Loading...
HomeMy WebLinkAboutWM0401315_Monitoring Well Permit Application_20211005Letter of Transmittal 1400 Weston Way West Chester, PA 19380 TO: Jim Gonsiewski — PG, Hydrogeologist North Carolina Dept. of Envir. Quality Division of Water Resources Winston-Salem Regional Office 450 W. Hanes Mill Road Suite 300 Winston-Salem, NC 27105 (336) 776-9797 WE ARE SENDING YOU: Date: September 14, 2021 Job No.: 11621.043.011 RE: Nokia -Lucent Cotton Mill Square Site, Greensboro NC — CAT 100 Performance Monitoring Wells Permit Application Attached Under Separate Cover Drawings Affidavit of Compliance Sample(s) Manuals Schedule Change Order Report X Other (Work Scope) Transmittal No. Copies Date Submittal No. Description 1 1 09/14/21 - Application for Permit to Construct Monitoring and Injection Wells, Nokia -Lucent Cotton Mill Square Site, Greensboro NC WE ARE TRANSMITTING as checked below: X For Approval For Your Use Copies for Approval As Requested Returned After Loan to Us Copies for Distribution X For Review and Comment Other (explain) Corrected Prints Signed: Weston Solutions, Inc. Date: 09/14/2021 REMARKS: Jim - Please find attached an application for performance monitoring wells installation in Greensboro NC associated with Nokia (formerly Lucent) Cotton Mill Site remediation. A separate well permit request has also been forwarded to the Guilford County Dept. of Environmental Health. We hope to install these wells the week of the third week of October 2021 provided all approvals are in place. Please do not hesitate to contact me with any questions you may have. Best Regards, Best Regards -David Kane- (484) 883-9322 David.Kane@WestonSolutions.com COPY TO: G. Mao— Guilford County Dept. of Health NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY - DIVISION OF WATER RESOURCES APPLICATION FOR PERMIT TO CONSTRUCT A MONITORING OR RECOVERY WELL SYSTEM PLEASE TYPE OR PRINT CLEARLY In accordance with the provisions of Article 7, Chapter 87, General Statutes of North Carolina and regulations pursuant thereto, application is hereby made for a permit to construct monitoring or recovery wells. 1. Date: 09/14/2021 2. County: Guilford FOR OFFICE USE ONLY PERMIT NO. ISSUED DATE 3. What type of well are you applying for? (monitoring or recovery): Infection and Monitoring 4. Applicant: David Kane Telephone: 484-883-9322 Applicant's Mailing Address: 1400 Weston Way, West Chester PA 19380 Applicant's Email Address (if available): David.Kane@westonsolutions.com 5. Contact Person (if different than Applicant): N/A Telephone: N/A Contact Person's Mailing Address: N/A Contact Person's Email Address (if available): N/A 6. Property Owner (if different than Applicant): Burkely Communities Telephone: 333-285-9300 (owner rep) Property Owner's Mailing Address: 3643 Clifton Road, Greensboro NC 27407 Property Owner's Email Address (if available): Owners Rep — Jordan Roling (336) 285-9300 7. Property Physical Address (Including PIN Number) Blunt Street, south of Hewitt Street, Block 43 Apartments City Greensboro County Guilford Zip Code 27407 8. Reason for Well(s): Injection monitoring wells, monitor gw quality downgradient of injection points (ex: non -discharge permit requirements, suspected contamination, assessment, groundwater contamination, remediation, etc.) 9. Type of facility or site for which the well(s) is(are) needed: Former Manufacturing Facility now residential (ex: non -discharge facility, waste disposal site, landfill, UST, etc.) 10. Are there any current water quality permits or incidents associated with this facility or site? If so, list permit and/or incident no(s). Non -discharge Permit # WQ0036621 11. Type of contaminants being monitored or recovered: volatile organic compounds (ex: organics, nutrients, heavy metals, etc.) 12. Are there any existing wells associated with the proposed well(s)? If yes, how many? Yes; —49 Existing Monitoring or Recovery Well Construction Permit No(s).: N/A 13. Distance from proposed well(s) to nearest known waste or pollution source (in feet): 500 feet 14. Are there