Loading...
HomeMy WebLinkAboutSW3190703_Design Calculations_20211004Engineering Project Report for Hemby Place Subdivision City of Weddington, North Carolina Date: September 17th, 2021 Client: Toll Brothers 14529 Grand Palisades Pkwy. Charlotte, North Carolina 28278 Engineer: 4 up R. Joe Harris & Associates, Inc. Engineering ° Surveying ° Planning ° Mmiagelnent 1186 STONECREST BOULVARD, SUITE 101 TEGA CAY, SC 29708 ►�,�/11111111►,,, ,,,�/11111111�,�► .�•''`�� H CA ROC''`'f. .-`''`���' CA ROB .'�°e°hFEsslp°°� -•: ='�° "�FESS�p°e��y': ► e a �(�Lv i a °•9r e ► ° r ° SEAL zcc;� _ SEAL �a .L e° C-416$ y'° 043341 Sze y - Report - Submittal to City of Weddington Hemby Place Engineering Project Report SECTION I: Project Summary • Project Summary SECTION II: Project Information • Vicinity Map • Soil Classification Map • USGS Topographic Map • FEMA Map • Rainfall Data SECTION III: Storm Drain Calculations • Storm System 100, 200, & 300 o Plan View o Pipe Design —10-year Storm Event o Inlet Spread — 1-year Storm Event o Drop Inlet — 25-year Analysis o Rip -Rap Apron Calculation • Storm System 400 o Plan View o Pipe Design —10-year Storm Event o Inlet Spread — 1-year Storm Event o Drop Inlet — 25-year Analysis SECTION IV: Erosion & Sediment Control • Initial Phase Erosion Control Basins Calculations o EC Sediment Basin #1 o Temporary Skimmer Basin #1 o Temporary Skimmer Basin #2 o Temporary Ditch Calcs • Final Phase Erosion Control Basin Calculation o EC Sediment Basin #1 SECTION V: Pre & Post Analysis • Pre & Post -Development Summary • Pre & Post -Development Curve Numbers • Pre & Post -Development Time of Concentrations • 1, 2, 10, 25, 50, 100-year Storm Event Hydrograph Analysis Table of Contents Hemby Place Engineering Project Report SECTION VI: BMP Analysis • Wet Pond 100 o BMP Curve Number Calculations o Water Quality Calculations o Hydrograph Analysis SECTION VIL• Appendix A Table of Contents • Pre -Development Drainage Area Map (Included in Construction Plans) • Post -Development Drainage Area Map (Included in Construction Plans) • Storm Drainage Area Map (Included in Construction Plans) Hemby Place Engineering Project Report Project Summary Section 1: Project Summary Hemby Place Engineering Project Report Project Summary A. PROJECT DESCRIPTION The Hemby Place Subdivision is located at the intersection of Hemby Road and Providence Road in Weddington, NC 28104. The site resides on Parcels 6147009, 6147010, 6147011 consisting of approximately 43.82 acres, and will include the development of 35 single family residential lots. The site consists primarily of farming/cultivated land. The predominant soil types within the proposed limits of construction are Cecil gravelly sandy clay loam, 2 to 8 percent slopes (CeB2), and Cecil gravelly sandy clay loam, 8 to 15 percent slopes (CeC2) (as taken from the Web Soil Survey 2.1 - National Cooperative Soil Survey by NRCS). CeB2 and CeC2 are classified as Hydraulic Soil Group B. The site disturbance will encompass roughly 25.58 acres. The site will encounter two phases of erosion and sediment control management, beginning with an initial phase. The initial phase will consist of the initial clearing, grading and infrastructure placement. The last phase (stabilization or final phase) will include paving and stabilization of the site. Given the moderate amount of grading work that will take place, the majority of the erosion control is best managed through the use of two temporary skimmer basins, a sediment basin, and temporary diversion ditches to help channel flow to the basins. Accessory features such as inlet protection, silt fence, and concentration outlets will also be used to assist with bypass areas and smaller areas of concentrated flow. One (1) sediment basin and two (2) temporary skimmer basins have been specified for the initial phase erosion control. As grading work begins and the storm drainage systems are installed, the sediment basin will need to be re -graded to final size in compliance with final grades. After all work has been completed and the drainage areas are stabilized; the temporary skimmer basins will be filled in and brought to final grade and remaining sediment basins converted into one permanent BMP wet pond. B. STORMWATER MANAGEMENT Pre and Post Development runoff summaries can be found in Section V of this project report and in summary, the results are as follows for the 1, 2, 10, 25, 50, & 100-Year Storm Events: Description: Area (Ac.) 1-Yr (cfs) 2-Yr 10-Yr 25-Yr 50-Yr 100-Yr Pre -Development Runoff Area 1 54.15 5.59 15.64 58.69 92.45 121.58 153.88 Post Development Runoff Area 1 43.90 4.05 11.64 52.97 83.53 109.09 137.01 Pre -Development Runoff Area 2 3.68 0.79 1.82 5.76 8.65 11.12 13.85 Post Development Runoff Area 2 1.72 0.49 1.13 3.44 5.13 6.56 8.12 Pre -Development Runoff Area 3 8.36 0.91 2.71 10.56 16.67 21.93 27.77 Post Development Runoff Area 3 3.59 1.17 2.58 7.53 11.09 14.12 17.42 Pre -Development Runoff Area 4 1.58 0.18 0.53 2.03 3.19 4.18 5.29 Post Development Runoff Area 4 0.40 0.08 0.23 0.81 1.23 1.60 2.00 Hemby Place Engineering Project Report Project Summary C. WATER QUALITY This site has four (4) locations for points of discharge collected from the four (4) main drainage areas. Drainage Area #1 is the largest drainage area and discharges into an existing stream located on the east side of the property. Drainage area #1 contains a permanent wet pond BMP, and a bypass drainage area. Drainage Area #2 has a discharge location on the southern side of the site, and simply flows off site towards a small pond south of the property. Drainage Area #3 discharges into two existing storm systems located at the west and northwest of the site. Drainage Area #4 is a small drainage area, and has a discharge point located in the north part of the site, and discharges onto an adjacent property. Drainage area #4 is much smaller in the post -development stage of the project, and has less runoff than the pre -development drainage area. A pre vs. post analysis was conducted to ensure that the flow of discharge for the 1-yr, 2-yr, 10-yr, 25-yr, 50-yr, and 100-yr 24-hr storm events did not exceed that of the pre -condition. The wet pond has been designed to maintain at least six (6) inches of freeboard with respect to the top of berm for the 100-YR, 24-hr storm event. The calculations for the water quality have been provided in Section VI of this report. D. STORM DRAINAGE SYSTEM For the analysis of Storm Systems 100 - 400, RJH Engineering utilized field run topography and proposed road grading to evaluate all of the storm drain systems. The analysis was conducted to verify that these drainage systems would not surcharge or be beyond capacity due to the storm water runoff for the 10- year, 24-hour rainfall intensity. All of the street catch basins were evaluated for inlet spread using the 1- year, 24-hour rainfall intensity. Street catch basins evaluated with the collection of 100% impervious area located within the right of way and 50% of the pad impervious area. Both systems function within the design parameters set forth by the City of Weddington, North Carolina, and NCDOT for both pipe design and inlet spread capacity. Yard inlets were modeled for inlet spread using the 25-year storm. The complete system has been fitted with a properly sized rip -rap apron at the outfall for energy dissipation. All of the proposed storm drain profiles have been designed to limit the hydraulic gradient line (HGL) to no closer than 0.5' below the weir/rim elevation. End Report Secrest Commons (Tract 2) Engineering Project Report Section 2: Project Information Overall Project Information d O , � � a � 0 { � \ a 5 g y { % � ± � \ � $ � ® ƒ @O � � 2 D " � 2 � ■ ¥� eoa>e . _ P #; � \/ . ~° \ « \ / 3 \ \ �± ) 5 v. / » }ƒ } ;tZ7 / � } / 4 : \ � . . / � \ \ > o ° ' ) j .oa / of ' of ' j of od of \ k \ / § / of od of od / / 2 06 06 =ez ,z a a e § q / \ OZ99a ocv9a OK9a ogz9a 0a T99a OCt79a M9a oCz9a 0a / £ / 2 ° �§ \\ § 0 \ �\ \ ® = t ��f 2 � � t f * i ) @ \ ° ) B j J f \ # 10 > kW ) �\ �! ` _ _§ _ \ 22 \ ° z Q z ,sa a o a KD � U 3 m U d T 0-0 'E E a) O- U)3 U O 0 U U 0) O O T Z O G O LL Z a CQ G 0 Z /W V W J a Q O O y m O U N UU) y N' N N U)CL O C U O L 6 00 (1) 7 0 �_ O m E .N E '6 N '6 -E (UA O N (n „_ Q m N p U O LO N N O m (1) a U (n m C E N U -a u) O N y tl) N O Z m N N U E y '6 m c d N U) m Q ON O N N E U W (p m O N (+j (6 N O O U O N U)m Z C N m Cc:Q N i U m U O O- O (o E U N N N .� U O 3 0 y Q E �' m y O 'o N (0 O� O cn Q N m E N N U 7 u) U O N �_ �p 12 w '6 '6 N V O 'o N m N m E tl) >N p O N E N N N 2f N C N 3 J> m ((1) Q C U) Q (6 N Utl) i -0y -O O t C N N Z E Q U C N Q o aaci N (6 N N rn o p _0'- O) m -O m N m� E O C y Q N j, N m (6 7 ,tl) C N o (n (6 O '6 m Q O N >' 3 U m N U .o Q m 0 m s n E E (n O E m a p D O N cr a) a) 7 fA O N Q 7 O_ O a) m 00 C (U (NA U)U p U �6 U) U > Q N (n N m O E O y 0 N N 0 —Q N C N N p N p (6 O n L 0 7 O O LPm N N E N!5 FL E U U p 2 Q=o Q m H o U U U m H Oo.E m y N C N L m °- o U L ° o a N 0 N L m o m a d U U o Z in O Q R R C 0 7 0 ■ ■ 0 LLFm }{ R 4 Rt R F m o a o O w y OC rn `o y a o > w H a. o 0 0 0 c Q v rn Q � a m m U (� o Z rn Q � '16 ❑ ❑ ❑ ❑ ❑ ❑ ❑ }f 'p R y p 1 0 y y Q V1 .j 0 0 a y m � 0 0 0 o a. o 0 a m m U U o z 0) Q a m m S ❑ ❑ o 0 U) O � U 3 N U ' m O N U Q O U m 0 m Z Hydrologic Soil Group —Union County, North Carolina WSS - Hemby Place Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CeB2 Cecil gravelly sandy clay B 27.7 64.1 % loam, 2 to 8 percent slopes, moderately eroded CeC2 Cecil gravelly sandy clay B 15.5 35.9% loam, 8 to 15 percent slopes, moderately eroded Totals for Area of Interest 43.2 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 7/20/2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Union County, North Carolina WSS - Hemby Place Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 7/20/2021 Conservation Service National Cooperative Soil Survey Page 4 of 4 35o 1'53"N r �i r �i r �i r �i r �i 35o 1' 27" N 521800 521900 522000 522100 Map Scale: 1:3,910 if printed on A portrait (8.5" x 11") sheet. ` Meters $ N 0 50 100 200 300 Feet 0 150 300 E00 900 Map projection: Web Mercator Coner000rdinates: WGS84 Edge tics: UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Hydrologic Soil Group —Union County, North Carolina a (WSS - Hemby Place (Offsite)) In 521800 521900 522000 522100 in 522300 35o 1'53" N r �i r �i r �i �i 35o 1' 27" N 522300 a 7/21/2021 Pagel of 4 0 Z /W V W J a Q O O U m O 0) U U y U) O (6 U a) OU C 0 O L -6 �_ U 7 a) O m .N '6 Ul '6 "J U) O N U > O Q m 0) p U Cc: LO .� a) 0) � O m U) a U U m C E N U U-0 O 0) y C m O a)N af 0 O U 0) 0 O � > Z 0 m N UU)) U E U) -6 m d 0) U) m Q O O 0) L E O E U W m (p O N L () (6 N O O U O N C N m Z C 0) m 0 Q N i U m U 0 O- O (o E C U 0) 0 .�.. 0) N .g C U C O 3 0 y � Q E �' O U) O O C Q 0) m E N N U 7 U) U U) Up O w '6 U O N to m 0) (0 -co: U) >N o 3 J> m O (O!) Q C O U Q C N Utl) U) C N o Z E Q 2 U o Q o a� m o 0) rn 0 O >+ L N N jp O) N -O m m� E O _O T 7 C y Q 0) U) 0) (6 (6 7 ,U) C N o U (60 O 'O O Q -00 0 >' 3 U ".' C m (6 U .0 Q m C 0 s C (n E E U- O E m 3 O D O O) 0) O 7 U) O O Q 7 O_ O N m 00 0 O t '6 O fOA N O C U U �6 U) U C > O- 0) (n N m O E O y 0 N N 0 —Q 0) C m m 0) 0) O 0 N O Q.� O U (0 O U) U L —_ O 7 —_ O O N m 0) E N FL E U�U U QoQ m H o UU U� m H Oo. to a) Z m y N C N L m °- o ° o a N 0 N L m o m a d U U o Z in O Q R R C 0 7 0 ■ ■ 0 LL }{ R 4 Rt R In 'It F m o a o O w y 0) `o y a o > w H'a) a° o 0 0 0 c Q v rn Q � a m m U U o Z rn Q � '16 ❑ ❑ ❑ ❑ ❑ ❑ ❑ }f 'p R y p 1 0 y y Q co .j 0 0 a y m -0 0 0 0 o a. o 0 a m m U U o z 0) Q a m m S 4 t - ❑ ❑ o 0 y Uo � U � a) U ' m 'o � U Q O U (6 0 m Z Hydrologic Soil Group —Union County, North Carolina WSS - Hemby Place (Offsite) Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CeB2 Cecil gravelly sandy clay B 35.7 80.9% loam, 2 to 8 percent slopes, moderately eroded CeC2 Cecil gravelly sandy clay B 8.4 19.1 % loam, 8 to 15 percent slopes, moderately eroded Totals for Area of Interest 44.1 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 7/21/2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Union County, North Carolina WSS - Hemby Place (Offsite) Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 7/21/2021 Conservation Service National Cooperative Soil Survey Page 4 of 4 PARTMENT OF THE INT `i US GS U.S. DEU.S. GEOLOGICAL SURV YERIOR science for a changing world -80.8750" 35.1250 ° 512000m E 13 14 3886000" N 85 84 83 82 m 79 78 77 76 75 74 35.0000' 12 -80.8750' 13 14 The National Map WEDDINGTON QUADRANGLE USI I NORTH CAROLINA - SOUTH CAROLINA Topo 7.5-MINUTE SERIES -80.7500' 15 16 17 18 19 20 21 22 35.1250 ° 15 16 17 18 19 FA Produced by the United States Geological Survey * SCALE 1:24 000 MN North American Datum of 1983 (NAD83) World Geodetic System of 1984 (WGS84). Projection and 1 0.5 0 KILOMETERS 1 2 NORTH 1 000-meter grid: Universal Transverse Mercator, Zone 17S N AROLINA This map is not a legal document. Boundaries may be 7050' 1000 500 0 METERS 1000 2000 generalized for this map scale. Private lands within government 139 MILS o°s 1 0.5 0 1 reservations may not be shown. Obtain permission before 2 MILS MILES entering private lands. 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 QUADRANGLE LOCATION Imagery .....................................................NAIP, May 2015 - November 2016 FEET Roads ......................................... U.S. Census Bureau, 2016 - 2017 Names............................................................................GNIS, 1980 - 2018 UTM GRID AND 2019 MAGNETIC NORTH 1 Charlotte West Hydrography...............................National Hydrography Dataset, 2003 DECLINATION AT CENTER OF SHEET 1 2 3 2 Charlotte East Contours .................... ........................National Elevation Dataset, 2008 - 2013 U.S. National Grid CONTOUR INTERVAL 10 FEET 3 Mint Hill Boundaries ..............Multiple sources; see metadata file 2017 - 2018 NORTH AMERICAN VERTICAL DATUM OF 1988 4 Fort Mill 100,000 - m Square ID 4 5 5 Matthews6 Wetlands.................FWS National Wetlands Inventory 1983 - 1989 This map was produced to conform with the Rock Hill East NU National Geospatial Program US Topo Product Standard, 2011. A metadata file associated with this product is draft version 0.6.18 6 7 g 7 Catawba NE 8 Waxhaw Grid Zone Designation ADJOINING QUADRANGLES 17S 21 522000mE 85 84 83 82 81 79 78 77 76 75 3874000"N 35.00000 -80.75000 ROAD CLASSIFICATION .�. � N Expressway Local Connector v M rn Secondary Hwy Local Road �< Ramp 4WD . Interstate Route US Route O State Route r` Y M N CY�C° X LQ o (D '�-- M in v Coco O ,T^ Z LU WEDDINGTON, NC, SC I--za 2019 z z N O e Q ¢ li N O N C E �' Q ° a) Co N "6 (6 °- C N lwi N H i C E a) '� ao 2 H t t v > N co a) O w Z Q O E co 'aD m N Z C ¢ _ d N J -p x N � LL a3 C O y N yN, O co a g o �33� �x o as o : °° : aN Q �ovwo o�ac)E� m W oo°. : d m O E a) a �o� �3as E: N� �� LL a) ° m o w C` o k x o ¢: : E N v o ° E o¢ N y as p Q N N LL w a) ¢ N O v?j o O J N Q V co Y a) a) U a) p Y W T a) a) C o "6 l0 � S O a) � -6 ci C �' N � a) � C p N T W O p y0'E �� O -p N (6 U a) O ci Ia -p N N O C o O L > O (6 4 'Ip E O w a) U LL V N 4 a ° a ° m m LL N E 3 w Fi Co -Cl ¢ a) w Y N n W E a o E m a LL °o v0�y ox -o Co W o a) N a> 'o a > :° Y�o v$¢ v-00 E �a Eve w Nmo (ayN o a°z° °o E E ? ° o , co 0w v m -' o ¢ as : yo asaNW vv�asO: oV8>2 ° i C N N C O LL' LLL C O C U Y N _° C Co N O_ U V ° Q C -6 LL >>¢ a3 N E a) N z 00 w o := N O LL Y a) Y W _ aa) r °o g as as a-6i n m m o a r E O o Q m o �¢ m m ¢ Co ° 3 3 0 o ( m.2 o m m 'wo a m o> a v '3 w N uN 0 w m a Y�Y w'o N�a� �m �> w m> o m E r Co o-0 m E ��:° ¢°>aN �j��.�� �w°�� m N N a) t a) t a) O (6 O T O C _ H w O O V a3 LL U ¢ J ¢ ¢ W ¢ U J U U m J U Q 2 U Z -6 N 2 w O p_ -- a `1 E' y-0 N LL w w - — N N + I Q C co ate+ N° E 4 N N w >' V (6 O_ V o►, ` 1 _ ry �I I ❑❑® tO1 3 : °3c)E°v °>°L Co ou Qas N 3- J�-o N EL o H \ Z 1 m w S . 