Loading...
HomeMy WebLinkAbout20210569 Ver 1_DCM Permit_20210826Permit Class MODIFICATION/MINOR Permit Number 55-21 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission crmtt for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to William R. Hoft, 209 Buncombe St., Raleigh, NC 27609 Authorizing development in Carteret County at adj. to man -mad canal leading to Bogue Sound, at 153 Pond Dr., in Atlantic Beach , as requested in the permittee's letter dated 6/15/21, including the attached workplan drawing (1) Sheet 3A of 4 dated 6/15/21. This permit, issued on August 26, 2021 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) Unless altered herein, this permit modification authorizes the relocation of the previously permitted docking facility and one (1) formalized boat slip to the south side of the property as depicted on the attached workplan drawings. 2) This permit modification does not authorize any additional formalized boat slips. (See attached sheet for additional conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2024 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee William R. Hoft Permit No. 55-21 Page 2 of 2 ADDITIONAL CONDITIONS General 3) All debris associated with the removal or construction of the permitted marina shall be contained within the authorized project area and removed to an appropriate upland location. 4) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 5) This Minor Modification shall be attached to the original Permit No. 55-21, which was issued to the permittee on 5/6/21, as well as all subsequent modifications, refinements, and renewals, and copies of all documents must be readily available on site when Division personnel inspect the project for compliance. 6) All conditions and stipulations of the active permit remain in force unless specifically altered herein. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers assigned the project Action ID SAW-2021-00526. NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 2021-0569. NOTE: A minor modification application processing fee of $100 was received by DCM for this project.