Loading...
HomeMy WebLinkAbout20100141 Ver 3_Staff Comments_20130908Strickland, Bev From: Lucas, Annette Sent: Sunday, September 08, 2013 9:17 AM To: Smith, Cherri L Cc: Devane, Boyd; Strickland, Bev Subject: 10- 0141v3 Clement Colleymore -Bey Attachments: 10- 0141v3 Clement Colleymore - Bey.docx Cherri, As you probably saw, they still haven't provided a diffuse flow plan. I talked with the consultant about this and I think he now has a better understanding about what is needed. I suggest that we send another RFMI letter in the meantime though. Sorry this took so long! The SW folks are keeping me on my toes. Please don't hesitate to remind me if you need something from me. Thanks, Annette Annette M. Lucas, PE Environmental Engineer NCDENR I DEMLR I Stormwater Program 1612 Mail Service Center, Raleigh, NC 27699 -1612 (N111a.i.l.) 512 N. Salisbury St, Raleigh, NC 27604 1 9th Floor (i ocatior &, Parcels) Phone: (919) 807 -6381 1 Fax: (919) 807 -6494 1 Email: l nnetLe.1 -u as'(rLL(- Uicnr.��t-ry Website: http: / /portal.ncdenr.org /web /lr /stormwater Before printing this email, please consider your budget and the environment. E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 10 -0141 v3 Clement Colleymore -Bey AML comments September 8, 2013 Per the requirements of the Tar - Pamlico Riparian Buffer Rule, you must show that this site meets diffuse flow requirements with a level spreader- vegetated filter strip or other BMP per Chapter 8 of the BMP Manual (see http : / /portal.ncdenr.org /web /wg /ws /su /bmp- manual).