Loading...
HomeMy WebLinkAbout20051094 Ver 1_Close Out Request_20130722;p l a Ecosystem PROGRAM MEMORANDUM TO: Katie Merritt /Eric Kulz THROUGH: Tim Baumgartner FROM: Jeff Schaffer DATE: July 22, 2013 RE: Closeout Request for UT to Crooked Creek (Speas) Mitigation Site (EEP IMS #434) The UT to Crooked Creek (Speas) Mitigation Site is located in Franklin County in the Tar - Pamlico 01 Catalog Unit. The 5th year monitoring for the site concluded in February 2012. The site was presented for Close Out on July 12, 2013. Based on the July 12, 2013 onsite review, our discussions onsite and the enclosed asset map, EEP requests closure of the site's buffer assets generating 5.25 ac (228,900 sq. ft.) of buffer mitigation. Perpetual site protection will be maintained by: Eric Galamb Stewardship Program Office of Conservation, Planning, and Community Affairs, DENR 1601 Mail Service Center Raleigh, NC 27699 919- 715 -8696 Please find attached a map detailing the final enumeration of credits, and a credit /debit ledger. We respectfully request your concurrence to officially close out the buffer assets of Billy's Creek Mitigation Project. CC. Jeff Jurek Jim Stanfill File , Al j� NCE)ENR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699 -1652 / 919 -715 -0476 / www.nceep.net UT to Crooked Creek (# 434) Asset and Monitoring Features Map 200 400 800 1,200 1,600 Mitigation Project Name IMS ID # River Basin Cataloging Unit Project Type UT to Crooked Creek (Speas Property) 434 TAR - PAMLICO 030201010 Stream / Riparian Wetland I Riparian Buffer Mitigation Comment: The project was funded by the NCDOT ILF Program and verified buffer assets were sold to the Riparian Buffer Restoration Program Applied Credit Ratios 1 1 1 5 1 2 5 1 5 1 1 1 s 1 r1 s 1 r 1 '1 1 9 1 S 1 1 1 1 9 97Q 1 6.—, 1AR A�he�nn 'NOTE UT to Crooked Creek (Speas Property) mitigation site generated a total of 228,900 square feet (5.25 acres) of buffer mitigation The amount of buffer assets shown as the beginning balance above represents only the amount of buffer mitigation that has been sold to the Riparian Buffer ILF Program There is an additional 18.069.61 square feet (0 41 acres) of buffer mitigation available for sell to the Riparian Buffer ILF Program as needed to meet requirements Information from EEP Debit Ledger dated 4/29/2013 All buffer mitigation debits valid as of 4/29/2013. E R o m � E •d °+ m N C NA d V Rv N0 l'J am °Z ` . ylC Q - m o r O. 0 O z m O. A 0 z c c 6 w d O z m o A 6 r 2 Od z m w A r o v a v C 'L – w r 2 – N 2 a .c O . Z 0 z N Od o U z Beginning Balance (square feet) 210,830.39 Beginning Balance (credits) , 30.39 EEP Debits (credits): DWQ Permits Impact Project Name 2008 -0548 Central Nash Water and Sewer District 3.448.65 2003 -1494 NCDOT TIP U -2527 - Western Outer Loop of Henderson 3,552.00 2008 -0945 NCDOT TIP B -4115 - Bridge 57 over Sycamore Creek 4,377.00 2007 -1962 Bridge 84 on SR 1141 9,09000 2007 -0683 NCDOT TIP B -4298 - Bridge 3 over Ruin Creek 8,562 00 2007 -0789 1185 Sagamore Drive 266.00 2008 -1859 Rocky Mount Northern Connector 179,792.35 2010 -0039 Town of Red Oak Sanitary Sewer 1,440.00 2008 -1859 NCDOT TIP R -2823 - Rocky Mount Northern Loop302.39 