F ... iit _� 25 LF OF CHANNEL IMPROVEMENT �� G % �i�• K.M. BIGGS. INC. �� , _� AT N FLOOD BENCH L �' ���; �I'�,a �►, T 2 NORTHOBARREL - ` EST. 2 TONS CLASS I RIPRAP e •, Q' C., .� EST. 5 SY GEOTEXTILE ♦ �—` SEE DETAIL RR IJ��'(+ S W, II ' "�/� CLASS 'B' RIP RAP p(, EST. 1 TONS F EST. S SY GEOTEXTILE Y3 79 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED - \ \ ,, '•R* \ \ .v , \\ \\ ` � ` • 2@8'x7' R CBC WITH BEVELED HEADWALL .: BV SILL ON URIED 1' BARREL ,", 9 a., z,6x or F`�:no:°x°, zios'0. mof fait & nichol 91aNC License NO.: F-0105 r \ \ ��8`� �!� /�i,\, ry 2' SILL ON NORTH TH ♦ WITH 1' FLOOD BENCH GF RAP P O �� mo■■ MI ' E1 I NC nIN lNnue DRIVE. ,e ,oE��Me� r re RAL FIRM SUITE 871 N W . P', 1t(S�� \\\S� E5T.CLAS1 TONS EST.5 SY GEOTEXTILE OSEP. WWA�R •L;�� �I V \� \ IL A T. 8NS 9C 72 \2 • • N N N 4e, _ CLASS 'B' RIP RAP CLASS 1 p/ a \ V✓/t ELBOWS \\ EST. 1 TONS CONCRETE DITCH EST. 82 SY +ar \ w\ AF`C��. \ EST.S SY GEOTEXTILE BEHILL END NSTATIONS TO ED RETAINING AFINALIZED CULTIVATED FIELD GEOTEXTILE RETAIN ? ,�\ \ �"' jug UPON MSE WALL DESIGN ITYP) . BIGGS, INC. _! a� \•� T P(/ SEE DETAIL II SPECIAL LATERAL F PUE SPECIAL LATERAL 6.0' BASE DITCH �, \\\ \, SEE BASE DITCH SEE DETAIL AA �' � SEE DETAIL AA r M W = N 60 LF OF C,k1AAUJEI IMPROVEMENT WITH T FL BENCH AT NORTH BARREL \\ t PUE O PUE EST. 4 TONS CLASS 1 RIPRAP EST. 6 SY GEOTEXTILE Q \ W2 ELBOWS .. .. .. .. 1 SEE ETAIL S ISTwc Ri M•VE LLI /� �/ W W 48'WWISBW S 'B' ' IP RAP ��� o T w� 'X6' CUAS 'B' RI PxRA P. P •. n _.. - o. ;C X X .. -L EST.1 TONS .1� \:_EST .. .Te .. .. .. .. -�_- S__--- 48'WWISBW ..LJJ FILL;'`� �- SY GEOTEXTILE r S FILL HOLE WITH- •E BASE L • GEOTEXTILE SY o S--_ C---5--- - -----5----5----5 "__I r , " SEE DETAIL M EST. 5 TILE ` • � �� , W • > > ` ` CON: ' v, i 8-77 lb. < :\\\�Z�iZO��►•. O TYPE B-77 GREU TL-3 8.1 TRENCHLESS INSTALLATION TYPE B-77 ��5�_�\ 7 0 0 TB 2GI 15" RCP -IV \ __ - �[ TB L 1 SINGLE FACE 30" WELDED STEEL \ BARRIER_ 1 0 CO NC BARRIERL O c. O \C,ONC BARREEWA FLOWABLE FILL m 0 MOVE n PLUG // \ CO PROP.TYPE T BARRIER - __ .; �� b _ . PROP.TYPE T HARRIER -L- I N 4' 03' 14.3" I REMOVE ,� TB IGI I TB ' G� I \ IN I.) I - _BEARD - 0- IL 0- _ a ____D 0- _D- __0 D_ TL �' i - _`'\ ''If 0- ___0 10- b __a ___➢ D- _LL ___fl 0_ fl_ RCP- V T __.n -1 9- -1 - ____0_ - EL 0 V- i �GI V„RC A' 0- IL ' ` �' MIL E -_ cf-\ FLOWABLE FILL �� CABLE REMOVE - -- - Nr _ < v C BARRIER LL ��. �/�W (� OO1111CCggQQ[[__DDIIiiCCII - r,at,E ENH��OAINTNOGG WALL -- ��. \ BIN,ARRIER BARRIER V BE FINALIZED 8:1 2GI PLUGF ES „TB 7 .� : UPON MSE WALL DESIGN )TYP) \` INSTALLATION - \. • • SEE DETAIL 11 TRENCHL WELDED INSTAL ----- ------ F F F F - - _ ___ GREU TLC 4 y`\ TYPE B_‘` � •�� • Y 30" STEEL +86.65 / - % J J F -- _t - ! ^ PE B- 72.59 F \ — ' • Qom- '- �� 10' _ .. S 'B' RIP RAP PAD _ - > >� - < < < < • - • - ` \ EST. 4 TO ,�( Z- — < < < < \� EST.16 SY GEO \ - \ LL W ". --- -- -_ --- 1 Z48'WWI :W xx X X X X X X = Sly• 7y ,7441144\..._. '' s a �. w w. .k . J _ ASTINc R.'Wx Ap .."'� 5 .5 SY G •TEXTIL \ W A� 48'WWISBW .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. _ \\ N\ CLASS ' RIP RAP ♦` \ \ y EST. B TONS SPECIAL LATERAL i EL WS \\ \ HW ... '�� EST. 21 SY GEOTEXTILE 6.0' BASE DITCH \�\ \ /b RIP RAP SEE DETAIL AA J T 2 U +37.5• E 69.47 'O9 C' W2 '� .0 EMBANKMENT `\ `=`1 F SEE DETAIL cc -Y3- PC Sta. 34t04.73 CLASS 'B' RIP RAP ` f \ ELBOW K.M. BIGGS, INC. U I — EST. 5 TONS • ; EST. 14 SY GEOTEXTILE M`9� 10'X6' CLASS 'B' RIP RAP PAD\w2�LBOWS EST. 6EST. 4 TSY GEOTEXTILE +72.48 ` �. \ •' \' �!! `� p _Il.f \�\ ^; e NI' �1• • \U \ _� WOODS 181.43 A� • .•� \, 'V 0 15.11' V'II " " .II CLASS RIP RAP 4 N� "� 3.0' LATERAL EST. 2 TONS CLASS 'BF RIP RAP —!, ` 4 8 P T EST. 15 TONS DITCH EST.7 SY GEOTEXTILE EST. 37 SY GEOTEXTILE O\�� SEE EDETAIL FF `_\1 9-U PUE .0A �� AV \NN� 0 PUE \ \ \ o C.J . E REMOVE y `=1 K.M. BIGGS, INC. ',, ,, '\ t� \ "�\�\, \`� X \\\\ `'`y. �b CD rb -DRI- POT Sta.10+00.00\ sr t' / �+ 50' 0' 50' 133' 150' t' �' BEGIN CONSTRUCTION , • 30" RCP RCP\ w GRAPHIC �SCAL -DRI- Sta.10+10.00 �i r N 45' 57' 00.0' E t —DRI— PC Sta.10+5689 \.\``` \e_ FOR —L— PROFILE SEE SHEET 69 \ FOR —Y3— PROFILE SEE SHEET 89 FOR —DR1— PROFILE SEE SHEET 90 ,1 z 0 a' o' co // PROJECT REFERENCE NO. SHEET NO. MARG 'f,R.\ t / / / / ) DENOTES TEMPORARY ' / // PERMIT DRAWING // l // /-5987A 30 IMPACTS IN SURFACE WATER } L.-)/ SITE 2 3 / SHEET 50 OF 55 L- / v / \ s DENOTES IMPACTS IN I �,�� FEW SHEET NO. _ /• (; /�y \ , SURFACE WATER S ROADWAY DESIGN HYDRAUUCS �� / �� si„Iv " 3,0°LATE / / r".�. ., BASE D1T / ^. SEE DETAIL F " / ENGINEER ENGINEER +41.M111. � -- ♦ RIP RAP AT EMBANKMENT / O' �`�',1 SEE DETAIL GG / \ / /\ 1,1nv- A 2011 V ��V �j►- (�, • EST. 24 TONS GLASS I RIPRAP J / �. / INC®MPLE DO NOT VSB POR d E PLANS 2/w ACQUISITION a R'1 �G I yQr%%. ` EST. 35 SY GEOTEXTILE / r / X "'O \\.. i= � • UPSTREA AND DOWNSTREAM CHANNEL IMPROVEMENT CHEVRONS TURNED OFF FOR/CLARITY �'��? ��� ��- -•/ �r_,• '> 25 LF OF CHANNEL IMPROVEMENT / K.M. BIGGS, INC. // l -- // /� T" �� . L� _ / AT NORTH 1' FLOOD BENCH / / L — — -oC • V v. �/`,Ilt. � / AT BARREL/ J - I �I• EST. 2 TONS CLASS I RIPRAP ��l4 •�• \ EST. 5 SY CLASIILI -1 /\ SEE DETAIL RR \ \ 42 ��� \�\\O �. e VA �.; CD \� ♦ }•i';‘tilailL ♦ RAP 1 / // \ CLAS TONS / L / EST. SY GEOTEXTIL Y3 24+79 (•\ DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED �� \ \ ��q9 ,�� . _ -, rt \ �� '4�q`"A�� �� �t�`��' 'w \'"'�"\ / \ \/ WITH BEVELED H DWALL / % ". BURIED 1' \ /� 1' SILL ON SOUTPL BARREL S o r �,: or .s sc •o.o, WIT w ,",moffott & nichol ,,,,, C L7ceseLNo� F,o-os r,. ,�� ` \ c. ��,�; yA :Z AA� \� \ \ \\ \ /1-rot 2'SILL ON NORTH BARREL ♦ . / A , WITH 1' FLOOD BENCH V 1 CLASS 'B' RIP RAP Ln) O I ENGINEERING ,a,Fi M PE NUMBERramur .0 vaar, V- W �% C / , . EST.1 TONS •\` \ / 1"` .�\------\ OS P.. / .�AL.y`pJ .,'� � 3 ,'✓ � \ �-\\. \• \ / \ \ \ EST. S SY GEOTEXTILE \ \ / L �L \ ',. 04,, iir .: it NV \ \\ I \� ,� \ CLASS 'B' RIP RAP ♦ < \ VJ7ka ELB01 \� EST.1 TONS CONCRETE DITCH 1 / / \ / \\\ • \ r ti 4 BEHIND RETAINN�AL4/ .22 SY / \\\ ' \\ \ 6 U\ `���\ / �• _ \ EST. 5 SY GEOTEXTRE END STATIONS O BE FINALIZE / / I / CULTIVATED FIELD // OTFXTILE \__� �` TAW. \ EJ \ / "� / / ,.../ TEXTILE:‘X,._♦ ♦� \�1 UPON MSE W DESIGN (TYPI '-- ,_ / \ // i.BIG65.NC.� •o��� 'V���•�-/' :,v. \�� ��-� P(/ SEE ) A ( // A i \ / / SPECIAL LATERAL / / _ i \- / ~ NA.,.4•\ \\\ \ \, -'\\ \\ \ " I . \•.� -- /� SPECIAL LATERAL SAS / - �W" ee .i\OI �\ - \ \ _\� ` \ !, \ l IIf 6.0' BASE DITCH SEEPETAILIAAH // . ,n •�1? �� �� SEE DETAIL AA \V� v r CO `-, W LJJ _ ) 60 Lffl EL IMPR . \�, \ \. \\ \ 4,-�/ P �/ ��(C��((pp�INJ per VAAy yv�� vvvvvV (��, i� v91Tr1 1' FFLiSCD BE kT �IOR H wok/\ PEE VE EST.4 TONS RAP `�V\ VA �^ AVM V \.,., A \ A Q/�� / EST. b SY O E \ \ ��� \ \ \\fir \\ \\ \\ \ WR ELBOWS� .. 4 / , W /) W LLJ. --48•WWls�w S ': - . a y�•r \\\ ` pe p- -•- •o � .. _ .. .. • . .. .. ° ,-- '. L EST.1 TONS .\ \9\ E576'• TLI S'B'RIPRAP.P-... .. .•.. _ 49'Ww158W .. .. _i/ \ L HOLE WITH" • :, I E) . • EST. 5 SY, - '�`.\ \ SY GEOTEXTILE _ _- _ - - - _ / _ SEE . ETA AA GEOTEXTILE 2•A�.�• tes._ \\ _ — - - _ - - - — \ W ' ma's- ---.�--'=/l�/L—L__.-� ; --IG9 Q -- G --- --- ---,IP- � N to _ -,° \riY — e.--' s a—_ -- — yy < 1� E 1�� < //.... a > tG5 — — _ --- �.V�;"\'� ■■p I�_� $7,7- - - _�V 5— _ - - — HW _ — -WIZ/Rt. ` SIG- _ —=---' /Rt... _.,... em =-Ica--- -- ---------.m- t-r sel — - O -- [91 ' in - TYREG`F 9.'B.0 TYPE B-77 G REU-iL7_8T of -- -- _—sB1----� s91- _-------- 9 ---—s91_ �� —IHLED gN -- — ---- CD of _ sal_ yUTB 2G U 15' RCP -IV ` `{jl SINGLE�FACE ICI - - 9rGt •n' 691 --6SI --'�`6' O • - -t91--CONL BARRIER \ ` — _ -bm— — .— — — _ �` } 0 —C 1b re, FLOW L >i --- ABLE FILL 1 _ \C,ONC BARRIE' WA `'i \ T — i -- --------�.-- _ -----iGG-- - -- -_. _._- w� IG9 ---- _--— _ G. - - - - - —IGG- — - __ - - - - _ -. — EMOVE IV IG7 - _- PLUG _ —IG9- IG9 -------------t65--- 'gROP.TYPE, 7`HARRIER --'--.-_- \ _a _ - - Iu�� PROP.TYPE ARRIER-- L- N 4'03'l • I REMOVE 1 ._--' —Gy ---- .— IG5 IGG- ; G II- I -IG5 � TOP=1rn TB aGl ----- 1 —I 1N LO -C694EO--o--L-em--P-= 9...-1_ -- --- a __ a I �i TL _ - �,.�_ 1 =J6— 'BCP�V = ;.-, .�.V- �4:A �-�-J1=-Is==--L 1G1L". -t39-_a- -qir 1 . .�'I-D-_0_C _-t_IL-�-- -o_IL---D--O.� =�- `f -� MTL -_ ----- --'-- - "FCOWABLE-FILE -6vI �I - - - i"1RFAAOV _ __ --- Nr a z N —�-------� � C BARRIER L \ \ er -d _ — @ffL WALL-';1' 69 -- r BEH ND RETAIN — ---- V I •Dlrvb --�-- — — ` r — _IG9— - _ - -I69 - IGG- - - - - - - - - > - BARRIER w — IGG - _ - - - - GG "' :,1 — — ; f'�` -� -- GG z 1 UPON- WE -WALL DFSIG. aYp� - �PLTW>zFG �y - = GREU TLC I pit. ' 3St1is 1� - - '� __ — —30- WELDEDs-STEEL- — — — _ _ — .— cm ----- — — — `\' -_ \ -SEE-DETAIL-ILA- �[C-TRENEHL{35�NSTAI4AT13&_-- - 1 --- - --_I�------- F _F— S9t — -- --- --- ____ F ---� - , i�/ � ---�--- J J _ — _ _ — /`\ \� F F_-�.--f-.. $ ii / 'W � ! ! APE B- i ;C / �����\��\_ .� 4 10'" 5 B'RIP RAPP _--' .. '��T.. ` 1' \EST �/.� �_-_s9-�•.. .. .. - .. ' - / \\ 4 TO / Z- - \ a v \ �c EST. n /'� • �lIIG! 16 SY GEO_ ///(_ � v�/\ W V N. �-- Z..,;'WWI'•= - -uu- r9r 1 9+ �. / 'Ruli.�M. �r W •k .. .. .. .. .. � Y Z J y' - ` _ _ . v - ' `- ELTIIIEG/w s,1 ----„,,.\,.›...„ \\' ` C♦ \\ . 5 SY G' •TEXTIL ram' VI /' .� ✓ ¢\ �\.' "; /- Nlir 4B'WWISBW '� .� / < rise /\ .. .. _. ..F \\ .r I \ �' _ CLASS T'N IP RAP / I / . \\ \\L \\ °� :T \ \ \ \ ::f/ ;"'�, " V J �I EST. 6 O 5 v �� SPECIA4'GTERAL _ _ ` - lam_ / / DIGS• \ .I.-- . \ \ N. ` \ \\\� \ pO.V . \EST. 21 SY GEOTDCBLE / \ $6 0' BAST DITCH ) 7C L-EE DEVIL AA /� +37.5• N. \ \\\\ - \\\\ ?�i� .. s RIP RAP ATro T /1� U V/ ./ EMBANKMENT I 69.47 �., \\\ \ \\ \ \ 2 !1 `&G,x, SEE DETAIL GG-yi- PC . �4 .50 4.73 /e / -1 CLASS 'B' RIP RAP �` ` \ ��. LBO ` / n' r' K.M. BIGGIS; INC. / ./ I- �� EST.5 TONS •` t AAAA�� ��`� �� -_/ \��� �� . EST. ib SY GEOTEXTILE \\\�.i\\ I• \\ v \ \"1 J/ ' l �/ 10'X6' CLASS ST.4 TONS B'RIP RAP PAD `\ •\ � � \ \ �\r�// _1 1 der EST. 16 SY GEOTEXTILE +72.48 \ ". x '•,INN .,�.N. `� \\ ', \ _ 6 l.F 1 l i / % \ / 5 / / / I_, / / ` i / 4 / . VAAVA a >� -\ V VA A�� / / CLASS 'B' RIP RAP N.AA\ ��...\ �: A V • �� 1 V CLASS rBl' RIP VtAP -p �� V A A p `'+' V. AV " 'F A A' , A \ BASE H �� L // .. „ / EST.2 TONS EST. kS TONS )� A=9' �• / /-'L isr.ST'.SY GEOTEXTILE EST[37 SY GEOTEXTILE \ .. > \\� \�\���\ \Ac \\��\, \ SEEEDETAVT L--FF `=1 / FIELD / /yr-� ' r, E , a E PUE \O \ - %� :\„� \_I IC) . ;rrl0vr / ��,�� --- K.M. BIGGS, INC. `---- /� - --- /--. ,�F\\\-�S\\ \\\ \ -\\ \` (33 / \ \ o> \ \ %, \ �n) -DRI - POT Sta. /0+00.00 �� • \ N. \ + r ` 50' 0' 50' ICO' 150' t. _ v `' _ 30" RCP -III � ��(. GRAPHIC SCALE // vl — r., BEGIN CONSTRUCTION I �� `.� N. v -DRI- Sta./0+/000 �� // J/^=--_ �/ �� / \ 1 \SOS" ) -DRI- PC Sta.1O+L_,/\ \ FOR -L- PROFILE SEE SHEET 69 /u JG' \// (1 / ^?� L_-',+" F `` ' -Y3PROFILE SEE SHEET 89 FORR-DRI- PROFILE SEE SHEET 90 cr - c m �o\R�s ss \� Ro \26 01 Ih cr m 01 S 00 m 0) m 0 s_ 0 C 0 0 w w In 21 01 w a , o; 0�0 r colT 0 Ti TG ARCHIE PREVATTEE DB 756 PG 399 1 STREAM AND WETLAND IMPACTS SO TIMOTHY BELL DB 1782 PG 365 DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER LOW FLOW CHANNEL & FLOOD PLAIN BENCH SEE DETAIL Al SPECIAL LATERAL V DITCH SEE DETAIL P C SPECIAL LATERAL V DITC SEE DETAIL AF SITE 15 SO O �.... HW RIP RAP AT EMBANKMENT SEE DETAIL L 30 LF OF CHANNEL IMPROVEMENTS CLASS 'I' RIP RAP EST. 36 TONS EST. 64 SY GT RIP RAP BANKS ONLY 35 LF OF CHANN IMPROVEMENTS 48" RCP -IV BURY BOTH ENDS OF PIPES 0.8 FT 01 CLASS 'I' RIP RAP EST. 52 TONS EST.100 SY GT RIP RAP BANKS ONLY PAULA CAULDER DB 2121 PG 370 LOW FLOW CHANNEL & FLOOD PLAIN BENCH SEE DETAIL Al POND JS- 1 ERNESTINE PARKER DB 640 PG 734 MB 29 PG 149 POND fti 2' LATERAL V DITCH SEE DETAIL AD CULTIVATED LARRY PRIDGEN DB 1802 PG 240 MB 29 PG 149 LJ7 PROJECT REFERENCE NO. /-5987A R'W SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 33 HYDRAULICS ENGINEER INCOMPLE DO NOT USE FOR TE PLANS t1W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED N V 5 NV5 ENGINEERS & CONSULTANTS, INC. 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 P: 704.537.7300 www.NVS.com NC license N F.1333 PERMIT DRAWING SHEET 51 OF 55 N O CLASS 'B' RIP RAP EST. 2 TONS EST. 7 SY GT 15" CSP W,ELBOWS N SPECIAL LATERAL V DITCH SEE DETAIL P GRAPHIC SCALE 50 25 0 50 100 `1I111 PLANS N u1 0 0 N rn rrn CLASS 'B' RIP RAP EST. 3 TONS EST.10 SY GT CLASS 'B' RIP RAP EST. 2 TONS EST. 7 SY GT ALL DRIVEWAY RADII ARE 20' UNLESS OTHERWISE NOTED. UNIFORMLY TRANSITION DRIVEWAY SLOPES AS SHOWN. PROPOSED PAVEMENT REMOVAL FOR —Y2— PROFILE SEE SHEET 72 FOR —DR2— PROFILE SEE SHEET 91 FOR —DR3— PROFILE SEE SHEET 91 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 PROJECT REFERENCE NO. SHEET NO. cr 0- co � r "6 4 c b� 6 �R,Syis S 9 Rp HIE PREVAT TEE DB 756 PG 399 146 RIIF RAP AT EMBANKMENT A I SEE DETAIL L �4J:IMPROVEMENTS F OF ENTS LOW FLOW CHANNEL & , LASS 'I' RIP RAP FLOOD PLAIN BENCH TO NS 36 SEESEE D AIL P DETAIL Al III ST. 64 TGT �! P RAP BANKS fLY� O 1,11 V�V Ib1 104 SITE 15 TIMOTHY BELL L7131 PG 365 1�4 SITE 15 STREAM AND WETLAND IMPACTS DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER 35- IM PQV 5 RIP RAP 2 T• 00 SY T RIP`KAP BAN • ..1Y FLOW CHANNEL.&, )D PLAN BENCH a DETAIL AI T' a FLC SEE RNES TINE PARKE DB 640 PG 734 MB 29 PG 149 144 SPECIAL lATERAL v DITCH SEE DETAIL P 3 4 30 ULDER 121PG 37 744 27 ISBK0 LAT L DITCH SEE ETA L AD OA4 CUL ATED BEG SBG + 46.93 GREU TL-3 LARRY PRIDGEN DB 1802 PG 240 MB 29 PG 149 /-5987A R'W SHEET NO. ROADWAY DESIGN ENGINEER 33 HYDRAULICS ENGINEER INCOMPLE DO NOT USE FOR TE PLANS tcW ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED N V 5 NV5 ENGINEERS & CONSULTANTS, INC. 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 P: 704.537.7300 www.NVS.com NC license N F.1333 PERMIT DRAWING SHEET 52 OF 55 rn CLASS 'B' RIP RAP EST. 2 TONS EST. 7 SY GT 15" CSP W,ELBOWS N m SPECIAL LATERA SEE DETAIL P GRAPHIC SCALE 50 25 0 50 100 `1I111 PLANS 1,3 V 0 0 (11 rn CLASS 'B' RIP RAP EST. 2 TONS EST. 7 SY GT V DITCH ALL DRIVEWAY RADII ARE 20' UNLESS OTHERWISE NOTED. UNIFORMLY TRANSITION DRIVEWAY SLOPES AS SHOWN. PROPOSED PAVEMENT REMOVAL FOR -Y2- PROFILE SEE SHEET 72 FOR -DR2- PROFILE SEE SHEET 91 FOR -DR3- PROFILE SEE SHEET 91 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 PROJECT REFERENCE NO. SHEET NO. /-5987A RW SHEET NO. U CO 01 01 Z 01 a >- r 01 m o, m 0 o` 0 0 E 0 LLI a -0 00 oc� 000r meta SITE 15 -Y2- STATION 17 + 35 2@48"RCP -100' -75' -50' -25' ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLE DO NOT USE FOR TE PLANS tcW ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED N V 5 NV5 ENGINEERS & CONSULTANTS, INC. 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 P: 704 537.7300 www.NVS.com NC license N F.1333 0' 25' 50' 75' 10 0' 12 5' 145' 140' 135' 130' PRO PO SEC IMP TOP OP U CHAN ?OVEMF NE L Ts NY _LEFT cL INV OPE 0 4 137 0' 70/ PR Y2 STA 2@48" RC BURIED 1 REMOVE EXISTING 42' REMOVE ExIST1N OFILE ALONG 17+35 P N CMP 36" RCP STRUCTURE h 1 — L5\ rRorosED IMPROVEME EXI CHA NTS sn NE L G STREAM BE PERMIT DRAWING SHEET 53 OF 55 HORIZONTAL SCALE 25 12.5 0 25 50 FOR -L- PROFILE SEE SHEET 58 FOR DITCH DETAILS SEE SHEETS 2D-1 AND 2D-2 HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1-L- 110+70/112+15 7'x7' RCBC0.025 0.008 155 362-L- 224+65 System Outlet0.003 0.0153-L- 226+70 Bank Stabilization0.002 0.0094-L- 242+00/243+70 Bank Stabilization for 8'x7' RCBC0.005 0.0030.005 0.0305 -L- 250+55 System Outlet0.001 0.0296-L- 265+00 LT Bank Stabilization0.003 0.0017-L- 265+00 RT System Outlet 0.022 0.0017-L- 265+00 RT Bank Stabilization0.001 0.0038-L- 275+80 30" RCP0.004 0.0018-L- 275+80 Roadway Fill0.024 0.0019-L- 281+90 RT66" RCP0.0469-L- 281+90 RTBank Stabilization0.003 0.00210-L- 285+50 LTRoadway Fill3.029 0.166 0.018 0.00311-L- 310+50 3 @ 12'x12' RCBC0.220 0.077 120 4012-L- 308+00 to 318+50 Roadway Fill0.401 0.35413-L- 332+05 System Outlet0.004 0.00114-L- 339+15Roadway Fill0.020 0.02315-Y2- 17+252 @ 48" RCP 0.012 5015-Y2- 17+25 Bank Stabilization0.006 0.003 58 20TOTALS*:3.456 0.000 0.029 0.546 0.000 0.397 0.156 383 96 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 FebSHEET 54 OF 5547533.1.2Sptember 29, 2021ROBESON COUNTYNC DEPARTMENT OF TRANSPORTATIONI-5987ASites 2, 3, 4, 6, 7, 8, 9, and 13 are Tributaries and therefore Surface water impacts are considered for area only. WETLAND AND SURACE WATER IMPACTS SUMMARYSURFACE WATER IMPACTSWETLAND IMPACTSDIVISION OF HIGHWAYS HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1-15 Totals from Sheet 53 =>3.456 0.029 0.546 0.397 0.156 383 9616 LA2 340+00-351+50 Lt.Rdy fill,1@48" RCP,1@42"RCP0.354 0.28517 LA2 342+15 Rt. Roadway fill/False cut ditch0.035 0.02418 LA2 352+25-353+10 Lt. Roadway fill0.024 0.01919 LA2 354+06 Rt. & Lt. 2@7'X7' RCBC0.012 0.001 0.018 0.006 82 2619 LA2 354+06 Rt. & Lt. Bank Stabilization0.020 8220 LA2 366+29 Rt. & Lt. Rdy Fill/2@8'X9' RCBC0.139 0.022 0.119 0.035 0.025 96 10420 LA2 366+29 Rt. & Lt. Bank Stabilization0.026 9621A LA2 404+01 Rt Roadway fill0.013 3821A LA2 404+01 Rt Tailditch-Cleanout **0.107 48821 LA2 398+86-402+73 Lt. Roadway fill0.057 0.112 0.12222 LA2 454+44-455+52 Lt. Roadway fill **0.02222 LA2 454+44-455+52 Lt. Bank Stabilization0.004 1422 LA2 454+90 Rt. & Lt. 2@8'x7' RCBC0.003 0.001 0.006 0.007 22 4522 LA2 454+90 Rt. & Lt. Bank Stabilization0.018 8323 Y3 24+79 Rt. & Lt. 2@8'x7' RCBC0.020 0.003 57 1023 Y3 24+79 Rt. & Lt. Bank Stabilization †0.010 0.013 33 30TOTALS*:4.080 0.000 0.188 1.092 0.000 0.588 0.317 986 799 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET 55 OF 55 WETLAND AND SURACE WATER IMPACTS SUMMARYSURFACE WATER IMPACTSWETLAND IMPACTSDIVISION OF HIGHWAYS to the proposed streambed elevation per profile.47533.1.2September 29, 2021Robeson CountyNC DEPARTMENT OF TRANSPORTATIONI-5987A** Site 21A & 22: Includes Tributaries TAD and TP respectively. Therefore, Permanent or Temporary Surface Water impacts are considered for area only. for area only. Site 21A totals include SAB Temporary Surface water impacts: 0.107 ac., 488 LF.† Site 23: Bank Stabilization includes removal of existing roadway embankment and pipe, and installation of Rip Rap Class I 00 kaki W See Sheet IA For Index of Sheets -5R4- SR 1760 CEDAR GROVE CHRUCH RD TO LUMBERTON BEGIN BRIDGE -SR4- SR 1006 N GREAT MARSH CHURCH RD -Y4- STA. 24+00+/- END Y4- SITE 2 -SRS- SR 1741 OLD STAGE RD BEGIN BRIDGE -L- STA. 585 + 22 +/- END BRIDGE STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS ROBESON COUNTY LOCATION: I-95 IMPROVEMENTS FROM NORTH OF SR 1758 (McDUFFIE CROSSING RD.) TO NORTH OF SR 1723 (PARKTON TOBEMORY RD.) TYPE OF WORK: GRADING, PAVING, DRAINAGE, STRUCTURES, SIGNING, CULVERTS, AND RETAINING WALLS WETLAND AND SURFACE WATER IMPACTS PERMIT BEGIN BRIDGE -YSRpC- -L- STA. 587 + 02 +7- BEGIN HP PROJECT I-5987B —L— STA. 495 + 00.00 TIE TO TIP PROJECT I-5987A —L— STA. 495 + 00.00 -L- STA. 618+25+/- STA. 616+21 +/- END BRIDGE ST. P (EXIT 31) SITE 4 A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF ST. PAULS. CLEARING ON THIS PROJECT SHALL BE PERFROMED TO THE LIMITS ESTABLISHED BY METHOD THIS IS A CONTROLLED -ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. -Y5- NC 20 -L- PT STA. 641 + 83.86 LB = -L- POT STA. 641 + 84.17 LA SITE 7A YIBRPB- (EXIT 33) END BRIDGE -Y1B- STA. 30 + 69 +/- -SR3- OAKLAND RD. NAD 83MSRS 2011 -YIBRPA- BEGIN BRIDGE -Y6- STA. 29+41+ STATE STATE PROTECT REFERENCE NO. SNOT TOTAL SHEETS N.C. I-5987B 1 STATE PROLNO. P.A.PROI.NO. DESCRIPTION 47533.1.3 NHP-0095(056) PE PERMIT DRAWING SHEET 1 OF 80 END TIP PROJECT I-5987B 11 —L— STA. 915 + 07.85 TIE TO TIP PROJECT U-2519AA —Y— STA. 22 + 89.87 SITE 111 BRIDGE BEGIN BRIDGE -Y7- STA. 28 + 92 +/- -L- STA. 804 + 05 +/- SITE 12 BEGIN BRIDGE -Y1B- STA. 28+33+/ SITE 10 USS 3 301 -YIBRPC- arc r1 oa 4&414 N-SZ44:: ��i END BRIDGE -_- SR 1726 -Y6- STA. 31 + 15 +/- % To F- McRAINEY RD. END BRIDGE -Y7- STA. 30 + 49 +/- -Y7- SR 1723 PARKTON TOBEMORY RD. SITE 13 BEGIN CULVERT -L- STA. 902+20+/- END CULVERT -L- STA. 902 + 47 +/- INCOMPLETE PLANS DO NOT USE FOR R/ W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 `IIII� PROFILE (VERTICAL) DESIGN DATA ADT 2022 = 63,300 ADT 2042 = 92,600 K = 8 % D = 55 % T = 14 % * V = 75 MPH * TTST =11 DUAL 3 FUNC CLASS = INTERSTATE STATEWIDE TIER PROJECT LENGTH LENGTH ROADWAY TIP PROJECT I-5987B = 7.844 MILES LENGTH STRUCTURES TIP PROJECT I-5987B = 0.112 MILES TOTAL LENGTH OF TIP PROJECT I-5987B = 7.956 MILES MOTT M MACDONALD Prepared in the Office of 7621 Purloy Rd., Suite 115 Fuquey—Vorine, NC 27526 (919) 552-2253 (919)552-2254 (Fox) License 20I8 STANDARD SPECIFICATIONS RIGHT OF WAY DATE: MAY 28, 2021 LETTING DATE: AUGUST 17, 2022 �iiEewRD 1223 Jones FrarAn Rd. Fax; 919 BSI 8107 DAVID C. WALLER, PE PROJECT ENGINEER MICHAEL D. PEKAREK, PE PROJECT DESIGN ENGINEER CRAIG A. FREEMAN, JR., PE NCDOT CONTACT - DIVISION 6 HYDRAULICS ENGINEER P.E. SIGNATURE: ROADWAY DESIGN ENGINEER P.E. SIGNATURE: 9 N In PROJECT REFERENCE NO. I-5897B SHEET NO. 2D-/ RAY SHEET NO. C 0 0 ro 4 O E 4 0 f 0 d Nv. U � -+ C N 0 N co cc DETAIL A SPECIAL CUT DITCH WHINGE ( Not to Scale) FROM STA. 522+00 TO STA. 527+00 -L- RT FROM STA. 562+00 TO STA. 566+50 -L- RT FROM STA 875+00 TO STA. 878+50 -L- RT FROM STA. 20+50 TO STA. 27+00-YIBRPB- RT FROM STA. 15+00 TO STA. 18+00-Y1BRPC- RT FROM STA. 19+50 TO STA.21+25 -Y7- RT DETAIL F SPECIAL LATERAL BASE DITCH (Nefto Scab) Natural T Ground 3.7 D 3'�ott F� 60 Fi Slope W Min. D. SEE BELOW B. SEE BELOW FROM STA. 495+00 TO STA. 506+50 -L- RT, D.1.5' B.6' FROM STA. 495+00 TO STA. 497+80 -1- LT, D.1.0', B.6' FROM STA. 497+80 TO STA 502+00 -1- LT, D.1.0', B.4' FROM STA. 507+00 TO STA. 513+95 -L- RT, D.1.0', 13.4' FROM STA. 514+13 TO STA. 518+33 -L- RT, D.5.0', B.8' FROM STA. 518+33 TO STA. 520+00 -L- RT, D.1.0', B.6' FROM STA. 536+85 TO STA. 543+50 -L- RT, D.1.0', 13.4' FROM STA. 556+00 TO STA. 556+10 -L- RT, D.1.5', B.4' FROM STA. 577+00 TO STA. 585+00 -L- LT, D.3.0', B.6' FROM STA. 593+30 TO STA. 595+00 -L- RT, D.2.25', B•6' FROM STA. 601+50 TO STA. 607+00 -L- RT, D.3.0', B.4' FROM STA. 618+50 TO STA. 621+12 -L- RT, D.1.5', B.4' FROM STA. 632+00 TO STA. 634+39 -L- RT, D.1.5', 8.6' FROM STA. 634+39 TO STA. 638+00 -L- RT, D.1.0', B.2' FROM STA. 626+00 TO STA. 634+50 -L- LT, D.2.0', 8.8' FROM STA. 634+50 TO STA. 639+50 -1- LT, D.1.5', B.4' FROM STA. 639+50 TO STA. 642+25 -L- RT, D=1.0', B=2' FROM STA. 884+50 TO STA. 898+50 -L- RT, D.2.5', B.3' FROM STA. 73+50 TO STA. 79+00 -SR4- LT, D.1.5', B.4' FROM STA. 19+00 TO STA. 21+21 -SR10- RT, D.1.0', 13.2' FROM STA. 27+50 TO STA. 30+00 -SR10- LT, D.1.25', 8.4' FROM STA. 30+00 TO STA. 33+00 -SR10- LT, D.1.75', B.4' FROM STA. 35+50 TO STA. 36+25 -Y5- RT, D.2.0', B.2' FROM STA. 37+00 TO STA. 41+28 -Y6- LT, D.2.5', B.6' FROM STA. 38+50 TO STA 45+00 -Y7- RT, D.2.5', B.3' FROM STA. 45+00 -Y7- RT to XPIPE SR 1904 RT, D.2.5', B.3' DETAIL K STANDARD BASE TAIL DITCH ( Not Ic Scab) Natural Natural F7 Ground TD oet Ground �c Min. D. SEE BELOW B B. SEE BELOW FROM STA. 621+00 -L- RT, D.6', B.6', L.590', S.0.02%, BEG. EL. .153.25', END EL. .153.00' FROM STA. 895+14 TO STA. 895+72 -L- RT, D.2.5', B.3' FROM STA. 15+50 TO STA. 18+00 -Y5- RT, D.1.6' B.4' FROM STA. 48+50 -Y5- LT, D.6', B.6', L.150', S.0.02%, BEG. EL. .154.30', END EL. .154.27' Na ,1 Ground DETAIL P SPECIAL CUT DITCH ( Not to Scale) Min. D. 1.0 Ft. Front Ditch Slope FROM STA. 11+30 TO STA. 12+41.11 -DR1- RT DETAIL U SPECIAL BACK OF CURB CUT DITCH (NOT TO SCALE) NATUUNNDRAL GRO Min. D. 1.0 Ft. FROM STA. 34+00 TO STA. 34+75 -Y5- LT FROM STA. 24+27.14 TO STA 25+27.35-YSRPC- RT DETAIL B SPECIAL CUT DITCH VoHINGE I Not to Swb) FROM STA. 497+80 TO STA. 506+00 -L- RT FROM STA. 571+50 TO STA. 572+50 -L- LT FROM STA. 772+50 TO STA. 789+00 -L- RT FROM STA. 839+00 TO STA. 851+00 -L- LT FROM STA. 851+00 TO STA.864+83 -L- RT FROM STA. 892+00 TO STA. 895+00 -L- LT DETAIL G SPECIAL LATERAL 'V' DITCH ( Not to Scale) 3. Min. D.1.0 Ft. Fil Slope FROM STA. 502+00 TO STA. 503+00 -L- LT FROM STA. 527+50 TO STA. 529+50 -L- RT FROM STA. 531+05 TO STA. 532+00 -L- RT FROM STA 534+00 TO STA. 536+80 -L- RT FROM STA. 551+50 TO STA. 553+50 -L- RT FROM STA. 555+90 TO STA. 558+00 -L- LT FROM STA. 564+00 TO STA. 565+00 -L- LT FROM STA. 556+10 TO STA. 562+00 -L- RT FROM STA. 599+00 TO STA. 600+00 -L- LT FROM STA. 607+00 TO STA 610+00 -L- RT FROM STA. 617+15 TO STA. 617+56 -L- RT FROM STA 638+00 TO STA. 639+50 -L- RT FROM STA 642+25 TO STA. 650+00 -L- RT FROM STA. 639+50 TO STA. 650+00 -L- LT FROM STA. 650+00 TO STA. 654+98 -L- LT FROM STA. 650+00 TO STA. 655+60 -L- RT FROM STA. 700+50 TO STA. 702+50 -L- LT FROM STA. 74+00 TO STA. 76+50 -SR4- RT FROM STA 10+50 TO STA 12+50 -SR10- LT FROM STA. 10+50 TO STA.11+50 -SR10- RT FROM STA 12+50 TO STA. 15+00 -SR10- RT FROM STA. 19+50 TO STA. 27+50 -SR10- LT FROM STA. 21+21 TO STA. 36+00 -SR10- RT FROM STA.19+00 TO STA.20+15-Y1BRPB- LT FROM STA. 33+50 TO STA. 36+00 -Y4- RT FROM STA. 36+60 TO STA. 38+00 -Y5- RT FROM STA. 43+08 TO STA 43+50 -Y5- LT FROM STA. 15+00 TO STA. 23+30 -Y6- LT FROM STA. 36+50 TO STA. 40+00 -Y6- RT FROM STA. 41+50 TO STA. 44+00 -Y6- LT FROM STA. 45+00 TO STA. 46+00 -Y6- LT DETAIL L SPECIAL CUT DITCH ( N. to Scab) oa Front Dibh Slope Min. D.SEE BELOW FROM STA. 911+18 TO STA. 915+07.85 -L- RT, D.2' FROM STA. 913+00 TO STA. 915+07.85 -L- LT, D.2' FROM STA. 12+50 TO STA. 14+00 -Y4- LT, D.1.25' FROM STA. 30+50 TO STA. 33+50 -Y5- RT, D.1.5' DETAIL Q STANDARD BASE DITCH (Not to Scab) Geobihe Min. D. 2 H. Max. d. 2.5 H. 'When B is < 60' B. 3 Ff. Type of liner. Class I Rip -Rap STA 30+55 TO STA. 31+06 -Y7- LT, L.51', S.5.39% BEG. EL..1565.10', END EL..162.35' DETAIL V 10' WIDE BERM ( Not to Scale) 10' b:T 4.1 IF Distance Varies Depending Upon Spedfied Elevation D.Varies; Distance _. Lowed Point from Top of Berm to \ �in Natural Ground lowest control point or Proposed Ditch -L- STA. 639+50 RT, TOP ELEV.164.0' -L- STA. 667+00 LT, TOP ELEV.168.0' -Y4- STA. 21+71 RT, TOP ELEV.158.0' DETAIL R DITCH BLOCK ( Not to Scale) DETAIL C SPECIAL CUT DITCH WHINGE ( N. to Scab) dot Front A'' Ditch D F\a�Slope 6.0• I- Min. D.2.0 FT FROM STA. 543+50 TO STA 549+00 -1- RT FROM STA. 851+00 TO STA. 863+00 -L- LT FROM STA. 868+00 TO STA. 878+50 -L- LT DETAIL H SPECIAL CUT DITCH (Not to Scale) Min. D. 1.0 Ft. Dinah Slope FROM STA. 36+00 -SR10- RT TO STA. 603+65 -L- LT FROM STA. 879+00 TO STA. 883+00 -L- LT FROM STA. 879+00 TO STA. 882+50 -L- RT FROM STA. 36+50 TO STA. 38+50 -Y4- LT FROM STA. 37+00 TO STA. 38+00 -Y4- RT FROM STA. 22+09 TO STA. 26+60-YSRPB- LT FROM STA. 10+20 -Y21- LT TO STA. 10+25 -Y21- RT Natural Ground DETAIL M LATERAL 'V' DITCH I Not to Scab) 1 bI Ro pe n 3'. Stove Min. D.1.5 Ft. 6.5 Ft. FROM STA. 503+00 TO STA. 507+00 -L- LT FROM STA. 552+00 TO STA. 555+90 -L- LT FROM STA 721+00 TO STA. 724+50 -L- LT FROM STA. 10+90 TO STA. 16+50 -SR3- LT FROM STA. 76+50 TO STA 81+00 -SR4- RT FROM STA. 14+00 TO STA. 17+00 -Y4- LT FROM STA. 32+50 TO STA. 36+50 -Y4- LT FROM STA. 21+25 TO STA. 29+00 -Y7- RT Outside Ditch Traffic Flow S. Ditch Slope l Proposed Ditch FROM STA.914+99 -L- RT 3:7 po DETAIL W TOE PROTECTION (Nat to Scab) \oQs 9'� ot65 Geotextie d. 3.0 Ft. Type of Liner. 265 TONS Class B Rip -Rap 560 SY Geotextile FROM STA. 577+00 TO STA 585+00 -L- LT DETAIL D SPECIAL CUT BASE DITCH VsHINGE (Not to Scale) Min. D. 2.5 FT B. SEE BELOW FROM STA. 816+50 TO STA. 851+00 -L- RT, B.4' DETAIL I SPECIAL CUT BASE DITCH I Not Scale) Natural TOt Front Ground 47 D oottot Ditch Slope 1.=.1 Min. D.2.5 Ft. B.2 Ft. FROM STA. 907+50 TO STA. 913+00 -L- LT FROM STA 906+77 TO STA. 911+18 -L- RT FROM STA. 10+50 TO STA. 15+50 -Y5- RT DETAIL N LATERAL BASE DITCH ( Not to Scab) Natural ♦- Ground 3.y Npe Min. D.2.5 Ft. B. SEE BELOW b.5 Ft. FROM STA. 553+50 TO STA. 556+00 -L- RT, B.4 FROM STA. 574+90 TO STA. 577+00 -L- LT, B.6 FROM STA. 621+00 TO STA. 628+00 -L- RT, B.6 FROM STA. 628+00 TO STA 632+00 -1- RT, B.6' FROM STA 79+00 TO STA. 80+88 -5124- LT, B.4' FROM STA. 13+25 TO STA. 19+80-Y1BRPA- RT, B.4' DETAIL S SPECIAL LATERAL DITCH wHINGE ( Not to Scale) FROM STA. 565+00 TO STA. 566+00 -L- LT FROM STA. 727+00 TO STA. 730+00 -L- LT FROM STA. 726+50 TO STA. 730+00 -L- RT DETAIL X STANDARD BASE DITCH ( Not to Scab) Natural N6Nral Ground 3.7 7 3,\ Ground Min. D. 2 Ft. B. SEE BELOW FROM STA. 619+45 TO STA. 622+10 -L- LT, D.2.0', B.8' FROM STA. 622+10 TO STA. 626+00 -1- LT, D.2.25' B.8' DETAIL E DITCH BLOCK (NONo Salo) S. Ditch Slope Outside Ditch Traffic Flow S. Ditch Slope STA 536+70 -L- LT STA 563+62 -L- RT STA 563+62 -L- LT STA 568+12 -L- RT STA 568+12 -L- LT STA 592+62 -L- LT STA 595+13 -L- LT STA 599+88 -L- LT STA 610+12 -L- LT STA 610+12 -L- RT STA 612+37 -L- RT STA 613+12 -L- LT STA 615+12 -L- RT STA 619+80 -L- RT STA 622+37 -L- LT STA 771+62 -L- RT STA 839+00 -L- LT STA 35+09 -SR10- LT DETAIL J DITCH BLOCK ( Not to Scale) STA. 895+00 -L- LT DETAIL 0 SPECIAL CUT BASE DITCH (Not to Scale) Natural o• Front Ground ,�0'7�� Slope Al �,a< Ditch e. Min. D. SEE BELOW B. SEE BELOW FROM STA. 520+00 TO STA. 522+00 -L- RT, D.1.0', B.4' FROM STA. 10+58.30 TO STA 15+21 -DR1- LT, D.1.5', B.3' FROM STA. 12+50 TO STA 14+00 -Y4- RT, D.2.0', B.4' DETAIL T SPECIAL CUT BASE DITCH WHINGE Min. D. 1.5' MIN B. SEE BELOW Front Ditch slope FROM STA. 595+00 TO STA. 597+00 -L- RT, B.6' DETAIL Y SPECIAL CUT BASE DITCH WHINGE Min. D. 1.75 Ft. Max. d. 1.75 Ft. d B. 6 Ft. Type of Liner. Class B Rip -Rap Front Ditch Slope le FROM STA. 597+00 TO STA. 601+50 -L- RT ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/ W ACQUISITION MOTT MACDONALD 18 E, LLC LICENSE NO. F-0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M 7621 Purley Road, Suite 115 FUquay-Varina, NC 27526 (919) 552-2253 MOTT www.mottmuc.com MACDONALD NC license No. F-0669 ETHIERILL 122337 Nociliwe TT:RING Fn:�sis esi Dim PERMIT DRAWING SHEET 2 OF 80 Neturol Ground DETAIL Z LATERAL 'V' DITCH ( Notto Scale) Geotmtie Type of Liner. VARIES P. Min. D. SEE BELOW Max. d. Match 'D' b. 5 Ft. FROM STA.22+14 -Y1B- LT TO STA.23+14-Y1BRPA- RT, D.1.0 Ft., Class B Rip -Rap N In PROJECT REFERENCE NO. I-5897B SHEET NO. 2D-2 RAY SHEET NO. DETAIL AA LATERAL N' DITCH ( Noffo Scale) Min. D=1 R. 6=5 Ff. ti Slope FROM STA. 698+50 TO STA. 700+50 -L- RT FROM STA. 703+50 TO STA. 707+50 -L- RT FROM STA. 23+09 TO STA. 23+59 -Y1B- LT FROM STA. 37+50 TO STA. 38+50 -Y1B- RT FROM 5TA.19+50 TO STA. 20+93-Y1BRPC- RT FROM STA. 18+45 TO STA. 23+50-Y1BRD- RT FROM STA. 24+00 TO STA. 28+00 -Y7- LT FROM STA. 31+50 TO STA. 32+93 -Y7- RT Shoulder Paint Fi Min.!). SEE BELOW DETAIL AF V DITCH ( Not to Scale) o•0 Shoulder Pint FROM STA. 613+00 TO STA. 616+00 -L- LT, D=1.0' FROM STA. 626+50 TO STA. 627+00 -L- RT, D=1.25' FROM STA. 627+50 TO STA. 628+00 -L- LT, D=2.0' FROM STA. 694+00 TO STA. 698+50 -L- RT, D=1.0' FROM STA. 707+50 TO STA. 709+00 -L- RT, D=1.0' FROM STA. 706+00 TO STA. 710+50 -L- LT, D=1.0' FROM STA 724+00 TO STA. 726+50 -L- RT, D=1.0' Natural Ground DETAIL AK LATERAL 'V' DITCH )Noffo Scale) 1 .. 3 Min. D=SEE BELOW h.5 Ft. Slope FROM STA. 600+00 TO STA. 604+64 -L- LT, D=2.5' FROM STA. 10+00 TO STA. 13+25-YIBRPA- RT, D=2.0' Natural Ground DETAIL AP SPECIAL LATERAL DITCH WHINGE ( Not to Scale) P 6.0' le- Min. D=1.5 FT Sl Slope FROM STA. 755+50 TO STA. 759+00 -L- RT FROM STA. 762+00 TO STA. 771+60 -L- RT FROM STA 762+50 TO STA. 771+65 -L- LT FROM STA. 864+83 TO STA. 871+00 -L- RT DETAIL AU SPECIAL LATERAL BASE DITCH ( Nof to Scale) FROM STA TO STA. DETAIL AZ SPECIAL TOE PROTECTION ( Nat fe Scale) Type of Liner= 13,9,500 TONS Class B Rip -Rap 50 SY Geotextile FROM STA. 508+00 TO STA. 552+00 -L- LT DETAIL AB STANDARD BASE DITCH ( Not to Scale) Natural NnNral Ground Z,� ,LT Groun D Min. D= 5 R. B. 5 R. STA.760+15 -L- LT DETAIL AG LATERAL BASE DITCH ( Not fo Scale) b Natural Ground 3., T W it Min. D=SEE BELOW B=SEE BELOW b=5 R. Fa Slope FROM STA. 529+50 TO STA. 530+15 -L- RT, B=4', D.1' FROM STA. 530+15 TO STA. 531+05 -L- RT, B=4', D-4' FROM STA. 27+00 TO STA. 28+89 -Y1B- RT, B=2', D=1' FROM STA. 19+86 TO STA. 22+14-Y1BRPA- RT, B=6', D=3' DETAIL AL SPECIAL CUT TRANSITION DITCH )Nat fo Scale) Natural Front Ground .3; �D 3' es Dike Qet Slope Min. D=2.5 Ft. B=Var. 0-4 Ft. FROM STA. 37+00 TO STA. 38+50 -SR3- RT DETAIL AO STANDARD 'V' DITCH ( Not N Scale) Min. D=SEE BELOW Type of Liner= Class B Rip -rap Max. d=1.0 Ft. STA. 47+08 TO STA. 48+59 -EY18- LT, D=1.25' STA. 28+80 TO STA. 29+20 -Y5- RT, D=1.25' STA. 43+85 -Y5- LT, L=20', S=8.5%, D=1.00' BEG. EL. - 162.39, END EL. - 160.69 STA. 10+20 -Y21- LT TO STA. 599+50 -L- RT, D=1.25' STA. 771+52 TO STA. 771+72 -L- LT, D=1.5' DETAIL AV PIPE OUTLET CHANNEL ( Not fo Scale) CHANNEL d= 1.5 Ft. iFo k) Length (Left Bank - Looking DS). 110 Ft. Length (Right Bank - Looking DS). 110 Ft. Est.= 220 Tons Class I Rip -Rap, 285 SY Geotextile STA. 530+15 -L- RT DETAIL BA SPECIAL CUT DITCH (Not to Scale) Natural Ground GeofeHile Type of Liner= Class B Rip -Rap Front Ditch Slope Min. D=1.25 Ft. Max. d=1.25 H. FROM STA 10+20 TO STA. 11+25 -Y21- LT DETAIL AC TOE PROTECTION ( Nat fa Scale) Natural Ground d= 2.0 Ff. b. 4.0 H. Type of Liner= CL B Rip -Rap Geotextile FROM STA. 592+75 TO STA. 599+00 -L- LT FROM STA. 796+91 TO STA. 801+88 -L- LT FROM STA. 791+87 TO STA. 801+87 -L- RT FROM STA. 804+68 TO STA. 816+77 -L- LT FROM STA. 804+17 TO STA. 815+20 -L- RT FROM STA. 898+38 TO STA. 902+09 -L,- LT FROM STA. 902+58 TO STA. 906+96 -L- LT FROM STA. 897+99 TO STA. 902+08 -L- RT FROM STA. 902+58 TO STA. 906+73 -L- RT FROM STA. 18+67 TO STA. 20+87 -SR3- RT FROM STA.16+90 TO STA. 15+15 -Y4- RT FROM STA. 29+00 TO STA. 32+40 -Y4- RT Natural Ground DETAIL AN STANDARD 'V' DITCH ( N. to Salk) Natural Ground Min. D=SEE BELOW STA. 54+20 TO STA. 55+22 -EY18- LT, D=1.5' FROM STA. 36+12 TO STA 36+50 -Y1B- LT, D=1.0' DETAIL AM SPECIAL CUT DITCH (Not to Scale) Min. D=2.5 Ft. Front Ditch Slope FROM STA. 38+50 TO STA. 43+50 -SR3- RT FROM STA. 36+13 TO STA. 36+50 -Y1B- LT DETAIL AR LATERAL BASE DITCH ) Not fo Scala] 'When B is < 6.0' Type of Liner= Class I Rip -Rap Min. D=1.0 Ft. Max. 8=1.0 H. B= 2.0 F1. h= 5.0 Ft. FROM STA. 26+25 TO STA. 27+00 -Y1B- RT FROM STA. 30+75 TO STA. 31+00 -Y4- LT DETAIL AW LATERAL BASE DITCH ) Not ro Scale) "When B is < 6.0' Type of Liner= Class B Rip -Rap Min. D= 1.5 Ft. Max. d= 1.5 R. B. 4 Ft. b= 5 Ft. FROM STA. 574+80 TO STA. 575+70 -L- RT DETAIL BB CHANNEL IMPROVEMENTS ) Naito Scale) Nab. Natural Ground 3.,ryd e Ground A'gao� B=SEE BELOW IBI STA. 514+00 -L- RT, L=866', S=0.00%, B=6' BEG. EL. =161.2', END EL. =161.2' STA. 531+05 -L.- RT, L=500', S =0.00%, B.4' BEG. EL. =159.5', END EL. =159.5' STA. 18+75 -Y4- LT, L=140', S=0.51%, B=6' BEG. EL. =151.5', END EL. =150.8' DETAIL AD LATERAL BASE DITCH ( Not to Scale) Natural Ground l; 3J Ltd b Min. D=1.5 Ft. B= SEE BELOW b=5 Ft. ra Slope FROM STA. 677+25 TO STA. 684+50 -L- RT, B=4' FROM STA. 20+50 TO STA. 22+50 -Y1B- RT, B=3' FROM STA. 34+87 TO STA. 37+50 -Y1B- RT, B=2 FROM STA. 31+50 TO STA. 37+00 -Y6- LT, B=2' Natural DETAIL Al LATERAL BASE DITCH (Noffo Scale) Ground 3., T Min. D=2 Ft. B=4 Ft. b=5 Ft. HI Slope FROM STA. 10+50 TO STA 12+38 -SR3- RT FROM STA. 20+95 TO STA. 25+50 -5R3- RT FROM STA.14+00 TO STA.16+50 -Y4- RT FROM STA.17+00 TO STA.18+75 -Y4- LT DETAIL AN SPECIAL CUT DITCH ) Not to Scala) Min. D=0.5 Ft. Front Ditch Slope FROM STA. 42+00 TO STA. 43+29 -SR3- LT FROM STA. 45+00 TO STA. 46+50 -SR3- LT DETAIL AS SPECIAL CUT BASE DITCH WHINGE ( Not. Scale) Natural Ground Min. D= 2.0 FT B= SEE BELOW Fro. Ditch Slope FROM STA. 775+00 TO STA. 797+00 -L- LT, B=4' FROM STA. 817+50 TO STA. 838+00 -L- LT, 8=4' DETAIL AX STANDARD BASE DITCH (Not fo Scale) Natural Natural Ground 3.o T M1.\ Ground all Geotexdk 'When B 5 < 6.0' Type of Liner. SEE BELOW Min. D= 1 Ff. Max. d= 1 Ft. B. SEE BELOW FROM STA. 21+21 -SR10- RT, L=20', S=2.5%, B=2', CL B RIPRAP BEG. EL. =155.5', END EL. =155.0' STA. 20+50 -Y1B RPB- RT, D=1.0', B=2', CL I RIPRAP FROM STA. 18+75 TO STA. 1950 -Y4- RT, B=4', CL B RIPRAP DETAIL BD STANDARD BASE DITCH (Noffo Scale) Natural Ground all Geotextile 'When B is < 6.0' Type of Liner. Class I Rip -Rap Natural Ground Min. D= 2 Ft. Max. d. 4 Ft. 8= 4 Ft. STA.591+50 TO STA. 592+50 -L- LT, L=115', S=0 39% BEG. EL.=143.95', END EL.=143.50' DETAIL AE SPECIAL CUT BASE DITCH (Not to Scale) Natural Ground 3., 1 D Min. D=1.5 Ft. B=4 R. Front Ditch Slope FROM STA. 684+50 -L- RT TO STA.15+00-Y1BRPC- RT DETAIL AJ SPECIAL CUT BASE DITCH ( Nof fo Scale) Ground J., D Min. D=2.5 Ft. Front Ditch Slope FROM STA. 25+50 TO STA. 37+00 -SR3- RT DETAIL AO SPECIAL LATERAL 'V' DITCH ) Not to Scale) FR SIOPe Min. D. SEE BELOW FROM STA. 696+50 TO STA. 702+50 -L- LT, D=1.5' FROM STA. 34+00 TO STA. 35+00 -Y5- RT, D=1.5' DETAIL AT STANDARD BASE TAIL DITCH (Notto Scale) Natural Natural Ground, 3.� Ground Min. D=2.5 Ft. B= 4 Ft. STA. 536+82 -L- RT, L=80', S=0.25%, B=4' BEG. EL.=158.95', END EL.=158.75' DETAIL AY HEAD DITCH IMPROVEMENT ( Not. Scale) Natural Natural Ground 3.7 3.� Groun Min. D= 6 Ff. B= 3-18 H. FROM STA. 514+00 -L- LT FROM STA. 529+35 -L- LT DETAIL BE FALSE CUT ) Notto Scale) y 1 W=2 Td. Min. Min. D=1.5 Ft. FROM STA. 592+50 TO STA. 599+00 -L- LT ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/ W ACQUISITION MOTF MACDONALD 18 E, LLC LICENSE N0. F-0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M 7621 Pudoy Road, Suite 115 Fuquoy-Varina, NC 27526 (919) 552-2253 MOTT www.mollmac.com MACDONALD NC License No. F-0669 ETHIERILL Rz Loner, , nittwe TT:RING Fn:�sis esi eim PERMIT DRAWING SHEET 3 OF 80 0` N In PROJECT REFERENCE NO. I-5897B SHEET NO. 2D-3 RAY SHEET NO. DETAIL CSR 1-1 INLET TYPICAL (LT TO RT LOOKING DOWNSTREAM) 2 @ 8'x8' RCBC 2' THICK NOTE: SILLS TO BE LOCATED AT THE INLET AND OUTLET ONLY CLASS II RIP RAP Ifr W/GEOTEXTILE ON BANKS ONLY M,. (TYP.) 1' SILL (TYP.) EXCAVATION CULVERT BURIED 1' (TYP.) BACKFILL W/NATIVE MATERIAL PER SPEC. NOT TO SCALE V//A EXCAVATION • 5 CY CLASS II RIP RAP • 80 TONS GEOTEXTILE . 30 SY STA. 677+13.2 -L- LT DETAIL CSR 1-2 OUTLET TYPICAL (LT TO RT LOOKING DOWNSTREAM) 2' THICK i' CULVERT BURIED 1' (TYP.) BACKFILL W/NATIVE MATERIAL PER SPEC. NOT TO SCALE 2 @ 8'x8' RCBC NOTE: SILLS TO BE LOCATED AT THE INLET AND OUTLET ONLY CLASS II RIP RAP W/GEOTEXTILE ON BANKS ONLY (rYP.) 1' SILL (TYP.) EXCAVATION EXCAVATION . 11 CY CLASS II RIP RAP • 50 TONS GEOTEXTILE . 20 SY STA. 677+13.2 -L- RT DETAIL BF STANDARD BASE DITCH TRANSITION ( Not to Scale) Natural Ground \3.7 e' 91�et B. SEE BELOW Natural Ground STA.514+04 -L- RT, L•55', B.12'-6' STA. 530+95 -L- RT, L•50', B.14'-4' STA. 555+95 -L- LT, L.20', B.2'(EXIST. CHANNEL)-12' STA. 621+12 -L- RT, L.60', B.16'-6' STA. 47+50 -Y5- LT, L.50', B.6'-12' STA. 48+55 -Y5- LT, L.66', B.12'-6' DETAIL BG SPECIAL CUT BASE DITCH W/EARTH BERM ( Not to Scale) Ditch Slope B.4.0 F. Min. D.1.0 Ft. b b•2.0 Ft. NG FROM STA. 796+50 TO STA. 796+80 -L- LT DETAIL CSR 2-1 INLET TYPICAL (LT TO RT LOOKING DOWNSTREAM) NOT TO SCALE GROUNDNATURAL 1 DEPTH +)- 4' CHANNEL WIDTH 6' EST TON CLASS '1' RIP RAP • 53 TONS EST GEOTEXTILE • 112 SY (TYP) CLASS 'r RIP RAP W/GEOTEXDLE (TYP.) DDE • 260 CY STA. 708+48.43 -L- LT DETAIL CSR 2-2 OUTLET TYPICAL (LT TO RT LOOTING DOWNSTREAM) NOT TO SCALE NATURAL GROUND DEPTH +A 4' CHANNEL WIDTH APPROX. 6'- 7' EST TON CLASS 'r RIP RAP • 20 TONS EST GEOTEXTILE • 28 SY CLASS '1' RIP RAP W/GEOTEXTILE (TYP.) DDE • 85 CY DETAIL CSR 3-1 OUTLET TYPICAL (LT TO RT LOOKING DOWNSTREAM) NOT TO SCALE CLASS '1' RIP RAP W/GEOTEXDLE (TYP.) TO TOP OF BANK 4— NATURAL GROUND CHANNEL WIDTH VARIES FROM APPROXIMATELY 10 FT. WIDE @ RCBC OUTLET FACE TO 15 FT. WIDE DOWNSTREAM OF RCBC OUTLET FACE EST TON CLASS 'I' RIP RAP . 68 TONS EST GEOTEXTILE . 111 SY STA. 23+47.75 -Y6- LT DETAIL BH SPECIAL CUT DITCH ( Nol to Scale) Natural Ground Geoteeae Type of Liner•Clasx B Rip -Rap Front Ditch Slope Min. D•0.5 Ft. Max.6•0.5 Ft. FROM STA. 43+00 TO STA. 43+29 -SR3- LT STA. 708+48.43 -L- RT DETAIL CSR 4-1 INLET/OUTLET TYPICAL (LT TO RT LOOKING DOWNSTREAM) NOT TO SCALE NATURAL GROUND 1 — i CLASS 'II' RIP RAP W/GEOTEXTILE (TYP.) DEPTH +A 7' CHANNEL WIDTH APPROX. 28' EST TON CLASS 'II' RIP RAP . 245 TONS EST GEOTEXTILE . 100 SY RIP RAP TO SLOPE FROM CULVERT INVERT TO BED IN 25' CLASS 'II' RIP RAP W/GEOTEXTILE CLASS 'II' RIP RAP NO GEOTEXTILE IN BED DDE . 100CY STA.902+33 -L- ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/ W ACQUISITION MOTT MACDONALD 18 E, LLC LICENSE NO. FA669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M 7621 Porky Road, Suite 115 Fuquoy-Varina, NC 27526 (91W9) 552-2253 MOTT .mottmac.com MACDONALD NC license No. F-0669 ETHERILL 1323375 61314 TIERING Fn:�sis esi eim PERMIT DRAWING SHEET 4 OF 80 PROJECT REFERENCE NO. O 1- LLJ LLJ V) LLJ LLJ V) 0 0 Cn N LC) NE -L- ST 2 U -a n 5 -o _-c0 0- o, 01 C 0 7 1 2 E 0 0 00-0 0 cx c02 OiwLL x I• �w 57 PERMIT DRAWING SHEET 5 OF 80 100' GRAPHIC SCALE SPECULLO REMOVE 0' LEE MORRISEY ARDELLA MORRISEY p0 100' HEAD DITCH IMPROVEMENT EST. 20 LF @ 0.05% SLOPE EST. DDE 7 CY SEE DETAIL AY REMOVE —_CC,aElL_LR1P_RAP X +�T�TMC X X X CEST. 33 SY LPA•WWI — CAPE FEAR PROPERTY VENTURES, LLC WOODS T FO 7 u/C %NL • —ww• ° FLOWABLE FILL SR 1760 DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER SPECIAL TOE PROTECTION CL. B RIP RAP SEE DETAIL AZ N 04^OB'I" LOT.11 NO CLAIM N 04107'41" E '0E000' NO CLAIM EXISTING R/W ------------ * * * * * N 04 07'41' E 5.29' X.4 —1 ,o 7 — Fu=T EDAR GROVE CHURCH RD /8' BST T XFO X X X TB 2GI-A 54" RCP -III 20 CI A TRENCHLESS INSTALLATION 54" WELDED STEEL X PIPE OUTLET AT CHANNEL CL. I RIP RAP SEE DETAIL AV LATERAL 4' BASE DITCH SEE DETAIL AG SPECIAL LATERAL V DITCH SEE DETAIL G EMOVE FLOWABLE FILL TB 2GI-A 15" TB2GI 15" RCP -IV TB 2GI TB 2GI TB 2GI 15" RCP -IV N 04'56'101 E 100.71' DENOTES MECHANIZED CLEARING DENOTES EXCAVATION IN WETLAND N 04156'10' E 106.00' CULTIVATED FIELD -EY18- PC Sta. 48+39.80 i 111 HW Put �_ 0 T FO 7 N 04.56'10' E 109.23' CAP STANDARD V DITCH ,N MdCL. B RIP RAP EST. 60 TONS EST.130 SY GT SEE DETAIL AQ TV FO —8S yy X -SFEPIT TRENCHLESS INSTALLATION 36" WELDED STEEL 15" RCP -IV TB 2GI + 18" RCP -IV :L 24'BST -L- N 4° 03' /4.3" E 1-95 NBL 24'8ST �eLgssd• l''.