1 Q (6 N LL c N J N N O 8 E 0 0 'co coCL Z O m ba C-0 V Q 0 O Q O C Q Q w w w w $ v m u> a) c - E v° m °- OJ U) N LU w = x Z Q °o aEi >. v m `o t d N Q y of a�i o LL¢ w¢ ¢ Z r 0 ¢ © Co w N U O :_ CL a) c' as Q o ai a xx x wU ¢ a E� l2 °`oaI E Ea)�°co ¢ ¢ x ¢ p W C7 LL d N ,� o N c°� E aEi wo E wo in U¢ x 0 2 F- t o t co as E d t— d— S J LU ll¢VV =0 �v� as as 3 d_LL u�x rLL O W a fsfa *^ 44 - � • O Ilk a. ♦--+ cc o goy J om r o o * 1 _ t4 o 4w- r A - • ,, • o LO z _ O0 5 k o cu LO z� o All* 0 NOAA Atlas 14, Volume 2, Version 3 1' Location name: Weddington, North Carolina, USA* Latitude: 35.0299*, Longitude:-80.7608'. Elevation: 681.35 ft** *source: ESRI Maps " source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 1 100 100 200 500 1000 0.415 0.491 0.570 0.627 0.693 0.739 0.780 0.818 0.860 0.889 5-min (0.383-0.451) (0.452-0.534) (0.524-0.620) (0.575-0.681) (0.633-0.751) (0.672-0.800) (0.706-0.845) (0.736-0.886) (0.766-0.933) (0.787-0.967) 0.664 0.785 0.912 1.00 1.11 1.18 1.24 1.30 1.36 1.40 10-min (0.612-0.720) (0.722-0.854) (0.838-0.993) (0.920-1.09) (1.01-1.20) 1 (1.07-1.27) 1 (1.12-1.34) 1 (1.17-1.40) 1 (1.21-1.48) 1 (1.24-1.52) 0.830 0.987 1.15 1.27 1.40 1.49 1.57 1.64 1.71 1.76 15-min (0.765-0.900) (0.908-1.07) 1 1 (1.28-1.52) (1.35-1.61) 1 (1.42-1.70) 1 (1.47-1.77) 1 (1.53-1.86) 1 (1.56-1.91) 1.14 1.36 1.64 1.84 2.07 2.24 2.40 2.55 2.72 2.85 30-min (1.05-1.23) (1.25-1.48) (1.51-1.78) (1.69-2.00) (1.90-2.25) (2.04-2.43) (2.17-2.60) (2.29-2.76) (2.43-2.96) (2.52-3.10) 1.42 1.71 2.10 2.40 2.76 3.04 3.31 3.57 3.91 4.16 60-min (1.31-1.54) (1.57-1.86) (1.93-2.29) (2.20-2.60) (2.52-2.99) (2.76-3.29) (2.99-3.58) (3.21-3.87) (3.48-4.24) (3.68-4.52) 1.64 1.99 2.46 2.82 3.29 3.65 4.01 4.36 4.83 5.19 2-hr (1.51-1.80) (1.82-2.18) (2.25-2.69) (2.57-3.09) (2.99-3.59) (3.30-3.98) (3.60-4.37) (3.89-4.75) (4.26-5.27) (4.54-5.66) 1.75 2.11 2.63 3.03 3.57 4.01 4.44 4.89 5.51 5.99 3-hr (1.60-1.92) (1.93-2.32)1 (2.40-2.88) 11 (2.76-3.32) 11 (3.24-3.91) 1 (3.61-4.37) 1 (3.97-4.84) 1 (4.34-5.33) 1 (4.82-6.01) 1 (5.19-6.55) 2.10 2.53 3.15 3.65 4.32 4.86 5.41 5.97 6.76 7.38 6-hr (1.92-2.30) 11 (2.32-2.77) 1 (3.33-3.99) 11 (3.92-4.71) 1 (4.38-5.29) 1 (4.84-5.88) 1 (5.30-6.50) 1 (5.91-7.35) 1 (6.38-8.03) 2.48 2.99 3.75 4.36 5.20 5.88 6.59 7.34 8.38 9.23 12-hr (2.28-2.72) 11 (2.75-3.29) 1 1 (3.98-4.77) 11 (4.71-5.68) 1 (5.29-6.41) 1 (5.87-7.1 7) 1 (6.46-7.97) 1 (7.27-9.10) 1 (7.90-10.0) 2.93 3.53 4.43 5.14 6.13 6.92 7Y4 8.59 9.77 10.7 24-hr (2.71-3.16) (3.27-3.82) 11 (4.10-4.79) 11 (4.76-5.57) 11 (5.64-6.63) 1 (6.35-7.48) 1 (7.08-8.37) 1 (7.83-9.30) 1 (8.85-10.6) 1 (9.67-11.6) 3.44 4.14 5.17 5.98 7.10 7.99 8.91 9.87 11.2 12.3 2-day (3.19-3.72) 1 (5.52-6.48) 11 (6.54-7.68) 1 (7.33-8.65) 1 (8.15-9.66) 1 (8.99-10.7) 1 (10.1-12.2) 1 (11.0-13.4) 3.65 4.39 5.44 6.28 7.43 8.36 9.31 10.3 11.7 12.8 3-day (3.39-3.94) 11 (4.08-4.74) 11 (5.05-5.88) 11 (5.81-6.78) 11 (6.85-8.03) 1 (7.68-9.03) 1 (8.53-10.1) 1 (9.40-11.2) 1 (10.6-12.7) 1 (11.5-13.9) 3.86 4.63 5.71 6.58 7.77 8.72 9.70 10.7 12.2 13.3 4-day (3.59-4.16) 11 (4.31-4.99) 1 1 (6.09-7.09) 11 (7.17-8.38) 1 (8.03-9.41) 1 (8.91-10.5) 1 (9.81-11.6) 1 (11.1-13.2) 1 (12.1-14.4) 4.47 5.33 6.49 7.42 8.71 9.74 10.8 11.9 13.4 14.6 7-day (4.18-4.79) (4.99-5.71) 11 (6.07-6.96) 1 1 (8.09-9.33) 1 (9.02-10.4) 1 (9.97-11.6) 1 (10.9-12.8) 1 (12.3-14.4) 1 (13.4-15.8) 5.11 6.08 7.32 8.29 9.60 10.6 11.7 12.8 14.2 15.4 10-day (4.79-5.46) (5.69-6.50) 1 1 (7.74-8.86) 11 (8.94-10.3) 1 (9.89-11.4) 1 (10.8-12.5) 1 (11.8-13.7) 1 (13.1-15.3) 1 (14.1-16.6) 6.83 8.06 9.52 10.7 12.2 13.5 14.7 15.9 17.6 19.0 20-day (6.43-7.27) 11 (7.59-8.58) 11 (8.95-10.1) 11 (10.0-11.4) 11 (11.5-13.0) (12.6-14.3) (13.7-15.7) (14.8-17.0) (16.3-18.9) (17.5-20.3) 8.38 9.85 11.5 12.7 14.4 15.6 16.9 18.2 19.8 21.1 30-day (7.91-8.89) 11 (9.31-10.5) 1 1 (13.5-15.2) (14.7-16.6) 1 (15.8-18.0) 1 (17.0-19.3) 1 (18.5-21.1) 1 (19.6-22.6) 10.5 12.4 14.1 15.5 17.3 18.6 19.9 21.2 22.9 24.2 45-day (10.0-11.1) 1 (16.4-18.1) (17.6-19.6) (18.8-21.0) (20.0-22.4) (21.5-24.2) (22.6-25.6) 12.5 14.6 16.5 18.0 20.0 21.4 22.8 24.1 25.9 27.2 60-day (12.0-13.1) (14.0-15.3) (15.8-17.3) (17.2-18.9) (19.0-20.9) (20.3-22.4) (21.6-23.9) (22.8-25.3) (24.4-27.2) (25.6-28.6) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical PD5-based depth -duration -frequency {DDF) curves Latitude: 35.0299", Longitude:-80.7608° MIDI 25 t 20 41 CL di a 15 10 CL ti 4 t t t t t N N M N M M M N M o LA o o r� rh ry r� r$ r, o a o Ln o .i -1 m Ui.era lion to 14 N m v to 30 25 C t 20 n. Qj 15 A, 49 a 10 CL a 5 0 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAAAtla5 14, Wume 2, Vemifln 3 Created (GMT): Tue Aug 3 21:44:15 2021 Back to Top Maps & aerials Small scale terrain Average recurrence interval ;years} — 1 2 — b — 10 — 26 — 60 100 200 500 1000 Duration — 5-min — 2-day — 10-min — 3-day 15-min — 4-day — 30-min — 7-day — 8 D-rnin — i D-day — 2-hr — 20-day — 3-hr — 3"ay, — 6-hr — 45-day — 12-hr — 60-day - 24-tr Rd IN 111'rovidience nns:44 A E1:1 % 3km 2mi Large scale terrain In so 11 City Winston-Salem 4P Durham P. 40 Greensboro Ri 4P NORTH C A R 0 L I N A rharlotte Fa yetted i I I e 'Greenville' 3 0 U T H C A R 0 L I N A ti Columbia 60mi dw Large scale map Greensboro :7 z u I North Carolina dotte r I Fs el Gre le 100km b rribia 60mi outhCa lina Large scale aerial Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions noaa.gov Disclaimer Hemby Place Engineering Project Report Section 3: Storm Drain Calculations Storm Drain Calculations Hemby Place Engineering Project Report Section 3: Storm Drain Calculations Storm System 100, 200, & 300 Analysis u 0 N O N r N 0 m O ❑ 0 M m U � m m = O ❑ � ❑ O OM � m M N V O � Xk m U U O m � U U � U U N N E o � � M O O V o u U m oM u ai m u m � m U o O U m U o o m U m U N U o W N O m U m M M U m it m U m U U ❑ U O m o U u m � N ❑ ❑ U M o N � U U o � m U o N O u m U N ak � m m U m U U N O m m M � m U M U U N O ❑ m � m p N ❑ ❑ o N 4 p m U z 6 LL a� 'o a` N fa IL E E r� V / N 00 O O M r I- N 0 V O I- O M M N M 00 V[,- N N N N N 1� (4 r r (O V r 00 I� O r M Ln 00 (O (D N 00 V Ln O CO M i Q w n r r r 0 0 0 V LO V M r M M M N O LO LO LO M M M V 00 (O 00 CO (O O 00 N I- N V 00 I,- I` I` M 00 V M 00 LO J V M N (D O O O M N I,- LO O N O V O I- O LO O 00 (O V O C v V Lri Lri Lri N M Lri I` 00 O N O O O O N 00 O _ 00 00 00 00 O O O O O O O O O O O O O 00 00 O O O O M M M M M M M M M M M r M r r r r M M M M M M V 00 0 00 W 0 O M O 00 V I- (O I` M 00 N M ' J M N (D O O O M N I� Cl) V r O) M r- n O Lq O O N Lf) Q' V LO LO LO N M Lo I` 00 n N O O O n 0) 0) N 00 _ a0 m m m O O O O O O 00 O O O O O 00 00 O O O O N (O (D (D (D (O (O (D (O (D (0 O I- (O r r O r (O (O (O (O M O O LO LO M M M M O M LO V N r- Ln W O V M 00 J O V Lf? 00 I� O O O 00 O V� O M O O V� I` 00 V 0 v V V LO LO O N LO LO I` 00 N 0) O O O O O 00 00 Qj = 00 00 00 00 0)O O 0) O 0) O (D O O O O O 00 00 O O O O M M M M M M M M M M M r M r r r r M M M M M (D 0 I- (4 LO co Ln M V) O I- LO M V LO (O O V 00 O 00 M M O Q 00 O V V r V I� LI7 O I� O O 00 00 (O I� (4 N r r r O V 00 00 00 00 co V V LO LO I- r LO V V LO V I-- 00 O N N V O O O O O O O O O O O O O O O O O O O O O O O N w N N N N N N N N N O N O 00 N O N N O N N N N N O LO O O M O O O O O M O O LO ? O O O O LO 0 N U O r N N LI7 r LI7 r r LI7 r LI7 r LI7 r - O O r r - O O r O r r Lo r Ln O r r r r N M M M M M M M M M M M M M M M M M M M M M M M M Q' O O O O O O O O O O O O O O O O O O O O O O O N N c a o 0 0 0 0 0 0 0 0 6 0 6 0 0 0 0 6 6 6 6 6 6 6 0 c c U U U U U U U U U U U U U U U U U U U U U U U J F � Z N N N N (D (D O O O O 00 00 00 00 00 O O V V V M M co co M M r r r r r r r r r M M N N r r J (n a) O O O O O O r O O M O O N N O (DO (D (DO N Q ^ e LO LO LO LO LO r- Ln LO N LO LO LO LO V Ln LO LO LO LO LO LO LO O J U) .. O O O O O O O O N O O O O O O r O O O O O O M N a0 O M (O M LI7 (O Lf) 0)M O (O (D O (') v) MI- O I- N N Q N 00 00 00 Cl) M O (D O CD M I,- M V N 00 00 I,- (O V v N M M V O N V I- I--00 N Or O O (DO O O O 00 00 O O I- O (O (D (D (D (O (O (D (O (D (O (D (O (O (O (O (O (O (O (O O N 00 O O M M V 0 LO M O O 0 0 M LO M I- V I- t N r_O V (D O (O (DO r MN 00 0) M LO O M M 00 V LO (DLO 00 Q 0 > v N 00 N 00 M 00 V 00 O 00 O O N O V O 6 O I` O 1` O O 00 O O O (DO O O O O I- 00 00 00 O 00 O O I- O I` O N U U O N O V (D V N N O O (D O (D Lf) O O O O I- a0 '- l0 = N N N N O O M O (D V V CO M M (O O (O O O O O Ln (� Q V I- I- V I- V O) () Ln Ln V ULL .U.. r r- V V N M N N r N N r r r M N _ V a0 r O V) _ (D CD� W W V � � M Ln 1- M V N O M O V I� V r 00 CO N O r 00 Ln r r O 00 V O O a0 V V M M N (D 0) r M MN CD N N r O V)r O N r LL .U.. r r r r _O II CI l6 O LO 00 ('M O 00 M ('M M O O O O 0 O 0 V O p C a) fj O O V N O O O N N N N N O O O o a (; (; CD CD(; CD CD(; CD(; (; (; CD(; (; (; CD(; CD(; (; (; (; Q E N i (M O N M 00 (O (D V LO 00 O I- N O LO O I- M 00 n � T t M V V V V I� 00 O O Cl? M I` O O M M (O I` 00 O N V N (n C LO LO LO LO LO LO LO V) (D (D (D I- (D (D r r r (D (D (D r r I` w O O O O 00 00 00 00 O O M M O M V LO O 00 00 00 00 LO O O 00 0 O 0 0 I- M r M M r M M M V M M (O N (O CO (O I- 00 00 0 U O O O O O O O O O O O O O O O O O O O O O O O �U o v 00 CO M O N LO (O O N N LO N LO LO O M V N V O N a1 r O O (D O V I- N O N r Ln LO M O 0 O O O co N Cl) O O C IT 00 r 00 O 00 00 LI7 V � r r N 00 O VI 00 � 00 O M 00 O � t J N v M N M LOO _ N V (D N (O M N O M V (D ID M _ N J V NNN M V I- LO r N LO N (D r I- M N N N Ln E N N M V O N M V V) (O LO 1` 00 O O (O O N M O O C O O O O O O O O O O O CD CD CD CDO CD CD CD— .... N N N N N N N N N N N N N M M M M M M m m m m m m m m m m m m m m m m m m m — U U U U U U U U U U U U U U U U U U U U U U 0 (n N II 3 2:1 D — r N ('M V Ln (0 I- 00 O O M V N 00 O O r N Z N Z w r r r r r r r r r N N N J 0 c O LL UU) W r N 0 V LO (O I` 00 O O N M V � (0 I� � O c 0 r r r r r r r r r r N N N N O � J Z d Z N fa IL \V E E r� V / N O O a0 N (0 (0 I- O 0 1-OO O O N 1'- O V O 1'- a0 V O N 00 I� 00 V O 00 O 00 00 O O N O M O V V 00 M N O > i Q v M LO . (0 LO V M V M V - N - V) V N V M M LO M N V V II- O LO (O V O I- N LO N LO V (0 O I- M O (O O M a0 00 J V M N NC) O (0 O N LO (O I- M V 1- 00 N 00 M O C v O I` 00 00 00 O N O O 00 00 (0 Ln N (0 V O O V N _ O a0 a0 a0 O O O O O O O O O O O O O O 00 O O O O r M M M M M r M M M M M r M M M M M M M M M M ' LO W It O I- N r (O LO W CD It LO V O N W ' J N O N Ln O (0 O N Ln N O (O V (0 (0 0-)1� 00 O LO OD O- O N 00 00 00 0) NM O M 00 M 6 N 6 O O O V O O _ .`�.. O 1- 00 00 O O O O O O 00 O O O O O O V 00 00 O O N N I- 00 (0 (0 (0 (O (O I- M (0 M O (0 (O I- (0 (0 (0 (0 O (0 (0 (0 (0 (0 O (0 O N 00 00 M (O CO V O M LO LO (O V M 00 O LO O O 00 00 CY) J O O (0 N M O (0 (0 I� Lq V O O Ln V� V� N O O 00 Vn M O 0 v O LO 1- 00 (O 00 O N 00 O 00 00 (0 LO LO N LO M O O M O N = O 00 00 00 O O O O O O O O O) O O O O O 00 00 O O O r M M M M M M M M M M M M M M M M M M M M M M 0 O N O N 00 V LO N M N (0 (0 LO LO r Ln O V CO I- Q O 00 O O M O M M M V O N (O Ln (O V� O O O I- O0 V O O O N co LO N M co M N (O O O N O 00 O 00 M [-- .y^.. 0 O O O O O O O O O O O O O O O O O O O O O O W I� r cD r r r r r r r r r r r cD r cD cD r cD O O cD V) w O N N N N N N N O O O O N N O O O O O O O N yO d CD O O 0) O O 00 LO CD CD CD O CD LO CD CDV LO CD LO M O Lo Lo M V LO O N O (D O M O M M M M M M M M M M M M M M M M M M M M M M M O > Q' O O O O O O O O O O O O O O O O O O O O O O O u! (D c a o 0 0 0 6 6 0 6 0 6 6 6 6 6 6 6 6 6 6 6 6 6 0 0 c c U U U U U U U U U U U U U U U U U U U U U U U J F � Z a) a) Ln O O Ln p p N p p p p p N p 00 p C N_ C CO) N N N N J (A a) O N O O (0 a0 O O O O O O O O O O O O O O O N O- .-. a LO O) LO LO N M O LO LO LO LO LO M LO LO LO LO M) V Ln V LO LO O J � .. O O O O N O O O O O 6 O O O O O O O O O O .�+ LO N O) to (0 N NV) LO O 0 M LO LO LO LO N O r O N Q O0 N M _ (O N V I� N (0 N (0 N O0 N Ln O M V O > v O LO. (0 I` I- O O M 00 M 1- 0 0 M I- M M O M M M M M MI- M M M M MI- M M M M M M (D M M M N M � N CO CD CD N 0) to CD(O N N CD 0) 0)N LO CO t O O (O Cl) N O 00 LO M O O (O O LO 00 00 LO M I, N (0 Q > 0 > v O O V 00 (0 00 I� 00 O I` O O O O O 00 O 00 O 00 O I- O 6 O V O 0 O O V O M O I- 00 00 00 M O 00 00 O 00 a) _0 U O LO O N O 1- 1- 1- 1- I- O (0 M I- 1- O M) V O .- Lp = N Ln 00 O O (? Ln M O Ln Ln Ln Ln 00 O M) V Ln Ln I: - Ln O O (� C LL V 00 00 1- 1- 0) LO V V V V V LO V I- V V LO M V (0 .U.. (ce) D N N _ N I- M V _ (0 (0 O I� M O 0) 00 V I- r t` 0)O _ O V N M (O O N 00 LS') O 00 - M 00 M O V O M h (O I- W I� O 1l m � � V N - I- M- O CD V O V N O O CD a0 I` O LL .U.. N � � II 07 l6 LO N O O O M V V V O O (0 W N V 0 O p O N O N N Cl? N V N M 00 V N CO V o a (; (; CD(; CD(; (; CD(; (; CD CD(; (; (; (; (; (; o o (; (; Q N i M a0 LO N I- I� O N M O O Ln M M M M M M V N M M I� N r M M a0 O w 00 O (M (0 O LO 00 (0 (O N 1- 00 N 00 W 00 O 00 Cl) O 00 O CO I- M M (O r M Ln M (O 00 (O M V V (O V V CO (O CO V CO c O U O O O O O O O O O O O O O O O O O O O O O O O �U o v t O N O 1- M 00 a0 V O O CO M M W O O O O V N N O 00 (0 00 LO M 00 V O O 0 M O O O O O O r C IT O M O - V N O Ln (0 O O O I� O N O O O M � O 0? N t J N .`�.. CO O N V 00 V V V V CO N to N O (O W O N (O (0 00 LO (3) J N N LO N (0 (0 00 N ('M N O (0 N N V ('M N I� 00 00 N _ N 0 M 1- 00 O O V LO (0 N LO M_ V 00 N M M 00 O C O O O O O (CD) O (CD) N (CD) N - M M M M N N N LO C m m m m m m m m m m m m m m m 0 m m m m 0 m LO LO N II 3 , O M V LO (O 1� 00 O N W a0 1` 00 O O LO 1� N M M LO Z C Z N N N N N N N M co N N M ('M N V V V V � 0 J LL LU U W N V 1N 00 0)0 N M V 0M I- 00 O O N M V LO (0 N O N N N N N N N N M M M M M M M M M M V V V V V V V O O JC Z d Z N IL E E r� V / N N LO 00 LO 00 0 N 02 V V Ln M O N > > a s� v 07 07 V V 07 V 07 07 LO J V O O (MO O V O LO (D V M M V M M V M I- O O O O O O O O O O i� J W I` 00 Ln W O 00 O Q _ O O O O O O O O O O O N W V w LO 00 M 00 O I- LO J O I` O O V V I� M O UL 0 v (M M N M M N M M N V) Qj (6 O O O O O O O O O O 0 Q 00 (VM W � V O V O M o) a) CY) CY) 0) 0) CY) 0) CY) O � W cD cD cD cD cD cD cD cD cD cD N N N p O LO LO CD (O CD O 0 O r O O r r O r r O � N M M M M M M M M M M 0 > Q' O O O O O O O O O O u! N 0 c CL U U U U U U U U U U p J F s � Z m m Ln Ln Ln Ln Ln Oo Ln Ln Ln Ln J (A 4) O O O O O O O O 0 N Q O ^ I- LO LO LO LO LO LO LO I- 0) J U v rn m v rn O O2 LO N Q N O O O O N > v (M M N M N N M N I— O O O O O O O O O O I- w M w V O V O M r t N G O O 00 00 Ln V 00 V Q > " O O O O O O O O O 00 _0 (6 U I— LO (D LO CY) 0 l0 — N CO Ln Ln V (D Ln N U Q 7 LL V LO V V V V r- V V LO O U .. rn cD o� 1p OR rn ui o CR (q or v N V M N V M (N V r O I I i>7 l6 O (0 (0 I` L O N (M M p 00 O N Ln N 00 CO M o a o 0 0 0 0 0 0 o r o Q _ >1 t CO CO N V CO M V CO CO CO N w O O (M 00 N O O C? O a) V ItI- w to w V V V p U o 0 0 0 0 0 0 0 0 0 �U o v s N N N IT ^ N O _ CD O CD CD V I` 00 LO O O O O N N t J N .`�.. OM CO N CO N O 0) N O O N M O r- LO O N N E N V I— M V LO (D N N C N (CD) — # # _ # LO C m m m m m m m U? — UO UO U U UO U U 0 0 0 LO in u 3 2:1 £p O 00 w 6) O O N (M LO r Z N Z V N V LO V LO LO (N 0 J LL U) U W N r 00 O O N () V LO O N O V V V LO L(') LO LO LO LO LO O O J Z d Z Q N C CO J Z 00 00 O V V 00 O O 00 N L Q � O O O O O O O O O O O O O O O O O O O O O O O N C 0 vi O O O O O O O O O O O O O O O O O O O O O O O N l0 O O 00 M I- N N 00 O O O O M (O LO (O O O O O O N a) O O (0 (O I- 00 CS) N O O O O M N 0..y^.. O O O O (O O O co O O O O O O M O O O O O C t O O Cl) O V V V O O O O N M (O I� N O O O 03 Q. O O O O N O O O O O O O O O O O O O O O N r O O O O O O O O O O O O O O O O O O O O O O O 7 (0 O V O r (O O 00 h 00 LO O (O LO CD NW i O M M M (O M CO CS) M O r rl� M M O) O CO CO O Q^, O - M N (D co M co N N - - - N M V V N M N U) O t O 00 M O M M V O (O (O m M 00 00 O Q. O O N O O O O O O N (D O O O O O O O O O O O O O O O O O O O O O O O 0 � O O M M M O M M O M M M M M M O M O O M M M M M N O O O O O O co O O O CD O CD O O O CD O O O O O CD O CD O CD O CD O O O O O O O CD O CDO O O O O O O O O O CD O CDi O M Lo .n u! L _ ` O O N N N N N N N N N N N N N N N N N N N N N N Q N O O O O O O O O O O O O O O O O O O O O O O O rw'+ C. w O O O O O O O O O O O O O O O O O O O O O O O U O O O O O O O O O O O O O O O O O O O O O O O a O O (n O (n O (n O (n O (n O (n O (n O (n O (n O (n O (n O (n O (n O (n O (n O (n O (n O (n O 0 O 0 O 0 O 0 O E -6 (n O O O O O O O O O O O O O O O O O O O O O O O Z 0) _0 03 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O C .