HomeMy WebLinkAbout20051094 Ver 1_Close Out Request_20130722;p
l a
Ecosystem
PROGRAM
MEMORANDUM
TO: Katie Merritt /Eric Kulz
THROUGH: Tim Baumgartner
FROM: Jeff Schaffer
DATE: July 22, 2013
RE: Closeout Request for UT to Crooked Creek (Speas) Mitigation Site (EEP IMS #434)
The UT to Crooked Creek (Speas) Mitigation Site is located in Franklin County in the Tar - Pamlico 01
Catalog Unit. The 5th year monitoring for the site concluded in February 2012. The site was presented
for Close Out on July 12, 2013.
Based on the July 12, 2013 onsite review, our discussions onsite and the enclosed asset map, EEP
requests closure of the site's buffer assets generating 5.25 ac (228,900 sq. ft.) of buffer mitigation.
Perpetual site protection will be maintained by:
Eric Galamb
Stewardship Program
Office of Conservation, Planning, and Community Affairs, DENR
1601 Mail Service Center
Raleigh, NC 27699
919- 715 -8696
Please find attached a map detailing the final enumeration of credits, and a credit /debit ledger. We
respectfully request your concurrence to officially close out the buffer assets of Billy's Creek
Mitigation Project.
CC. Jeff Jurek
Jim Stanfill
File
, Al j�
NCE)ENR
North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699 -1652 / 919 -715 -0476 / www.nceep.net
UT to Crooked Creek (# 434)
Asset and Monitoring Features Map
200 400 800 1,200 1,600
Mitigation Project Name
IMS ID #
River Basin
Cataloging Unit
Project Type
UT to Crooked Creek (Speas Property)
434
TAR - PAMLICO
030201010
Stream / Riparian Wetland I Riparian
Buffer Mitigation
Comment: The project was funded by the NCDOT ILF Program and verified buffer assets were sold to the Riparian Buffer Restoration Program
Applied Credit Ratios 1 1 1 5 1 2 5 1 5 1 1 1 s 1 r1 s 1 r 1 '1 1 9 1 S 1 1 1 1 9 97Q 1 6.—, 1AR A�he�nn
'NOTE UT to Crooked Creek (Speas Property) mitigation site generated a total of 228,900 square feet (5.25 acres) of buffer mitigation The amount of buffer assets shown as the beginning balance above represents only the
amount of buffer mitigation that has been sold to the Riparian Buffer ILF Program There is an additional 18.069.61 square feet (0 41 acres) of buffer mitigation available for sell to the Riparian Buffer ILF Program as needed to meet
requirements
Information from EEP Debit Ledger dated 4/29/2013
All buffer mitigation debits valid as of 4/29/2013.
E R o
m �
E
•d °+ m N C
NA d V Rv N0 l'J am °Z `
.
ylC Q -
m o
r
O. 0
O
z
m
O. A
0
z
c c
6 w d
O
z
m o
A 6 r 2
Od
z
m w A r
o
v
a v
C
'L – w
r
2 – N 2
a
.c
O
.
Z
0
z
N
Od o
U
z
Beginning Balance (square feet)
210,830.39
Beginning Balance (credits)
, 30.39
EEP Debits (credits):
DWQ Permits
Impact Project Name
2008 -0548
Central Nash Water and Sewer District
3.448.65
2003 -1494
NCDOT TIP U -2527 - Western Outer Loop
of Henderson
3,552.00
2008 -0945
NCDOT TIP B -4115 - Bridge 57 over
Sycamore Creek
4,377.00
2007 -1962
Bridge 84 on SR 1141
9,09000
2007 -0683
NCDOT TIP B -4298 - Bridge 3 over Ruin
Creek
8,562 00
2007 -0789
1185 Sagamore Drive
266.00
2008 -1859
Rocky Mount Northern Connector
179,792.35
2010 -0039
Town of Red Oak Sanitary Sewer
1,440.00
2008 -1859
NCDOT TIP R -2823 - Rocky Mount
Northern Loop302.39
Remaining Balance (credits)
0.00
0.001
0.00
'NOTE UT to Crooked Creek (Speas Property) mitigation site generated a total of 228,900 square feet (5.25 acres) of buffer mitigation The amount of buffer assets shown as the beginning balance above represents only the
amount of buffer mitigation that has been sold to the Riparian Buffer ILF Program There is an additional 18.069.61 square feet (0 41 acres) of buffer mitigation available for sell to the Riparian Buffer ILF Program as needed to meet
requirements
Information from EEP Debit Ledger dated 4/29/2013
All buffer mitigation debits valid as of 4/29/2013.
