Loading...
HomeMy WebLinkAboutSWA000119_Add Info Request_20211005ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director Jeremy Keeny, PE Morris & Ritchie Associates of NC, PC 5605 Chapel Hill Road, Suite 112 Raleigh, NC 27607 NORTH CAROLINA Environmental Quality September 30, 2021 Subject: Request for Additional Information Stormwater ATC Project No. SWA000119 Duncan's Creek Harnett County Dear Mr. Keeny: The Central DEQ Office received and accepted a State Stormwater Fast Track Authorization to Construct Permit Application for the subject project on September 27, 2021. A preliminary in-depth review of that information has determined that the application is not complete and additional information is needed to determine whether the project complies with 15A NCAC 02H.1043. To continue the review, please provide the following additional information: 1. Please submit a copy of lease agreements, affidavits, or other documents showing that the applicant has obtained legal rights to submit a stormwater permit application within the proposed project area. [15A NCAC 02H .1043(3)(c)] 2. Please submit an application form with a signed and notarized Property Owner's Authorization. 3. The site plan sheet shows the typical road cross section with roadside ditches. In some spots, the ditch slopes are 2: 1. The low density rules require a maximum slope of 3:1. [15A NCAC 02H . 1003 (2)(c)(i)]. Please note that during the ATC review process, the plans are not reviewed for technical compliance with the rules. The complete review will be done after construction when the final permit application is received. 4. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: https:Hedocs.deq.nc.gov/Forms/SW-Supplemental-Upload Please remember to confirm that any revised information is presented consistently throughout the application documents. Please also remember to provide two hard copies and one electronic copy of any updated or requested documents per 15A NCAC 02H.1043(3). The requested information should be received in this Office by November 4, 2021, or the application will be returned as incomplete. The return of a project will necessitate resubmission of all required items, including the application fee. Please note that the Division is allowed 30 days ftom the receipt of a complete application to issue the authorization to construct permit. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 NORTH CAROLINA Uepat nt of enmmnmenmi (J.J; 919.707.9200 The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned application number on all correspondence. If you have any questions concerning this matter, please feel free to call me at (919) 707-3649 or email me at Corey.Anen@ncdenr.gov. Sincerely, .A� -a Steven Corey Anen, PE Environmental Engineer Stormwater Program cc: Fayetteville Regional Office D�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources EQ _ 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 NORTH C OROLINA OepartmeM Environmental UualN 0 " 919.707.9200