`�.. O N N N N N N N N N N N N N N N N N N N N N N 0 0 Y _ co co O _ O O M M OC\J O N U) O � O O O M N O O 0 O O N O N O N O O O O O O cq O O Ui v .0. m U _ a O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O v O N N N N N N N N N N N N N N N N N N N N N N ._ r+ � O O O O O O O O O O O O O O O O O O O O O O O N J v O M M M M M M M co co co co co co co co co co co co co co M II O U� ME O O O O O O O O O O O O O O O O O O O O O O O N d IS O O O O O O O O O O O O O O O O O O O O O O O Q a v o 0 0 0 (D o o (D o 0 0 0 0 0 (D o (D (D o 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O N J v O M M M M M M M co co co co co co co co co co co co co co M � N O O O O O O O O O O O O O O O O O O O O O O O O O V V V V V V V V V V V V V V V V V V V V V V v c c = O O O O O O O O O O O O O O O O O O O O O O + H U U U U U U U U U U U U U U U U U U U U U U a3 E O O O O N N O O O O O O O O (O O O O M O O O T N O O O O O O O O O O O O O O O O O O O O O O O u1 m U CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CDO r+ Q (D I- O O N N r- (n O) 00 00 M 00 (O O V Cl? N Ln V Ln M N O O N N V (0 O (0 Cl?LS') N (6 a V .U.. O O O O - O O O O O O O O O O O O O O O O O O N V Cl) O O O N O M N O O O O O O (O O O O M O O O O II u1 V .U.. O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O >+ .N C 0) C O M a7 O 00 V LO M I- r- M 00 I- V LO LO 00 - II a O — V M Ln V L? M N O O N N M I- O M M Ln N U .U.. O O O O O O O O O O O O O O O O O O O O O O O O I I E U) 3 O N i N M V O N M V (O I- CO O O W O N M O (DZ' N 2 CD CD O O N O N CD N O N O N O N O N N CDCD N N O N N N CD (') ('o CD ('o O ('o O ('o M Z - - p CO [0 [0 [0 [0 [0 [0 CO [0 CO [0 [0 [0 [0 [0 [0 [0 [0 [0 [0 [0 [0 N C U) U U U U U U U U U U U U U U U U U U U U U U W U) U 0) W N O N M V Ln (D I- a0 0)N O M a0 63 O N N N M N 0-Z 0 J Z N f0 IL 0. d CO J Z O M n a0 M O N aO a0 M V L Q O O O O O O O O O O O O O O O O O O O O O O O N C 0 vi O O O O O O O O O O O O O O O O O O O O O O O N -O l0 M O LO 0 O V V N M Ln (O 00 LO O 00 O V O Cl) O O O O N i O O ('M O I- M O Ln r Ln V OR 00 a0 O 00 M N (0 I- I` LO r N O N O O O M CD O O N O V (O O O N V C .y^.. r LO O V N N M O M N V M V (O N I'- (O M V M co Q O O O O O O O O O O O O O O O O N r O O O O O O O O O O O O O O O O O O CD O O O O 7 la O N LO M M V CO N V W V) I- O O O O V W (O V O O O i (33 M M (33 Lf) V (O O O M O C 7 (O 00 (0 O 00 V V N Q^, M M M N N M V Lo M N M N M V (D V V Co Co N V U) O M M_ V (O N M M M N (D O O O O O O O O O O O O O O O O O O O O O O O 0 O M M O M M M M O M M M M M O M O M M M M M M O N O O O O O co i O O . O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O CD O CD O CDO O O M LS') .N � u! M O L _ 9 N N N N N N N N N N N N N M N N N N N N CM) N Q N O O O O O O O O O O O O O Cl? O CDO O O O O M CDrw'+ 7 co w O CD CD O CD O CD O CD CD CD O CD CD CD CD CD CD CD CD O O O U O CD O O O O O O O O O O O co O O O O O O O co O -_ a Lo O Lo O Lo O Lo O Lo O Lo O Lo O Lo O V) O V) O V) O V) O V) O M M 0 O 0 O 0 O 0 O 0 O 0 O 0 O M M 0 CD -6 (n O O O O O O O O O O O O O O O O O O O O O O O Z N _0 03 O O O O O O O O O O O O O O O O O O O O O O O U O O O O O O O O O O O O O O O O O O O O O O O C Y V LO O V O M O N V M O O N O O O 03 O O O O � O O O O O � O � O O O O O O cli � .O. U) .. m _U a O O O O O O O O O O O O O O O O O O O O O O O r+ O O O O O O O O O O O O O O O O O O O O O O O � } >= O O O O O O O O O O O O O O O O O O O O O O O N w J v M M co M co M co co co co co M M (O M (O M M M M M M (O II _0 O UL ME O O CD O O O O O O O O O O CD O O CD O O O O O O O CD O N a O O O O O O O O O O O O O (V O (V O O O O O O (V Q a v o o (D o 0 0 0 (D o 0 0 0 0 o — o 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O M co co M co M M co M M M M M O M (O O M M M M O (O � N O O O O O O O O O O O O O O O O O O O O O O O O V O V V V V O V < v c c E E E E E E E E E E E E E C7 E E C7 E E E E E + H U U U U U U U U U U U U U 0 U U 0 U U U U 0 U a3 E LO O O V N O O O O M O M O N O I- O I` LO O T N O O O O O O O O O O O O O O O V O O O O O O am U CD CD CD CD CD CD CD CD CDO CD CD CD CD CD CD CD CD CD CD CD CDO r+ Q LO (O O V (O 00 (O O 00 LO V (O LO (O I` It M 00 m LO O I` (O 00 M M O N LO V N LO V (O r V co LO M I- M M M CDO a O N O O O O O O O N V Cl) O O V N O O O O O O O O O O O 00 O O I- O O II a O CD O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O >+ .N C 0) C O M LO M W co (O I- W LO (O I- M 07 M M W M I- W - II a M O N Ln V N L? M I- W V M Ln M V O C.? M M O O O O O O O O O O O O O O cli O O�O O O O O O O I I E U) _=5 0 N O N i _ CD (O CD I- CD CO CD O CD O V O O W O N LO N M 00 O M M (O I� M N N Z 41 M M M M N N N M * N Z k k k k k k k k k k k k k _ k in k k k k Tt in E — [0 m [0 [0 [0 [0 [0 [0 m [0 m [0 in [0 U [0 [0 [0 [0 U — U U U U U U U U U U U U U U 0 0 U U U U 0 0 LL U) U N W N V Lo CO I- co 0) O N M V (O I- M O O N M r LO (O O d 0 Z O J Z N N N N N N M M M M co co co M M M V V V V V V V co N N IL Q N COJ Z L Q „ O O O O O O O O O O N C 0 vi O O O O O O O O O O N l6 (O 00 O O O I,- r 00 N O N i V O O V N (O Ln r V I� V (O O (O O O N V LO C .y^.. t LO a7 O a7 M O V 00 N Q. O O O O O Oco N "" O O O O O O O O O O 7 4LO 00 4LO C) 00 cli 41 L V O M V V LO U) m O t a7 00 (O a7 M O V 00 Q. O . O O N (D O O O O O O O O O O 0 O O O M M O M M O O O N O O O O O O i O O O O CD O CDO O O O O O O O O O O Oco O M Lo (n u! M N Ln L _ ` N N N N N N N (') O V Q N x O O O O O O O M O rw'+ 7 w O CD CD O O O O O O O U — O O O O O O O M O E O O O O O O O O O O N _0(n 03 O O O O O O O O O O O O O O O O O O O O C 0 Y _ Q1 Q) 0 N O 0 O Q) 0 M O 0 M O Q) Q) Q) (O w 03 03 03 03 03 03 N (_) a O O O O O O O O O O C: r+ O O O O O O O O O O � } O O O O O O O O O O a) w J .`�.. (O (O ('M On (O On ('M (O (O (O II R � 0 N w O O O O O O O O O O O O O O O O d a cli O O � O O � � � Q a� CD CD 0 0 E 0 0 0 0 0 0 0 0 0 0 N J v (D (D M co (O co ('M O O O � N O O O O O O O O O O O v CL O O O O O O O + H U U U U U U U 0 0 0 (D E T o 0 0 0 0 0 0 0 0 0 U+ m u o 0 0 0 0 0 0 0 0 0 r+ Q Il- O O V) (O CO O V) N V O) Lo O co I- LO M O (O a O (DO O N N V (M N N O O 00 O O O O O II a O CD O O O O O O O O O O O O O O O O O >+ .N C 0) C (O 00 (O O N N O I- M — II a � (q � � Ln o U .V.. O O O O O N O O I I E U) 3 0 N O LO O - - U U m in U m m A) w � 0 v 00 v LO Ln LOLOLo L`o (LO 0 0-z J Z & 11 � � � _0 7E (1) 4-0 � � � CL O � � co LO 0 C C 0 � � � � � � L E % I 2 � \ 5 y / 7 c 2 \ a m ) \ y c d § ± 2 ƒ ® _ / E 5 0 $ LO \_ x a) ; 2 $ k / c # � 3 � 5 c / \ m . 7 (D 5 & E <:> � qa) 07 (D � � / CL 2 a)m E E � / a f E % C� _ \ 7 M 6 O �f E .0 f � � w C \ ¥ M o E E / *a)% & \ rn m a N r r L c� 0- a) cn � m J T (V O a .. LO 70 M (0 a) C m U) VJ L ` 3 V NZ3 LO _' E Q a) cl L M a) CV = .. O M CV LO (D T (n X .. O a) U J CV Z 1 � (D T � 1 Ic— 0 a) 1 Q o m � ... N O da m N 07 O 1 Q N T 1 1 0 1 I� 1 1 tS� Q 6n 1 a) q ' C 1 J 1 O O ' 1 c co a) J to O U O .. O m (n T QU "T .. (6 L O � U C� (n O � � U O C U �- CD LA (n T LA U U 'ITC .. L6 a) 0 U LL E ) _ o a) a c J (1) rn m a w /\ 4-0 _0 ^E W 4-0 ,L^ V^ CL O L L c .. O m J CV O N N N .. M 7 C 00 m a) CL U L (D N a) � CV m � O N ._. M L C Q a) cl L O a CV � .. O co LO M Cl? to X .. O N U J co 08 O Z Ic- co I� qj 7 + a) O N S.O 0 p� O 1 0 1 O (D � ... N C i C) 1 � ' (D O i 0 i � 1 Q 7i a) REP q3 r (D J 0) o c -- M a) J � O U� m � O U� Q .. M N U C� in O O U .. O — U LA Lo LA U M a) 0 ULL E A) _ o a) a c J rn m a N N r /\ 4-0 7E 41 L CL O L L c� 0- a) cn � m J T (V O a .. LO 70 M (0 a) O_ m U) VJ L ` 3 V NZ3 M � O a) N E.. Q a) cl L Ln y T _' O `Z3 V coM LO M Cl? to X .. O a) U J M O z C%j � M M Ic— .. O * U) a) o -- cn m U) O O .. N C - O -J r%4 m a) � O , L O � N T j C94, L. LL'S Q- LC5 a) 113 Y O IL L} J to (D U O .. O m to co U 0)M.. (6 N U C� (n O � � U O C LA C to co LA U .. O Ncu a) C U LL E a) _ o a) a c J rn m a V r N L c� a) cn c Mom, ly J T N (D CV 7 C 0") (0 a) C m VJ U) L M ` 3 V NZ3 LL M a) ._. M L C Q a) cl L N a) N � .. O O M O M Cl? to X .. O a) U J M O z M M cq U) Z3 a) Q O U� U) c CD O O .. N C — O da r%4 m a) 07 O 1 I L (n N T I O i S I Q •� L"'7 a) Q q3 C O O co CA J � Un O U O .. O m Lo .. MU O (6 U C� O � �) U O C LA Lo LA L U ..4 O a) C U LL E a) _ o a) M d C J (1) rn m a M r M w /\ 4-0 _0 ^E W 4-0 ,L^ V^ CL O L L c .. O m J T CV O CV N .. O 00 7 C 00 m N CL } T Q 0 3 V N L� 00 Q a) L I� y T _' 0 `Z3 V 00 O LO L O (n `� 0 a) /x VJ J LO M O Z O I .. O r6 U) N N N Q .. O iIO O 1 ' 1 r ' (D ' O CNI C i C) F9 1 O L N L 1 1 L j CL Elm a) l ' 113 O C .. M N J to O U M M� W U ~ M T U C� n O � � U O C U �- CD LA C LA U O C 0 U LL E m �# N O N d J � 2 0 2 � k k L) o � c � @cn � d U- § . k 2 r- = 2 CL . a -i k ) k $ \ } ® } \ 3 2 \ \ ! § 5 / \ Hemby Place Engineering Project Report Section 3: Storm Drain Calculations Storm System 400 Analysis 0) rn IL E E cn N N (MO Cl) O >a w (D M M J V (O O 00 O N O) C v 00 O O M O 2 ao rn 0) 0) (D (D J M (O O a7 N E-)( Ln O) _ O ^ 00 0000 00 O) M O N O O O (O (O OD (O 0') (O N 00 J (MO (MO O W (MO L N O v 1` 00 O) O) 00 00 2 w m m m w w 0 4LO (D (D (D 4LO 4LO O O N M M O OQ V � W cD cD cD cD cD cD V) w 0 N O N N N N p (DO LO O Lo O O O to la d M M M M M M > 0 J C U U U U U U a� Z J (n N N O CL ^ CO O N O J � o O N co LO N O O LO N O- M Ln Ln N > : v 1` 00 O) N m 00 00 00 O) 00 O — (O (O (O (O (O (O W W LO M LO M W N C v (O 1` 00 O) I— 00 N 00 00 00 00 00 00 OM CD LO V L() O N 00 Q 7 LL V 00 V I- O) N V U ui 0) O LO N } z N I� (O M O O LL .V.. (D M N — co co I I p) {� N O M 0 V a O C N N N N V M n O O o E o (n c (O (O I- I- ll-� ll-� o w O O Co. O M m O O M O M E O O �% 0 0 (D 0 o N < �U x LU t LO N LO r LO V) IT cNo m (q LO LO 0)o + J J _^ ... V ((O LM LO V LO x E W _ O N O N _ N M V O C O O O O — N ELO w in in0 Lo LO r` u 2 Z N M N (n p J O O jL U) r N M V LO (O U a) W 0) O O JZ a z Q N COJ Z L Q O O O O O O N C 0 vi O O O O O O l0 _ I� _0 O O N O N � i M Lp Cp a � .y^.. M O O I� W t M LO Cl) V M N N co Q O O O O O O O O O O LO O LO O O L C O Q^, co N co I- (n O t MO o M_ V M N O N (D O O O O O O 0 O O M M M O M N O O O O O O O O co i O O O O O O M N N 7E O O O O co V L _ ` O N O O O O O O rw'+ 7 C. w O O O O O O U CD CD CD CD co — ,CT O O O O O E _0 N cn w O O O O O O Z -0 m O O O O O O O O O O O O C 0 Y O O O O � O N s7 (n v C13 O O O O .0. m () a O O O O O O r+ O O O O O O O � } O O O O O O N w J v co M M co (O M II O N `c O O O O O O L a O cli Q a v (o 0 0 0 0 E o 0 0 0 0 0 _ N J v O O M co O O � N O O O O O O O L 7 O O V V O O < v c c. + (7 0 (7 (7 H 0 0 U U 0 0 aD E T o 004 0 o LLq C'1 m u o 0 0 0 0 0 Q r N r W (M O E a V .V.. O O O O N m N V X Cl) O O Cl) O O W E II O O O O LLq O O p .N X M N LO V O W — _ II a N o N r 0 M o r M o0 C'1 U 0 r 0 � o E u O N � N 7 0 N _ M r m i O_ O O NT O V I� Z V V N X. [0 in 0 m 0 W U U 0 0 IL U N W � m O O N M V LO (.0 a_Z J Z rn m a I r-1 oomm\ W 7E T L 0 /Y O L L c� 0- a) cn � m J T (V O (p (`V .. 70 O (0 a) C m U) VJ L ` 3 V NZ3 00 00. E Q a) cl L ({i a) O V O x O a) U) J O O Z CD O y L U V a) Q .2 �� (n � VJ j 1 1 1 T 1 O � da t'�1 a) (D (D i U Q � i r L 1 Q T a) J � O O .. M J to O U (D m t� N U M U C� IF U T C LA C in o0 LA U U N C cu 0 U LL E a) o a) T ^ I..L J rn m a N 0 W L t� a) T M0- W J T CV LO C)Lq CV N .. LO 7 C 00 m N CL L I� N a)O y O V N L� LO LO LO a) cl L I� N O V + O CO `� O a) /x VJ J O v C�1 O Z O m N O N 0 ° O � o (D .. N R� C) r qj +� O #+ i N 0 i Q •� N C�1 � q3 � O J + O .. M J UT Q .. O m t� N U M U C� O � �) U O u L A O LA U C U IL E_ U N a)N O d C J rn m a M O it r�1 R L c� 0- a) cn � m J T (V O a .. LO 70 M (0 a) C m U) VJ L ` 3 V N 00 _� i C T Q a) cl L M a) CV = .. O co 1 (O 1 X O C U i 1 J a co i i z CA) M (D 1 O l U) ; U 1 1 Z3 1 (� _ a) Q o m 1 1 (D .. N CV 1 1 a) 07 O r1� i 1 U N 1 j � 1 1 1 1 Q 1 a) 1 Q r J O 1 .. +� O 1 C (O i a) � i J 1 1 (� (D � U O .. O m t� N QU N .. (6 LO U C� ti r3 IF U LO C `� T LA C LA U U O C 0 U LL E a) a) LO a J rn m a r-1 L LO � m J T CV O CV 7 C 00 m a) CL a) a T Q 0 3 V N Q a) cl L I� y T _' 0 `Z3 V `� 0 a) /x VJ J O Z � o o m cn Z3 C� O qa DMNO .. o 0 e O 0 i L O r i N R� C) r i C) +� (D CD i r + Q a) J O O O7 .. M J U _ Q- �I T M� W 0 U 00 � T U C� � U O C U �- CD LA LA U co U U- E m _ a) o a J Hemby Place Engineering Project Report Section 4: Sediment & Erosion Control Erosion Control Calculations Hemby Place Engineering Project Report Section 4: Sediment & Erosion Control Initial Phase Erosion Control Basin Calculations Hemby Place Engineering Project Report Section 4: Sediment & Erosion Control Initial Sediment Basin #1 Hemby Place Weddington, North Carolina Project Number: 4727 09/08/21 Rational "C" Values 24 Hour Storm Event Initial Sediment Basin #1 Recommended Runoff Coefficient Values Used From Char-Meck Storm Water Design Manual Total Drainage Area = 13.64 ac. Paved Roads/Sidewalk/Stractures 0.00 ac. C = 0.95 Wooded Area 0.00 ac. C = 0.25 Lawns C = 0.3 0.00 ac. Newly Graded 13.64 ac. C= 0.6 Composite C 0.600 PROJECT NAME: Hemby Place PROJECT #: 4727 DESCRIPTION: Initial Sediment Basin #1 POND STORAGE VOLUME: DATE: 8-Sep-21 DESIGNER: B.N. ENGINEER: C.R.B. DESC. CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Bottom 682.00 5,908 0.0 0 684.00 27,793 2.0 31,010 31,010 686.00 37,984 4.0 65,512 96,522 688.00 43,054 6.0 80,985 177,507 Riser Weir 690.00 48,343 8.0 91,346 268,852 691.00 51,096 9.0 49,713 318,565 Top 692.00 53,849 10.0 52,466 371,031 Type of Basin: Drainage Area: Denuded Area: Req. Volume: Provided Volume: Spillway Length: Top of Basin/Berm: Spillway Elevation: Riser Weir Elevation Cleanout Elevation: Bottom of Basin: "C" Value: Q2=(13.64Ac.)(3.64 in/hr)(0.6) Q2= 29.79 cfs Q10=(13.64Ac.)(5.33 in/hr)(0.6) Q10= 43.62 cfs SA = (Q10)*(435) SA= 18,975 sq.ft. SA @ Design storage at Weir --- Sediment Basin #1 13.64 Acres 13.64 Acres 24,552 Cubic Feet 268,852 Cubic Feet (@ Weir) OK 20 Feet 692.00 Riser: 5' x 5' I.D. Precast Concrete N/A Barrel: 42" 96.2 LF RCP @ 0.50% 690.00 Inv In: 678.48 683.50 Inv Out: 678.00 682.00 0.600 43,054 sq.ft. SA Design Storage greater than SA required Storage *Baffles required in basin. *Skimmers are required in basin OK PROJECT: Hemby Place DATE: 8-Sep-21 PROJECT REF: Project Number: 4727 DESIGNER: B.N. DESCRIPTION: Initial Sediment Basin 41 ENGINEER: C.R.B. Initial Sediment Basin #1 Reuired Volume ft3 Required Surface Area ft2 Values from RJHA Sediment Basin Worksheet Required Volume to Dewater within 2-5 days. Use Spillway Capacity Sheet to Size Primary and Emergency Spillways -Skimmer Size (inches) 0.333 Head on Skimmer (feet) -Orifice Size (1/4 inch increments) 4.60 Dewatering Time (days) Flow Through Skimmer q = 5332.05 ft /day q = 0.06 ft3/sec q = 0.06 ft3/sec Standard SCH 40 PVC Pipe Sizes (Inches) 0.50 Orifice Size Shall 0.75 Be Equal to One 1.00 Of These Sizes 1.25 1.50 2.00 2.50 3.00 4.00 5.00 6.00 Skimmer Size Head on Orifice (Inches) (feet) 1.5 0.125 2 0.167 2.5 0.208 31 0.25 4 0.333 5 0.333 6 0.417 8 0.5 Skimmer Sizes as Manufactured by Faircloth (Standard Sizes) Skimmer size should be a min. 1-pipe size bigger than orifice Orifice size shall equal skimmer arm size (arm connects to outlet pipe) Project Name: Ballast Pad Design Sediment Basin #1 RJH Ref #4727 Riser Size (6ft x 6ft O.D.): Riser Size (5ft x 5ft I.D.): Barrel Size: Top of Basin: Bottom of Basin: Riser Weir: Top of Riser Weir: Bottom of Riser Structure: Spillway Height from top of Basin: Assumptions ' Water buoyancy in affect until bottom of the basin structure. ' Unit weight of concrete at 150 IMP Hemby Place 0 ft. Spillway Height 36 ft' 692 ft. Spillway Elev. 25 ft' 690 ft. Riser Weir 42 in 1,J(,6"x 6' O.D.): 692 ft. 682 ft. 690 ft. 13 ft. 690 ft. 678 ft. 0 ft. 682 ft. Bottom of Basin Bottom of Riser Structure Uplift at Peak Elevation: Ballast Pad Peak Elevation =690 ft. - 678 ft. 10.5' x 10.5' x 2.5' Peak Elevation = 12ft. Uplift Force= (62.4 Ib/ftl)(13 ft.)(36ft2) Uplift Force= 29203.2 lb Volume of Concrete Required to Stabilize Riser: 29203.2 Ibs X 1/150 Ibs/ft'= 194.688 ft' Volume of Concrete Within Riser: Weight of Concrete Within Riser: [(6'x6'x13ft.)-(5'x5'x{13ft.-0.5ft.)})]x1501bs/ft'= 21675 lb '6" topper included in precast riser Volume of Concrete Within Riser: 21675 Ibs X 1/150 Ibs/ft'= 144.50 ft' 51 in.O.D. RCP X 6in. -7.09 ft' Barrel O.D. N/A ft' 6" DIA x6" -0.10 ft' Orifice Total volume of concrete in riser = 137.31 ft' 692 ft. Top of Basin Stone Bedding 42 in. RCP Ballast Pad Dimensions: Volume of Concrete Within Ballast Pad: 10.5' x 10.5' x 2.5' 275.625 ft' Weight of Concrete Within Ballast Pad: 275.625ft' x 150 IMP = 41343.8 lb Buoyancy of Ballast Pad : 62.4 IMP x 98 ft' = 17199 lb 'Assume ballast pad has buoyance neglecting soil embedment Total Weight of Concrete in Riser Incld. Ballast = 61940 lb = (137.31ft' + 275.625ft3) x 150 IMP Total Weight Required to Prevent Uplift = 46402.2 lb = (29203.21b + 171991b) Factor of safety = 1.33 10 ft. Hemby Place Engineering Project Report Section 4: Sediment & Erosion Control Initial Skimmer Basin #1 Hemby Place Weddington, North Carolina Project Number: 4727 08/04/21 Rational "C" Values 24 Hour Storm Event Initial Skimmer Basin 1 Recommended Runoff Coefficient Values Used From Char-Meck Storm Water Design Manual Total Drainage Area = 4.53 ac. Paved Roads/Sidewalk/Stractures 0.00 ac. C = 0.95 Wooded Area 0.00 ac. C = 0.25 Lawns C = 0.3 0.00 ac. Newly Graded 4.53 ac. C= 0.45 Composite C 0.450 PROJECT: Hemby Place PROJECT #: 4727 DESCRIPTION: Initial Skimmer Basin 1 POND STORAGE VOLUME: DATE: 4-Aug-21 DESIGNER: B.N. ENGINEER: C.R.B DESC. CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Bottom 698.00 12,087 0.0 0 699.00 13,750 1.0 12,909 12,909 700.00 15,469 2.0 14,601 27,510 Spillway 701.00 17,244 3.0 16,348 43,858 Top 702.00 19,071 4.0 18,150 62,008 Type of Basin: Drainage Area: Denuded Area: Req. Volume: Provided Volume: Spillway Length: Top of Basin/Berm: Spillway Elevation: Cleanout Elevation: Bottom of Basin: "C" Value: Q2=(4.53Ac.)(5.33 in/hr)(0.45) Q2= 10.87 cfs Q10=(4.53Ac.)(6.92 in/hr)(0.45) Q10= 14.11 cfs SA = (Q10)*(325) SA= 4,585 sq.ft. SA @ Design storage at Weir --- Skimmer Basin 4.53 Acres 4.53 Acres 8,154 Cubic Feet 62,008 Cubic Feet (@ Weir) 10 Feet OK 702.00 701.00 Barrel: 4" 54.9 LF HDPE @ 3.64% Inv In: 698.00 699.50 Inv Out: 696.00 698.00 0.450 19,071 sq.ft. SA Design Storage greater than SA required Storage *Baffles required in basin. *Skimmers are required in basin PROJECT: Hemby Place DATE: 4-Aug-21 PROJECT REF: Project Number: 4727 DESIGNER: B.N. DESCRIPTION: Initial Skimmer Basin 1 ENGINEER: C.R.B Initial Skimmer Basin 1 Required Volume ft3 Required Surface Area ft2 Values from RJHA Sediment Basin Worksheet Required Volume to Dewater within 2-5 days. Use Spillway Capacity Sheet to Size Primary and Emergency Spillways Skimmer Size (inches) 0.208 Head on Skimmer (feet) 1.5 Orifice Size (1/4 inch increments) 3.44 Dewatering Time (days) Flow Through Skimmer q = 2370.42 ft /day q = 0.03 ft3/sec q = 0.03 ft3/sec Standard SCH 40 PVC Pipe Sizes (Inches) 0.50 Orifice Size Shall 0.75 Be Equal to One 1.00 Of These Sizes 1.25 1.50 2.00 2.50 3.00 4.00 5.00 6.00 Skimmer Size Head on Orifice (Inches) (feet) 1.5 0.125 2 0.167 2.5 0.208 31 0.25 4 0.333 5 0.333 6 0.417 8 0.5 Skimmer Sizes as Manufactured by Faircloth (Standard Sizes) Skimmer size should be a min. 1-pipe size bigger than orifice Orifice size shall equal skimmer arm size (arm connects to outlet pipe) Project Name: Hemby Place Date: 8/4/2021 Location: Weddington, NC By: B.N. Description: Initial Skimmer Basin 1 - Riprap Discharge Apron 3 0 Runoff Discharge Information Culler {I pQ La Q10 = 0.03 cfs envier ICUI r ti 0.5� Pipe Dia. = 4 in. Apron Sizing mxen9xn� �J 50 �ro Length = 10 ft. °p --' { ....... Width = 10.33 ft. aq . 