Mitigation Project Name UT to Crooked Creek /Speas Property (G)
EEP IMS ID 434
River Basin TAR - PAMLICO
Cataloging Unit 03020101
Comment: The stream assets associated with Billy's Creek were proposed for close out by EEP in 2013 and verbally approved in the field on 7/12/2013
Annlied Credit Ratins 1'1 1 11 1 G 1 6.564.1 1.1 3 1 9'1 5'1 1 1 3 1 71 5 1 1 1 31 9 1 5.1 1 1 z 1 n S 1
Information from EEP Debit Ledger dated 6/7/2013
Z a'
Z
m u
c
Z W
o
_ _
n N
Z a
m .
f
A
'3H °
U
c
f °_
h w
U
f E
N c
U W
m
? u
U �'
c�
CI 2
�L°
N v
r1
m y
E c
m t
N W
�,
.. _
? O
01
Z
m O
E p
q
r9
$
01
c
Q
z
O
Z
N
o
a
U
Z
Beginning Balance (feet and acres)
2,193.00
295.00
1,918.00
17.51
228,900.00
NCDOT Pre -EEP Debits (feet and acres): Not Applicable
EEP Debits feet and acres):
DWQ Permits
USACE Action IDs
Impact Project Name
2008 -1859
2007 - 00157 -164
0.03
2010 -0501
2010 -01382
NCDOT TIP U -3621B -
SR 1604 (Hunter Hill
Road) Improvements
386.00
1,88387
Riparian Buffer ILF Credit Purchase
210,830.39
Remaining Balance (feet and acres)
1,807.00
295.00
34.13
17.48
18,069.61
Information from EEP Debit Ledger dated 6/7/2013
Ecosyste
.. Im
II nt
PROGRAM
TO: Katie Merritt/Eric Kulz
THROUGH: Tim Baumgartner
FROM: Jeff Schaffer
DATE: July 19, 2013
RE: Closeout Request for Billy's Creek Mitigation Site (EEP IMS #36)
The Billy's Creek Mitigation Site is located in Franklin County in the Tar - Pamlico 01 Catalog Unit.
The 5" year monitoring for the site concluded in December 2010. The site was presented for Close
Out initially on May 24, 2011. At that time the stream component of the project was closed out but
monitoring for buffer assets was extended due to low stem counts in 2 vegetation plots. In that 2011
closeout report, "EEP has elected to reserve proposing any project acreage for buffer restoration credit
at this time." Supplemental planting was done in January 2012 (350 - 5 and 10 gal. stock). The total
buffer acreage of planted stems is 3.43 acres (Total Easement area: 5.028 acres; Area of existing
vegetation: 1.6 acres). The previously discussed amount of 2.6 acres did not include areas where
supplemental planting was completed. Based on the July 12, 2013 onsite review, our discussions onsite
and the enclosed asset map, EEP requests closure of the site's buffer assets generating 3.43 (149,410.8
sq. ft.) of buffer mitigation.
Perpetual site protection will be maintained by:
Eric Galamb
Stewardship Program
Office of Conservation, Planning, and Community Affairs, DENR
1601 Mail Service Center
Raleigh, NC 27699
919- 715 -8696
Please find attached a copy of a map detailing the
ledger. We respectfully request your concurrence to
Creek Mitigation Project.
CC. Jeff Jurek
Jim Stanfill
File
final enumeration of credits, and a credit /debit
officially close out the buffer assets of Billy's
North Carolina Ecosystem Enhancement Program, 1652 Mail Service (enter, Raleigh, N( 21699 -1652
X��.
