Loading...
HomeMy WebLinkAboutNCG030108_DMR Upload Review_20211007Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 9/30/2021 8:34:55 AM (DMR Submittal) Submit by McCoy, Suzanne 10/7/2021 3:07:41 PM (DMR Submittal Review) • The task was assigned to McCoy, Suzanne 9/30/2021 8:34 AM d� 4 NORTH LAROLI NA Enrlmnmenfcl Quouty DMR Submittal from 9/30/2021 Permit and Facility Information: Permit Number* Enter ODCor Individual F2rrrit Ninber NCG030108 Mast begin w ith NCS or NM Facility Name:* Railroad Friction Products Corporation County:* Scotland Note: Facility name and county are used to help the reviewer verify the permit number entered, and to display the Regional Office address on the submitter's form (not here). These metadata details will be pulled from current BIMS information after the DMR(s) are filed. If the submittal is accepted, simply note any errors in the reviewer's comments. Monitoring Period Information: ......................................................................... Monitoring Period VUTatisthe YEAR ofthe sanpledate(s)? Year:* 2021 DM R Upload* Oickthe upload button or drag and drop files here to attach document. NCG03-DMR-20210701-DEMLR-SW - July 2021 DMR up load to DWQ from July - Sept 30 2021 - 60.04KB Signed REV1 added missing COD.pdf Only R Fs are accepted. Comments: In accordance with General Permit Part F, RFPC shall submit quarterly Discharge Outfall Monitoring Reports which summarizes analytical monitoring of the site's single outfall. On July 29, 2021 RFPC electronically submitted and mailed the DMR covering the period of July 1, 2021 through September 30, 2021. However, in this DMR RFPC omitted reporting for Chemical Oxygen Demand (COD). Thus, the attached DMR shows the COD result for the period covering July 1, 2021 thought September 30, 2021. The COD result was 72.0 mg/L — less than the benchmark value of 120 mg/L. rJ By checking the box and signing box below, I certify that: have given true, accurate, and complete information on this form; • I agree that submission of this Data Monitoring Report (DMR) upload form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature on this upload form has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit this DMR upload form. Full Name:* Greg Thompson Narre of person subrritting this form Email Address:* gthompson@wabtec.com Phone Number:* 910-844-9739 Signature: "r�OAI Date: * 09/30/2021 Review Review Date: 10/07/2021 Confirm Permit No.* Correct the perrritIDnurrberifneeded. NCG030108 ConfirmDMRYear* 2021 Multiple DMRs will be automatically filed in a subfolder denoting the sampling year entered above. Can submittal be r Yes accepted?* r No (Explain why below) Do Central Office r No staff need to be r Yes alerted?* Do Regional Office r No staff need to be r Yes alerted? Type of Permit* General Ensures DUZ s) filed correctly.