1 3Do @ Pipe = 1 ft. 5 use 10'min. Riprap Stone Sizing (00) d50 Size (Avg) = 0.3 ft. { d50 Size (Max.)* 0.45 ft. Min. Depth** = 15** in. use 15" min. * equal to L5*d50 average stone size * * min. depth no less than 15" NOTES: Discharge(Olsec) 1.0 Riprap aprons to be sized for 10-year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 3*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet ***Barrel size from BMP calculations (worse Case) Riprap Q10 from Erosion Control CIA. (worse case) z in Hemby Place Engineering Project Report Section 4: Sediment & Erosion Control Initial Skimmer Basin #2 Hemby Place Weddington, North Carolina Project Number: 4727 08/04/21 Rational "C" Values 24 Hour Storm Event Initial Skimmer Basin 2 Recommended Runoff Coefficient Values Used From Char-Meck Storm Water Design Manual Total Drainage Area = 1.58 ac. Paved Roads/Sidewalk/Stractures 0.00 ac. C = 0.95 Wooded Area 0.00 ac. C = 0.25 Lawns C = 0.3 0.00 ac. Newly Graded 1.58 ac. C= 0.45 Composite C 0.450 PROJECT: Hemby Place PROJECT #: 4727 DESCRIPTION: Initial Skimmer Basin 2 POND STORAGE VOLUME: DATE: 4-Aug-21 DESIGNER: B.N. ENGINEER: C.R.B DESC. CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Bottom 674.00 2,794 0.0 0 675.00 3,708 1.0 3,240 3,240 676.00 4,729 2.0 4,208 7,448 Spillway 677.00 5,809 3.0 5,260 12,707 Top 678.00 6,945 4.0 6,368 19,076 Type of Basin: Drainage Area: Denuded Area: Req. Volume: Provided Volume: Spillway Length: Top of Basin/Berm; Spillway Elevation: Cleanout Elevation: Bottom of Basin: "C" Value: Q2=(1.58Ac.)(5.33 in/hr)(0.45) Q2= 3.79 cfs Q10=(1.58Ac.)(6.92 in/hr)(0.45) Q10= 4.92 cfs SA = (Q10)*(325) SA= 1,599 sq.ft. SA @ Design storage at Weir --- Skimmer Basin 1.58 Acres 1.58 Acres 2,844 Cubic Feet 19,076 Cubic Feet (@ Weir) 10 Feet OK 678.00 677.00 Barrel: 4" 29 LF HDPE @ 6.9% Inv In: 674.00 675.50 Inv Out: 672.00 674.00 0.450 6,945 sq.ft. SA Design Storage greater than SA required Storage *Baffles required in basin. *Skimmers are required in basin PROJECT: Hemby Place DATE: 4-Aug-21 PROJECT REF: Project Number: 4727 DESIGNER: B.N. DESCRIPTION: Initial Skimmer Basin 2 ENGINEER: C.R.B Initial Skimmer Basin 2 Required Volume ft3 Required Surface Area ft2 Values from RJHA Sediment Basin Worksheet Required Volume to Dewater within 2-5 days. Use Spillway Capacity Sheet to Size Primary and Emergency Spillways -Skimmer Size (inches) 0.167 Head on Skimmer (feet) -Orifice Size (1/4 inch increments) 3.01 Dewatering Time (days) Flow Through Skimmer q = 944.00 ft /day q = 0.01 ft3/sec q = 0.01 ft3/sec Standard SCH 40 PVC Pipe Sizes (Inches) 0.50 Orifice Size Shall 0.75 Be Equal to One 1.00 Of These Sizes 1.25 1.50 2.00 2.50 3.00 4.00 5.00 6.00 Skimmer Size Head on Orifice (Inches) (feet) 1.5 0.125 2 0.167 2.5 0.208 31 0.25 4 0.333 5 0.333 6 0.417 8 0.5 Skimmer Sizes as Manufactured by Faircloth (Standard Sizes) Skimmer size should be a min. 1-pipe size bigger than orifice Orifice size shall equal skimmer arm size (arm connects to outlet pipe) Project Name: Hemby Place Date: 8/4/2021 Location: Weddington, NC By: B.N. Description: Initial Skimmer Basin 2 - Riprap Discharge Apron 3 Runoff Discharge Information Out�e1 L:::n = , ' La P'Fe I" Q10 = 0.01 cfs diameter IC41 1 Pipe Dia. = 4 in. Apron Sizing ve ]� -q I' Length = 10 ft. I. Width = 10.33 ft. � I 3Do @ Pipe = 1 ft. use 10' min. Riprap Stone Sizing (00) .. .�. d50 Size (Avg) = 0.3 ft. 1p _ d50 Size (Max.)* 0.45 ft. . =x Min. Depth** = 15** in. use 15" min. - * equal to L5*d50 average stone size 5to zo * * min. depth no less than 15" NOTES: 50 Discharge (10/secj 1.0 Riprap aprons to be sized for 10-year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 3*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La = Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet ***Barrel size from BMP calculations (worse Case) Riprap Q10 from Erosion Control CIA. (worse case) r Hemby Place Engineering Project Report Section 4: Sediment & Erosion Control Initial Phase Temporary Ditch Calculations Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Temp. Ditch #1 Triangular Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 702.91 Slope (%) = 2.00 N-Value = 0.026 Calculations Compute by: Known Q Known Q (cfs) = 20.90 Elev (ft) Section 705.00 704.50 704.00 703.50 703.00 702.50 702.00 Wednesday, Aug 4 2021 Highlighted Depth (ft) = 1.35 Q (cfs) = 20.90 Area (sqft) = 3.64 Velocity (ft/s) = 5.73 Wetted Perim (ft) = 6.04 Crit Depth, Yc (ft) = 1.47 Top Width (ft) = 5.40 EGL (ft) = 1.86 1 2 3 4 5 6 7 8 9 10 Reach (ft) Depth (ft) 2.09 1.59 1.09 0.59 -0.41 _n al Hydrology Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Temp. Ditch 1 DA Hydrograph type = SCS Storm frequency (yrs) = 10 Drainage area (ac) = 3.570 Basin Slope (%) = n/a Tc method = User Total precip. (in) = 5.08 Storm duration (hrs) = 24.00 Q (cfs) 21.00 18.00 15.00 12.00 •M 3.00 Peak discharge (cfs) Time interval (min) Curve number (CN) Hydraulic length (ft) Time of conc. (min) Storm Distribution Shape factor Runoff Hydrograph 10-yr frequency Wednesday, Aug 4 2021 = 20.90 = 1 = 86 = n/a = 5 = Synthetic = 484 Hydrograph Volume = 47,255 (cult); 1.085 (acft) Q (cfs) 21.00 18.00 15.00 12.00 M 3.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 Time (hrs) — Runoff Hyd - Qp = 20.90 (cfs) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Temp. Ditch #2 Triangular Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 706.66 Slope (%) = 2.00 N-Value = 0.026 Calculations Compute by: Known Q Known Q (cfs) = 27.52 Elev (ft) Section 709.00 708.50 708.00 707.50 707.00 706.50 706.00 Wednesday, Aug 4 2021 Highlighted Depth (ft) = 1.50 Q (cfs) = 27.52 Area (sqft) = 4.50 Velocity (ft/s) = 6.12 Wetted Perim (ft) = 6.71 Crit Depth, Yc (ft) = 1.64 Top Width (ft) = 6.00 EGL (ft) = 2.08 1 2 3 4 5 6 7 8 9 10 Reach (ft) Depth (ft) 2.34 1.84 1.34 0.84 0.34 -0.16 _n rr Hydrology Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Temp. Ditch 2 DA Hydrograph type = SCS Storm frequency (yrs) = 10 Drainage area (ac) = 4.700 Basin Slope (%) = n/a Tc method = User Total precip. (in) = 5.08 Storm duration (hrs) = 24.00 Q (cfs) 28.00 24.00 20.00 16.00 12.00 Peak discharge (cfs) Time interval (min) Curve number (CN) Hydraulic length (ft) Time of conc. (min) Storm Distribution Shape factor Runoff Hydrograph 10-yr frequency Wednesday, Aug 4 2021 = 27.52 = 1 = 86 = n/a = 5 = Synthetic = 484 Hydrograph Volume = 62,212 (cult); 1.428 (acft) Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.001 1 1--• ' ' ' ' 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 Time (hrs) — Runoff Hyd - Qp = 27.52 (cfs) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Temp. Ditch #3 Trapezoidal Bottom Width (ft) = 1.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 702.69 Slope (%) = 2.00 N-Value = 0.026 Calculations Compute by: Known Q Known Q (cfs) = 3.75 Elev (ft) 704.00 703.50 703.00 702.50 702.00 Section Wednesday, Sep 8 2021 Highlighted Depth (ft) = 0.46 Q (cfs) = 3.750 Area (sqft) = 1.09 Velocity (ft/s) = 3.43 Wetted Perim (ft) = 3.91 Crit Depth, Yc (ft) = 0.49 Top Width (ft) = 3.76 EGL (ft) = 0.64 0 1 2 3 4 5 6 7 8 9 Reach (ft) Depth (ft) 1.31 0.81 0.31 -0.19 Hydrology Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Temp. Ditch 3 DA Hydrograph type = SCS Storm frequency (yrs) = 10 Drainage area (ac) = 0.640 Basin Slope (%) = n/a Tc method = User Total precip. (in) = 5.08 Storm duration (hrs) = 24.00 Q (cfs) 4.00 3.00 rM 1.00 0.00 ' 1' 0.0 2.0 4.0 6.0 8.0 — Runoff Hyd - Qp = 3.75 (cfs) Peak discharge (cfs) Time interval (min) Curve number (CN) Hydraulic length (ft) Time of conc. (min) Storm Distribution Shape factor Runoff Hydrograph 10-yr frequency Wednesday, Aug 4 2021 = 3.748 = 1 = 86 = n/a = 5 = Synthetic = 484 Hydrograph Volume = 8,471 (cult); 0.194 (acft) Q (cfs) 4.00 3.00 2.00 1.00 ...T--- ' ' - ' 0.00 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 Time (hrs) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Temp. Ditch #4 Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.25 Invert Elev (ft) = 702.56 Slope (%) = 2.00 N-Value = 0.026 Calculations Compute by: Known Q Known Q (cfs) = 14.64 Elev (ft) Section 704.00 703.50 703.00 702.50 702.00 1 1 2 3 4 5 6 7 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Sep 8 2021 = 0.73 = 14.64 = 3.06 = 4.79 = 6.62 = 0.81 = 6.38 = 1.09 8 9 10 11 12 Depth (ft) 1.44 0.94 0.44 _n sr Hydrology Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Temp. Ditch 4 DA Hydrograph type = SCS Storm frequency (yrs) = 10 Drainage area (ac) = 2.500 Basin Slope (%) = n/a Tc method = User Total precip. (in) = 5.08 Storm duration (hrs) = 24.00 Q (cfs) 15.00 12.00 3.00 0.00 ' 1 1 1- 1 0.0 2.0 4.0 6.0 8.0 — Runoff Hyd - Qp = 14.64 (cfs) Peak discharge (cfs) Time interval (min) Curve number (CN) Hydraulic length (ft) Time of conc. (min) Storm Distribution Shape factor Runoff Hydrograph 10-yr frequency Wednesday, Aug 4 2021 = 14.64 = 1 = 86 = n/a = 5 = Synthetic = 484 Hydrograph Volume = 33,092 (cult); 0.760 (acft) Q (cfs) 15.00 12.00 . We 3.00 —r- ' ' ' - ' 0.00 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 Time (hrs) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Temp. Ditch #5 Trapezoidal Bottom Width (ft) = 1.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 685.73 Slope (%) = 2.00 N-Value = 0.026 Calculations Compute by: Known Q Known Q (cfs) = 1.70 Elev (ft) 687.00 686.50 685.50 685.00 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Sep 8 2021 = 0.34 = 1.700 = 0.57 = 2.98 = 2.52 = 0.36 = 2.36 = 0.48 0 1 2 3 4 5 6 7 Reach (ft) Depth (ft) 1.27 0.77 0.27 -0.23 -0.73 Hydrology Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Temp. Ditch 5 DA Hydrograph type = SCS Storm frequency (yrs) = 10 Drainage area (ac) = 0.290 Basin Slope (%) = n/a Tc method = User Total precip. (in) = 5.08 Storm duration (hrs) = 24.00 Q (cfs) 2.00 1.00 0.00 0.0 2.0 4.0 6.0 8.0 — Runoff Hyd - Qp = 1.70 (cfs) Peak discharge (cfs) Time interval (min) Curve number (CN) Hydraulic length (ft) Time of conc. (min) Storm Distribution Shape factor Runoff Hydrograph 10-yr frequency Wednesday, Aug 4 2021 = 1.698 = 1 = 86 = n/a = 5 = Synthetic = 484 Hydrograph Volume = 3,839 (cult); 0.088 (acft) Q (cfs) 2.00 1.00 0.00 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 Time (hrs) Hemby Place Engineering Project Report Section 4: Sediment & Erosion Control Final Phase Erosion Control Basin Calculations Hemby Place Weddington, North Carolina Project Number: 4727 09/08/21 Rational "C" Values 24 Hour Storm Event Final Sediment Basin #1 Recommended Runoff Coefficient Values Used From Char-Meck Storm Water Design Manual Total Drainage Area = 18.29 ac. Paved Roads/Sidewalk/Stractures 5.99 ac. C = 0.95 Wooded Area 0.00 ac. C = 0.25 Lawns C = 0.3 12.30 ac. Newly Graded 0.00 ac. C= 0.6 Composite C 0.513 PROJECT NAME: Hemby Place PROJECT #: 4727 DESCRIPTION: Final Sediment Basin #1 POND STORAGE VOLUME: DATE: 8-Sep-21 DESIGNER: B.N. ENGINEER: C.R.B. DESC. CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Bottom 682.00 26,263 0.0 0 684.00 33,131 2.0 59,261 59,261 686.00 37,984 4.0 71,059 130,320 688.00 43,054 6.0 80,985 211,304 Riser Weir 690.00 48,343 8.0 91,346 302,650 691.00 51,082 9.0 49,706 352,356 Top 692.00 53,849 10.0 52,459 404,815 Type of Basin: Drainage Area: Denuded Area: Req. Volume: Provided Volume: Spillway Length: Top of Basin/Berm: Spillway Elevation: Riser Weir Elevation Cleanout Elevation: Bottom of Basin: "C" Value: Q2=(18.29Ac.)(3.64 in/hr)(0.513) Q2= 34.15 cfs Q10=(18.29Ac.)(5.33 in/hr)(0.513) Q10= 50.00 cfs SA = (Q10)*(435) SA= 21,749 sq.ft. SA @ Design storage at Weir --- Sediment Basin #1 18.29 Acres 5.99 Acres 10,782 Cubic Feet 302,650 Cubic Feet (@ Weir) OK 0 Feet 692.00 Riser: 5' x 5' I.D. Precast Concrete N/A Barrel: 42" 96.2 LF RCP @ 0.50% 690.00 Inv In: 678.48 683.50 Inv Out: 678.00 682.00 0.513 43,054 sq.ft. SA Design Storage greater than SA required Storage *Baffles required in basin. *Skimmers are required in basin OK PROJECT: Hemby Place DATE: 8-Sep-21 PROJECT REF: Project Number: 4727 DESIGNER: B.N. DESCRIPTION: Final Sediment Basin 41 ENGINEER: C.R.B. Final Sediment Basin #1 Reuired Volume ft3 Required Surface Area ft2 Values from RJHA Sediment Basin Worksheet Required Volume to Dewater within 2-5 days. Use Spillway Capacity Sheet to Size Primary and Emergency Spillways -Skimmer Size (inches) 0.333 Head on Skimmer (feet) -Orifice Size (1/4 inch increments) 2.02 Dewatering Time (days) Flow Through Skimmer q = 5332.05 ft /day q = 0.06 ft3/sec q = 0.06 ft3/sec Standard SCH 40 PVC Pipe Sizes (Inches) 0.50 Orifice Size Shall 0.75 Be Equal to One 1.00 Of These Sizes 1.25 1.50 2.00 2.50 3.00 4.00 5.00 6.00 Skimmer Size Head on Orifice (Inches) (feet) 1.5 0.125 2 0.167 2.5 0.208 31 0.25 4 0.333 5 0.333 6 0.417 8 0.5 Skimmer Sizes as Manufactured by Faircloth (Standard Sizes) Skimmer size should be a min. 1-pipe size bigger than orifice Orifice size shall equal skimmer arm size (arm connects to outlet pipe) Project Name: Ballast Pad Design Sediment Basin #1 RJH Ref #4727 Riser Size (6ft x 6ft O.D.): Riser Size (5ft x 5ft I.D.): Barrel Size: Top of Basin: Bottom of Basin: Riser Weir: Top of Riser Weir: Bottom of Riser Structure: Spillway Height from top of Basin: Assumptions ' Water buoyancy in affect until bottom of the basin structure. ' Unit weight of concrete at 150 IMP Hemby Place 0 ft. Spillway Height 36 ft' 692 ft. Spillway Elev. 25 ft' 690 ft. Riser Weir 42 in 1,J(,6"x 6' O.D.): 692 ft. 682 ft. 690 ft. 13 ft. 690 ft. 678 ft. 0 ft. 682 ft. Bottom of Basin Bottom of Riser Structure Uplift at Peak Elevation: Ballast Pad Peak Elevation =690 ft. - 678 ft. 10.5' x 10.5' x 2.5' Peak Elevation = 12ft. Uplift Force= (62.4 Ib/ftl)(13 ft.)(36ft2) Uplift Force= 29203.2 lb Volume of Concrete Required to Stabilize Riser: 29203.2 Ibs X 1/150 Ibs/ft'= 194.688 ft' Volume of Concrete Within Riser: Weight of Concrete Within Riser: [(6'x6'x13ft.)-(5'x5'x{13ft.-0.5ft.)