Remaining Balance (credits) 0.00 0.001 0.00 'NOTE UT to Crooked Creek (Speas Property) mitigation site generated a total of 228,900 square feet (5.25 acres) of buffer mitigation The amount of buffer assets shown as the beginning balance above represents only the amount of buffer mitigation that has been sold to the Riparian Buffer ILF Program There is an additional 18.069.61 square feet (0 41 acres) of buffer mitigation available for sell to the Riparian Buffer ILF Program as needed to meet requirements Information from EEP Debit Ledger dated 4/29/2013 All buffer mitigation debits valid as of 4/29/2013. Mitigation Project Name UT to Crooked Creek /Speas Property (G) EEP IMS ID 434 River Basin TAR - PAMLICO Cataloging Unit 03020101 Comment: The stream assets associated with Billy's Creek were proposed for close out by EEP in 2013 and verbally approved in the field on 7/12/2013 Annlied Credit Ratins 1'1 1 11 1 G 1 6.564.1 1.1 3 1 9'1 5'1 1 1 3 1 71 5 1 1 1 31 9 1 5.1 1 1 z 1 n S 1 Information from EEP Debit Ledger dated 6/7/2013 Z a' Z m u c Z W o _ _ n N Z a m . f A '3H ° U c f °_ h w U f E N c U W m ? u U �' c� CI 2 �L° N v r1 m y E c m t N W �, .. _ ? O 01 Z m O E p q r9 $ 01 c Q z O Z N o a U Z Beginning Balance (feet and acres) 2,193.00 295.00 1,918.00 17.51 228,900.00 NCDOT Pre -EEP Debits (feet and acres): Not Applicable EEP Debits feet and acres): DWQ Permits USACE Action IDs Impact Project Name 2008 -1859 2007 - 00157 -164 0.03 2010 -0501 2010 -01382 NCDOT TIP U -3621B - SR 1604 (Hunter Hill Road) Improvements 386.00 1,88387 Riparian Buffer ILF Credit Purchase 210,830.39 Remaining Balance (feet and acres) 1,807.00 295.00 34.13 17.48 18,069.61 Information from EEP Debit Ledger dated 6/7/2013 Ecosyste .. Im II nt PROGRAM TO: Katie Merritt/Eric Kulz THROUGH: Tim Baumgartner FROM: Jeff Schaffer DATE: July 19, 2013 RE: Closeout Request for Billy's Creek Mitigation Site (EEP IMS #36) The Billy's Creek Mitigation Site is located in Franklin County in the Tar - Pamlico 01 Catalog Unit. The 5" year monitoring for the site concluded in December 2010. The site was presented for Close Out initially on May 24, 2011. At that time the stream component of the project was closed out but monitoring for buffer assets was extended due to low stem counts in 2 vegetation plots. In that 2011 closeout report, "EEP has elected to reserve proposing any project acreage for buffer restoration credit at this time." Supplemental planting was done in January 2012 (350 - 5 and 10 gal. stock). The total buffer acreage of planted stems is 3.43 acres (Total Easement area: 5.028 acres; Area of existing vegetation: 1.6 acres). The previously discussed amount of 2.6 acres did not include areas where supplemental planting was completed. Based on the July 12, 2013 onsite review, our discussions onsite and the enclosed asset map, EEP requests closure of the site's buffer assets generating 3.43 (149,410.8 sq. ft.) of buffer mitigation. Perpetual site protection will be maintained by: Eric Galamb Stewardship Program Office of Conservation, Planning, and Community Affairs, DENR 1601 Mail Service Center Raleigh, NC 27699 919- 715 -8696 Please find attached a copy of a map detailing