�dy_ X �� �, °_ CHANNEL IMPRO _ +tR ' � � �� ■1�.s'r�'3rv-* +E 9E 6E iE * * 9F * 96 a '�'�.�... �- DDE 445 CY �' _ _e lum— SEE DETAIL BB WOODS MARGARET LIJIJ EVERETTE JAM SCHEV RETppIE CULTIVATED FIELD 42" WELDED STEEL TB 2GI-A TB 2GI-A STANDARD 4' BASE TAIL DITCH DDE - 15 CY E DETAIL AT LTl 1-5987B SHEET NO. 7 RAN SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR 4/W ACQUISITION MOTT MACDONALD 18 E, LLC M01T MACDONALD 16 E, LLC LICENSE NO_ F.0669 LICENSE NO, F.0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M 7621 PurlV Rd, Suite 115 OTT I'nn• NC 27526 MA CDONALD wV.w.mo mac, ombme5s NO CLAIM WIC NAD 8 2011 FEAR PROPERTY VENTURES SPECIAL TOE PROTECTION CL. B RIP RAP SEE DETAIL AZ N 0410' I 84.26' NO CLAIM LLC O ?5 PF FO—r —2rPR —TV — FLOWABLE FILL EXIST. 18" RE, Ef9VE - S 18" RCP -IV 42" RCP -III FLOWA: LE FI L 0 MOVE-32 LA FIST 18" RCP - TS Sta.537+01.64 CL. I RIP RAP EST. 20 TONS EST. 39 SY GT r15" RCP -IV 75 -L- SC Sta.539+0/.64` SPECIAL LATERAL 4' BASE DITCH SEE DETAIL F B'WWISBW X X/C�". SAMUEL J. HOWARD SEE SHEET 6 OF 80 FOR ENLARGEMENT -L- Pls Sta 538+34.97 Pt Sta 546+0659 es = 0° 59' 535° A = 14' 00' 11.8° (RT Ls = 200.00' 0 = 0° 59' 53.5" LT = /33.34' L = 1.402.87' ST = 66.67' T = 704.95' R = 5,740.00' TB 2GI TB 0 0 d Q N cr PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING SHEET 6 OF 80 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ JRR DENOTES IMPACTS DENOTES SURFACE STANDARD 4' BASE TAIL DITCH DDE = 15 CY EJ:__TAIL AT TEMPORARY IN SURFACE WATER IMPACTS IN WATER * * * * * * * * DENOTES MECHANIZED CLEARING DENOTES EXCAVATION IN WETLAND ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER INCOMPLETE PLANS DO NOT USE FOR It ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED I S S/o. \( 01.64 CL. I RIP RAP EST. 20 TONS EST. 39 SY GT C U1 L 0 r 5 -0 In C 1_ IG 0 2 —o Ny ED D0 9- HOC c O L• DwC MD) CC w 0 Z 1- LJJ LL L/) LLJ W (1) 0 0 0 0 0' N LJJ J PERMIT DRAWING SHEET 7 OF 80 GRAPHIC SCALE LEE MORRISEY AND ARDELL MORRISEY /6s IN TALLAT OH165 54" WELDEO,STEEL O Ln PIPE_ OUTLET ATstHANNECI SE I ET IL 4V SEE DETAIL AV Y. LATERAL 4' BASE DIT SEE DETAIL AG L SPECIAL LATERAL V DITCH SEE DETAIL G DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER CAPE FEAR PROPERTY VENTURES, LLC WOODS N 04'0e'I 107.11 NO CLAIM 23, * * * * * * * * * N 04.07'41" E 106.00' NO CLAIM N 0407.41'E 5.29' x DENOTES MECHANIZED CLEARING DENOTES EXCAVATION IN WETLAND N 04'56'10. E N 04.56'10' E 100.71' 106.00' CULTIVATED FIELD SPECIAL TOE 1 HW PROTECTION CL. B RIP RA SEE DETAIL J svT — T_ _ — _ _ — — — — — — — T Fo -EY18- PC Sto. 48+39.80 i N 04'56'10' E 109.23' CAP STANDARD V DITCH N vlCL. B RIP RAP EST. 60 TONS EST.130 SY GT SEE DETAIL AQ FLOWABLE FILL TB 2GI-A MARGAAR SR 1760 x SOAR GROVE CHURCH RD /8' BST L 24' BST Q -- /-95 NBL 24'BST ETTE C. E ERET),( 7E / F 0 L LATERAL V DITCH D AIL G 42" WELDED STE STANDARD 4' BASE TAIL DITCH 42 15 CY ED" -,T x 99I TRENCHLE . ' GI TB 2GI CULTIVATED FIELD 591 FLOW BSLE_FILL FLOWABLE FICC- EXIST18" RCP ha ° 537+0/°64 - CL. I RIP RAP EST. 20 TONS EST. 39 SY GT 1 NAD 8 1111 0 N 04'5611' E 109.83 NO CLA FEAR PROPERTY VENTURES —L— SPECIAL TOE PROTECTION CL. B RIP RAP SEE DETAIL AZ N 04°56'10' E N 84.26' NO CLAIM , LLC " RCP -IV - SC Sto. 539+0 SA EL J. HOWARD Pls Sto 538+34.97 PI Sto 546+06.59 es = 0' 59' 53.5° s = 14' 00' 11.8' (RT Ls = 200.00' D = 0' 59' 53.5' LT = 133.34' L = 1,402.87' ST = 66.67' T = 704.95' R = 5,740.00' PROJECT REFERENCE NO. 1-5987B SHEET NO. 7 RAV SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR 'R/ W ACQUISITION MOTT .1.6=NALD L 6g E, LLC CENSE NO. F-0669 MOTT LIECDNNAD4, LLC DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in She Office of: M 7621 Purfoy, Rd, Suite 115 MOTT M Fuquoy-Vodna, NC 27526 MACDONALD www.mot:mac.wm4me:icaa NO tiles CLAIM 0 0 0 0 L) N — J PROJECT REFERENCE NO. SHEET NO. CO Ings\I5987B_sltel p p .dg Ironmentai\D w w 7 co 0 p kP— on—D_ Z 0 w SITE 1 -Ll- 530 + 00 175 PERMIT DRAWING SHEET 8 OF 80 ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 170 165 1 155 0 4 N 12 3.1 SS @77 7* , / , Ws ELEV 161.75 S KE • • W • @48" RCP -I 0.3% V V/ 2 @ 5 W 4"T RE ELDE D N / , CHLES STEEL 200 -150 -100 -50 0 INV. OUT =160.32 CL (FT) 0 • INV. IN =160.50 BED INV. IN =160.29 INV. IN =160.04 S 3% T OP • • • OF BA TOP O PROP C N F H 7 • • PROP • • OS XIS R BANK LE ANNEL E D Ti OA • FT/ D 0 Y AD G R 0 50 100 150 U BED INV. OUT=159.59 INV. OUT =159.34 N cv PERMIT DRAWING SHEET 9 OF 80 GRAPHIC SCALE DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER CALVIN T. WILKERSON CALVIN T. WIL ERSON LATERAL 2' BASE DITCH w/CLASS I RIP RAP EST. 21 TONS EST. 35 SY GT SEE DETAIL AR A� W000S Y INVERT 11pq —Airlet, cL. PUE ST1.11 1 y/: SEE SHEET Td'OF 80 FOleFNIARGEME N 33 35'W SEE SH ET 11 OF 80 FOR ENLARGEMENT TOE PROTECTIO 0p5 w/CL B RIPRAP EST. 175 TONS EST. 390 SY GT SEE DETAIL AC TB 2GI CL. B RIP RAP EST. 1 TONS EST. 5 SY GT //5 P1 Sta 30+01.84 A = 36' 39' 06.9" (RT) D = 4' 46' 28.7" L = 767.64' T = 397.47' R = 1,200.00' R0 = /92' WV SAMUE4 J. HOWAR9, —Y4— P1 Sta 36+46.08 A = 0' 27' /6.8" (RT) D = 0' 04' 58.6" L = 548J4' T = 274.07' R = 69,075.48' RO = NC LOUVA Y. DANIEL REMOVE TIE TO EXISTING DIt63H 38°°35,9,E SP-' IAL LATERAL V DITCH 8ff R TAIII G V DITCH SEE DETAIL G CL. B RIP RAP PUE T 8 og5SY G� \ P1 Sta 41+/2.18 A = 0'11' 20.8" (LT) D = 0' 02' 57.3" L = 384.05' T = 192.03' R = 1/6.354.33' RO = NC AGF SPECIA CIIL TH\\ ITCF � SEE DE\ HARRY L. GORE AND WIFE, RUTH A. GORE ISBRD PROJECT REFERENCE NO. SHEET NO 1-5987B I 40 RAN SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS 00 NOT USE FOR /W ACQUISITION MOTT MACDONALD 15 E, LLC LICENSE NO. F-0669 MOTT MACOONALD I & E, LLC LICENSE NO. F-e669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared m the Office of: P W000S M 7621 Purfay Rd, Suite 115 MOTT Fequay-Varina, NC 27526 MACDONALD w"w.moHmaC.Comfimericas ROI/ IE E. SKINNE AND WIFE. W DA P. SKINNER \I Fo 4Y 0 cr cr cn c Q 0 a co OL RD 0 E 0 O i, PERMIT DRAWING SHEET 10 OF 80 A' 0' AS' iiiii SSA S SS ItVift Ilk vilt 1 'MEW AWN �I ;p �� __67L --- 4 S� DENOTES FILL IN WETLAND DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES MECHANIZED CLEARING TB 2GI S / S PROJECT REFERENCE NO. SHEET NO. ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER INCOMPLETE PLANS DO NOT USE FOR E/ W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Rcp-III UM niiimm Iffielim."-Wilagunkosstorosissiattliennicattessweistak • \ 44 At. � S S ;t0111NWF DI I P Ings\ 5987b_rdy_ psh_ 4m_ blowup2.dgn 0 N co a c N -rf o m 7 \�coCCU. PERMIT DRAWING SHEET 11 OF 80 ?R' 3' JRAR FILL IN WETLA D DENOTES FILL IN WETLAND WZ PROJECT REFERENCE NO. SHEET NO. ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER INCOMPLETE PLANS DO NOT USE FOR a/w ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED \, IME WETLAND CLEARING I I CD N 37°43/15" 1/I/ 30 72/ SITE 4 DENOTES MECHANIZED CLEARING 1-5987B 40 PERMIT DRAWING SHEET 12 OF 80 100' GRAPHIC SCALE F j * * * ** * * �r > DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER l\CALVIN T. WILKERS k �'055� L,gO TOE PROTECTIOWIippps w/CL B RIPRAP EST. 175 T S / EST. 390 SY GT \ SEE DET AC 7 / 0 CALVIN T. WILKERSON zo RA2' BASE DITCH LASS I RIP RAP 21 T NS 35 GT E IL AR Sst 4' wv SANgst9 1'''J.. H0W/iRl 541I� -Y4- Soo, 7272, PI Sto 30+01.84 A = 36' 39' 06.9" (RTl D = 4° 46' 28.7" L = 767.64' T = 397.47' R = (.200.00' RO = 192' PI Sto 36+46.08 PI Sto 41+12J8 A = 0' 27' 16.8° (RT1 A = 0' 11' 20.8° (LT) D = 0' 04' 58.6° D = 0' 02' 57.3° L = 548.14' L = 384.05' T = 274.07' T = 192.03' R = 69.075.48' R = 116.354.33' RO = NC RO = NC LOUVA Y. DANIEL �6-35,9, E /5 0 55/.68' ti 6, HARRY L. GORE AND WIFE, RUTH A. GORE IS RW SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR T®W ACQUISITION MOTT MACDONALD ID E,LLC LICENSE NO. F-0669 MOTT MACDONNALO.DF-0618 69LLE, C LICENSE DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared .n the a Office f: M M 7621 Purr Rd, Suite 115 MOTT Fuquay-Vmina, NC 27526 MACDONALD www.moRrnac.comhmerkaz S 253g"0 . RO W IE E. SKINNE AND WIFE, DA P. SKINNER PROJECT REFERENCE NO. SHEET NO. CO Ir 0 co CO CO In 0 0 0 0 0 H CC 0m �=w 170 165 160 u_ Z 0 155 w W 150 145 BED INV. OUT=141.37 INV. OUT=140.37 140 SITE 3 -Y4- 31 + 05 PERMIT DRAWING SHEET 13 OF 80 3: 1 6 S 9 S S KE W A P R 0 PO 1 SE D ROADWAY EXISTING GROU ROADWAY NWS 1 J 7 2 II 1 RC • 0 P -I V • 1 ND/ ELEV 43.3 NATU 2 RA L OP-0 TOP F 0 F ///V/I:< BED -100 -50 CL (FT) 50 100 INV. N N v .IN 141 ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED UND K LEFT K RIGHT =142.99 .99 G RO .AN BAN c) 1 50 140 30 2 0 10 100 90 ®C 70 60 5C 4C 3C 2C 1D 0 10 6C 7 C 10 0: 0 5 10 "0 PROJ. REFERENCE NO. I-5987B 120 130 • SHEET NO. X-587 T'l==12 \EM:7'1 LIM LR.'.R.' S ITE-3 rn P E RM H E E T T D RAV`: 14 OF 79 i7n TF0 0 .080 0 080 0 n WETLANDS 3.1 rFn 5n r40 4 ,7n 0;080 f/ 0 —t rzn /0 113 i70 21 WETLANDS WETANDS J 0 080 31 + 00.00 r-n n r40 / 0.080 0 080 30 + 50 00 L .1 ,fin a ■ /0 ?n [t4n 5n 4 0 0 1 50 1 40 130 12 0 10 100 90 8 0 7 0 60 50 4C 3C 20 10 -Y4- 0 10 20 30 40 5C 6C 7 0 80 90 100 10 120 130 1 40 1 5 0 w w ME=MIMETEMM!=MMgMS 0 5 10 PROJ.REFERENCE NO. SHEET 111111111111111111111111111111111 111111111111111111 111111111 ■ ■ . ■I-5988x-73I1II1III,I1II I� !11�11111111!11�111111111111111111�1I�111111111�1�11111111_.I�11111 o I■ 0 110 1 z o 1,0 1 0 1 q...i , , ;, ' ,' 1� 1� , , , ,, 11it1111111111111111111111111111111111 ill11111111111111111111111111111111111111111111l1111111 II ;IIIII ,:!I �ll, E RM I T DRAWING i, ji' �IIi lll� ;; ■■ SE ..;;,,,III ■ N /.... ■ IIII!IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIII it ` ._•. ■■IIII 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111ninI111111ninI111111ninI1111111111111111111111111111111111111111111111111111111111InnI1111111111 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111� A�11111111111111111111111111111111111111111111111111111111111111111111111 , ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■III`... 1 ...........................................ill , 1111111111111111111111111111111111111111111111rnhllll r !lllll111111111111111111111111111111111111111111I111111,,,,,IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1111111111111111111111111111!!1 11111111111111111111111111111111111111111111111111 11111111111111111111111111111111111111111111111111111111___ nnnu■■■■■■■■■■■■■■■nr�-.�r4`=Leo=�■ ■■■■■■.■,■---■:__■■..■■::G■:■■■■..■■■■■■■... IIIIIIIIIIIIIIIIIIIIIIIIIIIiii ■ ■■■■■■■■■■■■■■■■nnnnnnnnnnnnnnn■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 1•.•.i.11!!!!!!!lii� ■■■■■■111111111111 _ _■■___■■_= ■='-■-iiillllllliiilllllllllllliiii ' ""■ " IIII>>IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII------------------------------------------------------------111111-----------_ 11111111111111111111111111111111111111111111111111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ::::::::::::....iiiiiiiiiiii9l111111111111111111111111111111111111111111111111111111 111111111111111111111!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII.■■■■■■■ 11111111111111111111111111111111111111111111111111■■■■■■■■■■■■■■■■■■■■■■■■■ !!!!!!!!!!!!!!!!!!l1111111111111111� 1111111111111111111111111111111111111111111111111111111'■■■ iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii �������������������������������� !!!!!!!l11111111111111111111111 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111!!!!!!!!!!l11111111111111111111 ..,...■,�,� .,■.�,,, NERN11111111111111111111111111111111111111111������������������������ 11111111111111111111111111111111111111111111111111111111111111111 .■■■■■■■■■■■■■■■■■■■■■■■■■■1111111111111111111111111111111111111111111111111111111111��I!11111�1 Illl�lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll:::IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIl1�111111111i11111111111111111111111111111111111111111111111111111111111111111111111 . , ■ IIIIIIIIII 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 IIIIIIIIIIIIIIIIII11101111IIIIIIIIIIIIIIIIIIIIIIIIIIIII111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIMIIm7rmmrmmmmmmmmmmmmmn"";;;;;;;igli"7Iilit 1"II1 l 6l��Gi1111111111111111111111111111111111111 F I�1 1�� n ■.■ :.■.11111111111111111111111111111111111111111111111111111111111111111111111111 1 111111111111111111111111111111111111111111111111111111111111111!1111111111111111111111!_ll...1l..1l.__I___1!___I___1!__ll_11111111o,_l11.�I��IIIIIIIIII�ii ...•,==.■q-- inifit/lll llllllllll llllllllll llllllllll llllllllll llllllllll llllllllll llllllllll llllllllllllllllllllllllllllllllllllllllllllllllll llllllllll llllllllll llll r II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ,-. rip 1 Al IP o'r 'I11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 i 11111111111111111111111111111111111111111'I� 1 LANDS 111111111111111111111111111111111111 11111111111111111111111111111111111111111"� 111 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 11 IIIIIIIIIII,IIIN.111111111111111111111111111111111;1 11 1111111111111111111111111111111111111111111111 , •, 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 . 11 111 11III11 Il.dilliiii!ilIuiiiiliiIi!!l111111111:!1111111111!!!!!!IJIIIII!!!!!III!!!!! kiiiII"I""IIIlinIIIIIII 11111111IIIIIIII11111111111111111111 __� ■■■ ■■ 14+00.00 r i —R.I •i . M , 1 /� 1 1 M RA in Cn I t% -1" nn '1/. 'fa, 1 fl I1 ^ An ' C I. NO. 7 n 60 PO 7- n n 7t9- Pe- 0 n 0- o- Lc Lo PROJECT REFERENCEBNO. SHEET NO. / DENOTES EXCAVATION• 9 _ _ PERMIT DRAWING IN WETLAND \ EET NO. SHEET 16 OF 80 � /// / 1`O �,1 DENOTES FILL IN E SNEE 8 WETLAND 0 00 SE T22 33_RA N • IATE 2' ROADWAY DEBIGN ENGINEER HYDRAULICS ENGINEER 30N 100' 0' 10�' fJSON ** * * * * O -...�� _/BASE TCH .' DENOTES MECHANIZED S'(P.• 1$ SEE DE 1 INCOMPLETE DO NOT USE FOR PLANS Raw ACQUISITION • • • •• - CLEARING _' J% 1� \ ��_ � GRAPHIC SCALE ` G` '`\ DWIGHT A. ATKINSON, JR. AND WIFE, `r - N to �I';► �0�c SOIL c, l• \ _ 'l'i� -,cii ��.11 -EYI8- POT Sto.77+13.88 AMANDA B BARNHORST p,, Q I / �`I lit '. oak ' � w�S �-2 a �. ,. ,� �� PQc MOrf /MCDONALD 18 E, LLC LICENSE NO. F06b9 MOTE MACDONALD 18 E, LLC LICENSE NO. F-0669 ) 1 — — 'lit ,,.3 416.00-Y4-U. \�� 1 _�,; is `��� � � � � _af� �`c DOCUMENT NOT CONSIDERED FINAL 2 8' \, 65.85'(EX.RIW}< o� ® UNLESS ALL SIGNATURES COMPLETED I I ��'°�°Y �pp,�'4 -\ I vv /nS Office o m the Office f: M oCAPE FEAR PROPERTY VENTURES, LL 9��23(FbiR'V1 - STAND�.�� 4' BASE PIYCH o 0 S CL B RIPRAP '•�1 • ''� 1 \ RIPTO PE -\ I ,. \ EST. \ 50 SY GT ---� ZO 1 0 1 1 M 2621 P°AoY ., Suite 115 MOTT Fuquay-Vamo, NC 27526 AcooNALD .,•,..momm°aomtm"ecw. I EST. 85 SY I LATERAL 4' SPECIAL LATERAL WOODS I I `I , \ 1 HANNEL IMPROVEMENTS \ 4' BASE DITCH \ BASE DITCH PUE iF ;/ p II IY 1 wDE D 230 CY \ E DETAIL BB TRAFFIC DIAGRAM SEE DETAIL F 0 Atli _ 1.. ny 1,�7A P E 1 \ FIIIII SR 1006 PUE U -- P / -�- (W GREAT MARSH CHURCH ROAD) inkA:tifM:°".2'agit...Ar•tllVgraae./� \FADT 2022� 3400 ��1 4sww - ®ca1041111.- EI a11LV TLa:n-av_ V. ��ra �.�_ ayl'1/IICO ADT 2042 7�•- i111_"__ _ _ =_ �,-�— i.n —f Fo -- -- 0 1 .. - II DWIGHT A. ATKINSON, JR. - - n BL 16'esT -S/�4- L — v \r 63800 I-95 1-95 _ _-I _ -w E - - e TV Fo - - --TV FO ry Fo- - - - - i.9'. -TV AND WIFE, ©© AMANDA B BARNHORST 95400 ' �-/" Fo .• — . gypy` — tS e- r,�.� �� .,may _ _ _ x S__ ` � ��� � W �. 29 F 24'F \ - ��A-RlWi�+"ArarirdMrArArAr.��._ IC FES \I I _ " AaN air \\ �O'''I��'Aic� / it \ SPECIAL LATERAL V DITCH ad _ I' SEE DETAIL G I_�raa /� F \ \ SR I II II (E GREAT MARSH CHURCH ROAD) LATERAL V DITCH ( SEE DETAIL M zX in Oi in ® TOP ELE BERM TOP IDE BERM 0' SEE DETAIL V .I No SR4- f . III 100.0o II II \ III TB GI R ,t. _ . \ F '.. : 1 r. in -- _. rn coo�IM Pl Sta 75+9926 Pl Sto 78+69.7/ NI I I a0 I I i CL. I RIP RAP EST. 26 TONS / EST.50 SY GT - k.565+00.00 SEE SHEET NO. 9 R = 3,390.00' R = 3,390.00 RO = 88' RO = 88' X E i B 1 Fl fi \< ( " IATERAL 6' BASE ITCH SEE DETAIL N K Y- \ 41) 577+00.00 SEE SHEET NO. 11 SPECIAL LATERAL ' 1 SITE 6" Y DITCH WHINGE .. .- \� :H6CH A WF� NO�CLAIM 5" RCP -IV I J SEE DETAILS RE X _ - X'�*�F�°iElF7F 'lF aE iE - C .. - .. " ECIAL CUT .. c_ -- _ DITCH v.HINGE - ���f�' �, I 15" v✓2 ELBOWS/�`'.�pr?'�~��Y��/�_®�� .. — .. AIL B - - SEE DETAIL11111401W41 GI•.SEE-DETeu 1- _ -. - r,�/��I./��� -, '�!'�� r�� REMOVE � .. et- - TB _ rNr�-7�—�I1.�_ ONC CONC 0:1111' HW e 15" RCP -IV 15 RCP -IV TRENCH LESS INSIALL4 fION �� I nor. � �I TB 2G1-A - -- P —_ FLOWABLE FILL ¢, W REMOVE 12 LF c+ REMOVE Li Z F O W I I -I SBL 24'BST 15" RCP -IV EXI T. 1 " RCP --- i� r TB 2{}L��_ —--rT62GFJ� REMOVE 30" RCP -IVY REMOVE � -- �5"•. .-�„ 24" RCP -IV N IB' RCP _REMOVE .�DI 1n 36" RCP- -/ L°1-A 'z 'O I TB 2GI I 15" RCP -IV Y is -' - __ - 20._0j'13. E -- —TB 2GI'oo I • r`1 —— a�-L•— TR --- i. in: —CMOVEtF� FXIST lA" RfP ¢ �B 2GI II 25 .J�`L -_ �1 ys NBL zwe5/ — -- m _ --- roffir :$ FLOWABLE FILL TRENCHLESS INSTALLATION— -- MI ���� REMOVE 18 WELDED STEEL ° - FES N CONC L FTB 2eM� -r' iii■-I TB 2CI A _ _ __ N HW - - I�IIIMil� F �. 2GI 18" } , ���l- EMOVE LTCHLINE -L- w• ■� LN 2G NJr 8)CMP F ;���.,,LICi,;, 2� -- -. Ili >� - F LI..I SEE DET6L E-_ �Ii11W� �. �__-. . p Z C SPECIAL CUT RFMOVOV: DITCH v,HINGE TB2GI 15" vd. - +i•a-''_._.;_:�;�'_�� ELBOWS /ems SEE DETAIL A fl l,alg. RCP -IV 010�1•.9 cfs = -L--Y4- f } VIO �1. fps 5 U PI Sto 576+78.99 PI Sta /6+06.46 PI Sta 21+04.05 PI Sto 30+01.84 ' a SEE SHEET 17 OF 80 Fo ENLARGEMENT WF F- z A = 0° 43' 57.9" (FIT) p = ' 03' 10.8° (LT) p = l8' 06' 45.3" (RT) ,L = 36' 39' 06.9" (RT1 D = 0' 12' 03.7° D = 29' 53.6° D = 4' 46' 28.7" D = 4' 46' 28.7" X L = 364.49' L . 6/2.78' L = 379.35' L = 767 64' I I T = 18225' T = 306.46' T = 19/27' T = 397.47' R = 28,500 00 R = /b500 00 R = l 200.00' R = l 200.00' /�,c�T RO = NC RO = 192' RO = 192' CHLINE -Y4- STA. �7+00.00 i CALVIN T. , KERSON I ��© ,TERAL 4' BASE DrrcH WILL. B RIP RAP EST. 50 TONS SEE DETAIL AW SEE SHEETSEE.lOSSYGT No. 40 PROJECT REFERENCE NO. SHEET NO. CP 0 co 0 01 E 0 0 0 E 0 1- 01 -+ 0 (71 O 0 LW �=W colrW PERMIT DRAWING SHEET 17 OF 80 40' 0' ■ ■ ■ ■ ■ 40' DENOTES EXCAVATION IN WETLAND DENOTES FILL IN WETLAND LATERAL 6' BASE DITCH K JCC LJCl/AIL IN / GRAPHIC SCALE * . . * DENOTES MECHANIZED CLEARING - 19J I \ cu\5" SITE /11O5CLAIM • a vE RCP -IV 1 _ I c WF I•( �II i 1'q' I F o v TB I 15" w/2 �� A I N ELBOWS _ ar�� "jar ~��,��jA I P D ti 11 IST441te Al IVA . PI WA .10.4 I I r ri r4 I ?,, T. T TB �TB 2GI REMOVE' - _ 4' RCP 2"_RCP-I Ji 15" RCP -IV 15" RCP -IV GI -A TL TB 2GI 11.1 T s c Z 1- I Q TB 2G-IA-- 10' BST J I-0 co vgo < J Ln 1 „ / 95 SBL 24' BST -I- Z CD 9 TB 2 G 1-4 -13W -ii M 15" RCP -IV z TB 2GI T _ 0 1 25 / 95 NHL 24BSI TRENCHLESS INSTALLATION /0' BST 16" WELDED STEEL _ FES TB 2CI—A 2GI 18" C or 24" RCP IV REMOVE / C X F F F : EMOVE 8" CMP F 8" CMP F F ND NK F N -I 0 D MOVE A I N sr. _ — — —_____ -_ • AIN - _� _ - -_,mowA arse eimmi :-.ir L� F �.I-mil - � ���e� •��a.n@i\��7I��s��•i�@�i���t��i��t•�►•� r •w� VE TB Q _..z....A ...o• _v ; ; • � •=� - - REM x T 15" w/2 • ►► 1� i. _� ,� �' r ELBOWS QO=1.9. fp ,. o 1C * _ I 'RCP —IV v rfVI ; ATE 5 WF 0 z W W (i) W W 577 +00.00 W Z ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER INCOMIPILETE PLANS DO NOT USE FOR T/ W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED m 0� PROJECT REFERENCE NO. SHEET NO. DENOTES EXCAVATION \ 59878 /0 PERMIT DRAWING IN WETLAND NQ • RM SHEET NO. SHEET 18 OF 80•SNEE �r 0A1 "� ROADWAY DESIGN HYDRAULICS //// J` , Q DENOTES FILL IN SE °a' ENGINEER ENGINEER F F QO WETLAND la jr 4 BASE INCOMPLETE E PLANS SEE D 10 LO' Dr IOW DO NOT USE FOR RJR ACQUISITION • • • • ■ • • • • • * * * * SIP`• DENOTES MECHANIZED �,��\ N.,.„, \ ' ' 2` •D CLEARING J h\OW GRAPHIC SCALE GN�,�N ' e SS P(/ \ TKINSON, JR. ...„4,__ WIFE, " sat m �1.\ �_ ►��j'� j 7_��� 4-j\��iJ�Y z BARNHORST -pq* I '°j•'• I ,` ` 8' BSI-` -.mamma yin \ Or ,��A �1 ylO V —.1�`, 4,i �, EW --,` �'y�`� CI \ ��`av�A�r��a MOTT MACDONALD I & E LLC LICENSE NO. F-0669 MOTT MACDONALD 1& E, LLC LICENSE NO. FA669 i iK tiJ \ JXy I l + ����\�\\` T DOCUMENT NOT CONSIDERED FINAL m8 I I 6S�IEX.�� •�{ y ® ` �, 150 1 0�� UNLESS ALL SIGNATURES COMPLETED m, z 1 ,, 1�\ " Prepared in me Office of: M oCAPE FEAR PROPERTY VENTURES, LL I 9 2 TV" To W R� (/ A J ; STANDARD 4'� PfrCH To - --CL B RIP' ,/ I �%s 1\11,13) 1111r • I 1 1 EST. RIP h �' 0� �.. 50 SY GT�� Z 0 M )6n FurfoY ad, Sole n5 MOTT a°a°°Y-Vm°a' NC z)52e MAODONALD wwvr m°H c°mnmer,c°a ES I 11 I ^. LATERAL 4`' 1 SPECIAL LATERAL WOODS EST.•,,,, HANNE ROVE NTS 1 4' BASE DITCH RAT' I BACH U� DE 2 �II DIAGRAM SEEDETAILF qiSE / /TRAFFIC \j I DET I B6Filik I/ / (W GREAT MARSH CHURCH ROAD) ' LiA_ ■ni�1J�I��d 1� / n1 �F //.� / l J ADT 2022 3aoo .% T ��.mA�� • r w C_, W .f�/�tI� e! E'4a.1 a 'esN j••Fs7� r' './ \ 4200 —/■IIIC JIiLe —_ - >iiw r74G;..... , I'i n �( I \ ADT 2042 INo-- vr•+/� .. — _ r _yam V���Gld' viMY 1 4 0 Ls� .✓ S. dv—� am I F 'I (� A. TK NS N. JR. 5. hEB EfA 1R B RD /8' BST -SR4-e o AN 63800 1-95 1-95 — ---- ---- _ Tv ro -Tv SO- -_ = E..- - - -0 ro -t��9' 44J° WIF © ANDA B NH ST 95400 _- - _ j"-T;LFn� .w. .w. _��` Ey .� -74prippor- �- .�._� .w'.�'�'_�.� ..s�•�llS r ma' X ,i X� F0�-2 2 ' ' \ i 6 - 0 41. SPECIAL LATERAL V DITCH a "'� ���„��y� a�T ����✓✓ """ SEE DETAIL G I`AW.� " N. �% \ \ \ 1006 I MARSH CH (E GREAT MARSH CHURCH ROAD) LATERAL V DITCH,....,,0 �., -�- �, SEE DETAIL M n/ mil 160 �aV s� // / a Lri ,6 / ���� ^ \\ _� s - 999 \ 0 I I / 1100.00 'I, / F / /'- J -00.00 SEE SHEET NO. 9 C`J V A [ �160-� /- J 10' WIDE BERM / �- ^ �160.�r TOP ELEV.158.0' V I f SEE DETAIL V • (\\1J ®a ,I IM / I I I y I F J ��p r�� s�'ll �srl\'� _� _ eN• NCD J PI Sto 5+99.26 Sto 78+69.7/ lfY ", m/ = 32' 34.2° ( TJ .L2)= 2' 32' 3 (La t �,6 D - 4/' 245° D = 141 245" woods r L = l 0.45' L = I50 T= 7 24' T- i54' R-�539000' = 3.390.00' 7 Is^- 88' RO = 88' 5— _ x� "I I III 11� I� I �y 1' 1 III I J CL. I RIP RAP a ✓ <� EST. v EST. 50 5Y GT TERAL 6' BMA ITCH ETA N. „Lilo SPECI!}L LATERAL A " ` Z DITCFI wILINGE �2 ` Rn 1 I NO NNNJpJpJp[ 31 RCP -IV I �e J \VY 44 SEE D IL S /� �1 55 /— RE ''. p 3 .E Y ' \A` �,�i'J 1 W J ) CIAL CUT 5 , 1 / RCH wrHINGE "�C F 01 ,MRII1f �p�Y"F ?,1 n IS 1�1 AIL 1\1 I x 7RIi fl I 15" vi2 �� �� I� EL:OW �I��*I/.,I.��ir�J- ;Wr�f�✓'fArf: �/4/6//A!� 6i�� �I IZII'7�/r���L�IIT.�� W Z s -' -''�►i. J _ .`-__ 2GI. Fre1 rn �� SEE DETAIL B i01i 2GI 1- L E ��- J-- �1�1j1d'! � I®ry[ ''Iu1 I i' L \f I '� ���a_ _ -�_ft + ',i l.: sB — i .�■1{p�, w.o//�YIIII_"J� Y�yf1 /���p/JJIIj i-^" �1l� to '\� 9 0� '� � TB Gl LLI . - u �,r t Oho, T F9W-,1 ` •eY a'.. 9'E••: ' NT— IV 15" RCP -IV - 11) `•, _ss . L�:=--� ,, �' �' AR ..3.r YS INSTALLA ffON ,.. �04A.U]F.ids1R-, v7 .- /�U1SI -1 _OSi� 0651 �IR��\�1� RFMOW • O mac— FL• BL -- -- a ABLE FILL /' i L IM i' re 0 �9, \ \\'\ EMI / 95 SBL 24 BST REMOVE 12 LF REMOVE .. " ;�ra� E IFIRMii TB GI REMOV REMOVE-- " RCP -IVY es _ PJY �6=IiCP-N •VE j. '*!'�L" - _�j"f° • 15" RCP MATCHLINE -L- STA. 565 V C _ �8_R6P-�s. !�'r�• _ .- '' -IV _ MATCHLINE -L- STA. 577+ - -_ S[_� -•ai II�C��i - - - TB 2GI - �% TFL _ T: RCMO�' V " R!" EXIST lA= ��` I � I• I_MII 0--- •/ -- FLOWABLE FILL CHLESIN ,• S T. T8" RENWELDE la M ��R I __ TRENCHLESS INSTALLATIO_' -- - - �- - • E / _.. - 1 __ " 150- - 150- / prpr /?-1-. .: _�EEI Z� ONO w �.•r,.tlrr� IE' e1 ill �_�! - _-155� A &A ., r l �► —,a�----- —Ssi -n. 16"FriMiill�,�rbii1ei11M1 �� 1 J © -�'iss/� gyp �� cast �— S9t ��� �J��fi"IG F e��IC�it pi I� � �� SEED i11iI11 v ��1Ywifll���win. hI°I AIL 7 C . ���•, ll'YII���I� = • gt .. �amfi RFAO SPECIAL C ITCH wA TB a}.I c TB.2 w� ELBOWS �� >169"dcfs SEE DETAIL �• i, ��� ffr s RCP-v v11 9 / �, L-*' ,0 S Y4 �, � �� SITE 5 ' PI Sto 57 PI Sto I6+0s. -% Pt St 2 +405 PI Sto \ = 0 ' 57.9�RTJ 03' 10,8° ( J / 06' 45.3° ( 6 39' 06.9 (RTJ I I' /D = 0 /2' 03.7 6 . I' 29' D 4' 46 7° D - 4 46' 28.7° ,,,-\_ �% L = 64.49' _ L . :12.7 ia+�•3? 1 7676J �� \ (� T = 182.25' T = 306.46' t = I9/.27 T = 397.47' R = 28,500.00' R = 11.500.00' R = 120000 R = 1,20000' MATCHLINEN RO = NC RO = 192' RO = 192'SEE —Y4— I IP ISTA. I a ' 27+ 00,00 m WF 19 N �� I ALVI T. KE N `tA • ZTERAL 4' BASE DITCH" 2 iCL. B RIP RAP E.T.50 TONS I EST. 105 SY GT AW SEE SHEET NO. 40DETAIL •"e "s PROJECT REFERENCE NO. SHEET NO. I-5987B II PERMIT DRAWING DENOTES IMPACTS IN EET Na SURFACE WATER 201, ROADWAY DESIGN HYDRAULICS SHEET 19 OF 80//� — ' �J ENGINEER ENGINEER DWIGHT A. ATKINSO / ,JR AND WIFE, AMANDA B BARN ORST /. (7 /� i DENOTES TEMPORARY IMPACTS IN SURFACE WATER INCOMPLETE DO NOT USE FOR R/W PLANS R6W ACQUISITION 100' 0' 100' ■ ■ ■ ■ ■ _ GRAPHIC SCALE/ MOTE E, MACUME ALD 18 E, LLC LICENSE NO. rbb9 CENSE NO. F0669 // DENOTES EXCAVATION IN WETLAND DOCUMENT UNLESS T O SI ERED NOT CONSIDERED FINAL ALL SIGNATURES COMPLETED m the 3 /�/ DENOTES FILL IN KEITH-PERRY. LLC ® WETLAND tired M M )621 Pudo Rd, Suile 115 Fu uap 99 66,,NC 2215 M>CroorvnLo mfimericas ',P NO CLAIM KEITH-PERRY, LLC I DENOTES MECHA IIZED aS CLEARING f WOODS WOODS t 0 e 'y TF -L- PRC Sto.578+61.23 -L- PT Sa.584+5.9/ WF \ \k \k * SITE 5 `tF CL. B RIP RAP - O CL.��gg RIP RAP Y` EST. qq��JJONS `� • EST13 TONS EST. 7 SY GT - TOE PROTECTION `K \k SPECIAL LATERAL EST. P`SY GT y . EXCAVATI 1 LIMIT SITE 5 '' T— O Z K `L l� SPECIAL LATERAL 6' BASE DITCH SEE DETAIL E ISTF�G SEE DETAIL W EST 2 RT TONS \k. 6' BASE DITCFL `tL SEE DETAIL F ST. 7 SY GT Fr l\ R/.r�. `L l� EMP IMPACTS IN \ \k B RIP RAP RFACE�VIATER ST. 1 ttYNS �, E TO W TRKPAD \cfST. S SY GT ! E F. _ O Z - - . XS: X X X --X X X X ., .. �� ..- - _ X ' � �IS � W dy���9' .��s ,l.��� s yos� .Y%. �� rs+s .. srr rAvAri it a►,r.... t . ...srAwrirAnww:�/� . - a I �._ Wi -, :-- - -. -. tea Imarlsq�r/l�%ROY,,Ar der a. - -. _ .,•__. yur i�!Z. , _ >rs_�9. mra.., J P'tt— _ .RCri� _ . ; . , , , , ,'��� ..ja,; V L,i�"'�. N R. �i����'�//I�=� ..,iiii/�.,I.�!!�%r.�� ��/� .rr. �.�i��������L!& .LO TB 2GI 1 - - - � �=�i_. ■_ INER�RIeE MBuLME�u V) ROADWAY Q%IMlri i=wai i iI - - --- TB 2GI O AMIMMIMINI� 1-95 SBL 24' BST REM. 11uj VE 111=11''_E►1.RR1reL•>ri i1 f.ST �II �,i3 1151 uR In I I u II REMOVE Q —_-- —J��l = 'I --- 0 0 oV) N TB 2GI D� �ir■Gii. i'�___ € TB 2GI J. it 7J, REMOVE 1 CON.. IIIII RDI ---_ _ 15" RCP -IV `�o TB 2GI 15" RCP -IV �i■��I4'I ���' ff - iRiy' N. �B_2Gr i -- --- TB 2GI Ali _ I"'R"%:'" ' III �I r 03.2° E� ;1= j --- 15" RCP -IV FLOWABLE FILL cr N _ �_ _ I-95 NBL 2 Ev TB 2GI �IAN i�_`/� Rt e•R ilI1��R 1� TB 2GI w co • FLOWABLE FILL REMOVE aes --- — nn���� l �_RR ' -- — 14 Q-- oeI PLOWABLEI� ipII �p i' I w/ I�. - - _- _� TB,-2Gy -Marilli �� MOM_ �, _ --- F y ax.-eor�.S , L RR �. /�17i��II�uu11 .R! - •�! C�.`,. v I j_Y � ... ' 14" ������%7��/i►I{ I 4/ I�mmRu n ,IMPACTS Pi ax IN � l —I LLB .iilrii� ma`s �liu u u uP RiRJi m R R r 9E iF SURFACE WAT �R _..._ .. s.:.: xxxxx �T� --_ —__ - ��.Ai s rs.',ararr®.II/®:r �.. iamb air Av A R R!' _ .r.o7, LtTow6- • Riw-- LLI Z . dF iE iEH v asv `- IIIMMISIMEIN ‘111121 .�� Ai �fI 4 4q, I�R iu _ 1W' /� J , CL. B RIP RAP W - .. EST.1 TONS CL. B RIP IW' `K It. \k _ Eit-' _ .,ca !3 .� W .;� e{ �- CL B RI RA• / _L� v Z U EST. 5 SY GT K \k \k Eg, 1 TONS Y` \k `k E 5 SY GT CL II RIP RAP / I EST 1 TONS CL II RIP RAP '� / EST. 5 SY GT SITE 5 —I2 = WF // / eM/ WF Q K ,� roODs EST.1 TON EXCAVA N— ` SEE SHEET 20 OF 80 FOR ENLARGEMENT C SITE 5 EST.5 5Y GT ,,, LIMIT < T. WILKERSON : . -L- 14° CDCALVIN I -, .. TRIPLE K INVESTMENTS, LLC. PL Sto 576+78.99 PI Sto 581+56.08 .L = 0' 43' 57.9° (RT1 .A = r 11' 07.7" (LTI D = 0°12'03.7" D = 0'12'03.7° L = 364.49' L = 589.68' T = 182.25' T = 294.85' R = 28,500.00' R = 28,500.00' ronmental\Drawings\15987b_rdy_psh 11 blowup.dgn PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING SHEET 20 OF 80 DENOTES EXCAVATION IN WETLAND DENOTES IMPACTS IN SURFACE WATER ROADWAY PAVEMENTDESIGN IGN INCOMPLIETIE PLANS DO NOT USE FOR R, W ACQUISITION F /// DENOTES FILL IN /i�� DENOTES TEMPORARY 40' 0' 40' WETLAND /'// '/ IMPACTS IN SURFACE WATER • • • • SITE 5 ■ ■ ■ ■ ■ * * * DENOTES MECHANIZED EXCAVATICiKI LIMIT GRAP-IC SCALE * ** CLEARING - * C B RIP RAP DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED . TEMP IMPACTS IINJ-� `'�! " ST. 1 TC F1S 5 SY GT SURFACE WATERA '� SST. .r. 1�� EXISTING R/W - �• g _ _Vtr�E Tarp �I 4811 ,' 1 SBW -+�� _ TB LLJ v ��IR���-r�I �il2101l�;r�1 /11I Ic* k. ! Z. _ir; 7 • � 1 W T _ .ie•__ ra r7, //./110/t//) ��� copIT rottamounk r1;�111111111�401 Ct Q illatilielli Theterta gl WO �Q I,`'�i I/////// ////�/Ilia//// 1%t' �' ! C� '.:1 O �r^,�,►Z1:[� I1//�111�%0 Ud'!!!/ P%�.w —� �J W 1111111010 ........ i,o11' 1 i iiti��i�i���1iA W wow l livo cn 0 o.oo K '1 "' iitr, ST OADWAY , ��' TB 2GI REM 1113,11S VE Mitt . � i - ONIC ..IDaE , I jffhf!I REMOVE ��;, l ` DI � i 0NWiglit I NNW - TB 2G1 q q I REMS'VE ��1i1I - DI CON r. I IAnd MO TB 2GI _ °= — RCP-IV - Ii �II OW IN _ _ BST R A D 1`d I, �/ • � 1r • Li Ei 117- 15" RCP -IV ; - - FLOWABLE FILL VBL 24/ BST TB 2GI i�ti111g itlii TB 2GI tam CONC BRIDGE it j� IiiinillAng fq i iti A I" Mom, FILL -- i�l�si o1/1�� oim III flair:, �� yi�ii'1 ',-: �E �E��E 3,1..,. ""/ABLE �� ti - rult1oiomm. v Alb 6 6.iii ,I �� SISI� . i111111,1,eTi�If�i1��� iire01 I011111,111, �1101/110 IMP PA * SURF , ii.,......,....6B SIN .. lits•i CE WATE ' itil111n1lo uaIsti It itor ) iingtfl%1 epffi1r # * Warts. O R- .. .. .. c 7C `(-vim / - CL. B RIP RA A y / EST. 1 TONS CL II RIP / EST. 5 SY GT CL II RIP RAP SITE 5 = �Q / w c� PROJECT REFERENCE NO. SHEET NO. .577+00.00 SEE c -o 0 a -0 0- 0' co Lc) m m c 7 ro 0 00 0 000 (S.I r o, ALL CO , �W CC Lu DWIGHT A. ATKINSO AND WIFE, AMANDA B BARNKIORST ti J PERMIT DRAWING SHEET 21 OF 80 JROG D' 100' GRAPHIC SCALE * * * * * * * * * * DENOTES EXCAVATION IN WETLAND DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING WOODS IAL LATERC�L 6' BASE DITCH SEE DETAIL j� E%IST G kMIIMMI p����� J ��1 rn.- _ is 4 iv- -,e),74rz(A. . a DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER KEITH-PERRY. LLC NO CLAIM °WOODS 4!. co KEITH-PERRY. LLC EXCAVATi&N LIMIT ABLE FIL f fiR'-ar- FM �/ .�,��►� i. riF 4f: '���� a\ � rnnr n n � *-----SLIStir I-5987B R'W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR A/W ACQUISITION MOTT MACDONAID I & E, LLC LICENSE NO. F-0669 MOTT MACDONALD 1 & E, LLC LICENSE Na F-0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED •repo - n f e Office of: IVI RA 7621 Puri,. Rd, Suite „5 rrr 1.1 Fuqueymo-Vltmoac.cno, oNmb 2T526 MACDONAID wxvi.meriws CD P Or/ -L- P1 Sta 576+78.99 A = 0° 43' 57.9' (RT) D = 0° 12' 03.7" L = 364.49' T = 18225' R = 28,500.00' P1 Sta 581+56.08 A = r /1' 07.7" (LT) D = 0' 12' 03.7" L = 589.68' T = 294.85' R = 28,500.00' INVESTMEL IMRN CV • Z H w w V) w w V) O O O O CN CO J Z_ J gV LEGEND PROPOSED PAVEMENT REMOVAL PROPOSED PAVED SHOULDER PROPOSED APPROACH SLAB FOR -L- PROFILE SEE SHEET 55 PROJECT REFERENCE NO. SHEET NO. •5 1 •_r. •5 _ _. _•rl. •e_ .. ,•• 72.T.T I CIEU'.F-". IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII111111111111111111111102111!!!!!!!11IIIIIIT1111IIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII§1I III III iiii1IIIIII,111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERMIT D SHEET 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII illoommomminionionimmolll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 18 170 160 150 BRIDE HYDRAULIC DATA DESIGN DISCHARGE = 4,500 DESIGN FREQUENCY = 100 DESIGN HW ELEVATION = 148J BASE DISCHARGE = 4,500 BASE FREQUENCY = 100 BASE HW ELEVATION = I48J OVERTOPPING DISCHARGE = 18,000 OVERTOPPING FREQUENCY= 500+ OVERTOPPING ELEVATION = 1542 DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY CFS YRS FT CFS YRS FT CFS YRS FT 12/08/2020 = 140.5 FT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1111111111111111111111111111 ...„.L...1%....1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1-5987B 55 ROADWAY DESIGN ENGINEER BNCOMP]LE DO NOT USE FOR MOTT MACDONAID 18 E, LLC LICENSE NO. F060 HYDRAULICS ENGINEER TE PLANS R/W ACQUISITION MO, O F ofi6E' LICENSE LLC DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M 7621 Puday Rd., 5,.., 115 MOTT FuqummVodna, NC 27526 MACDONALD www.mottmoc.conA meriwt Hilil IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ,tl1:W ■IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII — 1_!IIIIIiiPIIIIIIIIIIIIIIIIIIIIIIIIIIIII;1r �1111111111111••••• •mmounimommiiimm11111111111111111111111111111111111111111111111111111111111111111111111111IIIIIIMINIIIIIII1111111111111111111111111111111111111 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111181 3ICIZGI7ZMM li p IIIII/ 140 130 �1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111� (IIIIIIIIIIt;:��L���yi;alR:r��a11111+, IIIIIIIIIIIIIIIIIIIIIIIIlI!!!!lIII_IIIII_IIII_IIII_IIIII.11111111111111111111111111111��Il�Illlllllllllllllllllllllllllllllllllllllll�ii�f�liilllllll�llllllllllllllf ��Illl.tyl��li I►�� IIIIIIIIIIIIIIIIIIIII ��Illlllllllllllllllllllllllllllllllllllllllllllllliilllllllifiiiiillllliiiiiiilili11111111111111�111111G��iiiiiiiilliiiilililiilliiiiiiiiiiillllllllllq� IIIIIIIIIIIIIIIIIIII�����������__�_ M1EIIIII ice■ Pl = 588+60.00 EL = /57.82' VC = 280' K = 396 DS = 80 MPH ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ u:::� ,la.Illlollllllllllllllllllll W=1111111111111111111111111111111111111111111 ME II•► _+'_ I 1111111111111111111111111111111111111111111 .7. ,.7I LJl.,I1,,L! i�, ��r�i!■1� ����6.111111111111111111111111111111111111111 �l IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII (III IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIII MEM E FOR -L- PLAN SEE SHEET II 180 170 160 150 140 130 577 578 579 580 581 582 583 584 585 586 587 588 589 -L N B- 190 190 180 180 170 160 150 140 130 LII PHUPdScU GI+ADC L K (Ni ■ UAL) ■ jl C OP 1.5 oRMAL LAS O ■ XC LEV. II R ■• T 4 P O 2. H C (TY) ELE11 Y2 WS 1a8. DGE C PROP. BR 45" PRESTRESSED 1@52.5', 1@75','. SKEW = 100 DE -L NB- GP EL'_V S A .5 ON 2 8 C 6 R ET 09 6 -L NB- E GIRD ERS W/2.5' DE=P CAPS KEES 57.1' 5 LOW SIDE/LOW STEEL PI = 588+60.00 EL = /57.82' VC = 280' K = 396 DS = 80 MPH EXCAVATION • ELEV. -143.0 3.5KEY DEPTH (TYP.) 170 160 150 140 130 577 578 579 580 581 582 583 584 585 586 587 588 589 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII MN PROJ. REFERENCE NO. I-5987B ���■11111111111111111111111������� !! .. 11111111111111111111111111111111111111111111111111111111111111111111111 1111111111111111111111111111111111111111111111111111111111111111111111 ` 11111_.,1111111111111111111111111111111111111111111111111111111111111111111111 ■ • 0 5 10 30 20 10 0 SHEET NO. X-58 1. !!! lilllil■■..■■■■■■■■■■■■■■■■■■..■.................................................■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■................................................■■..■■■■■■■■..■■■■■■■■■■■■■■■■■■■■■■■■■■■■..■...■.......■.................■■��■■■■■ tl�rl IT DRAWING PL■J 1:: 2 F 0 11111 r In000nnoo•••••••••••••• ••••••••• • 11ftl[SX�11111111111111����:.n.........`i`ii�lllllll_-- � 11111111 IIIr111�ii�lii11111 1�___ 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111........1111111111111�11111111111111111111111l��=�� - __ �--- _......... 1 ' III1111Ii1111111111111111111111111111111111111111111111111111111111111111111��llllfl�il�111 Illlllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll��������������������������IIIlliffi�iilmiii.i�l■IliliiiM!iliiiil lll! 1.: ■■■■■■■■■■■■■■■■■■■■■■: 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 =�� . ■..............■■■■�.rrrrrrrrr�■■■■■■■■■■■ IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIl111111111I11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111!!!!!!!!!!1!!lI�I111111YWIIW� 1.1 .... III/Glir1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 �' �••••••••••••••••••••••••••••••••••••••••••••••••••• ••• 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111Yi■11111111111�1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111:1::111 i 1 0 !I!1 r, r, ;r � IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I Iiilll111111111111111111111111111111111111111111111111iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii111111y���' I'�111 I 11111111111111111111i1 Ir milmmommaionmaiiiimaiiiihdoliiiiiiiimmimmilimmimmumcmimumcmcmcmcmcmcmcm:mmimm 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1■ Jill.. ' ��i 1�" ' l�iilli!!!!!!!!!IIIIIIIiiiiiiiiiiiiiiiiiilllllllllllllllllllllllllllllliidhllllllllllllllil IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII_!11 i11111111_!l�illl111111111111111111111111111111111111111111111111111111111111111111111111111111111111IIIII 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111,1111111111111111••••� "•°°= 1111111111111111111111111111111111111111111111111111111111 F J Y tsti I II I I 11111111111111111uuuu.......iimui111111111111111l1111 ° ` 11111Iiii 710 Gx 3p 111 ■■■■■■■■■■■■■■■■■■■■.... ■ II 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 o IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII� 1111111111111111111101111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111_I! `,1„-1 Illlfrillllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllan.i -- I I I I I II Ld .I l . 11 WETLANDS 111 _. 11111111 -r 1 � 1 1, 4, ! �0■l�/■l, 1111111111 11 fll ,T,1111111111 .. 111111111111111111111_ .......■ ..■ ■■■■■■■■■■ 11ill.■■:iiim."_!.i iiii11111i11111111111111111111111111111 mi11111.Ikumin111 u 11111 dill A; 70,11 izil M111111111111 • r 1. CI 111111111111111111111111111111111111111111111111111111111111111911 IIIIIIIIIIIIIIIIIIII .1 1' 10 10 2C 3C 40 60 70 8C 9C 1 00 0 5 10 PROJ. REFERENCE NO. SHEET NO. I-5987B X-340 110 170 130 140 50 149 170 189 199 2®O 2 0 220 230 740 250 260 2'0 280 290 PERMIT DRAM ... Fn 111111111111111111111111111111111111111111111111111111111111111 NG SHE. 2A • _a 11111111111111111111111111111111111111 111111111111111111111111111111111111111111 1111 1 70 IN A �-.- - T.L PJUL1 1.1 ll1 ... NAUMAN r/ KII7VWTR ... 111111111111111111111111111111111111111111 11111 • 1 1 1 1 1 1 1 111 1 111111111 -'i WKAAi1 111111111111111111111111111 MANN MAE 152.T7 0 040 0.0 3 0 0 04"WET AM • • 00.e e Fn r 1 0 1_ 1 .3 '�'5'0.00 i i i I i i UT iii i i i I 1 i I i i i i 1 i i i I i i i I 11111111111111111111111111111111111111111111 1 MI. ia. MlI "a1 wi T.� 1 i i i i 1 111111111 MI. i 1111111111111111111111111111111111111111111111111111111111111111111111111=11111111111111111111111111111111111111111111111111 0 10 —i — 10 20 30 40 50 60 a et 9a 00 0 20 .0 40 50 60 70 80 90 200 2 0 220 230 240 i60 270 280 290 _ yg!6B/9. PROJECT REFERENCE NO. SHEET NO. SR 2 PERMIT DRAWING DENOTES MECHANIZED '�//�'/ DENOTES TEMPORARY \ —' SH87B — Rw SHEET NO. --- SHEET 25 OF 80 # # CLEARING �� I IMPACTS IN SURFACE WATER ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER m' 100' lmm' //// DENOTES FILL IN j TS IN F�, / WETLAND iijj ' S 20� SDURFOACE WATER \ INCOMPLETEOT SEFOR1/W IQ NOT USE FOR ACQUISITION 2/W ACQUISITION GRAPHIC SCALE N MOTT MACDONRID 1 & E, LLC LICENSE, F0669 MOTs MACRON O 14 E, LLC LICENSE NO I, E \ DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED KEITH-PERRY. LLC Prepared in the Office of: M 7621 Rh, Rd, Rim 115 M MOTT Fuquay-Vorina, NC 27526 MACDONGID www.moemgc.com4merim5 R in � STANDARD 4' BASE TAILDITCH W/CL I RIP RAP X x 115 L=@ 0.39% WOODS DDE ELF \ EST.260 TONS EST. 430 SY GT SEE DETAIL BD 0, S -Y5- (NC20) DRAINAGE DIVERSION FROM OUTFACE 1311 (-Ir STA. N12- Ri. ' OUTFACE 12-01 1-1 $TA. 592+50 L WOODS TOE PROTECTION FALSE CUT SEE DETAIL AC SEE DETAIL BE LATERAL V DITCH SEE DETAIL AK tEii- ���r����__ I TJ I PDE � WF .\5\� \ •) o ) / "DI• a ur — — — J CHLINE -L- STA. 589+00.00 SEE SHEET Ng �lTE 5 .-. Q• SITE 6 ins `— — — - B/L — - - SY. MON - T -- EXISTING R/W r - — — — — — — —X— — h— ,C, — _ _ — — X �F .;• • s. !�G ,3' ) �I. X X -•".... ... �n.-•'s.'i ob. ... ........ ...,.. r x x X h X JC JC X k .A, Mg. 2G TA • . R�rlrrr uYsnr'+w ulY•i:.. FEE w r • 'X"X' "• F SEE DETAIL E r.uun:imp.. n..wm muumr............. .. ... ... .... g DETAIL E ................._..... — L�—� EE ETAIL.E �� •- c W _ — CL. I RIP RAP lv. - - T C3 C3 ym 1 EST. 26 TONS EW •► SP. DET. ~ TB 2GI ,�� EST. 50 SY GT "a ES m ^ MIN 2GI-A REMOVE 30 EXIST.30" .P R - 5 oF . DET. MINg2GI-A 54" < < < — :' W -- -- — ,� `� � --- la,— — PLOWABLE FILL 48" WELDED STEEL TB Pq PLOWABLE FILL 1-95 SBL 2a BST - \ .REMOVE /-95 SBL 24'BST O �CI4 REMOVE TB 2GI \ 7— UI 15" RCP REMOVE O L�__ dA" Rrp_Iv -IV __—� TO 2GI �I IS" RCP 18" RCP -IV TB 2GI 18" RCP -IVY TB 2G 15" RCP -IV 0 PLOWABLE FILL /II /g 36' 032" E ii — 1 15" RCP -IV TB 2GI -� 15" RCP -IV 15" RCP -IV TB 2GI JO, l-yh NBC__ TB 2GI TB 2GI 26 A l0'BST `Pq _ _ __ --_ __—, 1-95 NBL 24'BST O TRENCHLESS INSTALLATION • _ CS c"i48" WELDED STEEL -Y5RP - I- If E.� s N r 54' 032" E N it e • „).in1. t q!! !!• F . +l+l. yl.. yw+..+� X < Je W �ir�r�r '� X X - - F r� A1iiY'i�^'fi'^'7fi1M�.lIRI.{'S■y■. LL.I �Ai �.^ �YIS Ai w / - le SEE SHEET 26 OF 80 FOR ENLARGEMENT m STANDARD V DITCH SPECIAL UT .' BA E EST. ; - SPECIAL LATERAL 6' BASE DITCH DITCH vaHINGE EST.17 SY GT N��a' �`fy�\�". A • 9' y c SEE DETAIL F SEE DETAIL T 1 -.4 SPECIAL CUT 6' BASE DITCH SEE DETAIL AO i/ iW N%1 MrHINGE vdCL B RIPRAP i EST. 315 TONS,9 WOODS EST. 685 SY GT y 1 / m SEE DETAIL Y - .. - i / '�•: Q ��• ,.al`� �IIII —TB TB TB TB TB TB - I l I.