})]x1501bs/ft'= 21675 lb '6" topper included in precast riser Volume of Concrete Within Riser: 21675 Ibs X 1/150 Ibs/ft'= 144.50 ft' 51 in.O.D. RCP X 6in. -7.09 ft' Barrel O.D. N/A ft' 6" DIA x6" -0.10 ft' Orifice Total volume of concrete in riser = 137.31 ft' 692 ft. Top of Basin Stone Bedding 42 in. RCP Ballast Pad Dimensions: Volume of Concrete Within Ballast Pad: 10.5' x 10.5' x 2.5' 275.625 ft' Weight of Concrete Within Ballast Pad: 275.625ft' x 150 IMP = 41343.8 lb Buoyancy of Ballast Pad : 62.4 IMP x 98 ft' = 17199 lb 'Assume ballast pad has buoyance neglecting soil embedment Total Weight of Concrete in Riser Incld. Ballast = 61940 lb = (137.31ft' + 275.625ft3) x 150 IMP Total Weight Required to Prevent Uplift = 46402.2 lb = (29203.21b + 171991b) Factor of safety = 1.33 10 ft. Hemby Place Engineering Project Report Section 5: Pre & Post Analysis Pre & Post -Development Summary Hemby Place Weddington, North Carolina Project Number: 4727 September 13, 2021 DOWNSTREAM POINT OF ANALYSIS Pre vs. Post Hvdroloav Area 1 YR 2 YR 10 YR 25 YR 50 YR 100 YR (acres) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) Pre -Development Flow (cfs) Pre-DA #1 54.15 5.59 15.64 58.69 92.45 121.58 153.88 Pre-DA #2 3.68 0.79 1.82 5.76 8.65 11.12 13.85 Pre-DA #3 8.36 0.91 2.71 10.56 16.67 21.93 27.77 Pre-DA #4 1.58 0.18 0.53 2.03 3.19 4.18 5.29 Grand Total Area (acres) 67.77 Post -Development Flow (cfs) Post BMP #1 Bypass 43.90 3.88 11.43 45.13 72.00 95.27 121.11 Wet Pond #1 18.3 0.483 1.42 8.05 11.60 13.90 15.97 Post-DA #1 62.20 4.05 11.64 52.97 83.53 109.09 137.01 Flow Delta (cfs) -1.54 -4.00 -5.72 -8.92 -12.49 -16.87 Post-DA #2 1.72 0.49 1.13 3.44 5.13 6.56 8.12 Flow Delta (cfs) -0.30 -0.69 -2.32 -3.52 -4.56 -5.73 Post-DA #3 3.59 1.17 2.58 7.53 11.09 14.12 17.42 Flow Delta (cfs) 0.26 -0.13 -3.03 -5.58 -7.81 -10.35 Post-DA #4 0.40 0.08 0.23 0.81 1.23 1.60 2.00 Flow Delta (cfs) -0.10 -0.30 -1.22 -1.96 -2.58 -3.29 Grand Total Flow Delta (cfs) -1.68 -5.12 -12.29 -19.98 -27.44 -36.24 Grand Total Area (acres) 67.91 Hemby Place Engineering Project Report Section 5: Pre & Post Analysis Pre & Post -Development Curve Numbers Composite Curve Number Worksheet Project 4727 - Hemby Place By AG Date 8/4/2021 Location Weddin ton, North Carolina Checked By CB Date 8/4/2021 Drainage Area Pre-1 Check one: ❑ Present ❑ Construction ❑ Developed Runoff Curve Number Soil Type(s) Hydrologic Soil Group Cover Description CN Area (acres) Product of CN x Area CeB2 B Good (grass covers >75% of area) 61 15.4 939.4 CeB2 B Gravel 85 0.66 56.1 CeB2 B Paved Parking Lots, Roofs, Driveways 98 0.32 31.36 CeB2 B Good (no grazing; brush covers ground) 55 17.99 989.45 CeC2 B Good (no grazing; brush covers ground) 55 19.22 1057.1 CeB2 B Poor (<50% ground cover or heavily grazed) 79 0.58 45.82 0 0 0 0 0 0 0 0 54.17 3119.23 total product 3119.23 CN (weighted) = total area 54.17 - 57.6 Composite Curve Number Worksheet Project 4727 - Hemby Place By AG Date 8/4/2021 Location Weddin ton, North Carolina Checked By CB Date 8/4/2021 Drainage Area Pre-2 Check one: ❑ Present ❑ Construction ❑ Developed Runoff Curve Number Soil Type(s) Hydrologic Soil Group Cover Description CN Area (acres) Product of CN x Area CeB2 B Good (grass covers >75% of area) 61 0.74 45.14 CeB2 B Fair (grazing but not burned; some brush 60 2.94 176.4 0 0 0 0 0 0 0 0 0 0 0 0 3.68 221.54 1.5 total product 224 CN (weighted) = total area 1.5 = 60.2 Composite Curve Number Worksheet Project 4727 - Hemby Place By AG Date 8/4/2021 Location Weddin ton, North Carolina Checked By CB Date 8/4/2021 Drainage Area Pre-3 Check one: ❑ Present ❑ Construction ❑ Developed Runoff Curve Number Soil Type(s) Hydrologic Soil Group Cover Description CN Area (acres) Product of CN x Area CeB2 B Gravel 85 0.25 21.25 CeB2 B Good (no grazing; brush covers ground) 55 6.59 362.45 CeB2 B Good (grass covers >75% of area) 61 1.52 92.72 0 0 0 0 0 0 0 0 0 0 0 8.36 476.42 6.4 total product 472 CN (weighted) = total area 6.4 - 57.0 Composite Curve Number Worksheet Project 4727 - Hemby Place By AG Date 8/4/2021 Location Weddin ton, North Carolina Checked By CB Date 8/4/2021 Drainage Area Pre-4 Check one: ❑ Present ❑ Construction ❑ Developed Runoff Curve Number Soil Type(s) Hydrologic Soil Group Cover Description CN Area (acres) Product of CN x Area CeB2 B Good (grass covers >75% of area) 61 0.59 35.99 CeB2 B Good (no grazing; brush covers ground) 55 0.99 54.45 0 0 0 0 0 0 0 0 0 0 0 0 1.58 90.44 total product 90.44 CN (weighted) = total area 1.58 57.2 Composite Curve Number Worksheet Project 4727 - Hemby Place By AG Date 8/4/2021 Location Weddin ton, North Carolina Checked By CB Date 8/4/2021 Drainage Area Post-1 BMP Check one: ❑ Present ❑ Construction ❑ Developed Runoff Curve Number Soil Type(s) Hydrologic Soil Group Cover Description CN Area (acres) Product of CN x Area CeB2 B Good (grass covers >75% of area) 61 11.12 678.32 CeB2 B Paved Parking Lots, Roofs, Driveways 98 5.81 569.38 CeC2 B Good (grass covers >75% of area) 61 1.19 72.59 CeC2 B Paved Parking Lots, Roofs, Driveways 98 0.18 17.64 0 0 0 0 0 0 0 0 0 0 18.3 1337.93 total product 1337.93 CN (weighted) = total area 18.3 - 73.1 Composite Curve Number Worksheet Project 4727 - Hemby Place By AG Date 8/4/2021 Location Weddin ton, North Carolina Checked By CB Date 8/4/2021 Drainage Area Post-1 Bypass Check one: ❑ Present ❑ Construction ❑ Developed Runoff Curve Number Soil Type(s) Hydrologic Soil Group Cover Description CN Area (acres) Product of CN x Area CeB2 B Good (grass covers >75% of area) 61 8.24 502.64 CeB2 B Paved Parking Lots, Roofs, Driveways 98 0.28 27.44 CeB2 B Good (no grazing; brush covers ground) 55 17.13 942.15 CeC2 B Paved Parking Lots, Roofs, Driveways 98 0.18 17.64 CeC2 B Good (grass covers >75% of area) 61 2.61 159.21 CeC2 B Good (no grazing; brush covers ground) 55 15.46 850.3 0 0 0 0 0 0 0 0 43.9 2499.38 total product 2499.38 CN (weighted) = total area 43.9 = 56.9 Composite Curve Number Worksheet Project 4727 - Hemby Place By AG Date 8/4/2021 Location Weddin ton, North Carolina Checked By CB Date 8/4/2021 Drainage Area Post-2 Check one: ❑ Present ❑ Construction ❑ Developed Runoff Curve Number Soil Type(s) Hydrologic Soil Group Cover Description CN Area (acres) Product of CN x Area CeB2 B Good (grass covers >75% of area) 61 0.35 21.35 CeB2 B Fair (grazing but not burned; some brush 60 1.37 82.2 0 0 0 0 0 0 0 0 0 0 0 0 1.72 103.55 CN (weighted) - total product _ 103.55 _ 60.2 total area 1.72 Composite Curve Number Worksheet Project 4727 - Hemby Place By AG Date 8/4/2021 Location Weddin ton, North Carolina Checked By CB Date 8/4/2021 Drainage Area Post-3 Check one: ❑ Present ❑ Construction ❑ Developed Runoff Curve Number Soil Type(s) Hydrologic Soil Group Cover Description CN Area (acres) Product of CN x Area CeB2 B Good (grass covers >75% of area) 61 3.59 218.99 0 0 0 0 0 0 0 0 0 0 0 0 0 3.59 218.99 total product 218.99 CN (weighted) = total area 3.59 = 61.0 Composite Curve Number Worksheet Project 4727 - Hemby Place By AG Date 8/4/2021 Location Weddin ton, North Carolina Checked By CB Date 8/4/2021 Drainage Area Pre-4 Check one: ❑ Present ❑ Construction ❑ Developed Runoff Curve Number Soil Type(s) Hydrologic Soil Group Cover Description CN Area (acres) Product of CN x Area CeB2 B Good (grass covers >75% of area) 61 0.12 7.32 CeB2 B Good (no grazing; brush covers ground) 55 0.28 15.4 0 0 0 0 0 0 0 0 0 0 0 0 0.4 22.72 total product 22.72 CN (weighted) _ _ = 56.8 total area 0.4 Hemby Place Engineering Project Report Section 5: Pre & Post Analysis Pre & Post -Development Time of Concentrations TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Pre DA1 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 0.70 0.00 0.00 Travel Time (min) = 14.06 + 0.00 + 0.00 = 14.06 Shallow Concentrated Flow Flow length (ft) = 1668.00 0.00 0.00 Watercourse slope (%) = 4.30 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.35 0.00 0.00 Travel Time (min) = 8.31 + 0.00 + 0.00 = 8.31 Channel Flow X sectional flow area (sqft) = 1000.00 0.00 0.00 Wetted perimeter (ft) = 150.00 0.00 0.00 Channel slope (%) = 1.70 0.00 0.00 Manning's n-value = 0.050 0.015 0.015 Velocity (ft/s) =13.85 0.00 0.00 Flow length (ft) ({0})1056.0 0.0 0.0 Travel Time (min) = 1.27 + 0.00 + 0.00 = 1.27 Total Travel Time, Tc.............................................................................. 23.64 min TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 2 Pre DA 2 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 2.90 0.00 0.00 Travel Time (min) = 17.45 + 0.00 + 0.00 = 17.45 Shallow Concentrated Flow Flow length (ft) = 284.00 0.00 0.00 Watercourse slope (%) = 2.90 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.75 0.00 0.00 Travel Time (min) = 1.72 + 0.00 + 0.00 = 1.72 Channel Flow X sectional flow area (sqft) = 86.90 0.00 0.00 Wetted perimeter (ft) = 32.00 0.00 0.00 Channel slope (%) = 1.90 0.00 0.00 Manning's n-value = 0.050 0.015 0.015 Velocity (ft/s) =8.02 0.00 0.00 Flow length (ft) ({0})113.0 0.0 0.0 Travel Time (min) = 0.23 + 0.00 + 0.00 = 0.23 Total Travel Time, Tc.............................................................................. 19.40 min TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 3 Pre DA 3 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 3.70 0.00 0.00 Travel Time (min) = 15.83 + 0.00 + 0.00 = 15.83 Shallow Concentrated Flow Flow length (ft) = 462.00 0.00 0.00 Watercourse slope (%) = 1.90 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.22 0.00 0.00 Travel Time (min) = 3.46 + 0.00 + 0.00 = 3.46 Channel Flow X sectional flow area (sqft) = 2.25 0.00 0.00 Wetted perimeter (ft) = 3.00 0.00 0.00 Channel slope (%) = 1.50 0.00 0.00 Manning's n-value = 0.026 0.015 0.015 Velocity (ft/s) =5.79 0.00 0.00 Flow length (ft) ({0})250.0 0.0 0.0 Travel Time (min) = 0.72 + 0.00 + 0.00 = 0.72 Total Travel Time, Tc.............................................................................. 20.01 min TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 4 Pre DA 4 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 1.08 0.00 0.00 Travel Time (min) = 17.21 + 0.00 + 0.00 = 17.21 Shallow Concentrated Flow Flow length (ft) = 192.00 0.00 0.00 Watercourse slope (%) = 2.73 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.67 0.00 0.00 Travel Time (min) = 1.20 + 0.00 + 0.00 = 1.20 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 18.40 min TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 6 Post DA 1 Bypass Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 0.70 0.00 0.00 Travel Time (min) = 14.06 + 0.00 + 0.00 = 14.06 Shallow Concentrated Flow Flow length (ft) = 1668.00 0.00 0.00 Watercourse slope (%) = 4.30 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.35 0.00 0.00 Travel Time (min) = 8.31 + 0.00 + 0.00 = 8.31 Channel Flow X sectional flow area (sqft) = 1000.00 0.00 0.00 Wetted perimeter (ft) = 150.00 0.00 0.00 Channel slope (%) = 1.70 0.00 0.00 Manning's n-value = 0.050 0.015 0.015 Velocity (ft/s) =13.85 0.00 0.00 Flow length (ft) ({0})1056.0 0.0 0.0 Travel Time (min) = 1.27 + 0.00 + 0.00 = 1.27 Total Travel Time, Tc.............................................................................. 23.60 min TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 9 Post DA 2 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 2.10 0.00 0.00 Travel Time (min) = 9.06 + 0.00 + 0.00 = 9.06 Shallow Concentrated Flow Flow length (ft) = 227.00 0.00 0.00 Watercourse slope (%) = 3.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.79 0.00 0.00 Travel Time (min) = 1.35 + 0.00 + 0.00 = 1.35 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 10.40 min TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 10 Post DA 3 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 2.78 0.00 0.00 Travel Time (min) = 8.10 + 0.00 + 0.00 = 8.10 Shallow Concentrated Flow Flow length (ft) = 473.50 0.00 0.00 Watercourse slope (%) = 2.80 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.70 0.00 0.00 Travel Time (min) = 2.92 + 0.00 + 0.00 = 2.92 Channel Flow X sectional flow area (sqft) = 1.23 0.00 0.00 Wetted perimeter (ft) = 1.25 0.00 0.00 Channel slope (%) = 5.14 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =22.28 0.00 0.00 Flow length (ft) ({0})45.0 0.0 0.0 Travel Time (min) = 0.03 + 0.00 + 0.00 = 0.03 Total Travel Time, Tc.............................................................................. 11.10 min TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 11 Post DA 4 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 74.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.60 0.00 0.00 Land slope (%) = 3.00 0.00 0.00 Travel Time (min) = 6.17 + 0.00 + 0.00 = 6.17 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 6.20 min Hemby Place Engineering Project Report Section 5: Pre & Post Analysis 19 29 109 259 509 & 100-year Storm Event Hydrograph Analysis Hydrograph Return Period RecP� y raflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 5.594 15.64 ------- ------- 58.69 92.45 121.58 153.88 Pre DA 1 2 SCS Runoff ------ 0.787 1.818 ------- ------- 5.759 8.654 11.12 13.85 Pre DA 2 3 SCS Runoff ------ 0.908 2.713 ------- ------- 10.56 16.67 21.93 27.77 Pre DA 3 4 SCS Runoff ------ 0.180 0.528 ------- ------- 2.026 3.185 4.184 5.292 Pre DA 4 5 SCS Runoff ------ 26.22 39.02 ------- ------- 76.72 102.31 123.12 145.23 Post DA 1 BMP 6 SCS Runoff ------ 3.881 11.43 ------- ------- 45.13 72.00 95.27 121.11 Post DA 1 Bypass 7 Reservoir 5 0.483 1.419 ------- ------- 8.053 11.60 13.90 15.97 Wet Pond 1 8 Combine 6,7 4.047 11.64 ------- ------- 52.97 83.53 109.09 137.01 Post DA 1 9 SCS Runoff ------ 0.490 1.128 ------- ------- 3.444 5.126 6.555 8.121 Post DA 2 10 SCS Runoff ------ 1.172 2.577 ------- ------- 7.525 11.09 14.12 17.42 Post DA 3 11 SCS Runoff ------ 0.081 0.233 ------- ------- 0.808 1.232 1.595 1.995 Post DA 4 Proj. file: 4727-pre&post. gpw Monday, 09 / 13 / 2021 Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 5.594 2 734 49,517 ------ ------ ------ Pre DA 1 2 SCS Runoff 0.787 2 728 4,436 ------ ------ ------ Pre DA 2 3 SCS Runoff 0.908 2 730 7,284 ------ ------ ------ Pre DA 3 4 SCS Runoff 0.180 2 730 1,407 ------ ------ ------ Pre DA 4 5 SCS Runoff 26.22 2 718 52,939 ------ ------ ------ Post DA 1 BMP 6 SCS Runoff 3.881 2 736 37,239 ------ ------ ------ Post DA 1 Bypass 7 Reservoir 0.483 2 1134 51,745 5 683.62 38,101 Wet Pond 1 8 Combine 4.047 2 736 88,984 6,7 ------ ------ Post DA 1 9 SCS Runoff 0.490 2 724 2,138 ------ ------ ------ Post DA 2 10 SCS Runoff 1.172 2 724 4,805 ------ ------ ------ Post DA 3 11 SCS Runoff 0.081 2 720 320 ------ ------ ------ Post DA 4 4727-pre&post. gpw Return Period: 1 Year Monday, 09 / 13 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 1 Pre DA 1 Hydrograph type = SCS Runoff Peak discharge = 5.594 cfs Storm frequency = 1 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 49,517 cuft Drainage area = 54.170 ac Curve number = 57.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 23.64 min Total precip. = 2.98 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 Pre DA 1 Hyd. No. 1 -- 1 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1 1 " ' ' ' ' ' ' 11 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 2 Pre DA 2 Hydrograph type = SCS Runoff Peak discharge = 0.787 cfs Storm frequency = 1 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 4,436 cuft Drainage area = 3.680 ac Curve number = 60.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.40 min Total precip. = 2.98 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 Pre DA 2 Hyd. No. 2 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 3 Pre DA 3 Hydrograph type = SCS Runoff Peak discharge = 0.908 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 7,284 cuft Drainage area = 8.360 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.01 min Total precip. = 2.98 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 Pre DA 3 Hyd. No. 3 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 4 Pre DA 4 Hydrograph type = SCS Runoff Peak discharge = 0.180 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 1,407 cuft Drainage area = 1.580 ac Curve number = 57.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 2.98 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Pre DA 4 Hyd. No. 4 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 5 Post DA 1 BMP Hydrograph type = SCS Runoff Peak discharge = 26.22 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 52,939 cuft Drainage area = 18.300 ac Curve number = 73.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.98 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 Post DA 1 BMP Hyd. No. 5 -- 1 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 6 Post DA 1 Bypass Hydrograph type = SCS Runoff Peak discharge = 3.881 cfs Storm frequency = 1 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 37,239 cuft Drainage area = 43.900 ac Curve number = 56.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 23.60 min Total precip. = 2.98 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post DA 1 Bypass Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 6 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 7 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 0.483 cfs Storm frequency = 1 yrs Time to peak = 1134 min Time interval = 2 min Hyd. volume = 51,745 cuft Inflow hyd. No. = 5 - Post DA 1 BMP Max. Elevation = 683.62 ft Reservoir name = Wet Pond #1 Max. Storage = 38,101 cuft Storage Indication method used. Wet Pond 1 Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) — Hyd No. 7 Hyd No. 5 Total storage used = 38,101 cult Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Pond No. 1 - Wet Pond #1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 682.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 682.00 20 0 0 0.50 682.50 25,689 4,404 4,404 1.00 683.00 30,877 14,120 18,524 1.50 683.50 32,027 15,724 34,248 2.00 684.00 33,177 16,299 50,546 2.50 684.50 34,357 16,881 67,427 3.00 685.00 35,536 17,471 84,898 3.50 685.50 36,745 18,068 102,965 4.00 686.00 37,955 18,672 121,638 4.50 686.50 39,223 19,292 140,929 5.00 687.00 40,492 19,926 160,855 5.50 687.50 41,773 20,563 181,419 6.00 688.00 43,054 21,204 202,623 6.50 688.50 44,363 21,851 224,474 7.00 689.00 45,671 22,505 246,979 7.50 689.50 47,007 23,166 270,146 8.00 690.00 48,343 23,834 293,980 8.50 690.50 49,706 24,509 318,489 9.00 691.00 51,069 25,191 343,679 9.50 691.50 52,459 25,879 369,558 10.00 692.00 53,849 26,574 396,132 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 42.00 12.00 2.50 0.00 Span (in) = 42.00 24.00 2.50 0.00 No. Barrels = 1 1 1 0 Invert El. (ft) = 678.48 683.50 682.00 0.00 Length (ft) = 96.18 0.00 0.00 0.00 Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes Yes No Stage (ft) 10.00 8.00 6.00 4.00 2.00 0 00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 20.00 0.00 0.00 0.00 Crest El. (ft) = 690.00 0.00 0.00 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = 1 --- --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 0.0 20.0 40.0 60.0 80.0 Total Q 692.00 690.00 688.00 686.00 684.00 682.00 100.0 120.0 140.0 160.0 Discharge (cfs) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 8 Post DA 1 Hydrograph type = Combine Peak discharge = 4.047 cfs Storm frequency = 1 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 88,984 cuft Inflow hyds. = 6, 7 Contrib. drain. area = 43.900 ac Post DA 1 Q (cfs) Hyd. No. 8 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) — Hyd No. 8 Hyd No. 6 Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 9 Post DA 2 Hydrograph type = SCS Runoff Peak discharge = 0.490 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 2,138 cuft Drainage area = 1.720 ac Curve number = 60.