Loading...
HomeMy WebLinkAboutWQCS00156_Compliance Evaluation Inspection_20211008ROY COOPER Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director Ken Gamble, Town Manager Town of Mocksville 171 South Clement Street Mocksville, NC 27028 NORTH CAROLINA Environmental Quality October 7, 2021 Subject: Compliance Evaluation Inspection Report Wastewater Collection System Permit WQCS00156 Mocksville Wastewater Collection System Dear Mr. Gamble: On September 21, 2021, Gary Hudson of the Division of Water Resources (Division), Winston-Salem Regional Office met with Brian Moore, Operator in Responsible Charge (ORC), to conduct a Compliance Evaluation Inspection of the above referenced Wastewater Collection System. This inspection consists of (1) a review of the permit and accompanying documentation to determine compliance with permit conditions, and (2) an on -site inspection of collection system components. The attached inspection form notes the areas that were evaluated for the inspection, with notable findings outlined as follows. Site Inspections 1. Outfalls — The Charleston Ridge Outfall was inspected, and no issues were noted. 2. Pump Stations — The Boxwood Pump Station was inspected, and no issues were noted. The inspection was considered satisfactory. If you should have any questions, please do not hesitate to contact Gary Hudson or our office at (336) 776-9800. Sincerely, Enclosures — Inspection Report CC: Laserfiche NORTH D E Department of Dnimumom.i au.i` 1- DocuSiiggned by:< t— l . cin,atr "- 145B49E225C94EA... Lon T. Snider, Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office Division of Water Resources, NCDEQ North Carolina Department of Environmental Quality Division of Water Resources Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105 336.776.9800 Compliance Inspection Report Permit: WQCS00156 Effective: 04/01/17 Expiration: 03/31/25 Owner : Town of Mocksville SOC: Effective: Expiration: Facility: Mocksville Collection System County: Davie 171 Clement St Region: Winston-Salem Contact Person: Charles A Willis Directions to Facility: Mocksville NC 27028 Title: Phone: 704-338-4668 System Classifications: CS2, Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: NC0024872 NC0021491 Davie County - Cooleemee WWTP Town of Mocksville - Dutchman Creek WWTP Inspection Date: 09/21/2021 Entry Time 10:OOAM Exit Time: 12:OOPM Primary Inspector: Gary Hudson Phone: 336-776-9694 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling Permit Inspection Type: Collection system management and operation Facility Status: Compliant ❑ Not Compliant Question Areas: ▪ Miscellaneous Questions ▪ Capital Improvement Plan ▪ Inspections (See attachment summary) ▪ General ▪ Map ▪ Spill Response Plan ▪ Sewer & FOG Ordinances ▪ Reporting Requirements Page 1 of 5 Permit: WQCS00156 Owner - Facility:Town of Mocksville Inspection Date: 09/21/2021 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Inspection Summary: *The permit became effective June 1, 2013 and expires May 31, 2021. *FOG flyers are mailed once per year, included in the Annual Report, and placed on the city website. *Mr. Moore provided a Capital Improvement Plan that covered a 10-year period. *Mr. Moore keeps very good records of inspections and maintenance activities. *An adequate Spill Response Action Plan was presented and is available to all personnel. *The Boxwood Pump Station was inspected, and no problems were noted. Page 2 of 5 Permit: WQCS00156 Owner - Facility:Town of Mocksville Inspection Date: 09/21/2021 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine General Is there a properly designated primary ORC and at least one back-up of proper grade? Are logs being reviewed by the system management or owner on a regular basis? # What is that frequency? # Are there any issues being addressed currently or any in the planning stages? Is there a specific pump failure plan available for all pump stations? Does plan indicate if pump parts/new pumps are in spare parts/equipment inventory? Are new/significantly upgraded pump stations equipped with anti -corrosion materials? Does the permittee have a copy of their permit? # Is permit expiring within the next 6 months? If Yes, has the Permittee applied for renewal? Comment: *The permit became effective June 1, 2013 and expires May 31, 2021. Sewer and FOG Ordinances Is Sewer Use Ordinance (SUO) or other Legal Authority available? Does it appear that the Sewer Use Ordinance is enforced? Is there a Grease Control Program that legally requires grease control devices? What is the standard grease trap cleaning requirement in the FOG ordinance? Is Grease Control Program enforced via periodic inspections/records review? Is action taken against violators? # Have satellite systems adopted an equivalent or more stringent ordinance? Is grease/sewer education program documented with req'd customer distribution? # Are other types of education tools used like websites, booths, special meetings, etc? If Yes, what are they? (This can reduce mailing to annual.) *FOG flyers are mailed once per year, included in the Annual Report, and placed on the city website. Comment: Capital Improvement Plan Has a Capital (CIP) or System Improvement Plan been developed and adopted? Is it designated for wastewater only or does it have a dedicated section? Does CIP cover three to five year period of earmarked improvements? Does CIP include description of project area? Does CIP include description of existing facilities? Does CIP include known deficiencies? Does CIP include forecasted future needs? Comment: *Mr. Moore provided a Capital Improvement Plan that covered a 10-year period. Map Yes No NA NE ▪ • • ❑ ❑ ❑ Monthly ▪ ❑ ❑ ❑ ❑ ❑ • ❑ ❑ • ❑ ❑ ❑ ❑ •❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE Page 3 of 5 Permit: WQCS00156 Owner - Facility:Town of Mocksville Inspection Date: 09/21/2021 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Is there a overall sewer system map? Does the map include: Pipe Type (GS/FM) Pipe sizes Pipe materials (PVC, DIP, etc) Pipe location Flow direction Approximate pipe age Pump station ID, location and capacity # Force main air release valve location & type # Location of satellite connections Is the map being updated for changes/additions within 1 year of activation? Comment: Reporting Requirements # Have there been any sewer spills in the past 3 years? If Yes, were they reported to the Division if meeting the reportable criteria? If applicable, is there documentation of press releases and public notices issued? Is an Annual Wastewater Performance Report being filed with the Division, if required? Is the report being made available to all its sewer customers? # How is it being made available? Comment: Inspections Are adequate maintenance records maintained? Are pump stations being inspected at the required frequency? # Is at least one complete functionality test conducted weekly per pump station? Is there a system or plan in place to observe the entire system annually? Is the annual inspection documented? # Does the system have any high -priority lines/locations? Are inspections of HPL documented at least every 6 months? Are new lines being added to the HPL list when found or created? Comment: *Mr. Moore keeps very good records of inspections and maintenance activities. Spill Response Action Plan Is a Spill Response Action Plan available? Is a Spill Response Action Plan available for all personnel? Does the plan include: • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Page 4 of 5 Permit: WQCS00156 Owner - Facility:Town of Mocksville Inspection Date: 09/21/2021 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine 24-hour contact numbers Response time Equipment list and spare parts inventory Access to cleaning equipment Access to construction crews, contractors, and/or engineers Source of emergency funds Site sanitation and cleanup materials Post-overflow/spill assessment Does the Permittee appear to respond within 2 hours of first knowledge of a spill? • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ • • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: *An adequate Spill Response Action Plan was presented and is available to all personnel. Page 5 of 5