�'':co C TB � TB TB TB TB / I SE L * I mSPECIA .sT� r� . I �, 'L> III CDSPECIAL CUT V DITCH ,,,,CL B RIPRAP SEE DETAIL BA / A TRIPLE K INVESTMENTS, LLC. EST. 45 TONS EST. 30 SY GT / CO THE MELBA H. INMAN LIVING TRUST LEGEND Im5w,j PROPOSED PAVEMENT REMOVAL / PROPOSED PAVED SHOULDER r////A PROPOSED APPROACH SLAB / FOR -L- PROFILE SEE SHEET 56 PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING SHEET 26 OF 80 CRAP In Q 0 01 CO CO 01 1 0 0 N E 0 w 1- 01 ID w C N OCO O10 cr,LLJ \0.U1 oJCC, IC SCREE • 0 z W W W W 0 0 0 0 Q i J W Z 589 + 00.00 4 0' DENOTES MECHANIZED CLEARING DENOTES FILL IN WETLAND SITE 5-- X . B v P PAP � �i M O N TOXNS 5 S`- » G 30 TB 2GI W X TB ST DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES IMPACTS IN SURFACE WATER TJ WF F CL. I RIP RAP EST. 26 TONS EST. 50 SY GT PDE ►;Iris �' '!a• �R EW ` ES TRENCHLESS INSTALLATION 48" WELDED STEEL /0BST LuJ TB 48" RC'P-IV ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER INCOMPLIETIE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SITE 6 X X FS SEE DETAIL E TB 2GI-A TRENCHLESS INSTALLATION 48" WELDED STEEL }_ X SP. DET. 54" MIN 2GI-A -REMOVE 30 LF EXIST. 30" RCP FLOWABLE FILL DI F REMOVE FLOWABLE FILL FES m t- H 0 01 0 0 -0 _0 m Cr LC) 7 2 r= 0 0u 000c Nil �.a m >u COwa uiu �u 01 rr d y4i6:;/9'F PROJECT REFERENCE NO. SHEET NO. 1-5987B /2 PERMIT DRAWING DENOTES MECHANIZED DENOTES TEMPORARY \ RAN SHEET NO. _ SHEET 27 OF 80 . . CLEARING �% /��'/ IMPACTS IN SURFACE WATER'''''"-- ROAENGINERIGN ENGINEERS m� am' //�/ DENOTES77`' FILL IN WETLAND j i�i �// DENOTES IMPACTS IN $ 2p1" , SURFACE WATER \ i. INCOMPLETE DO NOT USE FOR PLANS A/ W ACQUISITION 11• 1111 1111 1111 1111 GRAPHIC SCALE \ MO, MACDONALD ID E, LLC LICENSE NO, F0669 MOTE MACDONALD 16 E, LLC LICENSE NO. F-0669 0 \ \ DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED KEITH-PERRY, LI__ \Ofl Prepae.eod ID the r: M M J602 Pu o Rd,Suile 115 Fuqu.mottmna,NC 37536 mweoonnlD vmw.motlmgccomrfimesicgs Lo •�-� ` �� / \ , �� —'•5\ CL IRIP RAP TAILDITCH a :; � �•" 15 LF @ 0.3q� \ 325 CY h' Ob EST, 60 TONS �, I �s. \ EST, SY GTT �.Th Ti LO 'm� Y5- (NC20) I ( NAGS DIVERS N FROM I /� ) n FALL 13-01 (-lr STA. 592+50 L TO WOODS TOE PROTECTION FALSE CU7 \ SEE DETAIL AC �.% E-DE AIL BE % �\\ / \ \ / & m .., p � 1 LAT RAL V DITCH V DETAIL AK (� j • Ea ` • Q� �/ O Z 11111 11 11/ tl 111116 __ __________ _ ______ _ - f :` _ I i ,., ++- _ %ISTING P/W • Z D LLI `� , ,;; .. _ ,.is_...i. _— _ ....,,I y ...... _-„w FS LJJ LLIu. .v ..,....... 6 DETAIL E�—� a v r '-.... � —...... RIP RAP i � 1LLI N , "' EST, • 6 TONS APO TB 2GI• '•' EST. •0 SY GT a., .\ Lu LLI MATCHLINE -L- STA. 589+00.00 SI -YSRLE N TRENCHLESS INSTALLATION r ' 48' WELDED STEEL TB_ A v FLOWABLE FILL 1-95 SBL ill\ .\REMOVE 1-95 SBL 24':'� 0 O ` ` . 15" RCPIIV � —,sa IN' CABLE„. 0 � I - !1 Q `��: Ma 1• -i�'°� .. n _ a� - - {M FLOWABLE FILL N I9 36' 63. MO15" RCP -IV TB 2 15" RCP -IV 15" P-IV TB GI Yip, l=JS Nt}aL4'tlS� TB '1GfD \ \ TB 2GI aTB_ • -- I.,1 �m = 1 95 NBL 24 BST = sm — :lae.�:n.:r I, LLicT10 �_ 48" WELDED STEEL .. - - �e.— -Y5N1 _ $ ...ill to / u ! us:::. eu a eui a — = — _____0,.. ....r .,,-5]E 'i��ah� ' S.sce. .,�_ 1a�.ra �..�� +....:-..�,. a .. _y:K.ii -.. �.�—� ,x.IW -.6m -rim s7 -re mrr. w �Ai ��M 7 �,: 7 0 ± �c� s . , ,lol: Z_ J., � ST IARD V DITCH 6 1 EC T' UT .'BA , ,y EST. :B .IPRAP SPECIAL LATERAL 6' BASE IT SEE DETAI F (/ 5. DE vArIHLINGE EST. 17 $Y G `) SPECIAL T 6' o SE DIT H SEE DETAIL A LAMING vOCL B RIPRAP i / /�� l� LODE EST. 685 EST, 315 TONS -°" a SEE ET L .a �I 91 / . 4. ` . 4 1 y V •, 1 ♦•�� \2 Of '\\\ v TB 1E O 0III 1 ' J /�v 1 / �_� 11 \ \ '�41 s / StiSPEGIk;��T Alk� SE L *! li SPECIAL C V DITCH , — w'CL B RIPRA' TRIPLE K INVESTMENTS, LLC. EST, 45 TONS EST, 30 SY GT SEE DETAIL BA / 0 THE MELBA H. INMAN LIVING TRUST LEGEND „al PROPOSED PAVEMENT REMOVAL / PROPOSED PAVED SHOULDER K////A PROPOSED APPROACH SLAB / FOR -L- PROFILE SEE SHEET 56 rOWN OF Si PAULS .......... _ _ Ulla, 4-Y.I J7;.ID. El/lM - '� Ali. _•Il ., LR/=& ...-.,.� Jed' Rf %fNM//F/11/AP tP"�S/—E' . 1 i11&NG/i Di I - DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL 31011101.111ES COMPLETED INTERCHANGE -Y5- (W. BROAD ST.) WITH -I- (-95) n No.: 1598713 COumm. ROBESON CHFCCM .74 PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING SHEET 29 OF 80 cc' C' cC' ..... SRAR Io S:A co UN I5" R 01 a 0 r a Cr CO CC 01 C E 0 C CC W Uy 0 N 0O] -0 m W \MV1 m0'= N 26°57/49„ E RETAIN PUE DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER PUE HW — LP 2� c r-\ RFBFCC/ SITE 7A ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER INCOMPL]ET]E PLANS DO NOT USE FOR -t/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED <'c PROJECT REFERENCE NO. SHEET NO. c N a 0 a CO 0) 61 q) 0 D 0 CC CC 0 w U- 0 0m ='w PERMIT DRAWING SHEET 29A OF 80 R' ..... . . . . . RRR RIP RAP TONS 0 SY GT RR R I D LVI SPECIAL LATERAL 4' BASE DITCH SEE DETAIL F STANDARD BASE DITCH TRANSITION /► w �- ♦ . . DENOTES IMPACTS IN SURFACE WATER ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ESCl . IPA, 'f � � TQ EST. 124 S` •� e =O=NrIMEOZ2Itit iffM/ ma; DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER lYA"i' dN"'&�RT"rv"�+}7/%Ill _:..��..�: ^ Mlfi:Y� isi tea... S.iTa•�i� �I�� ' ^ i—/ ,��Efi/hiu�'L .,s7iiFG71 rllllll/�'/�F c �L1�"'�OS4/@Y'zPli//'SIA�/llllllv�r �-_.••.." ,¢,.. • �-_ ,,,�_� � �v�M'�� Im COMPLETE PLANTS LAAFFIC DIAGRAM BROAD MT2042 2071 INTERCHANGE -V5- (W. BROAD 55) WITH L (L95) m coo. 1-590113 DESIGNED BY cowl.. ROBESON 5' PROJECT REFERENCE NO. SHEET NO. 1-5987B 13A 10 PERMIT DRAWING SHEET 31 OF 80 44/ NO CLAIM TOM KEITH SEE SHEET NO. 13 II 112 III // // // BURY INVERT 0.2 TDE 100' DENOTES IMPACTS IN SURFACE WATER 0' GRAPHIC SCALE CL. I RIP RAP EST. 66 TONS EST. 124 SY GT TDE BURGER KING CORPORATION BURGER KING CORPOR• ION N Ap LHES[gyp, HI'A CONVENIENCE STORES & RENTALS, INC. NO CLAIM h, // /4, NO CLAIM JULIA A. ODOM-RZONCA 7 NO CLAIM THOMAS E. ALLEN h STANDARD BASE DITCH TRANSITION SEE DETAIL BF /9 STANDARD 6' BASE TAIL DITCH SEE DETAIL K TAC SITE 7 TDE VV_ 628>� S 70.09'57' E 245.82' BEGIN JURISDICTIONAL STREAM SAA DOWNSTREAM OF EXISTING 24" RCP LAURINBURG KFC TAKE HOME, INC. Ui0 `�� •� Ek@T TOP,l6 � �\DlP •"ti. NO CLAIM%,; DEBORAH F. INMAN a � FADHI ALHOBISHI S 73'3938' E 203.95' JOSEPH M. BARNHILL, JR. N6N 6=9.w 145.06 NO IM NORMA ROBLES PT ,Ita. 52+85.70 NO CLAIM BEN CHAVIS EXIST, 0 TOP-163.1 0.46'09 27.3 Z NO CLAIM olo 5— PCC Sta. 5707.55 4— — — — 9_' STEEL INV=159.7 �3ass� INv=i6o.o '. Q*P=166.33 p NO CLAIM KENNE E. MK AN E, C3 MA G. ASK NV=I60.40 BY22-226 LT 1 ' 64 NO CLAIM /SUZANNE M. MCGOUGAN 1!‘, w e' S 63°44'39. Ego a 75.74' �I 330' RCP lre� NO CLAIM 5' VIP TRUCK SALES INC. 0 40 —Y5— PCC Sta. 58+5 ,85 2 —Y5— PT Sty N 64°35'03' W 130 96' WILLIA-CE, JR, AND WIFE, LORIE B.JJP77EARCE S 64°303'E 120.5�- 1\IWILLIAM F. PE ARCE AND HELEN C. • A{7 Imo' =149.70 V=151.976 RN✓ SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACOUL8ITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M M J621 PNAay Rd, Suite 1152 Fuquoy-Vemo, NC 27526 mccooNniD www.monmoc.<omEmericgs S 70'49'46" E 253.77' NO CLAIM JOYCE HARDIN N 70.36'42' w 256.00' —Y5— PC Sta. 62+85.70 61+85J4 30°31'07, 63°25'15' 111 0.37' 97" W 174.60' EIP•btl UND 30.37'07 19.72' X�.i 10^10 37, SI 2 I MARGARET OF�o157_90 2 INV =149 4 INV=149.35' TOP=9?5' INV=14 _•' OP'15� 99' T .� •+ NC 20 1F0e`ILLEDI6f e o-EBR15_°Ji3• flo3it 13 HW/W 33.30; NV=153.51' �1S��R IRW=1 4.46 66 d7.53' N 71°25 332., -sn.5c7 -EY22 w ME AND W" `KER YETTA WALKER ,K S 67'E \ ~Z EASEm \ II gROAD `'T _ - 6' IS 0' /-5987B 13A 10 -o 0 0 0' 0 01 PERMIT DRAWING SHEET 32 OF 80 DENOTES IMPACTS IN SURFACE WATER 100' 0' GRAPHIC SCALE CL. I RIP RAP EST. 66 TONS EST. 124 SY GT INVERT TDE STANDARD BASE DITCH TRANSITION SEE DETAIL BF STANDARD 6' BASE TAIL DITCH SEE DETAIL K TDE BURGER KING CORPORA IN BURGER KING CORPOR ION N Ap LH�S[gyp, HIVt CONVENIENCE STORES & RENTALS, INC. NO CLAIM h, z / JULIA A. ODOM-RZONCA NO CLAIM 64.85, /62. >� S 70°09'57' E / 245.82' EGIN JURISDICTIONAL STREAM SAA DOWNSTREAM OF EXISTING 24" RCP LAURINBURG KFC TAKE HOME, INC. FADHI ALHOBISHI S 73°39'18' E 203.95' JOSEPH M. BARNHILL, JR. N 6N 6 09" W 145,06 NO CLAIM NORMA ROBLES O'46'09 27.0 Z NO CLAIM o to 5- PCC Sta. 5707.55 INV 159.9p' TOP=162.66/ INV=160.03'�/ I jl/ M VIP TRUCK SALES INC. 17 NO CLAIM /SUZANNE M. MCGOUGAN _z S 63'44'69" E r I 18��'� 75.74' " �i� 330' RCP li� vim_ 2'BST NO CLAIM 5 z CEI R/ 0 60 -Y5- PCC Sta. 58+5 ,85 RN✓ SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACOUL8ITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M 7621 Puray Rd, Suite 115 MOTT Fuquoy-Vomo, NC 27526 MACDONALD ww+v.monmoc.<o06021*as S 70,19'46. E 253.77' NO CLAIM JOYCE HARDIN N 70°36'42' L.„- 256.00 -Y5- PC Sta. 62+85.70 -Y5- PT Sta! 61+85J4 N 6464°350 96' WILLIAM F. PEARCE, JR° AND WIFE, RI ft' IIRAl..a EI 11. � END g LO E B. PEARCE N 71°25 332., BROAD ST _ - TOP=16 r.14;04.17 BOT OF BOX 15 �0.A`LKERrrt11� MELVIN WIFE. KEY TTAIW ALKE r PROJECT REFERENCE NO. SHEET NO. ngs\I5987B_site7 pipe.dgn LL Z 0 LLI w BED EL.=156.02 INV. IN =155.77 190 185 180 175 170 165 160 SITE 7 -L1- 621 + 66 PERMIT DRAWING SHEET 33 OF 80 ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER INCOMPLE DO NOT USE FOR TE PLANS R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED OP 3:1 SK SS EW VA WS E 157 OF 2 P54' 155 150 / / L • 0 , RCP -III RI G • ES HT • _z- i / f • • • • 7 @54' k 0 S • • • • • • • • t • • • i • WELDED STEEL •0. • • • • • • • PR A OP • • ED ROADWAY EXISTING GROUND/ ROADWAY NATURAL GROUND 14-00 -250 -200 -150 -100 -50 0 50 100 150 200 250 300 BED EL.=154.40 INV. OUT =154.15 CL (FT) PROJECT REFERENCE NO. SHEET NO. CP v LC) 0 Z 1- LLJ LLJ N LLJ LLJ V) 0 0 0 0 0 LC) 44 co 7B_RDY_PS IP PERMIT DRAWING SHEET 34 OF 80 100' 0' IVAVO GRAPHIC SCALE O O KEITH-PERRY x 60• Wl/ ISBW N X x •B,I x SPECIAL LATERAL V DITCH woos SEE DETAIL G DENOTES IMPACTS IN SURFACE WATER ENOTES TEMPORARY PACTS IN SURFACE WATER 10 U) WOODS WOODS KEITH-PERRY LLC C � .+ ww>/slwx x x x x >< 'g,Lx x x x X x I\G a WOODS WOODS WOODS HW NAD 60. WW ISBW EXISTING ROW x X x 1-5987B /6 RAY SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ENGINEERING 1223 Jones Franklin Rd. Raleigh, N.C. 27606 License No. F-0377 Bus: 919 851 8077 Fax: 919 851 8107 TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION x= F F / 95 SR 38'BST PLOWABLE FILL TB 2GI TB 2GI 15" RCP -IV —L — Cs oz z TB 2GI-A 5" RCP- CONC TB 2GI TB 2GI 15" RCP -IV TB 2GI O YiI»E T BARRIER N 9° 42' 21.0" E 1�'R`P-IV TB 2GI TB 2GI 0 0 c a ww Rxx 1 4 C SPECIAL LATERAL V DITCH SEE DETAIL G X x xAI x x DN FREDERICK AND JUDY KEITH TRUST 000°W .67' WOODS SPECIAL LATERAL V DITCH SEE DETAIL G X x X X x CL ES ES TB 201 FiEt#PWA 37'BST ~µ IN rD --- p �Z EW -- � FLOWRRLE// FILL 5 TB J- it x x - x I RIP RAP I. 40 TON I.75 SY GT // // x SITE 8 SQ SEE SHEET 35 OF 80 FOR ENLARGEMENT 0 0 1r X— CL. B RIP RAP EST. 2 TON EST. 7 SY GT 60" ww ISBW 0ISTING FREDERICK KEITH WOODS WOODS 3- a 0 D co } cc ]a Cr Cr 0 0 y C N 0 C W 3- a 0 N '6CC cs.OFD \.0 oJLL PERMIT DRAWING SHEET 35 OF 80 S' 0' SE' SRAI IP RAP ) TON 5 SY GT RSA DENOTES IMPACTS IN SURFACE WATER LJ / FLOWOLE FILL TB nn--) SQ SITE 8 PROJECT REFERENCE NO. SHEET NO. ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED re DENOTES TEMPORARY IMPACTS IN SURFACE WATER H N -o co 07 cc LID co PERMIT DRAWING SHEET 36 OF 80 100' 0' GRAPHIC SCALE WW IS KEITH-PERRY 60119 ISB n� 0 8 SP IAL LATERAL LITCH WOODS SEE DETA C SPECIAL LATERAL V INCH SEE DETAIL G X xAi x x r FREDERICK AND JUDY KEITH TRUST '00" W W SPECIAL SEE RAL VLl 2I1 H DXTML G y x x a 40 �(7 WOODS `f SB a.s DENOTES IMPACTS IN SURFACE WATER ENOTES TEMPORARY PACTS IN SURFACE WATER WOODS WOODS x x x x CL I RIP RAP EST. 40 T N EST.3Y5 S GT KEITH-PERRY LLC 01 FREDERICK KEITH EXISTING R/ X 1,1it.,$y2o11 CL. B RIP RAP EST. 2 TON EST. 7 SY GT IS6Xw Exisrw /sT C) WOODS PROJECT REFERENCE NO. 1-5987B R'W SHEET NO. SHEET NO. /6 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ENGINEERING 1223 Jones Franklin Rd. Raleigh, N.C. 27606 License No. F-0377 Bus: 919 851 8077 Fax: 919 851 8107 TRANSPORTATION KANN NG/DESIGN - BRIDGE/STRUCTURE DESIGN CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION WOODS 1- uJ uJ 2 N H N J ngs \I59B7B_siteB pipe.dgn onmental\Dr PROJECT REFERENCE NO. SHEET NO. PERMIT D RAW I N G SHEET 37 OF 80 ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER SITE 8 I INCOMPLETE DO NOT U3H FOR CQUISLPLANS R/W ACQUISITION -L2- 655+00 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 17� PROPOSED ROADWAY 3:1 S @74 SKEW -� , - �, , . ' . �i (STING GROUND/ , RO ° 'WAY 5, . , ' '� �� ELEVATION / , NWS ELEV. ' - = 161.54' , , ,..,.,,,,, , 66"WELDED STEEL PIPE ........, ,, TOP OF BANK RIGHT ' NATURAL GROUND i i BURIED 1 ' �� " O.4% TOP OF BANK LEFT D . . _ TT vT T - - -\ BED INV. -100 158.91 INV. 159.91 -50 CL 0 (FT) 50 INV. 100 BED 158.24 INV. 159.24 3- m PROJECT REFERENCE NO. PERMIT DRAWING 1-5987B SHEET NO. 17 * * * * DENOTES MECHANIZED RAY SHEET NO. SHEET 38 OF 80 * * ** * * * CLEARING 1l 8 ZO ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER NM) 100' G100' DENOTES EXCAVATION • • • • • ■ ■ ■ ■ ■ ?/E,/ IN WETLAND GRAPHIC SCALE DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 1223 Jones Franklin Rd. ETHERILL Raleigh, N.C. 27606 ENGINEERING License No. F-0377 --111111.111 Bus: 919 851 8077 Fax: 919 851 8107 TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION KEITH-PERRY LLC u-1 O O N O co -L- TS Sta.673+86.68 FA. 662 +00.00 SEE SHEET NO. 16 WOODS 10' WIDE BERM TOP ELEV=168.0' S SEE DETAIL V i 'C' EXISTING R/W IA. 674+00.00 SEE SHEET NO. 18 DODS ( WOODS _ .- WOODS WOODS WOODS e F F F C C F N 9` 42' 2/.0" E -L- TB 2GI 15" RCP -IV TB 2GI — 15" RCP -IV T 2GIM PR(X. TYPE T BARRIER TB 2GI 15" RCP -IV 24" RCP -IV B 2GI 5 --- — — HLINE -L- S -- I Z 1 F p F F F WOODS WOODS F WOODS— EST627 RSYO GT/ / , ',- O OP ts!.„.,,. r4 �I< --X X 60'WY'v ISBW / � MATC U �� -. -. -. NONE X -- X .. X—FA\, X X .. X .. X 04 STING Riwx H Alm SITE 9 ( WE it 1 84. CHL<3SBW 7X, i ) h UO O q L� ) SEE SHEET 39 OF 80 FOR ENLARGEMENT 0DS - .. 7sy' INV=I59.3 7OMM' TOWER �\ )9- \ 6�/ GATE \y OR \� HC II I 11 / O OGO gSMBL 1 /I / 1/ 50 PR 25 PR f24 STR LA=D7� WOODS _1S �$ \' INv=ise.i2 -�--/ 1 FREDERICK KEITH KEITH-PERRY LLC / NIN PROJECT REFERENCE NO. SHEET NO. 0 D CO 0 CC CO CO 0 0 0 01 V E CO CC 0 PA- �w coM PERMIT DRAWING SHEET 39 OF 80 . . . . . ..... JRAI nnn )0 ZW N V) W VNcr z�- F CL. B RIP RAP �/ * � � EST.2 TON � * EST. 7 SY GT/ * * * * .*, * SITE 9 * * * * * * * * 7K WE DENOTES EXCAVATION IN WETLAND DENOTES MECHANIZED CLEARING G ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER INCOMPLETE PLANS DO NOT USE FOR F/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ti cn > or co o- ID 0 C 0 �v —E m>>D mw6 Inc_ 01 w PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING I-5R9 /7 DENOTES MECHANIZED SHETNO. SHEET 40 OF 80 X * X * X * X CLEARING WO s 201I ROADNGINEER IGN ENGINEERS lmm'■ 0' 100' ■ ■ ■ DENOTES EXCAVATION GRAPHIC SCALE N WETLAND DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 1223 Jones Franklin Rd. ETHERILL Raleigh, N.C. 27606 ENGINEERING License No. F-0377 Bus: 919 851 8077 Fax: 919 851 8107 TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION KEITH-PERRY LLC u-1 O 10 —L— TS Sta.673+86.6$� HLINE -L- STA. 662+00.00 SEE SHEET NO.16 GI WOODS 10' WIDE BERM ` [ ( TOP ELEV=168.0' S SEE DETAIL V O � �$` CC ry HLINE -L- STA. 674+00.00 SEE SHEET NO. 18 WOOD. ..<Bq oft WD09 ¢ WOODS . no ODDS .m—�sn .. _.�_ ODS .. -. in �� r - . - .. -_ --- . .- .- .. - •- As s .a-wi ass_ __ _ "__ N 9' *Air I —L— ' TB 2Gl INZIEMOZgIMINEZNAgit - _ PR/ •. TYPE T BARRIER TB 2GI AgilErEMSFAMItr : .GI N, u, - 4. ------------- - -- -- - --- - N.r aq -- m F m, f �a, �— m P x. m! _ —m,____ m� u3 . - , '.SODS -- -- -- -- -- -- .- - -- .. -.. - _>. BEST B7 SYO GT/%/!L, x, ". x : � s X 9X X—FC�� 60'W ISBW _ / U `/ �ss�� IC �_� .. .. .. .. .. .. .. NON .�, -- Po T�� - - A� R = sTIN - 11. i- i 1 @,. J Al J 84' CHLx3S81 / ----- DS \ �� x ® ' COMM ;. TOWER o-' \B r .. ,T GRgABD) �rE ooJ�''''p 1 5 f� ' B ",/ 1 .� 1 I✓�1 / `V zs PR r� za srR/ ( LSMBIIS�,8\ate / / OODS 6 L� _..> Altettwor / __ --- 1 III —'m--. FREDERICK KEITH KEITH-PERRY LLC / NIN PROJECT REFERENCE NO. SHEET NO. N ON PARCEL D PEE FLAGGING o_ i cc PERMIT DRAWING SHEET 41 OF 80 1 0 0 ' 0' 100' GRAPHIC SCALE KEITH-PERRY LLC V "T 0 0 0 —L— SC Sta.676+36.68 WOODS DENOTES MECHANIZED CLEARING DENOTES FILL IN WETLAND ).LASS II KIPRAP (2 FT. THICK) UP TO ELEV. 157.8' CL II RIP RAP EST. 158 TNS 25 LF INLET BANK STABILIZATION W/CLASS II RIP RAP SEE DETAIL 1-1 SITE 9 WOODS WOODS END SBG STA +25 DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER (COO SWMIP T/) N 26°29 52.5E N 00°00' 9 E 28.23' --- rt= IAA il,<.�./O.l./4tlf�f'�� 20, wooDoirogreArAWAgrAreASOVAPPffilli fflit*'�� %rff IOW pis BURIED NE F T V1 rn rn V1 m rn Z - 1 vdELBOWS CL. B RIP RAP EST. 1 TON �F EST.A SY GT yp• WW ISBW SWAMP KEITH-PERRY LLC 5 s WOODS CODS ABUNDANT LIFE CHURCH NO CLAIM WOODS m — W00D5 _vim J• W � WOODS EXISTING R/W JOHN C. MCLEOD & SHORE B. MCLEOD TOE PROTECTION vaCL B RIPRAP SEE DETAIL AC X X WOODS .....uuuuusuuuu»uw»usii»siisssY ......nnuuu.....au•e..nu.... � : - WOODS 24" RCP -IV 18" RCP -IV TB.2GI' TB 2GI Q10.34.5 ds V10.0 fps E E SEE SHEET 42 OF 80 FOR ENLARGEMENT 32 LF OUTLET CHANNEL IMPROVEMENTS W/CLASS II RIP RAP BANKS ONLY SEE DETAIL 1-2 MARY H. BUTLER & SHORE CARY EXISTING NSW 4' LATERAL BASE DITCH SEE DETAIL AD DDE-2,450 CY MARY H. BUTLER CL. B RIP RAP EST. 5 TON EST. 14 SY GT HOWARD W. JOHNSON JR —YIBRPC— TS Sta. 10+00.00 & SHORE CARY —L— POC Sta. 685+00.00 OFF= RT 6/' co X 4' SPECIAL CUT ] BASE DITCH SEE DETAIL AE ti 1-5987B /8 RAV SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ENGINEERING 1223 Jones Franklin Rd. Raleigh, N.C. 27606 License No. F-0377 Bus: 919 851 8077 Fax: 919 851 8107 TRANSPORTATION PIANNING/DESIGN - BRIDGE/STRUCTURE DESIGN CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION Z 1— W W N W W N 0 0 0 0 T CO a PERMIT S_E o cni arc DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER CL. B RIP RAP EST. 1 TON \� EST_\5 SY GT \� ,w ,G WOODS ' P� 20 Lr IINLCI BANK STABILIZATION W/CLASS II RIP RAP SEE DETAIL 1-1 —SSG F Q10 = 34.5 cfs V10 = 0 fps PROJECT REFERENCE NO. SHEET NO PAVEMENT DESIGN ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS PERMIT DRAWING SHEET 43 OF 80 100' GRAPHIC SCALE KEITH-PERRY LLC * * * * * * 4 45 45 W SE DENOTES MECHANIZED CLEARING DENOTES FILL IN WETLAND C S II RIPRAP (2 THICKI P T ELEV. 157.8' RIP RAP EST. 158 TNS L INLET NK STABILIZATION LASS II RIP RAP E DETAIL 1-1 CL. B RIP RAP EST. 1 TON. EST. 5 W000 —END SBG +35 AIWA _WOOD. —_�I'�� KEITH-9EPRY LLC ABUNDANT LIFE CHURCH NO CLAIM DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER WOODS JOHN C. MCLEOD & SHORE B. MCLEOD EX. TING R/W X� TO�PROT X—X X .2 �J w' L B RAP� SEE DETAI'RIL AC WOODS revs.�� �r ter.'. . — csiw3'4Cffi' MikiR �_Z4L+ ...................��`�'x�'` � N 32 LF OUTLET 5n CHANNEL PROVEMENTS K W/CLAS P RAP BANKS NLY SEE DET IL 1-2 - MARY H. BUTLER & SHORE CARY 4' LATERAL BASE DITCH SEE DETAIL AD DDE-2,450 CY W SPECIAL CUT BASE DITCH SEE DETAIL AE PROJECT REFERENCE NO. SHEET NO. 1-5987B 1 /8 RAY SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ENGINEERING 1223 Jones Franklin Rd. Raleigh, N.C. 27606 License No. F-0377 Bus: 919 851 8077 Fax: 919 851 8107 TRANSPORTATION PIANNING/DESIGN - BRIDGE/STRUCTURE DESIGN CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION O Z 1- W W N W No N 0 O 0 0 co No CL. B RIP RAP EST. 5 TON EST. 14 SY GT HOWARD W. JOHNSON JR W -YIBRPC- TS Sta. 10+00.00 -L- POC Sta. 685+00.00 OFF= RT 6/' & SHORE CARY 01 PROJECT REFERENCE NO. SHEET NO. T PERMIT DRAWING SHEET 44 OF 80 SITE 9 ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER INCOMPLETE PLANS DO NOT USD FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED -250 -200 -150 -100 -50 0 5 0 100 150 200 25 0 TOP Ings\I-5987B hyd CSR (9).dgn onmental\C OF 0 170 EFT -160_ - BANK RIGHT L BANK BANK L 150 X STRE 1ST AM 100 EL ING BED EV E YR WS .=1657' ORMAL S LEV.-16'.9 (12/8'2 020) 3 :1 NORMAL 3 4.1 SKEWED 1 6" BEVELED / H A DWALL PR • P STA. 6 ELEV -CLASS II RIPRAP (2 FT THICK) UP TO ELEV. 157.8 CULVERT C J 77+26.3 -L SB- - 172 9' r 2.5' TOE WALL 1 EXI►TI TO B CL TOP OF FOOTI ELEV -156 5' G PROP. SLOPE=0.3 % N E G R P 2 S CULVE ROP CULVERT C STA 677 @ 8' X 8' RC BC KEW = 117 8 DEGREES RTS EMOVED PROP. CULVERT C + 13 2,1 STA 677+00 0 -L NB- ELEV. = 171:9 1' SILL (INLET 3 ( •1 3 AN NORMAL 4.1 SKEWED D TOP TOP OUTLET) 0 F 0 F 17 BANK 0 RIG 160 BANK 15 LEF 0 H T T 0 CD N C 0 5 10 PROJ. REFERENCE NO. SHEET NO. X-124 ■ ■ ■ ■ ■ I-59876 180 170 L .; e o •1 • —2-80 a3o z10 70 60 50 ,0 3G 20 10 a 160 10 zzo aoo ;._.. • a7o zoo zso 240 190 ' -A 51- I E RM I T D RAW I N G SHEET 45 OF 80 r Io F�■■- ■s ' ' •"�'',� Jl�li�'�1rTS����■�11� 111111 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 WEtIPnIDS �1 ' ■■■■ -- ______ ______ -- _� `-- ------ /nn /�------------ /60 1 161.21 /'50 15n ion 678+50.00 /4° ft'n lRn 0.010 0.090 4.1 � 0.050 0 050 0.050 0:010 '_ — /7n 1111111� . — -- ---- ran — - — — le , /n 678+00.00 / ° 11111/111 0.050 0 050 _ ■iiii��iii WETLANDS_ • ,0.090 11111111 -----------_ • . � �.050 .l...�■■■ IIIIIIII ...�.,.. _ _Griii■111. III4ill ----- 1111■■Bfll' i —_ ■' ■■■■■■■■__■■■ 11111 111111_ _II■IIIIIIII■■III 1111 - — - __ -- — — — r r /50 677+50.00 41 id° —f — 9n 9Rn 9''0 :nn asn 9dn 9111 :9n 91n 9nn "9n an 1-n 1An 1'n An "11 "9n 1"a "nn 9n an 7 IIIIIII I'lIIIIIII '1 11111111111111111111111111111 111 ae a Wu1•�/ .y�p�p� ME El SIT:Z: . II II.. . ,1••1.. 0 5 10 Inds PROJ. REFERENCE NO. I-5987B SHEET NO. X-407 MW _. � MEM .• cn7M..00crM !� 0•.� .•.� 1J• ; W� Y WI WI AIM _ •� =MEE WI WI -- W. I ....r .1 WI WI l.f...— — AM WI WI '--,..— — EMII ......WI __. ._ Wes..::..••�1.�- Wes...... J JI ..a kV I ■ ._...... V &'I. ..■Jy -Inn• le:. • � e : ..W .\7../. \r.VI • � .' I► e 11 °'.L�'...:'°::__ ,r'rr'.j "`r`, ][L_:1;,uGLL+ •11111111111111n huuu.n■■■91 1 illlllllllll� 1 ENC... 1 11I..IIIIIIIyIImilrmr.T 11 1.YI 111 f 1 I.11111111.. It ■. 1111: 11 11 irct 41,•C2 ■ 7liiiiiiL2R7111111111111111111: I1Illliiii;IIIIIIIIIIIIIIIIIliilue_ __ • ...II.IIi... G!.......! GG.GG. N C I IUGIY• ii MM .._.---.C!M9Pee.eeGalG--.G--aC-..6..iGo=! 1 ...III II ...I1L'II..OA.I .r.,vl..i.,1 .\Lr s.cl: 11.1.1.r1 11111111111111111111111111111111111 .111• ---WI — Iu�l171...IIII...flf.�rAA/I�1Li WW7.LL7�.W... 111 ���+±:!ii�::�i�i111111��111111A11I111:M E III 111111111111111111111�1I 111:::I11111i1111IIIIIII!!! nn-- �1.....aG--7....ii 11: ... IYI:l... WIWW� WIWW� WIWW� ®1111111111111111111111111111111111111111111 ........= WIWY.W sim sim WIWW� —� —� W� am:11... ritia... CG-!. dG=G7lG!! ... iri........Yod.iGi.E...d.......di.......iC..=....aC--7E---I:I.II IIIIL.I Iu11.11.JE1.1�J:• 11 1i1!II1II1:z 11 'J J J• M• 0 CwiM arm.. R. EWE • suNTa DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES EXCAVATION IN WETLAND '""R 'k \\\ a \\ ° \\ -Y/BRAB-I- PC 5/010/ 0.00 -7/8- POT 510.24.1600 -YIRRPR- PT 9028406.34 -Y12RA2-1- PCC SI00046.50 0£E.-T RT. BNB/A1545J8 Y/o 5/0 2DW06.s, S/A24t1196 0 7 4707.7 tRTI es - cr4eses 0 1T'tRTI 31/O \ R 60607000 ST 5000• R 3.84 /847, 8002 3027 SE 001 50 � PLANS PISTA23+94.H P/5TA234667/ P/STA25+9597 -/STAJ54/2E/ P15TA360495/ EAPPB- 5k5 51023s10.74 0 24524261RT1 0= /746'l021RT1 0= 1446'1370T1 .0. 27474661LT, 0- 2747097MT, 0 + 5740597 \ 0 = /705' 547 0 = 1705' 547 0 + 36'57 542 0 - 0 27.33O L + 150.54 L = 6626 L = 7751' L + 6926' L - 207.43' T • 95E0 r = JJST' T = JB.97' T + 32EI' T - 0527 R + 9600 R = 30007 R = 300.00 R + 15500 R - 50000 \ 5E + 003 y R0 ++ SEE PLANS / pq ��ggpg S(o/k &1 Yl SI1 P/S/AIYtl62/ KS 5/0 2/s99pJ yl,S ya 24+053 YIS/A[69J&99 O - 360000001CT1 0 = 3600000OIT1 0+ 1736366OT1 98 - 245,67 es - 709437 A - 37000T71RT1 \ 0 9207452 0 0 = 9224452 0 + SOB'SJP Is - R500 Lt - 5000 0 - 9J2'S75' C 329.54' L L - 36959' L + /OS56' 07 - //66B• LT - 1(008' L 345E0 T 000 T - O.LO' T + 20/09 ST - 5535' ST - 5007' T 17774 R 6200 R - 6200 R . 1132007 R 60000 002 SE- 002 5E+ O0T 5£ OM R0- SEE PLANS SE -MAPS- C5 S 02/13574 P15/A/146/12 Y F'155M 16+04/I G = 44018O/LT1 6s = 21.743T 0 = 23715T Ls = 0500 L = 37/37' LT = 116E0 T= 196J2 5T= 5834' R = 220000' 5E - 007 0516754V0T1 0=IA, O1 Y1RT1 0 5/53T'39/RTl NATI 82 0 = /051062 0 = 48287 0 = 752'202 L = 37334' L = 4679S L = 83460 T = 20900, ., T = 24673' _ T = 41A9r R = 34000 5E _ 30.OB'_ _ _ _ _ T �..4Nd'�z�/ =`SSEEE PLAN EE PLAMS' RO - 'EE PLANS # - =6RJ' PC 70644934 , ........................................ -.m...:y._. Wei GRAPHIC SCALE PLANS INTERCHANGE -//B- SUS 3014 WITH -B- N'RN 459117B cowry: ROBESON JONATHAN HEFNER, PE CHECKED n: BOB MAY, PE PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING SHEET 48 OF 80 40' GRAP Ings\I5987B_ RDY_PSH_ 20_blowup.dgn 0 0 0 O 0 In Ir 0 0 IC SCALE /L2 F DENOTES EXCAVATION IN WETLAND DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING \ SITE 10 WL V DITCH ;I S DENOTES IMPACTS IN SURFACE WATER MARY ANN REGAN DENOTES TEMPORARY IMPACTS IN SURFACE WATER YI BRPD — ST StcJ7 +2/037 SPECIAL CUT -BASE DITCH E DETAIL Al =1425 CY CL. B EST. 2 EST. 7 \• I IP RAP ;,' TON Y GT \ , / w 1@ 6' X 7' \, W/BEVELED HEA BURIED ONE FOO ;, i, ;, TB SR3 'l FCC ;,Stao2/ +37025 \ /I \• SS TB Bc' I RIP TB \, i, ,, Put. \• \, ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER INCOMPLETE PLANS DO NOT USE FOR i/ W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED \ 7, 7l ---WLE \' TB' TB Sf Tg -77 TOE PROTECTIC SEE DETAIL AC C L\ B RR=175 POE EG SBG +46 oJLL= DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER ANS(0.(5+53N9 M/39la 203(9.5/ PI Si0.24+1154/ A 74207.2(RT1 9s - a425B.T 0 93'17'115'(5T1 a 5T'n7• u - 15000' 0 7137/10 80656 LT - 100O0 L 13026 403B9 5T - 5000 T 8474 600000 SR E � R0 SEE PLANS -Y(BRAB-I- PC S/310+0000 -/18- POT 510.24+/8B0 -REAPS- PT 5/02840634 -TIBRAB-I- PLC 5/1094650 OFF.-4' RT. P/STA23+P/STA25+9897 -Y/R-ISTAJ5+1261 P157A36+495/ 0= /246412102/Rn A= 14'4671393.T1 0- 22454621LT, 0- 23'46'09.6071 0 = 7205'542 0 = 1.90554.2 0 - 3652547 0 - 827'330 T=� L =� T - 6422 L - 20TA3' R = 30007 R = 300.00' R - /5500 R - 50000 PI STA2J+94N 918RP8- SR5 51o23+10.74 C. - 89524281RT1 0 - 5940 592 L - 15059 T- 9580 R - 9600 5E - 003 RO - SEE PLANS Y/S(o/k &1 YIS/1 4I PIS,APS4i62/ 1'8 WV 21.941y/SSIO 29+0111 PIS/A283.9895 A- 360000001LT1 C.= 36000000(LT1 5 - 1236366(LT, 9s - 245166 es - T09437 A - 320a081RT•b1° [ 1 0 9224.452 0 0 = 92'24'452 0 - 3'08532 Ls - n500 Ls - /5000 0 - j 25 5' NT74. 60900 007 L 389.5P L L - 36954' L - /OS56' LT - 11668• LT - 50019• L T 000' T - 020' T - 2002 ST - 5835 SJ -SOOT' T R 6200 R - 6200 R - (.82700 002 SE- 002 SE- 007 5£ R0- SEE 90465 SE -T1BRP8- C5 51a21/3514 Pl5(A/S46112 -- P/s 5M 1610471 _G= 9'4a/80/LT1 6s = 216.432 T = 3/8E42 n R = 2.20900 PIS,0./3+08(0 INS/A184960/ Yl5/A25+5/f6 A = 6254'5029T1 G = 2107082 /RT1 0 = 15'37'37.9,RT1 = 1657097 0 = 147280 0 = 752'202 L -= 37334' = 487.97 L = 83480 T - +, / ..T=•24672 5/433 3800 9 I-59878 2 NO -P/B- PDT SYo.4240000 P 1•% ENO CORST ;y8'•,. -e r` � o -if GRAPHIC SCALE °® ..:1aNaT N'ao.: 459117B cowry: ROBESON ER, PE PLANS CHECKED n: BOB NAY, PE PROJECT REFERENCE NO. SHEET NO. ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER PERMIT DRAWING SHEET 50 OF 80 SITE 10 INCOMPILE DO NOT USE FOR TIE PLANS hi W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ' Lt. 300' Lt. 200' Lt. 100' Lt. 100Rt. 200' Rt. 300' Rt. 400 Rt. S'ECIAL "ITCH GRADE REQLIRED TO PRO ID E COVER OVER RC3C (1.2' COVE PROVIDED BASED OV AN ASSUMED 1 0' TOP SLAB THICKNESS) STATION 708+48.43 -L- ' X 7' RCBC (3URIED 1 ) 102 30 00 SKEW / SPEC TO AN 5' IA_ DITCH GRADE REQUIRED PROV DE COVER OVER RCEIC. COVER PROVIDED BASED ON ASSJ\kED 1.0' TOP SLAB THIC KN SS 93" 9' 23" 5KEW GP E)_. 183.54 P OPOSED GRADE GP S-AT ON 708+53 98 LBWS 102° 30' 00' SKEW LEV. 174.3 STATION 17+99.65 Y1BRPD 116°43' 45" SKEW GP EL. 176.15 1 ATI ON 118 21* 007' 29 68 SR3 38" SI(EW GP EL. 177.34 180 170 E 160 XI ST N G1 G 3 WS (tYp) -WS BE D EXISTING GRAE 3:1 ORMAL •1 S(EW 100 YR LEV.168.2 FORMAL WS \ / 6" BEVELED HEADWLL LEV 165 • ' 102320 164 •a 7LL i 74 w. "Trwv .7fe. •.: IW A* /A P RO 0 POSE 3% D B:D - GRADE 151.E 3 // 30 CP RCP IN • PZOPOr ED GRADE XISTIN :";ZADE a 1 V 162 64 -/ 24" RCP IkV 36' ."6 2 RCF 6 4 16„ BE 0 R D /GP S AT ON 708+42 89 LB2N 102° 30 00" SKEW ELEV. 174.02 PROPOSED GRADE EXISTING GRADE P I.1V 165 10 E,_EVATION 161.08 0 21% GRADE / PROPOSED • EXISTING 36" R 2 4 P INV 165 00 6 GRADE GRA E 3:1 NORMAL 3.4"5:1 SKEW f NGT B (ty E p) 0 5 10 PROJ. REFERENCE NO. I-5987B SHEET NO. X-712 TS-►tR3 ME \6L'I 167'l:II IE.9d11f:M I1.TMZMIEN. /90 5 0 1 0 3 0 len /7n /Fn /:ten /.90 /Rn /7n 1 2 0 1 0 0 0 9C 11 M' 0 0 CO 03 ce W W z J Y 00 O' Fr) 0 200 1 i ■ ,I :0 90 P • 1 • 2 +0 0.00 oe oe64..360 0 060 03 LU LU W a Y oe 00 1] . B .4 161 48 100 E 110 120 130 140 15 T DRA Z0 + 50.0 ING =.. =.. 11 II s0s 0 /90 IRO /?n /R0 /0n /Rn • IR0 /rl0 eon 0.060 try-) w W z Y m i - . . • • • • • • • • • • • • • 9.6 010 0 .06. 00 3; : WETLA,DS. /Ro /7n /F0 5 0 1 4 0 8 0 1 2 0 1 0 0 0 90 80 7 0 60 5 0 4 0 30 • • . S P 3- 2C� 10 0 10 20 30 40 50 60 7 0 80 9 0 100 i0 1n 4 0 1S 0 E" Cy. o0c c >L c¢ ww ocEL �-L�w Ecc d 100' PERMIT DRAWING SHEET 52 OF 80 1210' GRAPHIC SCALE 0 Z 1- LL.I LLI 2 LLJ LL.I N CL. I RIP RAP EST. 3 TON EST. 7 SY GT * * * * * * F j 6' BASE CHANNEL CHANGE EE DETAIL AG E-?25 CY DENOTES EXCAVATION IN WETLAND DENOTES MECHANIZED CLEARING DENOTES FILL IN WETLAND -YIBRPA- CS Sta.19+5 SEE SHEET FOR ENLARGEMENT 7s/ DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES IMPACTS IN SURFACE WATER N.. -YIBRPA- T -L- PO'f -YIBRPA- SC Sto.11+50.00 / I C"GRD T L. 1 RIP `,� CNIBA1d1fMENI3BOTECTION ' EST. 41 TON Ct \\`. � _I.• EST. 59 SY GT —E E- 1_ SITE 10 CL. B RIP RAP � EST. 7 SYEST. 2 GT LATERAL 4' DITCH ESE SEE DETAIL N DDE�1175 CY � CL. B RIP RAP 94 rr ��i�� �• rr , �-'����___ Wpo�s EST. 2 TON trikvar Nik ��` �''''���������\ �S E DETAILTCH EST.7 SY GT �.\ \``` DE=550 SY via -41W�� g !� �s. CHORD foliTourasinurozwas-ss � Wo•= � = -- o� N / /MARYANN RED StaJ0+00.00 Sta.72/+00.00 OFF.=6/' LT. " RCP-111 TB-2G1- 15" RCP -IV 15" RCP -IV 15" RCP -IV -IralaIIED DRAIN v115" CSP SPECIAL DETAIL CL. B RIP RAP EST. 11 TON EST. 28 SY GT 4' SPECIAL CUT BASE DITCH SEE DETAIL Al DDE1425 CY SITE 10T -YIBRPD- CS StaJ, MARY ANN REGAN TB 2GI O PUE +4..37 15" RCP -IV TB 2GI pUE uuuRu�ABR N 34 38' 02.0" E PROP. TYPE IT BARRIER E SPECIAL'DETAIE CL. B RIP RAP EST. 15 TON EST. 37 SY GT -YIBRPD- SC StoJl+75.00 rCl REMOVE UEo� -YIBRPD- TS StaJ0+00.00 -L- POT Sto.7/6+00.00, OFF. = 6/' RT BRAIN SCC SPECIAL-n TAB- WABLE FILL 34+ 29--562" E E -SR3- PT Sto29+7/.85 15" RCP -IV TB 2GI PUE 1-95 NB 44' BST 15" RCP -IV -L- SC Sta.718+6/.15 -SR3- PC Sta.3/+58.40 MARY ANN REGAN OAKLAND RD 4' SPECIAL CUT BASE DITCH SEE DETAIL Al PROJECT REFERENCE NO. SHEET NO. I-5987B 2/ R'W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ENGINEERING 1223 Jones Franklin Rd. Raleigh, N.C. 27606 License No. F-0377 Bus: 919 851 8077 Fax: 919 851 8107 TRANSPORTATION PIANNING/DESIGN - BRIDGE/STRUCTURE DESIGN CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION PUE PUE PUE PUE 0- 0- PROJECT REFERENCE NO. SHEET NO, ronmental\Drawings\I59878_RDY_PSH 21 blowup.dgn PERMIT DRAWING SHEET 53 OF 80 S' S' SS' ..... . . . . . SRS SS ` PIO 0 DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY A\I/IPAFN SURFACE WATER etitttr i�nkis a?vtoiMS�I/ 4stistatt 81 81 81 L. I RIP RAP ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER INCOMPLETE PLANS DO NOT USE FOR T/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED EST. 41 TON EST. 59 SY GT 41% vw • N BI OTECT SITE 10 N Z 0, o_ n co LC I m s_ 7 PERMIT DRAWING SHEET 54 OF 80 GRAPHIC SCALE CL. I EST. TON 7 SY GT 6' BASE CHANNEL CHANGE EE DETAIL AG Ez325 CY StaJ9+5 4 DENOTES EXCAVATION IN WETLAND DENOTES MECHANIZED CLEARING DENOTES FILL IN WETLAND DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER -YIBRPA- T -L- PO'f -YIBRPA- SC Sta.11+50.00 / G a y -1. I R� a B RAP E�— �. .✓ .��`�� EST. 7 SY O GT LATERAL 4' DITCH ESE SEE DETAIL N I PAPS V,`"` DDE1175 CY ;�il�__ , CL.B RIP RAP IV RP& 1-" � �,0 EST. 2 TON LA L V DIT S DETAIL K „�� - — 7:01:ST. CHORDMIER - �drdl/���h���:����i��ww�3�ro����"\`�a��\`\�ci�OR��\\\\\\\\ / /MARYANN RED StaJ0+00.00 Sta.72/+00.00 OFF.=6/' LT. III I PUE CL. B RAP ( EST. 1 TO /.J / '�� EST. S GT ' 4' SPECIAL UT B.SE DITCH SEE D14AI I / DE=14 CY 11 N r oL� -YIBRPD- CS Staj Y ANN REGAN B RIP RAP CL. B RIP RAP - EST.15 TON EST. 37 SY GT -YIBRPD- SC StoJl+75.00 -YIBRPD- TS StaJ01-00.00 -L- POT Sto.7/6+00.00, OFF. = 6/' RT PUE 8 / 37 PROJECT REFERENCE NO. SHEET NO. 1-5987B 2/ RAY SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ENGINEERINGyinpumpw 1223 Jones Franklin Rd. Raleigh, N.C. 27606 License No. F-0377 Bus: 919 851 8077 Fax: 919 851 8107 TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION -SR3- PT Sto.29+7/.85 -SR3- PC Sta.3/+58.40 MARY ANN REGAN .7/8+6/J5 PUE PUE 4' SPECIAL CUT BASE DITCH SEE DETAIL Al PUE' PUE _ Cr \Drawings\I5987B RDY PSH 44.dgn 100' PERMIT DRAWING SHEET 55 OF 80 i' 100' GRAPHIC SCALE E0S TING R RE 25 pR BEGIN CONSTRUCTION -Y6- POT Sta. 14+50.00 DENOTES MECHANIZED CLEARING DENOTES EXCAVATION IN WETLAND DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER -Y6- PC Sta.15+43.60 E SPECIAL LATERAL 'V' DITCH SEE DETAIL G E FAYE E. MCRAINEY REAVES FAYE E. MCRAINEY REAVES REMOVE PUE PUE EX/ST/NGRR PUE CL. B RIP RAP EST. 1 TON EST. 5 SY GT -Y6- woods LASS I RIP RAP /GEOTEXTILE PICAL) CL. B EST. 2 EST BURIED WOODS Pl Sta 20+25.89 A = 4° 58' 32.9" (LT) D = 0° 30' 58.2" L = 963.97' T = 482.29' R = 11J00.00' SE = NC PI Sta 26+92.85 A = P54'45.5"(RT) D = 0° 30' 58.2" L = 370.54' T = 18529' R = 11100.00' SE = NC :r\ SWAMP io er if PROJECT REFERENCE NO. SHEET NO. I-5987B 44 RAN SHEET NO ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACOUISITION MOTE MACDONALD I& E, LLC LICENSE NO. F-0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared m the Office of: M M PO 0,. 200 MOTT •)=Y_Va!=, NC 27526 MACDONALD wwri.moHmac.c*Allt* gas anJana FranklinRd. ENGINEERING urance"0cJ TT Ft! 919eslero2 SITE 11 SEE DETAIL CSR 3-1 FOR. OUTLET CHANNEL IMPROVEMENTS WOODS -Y6- E SHEET 56 OF 80 FOR ENLARGEME w00Ds Q10 = 114 HW'D .1.02 CLASS I RIP RAP W/GEOTEXTILE (TYPICAL) EST RR - 24 TON ST FABRIC - 40 SY PRC Sta. 25+07.57 WOODS LEGEND PROPOSED PAVEMENT REMOVAL PROPOSED PAVED SHOULDER PROPOSED APPROACH SLAB FOR -Y6- PROFILE SEE SHEET 95 PROJECT REFERENCE NO. ngs\I5987B RDY PSH 44 blowup.dgn PERMIT DRAWING SHEET 56 OF 80 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ J R S P pV E S CN/P 15"� AL • S nnn 1 @ 6' X 7' RCBC W/BE D HEADWALL BURIED' ONE FOOT ► 4I 11! Si: :I 411- �', r�rirl rvia'' try 1 SO 741ADA mime six ,1[4, Jo: :77„,la 11* r simian lil iiiri K2 NW! ► 4tr4, WINO Ire; al itioarr _•fir la irCP 1 ' :4t 1 NIS .���,�a;A4/611 111 VL— SITE 11 SK * K * * * * * * * WN w SHEET NO. 44 R/W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DENOTES EXCAVATION IN WETLAND DENOTES MECHANIZED CLEARING DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER 0 TING R%VV �a-7 SR A _ C z D, 0 cc ings\I59B PERMIT DRAWING SHEET 57 OF 80 100' 100' GRAPHIC SCALE EXISTING 25 GIN CONSTRUCTION -Y. POT Sta. 14+50.00 DENOTES HAND CLEARING DENOTES EXCAVATION IN WETLAND DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER -Y6- PC Sto. /5+43.60 SPECIAL LATERAL 'V' DITCH SEE DETAIL G E FAYE E. MCRAINEY REAVES FAYE E. MCRAINEY REAVES PUE — ExlsTwc iw PUE CL. B RIP RAP EST. 1 TO EST.5 SY)GT -Y6- P1 Sta 20+25.89 A = 4° 58' 32.9° (LT) D = 0° 30' 58.2° L = 963.97' T = 48229' R = 11,100.00' SE = NC PI Sto 26+92.85 A = /° 54' 45.5" (RT) D=O30'58.2" L = 370.54' T = 185.29' R = 11,100.00' SE = NC 00D PROJECT REFERENCE NO. SHEET NO. I-5987B 44 R'W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/ W ACQUISITION MOTT MACDONALD 18 E, LLC LICENSE NO..669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared n the Office of: M M PO Box ea MACDONALD wwwqu2.7o= . NmC m2e1ri2co6z MOTT / CLASS I RIP RAP W/GEOTEXTILE (TYPICAL) ST RR - 24 TON T FABRIC - 40 5 1223 Jones Hernial!,ETHERILL rurvo'F•.06 T HGIHT en,r27 Fa.. sLs SS10107 . 26+00.00 SEE SHEET NO.25 PROJECT REFERENCE NO. SHEET NO. 2 170 160 150 140 SITE 11 PERMIT DRAWING SHEET 58 OF 80 ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED of 100' 100' 20 PROPOSE 3:1 NORMA D ROADWAY SECTION q STA. 2 3 + 47.75 -Y6- SKEW 8/°26.5' ELEV = 172 79 6' X 7' RCBC (BURIED 1') W/BEVELED HEADWALL EXISTING ROADWAY SECTION 0 \,\ iIR RIGHT TOP OF BANK (TYP EFT TO F BANK (TYP) EXISTING EAM BED ) CL I RIP 0 4 / r 6" BEVELED PROP. 100 YR. HEADWALL ELEV.=164.1' PROP. 25 YR. ELEV.-162.8' BACKFILL 1WITH NATIVE MATERIAL 0' NORMAL WATER SURFAC DATE OF SURVEY EL.-158 0 (12ro320 SUITABLE FILL 3.5' TOE WALL sl ELEV. 155.51 ON 0.66% GRADE PROFIL E ALONG STRUCTURE E 1 1 1 1 1 1 1 90 B0 60 50 40 30 20 0 50 �w 0 5 10 PROJ. REFERENCE NO. ■. ■TT 1-5987B 11 • SHEET NO. X-671 120 130 140 150 a -o co x 7 0 7175 0 CC 0 0 o� mCD 5 0 0 3 0 4 0 0 0 0 7C 11■11111111■1■11111 air 1N i 1 ■ PERMIT 180 /70 /60 /60 /4n /50 .. ... ... ... /!I /0 1 1, 0 140 /50 0.020 •11111 III 111 �11111�1 11 • DRAWING SHEET 59 OF 80 11. 11 MN MN MN MN .. ..II . .. ME ir0 /40 MN -0•10 Ill -..-� -..M �yL'IMN M MN M MN M -� �... ..-_..Ga-... ..-� -... - HM=11E11111 111 /70 /60 WE 1 r i . 11 11 ...... • .. •.. _ MN 11 i / 0 /40 APO... P /60 /:n /40 23 i 50.00 %0 110 100 90 80 7C 60 50 40 30 20 10 -�Y 1 0 20 30 40 50 60 70 .1 90 100 110 120 30 "40 5- 111 �11111�1 11 • DRAWING SHEET 59 OF 80 11. 11 MN MN MN MN .. ..II . .. ME ir0 /40 MN -0•10 Ill -..-� -..M �yL'IMN M MN M MN M -� �... ..-_..Ga-... ..-� -... - HM=11E11111 111 /70 /60 WE 1 r i . 11 11 ...... • .. •.. _ MN 11 i / 0 /40 APO... P /60 /:n /40 23 i 50.00 %0 110 100 90 80 7C 60 50 40 30 20 10 -�Y 1 0 20 30 40 50 60 70 .1 90 100 110 120 30 "40 5- PROJECT REFERENCE NO. C 01 TJ CO N (n D_ O o' CO CO CO LO 01 0 0 0 i 0 0) 00 l 0C o ,CC 6�wIL CO(OCC CC —rtr w D_ 0 PERMIT DRAWING SHEET 60 OF 80 100' ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ 100' GRAPHIC SCALE * * * * * * * * * * ExlsTiNc Riw WD SWAMP DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING DENOTES EXCAVATION IN WETLAND SPECIAL CUT 4' BASE DITCH AhINGE SEE DETAIL AS 'C` 60 WW IS CL.B t1FE EST. 2 QN EST. 7 SY-,GT WOODS rim WOODS FAYE E. MCRAINEY REAVES WOODS -L- CS Sto. 797+30.32 SPECIAL CUT A' BASE \ DITCH v/EARTH BERM SEE DETAIL BG \LV110IO 27 �27 'f Vfp1 WOODS -L- ST Sta.798+80.32 TOE PROTECTION woCL B RIPRAP SEE DETAIL AC CL. B RIP RAP EST. 1 TON EST. 5 SY GT gRS �z e•• I orinr i .-.: r ,rr�s_ I I Y Y I! ':- .r..,,e.e1. en .: '...__..., Y . � I � r:.. I Y "I i1 u n nr r •!vfi 'r I:•s amri l lL�t�4^41 Fi �lt1rilll111lt1rr.I M TOE PROTECTION v,CL B RIPRAP NEE DETAIL AC WD SWAMP -L- SW AMP B RIPRAP EST. 1 TON EST. 5 SY GT WOODS P1 Sto 788+81.45 L = /2' 33' 12.3' (LT) D = O'44'112" L = 1,704.58' T = 855.72' R = 7,780.00' SE=03 RO = 150.00' Pls Sto 797+80.32 6s = 0' 33' 08.4" Ls = 150.00' LT = 100.00' ST = 50.00' RIDDLE FARMS, LLC. WOODS CL. B RIP RA EST. 1 TON EST. 5 SY G o 0 co LOW 156 LV „,, ITE 12 sttitgijiZZIff NOG I7 SWAMP EXISTING OVERHEAD POWERLINES 1-5897B SHEET NO. 28 R'W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR T/W ACOUISITION MO, MACDONALD 16 E, LLC LICENSE NO. F0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: FO Boa 700 MOTT uquo,Varina, NC 27526 MACDONALD www.moMnac.com4mericos ENGINEERING TT 1223 ]ones EDO. Rd use No'Foin H N J CE 1.0 c DY PSH 28_con 0 0 PERMIT DRAWING SHEET 61 OF 80 100' m' 100' GRAPHIC SCALE 0' CO 1 F * * * * * * * * * * DENOTES FILL IN WETLAN D DENOTES MECHANIZED CLEARING gal -� f (�-- PECIAL CUT 4' BASE DITC MINGE SEISETAIL AS TOE PROTECTION wCL B RIPRAP SEE DETAIL AC WD SWAMP -L- FAYE E. MCRAINEY REAVES P1 Sta 788+81.45 Pls Sta 797+80.32 A = /2° 33' 12.3° (LTI es = 0° 33' 08.4° D = 0° 44' 11.2° Ls = 150.00' L = 1.704.58' LT = 100.00' T = 855.72' ST = 50.00' R = 7.780.00' SE = 03 RO = 150.00' SW CL B RIP '/ P ES. 1 TAN 3'SY GT�/ RIDDLE FARMS. LLC. 2ow Sta. 797+30.32 WOODS -L- ST Sta. 798+80°32 TOE PROT v.CL B RIPRAP SEE DETAIL AC CL. B RIP RAP EST. 1 TON EST. 5 SY GT LOW UTILITY ELEV199.56� co PROJECT REFERENCE NO. SHEET NO. /-58978 1 28 R'W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION MOTT MACDONALD 16 E, LLC LICENSE NO, F0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Offic e a of: SHEET O O O F— N J V M M PO Box ZOO TT Fuquoy-Vonna, NC 27526 MACDONALD www.moHmac.combmerimo 'M Jones olkin Rd. ENGINEERING uxo r.M77 TT Pm: Mes M NAD $ 2�11 PROJECT REFERENCE NO. I-5897B SHEET NO. 29 R,W SHEET NO. ngs\I5987B_RDY_ PSH_ 29.dgn 0 7 c E Cy - o o C cw 07,L_ w 0_ 0 100' PERMIT DRAWING SHEET 62 OF 80 0' ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ 100' GRAPHIC SCALE MATCHLINE -L- STA. 800+00.00 SEE SHEET NO. 28 co LOW UTILITY ELEV=I99.56' WOODS DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER FAYE E. MCRAINEY REAVES SITE 12 0 co ��illy SITE 12 I TOE ROTECTION IWDI vac is RIPRAP SEE :, AIL AC' 5T4AMP WOODS / lIITLE MARSH r, WD SNAMP SWAMP IE T P IMPACTS IN S6 �E K" VE SU' - E WATER IE CL. B RIP RAP WORKPAD DUE To O . �. 1 WOODS TOE PROTECTION v. L B RIPRAP SEE DETAIL AC SWARP \E \E K" C � � C` IE r3// IE ` c/ X X X �f'- X X X X-X�.�J� Y` Y` 60 WXISBW �- X-X- X 'X EST ••• IF ._ iE iE iF 9F iF if iF SE iF SE � / i iE aF%'x' 96 9f # if if iE iE iF ! 99 9F iF iE SF SF rE SE SF -IE �•f.. �.:r, � ..__ . r. r�� _'. .. � �'Ti' :-y.�� '� � ar-:. min I r.nr,6uniT nrnnn, .u•n9:•n:n•:,vnnr•.nrn.r - , , � � m nurur.rnn tirz i rnnn mu.,.nr.ar _4.