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.40 min Total precip. = 2.98 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Post DA 2 Hyd. No. 9 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 10 Post DA 3 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 3.590 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 2.98 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 3 Hyd. No. 10 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 10 Monday, 09 / 13 / 2021 = 1.172 cfs = 724 min = 4,805 cuft = 61 = 0 ft = 11.10 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 11 Post DA 4 Hydrograph type = SCS Runoff Peak discharge = 0.081 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 320 cuft Drainage area = 0.400 ac Curve number = 56.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.20 min Total precip. = 2.98 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 Post DA 4 Hyd. No. 11 -- 1 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 15.64 2 732 92,326 ------ ------ ------ Pre DA 1 2 SCS Runoff 1.818 2 728 7,795 ------ ------ ------ Pre DA 2 3 SCS Runoff 2.713 2 728 13,767 ------ ------ ------ Pre DA 3 4 SCS Runoff 0.528 2 728 2,645 ------ ------ ------ Pre DA 4 5 SCS Runoff 39.02 2 718 78,063 ------ ------ ------ Post DA 1 BMP 6 SCS Runoff 11.43 2 732 70,573 ------ ------ ------ Post DA 1 Bypass 7 Reservoir 1.419 2 844 76,776 5 683.81 44,510 Wet Pond 1 8 Combine 11.64 2 732 147,349 6,7 ------ ------ Post DA 1 9 SCS Runoff 1.128 2 722 3,757 ------ ------ ------ Post DA 2 10 SCS Runoff 2.577 2 722 8,310 ------ ------ ------ Post DA 3 11 SCS Runoff 0.233 2 718 607 ------ ------ ------ Post DA 4 4727-pre&post. gpw Return Period: 2 Year Monday, 09 / 13 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Pre DA 1 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 54.170 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.60 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 M M 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre DA 1 Hyd. No. 1 -- 2 Year Monday, 09 / 13 / 2021 = 15.64 cfs = 732 min = 92,326 cuft = 57.6 = 0 ft = 23.64 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 M . �� 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 2 Pre DA 2 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 3.680 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.60 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre DA 2 Hyd. No. 2 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 2 Monday, 09 / 13 / 2021 = 1.818 cfs = 728 min = 7,795 cuft = 60.2 = 0 ft = 19.40 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 3 Pre DA 3 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 8.360 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.60 in Storm duration = 24 hrs Q (cfs) 3.00 I'm 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre DA 3 Hyd. No. 3 -- 2 Year 120 240 360 480 600 720 840 960 — Hyd No. 3 Monday, 09 / 13 / 2021 = 2.713 cfs = 728 min = 13,767 cuft = 57 = 0 ft = 20.01 min = Type II = 484 Q (cfs) 3.00 I'm 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 4 Pre DA 4 Hydrograph type = SCS Runoff Peak discharge = 0.528 cfs Storm frequency = 2 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 2,645 cuft Drainage area = 1.580 ac Curve number = 57.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 Pre DA 4 Hyd. No. 4 -- 2 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 5 Post DA 1 BMP Hydrograph type = SCS Runoff Peak discharge = 39.02 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 78,063 cuft Drainage area = 18.300 ac Curve number = 73.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post DA 1 BMP Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 6 Post DA 1 Bypass Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 43.900 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.60 in Storm duration = 24 hrs Q (cfs) 12.00 10.00 M M 4.00 r M� Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 1 Bypass Hyd. No. 6 -- 2 Year Monday, 09 / 13 / 2021 = 11.43 cfs = 732 min = 70,573 cuft = 56.9 = 0 ft = 23.60 min = Type II = 484 Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 7 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 1.419 cfs Storm frequency = 2 yrs Time to peak = 844 min Time interval = 2 min Hyd. volume = 76,776 cuft Inflow hyd. No. = 5 - Post DA 1 BMP Max. Elevation = 683.81 ft Reservoir name = Wet Pond #1 Max. Storage = 44,510 cuft Storage Indication method used Q (cfs) 40.00 20.00 10.00 0.00 ' 0 600 — Hyd No. 7 Wet Pond 1 Hyd. No. 7 -- 2 Year 1200 1800 2400 — Hyd No. 5 3000 3600 4200 4800 5400 Total storage used = 44,510 cuft Q (cfs) 40.00 30.00 20.00 10.00 1 0.00 6000 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 8 Post DA 1 Hydrograph type = Combine Peak discharge = 11.64 cfs Storm frequency = 2 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 147,349 cuft Inflow hyds. = 6, 7 Contrib. drain. area = 43.900 ac Q (cfs) 12.00 10.00 M M 4.00 r M� Post DA 1 Hyd. No. 8 -- 2 Year 480 960 1440 1920 2400 2880 3360 3840 Hyd No. 8 — Hyd No. 6 Hyd No. 7 Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 4320 4800 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 9 Post DA 2 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 1.720 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.60 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 2 Hyd. No. 9 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 9 Monday, 09 / 13 / 2021 = 1.128 cfs = 722 min = 3,757 cuft = 60.2 = 0 ft = 10.40 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 10 Post DA 3 Hydrograph type = SCS Runoff Peak discharge = 2.577 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 8,310 cuft Drainage area = 3.590 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.10 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post DA 3 Q (cfs) Hyd. No. 10 -- 2 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 Li 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 11 Post DA 4 Hydrograph type = SCS Runoff Peak discharge = 0.233 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 607 cuft Drainage area = 0.400 ac Curve number = 56.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.20 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Post DA 4 Hyd. No. 11 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 58.69 2 730 248,002 ------ ------ ------ Pre DA 1 2 SCS Runoff 5.759 2 726 19,554 ------ ------ ------ Pre DA 2 3 SCS Runoff 10.56 2 726 37,639 ------ ------ ------ Pre DA 3 4 SCS Runoff 2.026 2 726 7,191 ------ ------ ------ Pre DA 4 5 SCS Runoff 76.72 2 718 154,869 ------ ------ ------ Post DA 1 BMP 6 SCS Runoff 45.13 2 730 193,497 ------ ------ ------ Post DA 1 Bypass 7 Reservoir 8.053 2 744 153,443 5 684.65 72,828 Wet Pond 1 8 Combine 52.97 2 730 346,940 6,7 ------ ------ Post DA 1 9 SCS Runoff 3.444 2 722 9,425 ------ ------ ------ Post DA 2 10 SCS Runoff 7.525 2 722 20,449 ------ ------ ------ Post DA 3 11 SCS Runoff 0.808 2 718 1,670 ------ ------ ------ Post DA 4 4727-pre&post. gpw Return Period: 10 Year Monday, 09 / 13 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Pre DA 1 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 54.170 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.25 in Storm duration = 24 hrs Q (cfs) 60.00 40.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre DA 1 Hyd. No. 1 -- 10 Year Monday, 09 / 13 / 2021 = 58.69 cfs = 730 min = 248,002 cuft = 57.6 = 0 ft = 23.64 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1 1' ' ' ' ' ' ' ' � ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 2 Pre DA 2 Hydrograph type = SCS Runoff Peak discharge = 5.759 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 19,554 cuft Drainage area = 3.680 ac Curve number = 60.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.40 min Total precip. = 5.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 Pre DA 2 Hyd. No. 2 -- 10 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1 1�ff ' ' ' ' ' ' ' %, ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 3 Pre DA 3 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 8.360 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.25 in Storm duration = 24 hrs Q (cfs) 12.00 10.00 M M 4.00 r M� Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre DA 3 Hyd. No. 3 -- 10 Year Monday, 09 / 13 / 2021 = 10.56 cfs = 726 min = 37,639 cuft = 57 = 0 ft = 20.01 min = Type II = 484 Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 4 Pre DA 4 Hydrograph type = SCS Runoff Peak discharge = 2.026 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 7,191 cuft Drainage area = 1.580 ac Curve number = 57.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 5.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre DA 4 Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 5 Post DA 1 BMP Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 18.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.25 in Storm duration = 24 hrs Q (cfs) 80.00 70.00 40.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 1 BMP Hyd. No. 5 -- 10 Year Monday, 09 / 13 / 2021 = 76.72 cfs = 718 min = 154,869 cuft = 73.1 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1 ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 6 Post DA 1 Bypass Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 43.900 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.25 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 20.00 10.00 0 120 241 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 1 Bypass Hyd. No. 6 -- 10 Year Monday, 09 / 13 / 2021 = 45.13 cfs = 730 min = 193,497 cuft = 56.9 = 0 ft = 23.60 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 r.TiT.I 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 7 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 8.053 cfs Storm frequency = 10 yrs Time to peak = 744 min Time interval = 2 min Hyd. volume = 153,443 cuft Inflow hyd. No. = 5 - Post DA 1 BMP Max. Elevation = 684.65 ft Reservoir name = Wet Pond #1 Max. Storage = 72,828 cuft Storage Indication method used. Q (cfs) 80.00 70.00 40.00 20.00 10.00 Wet Pond 1 Hyd. No. 7 -- 10 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 1 1 1 ' 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 5760 Time (min) — Hyd No. 7 Hyd No. 5 Total storage used = 72,828 cult Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 8 Post DA 1 Hydrograph type = Combine Peak discharge = 52.97 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 346,940 cuft Inflow hyds. = 6, 7 Contrib. drain. area = 43.900 ac Q (cfs) 60.00 40.00 20.00 10.00 WITIN Post DA 1 Hyd. No. 8 -- 10 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 OFIVIT21 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 8 — Hyd No. 6 Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 9 Post DA 2 Hydrograph type = SCS Runoff Peak discharge = 3.444 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 9,425 cuft Drainage area = 1.720 ac Curve number = 60.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.40 min Total precip. = 5.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post DA 2 Q (cfs) Hyd. No. 9 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 10 Post DA 3 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 3.590 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.25 in Storm duration = 24 hrs Q (cfs) 8.00 M 4.00 I'm 0.00 0 120 240 — Hyd No. 10 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 3 Hyd. No. 10 -- 10 Year 360 480 600 720 840 960 Monday, 09 / 13 / 2021 = 7.525 cfs = 722 min = 20,449 cuft = 61 = 0 ft = 11.10 min = Type II = 484 Q (cfs) 8.00 . �� 4.00 I'm 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 11 Post DA 4 Hydrograph type = SCS Runoff Peak discharge = 0.808 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,670 cuft Drainage area = 0.400 ac Curve number = 56.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.20 min Total precip. = 5.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 Post DA 4 Hyd. No. 11 -- 10 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 92.45 2 730 366,448 ------ ------ ------ Pre DA 1 2 SCS Runoff 8.654 2 726 28,291 ------ ------ ------ Pre DA 2 3 SCS Runoff 16.67 2 726 55,907 ------ ------ ------ Pre DA 3 4 SCS Runoff 3.185 2 726 10,663 ------ ------ ------ Pre DA 4 5 SCS Runoff 102.31 2 716 206,998 ------ ------ ------ Post DA 1 BMP 6 SCS Runoff 72.00 2 730 287,666 ------ ------ ------ Post DA 1 Bypass 7 Reservoir 11.60 2 740 205,516 5 685.38 98,593 Wet Pond 1 8 Combine 83.53 2 730 493,182 6,7 ------ ------ Post DA 1 9 SCS Runoff 5.126 2 722 13,636 ------ ------ ------ Post DA 2 10 SCS Runoff 11.09 2 722 29,408 ------ ------ ------ Post DA 3 11 SCS Runoff 1.232 2 718 2,485 ------ ------ ------ Post DA 4 4727-pre&post. gpw Return Period: 25 Year Monday, 09 / 13 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Pre DA 1 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 54.170 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 6.27 in Storm duration = 24 hrs Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 20.00 10.00 0.00 0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre DA 1 Hyd. No. 1 -- 25 Year Monday, 09 / 13 / 2021 = 92.45 cfs = 730 min = 366,448 cuft = 57.6 = 0 ft = 23.64 min = Type II = 484 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 2 Pre DA 2 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 3.680 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 6.27 in Storm duration = 24 hrs Q (cfs) 10.00 Were . UX 4.00 r w Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre DA 2 Hyd. No. 2 -- 25 Year 120 240 360 480 600 720 840 Hyd No. 2 Monday, 09 / 13 / 2021 = 8.654 cfs = 726 min = 28,291 cuft = 60.2 = 0 ft = 19.40 min = Type II = 484 Q (cfs) 10.00 N. We 4.00 r w 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 3 Pre DA 3 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 8.360 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 6.27 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 M M 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre DA 3 Hyd. No. 3 -- 25 Year Monday, 09 / 13 / 2021 = 16.67 cfs = 726 min = 55,907 cuft = 57 = 0 ft = 20.01 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 M . �� 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 4 Pre DA 4 Hydrograph type = SCS Runoff Peak discharge = 3.185 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 10,663 cuft Drainage area = 1.580 ac Curve number = 57.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 6.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre DA 4 Q (cfs) Hyd. No. 4 -- 25 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 5 Post DA 1 BMP Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 18.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.27 in Storm duration = 24 hrs Q (cfs) 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 1 BMP Hyd. No. 5 -- 25 Year 0.00 ' ' ' ' ' ' ' 0 120 240 360 480 600 720 840 — Hyd No. 5 Monday, 09 / 13 / 2021 = 102.31 cfs = 716 min = 206,998 cuft = 73.1 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 120.00 100.00 40.00 20.00 0.00 960 1080 1200 1320 1440 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 6 Post DA 1 Bypass Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 43.900 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 6.27 in Storm duration = 24 hrs Q (cfs) 80.00 70.00 40.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 1 Bypass Hyd. No. 6 -- 25 Year Monday, 09 / 13 / 2021 = 72.00 cfs = 730 min = 287,666 cuft = 56.9 = 0 ft = 23.60 min = Type II = 484 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1 1'r ' ' ' ' ' ' ' %, ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 6 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 7 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 11.60 cfs Storm frequency = 25 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 205,516 cuft Inflow hyd. No. = 5 - Post DA 1 BMP Max. Elevation = 685.38 ft Reservoir name = Wet Pond #1 Max. Storage = 98,593 cuft Storage Indication method used. Q (cfs) 120.00 100.00 40.00 20.00 0.00 ' ' WIM 0 480 — Hyd No. 7 Wet Pond 1 Hyd. No. 7 -- 25 Year 960 1440 1920 Hyd No. 5 2400 2880 3360 3840 4320 Total storage used = 98,593 cuft Q (cfs) 120.00 100.00 40.00 20.00 0.00 4800 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 8 Post DA 1 Hydrograph type = Combine Peak discharge = 83.53 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 493,182 cuft Inflow hyds. = 6, 7 Contrib. drain. area = 43.900 ac Q (cfs) 90.00 70.00 40.00 20.00 10.00 Post DA 1 Hyd. No. 8 -- 25 Year Q (cfs) 90.00 -5 1 It 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1 1 1"' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 8 — Hyd No. 6 Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 9 Post DA 2 Hydrograph type = SCS Runoff Peak discharge = 5.126 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 13,636 cuft Drainage area = 1.720 ac Curve number = 60.