any water supply wells located less than 500 feet from the proposed well(s)? No If yes, give distance(s): 15. Well Contractor: Geologic Exploration Certification No.: 2580 Well Contractor Address: 176 Commerce Blvd., Statesville NC 28625 PROPOSED WELL CONSTRUCTION INFORMATION 1. As required by 15A NCAC 02C .0105(f)(7), attach a well construction diagram of each well showing the following: a. Borehole and well diameter e. Type of casing material and thickness b. Estimated well depth f. Grout horizons c. Screen intervals g. Well head completion details d. Sand/gravel pack intervals Continued on Reverse PROPOSED WELL CONSTRUCTION INFORMATION (Continued) 2. Number of wells to be constructed in unconsolidated Material: 1 3. Number of wells to be constructed in bedrock: 2 4. Total Number of wells to be constructed: 3 (Add answers from 2 and 3) 5. How will the well(s) be secured? Flush mount pad bolted with locking expansion cap 6. Estimated beginning construction date: 10/18/2021 7. Estimated construction completion date: 10/19/2021 1. ADDITIONAL INFORMATION As required by 15A NCAC 02C .0105(f)(5), attach a scaled map of the site showing the locations of the following: a. All property boundaries, at least one of which is referenced to a minimum of two landmarks such as identified roads, intersections, streams, or lakes within 500 feet of the proposed well or well system. b. All existing wells, identified by type of use, within 500 feet of the proposed well or well system. c. The proposed well or well system. d. Any test borings within 500 feet of proposed well or well system. e. All sources of known or potential groundwater contamination (such as septic tank systems, pesticide, chemical or fuel storage areas, animal feedlots as defined in G.S. 143-215.10B(5), landfills, or other waste disposal areas) within 500 feet of the proposed well or well system. SIGNATURES The Applicant hereby agrees that the proposed well(s) will be constructed in accordance with approved specifications and conditions of this Well Construction Permit as regulated under the Well Construction Standards (Title 15A of the North Carolina Administrative Code, Subchapter 2C) and accepts full responsibility for compliance with these rules Senior Project Manager Signature of Applicant or *Agent Title of Applicant or *Agent David Kane, P.G. * If signing as Agent, attach authorization agreement stating Printed name of Applicant or *Agent that you have the authority to act as the Agent. If the property is owned by someone other than the applicant, the property owner hereby consents to allow the applicant to construct wells as outlined in this Well Construction Permit application and that it shall be the responsibility of the applicant to ensure that the well(s) conform to the Well Construction Standards (Title 15A of the North Carolina Administrative Code, Subchapter 2C). Signature of Property Owner (if different than Applicant) Printed name of Property Owner (if different than Applicant) DIRECTIONS Please send the completed application to the appropriate Division of Water Resources' Regional Office: Asheville Regional Office 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone: (828) 296-4500 Fax: (828) 299-7043 Fayetteville Regional Office 225 Green Street, Suite 714 Fayetteville, NC 28301-5094 Phone: (910) 433-3300 Fax: (910) 486-0707 Mooresville Regional Office 610 East Center Avenue Mooresville, NC 28115 Phone: (704) 663-1699 Fax: (704) 663-6040 Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 Phone: (919) 791-4200 Fax: (919) 571-4718 Washington Regional Office 943 Washington Square Mall Washington, NC 27889 Phone: (252) 946-6481 Fax: (252 GW-22MR Rev. 3-1-2016 Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Phone: (910) 796-7215 Fax: (910) 350-2004 Winston-Salem Regional Office 450 W. Hanes Mill Road 41Ir tilY Wil ngFan C 27105 -9800 7 Legend Former Injection Well ■ Former Extraction Well Bedrock Monitor Well ▪ Saprolite Monitor Well + Transition Zone Monitor Well • CAT100 Injection Point • • Cotton Mill Square