the ledger. We respectfully request your concurrence to Creek Mitigation Project. CC. Jeff Jurek Jim Stanfill File final enumeration of credits, and a credit /debit officially close out the buffer assets of Billy's North Carolina Ecosystem Enhancement Program, 1652 Mail Service (enter, Raleigh, N( 21699 -1652 X��. NCIDENI% / 919 - 115 -0416 / www. iceep.net Billy's Creek Buffer Asset Closeout Map I 350 stems planted in replant areas in Jan 2012 Planted Area /Buffer Assets: 3.43 ac Existing Vegetation: 1.60 ac y Legend Easement Cross Sections Veg Plots rN Buffer Area Existing Vegetation 1 Planted Trees Replant Areas r.1 91= r1- 19 ftiim Feet 0 62.5 125 250 375 500 Mitigation Project Name Billy's Creek IMS ID # 36 River Basin TAR - PAMLICO Cataloging Unit 030201010 Project Type Stream / Riparian Buffer Mitigation Comment: The project was funded by the Statewide ILF Program and verified buffer assets were sold to the Riparian Buffer Restoration Program Aoolied Credit Ratios 1 1 1 5 1 9 5 1 5 1 1 1 3 1 71 5 1 1 1 q 1 9 1 F 1 v o 0 0 1 iti..i.,,. I nc Ii Information from EEP Debit Ledger dated 4/29/2013 All buffer mitigation debits valid as of 4/29/2013. fir. u`c a z a o U z C C m E A O L zw c C _ C N O Zp N C m .2 W x VK M a N O U c. C m E q a Uw 0 C a O I rn 0_ z O z t w p, O z Beginning Balance (square feet) 149,410.80 Beginning Balance (credits) 149,410.80 EEP Debits (credits): DWQ Permits Impact Project Name 2004 -0872 Dixie Development Commercial Site 6,933.00 2003 -1494 NCDOT TIP U -2527 - Henderson Western Outer Loop 22,070.65 2003 -1494 NCDOT TIP U -2527 - Henderson Western Outer Loop - Additional 11,716.00 2005 -1772 Winstead Park 1,950.00 2006 -0658 Hidden Lake 50,573.00 2006 -1949 Brookfield Subdivision, Lot 45 3,531.00 2007 -0626 Lake Royale Lot 818 3,188.00 2007 -1426 Lake Royale Lot 1392C, 104 Big Horn 128.00 2007 -1788 Lake Royal C1394 108 Big Horn 612.00 2007 -0995 Lake Royale Lot C947 140.00 2008 -0493 Southern Blvd. Thorp Home 563.00 2008 -0548 Central Nash Water and Sewer District 11,851.35 Remaining Balance (credits) 36,154.80 0.00 0.00 Information from EEP Debit Ledger dated 4/29/2013 All buffer mitigation debits valid as of 4/29/2013. Mitigation Project Name Billy's Creek IMS ID 36 River Basin TAR - PAMLICO Cataloging Unit 03020101 Project Type Stream / Riparian Buffer Mitigation Comment: The stream assets associated with Billy's Creek were proposed for close out by EEP in 2011 and the final approval for close out was 8/22/2012 Annlipri Crpriit Rafins 1 1 1 5 1 7 5 1 5'1 1 1 3'1 9 1 5'1 1 1 3 1 ? 1 5 -1 1 1 3 1 7 1 5 1 1 -1 '1 1 x15 1 Information on Assets and Debits as of 5/5/2011 N O .0 E _ N u° & y N O L O. m f 2 f z O . o a w 'C O O 0 O U C C O L C O R N m U A L m O '' z O O 0. 2,101.00 zX z z W za U� U U W v°' 149,410.80 m z O z Beginning Balance (feet and acres) NCDOT Pre -EEP Debits (feet and acres): Not Applicable EEP Debits feet and acres): DWQ Permits USACE Action IDs Impact Project Name Wal -Mart Super 2006 -0646 2007 - 753 -264 Center #4459 -00 91800 MOA Purchase 549.00 Riparian Buffer ILF Credit Purchase 113,256 00 Remaining Balance (feet and acres) 634.00 36,154.80 Information on Assets and Debits as of 5/5/2011