NCIDENI%
/ 919 - 115 -0416 / www. iceep.net
Billy's Creek Buffer Asset Closeout Map
I
350 stems planted in
replant areas in Jan 2012
Planted Area /Buffer Assets: 3.43 ac
Existing Vegetation: 1.60 ac
y
Legend
Easement
Cross Sections
Veg Plots rN
Buffer Area
Existing Vegetation
1 Planted Trees
Replant Areas
r.1
91=
r1- 19
ftiim
Feet
0 62.5 125 250 375 500
Mitigation Project Name Billy's Creek
IMS ID # 36
River Basin TAR - PAMLICO
Cataloging Unit 030201010
Project Type Stream / Riparian Buffer Mitigation
Comment: The project was funded by the Statewide ILF Program and verified buffer assets were sold to the Riparian Buffer Restoration Program
Aoolied Credit Ratios 1 1 1 5 1 9 5 1 5 1 1 1 3 1 71 5 1 1 1 q 1 9 1 F 1 v o 0 0 1 iti..i.,,. I nc Ii
Information from EEP Debit Ledger dated 4/29/2013
All buffer mitigation debits valid as of 4/29/2013.
fir.
u`c
a
z
a o
U
z
C C
m E
A
O L
zw
c C
_
C N
O
Zp
N C
m .2
W x
VK
M
a
N O
U
c. C
m E
q a
Uw
0 C
a
O
I
rn
0_
z
O
z
t
w
p,
O
z
Beginning Balance (square feet)
149,410.80
Beginning Balance (credits)
149,410.80
EEP Debits (credits):
DWQ Permits
Impact Project Name
2004 -0872
Dixie Development Commercial Site
6,933.00
2003 -1494
NCDOT TIP U -2527 - Henderson Western
Outer Loop
22,070.65
2003 -1494
NCDOT TIP U -2527 - Henderson Western
Outer Loop - Additional
11,716.00
2005 -1772
Winstead Park
1,950.00
2006 -0658
Hidden Lake
50,573.00
2006 -1949
Brookfield Subdivision, Lot 45
3,531.00
2007 -0626
Lake Royale Lot 818
3,188.00
2007 -1426
Lake Royale Lot 1392C, 104 Big Horn
128.00
2007 -1788
Lake Royal C1394 108 Big Horn
612.00
2007 -0995
Lake Royale Lot C947
140.00
2008 -0493
Southern Blvd. Thorp Home
563.00
2008 -0548
Central Nash Water and Sewer District
11,851.35
Remaining Balance (credits)
36,154.80
0.00
0.00
Information from EEP Debit Ledger dated 4/29/2013
All buffer mitigation debits valid as of 4/29/2013.
Mitigation Project Name
Billy's Creek
IMS ID
36
River Basin
TAR - PAMLICO
Cataloging Unit
03020101
Project Type
Stream / Riparian Buffer Mitigation
Comment: The stream assets associated with Billy's Creek were proposed for close out by EEP in 2011 and the final approval for close out was 8/22/2012
Annlipri Crpriit Rafins 1 1 1 5 1 7 5 1 5'1 1 1 3'1 9 1 5'1 1 1 3 1 ? 1 5 -1 1 1 3 1 7 1 5 1 1 -1 '1 1 x15 1
Information on Assets and Debits as of 5/5/2011
N O
.0
E
_
N
u°
& y
N
O
L
O.
m
f 2
f
z O
.
o
a w
'C O
O 0
O U
C C
O L
C
O
R N
m U
A L
m
O
''
z
O
O
0.
2,101.00
zX
z
z W
za
U�
U
U W
v°'
149,410.80
m
z
O
z
Beginning Balance (feet and acres)
NCDOT Pre -EEP Debits (feet and acres): Not Applicable
EEP Debits feet and acres):
DWQ Permits
USACE Action IDs
Impact Project Name
Wal -Mart Super
2006 -0646
2007 - 753 -264
Center #4459 -00
91800
MOA Purchase
549.00
Riparian Buffer ILF Credit Purchase
113,256 00
Remaining Balance (feet and acres)
634.00
36,154.80
Information on Assets and Debits as of 5/5/2011