� ��� -r: r S rn rn7 n. r� '��T..Yi-��,�� �/ �� P/ �AP I%'/ /��.rT.'. I�%1Ois. LOW UTILITY -•-` 'A,�i1R, ELEV=201.06' rf •• Ir1 •7 1 1r111 ! 1� 11 •r'1 A 'dam ! T • • • REM*, i+• _ . � � C. e it u urriinr r Y n riiii u uur � t - T$2l=i� j�n:. 9i�r!14 A:�'� 1 inrr TB 2GI______---- -- . r I f WV 11 IMF i --- _ .Ylli�,■.rAtr_.�II, II IIIti1�l -- ; -- TM1'MUVE DI — _ TB2GI A 'i I r:' TB 2GI 15" RCP -IV - 1 l TB 2GI 15'' RCP -IV /a li ` �/ � : �°�/�� I'I', !'t� 15" RCP -IV �-- ,� i I �2T,f— TB 2GI 'iiij� II � AI// '- �ii� l ir/ : 2GI FLOWABLE FILL it _ uu Straiii • ■ �In' nmi ���� r rF El 'M I : I= I < TB 2GI _ Ir1r1r �• Ti� �, f i° ;i;f --����� �' ��T fir! .v! .ov'' ..... ' Ir�� neH r%iiliilii j♦Willir 1111 �%� ' /'I. . r rr .. * .. • rr rrr�� 11' ` �� ��1 ��� . 40 1�/�/ rr l .: /j(. ••.z.�s':-E • '��g.' I►O f' � t o 1L��' d f ems" ,, rr. n r � rniEl.... .. ,. ��—: •rr�nrirr r... r1 Ir1 Irr Cr r r as �.. .�.- ..•.rear �.. •''-ems-;•�_ nln r . . -_ �r141rii . .�i�i/►� rr �#L����rnF. .. ;#.°C#.'i!ni�E , n ..r,•e ,... •r rr rr r�il�i.�r'•f .re _ © n ru i rr J ,,. rr ................................................. .. err,,I._W .,, l�RNf�il#I�• .. .. it Y -. a . - �Tlyy W __ MPACTS IN _aF er/ELBOWS . ! TM K- '�� IIjuRFcEw;TERW AI WD CL B ' ' RAP E( EEST. 1 ST.STr NGT S 23.24'05•E 'EST.. 5,„gDSGT WD �� r±ti SWAMP TOE PR•-r• vsCL B..L..P Na SEE '• rAy.�;� _,,,� SEE SHEET 63 OF 80 FOR ENLARGEMENT IF IE- �- / ES B RIP RAP EST.S TON TOE L PROTECTION vaC W —L— PC Sto. 805+40.32 SEE DETAIL AC SITE 12 Ma -� � z4E al 324.304 E s 42557 E NOTE: ONLY ONE WORKPAD IS ALLOWED TO BE IN PLACE AT A TIME AND MUST NOT BLOCK MORE THAN 50% OF THE CHANNEL WOODS JI FAYE E. MCRAINEY REAVES S 52.21'38" E S 49.23'12" E 18.91' 10.06' .o, O 5 0 P ;n 5 WOODS Pt Sto 808+70J8 L = r 19' 34.4" (LT) D=O'12'03.7" L = 659.69' T = 329.86' R = 28,500.00' SE = NC JAMES BRITT & RUTH B. BRITT 0 or) Z 1- LLI Lu N LLJ LU t!1 0 0 0 0 co 1— N J LLJ J U CQ ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR RFW ACQUISITION .MOTs LICENSE NOMACDONAL.DF0616 LL 69 E, C DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Offer o : lA me M rA rex )AA MACT F,,,,,, Va ,,, NC 39526 MACDONAID w.w.mokm"c.com6meric"a ENGINEERING 1333 Jones Fran. TT Pe!.; a 0 0 cc cr Go 7 0, 0 N 0 C CC E W d Oy 0 0 o-W (0 (0!(n PERMIT DRAWING SHEET 63 OF 80 4 0' 40 ■■■■■ ■■■■■ CRA'HIC SCALE 1104111AMyNLMINIM gAnrArdirmr4r41PALIPar � A LOW UTILITY z ELEV-201.06' CIA/ AAAP m N RAP SITE 12 WD ists F DENOTES MECHANIZED CLEARING DENOTES FILL IN WETLAND DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER LITTLE MARSH SWAMP Nnumw WM Moll Hem III ~ Xitittl n :pm' ions Watt - tam IPJIiIY NO 1 at ref ft ptomain"HO °CAI 'REP RAP l T/1A1 PROJECT REFERENCE NO. SHEET NO. ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER INCOMPLETE PLANS DO NOT USE FOR a/ W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED WD CL. B RIP RAP TON (/ XE X Ci X \/� SWAMP p ►Aber=� ► !DTI I�f r:I r��O�w ....mow WD cr PROJECT REFERENCE NO. 1-5897B SHEET NO. 29 0 0 0 0 01 m m LD 01 0 D 0 0 1' 0v 0 EC OC ‘,,CC 6 • OOwa Cf)1r (-- 01 W 100' PERMIT DRAWING SHEET 64 OF 80 2 100' GRAPHIC SCALE MATCHLINE -L- STA. 800+00.00 SEE SHEET NO. 28 S co I LOW UTILITY fELEV-199.56' fi s WOODS DENOTES MECHANIZED CLEARING DENOTES FILL IN WETLAND DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER FAYE E. MCRAINEY REAVES 0 co ✓ --'W00Ds SITE 12 3' WD % / J I / / r •OION TOE 'ROTE TION WD ii � —�\ J-/1 -/e 1T- IMPAC , IN ,3 ., ��LJ VE •,• E WA R /I • I CL. B RAP , � A s ;r r- r l� C �E r _ ``� J/ X X X~ X X �� 60 W'LIBW\- i X . � � , ST 1 T W t/ .clt�','�.4iii�: K, •1F iFi6'1F '1F 7F'lf '1F'1F t i wad �,�� �• ` / �, •••••su.-1..:reuw w.ur. .n s, / ...;x, p, ,n..±� nr oIr rrII,.n I Ir; • x �.lrf� , n n n n. i,, n rIn , n r� ..'! .I,n„ .a�r,per ..,w . s r,,.1 . , a :aliiigt _ ; i, wA `aP ; A4' ''' '.1a r,., e" i11 . -���'��/ �ekZ-4r*�..,.Ai.�//�u / �i°umRp , ` —/� Warr Vim__ • . - _'• J•i i r 1 11 11 1 �ai1 1Y .. hin. ..—. �- IF-� T � T- - —z Ids: I 1 � rli �B tom,— I C, -� :.. -: .,, • Jx�' • �yz � f��. � . .. .� ..� —TB _ Ilu �ilVISI ��,��lmu 11, ,z -- nisY: IM IIMIWISSi sI s"o11Ti - - 4 ri r rI' nga�� u NEM -- -- "—TB 2(,I — �si d r °4��ij ' t* TH--2GI — — — '-- — GU640C�BCE —°ITS"-R@P-1V T8-2Gh•� — 15" RCP -IV �Pit �I'..c/rT��11�,�''Ltt iii �' 15" RCP -IV/ II TB 2GI 11111y1�1O.A �t • yy��II'G .. ..ii_ un �3GI ,r FLOWABLE FILL " • 1 �� I I �r III:,`. rdPi,7��14 \ i! ICI: ���L��� 1��In .i\ �ln .. �}�,_. ' �,27 .��s�IAr <«Pi�.G1 A �il' am i_..• ��' �� �'' ��� �I�II i � I!I � nilu i i iiu �•'sj�.�/!>'. .1.2wi fs��refri .� .i, ._ 'g + �'.- ''� '11 n , .1 111 �; , > L`]�l°� :- . , `� �` 1 111: ,//� . � �`. it ,/ ir2 �. �. gegi,I� -ag• 0..�-�,��. s---- . i/�'K__ , , 1 .L 11 1 ,,. �.� a 0� ro A , n'1 nni:i y.. l' e1 Iu 1♦I. r I 1 1. •••. � � ' V ,— Y,11 /1A i4 AI —/ !//1 #Rf I��� • j1y;11�• _ \-; /.���.�����A/.�!!��/�i..Vi �r a.. 1 ru....�gy� r _. ' � —a % ���� ,_ ..... 1 I - 1 i 1 0/� — -- Z a"'.i3e _ - F .: i a. I '�ltts a'� y �•F1N _ �F - L v,✓ELBOWS. " �- '�Q' I .PACTS W ES 6 ' ' P S ACE WATE$- WD s,,yyy. EST.1 T•N 5 23°24' E S CKII'RWON P EST.S GT T 31. S �. ST. SW,,SXDSGT WD PPSWAkP TOE P:•-r. �P V°C .J I • ', II* / n SE• Se nr�IIIAAA�Y )r-i a, 1•' J s• s.=:aRs.s.a.�:�:ic:#:.�'I7•OyMIIII��Y �.�'v IE- 7JY\. B . TOE PROTE ION \ wCL B RIP P 11 ��.T'�� • ,a RIP 1 SOY -� / j . / .\ SEE DETAIL C y P♦ . :. S +40 6 \SITE 12 0 oP ' 4° E NOTE: Y ON WORKP ALLOWED CE BE CE AT 1 24 s 43°3v5z43 \ _ I \ryl A TIME AND MUST NOT p, K MORE THAM 50 o F HE -F_ `NE, z 4 f� ,-;-;-- �+ FAYE E. MCRAINEY REAVES 0 ti S 52°21'38' E I S 49°23'1'2' E 18.91 10.06' 00 .a, oe 00 w002s —L— PI Sta 8081-70.18 L = r /9' 34.4° (LT) D = 0' 12' 03.7' L = 659.69' T = 329.86' R = 28,500.00' SE = NC JAMES BRITT & RUTH B. BRITT R,W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR 8/ W ACQUISITION MOTT LAE�sOE a CDNALD�oeb9 LLC c DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED rreporenin Ine Office f: mec M Mro e°.a:n FugNv° oVmmnn°,w0C ]erica MACDONAID a. Mom,S,,, ENGINEERING 1223"�' FN°cun.6 c m 0 N m CO Ri 7 Ca a -C1 _o CO In 01 0 10 0 10 C N E C 10 w CC CC w 000 O iLL •, m= 1 150 140 130 1 1 1 800 1 1 1 1 1 801 nA/A—E 10 !.- 14:.0 0 S P. 00 Y 7 BPIDGE I1/DPAULIC DATA I 1DE,IGNFRCEMNIIIIMOO to " D sC`NGE = sgu0 CFS BAS NCY BA.; /lh ELCVATICN - 157.8 Fr OVE OVE W.S. AT 802 803 - /00 YRS 804 EXCAVATE TO ELEV. - 145.0" 1.5:1 RTURMAL h2• SKFNFII I RIP RAP KFY IN 55' NWS YJ S ON 10/28/2C CLE /. - 14,6' PRO'. I00YR. FEM W�Mb.4' 4 805 -L S B- S 1 NO ALL 0 O 806 E WO E' P PA LAC E 807 III PE IT DRAV S EET 65 0 11111 N 8 G 0 PROPOSED GRADE 808 Ex/ ST/NC Gh' 0ND 809 810 PROJECT REFERENCE NO. SHEET NO. 1-5987B ROADWAY DESIGN ENGINEER 74 HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION MOTT MACDONALD ID E, LLC LICENSE NO. P-0669 WETHERILL ENGINEERING LLC. LICENSE NO. P-0277 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M M 7621 Purfoy Rd., Suite 115 MOTT Fuquay-Torino, NC 27526 MACDONALD www.moonoc.combmeriws ra . Rd. ENGINEERING L9aT x'xo'wii2 TT Fa., sls asl slm FOR -L- PLANS SEE SHEET 29 811 • 150 130 150 130 -L N B- _- •••• 4IIIIJI!•1111 .1_ !H11 '��I• XCAVATC T• .w.#- .� ELEV - 145.0 II "�i IIrl�eR�iA`�'ai� 1 52• cKEWED M =FAJraaORME�-�eN Ate..—�.���_ Al ..ONZWIMPVMWBT M��...--...a tJ��Q MIZEMIELLEILIN P1 = 805+80.00 EL = 159.70' VC = 260' K = 3/6 DS = 75 MPH BM#58 ELEV = 146.16' TIE SPIKE SET IN 20" OAK L STA 808+48 — 71' RT PROPO ED GRAD' .. 180 170 150 130 800 801 802 803 804 805 806 807 808 809 810 811 CO CO CO w MIESMgEMN=LIMMIMMEM I 5 10 PROJ. REFERENCE NO. SHEET NO. IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ■■■■■ I-59876 X-211 7. �' JJ......LS'i1J......LTJJ......Li9'J 7. 1 11111111�1111111 J n 1 II i 1 40 yy W 0 10 I I 11111111111111111111111111111111111111111111111111111 WI i Illillllillllllillilllllllllllllllllillllilllllliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiillllllillllillllllllllllllillllillllllllllllllillllllll II1 Ilillllllill IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I 1 IP..n.11llliiiiiiiiiiiii 1111111111111111111111111111111111111111iiiiiiiiii111 111 1 PERMIT D ..iiiiiiliiiiiil RAW I N. �' : II• I. 1....II....... IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII :::'r' IIIIIIL,1►"'iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii111111 ,. �•610 ■■■■■ • IIIIIIiii-'i ...... r r I 17n /I IIIIIIIIIIIIIIIIIIIIIIIIIIIII:::::IIIIII 1::::::::::1 ••••••••••••••••••• ..................• :::::::::::::::::: d1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111■1111111■11111111111 Rilllllllllllllllllllllllllllllllllll i�WiiYYi� illllllillllllill 111111111111111111111111it��, �IIIIn111III1! �! ' �-�f ��1111� 1 1,1 .. ......... 1 _ 1■■■■■■■■.....■■■■■■w11111111111111 `'-�-" � .... 1 .......-• » 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 II II 1llll:iii111111111111111IIIIIIl1111111i.i.::.ia 00 11i1i11i1i11i1i11i1i11i11i11i11i11i11i11i11i11111i11i11i1i11i11i1i11i11i111i1i11i1i11inp.."ii 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 ,,i/11111111111i1•JIN111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII11111111111111:::::::I::::::IIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIII11IIIIII1111IIIIIIIIIIIIIIIIIIIIIIII 1 II1111111111iiii11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 i i 111111111111111111111111111111111.14n 13n 11 I �1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1 :O6 10.0 HQ 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 I 1111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIf�1i 1111111111111111111111111111111111111111111111111111111111111111111111111111111111 in ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 1 ..I ■.■ Mill no■1111111111111111111111111111111111111111111111111111111111111111111111111111111111111 ..I -- 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 - -1111.■.■.■■■■■■■■■■■■1■■1■■■11111111111111111111111■■■■■■.■■■■nm■1■1 1 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 /5l/ .i - --7.o MN ...................................... L....ns - 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111:IIIIII.::i -... I.....11 --. --- 1111111�1111111111111111111111111111111111111111111111111111i11:1111111 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111I111' 1111:111111111111111111111 ___I__1::__::_!::IEMIFI111!1111111111111111.:11:n1111111111111111111111111111111111111111111111111111111111 14n 1 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 .� �. _.� 11 I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII11111111111111111111111111111111111111 li 1■1111111■■1111. ........IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII. .■■■■■■1111111111 :..................................................................................................�-..... "' ""' I , n IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 111111 111111111111111111111111111111■■■■■■■■IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIF:i.f 11111111 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.. ill : ::1 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111:::::::::::::::::::::::::::::::::::::::::1 MIMMEMEMEMEMEMEMEMEMEMMIMMIMMIMMIMMIMMIMMEMEMEMEMEHEM IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 IIIIIIIIIIII111111111111111111111111111111111111111111111111111111111111111111111111111111111111 M ' IIEG]1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 11111111111111111111111111111111111111111111111111111111111111111111111111111 111111111111111111111111111111111111111111111111IIIIII11 1111111111111111111111111111111111111111111111111111111111111111111111111111 ' •• 1111111111111111111111111111111111111111111111 1' A IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 11111111111111111111111111111111111111IIIIII111111111111111111111111111■■■■■■■■ r 111111111111111111111111111111111111111111111111111111111 : 6�111'11I111111111111111E�111111�11111111���1 rr�::.:: 11 ,■■■III,I,L1I,■■■.,.:,.: ::. 11111111111111111111111111111111111 • 1 111111111111111111111111111111111111111111111111111111111111MI n�1 ........................... 11 ou■■ °'II •1I1lr'-_ii:JiuImI: mmomoi 1111111111 1111111111111■i.......... --- ....■■■■■■■■■;._ • • : I. i I IMMI 9;I::IIIia1ii11111 .■■■.1 211�11f111111 ..=.� •:: 111111111111111111111111111111111111111111111111 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■..I. "'��1 11j11_"""""II ■■■■■■■■i11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 ■■■■ I:IIIl11111111111:1j11�' �_ . .11■1 ■■■■■■■■■■■■■■■■ 111111111111111111111111111111111111111111111111111111111111111111111...ii■■ilii1111111111111111111111111 1 111 !iP. _rr 10.011 10000 :00000000000000000000000000000000000000000010000000000000000000000000000000000110000000000000000000000000000000000 11 I.1 r. r A AN r 111111111TY1 1 1 1 1 1 19YY1 1 1 1 1 1 19fY1 1 1 1 1 1 19TY1 1 1 1 1 1 111YI 1 11111f1'YI 111111111111111 Iff'111111 If!Y'11111111Y'YI 1 1 1 1 1 11TY1 1 1 1 1 1 111Y1 1 1 1 1 1 111Y1 1 1 1 1 1 11YY1 1 1 1 1 1 11 fY1 1 1 1 1 1 11`tY1 1 1 1 1 1 11'fY1 1 1 1 1 1 111Y1 : I I I 11Y11111111YY'1 I I I I I I PI`i 1111111 f1`i 1111111 YIY : I I I I I I Y1Y: I I'Pi 1 1 1 1 1 1 1 DIY I I I I I I YY: I I I`M 111111'H 1111111 I'YI 11111111'M I I I I I I CO CO 1D 0 10 20 30 40 50 GO 70 Do 90 1 00 1 10 120 1 3 0 1 4 0 15 0 1 6 0 1 1 80 1 00 2 00 2 0 2 0 23 0 240 0 5 10 PROJ. REFERENCE NO. [-5987B 2 5,1311 260 2 7 0 111111 1111 280 SHEET NO. X-501 2 90 cc 5 Eo m W L 1. co 01 Lao 0 CC 01 a O 0 020 O L NM En=W (00101 mELD S I T E 1 2 P ERMIT DRAWING S HEFT 67 OF 80 /70 n 040 0 0.020 n n5i� 50.67 /4n /3n 805 an 1 1 1 1 1 ... 1 1 elfiem a x1ih0 0 0 WET L4',IDS ..■ _.. .. .. .. NE .. . ... ... ... ... .. .. ... ... .. .. .. QI ■■ ■ ... ■ .. ..■ he) 1 1� I II .... 1111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII iRU —a_ .. a. ■.. ■.. ... ■■ /40 MN .. .. ... . 111 ... ... ... . . ... ... ... ... .. .. ■ .. .. .11111111111. IIIIIIIIIIIII.... ... ... ... ... .. .. .. .. /30 .. .. .. an .. .. ran W ANDS .. ■ ■ ... ■■ ... ... ■.. ... ... ■.. ■ ... ... ■.. /40 /.30 805 + 00.00 an ... ... ... EMM .. .. ■■ ■ ■ ■ .. .. ... ... ... ... .. .. .. ■■ .. ■■ ■■ /5n .... /osn II o.nao 0 020 0 070 /40 /30 /50 5C 63 /40 W 0 .0 3 0 ..d 0 04 0 LEI_ 170 160 f ., /50 /804+50.00 1D 0 1D 20 30 40 50 60 70 B0 90 1 00 1 10 120 1 3 1 4 1 5 0 1 40 1 1 80 1 9 13 6 0 11370 38 0 2 9 0 /40 /.30 PROJECT REFERENCE NO. SHEET NO. 1-5897B 30 PERMIT DRAWING SHEET 68 OF 80 100' 61' 100' GRAPHIC SCALE C 00 0_ r 0 o' CO CO 0) ti 00 so 6 +O' 0 E ,q 0c NOC I_ cCC 1n0 m1-L6 UCC C— LAI SHEET NO. 29 1 + 00.00 SEE 4 r * * * * * * * —L— PRC Sta.8/2+00.0/ DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING FAYE E. MCRAINEY REAVES co TOE PROTECTION SITE 12 �� 1< .,[•' SEE AC R - I WDI VV110.4.fpsc;/ K" -X/ iF iF iF if Jl XX L. B RIPRAP . X EST. 1 TON A X . iF *' 0 MJ . $ +; * iF 7f• iE iE tiiit F iF 9F 7E iE .. F 1e1 1' ; I"1•;1II cAlrn11 11111IIYI11 1 .1: .3Ei-F_ I 1i I_ I I 1iYF •irfr. •II I�'r�_r-e*,:wr ':- .. ``n-1 _--, •...- ? i ,xEy REMOVE - - - - - -FLOWABLE FILL _TB 2GI TB 2GI e,. T m� r rt- - --- O RA s TB 2GI I C 1lvv av r.Vb' IB'RCP INV=148.74'Pn cIN146.84' _OM ----- TB 2GI I Lb RCP_11L ---- _1132GL— 15" RCP -IV 1 / -REMOVE REMOVE --_ n - FLOWABLE FILL FES TB 2GI�p �` REMOVE 1. r am. I� .:1 15 *5 4074.W O . .. .. .. . ._ 4 4 •_ - - 1111f1i11i1L If 1�1�11- WOODS I. ' I- ... ���lfl�• il'31ia,er� s I I Y � .. C Y Y CL. BOP RAP \A� K- EST. IITON EST.S SY GT WOODS SWAMP X T—X Y IE Wp I IRA EST �T 11 O EST. 22 SY SEE SHEETA9 OF 80 FOR EN RGEMENT TOE PROTECTION wCL B RIPRAP SEE DETAIL AC JAMES BRITT & RUTH B. BRITT 0:` -L- Pt Sta 815+38J0 A = i2/'33.4"(RT) D = 0'12' 03.7" L = 676J3' T = 338,08' R = 28.500.00' SE = NC CL. I RIP RAP EST. 11 SON EST. 22/SY GT /4' 1 FREEHOLOPRmh.@B151ES INC N e0 —L— PT Sta.818+76J5 WOODS SPECIAL CUT 2' BASE DITCH WHINGE SEE DETAIL AS FnHA WETLAND CONSERVAT ON EASEMENT TRACT 03041 PER DB 701 PG 285-290 —x x x 60 WOODS c T1 RM/ SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION MOTS MACDONAID 1 & E, LLC LICENSE NO.F-6669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the a office f: M M PO Box 700 MOTT Fuquoy-Vorina•NC 27526 MACDONALD xww.moamgc.wmbmerias C C LLI LLI 2 N 006C L J TB 2GI 6" 5" RCP -IV -L - TB 2GI N 8° 21 30.0" E —a-T — RLMOVE' c`1X 60' GT JAMES BRITT & RUTH B. BRITT CONC CL. I RIP RAP EST. 3 TON EST. 7 SY GT SPECIAL CUT 4' BASE DITCH wHl SEE DETAI JAMES BRITT & RUTH 08 0 Q 0 0 N 13 ENGINEERING 22u�en°n Nac 6�G6' TT :. M2s1eim TOE PROTECTION w/CL B RIPRAP SEE DETAIL AC WD REMOVE arm u a�i a.;►raz.A .....wwro%%:iliiilif ice: .' . r► rr� a.i6��1�.�►. �7 ��� I� ��ti!s• .w _%.w .N .�f�isri1 1t►:yg :�ii1..Art y:'it.�...A-mm,�.-1 MOs DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Q10=40.3 fs V10=1.9 fp' IN`LW-148.8z cr tT PROJECT REFERENCE NO. I-5897B SHEET NO. 30 PERMIT DRAWING SHEET 70 OF 80 100' 100' GRAPHIC SCALE 01 0 0 CO CO CO CO 0 CC CO CO 0' 01 ti 0 O O c �v NEG >LL mLi10- ILL cc 0_ a * * * * * * * * * * * DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING FAYE E. MCRAINEY REAVES / I JAI // \ co NA' FREEHOROPROMMES INC co co 00 \}RXON 1 / / —L PRC li \..,�� Sta. 812+00.01 / TOE PTECTI SEE BIL I w1111- Lei l s ` AC j:. /F.��// it I� NP —L— PT o. 8/8 76J5Is GE \ z J EE 010 V10LT'CXST 1TON 1E$******** CM > i kj.1 - * * * * iF F� - �. y .. _ —s� Co1dc ��—use g LNCI T9-4Cs1 .��B3FiH c f1— M Mail '^'ter _- FL�WAB rltt •- �" -- — — .� - — _ — GRAS zGl— =GUORDCABLE B 2 �. - �RC*,v COF..- j15" _TB_ - r.-to:1T — - - RCP- N . — — — --i7TT --RE — ----/ REMOVE -- —ter _z KLMO' — C —O' x m`n -- _ ---—FLO FILL ---\ —_ — .\ 401.111-21.11, , — — IMMO • n mn n .e__.- uur • ' W0005 ', - n_ I ..... RAP GT . a— � 1 'Cs 60•' ; I� / � CL. B P / I�\ E�ST. IRON CST. 5 SY SWAMP A - • • WOODS TOE PROTECTION wCL B RIPRAP SE AC Tp . r S i wD f * CL. I RIP �/ EST. 22T� GT .�{ y $ ) J , / $ /�. $ / W / / 7, - E -w CL. I 'IP RAP ESL : TON EST. 7 SY GT tr y w-•�..w E .0 4' `EDIT kll SPECIAL ski /SEE`�ETAI Ste/ T 00I, r GE YF r / I / ` -- � JAMES BRITT & RUTH B. BRITT A�w \5G`i l —L— Pt Sto 8/5+38J0 A = I.21' 33.4" (RTl D=0•12'03.7' L = 676./3' T = 338.08' R = 28.500.00' SE = NC 0 0 1 � � JAMES BRITT & RUTH B. BRITT JAMES4ri2 T & RUT RAY SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT UBE FOR R/W ACQUISITION MOTT MACDONALD ID E, LLC LICENSE NO. P-0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED rrepaared in the Office of: M M PO Box 700 MOTT Fuquay-Vonno, NC 27526 MACDONALD www.meenue.combmencos 1223]ones Raper Pd. ENGINEERING sent F Ft;72i Tr . 91985181007 PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING SHEET 71 OF 80 100' d' 100' GRAPHIC SCALE O ON Cr) CL i CC CO CO LiN 0 m 7 01 0 0 0 Ev o-o� c ON w coin& 0 CC 01LLI MATCHLINE -L- STA. 892+00.00 SEE SHEET NO. 36 SPECIAL CUT DITCH SEE DETAIL B THICKET c * * * * * * * * * * * • HW A Z N, DENOTES FILL IN WETLAND DENOTES EXCAVATION IN WETLAND DENOTES MECHANIZED CLEARING DENOTES IMPACTS IN SURFACE WATER C,•���p��E IOVE DENOTES TEMPORARY IMPACTS IN SURFACE WATER CS 00 SPECIAL CUT DITCH SEE DETAIL B C WODDS X X 'c-fFo< X X J9ITCH -9L96K -44 TOP ELEV. 167.0 SEE DETAIL J CURTIS A. MABE X� i 0WW ISB NAD g zZ tip' �6 / S ry1 NVt2. WOODS C WOODS F FLOWABLE FILL 15" RCP -IV 0 TB JGI z - • TB 2GI 42" RCP -IV TB 2fl 15KLJICPAY_ TE12GI 0 - -GH 15" RCP -IV ( NO CLAIM VANCE U. TYSON JR SEE S I-58978 _ 37 RWV SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLE DO NOT USE FOR TE PLANS T/ W ACQUISITION MOTT MACDONALD 18 E, LLC LICENSE NO. F-0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office ofi RA FO Box 700 MATT uquay-Vorina, NC 27526 ACDONALD .wn,.mdlm0ccam*meric0s ENGINEERING uBB.rvec 77B70' t TT Fax. vs 3E BLoi 0 FOR ENLARGEMENT WOODS / N VATCHLINE -L- STA. 904+00 SEE SHEET NO. 38 0 8 SITE 13 / I 89SW AMP SWAMP / TOE PROTECTION MEB RIPRAP - SEE DETAIL AC WC�Lx IL 1� ^ E ST G / J WOODS ,' WOO DS e / L : RIP RAP SWAMP f� *fwfEfEff�B *fEfE * ._ ,../Aipr �� * iE iE lF iF dE 9t it it U ,r„ I rY r rr - _ R <. IC r n ..I rr i i�a3�stiF k re -...a o,u ' rr......• 7=,,,,ars:Kh +�'fIi.11� � t ry• „ ;. r .. -`x� ,:,,or, I .JI7�iII�SIe+��/r � s I Vre _ � WOODS Ly� w..,_ r iIf/��.. f r �./ AZ — B2GIU ' o o REMOVE -1•BZGr Iy RCP -IV v$2G1-- N U--,Jl.11.I_f_ BM RCP —IV TB 2GI 19" RCP —IV _-15" TB 2GI I16•. I---- ; 3 (, 9-'8' RCBC -- •I REMOVE I I� W4IEYELE2 HEADWAI I_ --- 90 DEGREE SKEW Al �` TRENCHLESS INSTALLATION • -- - 2GI W WSW Ll. REMOVE EM V� ,y .�.TB fi ��i Aillr.... r m1111115110..c.. ur r f. is eVrig �/�IYWATPA "a .urnun FiF r.um r '�' •, r' rrx "' "'a„xvrnr,.•n:•rr:rr'::rr� r rr Anrx ir rrr- _ . :�ii X Ill.��"* iE iF M M1E iE M iF iF fE iF it �' EXISTING Rio WC ' r 1� IICC„ LAs, RIP RAP K CL.B RIP RAP ySEE SOODS EST. 2 TONi*. IE EST. 7 SY GT iL 1- �/ . 2 \ W: RAP CL. I RIP RAP TOE PROTECTION / ON EST. 20 TON w/CL B RIPRAP /) Y GT EST. 39 SY GT SEE DETAIL AC 7 GRASS A/_[ -T-fi-261- TRENCHLESSI .0 d2"WELDED-STEEL 1-95 N8 '13' 8S 15" RCP -IV tJ' ,OSAT� NC II � II V I I fl II GR TB 2GI • WOOD CL. I EST. EST. ® AT- /svc----_-- 9s'PRroqE / PRIVATE PB 39 PG y2 SN PROPERTIES OF LUPBERTON, LLC FES REMOVE 60'W ISB SPECIAL 3' BASE CUT DITCH SEE DET F WOODS / o / / MON TB 2GI TB 2GI ODS 6.55 cfs 0-1.6 fps CL. I RI EST. 3 EST. 7 SWAM NO CLAIM H. MITCHELL III BAKER SWAMP WOODS /NO CLAIM JOSEPH MANNING BARNHILL, JR. AMP SITE 13 cr 01 01 Q 3 0 01 a m m m rn 0 0 0 0 C N E 0 01 01 w mcc N O[ F >/ PROJECT REFERENCE NO. SHEET NO. / vvc ROADWAY DESIGN PAVEMENT DESIGN PERMIT DRAWING SHEET 72 OF 80 DENOTES FILL IN Y WETLAND SITE 13 BUCK ENGINEER ENGINEER INCOMPLETE PLANS DO NOT USE FOR VW ACQUISITION 40: 4�J' /// DENOTES WOODS m •••:' WETLANQTION WAMP WOODS • • • • • GRAP-IC SCALE ** * * * DENOTES MECHANIZED * * * CLEARING m DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED TOE PROTECTION w DENO S FACE IMPACTS WATER IN w/CL B RIPRAP SEE DETAIL AC L. RIP RAP M • PENOTESSTEMPORARY WC EST 1 TON 5 SY GT WC 0 I I IN SURFACE WATER . AL - _IMPACTS K--- 00 SEE SHEET N � C ` FX TINC P II ,.1 RAP • �E �E �E �E �E �E �E �E �E �Emy_ •••• .w..w��a�l fir l�i�s►. ._ A * # * # * # # * # # * * aff Wm I ramRr.+w_. pm MIX' � i eIrl l A 1F FIFO* 1�I . n a �.��,I �i►.. '%i _ �_ % ���.:.. _ _ _ �3 ilili�iy���y_ _ .�.....ww.i��: •� +'� � � a� ���i��_ � .... i/er���w %�'�illr'?�� �w.>- - _ ��iliil� mywabi y dtal talk e �A' .��������i� �Ilid� en '�i _ - �, i e slito110.0W4145019 �IIf 11�,I�.�� � I ���iAA.A � ►_WA-star� �I _ -_ -0-pr _ q� _ � ��� �� >I�'�����.���f� r��!�� �I� �� WOODS a 15„ `,� L: �W (*±)---,-,u-' Li-J---c---)---c--us-r- 0 0 r el; 1 B 2GI REMOVE B 2GI r5022' - " RCP IV —fiB- - r,nndr 2-Gr 15" RCP -IV O" F Br RCP -IV TB 2GI 1 " RCP -IV TB 2GI _ . 3 @ 9' x 8' RCBC W/BEVELED HEADWALL REMOVE 90 DEGREE SKEW �_ TRENCHLESS INSTALLATION 18" WELDED STEED TB 2GI IA, 4 F REMOVE___,, ) onsf- •!0ll�,�, lit;'74; R' 4.4y2@ile5Wy 4ell � 2q”WaSr /',y%��0yrd' r'- r,%. ���aniTI , �'J- , %.I Ili .y.�rir,aa.�_ / _ . w�y 7+y..% lJ J$y� IAi�Ia — U,.m _-w I a ( I L�!!!t�l�, l,/ ! IIU�N0 1111 �l1►r■,. ,...alb/r!.:. i. 1�����I ���l�I�l� ��I�`��1� ��7 �■�I3i ��� ilr. -.�.-�... I 1�_•��V���� A�n. �•.�.t..I�.■. �� _i Ain.A �Lesi1litinglinNititreeillatellffit 1,wi'�►IAA �A'�►.A3''e'�ihilyri,tap, ai■'�'i'I I� nq i Alt �E X -I * * * �E 01X 7 STING R/W CL. B RIP RAP WC ! CLAS► SEE I RIP RAP K tSR J ; WOODS EST. 2 TON�y i EST. 7 SY GT \ VAN ; U RAP CL. I RIP RAP TOE PROTECTION B RIPRAP EST. 20 TON w/CL DN FCT �o cv rT SEE DETAIL AC / h PROJECT REFERENCE NO. cr 01 c 0 0 CO In d CC CC 7- CO 0 0 0 CU EC 0Oi 001a1C0 UIU. CC LL1 PERMIT DRAWING SHEET 73 OF 80 100' 100' GRAPHIC SCALE Cr) O W W 2 V) W 0 0 O 0 T CV 00 Q t!f W J 2 gV F/F / * * * * * * * * * * * S s, DENOTES FILL IN WETLAND DENOTES EXCAVATION IN WETLAND DENOTES MECHANIZED CLEARING DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER _URTIS A. MABE NAp 8 2011 5d � tit' 16 S ,E1 Aug. NO CLAIM VANCE U. TYSON JR _1=5897B SHEET NO. 37 R'W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLE DO NOT USE FOR TE PLANS R/W ACQUISTFION MOTI MACDONALD I D E, LLC LICENSE NO. F0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared m me Office of: M RA ".PO Bo: 700 MOTT 2gii manm c <o C 27536 .CDONALD . o . mAme)2a, rl ENGINEERING In'L-� Ncalwc TT sa.. slv 5'12 X oos \ e a woods ,VI �j SITE 13 B ��RV .) ® � / SWASWAMP/7, - n / TOE PR TE N / SPECIAL CUT DITCH / M✓CL B R RAP SPECI L CUT DITCH SEE DETAIL C DETAIL B �? SEE DETAIL B /.,. / DD •� ! I OODS � RI• RA y r 1 N ,,.y 5�5 •TI '/ / SWAVP WC IE E Via. :��• ,,, I I1Ji / s.• 1/;' RAP \- THICKET WOODS P J . VE EXISrING R/ '' `J/ �_ D "OOD _ -1�-s- - X -- Y` 'WW ISBW s g' $ `��� 14412R C >H' nlTrN r4•• 7 n rei ac a I� r _ r F �+ � rar ¢ r. � r .. rr.orr u u ar as r n`aaruu--- ---_ rar®I�h/'.�1 `�A�.V� <<2`rL _. a Eiar�a i a - . ."' sfJ SEE DETAIL J '� �.'il X •• 1 ��Sl�.rrI�/�i Q,16 C �., �� ���-�%Y.1 iil����� —,.. �► 04 J� El�ii /�/I�✓®� i�►�.Il►,�viJ/_/��C,li! .�� < .., ..,es..s? ' .,� —,�,— - - - - - ��� —� a _ ---- � — -- --� N: ---- — I m ,FLOWABLE FILL _— 1 O —TB3GH--- REMO __ —n3-2Gr —! ,. TB 2GI I 42" RCP -IV ; � s,. „ . -. —TB-2Gt_ — - 15" RCP -IV ��w ._—�L�—1PIV v c I �� TB22faL15�CP_IV _IB_2GL — —_ GRASS N Pr' lag Br RCP -IV TB 2GI 1_" RCP-IVTB 2GI _ ��----4-fl-2GF---1 , 3---°— xB'TCB� TRENCHLhsS I' '' ON _ . 11N --- FRS ._ Be 261 —18'-WELBED-STEEL_,.e a. me — ' EMOVE —� _. — _ I.in _ _ e. - r 111� ' t ..���%��f�`� a ryur i ie �„rli . { ....fi... _ rr.nr r ra a r r erx�'�,, _,� � Asa L.�i 1 �wJ/��i� �� ' ._p I ....e a rn r a r. I::r +. r n .. r rar ear• r. r .0 . r u r! �s a WOODS --- y — _ �/� "7� `� iE 1F iF 1F 1F iE iE * iE r °R iE JE 1E lI� III 11 'a' ' ' A :, • / T RIP RAP , — - - �`"V X— \ /� CL. B RAP .7 EE � . ` _ I- OODS �s �- --- - , EST TON , �a ���' --1 - e�� �'(E E T. SY GT IL \•\� / I / P �i9 F -- NASAT — �' IN srC I '•Or r �r TOE PROTECT! N \ / T. a SPEC . SE I / CL. I RIP RAP CL. I RIP RAP wyCL B RIPRA fr S DE a V EST. 3 TON EST. 20 TON _ _ _. _ r� EST. 39 SY GT EST. 7 TAT I $ '! AT\ 010.55 cfs SWAMP .� V10=1.6 fps �'i / �- I GR — �I �� / / // SWAMP � ( B�KHO SITE 13 / 4"''':, i /% ice/ ..' _ II � II V TT VC SN PROPERTIES OF LUPBERTON, LLC H. MITCHELL III BAKER WOODS /NO CLAIM JOSEPH MANNING BARNHILL, JR. PROJECT REFERENCE NO. SHEET NO. SITE 13 PERMIT DRAWING SHEET 74 OF 80 ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER ]NCO M]P]L]E DO NOT USE FOR TE PLANS R/ W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 200' LT. 100' LT. 100' RT. 200' RT. 1 1 5987B_hyd_CSR _902+33 (13).dgn 7 5 0 0 00 YR. LEFT TOP OF BANK RIGHT TOP OF BANK EXISTING STREAM BED P WS PROPOSED ROADWAY SEC ROPOSED EL,1635'� CLASS RIP RA 6" BtVEL ION EL) HEAfWA . .°001.11W- ' TOE WALL 0 N CLE SUITABLE FILL LEV. 153.1 0.20 % GRAD 0 E GPLB3 N GP - CL STA SUI 4' SKEW GPE @ C',PF 9 9 0+33 - B3- 0 L; 3-S=168.53 I 3-N =168 53 3@ TX8'RCBC W/BEVE E ' HEADWALL TAB F TOE WALL EXISTING ROADWAY SECTION 3: WS A CLASS I RIP RAP 1 02820 ORMAL 15 7 WS EL 1 5 r/`(IMF/ LEFT OF AVZI RI OF P B•K VI Or HT BA TO N K 1 P1 7 6 0 0 150 7 MI=MIMM=MMMIEM ro 0 7 • 0 5 10 PROJI-5987B REFERENCE NO. 1 SHEET NO. 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 ■■■■■ X -275 1 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 �• " "ill' ' IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIi11 I� I " "1 Hill.. ■■■■ 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111►. 1 III Ilil III �1111 1111111111111111111111111111111111111111111111111111111111111111111111111111111 : T ■r-�■■■ ,.■..■■■ ■■■■ :::: .1;. i..i ••I ;-- .:` IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII11e1 �Igii 1r ' :-= mi amr='' F .' 11111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiiiiiiiii •1L III. F, ,' it in ir, 1,,ii I 1 ' ' ', ..............................................■■■■■..■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ nnnnnn00000000000000000000000000000000.�o..r le■■■■■■■■..■■■■■■■■■■■■■■■■■■..■■■■■■■ d �rSD ---.G_ r� ■e_as 1111 1111111i..�....••••••■•••—•�-- i ii IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII■�!�1_YG IIIiGI11111111111111111111111111111111111111111111111111111111111111111111mume1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111�EIN1_III-iME:iiiiiiiiii111111111111111�i111111111111111111111111111111111111ii111111iiii�iiiiiiiiiiiiiiii 111iI1111111i���1••: ■■■■ ...■ �Lr_-....■■■■■ .C-9Po -�� � �� 9.--7.000aiG� ■ ■ ■ • •1� .. 1 IIIIIIIIIIIIIIIIIIII III 1111111111111111111111111111111111111111111111111111111111111111111111111�■11111111111111111111111111111111111111111111111111111111111111111111�1iii1iii11iii1iii11ii:1.., _., _- ' O2 + OO.O 1! ' i 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 m HIP 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 ; 111111111111111111111111111111111111111111111111IIIIIIIIW1111I111N��I111111111111111II11111111I111', I; .11g �rsgi�d'rtiin ,;;••"Mill.e 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111iR " :_i1giggila 1,,.,.1114°. MSC � ����F; ..., 1'... �___- •:__ _:. 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 °- ..,- - 11 ■� 111111111111111111111111111, I� 1.. IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�_ 11111111111111111111111 H911 .■ col 'rr. �..iiiiniI. II1 . Ill 717■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ — 11111 11 111111111111i.... ' 1 11 1 " "1 t 10 iIAN•S 0 .., .� — ■■-- I ' .. � � � - - _ �r 16-.66 III II I III III II III II III III III III III III 11 Ill II ill 1100 011111111:IIiiii11111 4• of + ' O.O' ■■ i i I 01 NCO CO 0 5 10 PROJ. REFERENCE NO. I-5987B SHEET NO. X-567 10 0 1 0 2 0 30 40 50 60 70 BO 90 100 ran 1 i 0 0.040 0.020 0 120 0.030 0.040 WFTIANTIS a_ 12 0 1 3 0 S ...i E HHH 1 4 0 650 W Sin 9 40 ARO • I 0.040 0.020 • 1 .1 0.030 0.040 Lj WTI (NrSS 144d1 �-4 n I 0 140 904+00.1 i I. n 4n 9 1 0 1 ...— MEM- i i i 1 0.0 vi LT. ...- MEM 0 1 0 20 30 40 ■ 50 .. .. .. .. .. MN MN MN MN MN MN .. .. ■ .. .. 60 70 Bo 1 00 0 2 0 1 0 4 0 1 1 61./ / cU lyb 0 0 2 1 0 2 2 0 2 3 0 24 E S 0 2 RM H E E 50 IT T 26 D 7 0 27 0 RAW 6 0 F 2 N 80 8 G 0 2 0 0 'Pr) N... N... .N .N N. N. ■.. ■.. ■ ..■ ..■ ..■ ..■ .N .N N. N. vn ..N 1E0 10 IS() /70 150 140 NENE .. .. NENE ■ ..■ ..■ .. .. IPO an NENE 00 2 0 2 2 a 2 3�T 2 4 2 50 2 0 O 27 0 2 8 0 2 00 rn ion • YI 1 1 1 1 1 119'YI 1 1 1 1 1 111YI 1 1 1 1 1 11Y'YI 1 1 1 1 1 11T'YI 1 1 1 1 1 1 PROJECT REFERENCE NO. SHEET NO. 1-5897B 38 1O0' PERMIT DRAWING SHEET 77 OF 80 O 100' GRAPHIC SCALE SEE SHET 78 OF 80 FORw LARGEMENT DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING NO CLAIM VANCE U. TYSON JR "CHLINE -L- STA. 904+00 SEE SHEET NO. 37 SITE 13 TOE PROTECTION v,CL B RIPRAP AMpSEE DETAIL AC i CLIP RA 7 TON SY .GT X NO �a0 JOSEPH LLAIM BARNHILL X E SE SE iE 3E iE {[. iF 7F iF ii 111 I _ Y -'*r: ii F IIII I. i1 � — Air w000s CONC ,. TOP_I64.88' TB 2GI ,�15 FLOWABLE FILL ---e- -- --- --- THE -- �L16` REMOVE ��, X X X• X�X� * *»* ` _ NO CLAIM T.7 TON 11 EST. 15 SY GAT RAP EST'31PON EST. 7 SY GT .. �f'"'J . TOE PROTECTION vdCL B RIPRAP / SEE DETAIL AC SWAMP -o co 7B_RDY_PS 2y Noc oic o wcC L" CB C Q10-22.8 cfs V10=1.64 fps WOODS X DS, RCP -IV N 8' 21' 30.0° E NCHLESS INSTALLATION D-STEEL- O 0 NAD 8 2011 SP Cf; IAL CUT 2' BASE DITCH SEE AIL I 60'WWXISBW —L— PC Sia.9/0+34.73 CSCLAlE AND -LXIEN 24" RCP-V NO CLAIM DANIEL F. CARROLL 60'WW ISB EST.11 TONS EST.22 SY GT —L— PRC Sto.9/2+04.75 NO CLAIM JOSEPH MANNING BARNHILL, JR. WOODS SPECIAL CUT DITCH SEE DETAIL L EXISTING 5/6 �X X 10 X X X WOODS 2GI S \ _m1 rrb11'.2 :V: I.I SYSTEM TO BE BUILT BY OTHER.; UNDER U-2519AA X X X TR EXISTING F/W WELDED STEEL —L— PT Sta.9/3174.76 —L— Pt Sto 911+19.74 A = 0°/6'41.9°(RT1 D = 0' 09' 49.3" L = 170.02' T = 85.0/' R = 35,000.00' SE = NC P1 Sta 9/2+89.76 A = O'/6'41.9"(LT ) D=O'09'49.3° L = 170.02' T = 85.0/' R = 35,000.00' SE = NC REMOVE SPECIAL SEE DETAIL L RAN SHEET NO ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR 4/W ACQUISITION MOLT MACDONAID 1 & E, LLC LICENSE NO. F-0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M ILA PO B°. 100 MOTT 11Lo www.m`Vanc. nt 37526 mrienon6 ENGINEERING 13 ui TT F•.. 9i9 esi a°o; X X�X X X X WOODS 102' BST SHOULDER 1-95SBL 237 B57 18. RCP -IV 777AST-'77/a L6tB- 1-95NBL 23.0'BST NV=165,Q5' 10.4' BST SHOULDER x SF•WW ISBA WOODS PROJECT REFERENCE NO. SHEET NO. N 01 Q 3 01 CO CC CO CO 01 7 y 0 CO CC 01 0 In PERMIT DRAWING SHEET 78 OF 80 4 0' 0' 0 01' M GRAPHIC SCALE 0 z LU W W W N 0 0 0 Q Z J 1 • VVUUUJ WC TOE PROTECTION w/CL B RIPRAP SWAMPSEE DETAIL AC CLIP RA 7 TON SY GT .ZZ ifiali r // w _AWA ram► ,gig JI �r.11 ► .!ir A'.�Ar r�='CIOoosaimirge NO CLAIM DENOTES FILL IN W27.6)N D TOE w/C SEE FLOWABLE FILL C X X X �7 C �� X \AJ PROTECTION * X L B RIPRAP * X DETAIL AA * + CL P a° EST. 7 TON EST. 15 SY GT Q10 = 22.8 cfs V10 =1.64 fps ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER INCOMPLETE PLANS DO NOT USE FOR IV W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Q10 = 21.0 cfs V10 =1.64 fps X X REMOVE TB 2GI TB 2GI NI-QODS CL. I RIP RAP EST. 3 TON EST. 7 SY GT DENOTES MECHANIZED CLEARING 1 TR 1� -411 -411 m G- 01 m co co CO CO CO LP 7 01 3 0 7 —E� C,Ci jL C• COLO LL UlU f 01 W / PROJECT REFERENCE NO. SHEET NO. 8 2011 /-5897B 38 aPP RNJ SHEET NO. PERMIT D RAW I N G DENOTES FILL IN F F P WETLAND 5 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER SHEET 79 OF 80 / INCOMPLETE CE PLANS * * * DENOTES MECHANIZED FOR DO NOT USE POE R/ W ACQUISITION 100 �' 10B' * * ** * * * CLEARING • • • • • / GRAPHIC SCALE " MOTs MAC SE N O 06 9 LLC UCEN P ® ati°� NO CLAIM DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DANIEL F. CARROLL VANNO C OIMN JR / U. Prepared in the Office of: Mmon M ro" riva a", NC 27526 CD ���_ __tooNALo O� 01 p� Ate. rr9 es. gE ) ( - ___,,,----- s ''--- --v r-_ -,_=__-ti5 \ ) I �,cs_ WOODS C J WOODS ) /�-� \ ��y SIT' 13 �/ P�\ N �A CLAIM \ \ C� JDS'PH BARNHILL M TOE PROTECTION / SEED B RI L AP S a PSEE DETAIL AC -----1*2 U \ — "� _na<� N_ I 1 _ J r 0 O WC V1 0 21 CL. I VI0 1.64 / P CIAL CUT 2' BASE ffCH S ECIATNCUL DITCH2 0 fps ® SEE AIL I / fps Z r�/�/ .. SY .GT �C � �C �/ \ EXISTING .11 EXISTING a.'� I- .4SY X X X XK X X X X / 60"WW'XISBW/1 X X. -. X �X - _ X X W m.m n -, v s1 �i -, . -- � .__--- � = I I m m r=1 n - r -�� WOODS 5 t' S LLJ _ I � � " -tea. *�.�i. y�.►r.�.is�.��.�Sr �•�. l" % ` w- rai / are ss �U / V , �� —_ -- — 0 u. 10.2' BST SHOULD o o 1-955BL �2'BST _,1 --- - CONE'. 1IN.t l' �, FS 7.�'I— ., ��l'�" . I 73 n' 18 RCPatr —n•— ..,_.,. -• •� O g, ei rn 1.,, ..� _. _.�_ _R. en PLOWABLE FILL �I tip\ T � ., i 9. TRENCHLESS INSTALLATION ea STB,4g SHOULDER ..S7 CA 61 o� ANu Dx �'�- - "R , J �.� —„ to = .a"_ —s ue Y�$'.� �/�✓f i c — ,�; ,� ��J \24 �wSYSTEM TO BE BUILT §,Yar. REMOVE �/ ��, ��y/►.w�j/%� /��i�i�t-'��ii3G�� �"- <N°Err'r2sm`,� r� � � :�, .;.- a a III � I n I III III III 111 III AI I .I III i I a1 r ....r r .... , qq .. Z * iiil nrr°ui i .!r DS la���r' O.O ,* �F / is. — - . - — ww Is _ / L.IRI .. • 60+Ww ISB G�3+�!� IIIIM— . - X X CX Xm U � CL:I; per• .: E 7 TON ST.7 OM NO CLAIM EST. ®Y GT EST. 7 Y Ti• H. MITCHELL III BAKE' TOE PROTECTION r / U MOCL B RIPRAP SEE DETAIL AC EST. . O ��-- EST. 22 $Y GT R TR - LA ' ' 24" WELDED STEEL SPECIA SEE DETAIL L LJ �16% \ 2 8 cfs -L- PC Sta.9/0+34.73 0110 RE11. -L-PRC Sto.9/2+04.75 / -L- PT Sta.9/3+74.76 // : co SWA4/P a/ " $ ® 4 c ID NO CLAIM ' JOSEPH s MANNING BARN L, J �+ �^ '0 -L- Pt Sto 911+-19.74 Pt Sto 9/2+-89.76 L = 0° /6' 4/.9" (RT) L = 0' 16' 41.9" (LT ) D = 0' 09' 49.3" D = 0' 09' 49.3" L = 170.02' L = 170.02' T = 85.01' T = 85.0/' R = 35.000.00' R = 35,000.00' SE = NC SE = NC Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 -L1- 530+90 to 535+85 RT Bank Stabilization0.010Channel Improvements0.056 0.118 0.062 0.0012 -L1- 536+85 RT 42" Welded Steel Pipe0.011 30Base Ditch0.006 0.004 50 203 -Y4- 31+00 72" RCP0.074 0.026 0.012 0.001 65 20Riprap Pad outlet0.003 0.001 25 104 -SR5- 14+00 to 15+00 RT Fill slope0.000 0.0235 -L1- 575+20 to 589+50 RT Fill/cut slopes1.181 0.565 0.646Bents and Causeway0.001 0.047 10 1506 -L1- 592+40 LT 48" Welded Steel Pipe0.001Riprap Channel0.014 0.0037 -L1- 621+00 RT 2@54" Welded Steel Pipe0.022Riprap Pad outlet0.005Rechannelization0.1427A -L1- 622+50 LT 2@54" RCP0.008Rechannelization0.009 0.0058 -L2- 655+00 RT Rechannelization0.008 58Riprap Pad outlet0.006 0.005 25 109 -L2- 677+25 2@8'x8' RCBC0.315 0.068 0.051 73Bank Stabilization0.006 0.005 20 10Riprap in Channel0.029 0.047 86 100-L2- 673+35 RT Temporary Bore Pit0.010 0.02010 -L2- 708+50 1@6'x7' RCBC0.226 0.181 0.126 0.142 0.013 320 4011 -Y6- 23+50 1@6'x7' RCBC0.004 0.014 0.026 0.003 101 2312 -L3- 790+00 to 816+80 Fill/cut slopes2.883 0.003 0.929Bents and Causeway0.008 0.289 150 3013 -L3- 898+00 to 907+00 3@9'x8' RCBC0.753 0.014 0.409 0.052 0.029 50 20Riprap in channel0.048 50TOTALS*:5.432 0.00 0.833 2.379 0.00 0.682 0.453 1113 433 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET 80 OF 808/23/2021Robeson Co.NC DEPARTMENT OF TRANSPORTATIONI-5987BSites 1, 6, 7 and 7A are Tributaries and therefore Surface water impacts are considered for area only.Site 9 Excavation in Wetland may be considered temporary impacts due to backfilling of the bore pits after installation of trenchless pipes.Impacts should only last 1 month +/- and will not require mitigation. WETLAND AND SURACE WATER IMPACTS SUMMARYSURFACE WATER IMPACTSWETLAND IMPACTSDIVISION OF HIGHWAYSSite 13 Riprap in channel impacts will not need mitigation.Sites 5 and 12: Permanent bent impacts calculated using 3' width by the length of the bent within the JS feature. 23 sqft and 365 sqftrespectively. -5987,_ut_ts _UCO 09/E8/ 9 TIP PROJECT: I-5987A See Sheet UC- 1 For Index of Sheets See Sheet UC-2 for Conventional Symbols 1p LVMB ER R7, EXIT 22) UTILITY CONSTRUCTION PLANS ROBESON COUNTY LOCATION: 1-95 IMPROVEMENTS FROM SOUTH OF US 301 (EXIT 22) TO 1VORTH OF SR 1758 (McDUFFIE CROSSING RD.) TYPE UOF WORK: GRADING IPA Ll DRAINAGE, STRUCTURES, WETLAND AND SURFACE WATER IMPACTS PERMIT y�. BEGIN BRIDGE —Y2— STA. 28 + 80.29 END BRIDGE —Y2— STA. 30 + 71.29 BEGIN TIP PROJECT I-5987A -L- POT STA. 67 + 00.00 TIE TO TIP PROJECT 1-6064 -L- POT STA. XXX + XX.XX A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF LUMBERTON. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. THIS IS A CONTROLLED —ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. NAD 83 NA 2011 EXISTING WEIGH STATION • (EXIT -L— 1-95 L r BEGIN BRIDGE —Y1A— STA. 40+3.41 BEGIN C —L— STA. U LVE RT 10+34+/- END CULVERT —L— STA. 310 + 64 +/— THIS PRELIMINARY UC PLAN SET INCLUDES ALL ROADWAY SHEETS. ONCE ALL PARTIES AGREE ON PROPOSED WATER AND SEWER RELOCATIONS, SHEETS CONTAINING NO RELOCATION WORK WILL BE REMOVED FOR FUTURE SUBMISSIONS. T.I.P. NO. SHEET Na I-5987A UC-1 PERMIT DRAWING SHEET 1 OF 4 END TIP PROJECT I-5987A -L- POT STA. 495 + 00.00 TIE TO TIP PROJECT I-5987B 0 -L- POT STA. 495 + 00.00 BEGIN BRIDGE —Y3— STA. 28 + 71.69 BEGIN CULVERT —L— STA. 454 + 80 +/— 4'6 END CULVERT —L— STA. 455 + 00 +/— END BRIDGE —Y3— STA. 31 + 36.53 TO FAYETTEVILLE p 1" ELIM]{NA Y PLANS DO NOT USE FOR CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNTIL ALL SIGNATURES ARE COMPLETED 1 GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 `1i11 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) J INDEX OF SHEETS SHEET NO.: DESCRIPTION: UC-1 UC-2 UC-3 UC-3A UC-4 THRU UC-39 UC-X THRU UC-X TITLE SHEET UTILITY SYMBOLOGY NOTES DETAILS UTILITY CONSTRUCTION SHEETS PROFILE SHEETS J WATER AND SEWER OWNERS ON PROJECT (A) WATER - CITY OF LUMBERTON AND COUNTY OF ROBESON (B) FORCE MAIN SEWER - CITY OF L UMBERTON J PREPARED IN THE OFFICE OF STV Engineers, Inc. 100 1600 Perimeter Park Dr. ee Suite 225 Morrisville, NC 27560 NC License Number F-0991 (919) 238-6672 FAX: (919) 468-8007 ANDREW PARKER, PE CONSULTANT CONTACT #1 ABBEY NARAYAN, El CONSULTANT CONTACT #2 CONSULTANT CONTACT #3 / DIVISION OF HIGHWAYS UTILITIES UNIT 1555 MAIL SERVICES CENTER RALEIGH NC 27699-1555 PHONE (919) 707-6690 FAX (919) 250-4151 BO HEMPHILL NABIL HAMDAN RICK HANDLIN RANDY D. ROGERS EASTERN UTILITIES MANAGER UTILITIES REGIONAL ENGINEER UTILITIES ENGINEER UTILITIES COORDINATOR i LO NOTES: 1. XXX PROJECT REFERENCE NO. SHEET NO. I-5987A UC-06 DESIGNED BY: ABN DRAWN BY: ABN C 01 (n Q I CD co 0- LC) CO 0 C 0 E C 0 L C W In E 0) a_ U 01 C L 0 0 C 01 C W CVO o Q rv- (0 CV/L \oo� LpE0Z p4V5"•0. E / -SR6- LCC Sta. 57+37 -DAVID GOODE DB 1181PG 810 MB 41 PG 129-1 NO .o -SR6- POT Sta.62+23J7 4 \130 -SR6- PT Sta.61+34.30 4• 45 2.2 NO CLAI BST / // 129 'OLT LTA \� jr STREAM AND WETLAND IMPACTS DENOTES TEMPORARY IMPACTS IN SURFACE WATER CHECKED BY: ATP APPROVED BY: REVISED: NORTH CAROLINA DEPARTMENT OF TRANSPORTATION UTILITIES ENGINEERING SEC. PHONE:(919)707-6690 FAX:(919)250-4151 UTILITY CONSTRUCTION PLANS ONLY UTILITY CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED N V 5 NV5 ENGINEERS & CONSULTANTS, INC. 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 P: 704.537.7300 www.NV5.com NC License # F-1333 STV Engineers, Inc. 100 900 West Trade St., Suite 715 ea/(4, Charlotte, NC 28202 NC License Number F-0991 PERMIT DRAWING SHEET 2 OF 4 D-1482 PG 372--- ! lti -, -Vb[-// .'i /� 41 PG Y29-q0 i� '•%a. 36 Tl7P-129sa - cuss 'c \ GbS / // v� / END CONSTRUCTION ' /, / _ .;ig _sT so / / / o . 9 �j / /� � � 63 INV 12f 28-`- E�'Vj X / 4•/ //j 20112 LLc / y - .y. e y 16 / - / /i p O -SR6- PO , Sta. 56+00 eo ,/ ate" �/ \,,/ / 4'� 9ti / // e / �"Z/9t60�00 `t' oNc // / / PT Sta.109+00.73 SITE 1 / // 44L- i�// ;�-�EN�c! - / / ? 21 / -PB- %� av7 4 �� . ��It \ s� • v YIRPB- SC Sta.l2+p000 �.�� �►� / I ,�� - -PC01-4._a9t:49 i/ %, ea �� £I .