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.40 min Total precip. = 6.27 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 Post DA 2 Hyd. No. 9 -- 25 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1 1 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 10 Post DA 3 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 3.590 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 6.27 in Storm duration = 24 hrs Q (cfs) 12.00 10.00 M M 4.00 r M� Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 3 Hyd. No. 10 -- 25 Year Monday, 09 / 13 / 2021 = 11.09 cfs = 722 min = 29,408 cuft = 61 = 0 ft = 11.10 min = Type II = 484 Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 11 Post DA 4 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 0.400 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 6.27 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 4 Hyd. No. 11 -- 25 Year 120 240 360 480 600 720 840 960 Hyd No. 11 Monday, 09 / 13 / 2021 = 1.232 cfs = 718 min = 2,485 cuft = 56.8 = 0 ft = 6.20 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 121.58 2 730 469,359 ------ ------ ------ Pre DA 1 2 SCS Runoff 11.12 2 726 35,803 ------ ------ ------ Pre DA 2 3 SCS Runoff 21.93 2 726 71,820 ------ ------ ------ Pre DA 3 4 SCS Runoff 4.184 2 726 13,685 ------ ------ ------ Pre DA 4 5 SCS Runoff 123.12 2 716 250,047 ------ ------ ------ Post DA 1 BMP 6 SCS Runoff 95.27 2 730 369,729 ------ ------ ------ Post DA 1 Bypass 7 Reservoir 13.90 2 738 248,527 5 685.99 121,144 Wet Pond 1 8 Combine 109.09 2 730 618,257 6,7 ------ ------ Post DA 1 9 SCS Runoff 6.555 2 722 17,257 ------ ------ ------ Post DA 2 10 SCS Runoff 14.12 2 722 37,089 ------ ------ ------ Post DA 3 11 SCS Runoff 1.595 2 718 3,195 ------ ------ ------ Post DA 4 4727-pre&post. gpw Return Period: 50 Year Monday, 09 / 13 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Pre DA 1 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 54.170 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.08 in Storm duration = 24 hrs Q (cfs) 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre DA 1 Hyd. No. 1 -- 50 Year Monday, 09 / 13 / 2021 = 121.58 cfs = 730 min = 469,359 cuft = 57.6 = 0 ft = 23.64 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' 1 1 1 1-.1 ' ' ' ' ' ' ' � ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 2 Pre DA 2 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 3.680 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.08 in Storm duration = 24 hrs Q (cfs) 12.00 10.00 M M 4.00 r M� Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre DA 2 Hyd. No. 2 -- 50 Year Monday, 09 / 13 / 2021 = 11.12 cfs = 726 min = 35,803 cuft = 60.2 = 0 ft = 19.40 min = Type II = 484 Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 3 Pre DA 3 Hydrograph type = SCS Runoff Peak discharge = 21.93 cfs Storm frequency = 50 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 71,820 cuft Drainage area = 8.360 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.01 min Total precip. = 7.08 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 24.00 20.00 16.00 12.00 m 4.00 Pre DA 3 Hyd. No. 3 -- 50 Year Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 4 Pre DA 4 Hydrograph type = SCS Runoff Peak discharge = 4.184 cfs Storm frequency = 50 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 13,685 cuft Drainage area = 1.580 ac Curve number = 57.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 7.08 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre DA 4 Q (cfs) Hyd. No. 4 -- 50 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 7777777N 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 5 Post DA 1 BMP Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 18.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.08 in Storm duration = 24 hrs Q (cfs) 140.00 120.00 100.00 40.00 20.00 GTiTi1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 1 BMP Hyd. No. 5 -- 50 Year 0 120 240 360 480 600 720 840 — Hyd No. 5 Monday, 09 / 13 / 2021 = 123.12 cfs = 716 min = 250,047 cuft = 73.1 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 r.TiT.I 960 1080 1200 1320 1440 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 6 Post DA 1 Bypass Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 43.900 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.08 in Storm duration = 24 hrs Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 20.00 10.00 0.00 0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 1 Bypass Hyd. No. 6 -- 50 Year Monday, 09 / 13 / 2021 = 95.27 cfs = 730 min = 369,729 cuft = 56.9 = 0 ft = 23.60 min = Type II = 484 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 7 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 13.90 cfs Storm frequency = 50 yrs Time to peak = 738 min Time interval = 2 min Hyd. volume = 248,527 cuft Inflow hyd. No. = 5 - Post DA 1 BMP Max. Elevation = 685.99 ft Reservoir name = Wet Pond #1 Max. Storage = 121,144 cuft Storage Indication method used. Q (cfs) 140.00 120.00 100.00 40.00 20.00 Wet Pond 1 Hyd. No. 7 -- 50 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 r.TiT.I 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Time (min) Hyd No. 7 Hyd No. 5 Total storage used = 121,144 cult Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 8 Post DA 1 Hydrograph type = Combine Peak discharge = 109.09 cfs Storm frequency = 50 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 618,257 cuft Inflow hyds. = 6, 7 Contrib. drain. area = 43.900 ac Q (cfs) 120.00 100.00 40.00 20.00 Q (cfs) 120.00 100.00 40.00 20.00 0.00 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 8 — Hyd No. 6 Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 9 Post DA 2 Hydrograph type = SCS Runoff Peak discharge = 6.555 cfs Storm frequency = 50 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 17,257 cuft Drainage area = 1.720 ac Curve number = 60.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.40 min Total precip. = 7.08 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 5.00 3.00 1.00 Post DA 2 Hyd. No. 9 -- 50 Year Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1' � ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 10 Post DA 3 Hydrograph type = SCS Runoff Peak discharge = 14.12 cfs Storm frequency = 50 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 37,089 cuft Drainage area = 3.590 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.10 min Total precip. = 7.08 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post DA 3 Q (cfs) Hyd. No. 10 -- 50 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 11 Post DA 4 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 0.400 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.08 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 4 Hyd. No. 11 -- 50 Year 120 240 360 480 600 720 840 960 Hyd No. 11 Monday, 09 / 13 / 2021 = 1.595 cfs = 718 min = 3,195 cuft = 56.8 = 0 ft = 6.20 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 153.88 2 730 584,143 ------ ------ ------ Pre DA 1 2 SCS Runoff 13.85 2 724 44,123 ------ ------ ------ Pre DA 2 3 SCS Runoff 27.77 2 726 89,599 ------ ------ ------ Pre DA 3 4 SCS Runoff 5.292 2 726 17,059 ------ ------ ------ Pre DA 4 5 SCS Runoff 145.23 2 716 296,406 ------ ------ ------ Post DA 1 BMP 6 SCS Runoff 121.11 2 730 461,449 ------ ------ ------ Post DA 1 Bypass 7 Reservoir 15.97 2 738 294,854 5 686.63 146,120 Wet Pond 1 8 Combine 137.01 2 730 756,303 6,7 ------ ------ Post DA 1 9 SCS Runoff 8.121 2 722 21,267 ------ ------ ------ Post DA 2 10 SCS Runoff 17.42 2 722 45,577 ------ ------ ------ Post DA 3 11 SCS Runoff 1.995 2 718 3,990 ------ ------ ------ Post DA 4 4727-pre&post. gpw Return Period: 100 Year Monday, 09 / 13 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Pre DA 1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 54.170 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.93 in Storm duration = 24 hrs Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre DA 1 Hyd. No. 1 -- 100 Year Monday, 09 / 13 / 2021 = 153.88 cfs = 730 min = 584,143 cuft = 57.6 = 0 ft = 23.64 min = Type II = 484 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 ' 1 1 11 --.- ' ' ' ' ' ' ' %, ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 2 Pre DA 2 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 3.680 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.93 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 10.00 01 M 4.00 ItX Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre DA 2 Hyd. No. 2 -- 100 Year Monday, 09 / 13 / 2021 = 13.85 cfs = 724 min = 44,123 cuft = 60.2 = 0 ft = 19.40 min = Type II = 484 Q (cfs) 14.00 12.00 10.00 . �� 4.00 of 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 3 Pre DA 3 Hydrograph type = SCS Runoff Peak discharge = 27.77 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 89,599 cuft Drainage area = 8.360 ac Curve number = 57 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.01 min Total precip. = 7.93 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 Pre DA 3 Hyd. No. 3 -- 100 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 4 Pre DA 4 Hydrograph type = SCS Runoff Peak discharge = 5.292 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 17,059 cuft Drainage area = 1.580 ac Curve number = 57.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 7.93 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 Pre DA 4 Hyd. No. 4 -- 100 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 11 --.O� ' ' ' ' ' ' M ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 5 Post DA 1 BMP Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 18.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.93 in Storm duration = 24 hrs Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 GTiTi1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 1 BMP Hyd. No. 5 -- 100 Year 0 120 240 360 480 600 720 840 — Hyd No. 5 Monday, 09 / 13 / 2021 = 145.23 cfs = 716 min = 296,406 cuft = 73.1 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 r.TiT.I 960 1080 1200 1320 1440 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 6 Post DA 1 Bypass Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 43.900 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.93 in Storm duration = 24 hrs Q (cfs) 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 1 Bypass Hyd. No. 6 -- 100 Year Monday, 09 / 13 / 2021 = 121.11 cfs = 730 min = 461,449 cuft = 56.9 = 0 ft = 23.60 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' 1 1 1' -..— ' ' ' ' ' ' ' � ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 6 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 7 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 15.97 cfs Storm frequency = 100 yrs Time to peak = 738 min Time interval = 2 min Hyd. volume = 294,854 cuft Inflow hyd. No. = 5 - Post DA 1 BMP Max. Elevation = 686.63 ft Reservoir name = Wet Pond #1 Max. Storage = 146,120 cuft Storage Indication method used. Wet Pond 1 Q (cfs) Hyd. No. 7 -- 100 Year Q (cfs) 160.00 - 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 360 Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 8 Post DA 1 Hydrograph type = Combine Peak discharge = 137.01 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 756,303 cuft Inflow hyds. = 6, 7 Contrib. drain. area = 43.900 ac Q (cfs) 140.00 120.00 100.00 40.00 20.00 Post DA 1 Hyd. No. 8 -- 100 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' ' ' " ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 8 — Hyd No. 6 Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 10 Post DA 3 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 3.590 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.93 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 M M 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 3 Hyd. No. 10 -- 100 Year Monday, 09 / 13 / 2021 = 17.42 cfs = 722 min = 45,577 cuft = 61 = 0 ft = 11.10 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 M . �� 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 11 Post DA 4 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 0.400 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.93 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 4 Hyd. No. 11 -- 100 Year 120 240 360 480 600 720 840 960 Hyd No. 11 Monday, 09 / 13 / 2021 = 1.995 cfs = 718 min = 3,990 cuft = 56.8 = 0 ft = 6.20 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2020.4 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 3426.6079 59.3997 1.6213 -------- 2 76.9232 13.1000 0.8842 -------- 3 0.0000 0.0000 0.0000 -------- 5 77.2081 12.9000 0.8371 -------- 10 75.5517 12.4000 0.8036 -------- 25 66.0145 11.1000 0.7420 -------- 50 59.2567 10.1000 0.6965 -------- 100 53.8843 9.2000 0.6563 -------- File name: Union County.IDF Intensity = B / (Tc + D)^E Monday, 09 / 13 / 2021 Return Period Intensity Values (in/hr) (Yrs) 6 min 10 16 20 26 30 36 40 46 60 66 60 1 4.00 3.54 3.17 2.85 2.58 2.35 2.15 1.98 1.83 1.69 1.58 1.47 2 5.94 4.79 4.03 3.49 3.08 2.76 2.50 2.30 2.12 1.97 1.84 1.73 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.90 5.61 4.76 4.15 3.68 3.32 3.03 2.79 2.58 2.41 2.26 2.13 10 7.61 6.21 5.28 4.62 4.11 3.72 3.40 3.14 2.92 2.73 2.56 2.42 25 8.40 6.87 5.87 5.15 4.61 4.19 3.85 3.56 3.33 3.12 2.95 2.79 50 8.94 7.33 6.28 5.53 4.97 4.53 4.17 3.88 3.63 3.42 3.23 3.07 100 9.44 7.75 6.66 5.88 5.30 4.85 4.48 4.18 3.92 3.70 3.51 3.34 Tc = time in minutes. Values may exceed 60. Precip. file name: K:\Hydraflow\Union Co.pcp Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 6-yr 10-yr 26-yr 60-yr 100-yr SCS 24-hour 2.98 3.60 2.10 4.52 5.25 6.27 7.08 7.93 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hemby Place Engineering Project Report BMP Analysis Section 6: BMP Analysis Hemby Place Engineering Project Report Wet Pond BMP #1 Section 6: BMP Analysis Composite Curve Number Worksheet Project 4727 - Hemby Place By AG Date 8/4/2021 Location Weddin ton, North Carolina Checked By CB Date 8/4/2021 Drainage Area Wet Pond BMP #1 DA Check one: ❑ Present ❑ Construction ❑ Developed Runoff Curve Number Soil Type(s) Hydrologic Soil Group Cover Description CN Area (acres) Product of CN x Area CeB2 B Good (grass covers >75% of area) 61 11.12 678.32 CeB2 B Paved Parking Lots, Roofs, Driveways 98 5.81 569.38 CeC2 B Good (grass covers >75% of area) 61 1.19 72.59 CeC2 B Paved Parking Lots, Roofs, Driveways 98 0.18 17.64 0 0 0 0 0 0 0 0 0 0 18.3 1337.93 total product 1337.93 CN (weighted) = total area 18.3 - 73.1 PROJECT NAME: Hemby Place PROJECT #: 4727 DESCRIPTION: BMP Wet Pond 41 Drainage Area: 18.29 Acres Impervious Area: 5.99 Acres % Impervious: 32.75% Pond Depth: 5.04 Feet SA/DA: 0.90 DATE: August 4, 2021 DESIGNER: B. Norris ENGINEER: C. Bridges Required Surface Area = (0.9/100) X 18.29 Acres X 43,560 SF/Ac. = 7,202 Sq.Ft. (Good - See Surface Area of Permanent Pool = 20502.36 sq.ft.) Runoff Coefficient = 0.05 + .9 (0.33% Impervious)) = 0.346 Orifice Equation: Q= CDA 2g—H CD: Coefficient of discharge A: Orifice Area (if) Orifice Size: 2.50 in. g: Gravity Ho: Driving head WQ Volume (To Be Controlled) = Design Rainfall X Runoff Volume X Drainage Area _ (1 in. Rainfall) X (0.345 in./in.) X (1/12 feet/in.) X (18.29 Acres) X (43,560 SF/Ac.) = 22,889 cu.ft. (OK - 22,971 cu.ft. @ 683.14 MSG when there is no release) Q=(0.6)'((0.104^2)'3.14))'(2'32.2'1.14/3)^(0.5) Q at: 683.14 MSG Q= 0.10 cfs Time to Drain= 22889 cu.ft.)/(0.1 cu.ft./sec)(86400 sec/day) 2.62 Days Total Temporary Volume =Volume of Lowest Orifice - Volume of Permanent Pool = 141774.29 CF - 100358.91 CF (taken from Full Pond Storage Volume chart) = 41,416 cu.ft. Q=(0.6)'((0.104^2)'3.14))'(2'32.2'1.5/3)^(0.5) Q= 0.12 cfs Time to Drain= 41415 cu.ft.)