Property Boundary Approximate Location for New Well Cluster _ J Pilot Test Area 0 W E S 70 140 Figure 1 Proposed Injection Point Locations t Feet Cotton Mill Square Facility Greensboro, North Carolina File: Y:\CMS\MXD\ProposedInjLocs Well Cluster.mxd, 2/10/2021 3:49:37 PM, johna Scope of Performance Monitoring Well Installation Three additional monitoring wells will be installed on -site immediately downgradient of the CAT 100 injection points. The approximate location of the new monitoring wells is highlighted on the attached figure 3-1. The new onsite performance monitoring wells will be installed to supplement the existing monitoring well network to monitor groundwater conditions in the upper bedrock, transition zone and saprolite. The following are the approximate depths for the new monitoring wells: bedrock well 90 feet below ground surface (ft bgs), transition zone well 60 ft bgs, and saprolite well 30 ft bgs. Each well will be drilled and installed using auger/air rotary drilling equipment. For the upper bedrock well, 8.25" inner diameter (ID) augers will be used to advance the borehole to the top of the transition zone or auger refusal; 8" air rotary drilling will then we used to advance the boring 2-feet into competent bedrock. A 6-inch casing will then be installed and grouted into the top of bedrock. After the casing has cured, 6" air rotary drilling will be used to advance an open bedrock borehole approximately 30-feet below the base of the casing. The transition zone and saprolite monitoring wells will be comprised of 2-inch diameter, schedule 40 PVC riser pipe and a 5- or 10-foot length of PVC screen (10 slot). A sand pack will be placed around the well screen and bentonite and cement grout seals will be placed above the sand pack. All wells will be completed at ground surface with a flush mounted, protective steel cover set in a concrete pad. The wells will be developed until the discharge water is sediment free and clear as possible. Prior to the commencement of CAT 100 injections in adjacent points, the newly installed monitoring wells will be sampled by Weston using low -flow techniques. Weston will submit VOC samples to a North Carolina State approved laboratory; separate well samples will be shipped to RPIs Project Support Laboratory for analysis: anions and cations using Method 300.1, and dissolved gases using RSK 175. WELL CONSTRUCTION LOG CLIENT: SITE NAME: DRILLING CO.: LOGGED BY: Well ID: Page DATE OF WELL CONSTRUCTION: DEPTH TO WATER (ft bgs): TOTAL WELL DEPTH (ft bgs): 1 of 1 Lithologic Unit of ( ) Saprolite ( ) Transitio ( ) Bedrock Date Developed: Vol. Purged: Purge Rate: Comments: Northing (UTM Zone YY, meters) Easting (UTM Zone XX, meters) Completion: /Overburden n zone Well ConstrL Bo We Ris gal. gpm Sci Sci Sci ft bgs feet below gal. Gallons ground surface gpm Gallons Per Minute Depths are presented as feet below ground surface unless otherwise indicated. GND Elevation (ft msl) TOC Elevation (ft msl) completed as flush -mount well ction: ring Diameter (in) II Diameter (in) er Material Top of Bentonite/Sand Seal Top of Sand Top of Screen een Material een Length (ft) een Slot (in) Bottom of Screen Total Boring Depth Well-Const_Template WELL CONSTRUCTION LOG CLIENT: SITE NAME: DRILLING CO.: LOGGED BY: Well ID: Page DATE OF WELL CONSTRUCTION: DEPTH TO WATER (ft bgs): TOTAL WELL DEPTH (ft bgs): 1 of 1 Lithologic Unit of ( ) Saprolite ( ) Transitio ( ) Bedrock Date Developed: Vol. Purged: Purge Rate: Comments: Northing (UTM Zone YY, meters) Easting (UTM Zone XX, meters) Completion: /Overburden n zone Well ConstrL Bo We Ris gal. gpm Sci Sci Sci ft bgs feet below gal. Gallons ground surface gpm Gallons Per Minute Depths are presented as feet below ground surface unless otherwise indicated. GND Elevation (ft msl) TOC Elevation (ft msl) completed as flush -mount well ction: ring Diameter (in) II Diameter (in) er Material Top of Bentonite/Sand Seal Top of Sand Top of Screen een Material een Length (ft) een Slot (in) Bottom of Screen Total Boring Depth Well-Const_Template