� �.b� --�� a 7I �.= �� �� ,v, � ��i �� v /� / / /�� �� / .,I 1 / I / / /� / i e / / �� �� . '4 6zt 0. �"� PROPOSED 12" WATER LINE IN 30 CASING \,"`� - - - '• /// •.. / 44 / % /ji 'T '� I ,..� / / e // I w �: ° g y ° \� 1P� aD ADDITIONALPROPOSEDTEMPORARY 26 IMPACTS IN SURFACE WATER ld L y �/� /� Db�47.6z'Q / / / - 144.3 L01 <t-� V" / �. / ./,r /i 1I� / �6 , - - V m2t .i2i rO . �OrJ4 AC �130 q N DAVID .� �'�, / .a Z / �. GE / ��% / k> �� p �����N�u� �� 'a es E'er o r, 12 - -YIRPA- POT Sta. IO+pO �f �9 in +� DB Pc o�/� 3oz DI / / / / 3 �� <� M CONG / � <.; ln '' /� -L- POT Sta.109+93.00 28 ,I Y ,, 26 PC Allatilk 3P N 4 , 35 -�,i % 3 / 5 RCP -_____IV a / ✓ 9 5"` c � ti � ti BY'-3 \\ Q e/ ti o • .:3O 'PA- �/ w �: C - 2 OFF 6/AO LT e�-Conv. \�.7-�_21--C&B- D1 TO //48" �7s /� CANS Tl\ a[ PI CS Sta. - .5 � +/-EXISTING ST,.ti `tP V=.,8 7 7u_. p -SRb- S A 0+90.00 7 IB . _ .,l H� PUTTT." /` a.,� -\ �• e1. p C".S '6'RIP RAP- ` _ _ \ -A a. l8 C2.II ic o / pN�[pNp� -Y/M"'' /JJ/U./.: -� .J1p0yp � �12DI �. NV=123.�y/�\�'" / 9r 7Rt PC _ f`�EST.5 TONGT \ �w�'ti % o 6�,.20 p ser F OF •H- NEL7 OVEM.,.. PoNDC,Po'IV �-a ® 15 ri I. a G® -iI _„\ 14 33 dY� �• 13 - �bZ • '1A1! \ // • / _ � NP 'P l.�® rTOP=129 B57F Q - y'_BINV=126.05' \ SS IP RAP '/'.\ ES 20 7c.. r. ;•.T,. E34 • - oo - Conv.DITO� --- 16 ../..' _•' __- _. '� ��'/.� - � 11• 13 / ill � ' / orad`.- (� 53 'e r7 Na"3o:.�.� EST. O 4S BLK \\.10 -__ ., iy .- !. r . �,� /�` I • r' '�N1� •. 1 I 05 ^, 4- cn 4Jr l �� t� CP_I ii RET N 2^C8G -�.at•�riKv >haaramY '�'v .. \ TB ......55G3 �� _ _ _ SZ1 - /-_ 1 [: sa _ .- 32 Ails '. I a �/ °3 _41 2£tr - - a 10036 2� YIRPA S to - [ N. ° �\.� _ m �- F/ o C. N or.n IjD ,% �\ p. ��# -�- \l 28 „-...n...:;:�_� MOV �' ,. i, 13� \ t ,. .� t��C 1. b$ j _ ` rf '�w�,�` ...,\ ��1-I • s i��... Vcj'�6 I .. I OM ._- a. �yi' / :: "• ,. �' / 15 JY/I +:. / 3.^ ,.II'' I a, i '� / -- 6.,�. 13e •ideL ems 1iT wv �\ -13L20 ..4a 0' 9 / / _ 136 ..,iC'.'�! �I / QS' "�. "f , 1� - '. YIRP..A- PC S�iJL•Is-_' ~r�% �. _ 85 �'"_ `s��- P=125i 'Zil> yP 8. •. \ � BST -, \�h /� INV 12519' ` �'o E E E ROBESON COUNTY BOARD Of EDUCATION i I , C -.S ': RIP RAP D8 181 PG 224 - - YMPB .4.03 - -0111.1'pier,_ i ./. .. - e2�11 , g, _- a /•. a 2�w. 1 i - -_ V . DUE R. EST. • T. NS DB 26127 • 4. _ � OVE - ��•` y° i I/ tat ..gip `� •ETAIN 1" CB iii�,' 12/ -_�-�� r. -.. �- - , p � tr. PVC r G --- IMENN®-_ .�.- - \ __- n,r' {� �, '/l•'�• .� v' _ _ - •.....-:.-.f , A - B- ST Sta.18+10,66 PGI ' -. -��1��1•.'.�r�is� * " FS RE �_/ iu .• • = o :.7/ - � �n„�. 1 _ - al; r__ _ �.ueY ram � ,i1 aew' ��s - T• �.ir.. �L ►�:7.���� -_�- i.�r .R• DVr -1V ��.,..�'3=- EST. 7 SY �("� - ---- �i 1'"� 1 `C S' tpy3' - �31 r_ ® 1C .__�_ Z- L� -Ft' 93 _ - �- - A -148 55 • „n �_ _ �� • _ ---125 SE 4'449.62 Po-•,� gBi ` �iY c _- - -':- as 16+1D.6•.� . ��\...�i� - i �_9���,eT ;-2 2GI-A-- � ; �a '9 tLZI �I- �^ 4gSr -� I � ___ I -,-_." - - ..ig • '-VA 30 24;;--RC ice'' •- [E ___e_ I ZL g RCP -IV _IV ___ _ _ � V -- r _ _� --_ _ �-.. - - _ _ £ it !'& 0 _ - _ - _- -� s _. - - _ OCT � - _ - REMOVE �IJ�IIPJf� _' POSSI�ia.�w+�•'�i �' '_ �•r� �w� 1 mEi 2-4 CHL �.a __ ,.� •>.•..a.:w. 11b E - ... ,.max 4� M=r.: - �-- IIII - _-_- - -' - �__ -- -- ����e�� -�i- - 4rrr� ,l-•9, US 301 s ° �'ST 15"/RCP-IV !/ @/ R 0 !. • 4� -- PLUG & FILL -- a1rT �an�.i. T 30" TRENCHLES�-- -V / TB 2GI 61 aAOMMW .: 4rr� REMOVE • StfL- -7 N /4 .erT.TB 2 _. �8-2f.� -- - _- _. 18" RCP -IV ,.1� - a1T ii■ 1T� I - - - - - -• 7N7My __T lirrNC-,REM9VE 2 �15"RCP-IV I N /5'12'I6.3"E PROP. TYPE T BARRIER "RC ®- 15 P-IVY.. - - - RCP -IV - !7;[P=24.1 ' --� -� .-�_. - .� „ , 1-95 .' 01NI7 4, BST /'31 ' rt7.TT:• _ ml' IIM,.. I I • - �{-`_- �� 6p _= -- ~ LIM / .-_• i!i/ -- PLUG &FILL _ __ -_ JN1L=126A5 i3 pTT^ �- -------------__� m PLUG & FILL 4 =� i-.. ° 130 r ., 1 IG: --- ---- _ lg•RC�._c+�i �LI• < --------'--- -�... - _ ---- -- TB 2GI i :, 2GI ® �� �GREO/TLC TYP ' : i f / - •- a .' < 7-0/i -�- -7 T1 ��'� _ -_ 65 =--a• �_\\C:� .es . 23+52J8 / 5„ cs� >� s_-- _ _. .._ \ E`' sa' �vI _ 'CONE ii - --_-` !` �!IfI ?gyp.` _ _ _ � �I� � _i i A,' OEP / �7 �� 0£1 __ 9 i w_-!. ®� " : Ai O. • - �FY �_�100 , - Tel �t c,. 1*6F� 63Y�/L Z ,--.i � _ _ .a 1' �. � W � r. !Z` -_ - - 18"RCP- DT tI .o LI li - S , IV .,�.5 J.� d° � j t _._ /// 1, ` Z ._Iv .�,- 'si•1.1:IMES =-------- -_ - II.fY,E - _ _ -� kgyi� -��� w,.:_� - - __ ` 0 m - � I / NSm.r'_^S",; -M _-'-��Ls: A *Via. • �_ _ aNtr�M�dk. : - a, >.� R: AI �.�,' �' i F _ ,... - 125.3' �1• -•e v LT 9- r X F �/0114_ _ _ _ - f,1tET(.IN 17fa .WI�/,,11 or .. • I' 7 9511F��..i•�'�% O •I -� •I / ': _ _ __ / - aw �'d! -__ _ ..,,\ INV- / ,i. r'1 �� / / t / 4 - imp. -Z -� CLAtiS RAP - ��jj _ r .., 4Hi //S'h� "�' �- INV=127 :- � 4�. ��iII III ��� _\ ETA A IIII '�I' 153 S a� =-a Z£I bi` S�1 ,�� k, i ____- 'fir 5 2K0 / S RIP �P EST.2 TONS 2 TOT // 1 / /tiff l INV-.9L[4 DI� ril i - nE - _ - - __� •yr` ..-,-._. - / / A� IIIII 13 3 Ff' F ` 1 �� E57.7 SY GT BS r I / .,� S ECIAL t X o // pp/ :7F1.04' . a .{ V� -� • lir ,I(rIo / V- ► - L° •1 4n , �s �/ T / 3 t w 9 t I_C 1 30 +r G 0 // � 4,` C 4.- 7 \ CLASS RAP EST . ONS / / / 8 EE DETAIi. T IE I :SS :! B' R' RAP .57 TONS SY G WOODS m REMOVE II ,� ` ._ POND WOODS 4.l i / INV-I J T N li 1 w / �¢ / i �8 � / iPONB 10 152 ,A C,�.,!la� i / �..�7-� Olo -- Lr� C� I T ,ZEI L ,I� �I �E , 1 1 pF OFF I 1 Q r 129 N 63 '33'11 � 1;, INV. arti � �- �'. .bZ y:P m / / ,..w0-0JB 4 wM1H _ 'CONC ® AST BST 1 i 7-•"III; ,. lOIG - EXIST 1 ,70 • �y..t� _ :...� .., .... 200.w- esr •EC/ ° � 3S N 1 WAWA - . , • S% K Bus r � � A 1•, / /1.,,, �< _. � 60p / i0 v VI /pp _ I \ ✓ \ \\ iW \ \ ,R / 9L �, ifro�1�� �' i/ // , ._ 9:.A � i� K��"� / / 9 1 tq ----------TM�/ N%rCB 4 1 `mob \ �/ is / / / / /-YIRPD- .. \ a l i I S,. / / // _i /, • j -LTC I Dro I SC Sto.1,+00.00 I I I 1. I C• I T G LT OB 1630 PG 697 c^� 1 13 i st �O 29 y N I 7t2„ 1 .. E� L I De 132 v + M 9ZI POND I .0' o.. //a li 3} - / q� i/ ' BY 154� --`� / - , e �� ii �. I LiQ 1 LT LT r ef' \ W' ,'� T7 1 a1 ' •f'i, �Q V=12�.63'I ��L £- -YIRPC- CS /_., i v ��'/. '►' %� d / i *w fa" '0 MOO 2S bz O I� .. I zeI :� zt I Sta.l5a69.70 END R '/'FA NG�//\,\� �- 0 I ,... /// /26 .a0:, / / 2�1 r 4K •3/1'oj/ // ® �� ' F I 2e _ - _- - _ ISBK BUS / _ - i r / POT a' �1 �\� `\ •a ii - / i _ � � 7-'"" EXI SYSTEM IN % 13 11110111,""% DOHERTY HOLDI S LLC DB 1357 PO08 w ._ I - AA. i �'"�� NLP LUMBERTON LL F 1 DB H26 PG 689 % --../ J. // ) 4 A / // /4 �' w / / / / SAG vZ FA CONDITION �// i ,_ �� per/ _ �� / / I 46' YIRPD- C Sta. /5+29 87 CO Q MB 31 PG 20' ,0 - _1' • �,I I� Yl P Il, :. ° l33 rL u IP 62 BST • / Y 5. 3: �I tat D t.. �/ Jar ��, . t / � 1 Q9 / I ® 13 - Mom' ae12 ;r / 4 / Py STA 95+34.91 // - - � / �' 3 j)<+ / � YIRPD ST Sta. /7+2987 • / CREST o�' POFFt6/a. D7+88.40c. m 09i BST J' /e'`' 0 NO C • IM� w * l POOL / ('.��,,, �� i ►�j' � ^� - _/ �+•a, .. SRB- PC a ✓�/ 1 yl� ! fi 9 - / • Sta. l6+/429 /� BST �\ �� r- � o` 1 \ M Q 1 A�@ III " , / / a 0. " /P I /� //., 15, w 117 ro 7: MDC NCI LP - �. - y /TOP=130.93 A \ / / // o rm De 216o Pc 747 / / / �� g �-1 d LUMBERTO SPITAL MB 31PG 43 1 INV=126.27 -O m v 144 / ' / 0 BA • 2 / icY _ \ 31 PG35 O li / 2� 70P=131. CO \ ti 2.3 / 41 INV=126.3' i£i / L- STA 4+25.780.0., 4.Y H m m I E ` 6i 12a 0ti - EiO BST • . • •56' / :C 1l / _---- I / lE• N NO CLAIM $a N ,I DI 70P=LT0.83' I e' 3 4 19 VISION 'HOSPITALITY LLC INV=125.82' 2 CLAIM £I� I i / 8LK � Jlrl INC �•.dk. Bjs � /r / / 40 33 ��Y R •� 4 NO CLAIM D 8235PGP4342 BST r / ss �'�`. zit - IRPD- PC Sta. 20+0295 +b Q1 m \ ,, DB PC 708 / L d o // -' a// / •/ J 3 _ / c -YIRPC- SC /•' a w Sta.14 11-39 �� � ® / // 33i / o s£ /� \ L,/ 7\ �1 ti /mac) NO M }e � � NO LUMBERTON BUFF G''UP ij7/ DB 1767 P,Gr 45 MB 32 PG !Irk N n 55 32 / \ BST 0' >oycT x-5,„54 51 BST LT Ct3 yf / A'j j// /BST BST / // BST 0 .777744,74777 zzt zzz 4 133 1�'POB' • 150.94' -132 SEE SHEET 7 GRAPHIC SCALE 100 50 0 100 200 PLANS NOTES: 1. XXX PROJECT REFERENCE NO. SHEET NO. I-5987A UC-17 DESIGNED BY: ABN DRAWN BY: ABN C 01 U1 0_ U 01 CO S 0 C 0) E c 0 L c w In j2 E s_ N 0_ U 01 01 c ti L 0) 0) c 01 c W In N O _Icr N —I r6 r,�(0 (N/ FEZ H W LLJ t/) LLJ W 0 0 CV N W NAD 8 09( A 2011 'n151; 2057 PG 126 1S0 gr 051 P 2 �; ``' 441 Zkr REMOVE GVA SER BURNETT 1742 PG 486 PT Sta 273+ '.48 +YIARPB- ST Sta. /6 -SRI= POT Sta. /3+6026 - POC Sto. 26+50. WESLEY REVELS DB 1778 PG 760 MB 45 PG 98 POT Sta. 11+50.00 END CONSTRUCTION -DR/O- POI -DR/O- N 59• -DR/O- PT Sto Sta. 11+32.00 -DR/O- S 79' -YI-YARPB N .3" W. L�`R"'LA3S 'B' RIP RAP 48 TONS EST. 92 SY S/ rs REMO Iq9 \ \ `CLASS ':' EST. 1 ST. 8 // / p -SRI- Pia..I3+1 .10+78 St. /0+ ISBKD 4L LATERAL CH ETAIL P 2 15" RCP -IV to. 10+00.00 POT Sto. 30+20.00 S Sta. 29+94.40 'B' RIP P E5. TO -ST.7 T C -N' LLOCAT'y, R/ T 411, DI CAT-1 77 TB 2GI 'P o -Y IA- ST Sto. 3/ CR 15"o6P W/EL dws STA 281+2e.58 b\ OUTLE TCATE \ \ 3 -Y IA- P Sta.,32 4210 CLASS 'B' RIP EST. 2 TONS EST. 7 SY GT N 657� ELLA NEALEY DB 1037 PG 588 a760> HW CLASS 'I' Rfri4P EST. 26 TONS €S... 50 SY TO CLASS 'B' RIP RAP EST. 15 TONS EST. 37 SY GT CLAEST.SS2 TO'B' NSRIP RAP EST. 7 SY GT 15" K- a IF 7z N 65' 27' /72' E AB Sta. -Y1A-SA-1+.6 rOMMIN=E0 REMOVE m .,icW_ "' ■ SITE 10 ADDITIONAL PROPOSED ' MECHANIZED CLEARING (0.1402 AC) `" PROPOSED 8" WATER LINE � A � �R1A RA21 I �113 30 . ,6 CLASS 'B' RIP R:4P EST. 2 TONS EST.7 SY GT CB 7z 15A '-V ARPA- 5 - \ �. 9+3.; 8 N -YIARAB - POC ta. l0 - 4ITT +00.00 ta. "8+67.1h1 -Y/'.."A- y� / DENOTES MECHANIZED CLEARING CLASS 'B' RIP RAP EST. 2 TONS EST. 7 SY GT 15" CSP /ELBOWS 3 t WOODS A -Y/A- POT Sto.39+24.02 - "ABI- - I2f5I -Y ' - POT Sta. 4/+/9A2 - POT Sto.286+ W— 4 1 149 198 a_uly l 150 —Y/ARFA_ / / / / / / -DRIO- DERRICK HUN 0 PG 20, 78 CORA RAIMO/ DB 721 PG 908 MB 30 PG 76 P PA- SC 20+95.0/ : - STA 294+56.40 CHECKED BY: ATP APPROVED BY: REVISED: NORTH CAROLINA DEPARTMENT OF TRANSPORTATION UTILITIES ENGINEERING SEC. PHONE:(919)707-6690 FAX:(919)250-4151 UTILITY CONSTRUCTION PLANS ONLY UTILITY CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED V 5 NV5 ENGINEERS & CONSULTANTS, INC. 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 P: 704.537.7300 www.NV5.com NC License # F-1333 STV STV Engineers, Inc. 100 900 West Trade St., Suite 715 e /(j. Charlotte, NC 28202 NC License Number F-0991 cn ROOD WOODS 1„ PERMIT DRAWING SHEET 3 OF 4 L- STA 296 3D IARPA- Sta.19+45A1 SAG -L- STA 271+87.19 CREST -SR2- STA 20+65.97 SFF StiF\ FT Tq � '16 /9X Op MARY BURNETTE DB 2057 PG 126 -SR2- PT Sta 25+07.48 -SR2- PC Sto.19+43.6 -L- STA 274+55.41 MARY BURNETTE DB 612 PG 393 CLASS 'B' RIP RAP EST. 8 TONS EST. 21 SY GT MARY BURNETTE DB 1112,,PG 393 fO.❖.00❖► •�� o. ICI LOLETA BLANKS DB 18H PG 73 RIP RAP 'T EMBANKM 'T SEE DE L L CLAS• '1' RIP RAP EST 48 TONS ES,.89 SY GT CREST -L STA 281+16.25 INV-.2.192RCP INV \ `/�l w\TRTL.ti h O� REMOVE INV466.72'\\� EL "BL 8" RCP -IV -REMe Vaill=111/WEEIFTABila PLUG & FILL 15" RC Pi -IV 36"RCP-IV RIP ' - P AT EMBAN ENT SE . TAIL L K- -YIARP6- . Sta. 25+7. I - PT Sto 35+75 AL THOMAS BLAN DB 841 PG 88 OLETA BLANKS DB I8H PC 73 LINDA BLANKS DB 1112 PG 393 CB GT 15" RCP -IV TB 2Gf LINDA BL De N25 ' 1 MB 37 - CLASS '8' RIP RAP EST. 8 TONS EST.21 SY GT 7 DE T RAI:- - Sta. 45+5'A2 EGI R7- PIrT Sto ' PT � 48 shopVVCONc SRETYLCO De 07 PG 256 2 LORRAINE CANADY DB 1195 PG 339 MB 30 PG 76 L 84i 30" RCP -IV / x • LASS 'B' RIP RAP ST. 8 TONS EST. 21 SY GT CLASS 'B' RIP RAP EST. 2 TONS EST. 7 SY GT bti0 f INE CANADY 1195 PG 339 30 PG 76 H W W V) w W 0 0 CN 1— N W GRAPHIC SCALE 100 50 0 100 200 PLANS WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) Site-1 Crossing -L- Line at 110+00 12" Water Line and 30" Encasement Pipe 0.0054 Site-10 Y1A 35+00 to Y1ARPA 13+00 8" Water Line 0.1402 TOTALS*: 0.00 0.00 0.000 0.14 0.00 0.00 0.01 0 0 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb SHEET NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 07-26-2021 ROBESON COUNTY I-5987A 47533.1.2 4 OF T.L.P. NO. SHEET NO, 09/08/99 L E L 0 a 7 L En L LCTO HCO n CLz L1 LLD- L> 0 /,_ 00 00 0i 0 (71 o a) 00 00 tr) Qfti ROBESON COUNTY -SR4- SR 1760 CEDAR GROVE CHRUCH RD TO LUMBERTON — —pp — I!� Apik BEGIN -L- STA. TIE TO -L- STA. 2252 C MBE' O U TY 1924 '2042 BEGIN -SR4- SR 1006 N GREAT MARSH CHURCH RD UC-8 -SR5- SR 1741 OLD STAGE RD TIP PROJECT 495 + 00.00 TIP PROJECT 495 + 00.00 I-5987B I-5987A 1 ROBESON COUNTY LOCATION: 1-95 IMPROVEMENTS FROM NORTH OF SR 1758 (MCDUFFIE CROSSING RD.) TO NORTH OF SR 1723 (PARKTON TOBEMORY RD.) WETLAND & SURFACE WATER IMPACTS FOR UTILITIES SITE 5 m Y5RPB- : cci -Y5 RPC- / / l / / -Y5RPD- ST. PAULS (EXIT 31O -Y5- NC 20 415 RPA- -L- PT STA. 641 + 83.86 LB = -L- POT STA. 641 + 84.17 LA 1 1— -Y1BRPB- -Y1BRPC- 00 00 ,441, -Y1B- US 301 -Y1BRPA- (EXIT 33� -Y1BR' •�� SITE 10 -S R34 OAKLAN D0RD .r, -Y6- SR 1726 McRAINEY RD. $7, I-5987B 1 PERMIT DRAWING SHEET 1 OF 5 NAD 83NSRS 2011 END TIP PROJECT I-5987B -L- STA. 915 + 07.85 TIE TO TIP PROJECT U-25I9AA -Y- STA. 22 + 89.87 • I-95 1 -Y7- SR 1723 PARKTON TOBEMORY RD. 1 TO FA YETTEVILLE INDICATES SHEETS WITH NO UTILITY IMPACTS p I" ELIMINA 1, Y PLANS DO NOT USE FOR CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNTIL ALL SIGNATURES ARE COMPLETED SHEET NO.: 1 2 3 4 5 INDEX OF SHEETS DESCRIPTION: TITLE SHEET SITE 5 SITE 10 SITE 10 TABLE J UTILITY OWNERS ON PROJECT ROBESON COUNTY REGIONAL WATER : WATER TOWN OF ST. PAULS UTILITIES: WATER AND SEWER / M MOTT PREPARED IN THE OFFICE OF MPO Box 700 Fuquay-Varina, NC 27526 MACDONALD www.mottmac.com/americas DONNA JACKSON JESSALYN ABRIL DAVID WALLER CONSULTANT CONTACT #1 CONSULTANT CONTACT #2 CONSULTANT CONTACT #3 DIVISION OF HIGHWAYS UTILITIES UNIT 1555 MAIL SERVICES CENTER RALEIGH NC 27699-1555 PHONE (919) 707-6690 FAX (919) 250-4151 RICK HANDLIN DONNA JACKSON RICK BOUNDS ED REAMS UTILITIES DIVISION ENGINEER UTILITIES ENGINEER UTILITIES DIVISION COORDINATOR UTILITIES COORDINATOR LLI LLI 0 0 O 0 Lr 190 -SR4- POT Sta. 73 +53.40 = PROP. U/G COMMUN. CABLES + 65.00-SR, /50.00' SPECIAL LATERAL DITCH wil-IINGE SEE DETAIL S SPECIAL CUT DITCH wil-TINGE SEE DETAIL A PROP. 862 L.F. OF 8" WATER LINE (PVC, SDR21) 192 -Y4DR1- POT Sta. 1/ +69.2/ 10.00-SR4- -REMOVE 12 LF J �� <1001> EXIST 18" RCP FLOWABLE FILL REMOVE -\ 4/CONC PROFTEABLES TB 2GI TRENCHLESS INSTALLATION 18" WELDED STEEL 2G1<1010> �m FS' SEE DE IEE 0.1 STANDARD 4' BASE DITCH w/CL B RIPRAP EST 40 • S EST. 85 SY N 20°D' 1.3.0" F ri e s u u GREU TL-3 SE� G—I A SNt ,'C S o. 10+ 3.15 S 7° 22' 33.3' LATERAL 2' man imin NI e° 1 III iil I1■ 41 , :01.1Mlw IE * 44co ' 41 11 pjI'► I .� TB- 261— �1004� `— — MTLT FES <1005> TB 2GI 18" LATERAL 4' BASE DITCH 10' WIDE BERM TOP ELEV=158.0' SEE DETAIL V ECIAL CUT DITCH wiHINGE SEE DETAIL B -Y4- PC Sta. 26+04.37 ABANDON EXIST. U/G CATV CABLE _Ii MATCHLINE - L1II1R Y4- STA. 2 7 + 00.00 SEE SHEE <1020� ' RCP -IV ■ �a 0� PROP. POLEI -Y4- POC Sta. /8 +46.98 -Y4- PRC Sto. /9 +12.78 -SR4- POT Sta. 81+89.63 -Y4 - POC Sto. 20 +39.7/ HANNEL IMPROVEMENTS DE = 230 CY E DETAIL BB TRENCHLESS INSTALLATI 16" WELDED STEEL w ELBOWS 'REMOVE POLE 2O 193 PROJECT REFERENCE NO. I-5987B DESIGNED BY: JMA DRAWN BY: JMA CHECKED BY: DLJ E DTNCOMPILE° NO"TH C•= L 1A DEPARTMENT OF TRANSPORTATION UTILITIES ENGINEERING SEC. PHONE:(919)707-6690 FAX:(919)250-4151 SHEET NO. 2 FE PLANS t/W ACQUISITION UTILITY CONSTRUCTION PLANS ONLY DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M PO Box 700 MOTT Fuquay—Varina, NC 27526 MACDONALD www.mottmac.comiamericas PERMIT DRAWING SHEET 2 OF 5 ADDITIONAL PROPOSED HAND CLEARING (Oo0940 AC.) CL. I RIP RAP EST. 26 TONS EST. 50 SY GT LATERAL 6' BASE DITCH SEE DETAIL N -o c 0) LATER4' BASE DITCH W/CL.IB IP RAP EST. 50 TONS EST. 1 5 SY GT SEE DETAIL AW UC-15 NO (194 I V) Z 0� 0.0 0 < °O LLJ Q � J ~ V Lll ZN JZ O VV Q J O Z H N m MATCHLINE WOODS NO CLAIM NO CLAIM x18T. 0/H POW a PROP. CATV cs▪ n LJ FO PROP. COMMUNICATIONS HANDHOLE WOODS F ROP0Gt 2G 6' BASE CHANNEL CHANGE SEE DETAIL AG DDE.925 CY Sta..-Y1BRP- 22+14-23+14 LT i.6.6 inter .0.62.110. '1.00)+ I0.3'0.861N.86 2-2.8 fps pssss 9 4-0..0N B.Oflfl x. d.2% n 0.0635 er=Cl 2.46 psf Clpss B Ri• Ra CL. I RIP RAP W/GEOTEXTILE SEE DETAIL 2-1 _ CL B RR.40 TNS l.16 n0. + �0 5Y GT, DDE.225 CY 10 min <(/ .6 inter .59.I(0.9'a561+10.3•o.DETAIL IEATERAL V DITCH 6 SEE DETZ, DDE.50 CY B.B N EST. 2 TON .1?% EST. 7 SY GT . .0345 ShearStre as.0.59 psf Liner=Gr.Grass ' LATERAL BASE DITCH SEE DETAIL AD S R. 2004 TO PREVENT THE NEED V PIPE. DESIGNED SYSTEM TO .. LEFT SIDE OF -YIB- DUE TO IN DITCH AT -YIB- STA.18+18 G FLOW TO CROSSPIPE AT -YIB- DRAINAGE ON BOTH SIDES OF NTUALLY OUTLET TO CULVERT UNDER LOWERED FOR CLASS OUTFALL HEADWALL RT BLOCK STA. 14+17 ROAD EV L. Sfa..-YIB- 20+50-22+50 RT .41 Ac. T- 25 mm 4.5 inter VV.0.65 .120 If, .1.45 fps d.1.0 N B: 5.0 ft • 0.3% • 0445 ShearStress• 0.19 psf Liner.Grass 0 cD REMOVE Sta..-YIB- 27+00-28+89 RT A.1.15 Ac. Tc=10 min b.b inter 0. .0.48. Iz0.9..341 + (0.3'0.811N 15 V=0.6 ci fps 4=0.33 B.240 ft Liner0.0345 =Gras.0.96 psf Liner.GrOss PROP. U END SBG STA +69 TOP 18 RCP -IV DEC \ SEE DETAIL AF TOP 186.90 NV. 18415 PROP U/G TE P 168.40 164.26 V DITCH SEE DETAI II SITE 1'Q ADD171ONA\6'PROPOSOgD HAND CLEARING 6/ (0 0054 AGE. 5 E DEIALCUUTPRASE DITCH D .1425 CY CL. B IP RAP Py EST. 2 TON i1 EST. 7 Y GT 6/ INV. 165.00 ''X7'RCBC :E . D HEADWALL IU DNE FOOT COLLAR F<202IP 89.05' INV 6 . t a0 FLOWABLE F LL TOOPV. 187.87 \ TB 2G TOP 185.277 \INV. 182.52 Sta..-Y1B- 26+25-27+00 RT A.0.46 Ac. Tc=10 min 6.6 inter • 0.55.1(0.9'.191+10.3'0.271)'0.46 0=1.7 cfs V.2.46 fps 4.0.25 N B.2 ft s.10.0% CABLE 51 PROP \ POLE V DITCH SEE DETAIL ACT, EST CL B RIP RAPS TONS, GEO 60 INV. 165,5 REMQVE - M 0/-''',. TOP 188.6 TO' NV. 1.6 MO�� COVE KI,_V. ,�i '��./�L \[� ti�ii� B 77 ®1 \\ra _V 4,•M 1 2 1 61 51 51 51 51 some • - SEE DETAIL 2-2 51 \ \ \ ''6'X 7'RCBC 5 W/BEVELED HEADWALL BLIRIED ONE FOOT 51 5 6/ 6/ Sta..-Y1BRP0. 18+45 to 23+50 R1 A=22 Ac. Tc.10 min -6.6 imhr Q.06 .8.7 V.26 fps .77.0 BN .0"i1S531-' -WL9- - .0.95 .0.03 Sheor5lr4es5 s.0.62 psf linerjl'Greas V V DITCH N,,, TAIL AA 5 CY 6/ 61 / 61 6 >1 / / 5 / >1 5/ 4" 5 j 5 ��5 TedgRAA'�8 .. go1550N-- 6/ TOE PRO CTIO SEE DE 'IL AC CL> • .175 REMOVE P :EG SBG +46 Li I PB- 24+50-26+00 RT .5=102min i. 6 imhr c 046.50.9'0.14)+(0.3'0.3850.52 1.6 cfs V=2.43 fps d.0.36 fl B=0 ft s.3.2% .0.0345 ShearStress.0.72 psf Liner.Grass END SBG 15" w✓ELBOWSe STA +36 I REMOVE CABLE � FLOWABLE FILL CL. 8 RIP RAP EST. 2 TON EST. 7 SY GT TOP 182.03 INV. 179.28 F Sta..-In 696+50-702+50 Lt A.4.7 Ac. '-.15 min 55 inter .0.47. ((1.3.0.9)+13.4'0.31V4.7 0.12.15 cfs V.1.65 fps 4=12N B.0 N s.03% 0345 ShearStress.0.23 psf Iiner.Grass ROP U/G IFOI CO SITE,/ 19 Sta..-L82- 703+50 to\707-5u 1 1 6p10NA1L PROPOSED vthCLEARING 8 AC.) PUF PUF sl 5 51 6/ 51 il= SIa..-SR3- 12+40 to 16+50 LT A=30 Ac. Tc.10 .06 0.11 9 V.21a t B=0f s.0 44 ShearO Liner PROP. 1,4 (PVC, SDR / \\\\\\\\\ac,, .i//.y ERAL V DITCH \��\ TAIL M ABANDON EXIST. U/G CATV CABLE REMOVE NitZ `��`.,\ rgs TOP 197.3 INV.169 01 2' LATERAL BASE DITCH LS• E-P4f5 TCY, CL I RR.50 TNS 100 SY GT BEG SBG STA +86 � TYPE �^6 gEG SBG \ SxcAALE� \\ ARb� oP o fro .on cmizom VA\_ 0 /0 TEL GABLES SPECIAL LATERAL V DITCH SEE DETAIL A SPECIAL LATERAL V DITCH SEE DETAIL AO Stn..-YI BRPB- 20+50-24+50 RT A.1.23 Ac. 1-.12 min 6.6 inter 0. 0.4. RO 9'0.211 +(0.3.1.02)0.23 V=0.8 f 7 fps 4=0.47 ftft B.O N s.0.5% 0.0345 Shea4 psf Iiner.Grass.Grpss 5A.ta.1..23-YIBRPBAc.- 20+50 RT Tc.12 min c=0.irvhr O.a.10.9`0 211+10.3'1.02114?3 VV..0.72 fps d.0.62 k B.O 8 She0a065 psi Liner.CI+,s !Rip Rap REMOVE POLE INV. 189.99 FLOWABLE FI INV. I89.94 02 ' 2G, END SBG STA +83 REMOVE REMOVEvI u/a /E0) CCU CAB TOP 191.57 INV.188.82 LATERAL V DITCH SEE DETAIL AA DDE.95 CY V DITCH SEE DETA SE DDE. P 169.2� .185.83 END SB -Ar 5 -S i / ,i �i ��� 5 .\ ,, - =-P�-1 51 51 7 L.F. OF 8" WATER LINE 21 �P 184 8 INV. 182.12 T.P 188 1 383 L.F. OF 8" UTILITY PIPE Stu..-SR3- 10+90 to 12+40 LT A.1.2 Ac. .0.6 0.1458 fps d.1.0 N 5.0 ft SS 3:1 s.0,03 Liner0.0345 =Grss.0.19 psf Liner. Grass /// PROP. POLE & DOWN GUY lk B RIP RAF EST. 8 TON 2.5' EST. 21 SY GT L S' LATERAL BASE DITCH DETAIL Al I1 �,� DDE.850 CY INV 168. ��LOWABLE FILL CL. 8 RIP RAP EST. 2 TON EST. 7 SY GT 2' LAT SEE D 0005 to 37+50 RT =19.4 cfs .2.4 fps d.1.4 N B.2 ft SS 3:1 RA0.404SE DITCH eatEDBc6 0° CY Liner.Gmss Tc=1. 6.6 Misr V.0.• .6. N5TERA• =0.3 E DER' B.0 P%Pf60 .2.02% .0. 345 Shear tress=1.04 psf ner.Grass P51' Sta .-SR3- 10 + 50 A.15Ac. T-.13 min 5 81 rrvhr Q.06 .53 fs V=27 NAD g 3/2077 51 i St isSON to 12-38 RT g¢iSP. POLE DOWN GUY .0 33' 0.03 ShearSlress=0.40 psf Li**, Liner.Grass CL. B RIP RAP EST.15 TON ST.37 SY GT 0/H POW a PROP. GAI 51 51 5/ -e161-+. PROP. POLE & DOWN GUYS 51 / / / / A / EXIST. 0/H POW a PROP. OR PROP. COMMUNICATIONS ANTI" RETAIN NO CLAIM AD. 2' BASE DITCH SEE DETAIL AX CL I RR-40 TNS 75 5Y GT .DDE.120 CY SPECIAL LATERAL V DITCH SEE DETAIL G TIE TO EXISTING DITCH PROJECT REFERENCE NO. SHEET NO. I-5987B 3 DESIGNED BY: xxx DRAWN BY: JMA CHECKED BY: APPRCIVVD BV• REVI EDLNUOMPLE NO Teel -AWN A8 DEPARTMENT OF TRANSPORTATION UTILITIES ENGINEERING SEC. PHONE: (919 )707-6690 FAX: (919 )250-4151 ']E PLANS / W ACQUISITION UTILITY CONSTRUCTION PLANS ONLY DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared to the Office of: M RA PO 700 ),6),RP. Fuquay-Varina, NC 27526 MACDONALD www.manmac.canr4mericas PERMIT DRAWING SHEET 3 OF 5 X X X EXISTING R/W NO CLAI/w Cn B- STA. 43+00.00 SEE SHEET UC- GRAPHIC SCALE 50 25 0 50 100 ■���� PLANS CL. I RIP RAP EST. 3 TON EST. 7 SY GT TB 1<2118> <2102\ 2GI 18II <2104> TB FB -2-61- F8101> 6' BASE CHANNEL CHANGE SEE DETAIL AG DDE=925 CY 15" RCP -IV SLOTTED DRAIN w/15" CSP PROP. POLE SPECIAL DETAIL REMOVE POLE CL. B RIP RAP EST. 11 TON \_ EST. 28 SY GT CL. I RIP RAP EMBANKMENT PROTECTION EST. 41 TON EST. 59 SY GT W� <2110> Iti 2GI 1115" RC 7' IV TB 2GI <2108> TB 2GI- �1O1j TB 2-GI CL. B RIP RAP EST. 2 TON EST. 7 SY GT LATERAL 4' DITCH SEE DETAIL N DDE=1175 CY CL. B RIP RAP EST. 2 TON EST. 7 SY GT PROJECT REFERENCE NO. I-5987B DESIGNED BY: JMA DRAWN BY: JMA CHECKED BY: DLJ REVIS E [NCOMPLE° NO'! TH� �.� I A DEPARTMENT OF TRANSPORTAT ION UTILITIES ENGINEERING SEC. PHONE: (919)7O7-6690 FAX: (919)25O-4151 SHEET NO. FE PLANS t/W ACQUISITIION UTILITY CONSTRUCTION PLANS ONLY DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: i������� �SEEDETAIL AK CHORD �������� ������``________ DDE = 550 SY -.� _. ��1®-® \����A ISBVV EXISTING a_=_ -`�������%%%%�%%%iiiiiiiiiii _1 n 1,5_" _RCP -IV n n o CUARen ABLE —_IL— n 15" RCP -IV TB 2GI P 'E -SR3- CL. B RIRAP EST.5 Ts EST. 14 SY GT 4' SPECIAL CUT BASE DITCH SEE DETAIL Al DDE=1425 CY SITE 10 SLOTTED DRAIN w/15" CSP SEE SPECIAL DETAIL 9P me -IF- CL. B RIP RAP EST. 15 TON EST. 37 SY GT PROP. POLE & DOWN GUYS PROP. 237 L.F. OF 8" WATER LINE (PVC, SDR 21) REMOVE POLE /H POW & ,_ _' \ _�PsL REMOVE -SR3- 12 00 80.00 SLOTTED DRAIN w/15" CSP SEE SPECIAL DETAIL WABLE FILL REMOVE FLOWABLE FILL 60"WW ISBW ROP 0/H POW & CATV LINES <2114> 25" RCP --IV B 2GI PROP. POLE & DOWN GUYS <2115> TB 2GI PROP 0/H POW & CA -SR3- + 65.00 83.00 n n n 1 99 15" RCP -IV 60'1 W ISBW PROP 0/H PATV LINES REMOVE POLE PROP. POLE <2116> TB 2GI REMOVE POLE 4' SPECIAL CUT BASE DITCH PROP . POLE SEE DETAIL AJ PROP. POLE -SR3- + 49.00 95.00 110.00 M PO Box 700 MOTT Fuquay-Varina, NC 27526 MACDONALD www.mottmac.com/americas PERMIT DRAWING SHEET 4 OF 5 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) Site-5 Y4 22+50 and 23+50 Duke pole and aerial lines 0.0940 Site-10 SR3 18+00 to 21+00 and 23+00 to 24+50 Duke pole and aerial lines 0.1658 TOTALS* 0.00 0.00 0.000 0.00 0.26 0.00 0.00 0 0 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 07-26-2021 ROBESON COUNTY I-5987B 47533.1.3 SHEET 5 OF 5 Attachment E: I-5987 DMS Mitigation Acceptance Letter ROY COOPER Governor ELIZABETH S. BISER Secretary NORTH CAROLINA Environmental Quality October 6, 2021 Mr. Gregory W. Price, PWS Division 6 Environmental Supervisor North Carolina Department of Transportation 421 Transportation Drive Fayetteville, North Carolina 28302 Dear Mr. Price: Subject: Mitigation Acceptance Letter: I-5987, I-95 Widening form US 301 (Exit 22) in Robeson County to South of Proposed I-295 Interchange, Robeson County The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the compensatory stream and wetland mitigation for the subject project. Based on the information supplied by you on October 6, 2021, the impacts are located in CU 03040203 of the Lumber River basin in the Southern Inner Coastal Plain (SICP) Eco-Region, and are as follows: Stream and Wetlands River Basin CU Location Eco- Region Stream Wetlands Cold Cool Warm Riparian Non- Riparian Coastal Marsh Impacts Lumber 03040203 SICP 0 0 1,663.000 13.850 0.290 0 *Some of the stream and/or wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. This mitigation acceptance letter replaces the mitigation acceptance letter issued on May 20, 2020. DMS will commit to implement sufficient compensatory stream and wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In-Lieu Fee Instrument dated July 28, 2010 for unanticipated NCDOT impacts. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information, please contact Beth Harmon at 919-707-8420. Sincerely, James B. Stanfill DMS Asset Management Supervisor cc: Ms. Liz Hair, USACE – Wilmington Regulatory Field Office Mr. Monte Matthews – Raleigh Regulatory Field Office Ms. Hannah Sprinkle, NCDWR Ms. Amy Chapman, NCDWR Ms. Linda Fitzpatrick, NCDOT – EAU File: I-5987 Revised Attachment F: I-5987 Non -Merger 30% Hydraulic Design Review Meeting Minutes N V 5 1-5987 Non -Merger 30% Hydraulic Review Meeting Minutes Project title I-5987A: 1-95 Improvements from South of US 301 (Exit 22) to North of SR 1758 (McDuffie Crossing Rd.) in Robeson County Subject Non -Merger 30% Hydraulic Review Meeting Location Microsoft Teams Date and time of 4/6/2021, 10:00am — 1:00pm EST meeting Attendees Craig Freeman NCDOT Div 6 David Bocker NV5 Matt Harvey Wetherill Engineering Steve Kendall NCDOT Div 6 Steve Drum NV5 Jerry Lindsey Wetherill Engineering Greg Price NCDOT Div 6 Nick Mountcastle NV5 Harminder Singh Wetherill Engineering Scott Pridgen NCDOT Div 6 Heather Wallace NV5 Scott Boyles Gannett Fleming James Rerko NCDOT Div 6 Will Weathersbee NV5 Jerry Page Gannett Fleming Paul Atkinson Hydraulics Unit Brian Yamamoto NV5 Josh Dalton Sungate Design Ray Lovinggood Hydraulics Unit Bill Jernigan MI Engineering Will Hines Sungate Design Matthew York Hydraulics Unit Linda Johns MI Engineering Brian Elam Sungate Design Chris Rivenbark NCDOT ECAP Morgan Morefield Mott MacDonald Liz Hair USACE Eleni Riggs Mott MacDonald Joanne Steenhuis NCDENR Herb Turner Jr. Mott MacDonald The following is a summary of the project discussions: Introductions were made by Herb Turner (Mott MacDonald) and all in attendance. Herb proceeded to give an overview of the project (I-5987A & B) noting that the project is located completely within the Lumber River Basin, consists of 27 Jurisdictional wetlands, 23 Jurisdictional streams, and 16 tributaries of US waters. David Bocker (NV5) proceeded to review Section Al of I-5987A noting that all waters within the project are classified as Class 'C' and/or Class 'SW'. The I-5987A project is within the Lumber River but more specifically falls within the Fivemile Branch and Tenmile Swamp watersheds. Sheet 4 • Site (NRTR Stream TZ): -L- 63+85 LT — Proposed 48"/30"/48" RCP systems outlet to roadside ditch. Some channel improvements may be needed and riprap at embankment may be needed at the headwaters of the JS channel/outfall. It was clarified at the roadside ditch is not a JS feature. Sheet 6 • Site: -Y1 RPB- 20+00 LT — Proposed 48" RCP with standard riprap apron is proposed however, we per Verified PJD signed 12/10/19, this is NOT a JS feature. Coordination will be needed with Locations/Survey Unit to revise FS file accordingly. I-5987A: Robeson Co. Page 2 of 5 Non -Merger 30% Hydraulic Review Meeting Minutes • Site (NRTR Stream SM): -L- 110+70 LT / 122+15 RT — Existing 54" RCP to be upsized to 8'x7' RCBC buried 1 foot, some inlet and outlet channel improvements are anticipated to tie invert to the existing stream bed. Riprap at embankment is also anticipated where roadside ditches tie to the stream to ensure bank stabilization is provided at both the culvert inlet and outlet. Sheet 14 • Site (NRTR Stream TX): -L- 224+65 RT — Existing 30" RCP to be upsized to 42" RCP buried 20% with standard riprap apron. Paul Atkinson asked the team whether the pipe will need to be buried. Joanne Steenhuis confirmed that since Stream TX is a tributary, the pipe does not need to be buried. Sheet 14/15 • Site (NRTR Stream TU & TT): -L- 242+00 RT / 243+70 LT — Existing 2 @ 48" RCPs to be upsized to 9'x7' RCBC buried 1 foot, some inlet and outlet channel improvements are anticipated to tie invert of the existing stream bed. There is also a small system outlet with standard riprap apron that drains to the JS. It was also noted that the culvert will be shorter due to the proposed culvert height. The wetland boundary will also be removed from within the JS feature; this will be applied to the entire project prior to permit drawing preparation. David also noted as a reminder to the team that all crosspipes are being replaced as part of the project. And at this time, all pipes are shown to be replaced in their present location via phase construction. Sheet 15 • Site (NRTR Wetland WAB): -L- 220+55 RT — Existing 18" RCP system outlet to be upsized to 30" RCP with standard riprap apron. Roadway fill slopes in this area have been minimized to avoid wetland impacts. Non -erosive velocities will be provided into the wetlands. Sheet 16 • Site (NRTR Stream TAA): -L- 265+00 LT & RT — No existing pipe connection found under 1-95, both JS features flow away from 1-95. The headwaters of JS are fed by interstate ditches. Riprap at embankment is proposed at ditch outlets to stabilize banks of JS. Sheet 17 • Site (NRTR Stream TS): -L- 275+80 RT — 30" RCP with standard riprap apron is proposed at SR2 crossing due to reconfiguration of interchange. 3:1 roadway fill slopes have been used to minimize impacts to the stream. Since JS feature is a tributary, the pipe does not need to be buried. • Site (NRTR Stream TBB): -L- 281+90 RT — Existing 36" RCP system outlet to be upsized to 60" RCP system outlet with standard riprap apron. Since JS feature is a tributary, the pipe does not need to be buried. Riprap at embankment is also proposed for ditches that outlet to the JS feature at this location. • Site (NRTR Stream TBB & Wetland WM): -L- 285+50 LT — Roadway fill/roundabout impact to wetlands & 36" RCP with standard riprap apron is proposed at -Y1A crossing due to reconfiguration of interchange. Since JS feature is a tributary, the pipe does not need to be buried. Jim Rerko asked how Stream TBB would be handled downstream of the proposed 30" pipe crossing at -Y1A-. David explained that the JS would be ditched over to the proposed 48" pipe crossing under-Y1ARPB- which also picks up another channel from the southwest. I-5987A: Robeson Co. Page 3 of 5 Non -Merger 30% Hydraulic Review Meeting Minutes Sheet 18 • Site (NRTR — Tenmile Swamp): -L- 310+50 LT/RT - Existing 3 — 11'x10' RCBC to be upsized to 3 — 12'x12' RCBC buried 1 foot, some inlet and outlet channel improvements are anticipated to tie invert to the existing stream bed. 3:1 roadway fill slopes have been utilized to minimize impacts to the stream and wetlands. Riprap is shown to fill the existing culvert inlet/outlet areas. Jim Rerko noted that there were huge voids under the culvert, and the Division had lots of problems during the hurricanes. Sheet piles were driven, and pumping was completed to address the voids. Jim & Craig Freeman recommended that the toe walls be enlarged to 3.5' or 4.5' instead of the standard 2.5'. Coordination with Geotech and Structures will be completed accordingly. • Site (NRTR Wetland WK): -L- 314+80 RT — Existing 18" RCP system outlet is being replaced and extended to the slope stakes with standard riprap apron. 3:1 roadway fill slopes have been utilized to minimize impacts to the wetlands. Ditches have been designed to daylight prior to the wetland to provide diffused flow with non -erosive velocities. Paul noted that this ditch was under review by Hydraulics, so some revisions will be anticipated in this area. Toe protection may be added in this area as well as design is finalized. Sheet 19 • Site (NRTR Wetland WK): -L- 315+00 LT & RT — 3:1 roadway fill slopes have been utilized to minimize impacts to the wetlands. Existing 18" RCP system outlet to be replaced and standard riprap apron is proposed at the toe of slope. Toe protection may be added in this area as well as design is finalized. Sheet 20 • Site (NRTR Stream TR): -L- 332+05 LT — Existing 18" RCP system outlet to be upsized to 30" RCP with standard riprap apron. Since JS feature is a tributary, the pipe does not need to be buried. • Site (NRTR Wetland WJ): -L- 339+15 LT — Existing 2 @ 24" RCP system outlet to be upsized to 36" RCP with standard riprap apron. Toe protection may be added in this area as well as design is finalized. Sheet 33 • Site (NRTR Stream SO): -Y2- 17+25 — Existing 36"/42" RCP to be upsized with 2 @ 48" RCP buried 1 foot with standard riprap apron. Riprap at embankment is proposed at ditch outlets upstream to stabilize banks of JS. Matthew York stated that since the 2 @ 48" RCPs are wider than the existing channel (4'-5') that channel improvements will be needed showing a floodplain bench with sill or pipes at different invert elevations. Jim Rerko expressed concern with pipes being set at different elevations since they have seen erosion on similar locations due to the sandy soil. David asked if a bench could be created with Class B or I riprap; Jim agreed that Class B would work, and Matthew suggested that Class I was more typical. Additionally, Matthew asked if there was concern about any erosion in the channel and noted that any riprap placed in the stream bed would need to be embedded. David agreed that riprap would be embedded, and the details would be modified accordingly. Bill Jernigan (MI Engineering) proceeded to review Section A2 of I-5987A Sheet 21 • Site (NRTR Wetland WJ): -L- 342+15 RT — Pocket wetland is a total take due to increase roadway footprint and false cut ditch with berm. • Site (NRTR Wetland WJ): -L- 343+09 LT — Existing 24" RCP to be upsized to 48" RCP with standard riprap apron. Roadway fill slopes will result in impacts to the wetlands (entire LT side of Plan Sheet). I-5987A: Robeson Co. Page 4 of 5 Non -Merger 30% Hydraulic Review Meeting Minutes • Site (NRTR Wetland WJ): -L- 347+68 LT — Existing 36" RCP to be upsized to 42" RCP with standard riprap apron. Paul Atkinson asked that the extra construction lines at the end of the riprap pad (red lines) in the wetlands be removed. • Site (NRTR Wetland WJ): -L- 352+89 - 3:1 roadway fill slopes have been used to minimize impacts to the wetlands Sheet 22 • Site (NRTR Stream SP — Upstream & Wetland WJ — Downstream): -L- 354+06 — Existing 2 @ 48" RCP to be upsized to 2 @ 7'x7' RCBC buried 1 foot with 1 foot sill on southern barrel and 2 foot sill and floodplain bench on northern barrel. Bill point out that there is ongoing coordination to determine if downstream should be JS as well. Jim stated that the team should assume that Stream SP continues downstream. • Site (NRTR Wetland WI): -L- 365+16 RT — Proposed base ditch outlets into wetland. A standard riprap apron will be added to the ditch outlet. • Site (NRTR — Cowpen Branch & Wetland WI): -L- 366+29 — Existing 2 @ 7'x7' RCBC to be upsized to 2 @ 8'x9' RCBC buried 1 foot with sills on both barrels. Slight channel improvements will be needed at the inlet and outlet. Sheet 23 • Site (NRTR Wetland WI): -L- 367+54 LT & 368+42 RT — Proposed base ditches outlet into the wetland. A standard riprap apron will be added to the ditch outlets. Sheet 25 • Site (NRTR Wetland WH): -L- 400+00 LT — Proposed base ditch through the wetland maintains a similar elevation as the existing ditch. Pocket wetland is not a total take. Sheet 29 • Site (NRTR Stream TP): -L- 454+44 LT • Site (NRTR — Cowpen Branch & Wetland WG): -L- 454+90 — Existing 54" RCP to be upsized to 2 @ 8'x7' RCBC buried 1 foot with 1 foot sill on northern barrel and 2' sill and floodplain bench on southern barrel. Sheet 30 • Site (NRTR — Cowpen Branch): -Y3- 24+79 — Existing 72" RCP/CMP to be upsized with 2 @ 8'x7' RCBC buried 1 foot with 1 foot sill on southern barrel and 2' sill and floodplain bench on northern barrel. 3:1 roadway fill slopes have been utilized to minimize impacts to the stream. Portions of the southern roadway embankment will be removed; therefore, the outlet portion of the culvert will be shortened. Slight channel improvements will be needed at the inlet and outlet. Sheets 5, 7, 8, 9, 10, 11, 12, 13, 24, 26, 27, 28, 31, 32, 34, 35, 36, 37, 38, and 39 • No jurisdictional streams or wetland, therefore no impacts. Herb Turner asked if there were any other questions or comments; no attendees had any additional comments. After a short break, Herb reviewed the I-5987B project which are captured in separate meeting I-5987A: Robeson Co. Page 5 of 5 Non -Merger 30% Hydraulic Review Meeting Minutes minutes. Some discussion occurred after the I-5987B review prior to adjourning that applied to both projects, see below: • Agency representatives liked the labeling of JS features which matched NRTR nomenclature and requested that Streams and Wetland be annotated on the PDF permit drawings as was done by Herb during both the I-5987A & I-5987B reviews. • Ray Lovinggood asked if a stream on both sides of 1-95 should be identified as one or two sites for impact purposes. The agencies did not have a preference as long as they know that there are two impacts to one stream. • Herb requested that the next coordination meeting date be changed from May 18th to June 15th which was later approved by Craig Freeman. This allows more time to capture potential impacts as final design is completed with various discipline and to minimize future revisions to the permit drawings. This change to the coordination meeting date does not impact the overall schedule of the permit application submittal. Attachment: Table of Non -merger 30% HYD Sites WETLAND AND SURACE WATER SUMM SHT Station (From/To) Structure Size / Type Comments No. 4 L -L- 63+85 System Outlet 6 L -L- 110+70/112+15 8'x7' RCBC 14 L -L- 224+65 System Outlet 14-15 L -L- 242+00/243+70 9'x7' RCBC 15 L -L- 250+55 System Outlet 16 L -L- 265+00 LT LT System Outlet 16 L -L- 265+00 RT RT System Outlet 17 L -L- 275+80 Roadway Fill 17 L -L- 281+90 System Outlet 17 L -L- 285+50 Roadway Fill 18 L -L- 310+50 3 @ 10'x12' RCBC 18 L -L- 314+00 Roadway Fill 20 L -L- 332+05 System Outlet 20 L -L- 339+15 System Outlet 21 L 342+15 RT False cut ditch 21 L 343+09 LT 1@48" RCP 21 L 347+68 LT 1 @42" RCP 21/22 L 352+89 LT Rdy fill slope 22 L 354+06 Rt & Lt 2@7'X7' RCBC 22 L 365+16 RT prop 6' base ditch 22/23 L 366+29 Rt & Lt 2@8'X9' RCBC 23 L 367+54 LT prop 6' base ditch 23 L 368+42 RT prop 6' base ditch 25 L 400+00 LT prop 6' base ditch 29 L 454+44 LT prop 6' base ditch 29 L 454+90 Rt & Lt 2@8'X7' RCBC 30 Y3 24+79 Rt & Lt 2@8'X7' RCBC 33 Y2 -Y2- 17+25 Pipe Crossing & Roadway Fill M MOTT MACDONALD M 1-5987 Non -Merger 30% Hydraulic Review Meeting Minutes Project title I-5987B: 1-95 Improvements from North of SR 1758 (McDuffie Crossing Rd.) to North of SR 1723 (Parkton Tobermory Rd.) in Robeson County Subject Non -Merger 30% Hydraulic Review Meeting Location Microsoft Teams Date and time of 4/6/2021, 10:00am — 1:00pm EST meeting Attendees Craig Freeman NCDOT Div 6 David Bocker NV5 Matt Harvey Wetherill Engineering Steve Kendall NCDOT Div 6 Steve Drum NV5 Jerry Lindsey Wetherill Engineering Greg Price NCDOT Div 6 Nick Mountcastle NV5 Harminder Singh Wetherill Engineering Scott Pridgen NCDOT Div 6 Heather Wallace NV5 Scott Boyles Gannett Fleming James Rerko NCDOT Div 6 Will Weathersbee NV5 Jerry Page Gannett Fleming Paul Atkinson Hydraulics Unit Brian Yamamoto NV5 Josh Dalton Sungate Design Ray Lovinggood Hydraulics Unit Bill Jernigan MI Engineering Will Hines Sungate Design Matthew York Hydraulics Unit Linda Johns MI Engineering Brian Elam Sungate Design Chris Rivenbark NCDOT ECAP Morgan Morefield Mott MacDonald Liz Hair USACE Eleni Riggs Mott MacDonald Joanne Steenhuis NCDENR Herb Turner Jr. Mott MacDonald The following is a summary of the project discussions: Introductions were made by Herb Turner (Mott MacDonald) and all in attendance. Herb proceeded to give an overview of the project (I-5987A & B) noting that the project is located completely within the Lumber River Basin, consists of 27 Jurisdictional wetlands, 23 Jurisdictional streams, and 16 tributaries of US waters. All waters within the project are classified as Class 'C' and/or Class 'SW'. • For I-5987A, David Bocker (NV5) and Bill Jernigan (MI Engineering) proceeded to review Section Al and A2, respectively. Refer to meeting minutes for I-5987A (under separate cover). • From prior meeting discussion, Joanne Steenhuis confirmed that pipe inverts do NOT need to be buried for sites designated as a Tributary Water of the U.S. For I-5987B, the meeting resumed at 11:15am. Herb introduced the hydraulic Design Team for I-5987B and proceeded with sheet -by -sheet review: I-5987B: Robeson Co. Page 2 of 8 Non -Merger 30% Hydraulic Review Meeting Minutes Sheet 4: No JS features Sheet 5: • -L- 514+00 RT: Non-JS with tail ditch cleanout Sheet 6: No JS features Sheet 7: • -L- 530+35 RT o Map ID: TM is designated as Tributary Water of the U.S on downstream end of crossing. o Existing: 36" pipe to be upsized to 2 @ 60" RCP system outlet with riprap bank stabilization o Since JS feature is a tributary, the pipe does not need to be buried o Upstream channel is lower than the downstream channel; therefore, channel improvements are recommended down to almost confluence. o Concerns/Notes: i. None • -L- 536+85 RT o Map ID: SR on downstream end of crossing o Existing: 18" pipe to be upsized to 42" RCP system outlet with riprap apron o Downstream is mostly backwater o Recommending cleanout down to confluence with Tributary TM which appears to be the main channel. o Concerns/Notes: i. None - Looks good Sheet 8: No JS features Sheet 9: No JS features Sheet 10: • -Y4- 18+50 LT o Outfall channel is incorrectly labeled as JS in the FS file. o Jim Rerko requested team update FS file. • -L- 575+10 — 586+00 LT o Map ID: WF - Wetlands system to Big Marsh Swamp. Proposed ditch in wetlands replaces an existing channel (left side) and mimics existing drainage conditions. • -L- 575+75 — 585+50 RT o Map ID: WF - Wetlands system to Big Marsh Swamp. Right side ditch ties to wetlands. Discharge into wetlands with non -erosive velocities. Sheet 11: • -L- 586+14 LT & RT o Map ID: Big Marsh Swamp o Bridge replacement o Replace existing dual, 3-span, bridges with single, 3-span, bridge. o Wetlands on both sides of corridor around Big Marsh o Steepened fill slopes to 3:1 with guardrail to minimize impacts to adjacent wetlands (Map ID: WF) I-5987B: Robeson Co. Page 3 of 8 Non -Merger 30% Hydraulic Review Meeting Minutes o Boundaries are being updated so wetlands don't have outside boundary edge o Concerns/Notes: i. Jim Rerko inquired how much did the proposed bridge rise over the existing. The proposed bridge grade is approximately 4' above existing bridge grade. ii. For avoidance and minimization during final design, the proposed bridge grade is a few feet lower than preliminarily design as a result of detailed hydraulic modeling and hydraulic bridge recommendations. • -L- 587+30 — 589+50 LT o Map ID: WF - Wetland system to Big Marsh Swamp. o Steepened fill slopes to 3:1 with guardrail to minimize impacts. • -L- 586+90 — 588+15 RT o Map ID: WF - Wetland system to Big Marsh Swamp. o Steepened fill slopes to 3:1 with guardrail to minimize impacts. Sheet 12: • -L- 592+35 LT o Map Ds: WF and TJ at outlet of existing crosspipe o Existing: 30" pipe to be upsized to 48" RCP o Since Map ID: TJ is a tributary, the pipe does not need to be buried o Standard riprap pad at outlet will be added. Sheet 13: • -YSRPA- 20+50 RT (-L- 621+75 LT) o Map ID: TH, only upstream o Existing 42" to be upsized to 2 @ 72" pipes, buried. o Since Map ID: TH is a tributary, the pipe does not need to be buried o Since trenchless installation, proposed crosspipe outlet will be realigned with the existing outfall channel. o To improve channel flow away from project, tail ditch cleanout, up to 1000' is recommended. i. Limits of cleanout need to be confirmed based on additional field surveys. o Concerns/Notes: i. Town of St. Pauls has reported flooding issues downstream (east) of project. Coordination between the Town and Division is ongoing. ii. Craig Freemans asked to pull it up on Google Earth for Liz Hair and Joanne Steenhuis to review. During jurisdictional delineations, direction of flow was not clear at site due to standing water and was incorrect shown as east -to -west which is why only the west side is designed as tributary (Map ID: TH). Jim thinks east side channel will probably be tributary but recommends it be verified for impact summary — Liz agreed. iii. Should TH designation continue downstream of project outfall? 1. Per Jim Rerko on Apr 7, 2021, site was reviewed following meeting. The outfall channel should also be designated as Tributary (Map ID: TH) which is JS-NonMit. Sheet 14: No JS features Sheet 15: No JS features Sheet 16: I-5987B: Robeson Co. Page 4 of 8 Non -Merger 30% Hydraulic Review Meeting Minutes • -L- 655+50 RT o Map ID: SQ on downstream (RT) side, only o Existing 42" to be upsized to 66" RCP, buried 1' o Provide riprap pad at outlet for stabilization of channel o Concerns/Notes: i. Fix flow arrow on upstream (LT) side; pointing wrong way Sheet 17 —18: • -L- 673+00 — 681+00 LT, CL, RT o Map ID: WE — Wetland system to Mercer Branch o Roadway fill in wetlands o Wetland boundaries need to be cleaned up in vicinity of Mercer Branch Sheet 18: • -L- 677+16 o Map ID: Mercer Branch o Replace existing 2 @ 7' x 6' RCBC with proposed 2 © 8' x 8' RCBC, buried 1' o A deeper toe wall at inlet is recommended due to existing scour hole. o Upstream channel improvements are recommended to fill scour hole at inlet, o Minor downstream channel improvements are also recommended. o Concerns/Notes: i. Jim pointed out that existing culverts sit full of water, normally. Sheet 19: No JS features Sheet 20: • -L- 708+50 RT o Map ID: TF — No impacts • -L- 710+50 LT o Map ID: PM (Pond) — No impacts Sheet 20-21: • -L- 705+50 — 711+25 RT o Map ID: WL — Wetland system to Brisson Branch o Proposed roadway fill and lateral ditch • -L- 708+48 LT, CL, RT o Map ID: Brisson Branch (sheet oriented a little differently): o Replace existing 36" with proposed 6' x 7' RCBC, buried 1' o Channel improvements on the outlet end o Upstream end, channel being relocated outside of roadway fill slope. Lateral ditch through wetlands that ties into Brisson Branch outfall. o Concerns/Notes: i. Near -L- 711+00 LT, Ray asked if we need to add a little more curvature to transition between Brisson Branch and new channel relocation. ii. Near -L- 711+00 RT, lateral ditch through wetlands starts on Sheet 21 and continues to Sheet 20. Based on depths, ditch through wetlands was required. I-5987B: Robeson Co. Page 5 of 8 Non -Merger 30% Hydraulic Review Meeting Minutes Sheet 22-24: No JS features Sheet 25: • -L- 756+00 RT o Map ID: PA (Pond) o No impacts (also shown on Sheet 45) Sheet 26-27: No JS features Sheet 28-29: • -L- 796+00 — 802+50 LT o Map ID: WD — Wetland system to Little Marsh Swamp o Pick up drainage systems that tie to Little Marsh Swamp. o Roadway slopes steepened to 3:1 with guardrail. Toe protection along wetlands. o Concerns/Notes: i. How far up does toe protection go? 1. Herb answered with 4' in each direction. 2. WEI stated that they updated so that it was just on the fill slope. 3. Paul recommended providing protection for flat area, too. ii. Direction: Show toe protection extending 4' out on each side of SS • -L- 709+22 — 802+40 RT o Map ID: WD — Wetland system to Little Marsh Swamp o Roadway slopes steepened to 3:1 with guardrail. Toe protection along wetlands. Sheet 29: • -L- 803+15 o Map ID: Little Marsh Swamp o Bridge replacement o Replace existing dual, 4-span, bridges with single, 3-span, bridge. o Grade raised significantly over existing grade (7.5-8' of grade change) o Wetlands on both sides of corridor around Little Marsh Swamp o Steepened fill slopes to 3:1 with guardrail to minimize impacts to adjacent wetlands (Map ID: WD) o Concerns/Notes: i. Fish and wildlife refuge? 1. We are staying within existing ROW and do not require more easement to stay off their property 2. Herb noted that the alignment was shifted so that there would be no impacts. Sheet 29-30: • -L- 803+75 — 817+00 LT o Map ID: WD — Wetland system to Little Marsh Swamp o Wetlands continue and so does toe protection. o Ray asked if we were getting rid of the "closed" wetland boundary lines. Herb replied that there is ongoing coordination to get those lines removed. • -L- 803+50 — 815+35 RT o Map ID: WD — Wetland system to Little Marsh Swamp I-5987B: Robeson Co. Page 6 of 8 Non -Merger 30% Hydraulic Review Meeting Minutes o Wetlands continue and so does toe protection Sheet 31-36: No JS features Sheet 37: Buckhorn Swamp crossing and wetlands: • -L- 898+20 — 902+20 LT o Map ID: WC — Wetland system to Buckhorn Swamp o Proposed roadway fill and toe protection in wetlands. • -L- 897+75 — 902+10 RT o Map ID: WC — Wetland system to Buckhorn Swamp o Proposed roadway fill and toe protection in wetlands. • -L- 902+33 RT & LT o Map ID: Buckhorn Swamp o Replace existing: 3 @ 9' x 7' with proposed 3 @ 9' x 8' RCBC, not buried due to perched nature of existing culvert. o We currently do not show it buried due to the perched nature of the existing culvert. Jerry Lindsey pointed out that it is not buried based on elevations at exact location but based on elevations at up and downstream channel, it is lower. Assumed that the natural channel will silt in on its own. Paul wants to verify that this design is ok. Jim is good with 4' toe wall design and no sills due to flat culvert slope. o Toe protection along wetlands with 3:1 side slopes with guardrail. Sheet 37-38: • -L- 902+50 — 907+20 LT o Map ID: WC — Wetland system to Buckhorn Swamp o Toe protection to stabilize slopes • -L- 902+50 — 906+90 RT o Map ID: WC — Wetland system to Buckhorn Swamp o Wetlands continue with toe protection. End of mainline 1-95 improvements. Sheet 39: • No JS features impacted. • Note - Large pond is outside of study area and it flows away from our improvements. Sheet 40: • -Y4- 31 +00 LT & RT o Map ID: SN and Wetlands WV & WZ o Existing 18" to be upsized to 75" RCP, buried 1' o Concerns/Notes: i. Confirmed 72" buried ii. Herb noted that design is currently being evaluated to remove lateral ditch and add toe protection to minimize impacts on wetlands (Map ID: WV) • -SRS- 10+80 LT o Map ID: WZ o Existing 18" to be upsized to 24" RCP, no bury o Concerns/Notes: I-5987B: Robeson Co. Page 7 of 8 Non -Merger 30% Hydraulic Review Meeting Minutes i. Minor fill slope impacts, only Sheet 41: No JS features Sheet 42: • Pond but no impacts Sheet 43: No JS features Sheet 44: • -Y6- 23+48 LT & RT o Map ID: SK (UT to Little Marsh Swamp) and WN o UT to Little Marsh Swamp — JS (Map ID: SK) with wetlands (Map ID: WN) on both up and downstream sides o Replace existing 1 @ 60" with proposed 1 @ 6' x 7' RCBC, buried 1' o Provide riprap channel improvements at the outlet to get positive flow away from our project o Concerns/Notes: i. None - Design looks good Sheet 45: • -Y6- 35+00 — 37+00 RT o Map ID: PA (Pond) - No impacts Sheet 46-47: No JS features Additional I-5987B Discussion Topics • Herb Turner asked if there were any other questions or comments; no attendees had any additional comments. • Jim noted good designs overall and that project concept seemed straightforward. Additional Overall Discussion Topics Some discussion occurred after the I-5987B review prior to adjourning that applied to both projects, see below: • Agency representatives liked the labeling of JS features which matched NRTR nomenclature and requested that Streams and Wetland be annotated on the PDF permit drawings as was done by Herb during both the I-5987A & I-5987B reviews. • Ray Lovinggood asked if a stream on both sides of 1-95 should be identified as one or two sites for impact purposes. The agencies did not have a preference as long as they know that there are two impacts to one stream. • Herb requested that the next coordination meeting date be changed from May 18th to June 15th which was later approved by Craig Freeman. This allows more time to capture potential impacts as final design is completed with various discipline and to minimize future revisions to the permit drawings. This change to the coordination meeting date does not impact the overall schedule of the permit application submittal. Action Items • I-5987B: I-5987B: Robeson Co. Page 8 of 8 Non -Merger 30% Hydraulic Review Meeting Minutes o PSH 13-Y5RPA- 20+50 (-L- 621+75) ■ Recommending tail ditch cleanout, close to 1000' • Limits of cleanout need to be confirmed based on additional field surveys o PSH 28/29 Little Marsh Swamp ■ Make sure toe protection extends 4' out on each side of SS • Both sections: Clean up wetland boundaries to remove show overlap with JS stream features Meeting Adjourned: 12:10 pm Attachment: Table of Non -merger 30% HYD Sites I-5987B I-5987B_Non_merger 4B Printed: 4/6/2021 PSH No. Alignment Station Side MAP ID 1S Map ID Wetlands Bridge or Culvert Best Usage Classification Existing Structure Proposed Structure Comments 7 L 530+35 RT TM --- Cross Pipe C; SW 1 @ 36" RCP 2 @ 60" RCP Cl. III (1' burial) (Channel Improvements) 7 L 536+85 RT SR --- Cross Pipe C; SW 1 @ 18" RCP 1 @ 42" RCP Cl. III 10 - 11 L 575+10 - 586+00 LT --- WF Rdwy Fill / Lat --- --- --- 10 - 11 L 575+75 - 585+50 RT --- WF Roadway Fill --- --- --- 11 L 586+14 LT,RT Big Marsh Swamp WF Bridge C; SW 3 Span 1 @ 50'5", 1 ( Bridge:3 span 45" PCG, OAL = 180 LF 11 - 12 L 587+30 - 589+50 LT --- WF Roadway Fill --- --- --- 11 - 12 L 586+90 - 588+15 RT --- WF Roadway Fill --- --- --- 12 L 592+35 LT T.I --- Cross Pipe --- 1 @ 30" RCP 1 @ 48" RCP Cl. III (0.25' burial) 13 YSRPA 20+50 (621+75 -L-) LT TH --- Cross Pipe --- 1 @ 42" RCP 2 @ 72" RCP Cl. V (1.25' burial) 16 L 655+50 RT SQ --- Cross Pipe C; SW 1 @ 42" RCP 1 @ 66" RCP Cl. IV (1' burial) 17-18 673+00 - 681+00 LT, CL, RT --- WE Roadway Fill --- --- --- 18 L 677+16 LT, CL, RT Mercer Branch WE Box Culvert C; SW 2 @ 7' x 6' RCBC w/ E 2 @ 8' x 8' RCBC w/ 1' sills at inlet and ou (Channel Improvements) 20 L 708+50 RT TF --- --- --- --- --- No impacts to TF 20 L 710+50 LT PM (Pond) --- --- --- --- --- No impacts to PM 20-21 L 705+50 - 711+25 RT --- WL Rdwy Fill / Lat --- --- --- 20-21 L 708+48 LT,RT Brisson Branch --- Box Culvert C; SW 36" RCP (Groove end 6' x 7' RCBC (buried 1') 25, 45 L 756+00 RT PA (pond) --- --- --- No Impact to PA 28 - 29 L 796+00 - 802+50 LT --- WD Rdwy Fill / Toe Prot --- --- --- 28 - 29 L 709+22-802+40 RT --- WD Rdwy Fill / Toe Prot --- --- --- 29 L 803+15 LT,RT Little Marsh Swamp WD Bridge C; SW 1 @ 37'10, 2 @ 37'6, Bridge: 3 span 45" PCG, OAL = 180 LF 29 - 30 L 803+75 - 817+00 LT --- WD Rdwy Fill / Toe Prot --- --- --- 29 - 30 L 803+50 - 815+35 RT --- WD Rdwy Fill / Toe Prot --- --- --- 37 L 898+20 - 902+20 LT --- WC Rdwy Fill / Toe Prot --- --- --- 37 L 897+75 - 902+10 RT --- WC Rdwy Fill / Toe Prot --- --- --- 37 L 902+33 LT,RT Buckhorn Swamp WC Box Culvert C; SW 3 @ 9' x 7' RCBC 3 @ 9' x 8' RCBC (Not Buried) Perched 37 - 38 L 902+50 - 907+20 LT --- WC Rdwy Fill / Toe Prot --- --- --- 37 - 38 L 902+50 - 906+90 RT --- WC Rdwy Fill / Toe Prot --- --- --- 40 Y4 31+00 LT,RT SN WV Cross Pipe C; SW 1 @ 18" RCP 1 @ 72" RCP Cl. IV (1' burial) 40 SR5 10+80 LT --- WZ Cross Pipe --- 1 @ 18" RCP 1 @ 24" RCP CL. III (no burial) 44 Y6 23+48 LT,RT SK WN Box Culvert C; SW 60" CMP w/ square e 1 @ 6' x 7' RCBC (Buried 1') UT to Little Marsh Swp 45 Y6 35+00 - 37+00 RT PA (pond) --- --- --- --- --- No Impact to PA Attachment G: I-5987 Permit Drawings Review Meeting Minutes N V 5 Project title Subject Location Date and time of meeting Date of Meeting Minutes 1-5987 Non -Merger Permit Drawing Review Meeting Minutes I-5987A: 1-95 Improvements from South of US 301 (Exit 22) to North of SR 1758 (McDuffie Crossing Rd.) in Robeson County Non -Merger Permit Drawing Review Meeting Microsoft Teams 7/13/2021, 10:00am — 1:00pm EST 8/4/2021 Attendees Craig Freeman NCDOT Div 6 Mark Staley Roadside Env. Unit Herb Turner Jr. Mott MacDonald Steve Kendall NCDOT Div 6 Deanna Riffey NCDOT ECAP Eleni Riggs Mott MacDonald Greg Price NCDOT Div 6 Emily Stupka NCDOT ECAP Morgan Morefield Mott MacDonald Scott Pridgen NCDOT Div 6 Liz Hair USAGE Juniper Walter -Eger Mott MacDonald James Rerko NCDOT Div 6 Robert Patterson NCDWR Donna Jackson Mott MacDonald Christy Huff NCDOT Div 6 David Bocker NV5 Jessalyn Abril Mott MacDonald William Marsh NCDOT Div 6 Steve Drum NV5 Kevin Alford Wetherill Engineering Gabe Shoffner NCDOT Div 6 Nick Mountcastle NV5 Matt Harvey Wetherill Engineering Chris Underwood NCDOT Div 6 Will Weathersbee NV5 Forest Brooks Wetherill Engineering Paul Atkinson Hydraulics Unit Chris Hund NV5 Jerry Page Gannett Fleming Ray Lovinggood Hydraulics Unit Bill Jernigan MI Engineering Josh Dalton Sungate Design Matthew York Hydraulics Unit The following is a brief summary of the discussions on the project: Introductions were made by Herb Turner (Mott MacDonald) and all in attendance. David Bocker (NV5) proceeded the first section of I-5987A (-L- 67+00 to 340+00) noting that all waters within the project are classified as Class 'C' and/or Class 'SW'. The I-5987A project is within the Lumber River but more specifically falls within the Saddletree Swamp, Fivemile Branch, Tenmile Swamp, and Cowpen Branch watersheds. Stormwater Management Plan • Robert Patterson noted that standard rip rap pads do not meet the definition of the Riprap Energy Dissipator Basins on Sheet 3 of the Stormwater Management Plan (SMP) and should therefore be removed from the SMP. • Robert Patterson also suggested the possibility of adding grass swales to the SMP. David noted that treatment is not needed so grass swales were not included. Paul Atkinson added that if not required, grass swales are typically not shown. Paul was going to double-check with the Stormwater staff at I-5987A: Robeson Co. Page 2 of 5 Non -Merger Permit Drawing Review Meeting Minutes NCDOT and follow-up with the Design team. After the meeting, Paul directed the design team per the Stormwater group to only call out grass swales used for treatment (where treatment is required) on the swale tab. A note has been added to the general project narrative that vegetated conveyances were used throughout the project which will have water quality benefit. Sheet 6 • Site 1 (NRTR Stream SM): -L- 110+70 LT / 122+15 RT — Existing 54" RCP to be upsized to 7'x7' RCBC buried 1 foot, some inlet and outlet channel improvements are proposed to tie invert to the existing stream bed. Riprap at embankment is also proposed where roadside ditches tie to the stream to ensure bank stabilization is provided at both the culvert inlet and outlet. Jim Rerko mentioned that the `Remove' label for the existing 48" RCP should be changed to 'Plug and Fill'. Herb & David pointed out that since this is a box culvert location that will be phased, pipe removal was shown. Jim Rerko also remarked on the associated profile sheet that locations with 'fill with suitable material' should ideally be filled with riprap. David Bocker said that clarifications can be made on the plans that the suitable material is riprap. Sheet 14 • Site 2 (NRTR Stream TX): -L- 224+65 RT — Existing 30" RCP to be upsized to 42" Trenchless with standard riprap apron. It was requested that any riprap in streams be embedded. David Bocker clarified that riprap in streams was intended to be embedded and that bank stabilization was keyed -in. • Site 3 (NRTR Stream TX): -L- 226+70 RT — Existing 18" RCP to be replaced with 18" Trenchless with standard riprap apron & riprap at embankment stabilization. It was requested that this impact be specified as bank stabilization instead of system outlet on the impact summary table. Sheet 14/15 • Site 4 (NRTR Stream TU & TT): -L- 242+00 RT / 243+70 LT — Existing 2 @ 48" RCPs to be upsized to 8'x7' RCBC buried 1 foot, some inlet and outlet channel improvements are proposed to tie invert of the existing stream bed. There is also a small system outlet with standard riprap apron that drains to the JS. It was also noted that the culvert will be shorter due to the proposed culvert height. Sheet 15 • Site 5 (NRTR Wetland WAB): -L- 220+55 RT — Existing 18" RCP system outlet to be upsized to 30" Trenchless with standard riprap apron. Roadway fill slopes in this area have been minimized to avoid wetland impacts. Non -erosive velocities will be provided into the wetlands. David Bocker to check and ensure that no additional impacts as needed due to impacts from the bore pit for the trenchless installation. Sheet 16 • Site 6 (NRTR Stream TAA): -L- 265+00 LT — No existing pipe connection found under 1-95, both JS features flow away from 1-95. The headwaters of JS are fed by interstate ditches. Riprap at embankment is proposed at ditch outlets to stabilize banks of JS. • Site 7 (NRTR Stream TAA): -L- 265+00 RT — Existing 18" RCP system outlet to be replaced with 18" Trenchless with standard riprap apron. Riprap at embankment is proposed at ditch outlets to stabilize banks of JS. Matthew York asked if the NRTR Stream designation of "TAA" should be different for the west and east side of 1-95? Jim Rerko answered that no, this should be the same tributary since that was determined from fieldwork and Liz Hair agreed. I-5987A: Robeson Co. Page 3 of 5 Non -Merger Permit Drawing Review Meeting Minutes Sheet 17 • Site 8 (NRTR Stream TS): -L- 275+80 RT — 30" RCP with standard riprap apron is proposed at SR2 crossing due to reconfiguration of interchange. 3:1 roadway fill slopes have been used to minimize impacts to the stream. • Site 9 (NRTR Stream TBB): -L- 281+90 RT — Existing 36" RCP system outlet to be upsized to 60" RCP system outlet with standard riprap apron. Riprap at embankment is also proposed for ditches that outlet to the JS feature at this location. • Site 10 (NRTR Stream TBB & Wetland WM): -L- 285+50 LT — Roadway fill/roundabout impact to wetlands & 36" RCP with standard riprap apron is proposed at -Y1A crossing due to reconfiguration of interchange. David Bocker further explained that at the roundabout, 4:1 slopes were used and deemed to be the least impactful due to sight distance, minimization of guardrail and other roadway design factors. It was requested that David share some of these specific design constraints and methodology with the NV5 staff that are completed the permit application. Jim Rerko requested that the portion of stream (SS) that is located between the tributary segments (TBB) be changed to TBB for consistency. Liz Hair agreed with the change of SS to TBB. Sheet 18 • Site 11 (NRTR — Tenmile Swamp): -L- 310+50 LT/RT - Existing 3—11'x10' RCBC to be upsized to 3 — 12'x12' RCBC buried 1 foot, some inlet and outlet channel improvements are anticipated to tie invert to the existing stream bed. 3:1 roadway fill slopes have been utilized to minimize impacts to the stream and wetlands. Riprap is shown to fill the existing culvert inlet/outlet areas due to past scour issues from major storms in the past couple years. Toe protection is also proposed allow the roadway embankment to provide additional stabilization and PDE is provided for future maintenance. • Jim Rerko requested that Permit Site 12 be designated/labeled on this sheet. A station range for Site 12 should also be added to the Impact Summary Table. Sheet 19 • Site 12 (NRTR Wetland WK): -L- 314+00 LT & RT — 3:1 roadway fill slopes have been utilized to minimize impacts to the wetlands. Existing 18" RCP system outlet to be replaced and standard riprap apron is proposed at the toe of slope. Ditches have been designed to daylight prior to the wetland to provide diffused flow with non -erosive velocities. Sheet 20 • Site 13 (NRTR Stream TR): -L- 332+05 LT — Existing 18" RCP system outlet to be upsized to 30" Trenchless with standard riprap apron. • Site 14 (NRTR Wetland WJ): -L- 339+15 LT — Existing 2 @ 24" RCP system outlet to be upsized to 42" Trenchless with standard riprap apron. Sheet 33 • Site 15 (NRTR Stream SO): -Y2- 17+25 — Existing 36"/42" RCP to be upsized with 2 @ 48" RCP buried 1 foot with sill/benches at the inlet and outlet to maintain stream width. Riprap at embankment is proposed at ditch outlets upstream to stabilize banks of JS. I-5987A: Robeson Co. Page 4 of 5 Non -Merger Permit Drawing Review Meeting Minutes Bill Jernigan (MI Engineering) proceeded to review the second section of I-5987A (-L- 340+00 to 495+00) Sheet 21 • Site 17 (NRTR Wetland WJ): -L- 342+15 RT — Pocket wetland is a total take due to increase roadway footprint and false cut ditch with berm. • Site 16 (NRTR Wetland WJ): -L- 343+09 LT — Existing 24" RCP to be upsized to 48" Trenchless with standard riprap apron. Roadway fill slopes will result in impacts to the wetlands (entire LT side of Plan Sheet). • Site 16 (NRTR Wetland WJ): -L- 347+68 LT — Existing 36" RCP to be upsized to 42" Trenchless with standard riprap apron. • Site 18 (NRTR Wetland WJ): -L- 352+89 - 3:1 roadway fill slopes have been used to minimize impacts to the wetlands Sheet 22 • Site 19 (NRTR Stream SP — Upstream & Wetland WJ — Downstream): -L- 354+06 — Existing 2 @ 48" RCP to be upsized to 2 @ 7'x7' RCBC buried 1 foot with 1 foot sill on southern barrel and 2 foot sill and floodplain bench on northern barrel. • Site 20 (NRTR Wetland WI): -L- 365+16 RT — Proposed base ditch outlets into wetland with a standard riprap apron. • Site 20 (NRTR — Cowpen Branch & Wetland WI): -L- 366+29 — Existing 2 @ 7'x7' RCBC to be upsized to 2 @ 8'x9' RCBC buried 1 foot with sills on both barrels with channel improvements at the inlet and outlet. Sheet 23 • Site 20 (NRTR Wetland WI): -L- 367+54 LT & 368+42 RT — Proposed base ditches outlet into the wetland with standard riprap aprons. Sheet 25 • Site 21 (NRTR Wetland WH): -L- 400+00 LT — Proposed base ditch through the wetland maintains a similar elevation as the existing ditch. Pocket wetland is not a total take. • Site 21A (NRTR Stream TAC to SAB): -L- 404+00 RT — Bill Jernigan explained that stream SAB was recently added as jurisdictional site per the recent updated study area. The channel improvements and outfall cleanout at this location as needed to ensure proper drainage of the roadway ditches. This site is not shown on the pdf made available for this Permit Drawing Review meeting; Jim Rerko requested that this impact site be added to the permit package. NCDOT Hydraulics and the Division asked if sufficient TDE is shown to construct the channel improvements. Division requested 20' on each of the channel bank. After the meeting, it was confirmed that the TDE shown on the permit drawings was outdated; TDE as shown on the R/W plans did accommodate 20' on each side of the channel banks as requested; therefore, no R/W revision is needed at this location. It was also requested that the stream profile for the channel improvements be added to the permit drawing package for Site 21A. Sheet 29 • Site 22 (NRTR Stream TP): -L- 454+44 LT — Tributary is impacted due to widening, proposed ditch maintains a similar elevation as the existing channel. I-5987A: Robeson Co. Page 5 of 5 Non -Merger Permit Drawing Review Meeting Minutes • Site 22 (NRTR — Cowpen Branch & Wetland WG): -L- 454+90 — Existing 54" RCP to be upsized to 2 @ 8'x7' RCBC buried 1 foot with 1 foot sill on northern barrel and 2' sill and floodplain bench on southern barrel. Sheet 30 • Site 23 (NRTR — Cowpen Branch): -Y3- 24+79 — Existing 72" RCP/CMP to be upsized with 2 © 8'x7' RCBC buried 1 foot with 1 foot sill on southern barrel and 2' sill and floodplain bench on northern barrel. 3:1 roadway fill slopes have been utilized to minimize impacts to the stream. Portions of the southern roadway embankment will be removed; therefore, the outlet portion of the culvert will be shortened. Slight channel improvements are proposed at the inlet and outlet. Herb Turner asked if there were any other questions or comments; no attendees had any additional comments. After a short break, Herb reviewed the I-5987B project which are captured in separate meeting minutes. Meeting adjourned: 12:30 PM I-5987B 4C Non -Merger Meeting Minutes Project title I-5987B: 1-95 Improvements from North of SR 1758 (McDuffie Crossing Rd.) to North of SR 1723 (Parkton Tobermory Rd.) in Robeson County Subject 4C Non -Merger Meeting Location Microsoft Teams Date and time of 7/13/2021, 10:00am — 1:OOpm EST meeting Date of Meeting 8/4/2021 Minutes Attendees Craig Freeman NCDOT Div 6 Mark Staley Roadside Environmental Morgan Morefield Mott MacDonald Steve Kendall NCDOT Div 6 Emily Stupka NCDOT TEA Eleni Riggs Mott MacDonald Scott Pridgen NCDOT Div 6 Chris Underwood NCDOT Herb Turner Jr. Mott MacDonald Gregory Price NCDOT Div 6 Deanna Riffey NCDOT Jessalyn Abril Mott MacDonald James Rerko NCDOT Div 6 Liz Hair USACE Donna Jackson Mott MacDonald Rusty Marsh NCDOT Div 6 Robert Patterson NCDWR Juniper Walter-EgerMott MacDonald Gabe Shoffner NCDOT Div 6 David Bocker NV5 Kevin Alford Wetherill Engineering Christy Huff NCDOT Div 6 Steve Drum NV5 Matt Harvey Wetherill Engineering Paul Atkinson Hydraulics Unit Will Weathersbee NV5 Forrest Brooks Wetherill Engineering Ray Lovinggood Hydraulics Unit Christian Hund NV5 Jerry Page Gannett Fleming Matthew York Hydraulics Unit Bill Jernigan MI Engineering Josh Dalton Sungate Design The following is a brief summary of the discussions on the project: Introductions were made by Herb Turner (Mott MacDonald) and all in attendance. Herb proceeded to give an overview of the project (I-5987A & B). • For I-5987A, David Bocker (NV5) and Bill Jernigan (MI Engineering) proceeded to review Section Al and A2, respectively. Refer to meeting minutes for I-5987A (under separate cover). For I-5987B, the meeting resumed at 11:35am. Herb Turner introduced the hydraulic Design Team for I- 5987B and Kevin Alford (Wetherill Engineering) proceeded with sheet -by -sheet review of the permit drawings: Stormwater Management Plans: • Robert Patterson noted that standard rip rap pads do not meet the definition of the Riprap Energy Dissipator Basins on Sheet 3 of the Stormwater Management Plan (SMP) and should therefore be removed from the SMP. I-5987B: Robeson Co. Page 2 of 4 4C Non -Merger Meeting Minutes • Robert Patterson also suggested the possibility of adding grass swales to the SMP. David noted that treatment is not needed so grass swales were not included. Paul Atkinson added that if not required, grass swales are typically not shown. Paul was going to double-check with the Stormwater staff at NCDOT and follow-up with the Design team. After the meeting, Paul directed the design team per the Stormwater group to only call out grass swales used for treatment (where treatment is required) on the swale tab. A note has been added to the general project narrative that vegetated conveyances were used throughout the project which will have water quality benefit. Plan Sheet 7: • Site 1 o Liz Hair asked if there were any wetland impacts due to updated jurisdictional determinations. Kevin said the design team will go back and verify. After the meeting it was verified that a wetland file provided on 6-16-21 showed wetlands that will be impacted by the project at this site. These wetlands did not show up in the previous files. • Site 2 o Liz Hair asked if there were any wetland impacts due to updated jurisdictional determinations. Kevin said the design team will go back and verify. After the meeting it was verified that a wetland file provided on 6-16-21 showed wetlands that will be impacted by the project at this site. These wetlands did not show up in the previous files. Plan Sheet 40: • Site 3 o No Comments • Site 4 o No Comments Plan Sheet 10/11/12: • Site 5 o Jim Rerko mentioned that a workpad will be needed under the bridge. Kevin Alford and Herb Turner confirmed that the workpad was accounted for but it will not show up in the profile view because of the location that the profile was cut at. o Paul Atkinson wanted to make sure the workpad was labeled in plan view and Kevin Alford verified that it was labeled. Plan Sheet 12: • Site 6 o No Comments Plan Sheet 13/13A: • Site 7 o Herb Turner mentioned that after the last non -merger meeting, the downstream end of the proposed 2 @ 54" was re-evaluated. It was found to be a tributary as well. The outfall cleanout was reduced to tie into the existing 24" RCP (on Plan sheet 13A). From the 2@54" to the outlet of the 24" RCP is JS non-mitigable. The JS mitigable determination will start at the outlet of the 24" RCP. I-5987B: Robeson Co. Page 3 of 4 4C Non -Merger Meeting Minutes Plan Sheet 16: • Site 8 o No Comments Plan Sheet 17: • Site 9 o Excavation impacts shown on the plans are required for a bore pit to install the 24" by trenchless installation. Paul Atkinson wanted to know if the excavation of the pit will be shown as temporary impacts or permanent. Paul wanted to make sure the impacts were shown correctly since it is shown as permanent. Liz Hair wants a note added to the impact summary table describing the impact. The note should state that the excavation area will be filled in after the pipe is installed, the impacts should only last about a 1 month +/- and the site does not require mitigation. Deanna Riffey stated that on the 1-540 project that have both excavation and fill impacts shown. Liz stated that it this site does not need mitigation, since it will be temporary excavation that will be filled back in and restored. Mechanized clearing will be shown as it is currently shown. It was decided there will be no changes to the way the impacts are shown and a note will be added to the impact summary sheet describing the impacts. Plan Sheet 18: • Site 9 o The detail callout for the inlet and outlet of the culverts does not match a detail on the detail sheet. Verify that the callout is correct or if the detail needs to be added. After the meeting it was found that the callout on the plans was correct, but the detail shown in the ditch details did not had not been labeled. A label was added to the details to match the plans. Plan Sheet 20/21: • Site 10 o No Comments Plan Sheet 44: • Site 11 o No Comments Plan Sheet 28/29/30: • Site 12 o The bridge is currently being re -designed to be a 2 span, rather than a 3 span. Paul Atkinson wanted to verify that the correct design is shown in the permit drawings, since a 2 span bridge is shown. Herb Turner confirmed that it is shown correctly. Plan Sheet 37: • Site 13 o Paul Atkinson said he assumed the culvert was not buried because it is perched. Herb Turner confirmed. Josh Dalton stated it was not buried because the channel is higher on both ends and burying it would further put the culvert in a hole. I-5987B: Robeson Co. Page 4 of 4 4C Non -Merger Meeting Minutes o No mitigation is required for rip rap fill in the existing stream bed to bring the bed elevation back to the pre -scour elevation. Rip rap in the channel will need a separate line item on the impact summary since it will not require mitigation. A note will be added to the impact summary. Additional Discussion Topics • Jim Rerko reminded the team that there will be a quick turnaround after this meeting. The permit drawings will need to be complete in a week or two. NV5 will be doing the permit application and will need to have it submitted by mid -August. • Paul Atkinson followed up after the meeting in regards to showing grass swale information in the stormwater management plan. His email stated that it has been confirmed with the NCDOT Stormwater group that we only call out those grass swales specifically used for treatment (where treatment is required) on the swale tab as they have specific post -construction inspection and maintenance requirements. It should still be noted in the general project narrative that vegetated conveyances were used throughout the project which have a water quality benefit" Meeting Adjourned: 12:30 pm Attachment H: I-5987 Permit Labels ROBESON COUNTY BOARD OF EDUCAT P O BOX 2909 LUMBERTON, NC 28359 L O SMITH & IZZIE SMITH VADIS MCDONALD 2923 ORBIE CIR FAYETTEVILLE, NC 28306 JOSEPH GLENN RIDDLE 3175 ODUM RD HOPE MILLS, NC 28348 RICHARD G ALLEN ETALS LF RUSS MARGARET RIDDLE REM 21 SHADY LANE CHAPEL HILL, NC 27517 LEEVON GODWIN 849 MOUNT OLIVE CHURCH RD LUMBERTON, NC 28360 DOROTHY L LOCKLEAR 3270 MOUNT OLIVE CHURCH RD LUMBERTON, NC 28360 CHRISTOPHER L CALLAHAN 6470 RENNERT RD SHANNON, NC 28386-9785 HENRY NORRIS ERMA NORRIS 853 WINDSOR CREEK TRAIL GRAYSON, GA 30017 BURGER KING 7150 C/O RYAN PO BOX 460189 HOUSTON, TX 77056 MICCHAEL GODWIN 125 NATIVE RD LUMBERTON, NC 28360 NANCY LYNN WHITE 3394 WATTS DAIRY RD ST.PAULS, NC 28384 HARRY L GORE RUTH GORE 235 GREAT MARSH CHURCH RD SAINT PAULS, NC 28384 JOSEPH CARDELL SANDERSON 6006 40TH AVENUE HYATTSVILLE, MD 20782 SN PROPERTIES OF LUMBERTON, LL P O BOX 828 LUMBERTON, NC 28359 NP 301 LLC 3405 PIEDMONT RD NE SUITE 175 ATLANTA, GA 30305-4819 KENNETH KEARN DANIEL PO BOX 477 ST PAULS, NC 28384 HOWARD JOHNSON 19275 HWY 301 N ST PAULS, NC 28384 GLENDA ANN BUIE 1758 BRITT RD ST PAULS, NC 28384 FADHI ALHOBISHI P O BOX 807 ST PAULS, NC 28384 THAD JUNIOR DAVIS CHERYL JONES DAVIS PO BOX 159 SAINT PAULS, NC 28384-0159 OSCAR T BLANKS HEIRS P O BOX 336 LUMBERTON, NC 28359 RAYMOND W JONES MYRA W JONES 415 DECKER RD ST PAULS, NC 28384 MARY L BURNETT TRUSTEE ROSCOE BURNETT TRUSTEE 460 CULBRETH RD LUMBER BRIDGE, NC 28357 ORVAL THOMAS BLANKS 63 RUSS RD LUMBERTON, NC 28358 ELLA V NEALY PO BOX 7485 LUMBERTON, NC 28359 BUTLER MARY H & CARY SHORE 600 SPRING ST OXFORD, NC 27565 DANIEL LOUVA YOUNG PO BOX 477 SAINT PAULS, NC 28384 CORA R RAIMO ET AL 201 LONDONDERRY DR LUMBERTON, NC 28358 RICKY L BLANKS 3201 LOWE RD LUMBERTON, NC 28360 ERNESTINE COLLINS 9802 STALL AVE LANHAM, MD 20706 DWIGHT ARNOLD ATKINSON JR. AMANDA BETH BARNHORST 127 W GREAT MARSH CHURCH RD ST PAULS, NC 28384 FREDERICK J KEITH ET ALS TRUST C/O FREDERICK J KEITH 3000 COBB INTERNATIONAL BLVD KENNESAW, GA 30152 TRIPLE K INVESTMENTS,LLC 121 S COOL SPRINGS ST FAYETTEVILLE, NC 28301 PATRICIA RUSS THOMPSON DAVID MICHAEL THOMPSON 1016 CUMBERLAND DR SHELBY, NC 28150-3610 RONALD G HAMMONDS 1218 HAMMONDS RD LUMBERTON, NC 28360-0472 CALVIN TODD WILKERSON 4945 ARLINGTON STREET HOPEMILLS, NC 28348 VANCE U TYSON JR 4925 NC HWY 87 S FAYETTEVILLE, NC 28306 RONNIE EARL SKINNER PO BOX 261 DUBLIN, NC 28332 DELLA DAVIS BAXLEY 74 DAVIS FARM RD ST PAULS, NC 28384 WESLEY REVELS JR GLINDA REVELS ET AL P O BOX 983 ST PAULS, NC 28384 BLANKS ANTHONY EDEN BLANKS AVERALL BLANKS ET AL 120 ALESE DR LUMBERTON, NC 28360 JOSEPH MANNING BARNHILL JR 557 BUCKHORN RD PARKTON, NC 28371 JAMES BRITT RUTH BRITT 1026 MCMILLAN SIDING RD PARKTON, NC 28371 ARCHIE PREVATTE & WF LF EST 424 MOSBY DR SW LEESBURG, VA 20175 MARY ANN REGAN ET ALS 119 S 2ND ST ST PAULS, NC 28384-1507 DAVID CHARLES WHITE WILLIAM WHITE HEIRS 2239 E GREAT MARSH CHURCH RD ST PAULS, NC 28384 HAPPY VALLEY FARM LLC 315 BARKER TEN MILE RD LUMBERTON, NC 28358 TIMOTHY BELL KITTY BELL 9820 US HWY 301 N LUMBERTON, NC 28360 WILLIAM A BRYANT JR ET ALS 4401 FAYETTEVILLE RD LUMBERTON, NC 28358 LILA RUTH MCCOWN TRUSTEE LILA RUTH MCCOWN REVOCABLE TRUST 6916 CHANCERY LN WILLIAMSBURG, VA 23188 JOHN C MCLEOD & SHORE B TRUSTEE MCLEOD JOHN C & SHORE TRUST PO BOX 389 TRINIDAD, CA 95570 LORRAINE CANADY LF EST ESSIE NEAL RABUN 11917 US HWY 301 N LUMBERTON, NC 28358 FRANKLIN G MELVIN GENEVIEVE C MELVIN 1634 CEDAR CREEK RD FAYETTEVILLE, NC 28312 FAYE E MCRAINEY REAVES 456 W MCRAINEY RD ST PAULS, NC 28384 LOLETA O BLANKS 291 LOLETAS LANE LUMBERTON, NC 2835-0401 BRUNSWICK TIMBER, LLC C/O FOREST INVESTMENTS ASSOC PO BOX 1288 MOBILE, AL 36633 CAPE FEAR PROPERTY VENTURES LLC 110 VELCORD DR LUMBERTON, NC 28358 MARGARET J EVERETTE JAMES C EVERETTE 802 FISHER RD ST PAULS, NC 28384 FREEHOLD PROPERTIES INC 2852 20TH AVE N ST PETERSBURG, FL 33713 BRENDA B SMITH 4336 GORDON RD WILMINGTON, NC 28405 KEITH-PERRY LLC PO BOX 20250 RALEIGH, NC 27619 MITCHELL H BAKER III 2905 GREEN TOP COVE WILLMINGTON, NC 28409 K M BIGGS INC PO BOX 967 LUMBERTON, NC 28359 Attachment I: I-5987 PreFiling Meeting Request Submission Completed Page 1 of 2 DWR Pre -Filing Meeting Request Form NCRTH CARCLINA Envinnriente QuaIRy Contact Name* Jennifer Harrod Contact Email Address* Jennifer.Harrod@NV5.com Project Owner* NCDOT Project Name* I-5987A&B Project County* Robeson Owner Address: * Street Address 500 Transportation Drive Address Line 2 PO Box 1150 Fayetteville, NC 28302 City State / Province / Region Fayetteville, NC NC Postal / Zip Code Country 28301 USA Is this a transportation project?* ® Yes 0No Type(s) of approval sought from the DWR: ❑ 401 Water Quality Certification - Regular ❑� Individual Permit ❑ Shoreline Stabilization Does this project have an existing project ID#?* ® Yes 0No Please list all existing project ID's associated with this projects. * SAW-2019-01276 ❑ 401 Water Quality Certific ❑ Modification https://edocs.deq.nc.gov/Forms/Form/showformsubmission/89dc 1 6a4-d404-49e 8-80d8-bf... 7/1 1 /2021 Submission Completed Page 2 of 2 Do you know the name of the staff member you would like to request a meeting with? No Please give a brief project description below and include location information.* The North Carolina Department of Transportation (NCDOT) proposes the widening of 1-95 from NC 211 in (Exit 20) to 1-95 Business (Exit 40) in Cumberland County, North Carolina (STIP 1-5987). A PJD has already been issued (SAW-2019-01276). Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature* Submittal Date 7/11/2021 https://edocs.deq.nc.gov/Forms/Form/showformsubmission/89dc 1 6a4-d404-49e 8-80d8-bf... 7/1 1 /2021 Attachment J: I-5987 Environmental Document DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Type III Categorical Exclusion Action Classification Form STIP Project No. WBS Element Federal Project No. A. Project Description: 1-5987 47533.1.1 N H P-0095(056) The proposed project is included in the North Carolina Department of Transportation's (NCDOT) approved Fiscal Year (FY) 2018-2027 and 2020-2029 State Transportation Improvement Program (STIP) as Project 1-5987. The NCDOT and Federal Highway Administration (FHWA) propose to widen 18.7 miles of 1-95 to an eight -lane freeway from US 301 (Exit 22) in Robeson County to 1-95 Business/US 301 (Exit 40) in Cumberland County. Although most of the planned construction will occur between Exit 22 in Robeson County and Exit 40 in Cumberland County, some work will occur beyond those interchanges to provide a transition back to the existing highway cross section outside of the project area. See Figure 1 for a vicinity map showing the location of the project study area. B. Description of Need and Purpose: The purpose of improving this section of 1-95 is to help relieve congestion, improve mobility, and improve the resiliency of this corridor to storm events, such that it can continue to serve as a primary East Coast route through the project design year of 2040. Improvements will be required to accommodate projected future traffic volumes and ensure the highway operates at an acceptable level of traffic service, particularly during the peak hour. Traffic volumes along the 1-95 corridor are expected to increase considerably by 2040, creating conditions in which operations degrade and average speeds are below the posted speed limit. Currently, the number of vehicles using the section of 1-95 between Exit 22 in Robeson County and Exit 40 in Cumberland County ranges between 45,400 vehicles per day (vpd) to 57,600 vpd. The current Level of Service (LOS) is C or better throughout the corridor. Future traffic volumes (2040 No Build) are expected to range between 62,000 vpd to 90,000 vpd between Exit 22 and Exit 40. Without improvements, operations along the 1-95 corridor between Exits 22 and Exit 40 are anticipated to degrade significantly by year 2040. This includes much of the study area south of the proposed Fayetteville Outer Loop operating between LOS C and LOS D between 6:00 a.m. and 8:00 p.m. There are several segments anticipated to operate at LOS E for two hours each day. Widening 1-95 to eight lanes as well as interchange reconstruction are proposed to provide the additional capacity needed to help relieve congestion and have the corridor within the project area operate at LOS B between 6:00 a.m. and 8:00 p.m. 1 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC In addition to improving traffic conditions, sections of 1-95 within the project limits have experienced significant storm related flooding resulting in total closure of the interstate for multiple days. Roadway and bridge improvements will be needed to make the corridor more resilient to future flood events. C. Categorical Exclusion Action Classification: Type III D. Proposed Improvements: The proposed project will add two through travel lanes in each direction and increase the total number of lanes on this section of 1-95 from four to eight. Although most of the planned construction will occur between Exit 22 in Robeson County and Exit 40 in Cumberland County, some work will occur beyond those interchanges to provide a transition back to the existing highway cross section outside of the project area. Existing bridges at interchanges, overpasses, and stream crossings will be replaced as necessary to accommodate the widened roadway. Drainage culverts will be upgraded or replaced as necessary. As well, improvements to interchanges are also proposed to address outdated design features or to accommodate the planned through lane additions on the main roadway. The majority of the 1-95 widening will occur within the existing right-of-way, although additional right-of-way will need to be acquired where interchanges are being re -configured at Exits 25, 31, and 33. Additional right-of-way will also need to be acquired along cross streets in order to replace existing grade separations at Powersville Road (SR 1529), McDuffie Crossing Road (SR 1758), Great Marsh Church Road (SR 1006), McRainey Road (SR 1726), and Parkton Tobermory Road (SR 1723). Finally, additional right-of-way acquisition could be expected where parallel service roads may be relocated. As currently designed, these additional acquisitions would be needed to shift Cedar Grove Church Road (SR 1760) to the west and Oakland Road (SR 1980) to the east. See Figures 2A through 2J for location and illustration of the major elements of work. E. Special Project Information: Alternatives In addition to the recommended improvements, the following alternatives to the proposed widening were considered: • No -Build Alternative • Alternate Modes of Transportation Alternative • Transportation System Management Alternative The No -Build Alternative does not propose any changes to 1-95 within the study area aside from projects that are currently under construction or programmed in the 2020- 2029 State Transportation Improvement Program. The No -Build Alternative would neither increase the traffic carrying capacity of 1-95 within the entire study area nor modernize infrastructure on a large enough scale needed to maintain the integrity of the corridor so that it can continue to serve as a primary East Coast transportation 2 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC route through the project design year of 2040. Since the No -Build Alternative does not fulfill the primary purposes of the project or address the area transportation needs, it is not recommended. The Alternate Modes of Transportation Alternative would include increasing ridership and freight on mass transportation modes like buses, railroads, and airplanes to reduce the number of vehicles that would use 1-95 daily. While this option could reduce congestion on 1-95, it would not provide nearly the same level of congestion reduction as the recommended alternative. As well, the Alternate Modes of Transportation Alternative would not modernize the infrastructure needed to support the remaining buses, trucks, and automobiles that would still use 1-95. Since the Alternate Modes of Transportation Alternative does not fulfill the primary purposes of the project or address the area transportation needs, it is not recommended. The Transportation System Management (TSM) Alternative includes operational or physical improvements to increase available capacity of a roadway within the existing right-of-way with minimum capital expenditures and without reconstructing or adding additional through lanes to the existing road. Operational changes are largely administrative in nature while physical improvements are typically more capital intensive. Examples of operational changes include traffic law enforcement, speed restrictions, and access control. Physical improvements would include striping, signing, and minor realignments. TSM improvements are best suited for areas with capacity or safety deficiencies in specific locations. The capacity issues and antiquated infrastructure are widespread through the project area and require more intensive solutions than those provided by TSM. For these reasons the Transportation System Management Alternative would not satisfy the project purpose or fulfill the transportation need and is not recommended. Interchange Modifications Exit 22 (I-95/US 301) — The existing interchange configuration in this location is a diverging diamond that was modernized within the past 10 years. Alterations to this interchange will be minimal and include minor ramp widening and extensions necessary to transition the 1-95 mainline from the proposed eight lanes north of the interchange to six lanes south of Exit 22, eventually reducing to four lanes at Exit 20. Exit 25 (I-95/US 301) — The existing interchange configuration in this location is a partial clover that provides ingress and egress between US 301 and 1-95 via ramps and loops located in the southwest and northeast quadrants of the interchange. Currently, the US 301 bridge over 1-95 at Exit 22 is skewed and limits the acceleration and deceleration lengths on the loops and ramps. Four options were considered to modernize the interchange as described below and illustrated on Figures 3A through 3D: • Option 1 — This option would retain the current partial clover configuration, but would manage traffic at the ramp/loop terminals and surrounding roadways via two proposed roundabouts on either side of the 1-95 mainline. This option, while minimizing construction impacts to the surrounding area, was ultimately rejected due to likely extended closure of the portion of US 3 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC 301 needed to construct the new bridge over 1-95. Additionally, both roundabouts would need to accommodate five road/ramp junctions and were not desirable from an operations perspective. • Option 2 — This option would convert the current partial clover configuration to a diamond configuration. It would manage the ramps, US 301, and local roadways (Russ Road and Bucket Road) using two roundabouts on either side of the 1-95 mainline. This option was rejected due to undesirable operations at the proposed roundabouts, each of which would need to accommodate five road/ramp junctions. • Option 3 — This option would convert the current partial clover configuration to a diamond configuration. It would manage the ramps and US 301 using two roundabouts on either side of the 1-95 mainline. Russ Road (SR 1942) would be re-routed and directly reconnected to US 301 east of the roundabout that would manage northbound ingress and egress to and from 1-95. Under Option 3, Bucket Road (SR 1767) would be re-routed on new location west of the 1-95 ramps and connected directly to US 301 west of the proposed roundabout on the west side of 1-95. While this option provides a shorter access route to US 301 for some residents on Bucket Road, it would require relocating a residence and incur impacts to a wetland system that could be avoided by providing access from Bucket Road to US 301 in another way. For these reasons, Option 3 was rejected. • Option 4 (recommended) — This option would convert the current partial clover configuration to a diamond configuration. It would manage the ramps and US 301 using two roundabouts on either side of the 1-95 mainline. Russ Road (SR 1942) would be re-routed and directly reconnected to US 301 east of the roundabout that would manage northbound ingress and egress to and from 1-95. On the west side of 1-95, Bucket Road (SR 1767) would not be re -connected directly to US 301. Instead, access to US 301 from Bucket Road would be via Rozier Church Road (SR 1765), an approximate 1.5 miles difference from what currently exists. The proposed roundabout on the west side of 1-95 would manage southbound ingress and egress to and from 1-95. Each of the roundabouts would accommodate 4 road/ramp connections. Since each of the roundabouts would be easier for motorists to navigate than the other alternatives, and right of way and wetland takings are reduced by eliminating direct access to US 301 from Bucket Road, Option 4 was selected as the preferred option. Exit 31 (I-95/NC 20) — The existing interchange configuration in this location is a compressed diamond. The proposed improvements retain the compressed diamond to minimize impacts to existing development. A large cemetery is located in the southwest quadrant of the interchange and the remaining quadrants contain mixed retail and business development. The proposed project would replace the existing bridges that carry 1-95 over Broad Street (NC 20) to accommodate the additional lanes that will be added to 1-95. The ramps will be lengthened to better accommodate travel speeds on 1-95. Currently, the ramp terminals are controlled by traffic signals. The signalized intersections will be replaced with roundabouts to manage ingress and egress between Broad Street and 1-95. Concrete traffic islands are proposed at the approaches to each of the proposed roundabouts to better manage access from surrounding retail establishments. 4 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Exit 33 (I-95/US 301) — The existing interchange configuration in this location is a diamond interchange with unsignalized intersections at the ramp terminals with US 301. The proposed improvements retain the basic diamond configuration, but will replace the bridge that carries US 301 over 1-95 to accommodate the proposed additional lanes on 1-95. The bridge will be replaced south of the current bridge to minimize the amount of closure time on US 301 during project construction. The current intersections that manage ingress and egress between 1-95 and US 301 will be replaced by roundabouts on the east and west sides of mainline 1-95. In the northeast quadrant of the existing interchange, Oakland Road (SR 1980) has direct access to the northbound 1-95 entrance ramp. The proposed interchange will eliminate direct ramp access from Oakland Road by relocating Oakland Road on new location to provide direct access to US 301 just east of the roundabout east of mainline 1-95. 1-95/1-295 (Fayetteville Outer Loop) — Although not part of Project 1-5987, a new interchange with 1-95 is currently under construction that will connect to the Fayetteville Outer Loop. The freeway to freeway trumpet interchange that is under construction will accommodate the proposed additional lanes recommended on 1-95 under Project 1-5987. The only work expected under 1-5987 will be minimal work to reconnect ramps and loops after the additional through lanes are constructed. Impacts resulting from this interchange have already been documented in previous NEPA documents prepared for the Fayetteville Outer Loop. Exit 40 (1-95/1-95 Business/US 301) and Exit 41 (I-95/NC 59) — Currently, these interchanges operate together along with the interchange at 1-95 Business and Chickenfoot Road (NC 59) to provide full directional ingress and egress between I- 95, 1-95 Business/US 301, and Chickenfoot Road. The proposed improvements retain the basic configuration of both interchanges at Exits 40 and 41. At Exit 40, the bridges that carry 1-95 over 1-95 Business will be retained and widened to accommodate the proposed additional lanes on 1-95. Minimal resurfacing is anticipated to tie to the existing ramps. At Exit 41, minimal ramp work is expected to accommodate 1-95 as it tapers from the proposed eight lanes at Exit 40 back to four lanes just north of Exit 41. Potential Section 4(f) Resources Four resources were identified within the project study area that would potentially be protected under Section 4(f) of the Department of Transportation Act. These include two publicly -owned parks and two properties managed by the US Fish and Wildlife Service — Pee Dee National Wildlife Refuge. Each property was identified in advance of preparing functional designs. As currently designed, no right of way will be acquired from these properties and no impacts are expected. The following properties were identified and have been avoided by current design plans: • French Park — This facility is located on the west side of 1-95 just north of Exit 20 at the southernmost extend of proposed improvements to 1-95. French Park is owned and operated by the City of Lumberton and provides a playground, walking trail, wooded park, picnic tables, and a paved parking lot. Access to the 5 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC park is provided on North Roberts Road (NC 211). French Park is identified on Figure 2A. • Tom Blanks Park — This facility is located on the west side of 1-95 between the NCDOT truck weigh station and Exit 25. Tom Blanks Park is owned and operated by the Robeson County Parks and Recreation Department and provides a single baseball/softball field, bleachers, playground, picnic shelter, and unpaved parking area. It is open to the public during daylight hours. Access to the park is provided from US 301 near Magnolia School. Tom Blanks Park is identified on Figure 2B. • USFWS Easement 1 — This easement is located just north of Little Marsh Swamp adjacent to 1-95 on the west side. The same easement, which surrounds the Southern Comfort Air Ranch and runway, is adjacent to existing NCDOT right of way for 1-95 on both the east and west sides just north of the airport facility. It is managed by the US Fish and Wildlife Service as part of the Pee Dee National Wildlife Refuge. Current designs for the proposed project stay within the existing NCDOT right-of-way in this area and will not require new right-of- way purchase or construction easement from this property. This easement can be seen on Figures 2G and 2H. • USFWS Easement 2 — This easement is located between Parkton Tobermory Road (SR 1723) and Buckhorn Swamp and is adjacent to existing NCDOT right- of-way for 1-95 on both the east and west sides of the highway. It is managed by the US Fish and Wildlife Service as part of the Pee Dee National Wildlife Refuge. Current designs for the proposed project stay within NCDOT right-of- way in this area and will not require new right-of-way purchase or construction easement from this property. This easement can be seen on Figure 2H located just north of Parkton Tobermory Road (SR 1723). Wetlands and Streams Water resources in the study area are part of the Cape Fear and Lumber River basins [U.S. Geological Survey (USGS) Hydrologic Units [03040203, 03030004 and 03030005]. A total of twenty-seven jurisdictional wetlands were identified within the study area. A review of the anticipated project impacts to these resources is provided in the table below. 6 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Calculated Wetland Impacts Map ID NCWAM Classification Hydrologic Classification Area in Stu(ycArea .) Impacts (ac.)1 WA Bottomland Hardwood Riparian 3.24 2.20 WC Bottomland Hardwood Riparian 2.54 1.60 WD Riverine Swamp Forest Riparian 6.67 4.72 WE Bottomland Hardwood Riparian 1.15 0.35 WF Floodplain Pool Riparian 6.66 3.25 WG Floodplain Pool Riparian 0.01 < 0.01 WH Basin Wetland Non -Riparian 0.29 0.28 WI Bottomland Hardwood Riparian 1.02 0.49 WJ Bottomland Hardwood Riparian 2.54 1.18 WK Bottomland Hardwood Riparian 9.13 1.53 WL Bottomland Hardwood Riparian 5.42 0.43 WM Headwater Forest Riparian 9.34 3.39 WN Floodplain Pool Riparian 0.27 0.03 WO Floodplain Pool Riparian 3.00 0.44 WV Bottomland Hardwood Riparian 1.14 0.17 WZ Floodplain Pool Riparian 0.56 0.03 Total 20.09 1 ac = acres. Calculated impacts are based on slope stake limits of the preliminary design plus 25 feet. A total of twenty-three jurisdictional streams (mitigable) and 16 tributary waters of the U.S. (non-mitigable) were identified in the study area. All jurisdictional streams in the study area have been designated as warm water streams for the purposes of stream mitigation. A review of the anticipated project impacts to these resources is provided in the table below. 7 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Calculated Stream Impacts Map ID Class' Compensatory Mitigation Impacts (If)2 Big Marsh Swamp Perennial Mitigable 307.5 Brisson Branch Perennial Mitigable 299.2 Buckhorn Swamp Perennial Mitigable 123.2 Cold Camp Creek Perennial Mitigable 171.5 Cowpen Branch Perennial Mitigable 431.3 Gray's Creek Perennial Mitigable 12.9 Horsepen Branch Perennial Mitigable 147.4 Little Marsh Swamp Perennial Mitigable 316.6 Mercer Branch Perennial Mitigable 133.7 SJ Perennial Mitigable 696.9 SK Perennial Mitigable 109.8 SL Perennial Mitigable 74.5 SM Perennial Mitigable 130.5 SN Perennial Mitigable 154.8 SO Perennial Mitigable 37.5 SP Perennial Mitigable 101.3 SQ Intermittent Mitigable 212.4 SR Intermittent Mitigable 37.6 SS Intermittent Mitigable 184.4 Tenmile Swamp Perennial Mitigable 249.9 Total (Mitigable) 3,932.9 TAA Trib WoUS Non-Mitigable 9.7 TBB Trib WoUS Non-Mitigable 504.8 TC Trib WoUS Non-Mitigable 1,063.5 TJ Trib WoUS Non-Mitigable 116.4 TM Trib WoUS Non-Mitigable 43.7 TP Trib WoUS Non-Mitigable 107.5 TR Trib WoUS Non-Mitigable 1.5 TS Trib WoUS Non-Mitigable 163.2 TU Trib WoUS Non-Mitigable 2.5 TX Trib WoUS Non-Mitigable 124.3 Total (Non-Mitigable)3 2,137.1 1 Trib WoUS = Tributary waters of the U.S. 2 If = Linear feet. Calculated impacts are based on slope stake limits of the preliminary design plus 25 feet. 3 Impacts to Long Branch (Trib WoUS, non-mitigable) were not included in this report because this resource will be previously disturbed under NCDOT Project U-2519 (Fayetteville Outer Loop). Impacts have already been accounted for in this project's NEPA documentation. No streams in the study area have been designated as an Outstanding Resource Water (ORW). There are no designated High Quality Waters (HQW) or water supply watersheds (WS-I or WS-II) within or within 1.0 mile downstream of the study area. The North Carolina 2018 Final 303(d) list of impaired waters does not identify any stream within the study area as an impaired water. 8 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Noise Analysis The source of this traffic noise information is the Traffic Noise Report 1-95 from US 301 (Exit 22) to 1-95 Business/US 301 (Exit 40), by Ramey Kemp and Associates dated November, 2019. Summary A traffic noise evaluation was performed that identified three noise barriers that preliminarily meet feasibility and reasonableness criteria found in the NCDOT Traffic Noise Policy. A more detailed analysis will be completed during project final design. Noise barriers preliminarily found to be feasible and reasonable during the preliminary noise analysis may not be found to be feasible and reasonable during the final design noise analysis due to changes in proposed project alignment and other design considerations, surrounding land use development, or utility conflicts, among other factors. Conversely, noise barriers that preliminarily were not considered feasible and reasonable may meet the established criteria and be recommended for construction. This evaluation was conducted in accordance with the highway traffic noise requirements of Title 23 CFR Part 772. In accordance with NCDOT Traffic Noise Policy, the Federal/State governments are not responsible for providing noise abatement measures for new development for which building permits are issued after the Date of Public Knowledge. The Date of Public Knowledge of the proposed highway project will be the approval date of the Categorical Exclusion (CE). Traffic Noise Impacts The maximum number of receptors in the proposed project alternative predicted to become impacted by future traffic noise is shown in the table below. The table includes those receptors expected to experience traffic noise impacts either by approaching or exceeding the FHWA Noise Abatement Criteria or by a substantial increase in exterior noise levels as defined in the NCDOT Traffic Noise Policy. Predicted Traffic Noise Impacts by Alternative* Traffic Noise Impacts Alternative Residential (NAC B) Places of Worship/Schools, Parks, etc. (NAC C & D) Businesses (NAC E) Total Build 92 2 6 100 Per TNM 2.5 and in accordance with 23 CFR Part 772 9 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Traffic Noise Abatement Measures Measures for reducing or eliminating the traffic noise impacts, including noise barriers, were considered for all impacted receptors in each alternative. Noise barriers include two basic types: earthen berms and noise walls. These structures act to diffract, absorb, and reflect highway traffic noise. Noise Barriers A noise barrier evaluation was conducted for this project utilizing the Traffic Noise Model (TNM 2.5) software developed by the FHWA. The following table summarizes the results of the evaluation. Preliminary Noise Barrier Evaluation Results NSA Noise Barrier Location Length / Height1 (feet) Square Footage Number of Benefited Receptors Square Feet per Benefited Receptor / Allowable Square Feet per Benefited Receptor Preliminarily Feasible and Reasonable ("Likely") for Construction2 1 NW1-1 East of 1-95, south of Exit 22, in southeast quadrant of US 301 interchange. 540/12 6,299 2 3,150/1,500 No3 2 NW2-1 West of 1-95, south of Exit 22 parallel to Dawn Drive. 2 280/19 43,441 31 1,401/1,500 Yes 3 NW3-1 East of 1-95, north of Exit 22 between Edinborough Road and Powers Road 1,140/14 15,781 3 5,261/1,500 No3 4 NW4-1 West of 1-95, north of Exit 22 adjacent to Robeson Community College 1,020/14 13,921 4 3,481/1,500 No3 8 NW8-1 West of 1-95, north of Exit 25 along Sun Road. 1,020/10 10,441 7 1,492/1,500 Yes 10 NW10-1 West of 1-95, south of Great Marsh Church Road, along Cedar Grove Church Road 900/12 10,919 4 2,730/1,500 No3 10 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC NSA Noise Barrier Location Length / Height' (feet) Square Footage Number of Benefited Receptors Square Feet per Benefited Receptor / Allowable Square Feet per Benefited Receptor Preliminarily Feasible and Reasonable ("Likely") for Construction2 11 NW11-1 East of 1-95, parallel to the 1-95 northbound off -ramp at Exit 31. 960/16 15,479 2 7,740/1,500 No3 19 NW19-1 East of I-95, just north of Parkton Tobermory Road. 1,200/16 19,499 13 1,500/1,500 Yes 19 N W 19-2 East of 1-95, north of Parkton Tobermory Road. 960/11 10,200 2 5,100/1,500 No3 20 NW20-1 West of I-95, just north of Parkton Tobermory Road. 780/13 9,840 4 2,460/1,500 No3 24 NW24-1 West of I-95, just north of Roslin Farm Road. 1,387/13 18,486 3 6,162/1,500 No3 25 NW25-1 East of 1-95, north of Exit 40. 2,340/18 43,199 12 3,600/1,500 No3 Average wall height. Actual wall height at any given location may be higher or lower. 2The likelihood of a barrier's construction is preliminary and subject to change, pending completion of final design and the public involvement process. 3 Barrier is not reasonable due to the quantity per benefited receptor exceeding the allowable quantity per benefited receptor. Public and Stakeholder Involvement Start of Study Notification — December 4, 2018: Start of Study Notifications were sent via US Mail and email that contained general project information and mapping. Recipients were asked to provide comments on the proposed project. Recipients of the Start of Study Notifications included local and elected officials in Robeson and Cumberland Counties, the City of Lumberton, the Towns of Hope Mills and St. Pauls, the Fayetteville Area Metropolitan Planning Organization, the Lumber River Council of Governments, the Catawba Cultural Preservation Project, the Coharie Tribe, and the Lumbee Tribe of North Carolina. In addition, the Start of Study Notification was provided to federal and state regulatory and resource agencies including the US Environmental Protection Agency, the US Fish and Wildlife Service, the US Army Corps of Engineers, the US Coast Guard, and the North Carolina State Clearinghouse. 11 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC The Catawba Cultural Preservation Project had no immediate concerns, but requested notification if Native American artifacts and/or human remains are located during the ground disturbance phase of the project. Other comments received included various requests for general information to be included in the environmental documentation for the project, identification of potential permit requirements, general preferences for stormwater treatment, and recommendations on minimization techniques that could be applied in later design phases and the construction phase of the project. Agency Introduction Meeting — January 15, 2019: A meeting was held at the NCDOT Division 6 office in advance of field review to familiarize US Army Corps of Engineers and NC Division of Water Resources staff with general project information. The Agency Introduction Meeting included a presentation that included a project overview, discussion of the need for and purpose of the proposed project, known environmental features, proposed typical sections, and the project schedule and funding. Newsletter— April 2019: NCDOT distributed approximately 3,400 copies of an informational newsletter to citizens and local officials with properties or interest in the project study area. The newsletter provided an overview of the project proposal, an explanation of the project purpose, preliminary schedule information, and a general explanation of the project development process. Recipients were also invited to submit comments via letter, email, or telephone call to the project team. Public and Local Officials Meetings — July 22 and 23, 2019: Public meetings were held at Robeson Community College and Gray's Creek Elementary School on consecutive evenings from 4:00 until 7:00 p.m. Each public meeting was preceded by a local officials' meeting. The public meetings were informal and provided an opportunity to review project maps and displays and meet one on one with members of the project team to exchange information about topics of interest related to the project and its potential impacts. Across the two days of meetings, approximately 220 people attended. A total of 20 comments were received at the meeting and during the comment period (through August 23, 2019). The most frequent topics expressed by citizens and local officials included the following: • General support for improving 1-95 in the project area; • Existing and future road noise and potential abatement measures; • Existing flooding and potential increased/changed drainage patterns due to the proposed changes to 1-95; • Individual property concerns including right-of-way impacts and property access during project construction; • Potential dedicated truck lanes on 1-95; 12 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC • Local access and traffic safety concerns at interchanges proposed to be modified; • Notification of future activities on the proposed project. Project Cost Estimates Several cost estimates were produced for the proposed project, including those for utility relocations, right-of-way acquisition, and construction costs. A review of these costs in comparison to the STIP cost estimates is provided below. NCDOT STIP* 1-5987 Project Estimates Preliminary Engineering $1,010,000 N/A Utility Relocation $1,000,000 $4,034,000 Right of Way $32,000,000 $2,096,952 Construction $413,750,000 $386,500,000 TOTAL $447,760,000 $392,630,952 "Cost estimates based on 2020-2029 Final Board of Transportation Approved STIP 13 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC F. Project Impact Criteria Checklists: Type III Actions Yes No If the proposed improvement is identified as a Type III Class of Action answer all questions. • The Categorical Exclusion will require FHWA approval. • If any questions are marked "yes" then additional information will be required for those question in Section G. 1 Does the project involve potential effects on species listed with the US Fish and Wildlife Service (USFWS) or National Marine Fisheries (NMFS)? X 2 Does the project result in impacts subject to the conditions of the Bald and Golden Eagle Protection Act (BGPA)? X 3 Does the project generate substantial controversy or public opposition, for any reason, following appropriate public involvement? X 4 Does the project cause disproportionately high and adverse impacts relative to low-income and/or minority populations? X X 5 Does the project involve substantial residential or commercial displacements or right of way acquisition? X 6 Does the project include a determination under Section 4(f)? X 7 Is a project -level analysis for direct, indirect, or cumulative effects required based on the NCDOT community studies screening tool? X 8 Is a project level air quality Mobile Source Air Toxics (MSAT) analysis required? X 9 Is the project located in anadromous fish spawning waters? X 10 Does the project impact waters classified as Outstanding Resource Water (ORW), High Quality Water (HQW), Water Supply Watershed Critical Areas, 303(d) listed impaired water bodies, buffer rules, or Submerged Aquatic Vegetation (SAV)? X 11 Does the project impact waters of the United States in any of the designated mountain trout streams? X X 12 Does the project require a U.S. Army Corps of Engineers (USACE) Individual Section 404 Permit? X 13 Will the project require an easement from a Federal Energy Regulatory Commission (FERC) licensed facility? X 14 Does the project include Section 106 of the National Historic Preservation Act (NHPA) effects determination other than a no effect, including archaeological remains? Are there project commitments identified? X 15 Does the project involve hazardous materials and/or landfills? X 16 Does the project require work encroaching and adversely effecting a regulatory floodway or work affecting the base floodplain (100-year flood) elevations of a water course or lake, pursuant to Executive Order 11988 and 23 CFR 650 subpart A? X 17 Is the project in a Coastal Area Management Act (CAMA) county and substantially affects the coastal zone and/or any Area of Environmental Concern (AEC)? X 18 Does the project require a U.S. Coast Guard (USCG) permit? X 19 Does the project involve construction activities in, across, or adjacent to a designated Wild and Scenic River present within the project area? X 14 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC 20 Does the project involve Coastal Barrier Resources Act (CBRA) resources? X Type III Actions (continued) Yes No 21 Does the project impact federal lands (e.g. USFS, USFWS, etc.) or Tribal Lands? X 22 Does the project involve any changes in access control? X 23 Does the project have a permanent adverse effect on local traffic patterns or community cohesiveness? X 24 Will maintenance of traffic cause substantial disruption? X 25 Is the project inconsistent with the STIP or the Metropolitan Planning Organization's (MPO's) Transportation Improvement Program (TIP) (where applicable)? X 26 Does the project require the acquisition of lands under the protection of Section 6(f) of the Land and Water Conservation Act, the Federal Aid in Fish Restoration Act, the Federal Aid in Wildlife Restoration Act, Tennessee Valley Authority (TVA), Tribal Lands, or other unique areas or special lands that were acquired in fee or easement with public -use money and have deed restrictions or covenants on the property? X 27 Does the project involve Federal Emergency Management Agency (FEMA) buyout properties under the Hazard Mitigation Grant Program (HMGP)? X 28 Is the project considered a Type I under the NCDOT's Noise Policy? X 29 Is there prime or important farmland soil impacted by this project as defined by the Farmland Protection Policy Act (FPPA)? x 30 Are there other issues that arose during the project development process that effected the project decision? X G. Additional Documentation as Required from Section F Question 1 - Does the project involve potential effects on species listed with the US Fish and Wildlife Service (USFWS) or National Marine Fisheries (NMFS)? As of June 27, 2018, the United States Fish and Wildlife Service (USFWS) lists nine federally protected species, under the Endangered Species Act (ESA) for Robeson and Cumberland Counties. One additional species, Atlantic pigtoe, was proposed for listing on October 11, 2018 for Cumberland County. However, it has not been officially listed yet. For each species, a determination of the presence or absence of habitat is included below along with the Biological Conclusion rendered based on survey results in the study area. 15 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC ESA federally protected species listed for Robeson and Cumberland Counties Scientific Name Common Name County Federal Status Habitat Present Biological Conclusion Alligator mississippiensis American alligator Cumberland /Robeson T(S/A)Yes Not Required Notropis mekistocholas Cape Fear shiner Cumberland E Undetermined No Effect Picoides borealis Red -cockaded woodpecker Cumberland /Robeson E Yes No Effect Mycteria americana Wood stork Robeson T Yes May Affect, Not Likely to Adversely Affect Neonympha mitchellii francisci Saint Francis' satyr buttefly Cumberland E No No Effect Schwalbea americana American chaffseed Cumberland E Yes No Effect Rhus michauxii Michaux's sumac Cumberland /Robeson E Yes No Effect Lindera melissifolia Pondberry Cumberland E Yes No Effect Lysimachia asperulaefolia Rough -leaved loosestrife Cumberland E Yes No Effect Fusconaia masoni Atlantic pigtoe Cumberland PT No Not Required At This Time E - Endangered T - Threatened T(S/A) - Threatened due to similarity of appearance PT — Proposed Threatened Wood Stork: The Biological Conclusion for the Wood stork (Mycteria americana)is May Affect, Not Likely to Adversely Affect. Suitable habitat for the Wood stork is present in the study area in the form of wetlands, swamps and canals; however, no individuals or nests were observed during site visits conducted July 7 and 21, August 4, 11, and 18, 2018. A review of NCNHP records updated on September 24, 2019 indicates no known occurrences within 1.0 mile of the study area. Per Division 6 coordination with USFWS, the biological conclusion for Wood stork in areas with habitat is May Affect, Not Likely to Adversely Affect. Atlantic Pigtoe: A Biological Conclusion for the Atlantic pigtoe (Fusconaia masoni) is not required at this time. Habitat for the Atlantic pigtoe is not present within the study area. All streams are slow moving swamp fed systems with silt and detritus for substrate instead of clean, coarse sand and gravel as required by the Atlantic pigtoe. A review of NCNHP records on September 24, 2019 indicates no known occurrences within 1.0 mile of the study area. A 16 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC search of the USFWS IPaC data base indicated that the Atlantic pigtoe is not listed within the study area. Based on these findings and no documented occurrences, this project will have no effect on the Atlantic pigtoe. Question 12 - Does the project require a U.S. Army Corps of Engineers (USACE) Individual Section 404 Permit? Under the current Section 404 permitting requirements, it is expected the project will require an Individual Permit (IP). In general, the USAGE Wilmington District issues an IP for projects that result in 0.5 acre or more of fill to Waters of the US or 300 linear feet or more of stream impacts or if the project is considered by the agency to be a major action. This permit requires a full public interest review, including public notices and coordination with involved agencies, interested parties, and the general public. The final decision regarding the type of permit required to construct the project rests with the USACE. The proposed project did not follow the formal NEPA/Section 404 Merger Process during project development due to the nature of the proposed improvements. Most of the proposed widening is contained within the current right of way limits, although limited additional right-of-way will need to be acquired where interchanges are being modernized at Exits 25, 31, and 33. Additional right-of-way will also need to be acquired along cross streets in order to replace existing grade separations at Powersville Road (SR 1529), McDuffie Crossing Road (SR 1758), Great Marsh Church Road (SR 1006), McRainey Road (SR 1726), and Parkton Tobermory Road (SR 1723). The overpasses are considered functionally obsolete and the pier locations of the existing structures cannot accommodate the proposed widened 1-95 cross section. Finally, additional right-of-way acquisition could be expected where parallel service roads may be relocated. As currently designed, these additional acquisitions would be needed to shift Cedar Grove Church Road (SR 1760) to the west and Oakland Road (SR 1980) to the east. Coordination with agency stakeholders began with the distribution of Start of Study letters, continued with a formal Agency Introduction Meeting, and has continued further with field meetings to determine location of wetlands and streams in the project area. Minimization of unavoidable impacts will continue to be considered as designs for the project advance to right-of-way plans. Question 14 - Does the project include Section 106 of the National Historic Preservation Act (NHPA) effects determination other than a no effect, including archaeological remains? Are there project commitments identified? Although no architectural survey is required for the project and archaeological surveys concluded the project will not adversely impact any significant or potentially significant archaeological resources, the Catawba Indian Nation asked to be notified if Native American artifacts and/or human remains are located during the ground disturbance phase of the project. The Catawba Indian Nation had no immediate concerns with regard to traditional cultural properties, sacred sites or Native American archaeological sites within the boundaries of the proposed project. Question 15 - Does the project involve hazardous materials and/or landfills? The NCDOT GeoEnvironmental Section identified twenty-four (24) sites of concern within the project study area. Low monetary and scheduling impacts are anticipated if any of the sites are impacted by the final project design. 17 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Question 16 - Does the project require work encroaching and adversely effecting a regulatory floodway or work affecting the base floodplain (100-year flood) elevations of a water course or lake, pursuant to Executive Order 11988 and 23 CFR 650 subpart A? The proposed project is anticipated to impact floodways and 100-year floodplain. As such, appropriate special coordination commitments are included on the greensheets. Question 18 - Does the project require a U.S. Coast Guard (USCG) permit? None of the area streams crossed by 1-95 within the project area are navigable. Appropriate information has been submitted to USCG from FHWA to claim jurisdiction over the bridges to be replaced over waterways. Question 24 - Will maintenance of traffic cause substantial disruption? The project involves constructing two additional lanes in each direction as well as multiple interchange re -configurations. Additionally, multiple grade separations will be replaced. Traffic maintenance will likely cause periodic disruption that will be minimized through developing work zone traffic control plans and coordinating with localities as design continues. Use of off -site detours is not anticipated for extended periods of time, however, further design needs to be completed to provide a more definitive assessment. Question 27 - Does the project involve Federal Emergency Management Agency (FEMA) buyout properties under the Hazard Mitigation Grant Program (HMGP)? Two existing reinforced concrete box culverts are recommended to be enlarged and replaced at the south end of the project near Exit 20 (NC 211/North Roberts Avenue). The culverts carry Meadow Branch and Fivemile Branch beneath 1-95, Dawn Drive, and Kahn Drive. The property owner at the ends of each culvert are identified as the City of Lumberton and the culverts are located within the 100-year floodplain. Outreach to the City of Lumberton has been made, and a determination of whether the properties were purchased using Hazard Mitigation Grant funds is forthcoming. NCDOT Division 6 will continue to coordinate with the City of Lumberton and other stakeholders as hydraulic design continues. Question 28 - Is the project considered a Type I under the NCDOT's Noise Policy? The project meets the conditions as a Type I project under the NCDOT Noise Policy. As such, a noise evaluation has been conducted and mitigation measures have been identified (See Special Project Information in Section E). Question 29 - Is there prime or important farmland soil impacted by this project as defined by the Farmland Protection Policy Act (FPPA)? Farmland soils eligible for protection under FPPA are present within the project footprint. Based on the current functional design slope stakes plus 25 feet (minus areas lying within the Fayetteville Urbanized area and within the future 1-295 Fayetteville Outer Loop right-of- way), 21.0 acres of prime farmland and 13 acres of farmland of statewide importance are expected to be impacted. 18 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC A preliminary screening of farmland conversion impacts in the project area has been completed (NRCS Form CPA-106 for corridor projects, Part VI only) and a total score of 29 out of 160 points was calculated for the 1-5987 project site. Since the total site assessment score does not exceed the 60-point threshold established by NRCS, farmland conversion impacts may be anticipated, but are not considered notable. 19 Revised 4/25/17 DocuSi.n Envelo•e ID: 76C248A9-01 D1-42E0-83C5-E086ED1224FC H. Project Commitments Robeson and Cumberland Counties 1-95 Widening from Exit 22 to Exit 40 Federal -Aid Project No. NHP-0095(056) WBS No. 47533.1.1 STIP No. 1-5987 Division 6 — Catawba Indian Nation Coordination The Catawba Cultural Preservation Project had no immediate concerns, but requested notification if Native American artifacts and/or human remains are located during the ground disturbance phase of the project. Division 6 — Town of Saint Pauls and Other Local Stakeholder Coordination The Division will continue appropriate coordination with the Town of St. Pauls and other relevant stakeholders as hydraulic design for the project continues. Results of modeling relevant to changes in drainage due to the project will be shared with local stakeholders. Division 6 — Robeson and Cumberland Counties Work Zone Traffic Control Plan Coordination In order to minimize and/or mitigate known multi -modal congestion issues that have historically affected emergency response and area schools when 1-95 traffic is detoured along alternate routes in the area, NCDOT Division 6 will coordinate directly with local emergency management and local schools transportation officials in the development of work zone traffic control plans. NCDOT Hydraulics Unit — Floodplain Mapping Coordination The NCDOT Hydraulics Unit will coordinate with the North Carolina Floodplain Mapping Program (FMP), the delegated state agency for administering FEMA's National Flood Insurance Program, to determine the status of the project with regard to the applicability of NCDOT's Memorandum of Agreement with the FMP or approval of a Conditional Letter of Map Revision (CLOMR) and subsequent final Letter of Map Revision (LOMR). Division 6 — As -Built Construction Plans The Division shall submit sealed as -built construction plans to the Hydraulics Unit upon completion of project construction certifying that the drainage structures and roadway embankments that are located within the 100-year floodplain were built as shown in the construction plans, both horizontally and vertically. Division 6 — Powersville Road Bicycle Accommodations In accordance with the NCDOT Complete Streets Policy Guidance (August 2019), the Powersville Road replacement structure and approach should be designed to accommodate bicycle facility improvements identified in the adopted Lumberton CTP, including a minimum 4-foot paved shoulder and 54-inch bridge railings. DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Categorical Exclusion Approval STIP Project No. WBS Element Federal Project No. Prepared By: 11/12/2019 Date Prepared For: Reviewed By: 11/12/2019 Date 1-5987 47533.1.1 NHP-0095(056) DocuSigned / by: 13?,1 %*t. VlRNW O Brian F. f d111 ;3 5t, Senior Project Development Engineer NV5 Engineers and Consultants NCDOT Division 6 DocuSigned by: jagMt,S J r& b James J. Rerco, rho ect Development and Environmental Analysis Engineer NCDOT Division 6 NCDOT certifies that the proposed action qualifies as a Type III Categorical Exclusion. 11/13/2019 Date FHWA Approval: 11/14/2019 Date p- DocuSigned by: Gv by y f viA,s Greg Burns eFfEroiJ ion Engineer NCDOT Division 6 DocuSigned by: ert John F. Su ivanE21PP,3 , Division Administrator Federal Highway Administration 21 Revised 4/25/17 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Appendix A STIP Project 1-5987 November 2019 Categorical Exclusion DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC A rfabia Rd lsR 1003) Town Lumber Bridge Town of Rennert Springs LRobeson and umberland Counties City Lumberton Fayetteville of Hopeopills,• t CUMBERLAND BLADEN Study Area i own Tar 3 1.5 0 3 Miles 1 inch = 3 miles Source: NCDOT, NCDEQ, CALYX Engineers and Consultants Figure Date: 10/28/2019 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION 6 1-95 Widening from US 301 (Exit 22) in Robeson County to 1-95 Business (Exit 40) in Cumberland County. STIP Project 1-5987 Robeson and Cumberland Counties Figure 1 - Project Vicinity DormSinn Envelone ID• 76C248A9-01 D1-42E0-83C5-E086FD1224FC Map index Preliminary Study Area Interstate US Route NC Route Major Road Local Road Town of St. Pauls Municipal Boundary County Boundary Town of Parkton NORTH CAROLINA DEPARTMENT '1 OF TRANSPORTATION DIVISION 6 1.5 0.75 0 1.5 Miles 1 inch = 1.5 miles Scarce: NC DOT. NCOneMap. CALYX Engineers and Consultant* Figure Date. 1Ol31O2O1g Town of Hope Mills 1-95 Widening from US 301 in Robeson County (Exit 22) to 1-95 Business (Exit 40) in Cumberland County. STIP Project 1-5987 Robeson and Cumberland Counties Figure 2 - Environmental Features Index DocuSinn Fnvalnna ID• 7BC94RA9-011)1-49F0-R3e5-FOABFr)1994FC CI Preliminary Study Area cf Proposed Edge of Travel ttt Proposed Slope Stakes Proposed Right of Way fl Proposed Culvert O Proposed Bridge 0 Assisted Living Facility Cemetery Church Daycare Firestation Ge oe nv iron me nta l Site of Concern • Government Facility National Guard *, Park eRecycling Center School • NPDES Stormwater Permit (Active) Public Water Supply Source Communication Tower Electric Substation Road Ili Historic Property (SL) —1—I Railroad L. Gilbert Carroll Middle School Delineated Stream NCDEQ Stream Delineated Wetland NWI Wetland Delineated Waterbody NCDEQ Waterbody Floodway 100-Year Floodplain Wellhead Protection Area Solar Farm Park Conservation Easement L___J Big Marsh Swamp Natural Heritage Area National Register Historic Boundary Building Footprint Parcel Municipal Boundary County Boundary NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION 6 800 400 0 800 Feet tin=800ft Spline: NCOEO, N000T, NCHPO, NCFMP. NCNHP, NCOneMap, USFWS, Googie. CALYX Engineers and Consultants Figure pate: lt/i/2019 1-95 Widening from US 301 in Robeson County (Exit 22) to 1-95 Business (Exit 40) in Cumberland County. STIP Project 1-5987 Robeson and Cumberland Counties Figure 2A - Environmental Features DocuSign FnvaIone ID• 76C248A9-01 D1-42E0-83C5-E08BFD1224FC Preliminary Study Area Proposed Edge of Travel Proposed Slope Stakes Proposed Right of Way Proposed Culvert Proposed Bridge ttt i n Q 0 Assisted Living Facility Cemetery Church Daycare Firestation Germ nv iron me nta l Site of Concern a Government Facility • National Guard • Park Recycling Center School NPOES Stormwater Permit (Active) . Public Water Supply Source A Communication Tower Electric Substation Road II Historic Properly (SL) —1-1 Railroad Delineated Stream NCDEQ Stream Delineated Wetland NWI Wetland Delineated Waterbody NCDEQ Waterbody 1 1 Floodway 100-Year Floodplain Wellhead Protection Area Big Marsh Swamp Natural Heritage Area National Register Historic Boundary Building Footprint Solar Farm Parcel Park • Municipal Boundary Conservation Easement r ] County Boundary NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION 6 800 400 0 800 Feet 1 in = 800 ft Source: NCOEQ. NCODT, NCHPO, NCFMP, NCNHP. NC4neMap, USFWS, Google. CALYX Engineers and Consultants Figure pats' 7till2019 m r: II Magnolia Elementary School 1-95 Widening from US 301 in Robeson County (Exit 22) to }-95 Business (Exit 40) in Cumberland County. Si1P Project 1-5987 Robeson and Cumberland Counties Figure 2B - Environmental Features DocuSinn FnvaInnn ID• 76C94RA9-01 r)1-49F0-R3C5-FORE F1l1994FC CI Preliminary Study Area Proposed Edge of Travel Proposed Slope Stakes Proposed Right of Way Proposed Culvert Proposed Bridge ttt 13 0 0 Assisted Living Facility Cemetery Church Daycare Firestation Ge oe nv iron me nta l Site of Concern 1111 Government Facility • National Guard • Park • Recycling Center NPDES Stornnvater Permit (Active) . Public Water Supply Source Communication Tower Electric Substation jSchool Road PI Historic Properly (SL) —1—I Railroad Delineated Stream NCDEQ Stream Delineated Wetland NWI Wetland Delineated Waterbody NCDEQ Waterbody Floodway 1DD-Year Floodplain Wellhead Protection Area Solar Farm Parcel Park •• •1 Municipal Boundary Conservation Easement L_] County Boundary Big Marsh Swamp Natural Heritage Area National Register Historic Boundary Building Footprint NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION 6 800 400 0 800 Feet tin=BOO ft m Scurce: NCIEO. NCp0T, NCHPO, NCFMP, NCNHP. NCCneMap, USFWS, Gnogle. CALYX Engineers and Consultants Figure pate: 1t/1/2019 1-95 Widening from US 301 in Robeson County (Exit 22) to 1-95 Business (Exit 40) in Cumberland County. Si1P Project 1-5967 Robeson and Cumberland Counties Figure 2C - Environmental Features DocuSign Fnvp f• 7FC;24RAQ-(11111-42Fn-R3C5-FfPR,FI11224Fn Preliminary Study Area Proposed Edge of Travel Proposed Slope Stakes Proposed Right of Way Proposed Culvert Proposed Bridge ttt i n 0 0 Assisted Living Facility Cemetery Church Daycare Firestation Germ nv iron me nta! Site of Concern • 420 Government Facility National Guard Park Recycling Center School • A NPDES Stormwater Permit (Active) Public Water Supply Source Communication Tower Electric Substation Road Historic Property (SL) —I—I Railroad Delineated Stream NCDEQ Stream Delineated Wetland NWI Wetland Floodway 100-Year Floodplain Wellhead Protection Area Solar Farm - Delineated Waterbody Park NCDEQ Waterbody Conservation Easement Big Marsh Swamp Natural Heritage Area National Register Historic Boundary Building Footprint Parcel Municipal Boundary County Boundary NORTH GAROLINA DEPARTMENT OF TRANSPORTATION DIVISION 6 800 400 0 800 Feet tin=S00ft m Source: NCOE4. NCDOT, NCHPO, NCFMP, NCNHP. NCOneMap, USFWS, Google. CALYX Engineers and Consultants Figure Pate' 111112019 1-95 Widening from US 301 in Robeson County (Exit 22) to 1-95 Business (Exit 40) in Cumberland County. Si1P Project 1-5987 Robeson and Cumberland Counties Figure 2D - Environmental Features DocuSinn FnvaIrna ID• 7BC94RA9-011-11-49F0-R3e5-FOFIRFr)1994FC Preliminary Study Area Proposed Edge of Travel Proposed Slope Stakes Proposed Right of Way Proposed Culvert Proposed Bridge ttt 0 0 0 Assisted Living Facility Cemetery Church Daycare Firestation Geoenvironmenta! Site of Concern la Government Facility SNational Guard 0 Park Recycling Center School • A NPDES Stormwater Permit (Active) Public Water Supply Source Communication Tower Electric Substation Road I 1 Historic Property (SL) —1—I Railroad Delineated Stream NCDEQ Stream Delineated Wetland NWI Wetland Delineated Waterbody NCDEQ Waterbody I Park Floodway 100-Year Floodplain Wellhead Protection Area Big Marsh Swamp Natural Heritage Area MI National Register Historic Boundary Building Footprint Solar Farm i Parcel Municipal Boundary Conservation Easement i ] County Boundary NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION 6 800 400 0 800 Feet tin = 800 ft Source: NCOEO. NCOOT, NCHPO, NCFMP, NCNHP. NCOneMap, t1SFWS, Googie. CALYX Engineers and Consultants Figure Pate: 11/1/2019 1-95 Widening from US 301 in Robeson County (Exit 22) to 1-95 Business (Exit 40) in Cumberland County. STIP Project 1-5987 Robeson and Cumberland Counties Figure 2E - Environmental Features DocuSian Fnvplone ID: 76C24RA9-01 D1-42E0-83C5-E086Ffl1224FC \80 4-4 !' ( Wr1P h //{�� SS •' -Eliia6gth� �, , r nr• 1y01dStageFdtSR If' aRjkorolt \l `` it! 1O �1111�N�, 1�111�1���. , 4 VadH041‘ \Itl` Preliminary Study Area Proposed Edge of Travel Proposed Slope Stakes Proposed Right of Way Proposed Culvert Proposed Bridge ttt n 0 0 Assisted Living Facility Cemetery Church Daycare Firestation Geoe nv iron me nta l Site of Concern )�[ Government Facility A • National Guard • 0 Park A Recycling Center A School NPDES Stormwater Permit (Active) Public Water Supply Source Communication Tower Electric Substation Road I@ Historic Properly (SO —1—I Railroad Delineated Stream NCDEQ Stream Delineated Wetland NWI Wetland Delineated Waterbady NCDEQ Waterbody Floodway 100-Year Floodplain Wellhead Protection Area Solar Farm Park Conservation Easement Big Marsh Swamp Natural Heritage Area National Register Historic Boundary Building Footprint Parcel j Municipal Boundary County Boundary NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION 6 800 400 0 800 Feet in=800ft Source: NCDEQ, NCOOT, NCHPO, NCFMP, NCNHP. NGOneMap, USFWS, Google. CALYX Engineers and Consultants Fgure Pate' 111312019 1-95 Widening from US 301 in Robeson County (Exit 22) to 1-95 Business (Exit 40) in Cumberland County- STIP Project 1-5987 Robeson and Cumberland Counties Figure 2F - Environmental Features DocuSinn Fnv InnA ID• 7BC24RA9-01 D1-42E0-83C5-E086FD1224FC Preliminary Study Area Proposed Edge of Travel Proposed Slope Stakes Proposed Right of Way Proposed Culvert Proposed Bridge ttt Ell 0 0 Assisted Living Facility Cemetery Church Daycare Firestation Geoe nv iron me nta l Site of Concern 11:11 Government Facility iNational Guard 0 Park Recycling Center jSchool g• A NPDES Stormwater Permit (Active) Public Water Supply Source Communication Tower Electric Substation Road IN Historic Property (SO —1—I Railroad Delineated Stream NCDEQ Stream Delineated Wetland NWI Wetland Delineated Waterbody NCDEQ Waterbody Floodway 100-Year Ftoodplain Wellhead Protection Area Solar Farm Park Conservation Easement L---J Big Marsh Swamp Natural Heritage Area National Register Historic Boundary Building Footprint Parcel Municipal Boundary County Boundary NORTH GAROLINA DEPARTMENT OF TRANSPORTATION DIVISION 6 800 400 0 800 Feet tin= 800 ft Source: NCDEC, NCODT, NCHPO, NCFMP, NCNHP. NCOneMap, USFWS, Google. CALYX Engineers and Consultants Fgura pate' 11/112019 1-95 Widening from US 301 in Robeson County (Exit 22) to 1-95 Business (Exit 40) in Cumberland County. Si1P Project 1-5987 Robeson and Cumberland Counties Figure 2G - Environmental Features DocuRirrn FnvpIr pp In. 7FC24RAA-ni r)1-49Fn-aRes-FnasFI11994FC Preliminary Study Area Proposed Edge of Travel Proposed Slope Stakes Proposed Right of Way Proposed Culvert Proposed Bridge tttt i n 0 0 Assisted Living Facility Cemetery Church Daycare Firestation Ge oe nv iron me nta l Site of Concern j, Government Facility • National Guard 0 Park t9 Recycling Center School • NPDES Stormwater Permit (Active) Public Water Supply Source Communication Tower Electric Substation Road .r Historic Properly (SL) —1—I Rafted Delineated Stream NCDEQ Stream 'Delineated Wetland NWI Wetland Delineated Waterbady NCDEQ Waterbody Floodway 100-Year Flaodplain Wellhead Protection Area Solar Farm Park Conservation Easement L___J Big Marsh Swamp Natural Heritage Area National Register Historic Boundary Building Footprint Parcel Municipal Boundary County Boundary Fayetteville Outer Loop (U-2519) Proposed ROW __ NORTH CAROLINA DEPARTMENT OF 6 TR ANSPORTATION DIVISION R wx 800 400 0 800 Feet tin=BOO R source: NCOEC, NCOOT, NCHPO, NCFMP• NCNHP. NC4neMap, USFWS, Google. CALYX Engineers and Consultants Figere nate' I Ir2019 m 1-95 Widening from US 301 in Robeson County (Exit 22) to 1-95 Business (Exit 40) in Cumberland County- STIP Project 1-5987 Robeson and Cumberland Counties Figure 2H - Environmental Features DocuSinn Fnvalnna In• 7BC24RA9-011)1-42F0-R2C5-FOREF1l1224FC CI Fayetteville Outer Loop (U-2519) Proposed ROW Preliminary Study Area 1 Assisted Living Facility .111I Proposed Edge of Travel ttt Cemetery 0 Proposed Slope Stakes t Church Proposed Right of Way 0 Daycare e Proposed Culvert 0 Firestation Proposed Bridge 0 Ge ae nv iron me n to l Site of Concern .. • t.,-i r..\ - ' _ • „..4. .0. , _ 4,.. , .... ,dr, ---,,--... _........,:, ----,, • .., • .......,-..,N Government Facility National Guard Park Recycling Center School .41 110 NPDES Stormwater Permit (Active) PubEic Water Supply Source Communication Tower Electric Substation Road Historic Property (SL)---1--1 Railroad Delineated Stream NCDEQ Stream Delineated Wetland WWI Wetland Delineated Waterbody NCDEQ Waterbody ;:ter . y'' S il,. .! ." 1 ` r - e ,,r,t \O ,,-.).:,-\. ' 7 . AV‘�i bfkaft, Se JiiwiviIiiiiT! - Floodway 100-Year Floadplain Wellhead Protection Area Solar Farm Park Big Marsh Swamp Natural Heritage Area National Register Historic Boundary Building Footprint Parcel Municipal Boundary Conservation Easement-_-� County Boundary NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION 6 800 400 0 800 Feet in=800ft SOurca: NCOEQ, NCOOT, NCHPO, NCFMP, NCNHP. NCOneMap, USFWS. Gadgia. CALYX Engineers and Co nsutta nts Figure pate: 111112019 m akezadir 1-95 Widening from US 301 in Robeson County (Exit 22) to 1-95 Business (Exit 40) in Cumberland County. STIP Project 1-5987 Robeson and Cumberland Counties Figure 21 - Environmental Features DocuSinn FnvaIone ID: 76C24RAa-o1D1-42E0-83C5-E086Ffl1224FC Preliminary Study Area Proposed Edge of Travel Proposed Slope Stakes Proposed Right of Way Proposed Culvert Proposed Bridge ttt i El 0 0 Assisted Living Facility Cemetery Church Daycare Firestation Geoenvironmental Site of Concern Ea Government Facility • National Guard • Park • Recycling Center School • A NPDES Stormwater Permit (Active) Public Water Supply Source Communication Tower Electric Substation Road • Historic Property (SL) —l-1 Railroad ->tl Delineated Stream NCDEQ Stream Delineated Wetland NWI Wetland Delineated Waterbody NCDEQ Waterbody Floodway 100-Year Floodplain Wellhead Protection Area Solar Farm Big Marsh Swamp Natural Heritage Area National Register Historic Boundary Building Footprint Parcel Park �•—. . Municipal Boundary Conservation Easement County Boundary NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION 6 800 400 0 800 Feet tin=BOO ft source: NCPEQ. NCOOT, NCHPO, NCFMP• NCNHP• NC4naMap, USFWS, Googla. CALYX Engineers and Consultants Figera Pate: 11A/2019 e 1-95 Widening from US 301 in Robeson County (Exit 22) to 1-95 Business (Exit 40) in Cumberland County. STIP Project 1-5987 Robeson and Cumberland Counties Figure 2J - Environmental Features DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Interchange Concepts Evaluated at Exit 25 (U.S. 301) 1-95 Widening from US 301 (Exit 22) in Robeson County to 1-95 Business (Exit 40) in Cumberland County STIP Project 1-5987 Robeson and Cumberland Counties 300 150 Study Area Proposed Edge of Travel and Lane Lines Proposed Bridge Proposed Concrete Island Delineated Stream Delineated Wetland Delineated Pond Parcel 0 300 Feet 1 inch = 300 feet „ •, NORTH CAROLINA DEPARTMENT '1 OF TRANSPORTATION DIVISION 6 Figure 3A Partial Cloverleaf Interchange with Five -Leg Roundabouts DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Interchange Concepts Evaluated at Exit 25 (U.S. 301) 1-95 Widening from US 301 (Exit 22) in Robeson County to 1-95 Business (Exit 40) in Cumberland County STIP Project 1-5987 Robeson and Cumberland Counties 300 150 Study Area Proposed Edge of Travel and Lane Lines Proposed Bridge Proposed Concrete Island Delineated Stream Delineated Wetland Delineated Pond Parcel 0 300 Feet 1 inch = 300 feet \ , NORTH CAROLINA DEPARTMENT '1 OF TRANSPORTATION Ik DIVISION 6 Figure 3B Diamond Interchange with Five -Leg Roundabouts DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Interchange Concepts Evaluated at Exit 25 (U.S. 301) 1-95 Widening from US 301 (Exit 22) in Robeson County to 1-95 Business (Exit 40) in Cumberland County STIP Project 1-5987 Robeson and Cumberland Counties 300 150 Study Area Proposed Edge of Travel and Lane Lines Proposed Bridge Delineated Stream Delineated Wetland Delineated Pond Parcel 0 300 Feet 1 inch = 300 feet mw„n�, NORTH CAROLINA DEPARTMENT idip '1 OF TRANSPORTATION Ik i DIVISION 6 Figure 3C Diamond Interchange with Four -Leg Roundabouts DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Interchange Concepts Evaluated at Exit 25 (U.S. 301) 1-95 Widening from US 301 (Exit 22) in Robeson County to 1-95 Business (Exit 40) in Cumberland County STIP Project 1-5987 Robeson and Cumberland Counties 300 150 Study Area Proposed Edge of Travel and Lane Lines Proposed Bridge Proposed Concrete Island Delineated Stream Delineated Wetland Delineated Pond Parcel 0 300 Feet 1 inch = 300 feet mw„n�, NORTH CAROLINA DEPARTMENT idip '1 OF TRANSPORTATION Ik DIVISION 6 Figure 3D Diamond Interchange with Four -Leg Roundabouts and Cul-de-Sac DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Appendix B STIP Project 1-5987 November 2019 Categorical Exclusion U.S. Army Corps of Engineers (USACE) APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT 33 CFR 325. The proponent agency is CECW-CO-R. FormApproved- OMB No. 0710-0003 Expires: 01-08-2018 The public reporting burden for this collection of for reviewing instructions, searching existing data information. Send comments regarding the burden at whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.ri information, OMB Control Number 0710-0003, is estimated to average 11 hours per response, including the time sources, gathering and maintaining the data needed, and completing and reviewing the collection of estimate or burden reduction suggestions to the Department of Defense, Washington Headquarters Services, . Respondents should be aware that notwithstanding any other provision of law, no person shall a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT EMAIL. be subject to any penalty for failing to comply with RETURN YOUR APPLICATION TO THE ABOVE PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, Section 103, 33 USC 1413; Regulatory Programs will be used in evaluating the application for a permit. local government agencies, and the public and is voluntary, however, if information is not provided reproducible copies which show the location and and be submitted to the District Engineer having System of Record Notice (SORN). The information and may be accessed at the following website: 33 USC 403; Clean Water Act, Section of the Corps of Engineers; Final Routine Uses: This information may be made available as part of the permit application cannot character of the proposed activity jurisdiction over the location of the received is entered into our permit http://dpcld.defense.gov/Privacy/SORNslndex/DOD-wide-SORN-Article-View/Article/570115/a1145b-ce.aQ 404, 33 Rule 33 CFR may be shared a public notice be evaluated nor must be attached proposed activity. tracking USC 1344; Marine Protection, 320-332. Principal Purpose: Information with the Department of Justice as required by Federal law. Submission can a permit be issued. One to this application (see sample An application that is not database and a SORN has been Research, and Sanctuaries Act, provided on this form and other federal, state, and of requested information set of original drawings or good drawings and/or instructions) completed in full will be returned. completed (SORN #A1145b) (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE (ITEMS BELOW TO BE FILLED BY APPLICANT) 5. APPLICANT'S NAME First - Gregory Middle -W. Last - Price Company - North Carolina Department of Transportation (NCDOT) E-mail Address-gwprice2@ncdot.gov 8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required) First - Jennifer Middle -W. Last - Harrod Company - NV5 Engineers and Consultants, Inc. E-mail Address -Jennifer.Harrod@NV5.com 6. APPLICANT'S ADDRESS: Address- P.O. Box 1150 City - Fayetteville State - NC Zip - 28302 Country -USA 9. AGENTS ADDRESS: Address- 3300 Regency Parkway #100 City - Cary State - NC Zip - 27518 Country -USA 7. APPLICANTS PHONE NOs. w/AREA CODE a. Residence b. Business c. Fax (910) 364-0835 10. AGENTS PHONE NOs. w/AREA CODE a. Residence b. Business c. Fax (336) 508-0050 (919) 836-4800 STATEMENT OF 11. I hereby authorize. Jennifer Harrod to act in my behalf as AUTHORIZATION my agent in the processing of this application and to furnish, upon request, supplemental information in support of this permit application. SIGNATURE OF APPLICANT DATE NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions) STIP I-5987 - Widen I-95 to eight lanes from US 301 (Exit 22) to south of the proposed I-295 interchange 13. NAME OF WATERBODY, IF KNOWN (if applicable) Big Marsh/Buckhorn/Tenmile Swamps; Brisson/Cowpen Branch 14. PROJECT STREET ADDRESS (if applicable) Address Robeson County City - Lumberton/St. Pauls State NC Zip- 15. LOCATION OF PROJECT Latitude: oN 34.80138 Longitude: .W -78.99049 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) State Tax Parcel ID Municipality Section - Township - Range - ENG FORM 4345, MAY 2018 PREVIOUS EDITIONS ARE OBSOLETE. Page 3 of 1 17. DIRECTIONS TO THE SITE Please see attached Project Location Map (Attachment H) for general location. 18. Nature of Activity (Description of project, include all features) The North Carolina Department of Transportation (NCDOT) proposes to widen existing I-95 to an eight -lane median divided facility on existing location from US 301 (Exit 22) to south of the proposed I-295 interchange in Robeson County, North Carolina (STIP I-5987). The project is approximately 15.7 miles in length. 19. Project Purpose (Describe the reason or purpose of the project, see instructions) Improvements to this portion of I-95 will help relieve congestion, improve mobility, and improve the resiliency of this corridor to storm events, such that it can continue to serve as a primary East Coast route. In addition to improving traffic conditions, sections of I-95 within the project limits have experienced significant storm related flooding resulting in total closure of the interstate for multiple days. Roadway and bridge improvements will be needed to make the corridor more resilient to future flood events. USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s) for Discharge Roadway fill, pipe/culvert installation and bridge construction. 21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Type Amount in Cubic Yards Amount in Cubic Yards Amount in Cubic Yards Fill dirt - amount TBD Soil - amount TBD Rip rap - amount TBD 22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres 14.403 acres of Wetlands or Linear Feet 2,099 linear feet of Streams 23. Description of Avoidance, Minimization, and Compensation (see instructions) The project was evaluated for ways to reduce adverse impacts to streams and wetlands. The following have been implemented for the project: NCDOT's BMPs for Protection of Surface Waters to maximum extend possible; Stormwater designed to avoid direct discharge to jurisdictional features to extent practicable; Minimized "in stream" activities; Pipes via Trenchless installation built offline; Stormwater design velocities entering jurisdictional wetlands habe been mitigated to be non -erosive (less than 2 fps). Unavoidable impacts to Water of the U.S. will be offset by compensatory mitigation provided by the North Carolina Department of Environmental Quality (NCDEQ) Division of Mitigation Services (DMS). ENG FORM 4345, MAY 2018 Page 3 of 2 24. Is Any Portion of the Work Already Complete? Yes n No IF YES, DESCRIBE THE COMPLETED WORK 25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody Of more than can be entered here, please attach a supplemental list). a. Address- See Application City - State - Zip - b. Address - City - State - Zip - c. Address - City - State - Zip - d. Address - City - State - Zip - e. Address - City - State - Zip - 26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. IDENTIFICATION NUMBER AGENCY TYPE APPROVAL* See Application * Would include but is not restricted to zoning, building, and flood plain permits DATE APPLIED DATE APPROVED DATE DENIED 27. Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant. SIGNATURE OF APPLICANT DATE SIGNATURE OF AGENT DATE The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, MAY 2018 Page 3 of 3 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Project Trac1i, i, No. (hrterrral Elm) 18-10-0036 HISTORIC ARCHITECTURE AND LANDSCAPES NO SURVEY REQUIRED FORM This form only pertains to Historic Architecture and Landscapes for this project. It is not valid for Archaeological Resources. You must consult separately with the Archaeology Group. PROJECT INFORMATION Project No: 1-5987 County: Cumberland and Robeson W.SS No.: 47533.1.1 Document Type: Fed. Aid No: Not provided in review request Funding: State X Federal Federal Permit(s): X Yes No Permit Type(s): USACE Protect Description: Widen 1-95 from US 301 in Robeson County (Exit 22) to 1-95 off -site detour specified in review Business in Cumberland County (Exit 40) (no request). SUMMARY OF HISTORIC ARCHITECTURE AND LANDSCAPES REVIEW Description of review activities, results, and conclusions: HPOWeb reviewed on 15 November 2018 and 22 March 2019 and yielded one S5, one SL, and no NR, DE, or LD properties in the Area of Potential Effects (APE). Cumberland and Robeson Counties current GIS mapping, aerial photography, and tax information indicated a partly developed APE of woodland and wetland and, cultivated fields, with above -ground resources dating from the late -nineteenth century to the 2010s (viewed 15 November 2018 and 22 March 2019). Of 233 resources, approximately 77% are residential in use, the remainder are commercial, plus several churches and cemeteries. Approximately 72% of all resources pre -date 1970 and are unexceptional examples (many are also altered) of their types. In 2016 HPD determined the previously recorded Robeson House (RB0675) not eligible for listing in the National Register of Historic Places, a finding that remains valid. The APE intersects the undeveloped eastern edge of a large parcel on which stands the study -listed Dr. Stephen B. Rozier House (RB0529), well outside the APE and beyond likely project impact with broad swaths of wetland and woodland intervening. The study area also contains seventeen bridges in Robeson County (built between 1959 and 2015) and five in Cumberland County (built between 1959 and 1980), all of which are not NR eligible as they are neither aesthetically nor technologically significant. Four cemeteries are located within the study area and, while not NR-eligible, should be afforded the usual protection during construction: Adams Cemetery (between US 301 and SR 2285 (Shipman Road), Cumberland County Parcel ID: 0413-81-1246), cemetery (W. Broad Street, Robeson County PIN: 030836153200), Jason Odom Cemetery (W. Broad Street, Robeson County PIN: 030836247900), and Oak Ridge Cemetery (W. Broad Street, Robeson County PIN: 030836537200). Google Maps "Street View" confirmed the absence of critical historic structures and landscapes in the APE (viewed 15 November 2018 and 22 March 2019). No architectural survey is required for the project as currently defined. Page 1 of 2 Histonc Archned UPC armort.urrr6cryex Nf1 St rk! EY REOtUHI:t3 j)ron for,Winor 7.ransfrrrltcINrnr Projects as (lrral!Jierl ri ihr 20U7l'rp,4rosmo(not•' ree:noir. DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Why the available information provides a reliable basis for reasonably predicting that there are no unidentified significant historic architectural or landscape resources in the project area: The APE equates with the study area established for the project, including the revisions of January 2019. The comprehensive Cumberland County architectural survey (1970s) as well as later studies for both Cumberland and Robeson Counties recorded no resources in the APE apart from the two noted above. County GIS/tax materials and other visuals clearly illustrate the absence of significant architectural and landscape resources. No National Register -listed properties are located within the APE. Should the project limits of any other aspect of the design change, please notify NCDOT Historic Architecture as additional review may be necessary. SUPPORT DOCUMENTATION X Map(s) Previous Survey Info. [Photos ❑Correspondence EDesign Plans FINDING BY NCDOT ARCHITECTURAL HISTORIAN Historic Architecture and Landscapes -- NO SURVEY REQUIRED ar 44go/9 NCDOT Architectural Historian I Date 1-5987, Cumberland and Robeson Counties • WBS No. 47533.1.1 PA Tracking No. 18-10-0036 Page 2of2 HistoicArch+tect+uc and f.andscryns Nl.Si1R6'!}'REOtIIRlif1(n,rrl./orhlirioi:7:+xlmp rruiion PreyeersaasQualified it the 2007Programmatic Agivo1i 1, DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC U-2519AB TOWN,OF HOP.E•MILLS NTLt 'N OF PARISTON= TT�� OF LiJMBEI BRIDGE--� Project Start Robeson and Cumberland Counties U-2519AA U-5797 Project End B-5693 TOWN OF TAR HEEL Study Area 2.5 1.25 0 2.5 Miles 1 inch equals 2.5 miles Smite: HCopi, NCOECL CALYX Erglneela end Cunsunan[v Figure DHe: 107eg0 f8 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION e 1-85 Widening from US 301 in Robeson County (Exit 22) to 1-95 Business (Exit 40) in Cumberland County. STIP Project 1-5987 Robeson and Cumberland Counties Protect Vicinity -f k:w Iv41 • Vit-ta 0036 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC 18-10-0036 NO NATIONAL REGISTER OF HISTORIC PLACES ELIGIBLE OR LISTED ARCHAEOLOGICAL SITES PRESENT OR AFFECTED FORM This form only pertains to ARCHAEOLOGICAL RESOURCES for this project. It is not valid for Historic Architecture and Landscapes. You must consult separately with the Historic Architecture and Landscapes Group. PROJECT INFORMATION Project No: I-5987 WBS No: 47533 F.A. No: Federal Permit Required? Project Description: Widen Interstate 95 (I-95) from NC 50 (Chickenfoot Rd.) (Exit 41) in Cumberland County to NC 211 (N. Roberts Ave.) (Exit 20) in Robeson County. The project will widen I-95 from 4- to 8- lanes by adding one lane towards the median and one on the outside in each direction. The Area of Potential Effects (A.P.E.) is approximately 35 kilometers (22 miles) long and has a variable width. The A.P.E. generally extends 60 meters (200 ft.) from the I-95 centerline on each side. The width of the survey area varies at interchanges and overpasses to include realignment of service roads and ramps and replacement of bridges. County: Document: Funding: Cumberland/ Robeson FEDERAL CATEGORICAL EXCLUSION ® State ❑ Federal x Yes ❑ No Permit Type: USACE SUMMARY OF ARCHAEOLOGICAL FINDINGS The North Carolina Department of Transportation (NCDOT) Archaeology Group reviewed the subject project and determined: x There are no National Register listed ARCHAEOLOGICAL SITES within the project's area of potential effects. No subsurface archaeological investigations are required for this project. Subsurface investigations did not reveal the presence of any archaeological resources. Subsurface investigations did not reveal the presence of any archaeological resources considered eligible for the National Register. All identified archaeological sites located within the APE have been considered and all compliance for archaeological resources with Section 106 of the National Historic Preservation Act and GS 121-12(a) has been completed for this project. There are no National Register Eligible or Listed ARCHAEOLOGICAL SITES present or affected by this project. (Attach any notes or documents as needed) Brief description of review activities, results of review, and conclusions: The archaeological survey report is in progress. Please see attached management summary of the field results. SUPPORT DOCUMENTATION "NO NATIONAL REGISTER ELIGIBLE OR LISTED ARCHAEOLOGICAL SITES PRESENT OR AFFECTED form for Minor Transportation Projects as Qualified in the 2007 Programmatic Agreement. 1 of 2 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC See attached: ❑ Map(s) ❑ Previous Survey Info ❑ Photos ❑Correspondence Other: Management summary Signed: CALEB SMITH 11/6/2019 NCDOT ARCHAEOLOGIST Date "NO NATIONAL REGISTER ELIGIBLE OR LISTED ARCHAEOLOGICAL SITES PRESENT OR AFFECTED form for Minor Transportation Projects as Qualified in the 2007 Programmatic Agreement. 2 of 2 DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC Appendix C STIP Project 1-5987 November 2019 Categorical Exclusion DocuSign Envelope ID: 76C248A9-01D1-42E0-83C5-E086ED1224FC EIS RELOCATION REPORT I X E.I.S. ❑ CORRIDOR ❑ DESIGN North Carolina Department of Transportation RELOCATION ASSISTANCE PROGRAM WBS ELEMENT: 47533.1.1 COUNTY Robeson/Cumberland Alt. 1 Of 1 T.I.P. No.: 1-5987 F.A.PROJECT NHP-0095(056) DESCRIPTION OF PROJECT: 1 95 FROM US 301 to 1-95 Bus./301 Exit 40 ESTIMATED DISPLACEES INCOME LEVEL Type of Displacees Owners Tenants Total Minorities 0-15M 15-25M 25-35M 35-50M 50 UP Residential 2 0 2 2 0 0 0 2 0 Businesses 0 0 0 0 VALUE OF DWELLING DSS DWELLING AVAILABLE Farms 0 0 0 0 Owners Tenants For Sale For Rent Non -Profit 0 0 0 0 0-20M 0 $ 0-150 0 0-20M 3 $ 0-150 0 ANSWER ALL QUESTIONS 20-40M 0 150-250 0 20-40M 11 150-250 0 Yes No Explain all "YES" answers. 40-70M 2 250-400 0 40-70M 36 250-400 2 X 1. Will special relocation services be necessary? 70-100M 0 400-600 0 70-100M 39 400-600 3 2. Will schools or churches be affected by 100 UP 0 600 UP 0 100 UP 162 600 UP 21 X displacement? TOTAL 2 0 251 26 X 3. Will business services still be available REMARKS (Respond by Number) after project? 4. Will any business be displaced? If so, indicate size, type, estimated number of employees, minorities, etc. 5. Will relocation cause a housing shortage? 6. Source for available housing (list). Local survey, Internet searches. 7. Will additional housing programs be needed? 8. Should Last Resort Housing be considered? 9. Are there large, disabled, elderly, etc. families? 10. Will public housing be needed for project? 11. Is public housing available? 12. Is it felt there will be adequate DSS housing housing available during relocation period? 13. Will there be a problem of housing within financial means? 14. Are suitable business sites available (list source). 3) Business services will remain available. 8) Last Resort Housing guidelines should be a consideration. Where warranted, Last Resort Housing will be applied in Accordance with the Uniform Relocation Act. 11) Need for public housing not anticipated but available through local agencies. 12) Based on available housing, no shortage of DSS housing is anticipated. 13) Any deficiency with housing within financial means will be mitigated as appropriate with guidelines of the Uniform Act. 14) No businesses are displaced on this segment. NOTES: Small cemetery located on parcel 25 affected by R/W. Cell Tower on parcel 92 in close proximity to R/W. Approximately 14 billboards located on project. Convenience store located on parcel 80 will have impacts to canopy. Tanks, however, are not located near proposed R/W. It is not anticipated the convenience store will require full reloc. X X X X X X X X X X 15. Number months estimated to complete RELOCATION? 9-12 months --I? �� '�r rC s 8/20/19 1 Date Right of Way Agent Relocation Coordinator Date