/(0.12 cu.ft./sec)(86400 sec/day) 4.13 Days PROJECT NAME: Hemby Place PROJECT #: 4727 DESCRIPTION: BMP Wet Pond #1 FULL POND STORAGE VOLUME: DATE: 4-Aug-21 DESIGNER: B. Norris ENGINEER: C. Bridges BMP Wet Pond #1 - Not including forebay, does include volume above 682 contour for total basin. (Does include 1 foot of sediment storage): Stages CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Storage 675.00 12,046 0.0 0 0 Bottom 676.00 13,151 0.0 0 0 677.00 14,290 1.0 13,721 13,721 678.00 15,464 1.0 14,877 28,598 679.00 16,672 1.0 16,068 44,666 680.00 17,915 1.0 17,293 61,959 681.00 19,191 1.0 18,553 80,512 Perm Pool 682.00 20,502 1.0 19,847 100,359 682.50 25,689 0.5 11,548 111,907 683.00 30,877 0.5 14,142 126,048 Weir 683.50 32,027 0.5 15,726 141,774 684.00 33,177 0.5 16,301 158,075 684.50 34,357 0.5 16,884 174,959 685.00 35,536 0.5 17,473 192,432 685.50 36,745 0.5 18,070 210,502 686.00 37,955 0.5 18,675 229,177 686.50 39,223 0.5 19,294 248,472 687.00 40,492 0.5 19,929 268,401 687.50 41,773 0.5 20,566 288,967 688.00 43,054 0.5 21,207 310,173 688.50 44,363 0.5 21,854 332,028 689.00 45,671 0.5 22,508 354,536 689.50 47,007 0.5 23,170 377,706 Riser 690.00 48,343 0.5 23,837 401,543 690.50 49,706 0.5 24,512 426,055 691.00 51,069 0.5 25,194 4511249 691.50 52,459 0.5 25,882 477,130 To Pond 692.00 53,849 0.5 26,577 503,707 MAIN POND PERMANENT POOL STORAGE VOLUME: BMP Wet Pond #1 - Not including forebay, does not include volume above 682 contour for total basin. (Does include 1 foot of sediment storage): Stages CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Storage 675.00 12,046 0.0 0 0 Bottom 676.00 13,151 0.0 0 0 677.00 14,290 1.0 13,721 13,721 678.00 15,464 1.0 14,877 28,598 679.00 16,672 1.0 16,068 44,666 680.00 17,915 1.0 17,293 61,959 681.00 19,191 1.0 18,553 80,512 Perm Pool 682.00 20,502 1.0 19,847 100,359 TEMPORARY STORAGE VOLUME ABOVE PERMANENT POOL: BMP Wet Pond #1- Includes area above Forebay Pond and Perminate Pond: Stages CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Perm Pool 682.00 20,502 0.0 0 0 682.50 25,689 0.5 11,548 11,548 683.00 30,877 0.5 14,142 25,689 Weir 683.50 32,027 0.5 15,726 41,415 684.00 33,177 0.5 16,301 57,717 684.50 34,357 0.5 16,884 74,600 685.00 35,536 0.5 17,473 92,073 685.50 36,745 0.5 18,070 110,144 686.00 37,955 0.5 18,675 128,819 686.50 39,223 0.5 19,294 148,113 687.00 40,492 0.5 19,929 168,042 687.50 41,773 0.5 20,566 188,608 688.00 43,054 0.5 21,207 209,815 688.50 44,363 0.5 21,854 231,669 689.00 45,671 0.5 22,508 254,177 689.50 47,007 0.5 23,170 277,347 Riser 690.00 48,343 0.5 23,837 301,184 690.50 49,706 0.5 24,512 325,696 691.00 51,069 0.5 25,194 350,890 691.50 52,459 0.5 25,882 376,771 Top Pond 11 692.00 53,849 0.5 26,577 403,348 FOREBAY STORAGE VOLUME: BMP Wet Pond #1- Forebay Pond (Percentage of total pond: 17.15% (Does include 1 foot of sediment storage): Stages CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Storage 675.00 2 0.0 0 0 Bottom 676.00 1,655 0.0 0 0 677.00 2,012 1.0 1,834 1,834 678.00 2,400 1.0 2,206 4,039 679.00 2,819 1.0 2,609 6,649 680.00 3,270 1.0 3,045 9,693 681.00 3,753 1.0 3,512 13,205 Perm Pool 682.00 4,267 1.0 4,010 17,215 rn N i O L N O z co m cc S O L cc U s O z a O U O w a _ D U � N �i r o u u d A w A a a a W W W r v v y_ u u o A ' H r~ 3 ) 0 O O O Hydrograph Return Period RecP� y raflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Inflow hyd(s) Peak Outflow (cfs) Hydrograph Description 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 2 SCS Runoff Reservoir ------ 1 26.22 0.483 39.02 1.419 ------- ------- ------- ------- 76.72 8.053 102.31 11.60 123.12 13.90 145.23 15.97 Post DA 1 BMP Wet Pond 1 Proj. file: 4727-wet pond.gpw Monday, 09 / 13 / 2021 Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 26.22 2 718 52,939 ------ ------ ------ Post DA 1 BMP 2 Reservoir 0.483 2 1134 51,745 1 683.62 38,101 Wet Pond 1 4727-wet pond.gpw Return Period: 1 Year Monday, 09 / 13 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 1 Post DA 1 BMP Hydrograph type = SCS Runoff Peak discharge = 26.22 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 52,939 cuft Drainage area = 18.300 ac Curve number = 73.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.98 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 Post DA 1 BMP Hyd. No. 1 -- 1 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 2 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 0.483 cfs Storm frequency = 1 yrs Time to peak = 1134 min Time interval = 2 min Hyd. volume = 51,745 cuft Inflow hyd. No. = 1 - Post DA 1 BMP Max. Elevation = 683.62 ft Reservoir name = Wet Pond #1 Max. Storage = 38,101 cuft Storage Indication method used. Wet Pond 1 Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) — Hyd No. 2 Hyd No. 1 Total storage used = 38,101 cult Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Pond No. 1 - Wet Pond #1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 682.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 682.00 20 0 0 0.50 682.50 25,689 4,404 4,404 1.00 683.00 30,877 14,120 18,524 1.50 683.50 32,027 15,724 34,248 2.00 684.00 33,177 16,299 50,546 2.50 684.50 34,357 16,881 67,427 3.00 685.00 35,536 17,471 84,898 3.50 685.50 36,745 18,068 102,965 4.00 686.00 37,955 18,672 121,638 4.50 686.50 39,223 19,292 140,929 5.00 687.00 40,492 19,926 160,855 5.50 687.50 41,773 20,563 181,419 6.00 688.00 43,054 21,204 202,623 6.50 688.50 44,363 21,851 224,474 7.00 689.00 45,671 22,505 246,979 7.50 689.50 47,007 23,166 270,146 8.00 690.00 48,343 23,834 293,980 8.50 690.50 49,706 24,509 318,489 9.00 691.00 51,069 25,191 343,679 9.50 691.50 52,459 25,879 369,558 10.00 692.00 53,849 26,574 396,132 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 42.00 12.00 2.50 0.00 Span (in) = 42.00 24.00 2.50 0.00 No. Barrels = 1 1 1 0 Invert El. (ft) = 678.48 683.50 682.00 0.00 Length (ft) = 96.18 0.00 0.00 0.00 Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes Yes No Stage (ft) 10.00 8.00 6.00 4.00 2.00 0 00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 20.00 0.00 0.00 0.00 Crest El. (ft) = 690.00 0.00 0.00 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = 1 --- --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 0.0 20.0 40.0 60.0 80.0 Total Q 692.00 690.00 688.00 686.00 684.00 682.00 100.0 120.0 140.0 160.0 Discharge (cfs) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 39.02 2 718 78,063 ------ ------ ------ Post DA 1 BMP 2 Reservoir 1.419 2 844 76,776 1 683.81 44,510 Wet Pond 1 4727-wet pond.gpw Return Period: 2 Year Monday, 09 / 13 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 1 Post DA 1 BMP Hydrograph type = SCS Runoff Peak discharge = 39.02 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 78,063 cuft Drainage area = 18.300 ac Curve number = 73.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post DA 1 BMP Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 2 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 1.419 cfs Storm frequency = 2 yrs Time to peak = 844 min Time interval = 2 min Hyd. volume = 76,776 cuft Inflow hyd. No. = 1 - Post DA 1 BMP Max. Elevation = 683.81 ft Reservoir name = Wet Pond #1 Max. Storage = 44,510 cuft Storage Indication method used Q (cfs) 40.00 20.00 10.00 0.00 ' 0 600 — Hyd No. 2 Wet Pond 1 Hyd. No. 2 -- 2 Year 1200 1800 2400 — Hyd No. 1 3000 3600 4200 4800 5400 Total storage used = 44,510 cuft Q (cfs) 40.00 30.00 20.00 10.00 1 0.00 6000 Time (min) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 76.72 2 718 154,869 ------ ------ ------ Post DA 1 BMP 2 Reservoir 8.053 2 744 153,443 1 684.65 72,828 Wet Pond 1 4727-wet pond.gpw Return Period: 10 Year Monday, 09 / 13 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Post DA 1 BMP Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 18.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.25 in Storm duration = 24 hrs Q (cfs) 80.00 70.00 40.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 1 BMP Hyd. No. 1 -- 10 Year Monday, 09 / 13 / 2021 = 76.72 cfs = 718 min = 154,869 cuft = 73.1 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1 ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 2 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 8.053 cfs Storm frequency = 10 yrs Time to peak = 744 min Time interval = 2 min Hyd. volume = 153,443 cuft Inflow hyd. No. = 1 - Post DA 1 BMP Max. Elevation = 684.65 ft Reservoir name = Wet Pond #1 Max. Storage = 72,828 cuft Storage Indication method used. Q (cfs) 80.00 70.00 40.00 20.00 10.00 Wet Pond 1 Hyd. No. 2 -- 10 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 1 1 1 ' 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 5760 Time (min) — Hyd No. 2 Hyd No. 1 Total storage used = 72,828 cult Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 102.31 2 716 206,998 ------ ------ ------ Post DA 1 BMP 2 Reservoir 11.60 2 740 205,516 1 685.38 98,593 Wet Pond 1 4727-wet pond.gpw Return Period: 25 Year Monday, 09 / 13 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Post DA 1 BMP Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 18.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.27 in Storm duration = 24 hrs Q (cfs) 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 1 BMP Hyd. No. 1 -- 25 Year 0.00 ' ' ' ' ' ' ' 0 120 240 360 480 600 720 840 — Hyd No. 1 Monday, 09 / 13 / 2021 = 102.31 cfs = 716 min = 206,998 cuft = 73.1 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 120.00 100.00 40.00 20.00 0.00 960 1080 1200 1320 1440 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 2 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 11.60 cfs Storm frequency = 25 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 205,516 cuft Inflow hyd. No. = 1 - Post DA 1 BMP Max. Elevation = 685.38 ft Reservoir name = Wet Pond #1 Max. Storage = 98,593 cuft Storage Indication method used. Q (cfs) 120.00 100.00 40.00 20.00 0.00 ' ' WIM 0 480 — Hyd No. 2 Wet Pond 1 Hyd. No. 2 -- 25 Year 960 1440 1920 Hyd No. 1 2400 2880 3360 3840 4320 Total storage used = 98,593 cuft Q (cfs) 120.00 100.00 40.00 20.00 0.00 4800 Time (min) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 123.12 2 716 250,047 ------ ------ ------ Post DA 1 BMP 2 Reservoir 13.90 2 738 248,527 1 685.99 121,144 Wet Pond 1 4727-wet pond.gpw Return Period: 50 Year Monday, 09 / 13 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Post DA 1 BMP Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 18.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.08 in Storm duration = 24 hrs Q (cfs) 140.00 120.00 100.00 40.00 20.00 GTiTi1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 1 BMP Hyd. No. 1 -- 50 Year 0 120 240 360 480 600 720 840 — Hyd No. 1 Monday, 09 / 13 / 2021 = 123.12 cfs = 716 min = 250,047 cuft = 73.1 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 r.TiT.I 960 1080 1200 1320 1440 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 2 Wet Pond 1 Hydrograph type = Reservoir Storm frequency = 50 yrs Time interval = 2 min Inflow hyd. No. = 1 - Post DA 1 BMP Reservoir name = Wet Pond #1 Storage Indication method used. Q (cfs) 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wet Pond 1 Hyd. No. 2 -- 50 Year Monday, 09 / 13 / 2021 = 13.90 cfs = 738 min = 248,527 cuft = 685.99 ft = 121,144 cuft Q (cfs) 140.00 120.00 100.00 40.00 20.00 r.TiT.I 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Time (min) Hyd No. 2 Hyd No. 1 Total storage used = 121,144 cult Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 145.23 2 716 296,406 ------ ------ ------ Post DA 1 BMP 2 Reservoir 15.97 2 738 294,854 1 686.63 146,120 Wet Pond 1 4727-wet pond.gpw Return Period: 100 Year Monday, 09 / 13 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Post DA 1 BMP Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 18.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.93 in Storm duration = 24 hrs Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 GTiTi1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post DA 1 BMP Hyd. No. 1 -- 100 Year 0 120 240 360 480 600 720 840 — Hyd No. 1 Monday, 09 / 13 / 2021 = 145.23 cfs = 716 min = 296,406 cuft = 73.1 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 r.TiT.I 960 1080 1200 1320 1440 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Monday, 09 / 13 / 2021 Hyd. No. 2 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 15.97 cfs Storm frequency = 100 yrs Time to peak = 738 min Time interval = 2 min Hyd. volume = 294,854 cuft Inflow hyd. No. = 1 - Post DA 1 BMP Max. Elevation = 686.63 ft Reservoir name = Wet Pond #1 Max. Storage = 146,120 cuft Storage Indication method used. Wet Pond 1 Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 160.00 - 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 360 Hyd No. 2 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2020.4 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 3426.6079 59.3997 1.6213 -------- 2 76.9232 13.1000 0.8842 -------- 3 0.0000 0.0000 0.0000 -------- 5 77.2081 12.9000 0.8371 -------- 10 75.5517 12.4000 0.8036 -------- 25 66.0145 11.1000 0.7420 -------- 50 59.2567 10.1000 0.6965 -------- 100 53.8843 9.2000 0.6563 -------- File name: Union County.IDF Intensity = B / (Tc + D)^E Monday, 09 / 13 / 2021 Return Period Intensity Values (in/hr) (Yrs) 6 min 10 16 20 26 30 36 40 46 60 66 60 1 4.00 3.54 3.17 2.85 2.58 2.35 2.15 1.98 1.83 1.69 1.58 1.47 2 5.94 4.79 4.03 3.49 3.08 2.76 2.50 2.30 2.12 1.97 1.84 1.73 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.90 5.61 4.76 4.15 3.68 3.32 3.03 2.79 2.58 2.41 2.26 2.13 10 7.61 6.21 5.28 4.62 4.11 3.72 3.40 3.14 2.92 2.73 2.56 2.42 25 8.40 6.87 5.87 5.15 4.61 4.19 3.85 3.56 3.33 3.12 2.95 2.79 50 8.94 7.33 6.28 5.53 4.97 4.53 4.17 3.88 3.63 3.42 3.23 3.07 100 9.44 7.75 6.66 5.88 5.30 4.85 4.48 4.18 3.92 3.70 3.51 3.34 Tc = time in minutes. Values may exceed 60. Precip. file name: K:\Hydraflow\Union Co.pcp Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 6-yr 10-yr 26-yr 60-yr 100-yr SCS 24-hour 2.98 3.60 2.10 4.52 5.25 6.27 7.08 7.93 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hemby Place Engineering Project Report APPENDIX A Appendix A: DATF I ISSUED FOR REVI 08/20/2021 Submittal to City of Weddington and NCDOT 0 09/17/2021 Second Submittal to City of Weddington and NCDEQ 0 A0Wftk1-, @P NOI N CARNINA qkp �11 Know what's belOW. N� 0—flnc-call Center Call before you dig. Engineer: R. Joe Harris & Associates, Inc. Engineering • Land Surveying • Planning Management 1186 Stoneaest Blvd., Tega Cay, S.C. 29708 P: (803) 802-1799 www.rjoeharris.com This drawing shall not be used for construction purposes until the seal and signature of the responsible registrant appears on the drawing, and proper permit forms and related fees are transmitted by the Owner, Owner's Agent or Contractor to the Authority having jurisdiction. Corporate Seal Engineer's Seal `®eat u u u �iiiii CAR �®e`t t n n � �iiiii RO'y'°' oSS/po \\A�A -°E �°°OFESS/oo ® o°� 9>®: �> o 9l� SEAL = o>° C---' - Z043341 =oC4168 ��� o. o Project Manager - C. Bridges A. Gendelman Department Manager Checked P. Murphy C. Bridges Print/Plot Date September 17, 2021 Asbuilt Date TOLL BROTHERS 14529 GRAND PALISADES PKWY CHARLOTTE, NORTH CAROLINA 28278 P: (704) 849-2625 Project: Hemby Place Drawing Title: Pre Development Drainage Area Project No. Drawing No. 4727 DWG File Name: C4 0 0 4727 - Pre & Post • V b f r 1 I �:.:1.-V 'PARCEL #O6 7 '"�"�. 6.2 I TE � : I I . G r . ill. U S ... PLD NALY.SIS P INT #4 .. .:............. - .. TY :: .. ..... .. .... .. S SS � ...... ..... � I DATE I ISSUED FOR REVI 08/20/2021 Submittal to City of Weddington and NCDOT 0 09/17/2021 Second Submittal to City of Weddington and NCDEQ 0 fk1-, ffn NORTH CARDIINA 11 Know what's below N*wg GAwE:..� One•C.all Center Call before you dig. Engineer: R. Joe Harris & Associates, Inc. Engineering • Land Surveying • Planning Management 1186 Stoneaest Blvd., Tega Cay, S.C. 29708 P: (803) 802-1799 www.rjoeharris.com This drawing shall not be used for construction purposes until the seal and signature of the responsible registrant appears on the drawing, and proper permit forms and related fees are transmitted by the Owner, Owner's Agent or Contractor to the Authority having jurisdiction. Corporate Seal Engineer's Seal `®eat u u u �iiiii CAR �®e`t t n n � �iiiii CA ROo ° �F ESS/p� �y �'® 0�`�����\A l'''®�. :`` � *o** ()F ESS/0 o�y'�® o 'Q� 9� >o _� o l �9� >0 = om SEAL CD = °,o � C-4168 o z = ow SEAL Zo - Z o e 043341 o� °FFR/NG & S� ® ® Fti �= ®�i ^ ''d' �''000 0000A 000 Project Manager C. Bridges A. Gendelman Department Manager Checked P. Murphy C. Bridges Print/Plot Date September 17, 2021 Asbuilt Date TOLL BROTHERS 14529 GRAND PALISADES PKWY CHARLOTTE, NORTH CAROLINA 28278 P: (704) 849-2625 Project: Hemby Place Drawing Title: Post Development Drainage Area Project No. Drawing No. 4727 DWG File Name: C4 0 4727 - Pre & Post • x A\\ PARCEL #06147176 DB: 7293 PG: 426 CB #402 GPI DEEP VOHRA & ARCHANA VOHRA G / AREA: 0.23 AC ' - � GP°' PARCEL #06147177 C: 0.91 9 DB: 7542 PG: 0001 S S` SS RSS � SS SS PROPERTY BO DARY _ S` SS SS CB #401 SS I l �AREA: 0.20AC----- ------ ..... ......... C: 0.89 / / / / - - - - --......... . -- EX. DI #2 1441' / AREA: 0.22 AC DCB #�12 C: 0.30 i DCB #124 �1 := : I. AREA: 0.49 AC - moo, - I C: 0.49 - - D� 1$- : %.......... .... DI #400 EX. AREA: 0.11 AC r DI #165 I I \ C: 0.30 AREA: 0.AC I I 5 C: 0.43 I o I W I/. EX. CB #1 1 #403 so DDI #403 W AREA: 1.45 AC C: 0.30 DDI AREA: � C: 2U �° 9\ D I AREA: ` C: I 1921 AC > 5 X. WETLANDS I 4 ( tio� I (TYP.) !� CB 1 3 I 0.32 A c� �- 2 0.34 AC I SF k / p6 / 5 I / 1 14355 SF CB #123 o !77Q DCB #119 1 SF CB #117 AREA: 0.14 AC AREA: 0.40 AC CB #116 C. 0.68 / C: 0.61 AREA: 0.26 AC AREA: 0.12 AC CB #121 �'� I z� r� _ CB #117-r v\-.o rr I I � w / 0.3 AAREA: 0.22 AC /JC)%AIIIIIIIII�B #120 AREA: 0.14 AC C 116 I S AREA: 0.55 AC o.a Ac #122 166 C: 0.68 CB #120 C: 0.67 _ o C: 0.64 I i / CB #„ i 2135 SF 0.83 AC AREA: 0.16 AC ,� 4p.4a, CBI#115 0.42 C: 0.67 ES CB #107 / 14 W3 N GVBL\G R� °a AREA: 0.21 AC CB #114 C: 0.66 Ste. AREA: 0.27 AC ' 8 CB #106 C: 0.64 L CB #108 3z AREA: 0.10 AC \ 7 o. ` ��B #113 0.4 C AREA: 0.17 AC 31 z7 sF C: 0.63 / C: 0.69 ° \ CB #113 1 2 SF w / 8 zz sF \ AREA: 0.06 AC 8 0. \ \ C:0.73 145 SFCB 11 s CB #109 0 30 \ 19365 SF / W �= \. AREA: 0.09 AC 652 sF CB #105 \ \ \ C: 0.75 \ AREA: 0.02 AC z \ \ \ C:0.79 \ �- CB #110 \ \ ---CB #105 \ / AREA: 0.21 AC \ DD1141 7 C: 0.68 \ / \ 0.3 AC � \ \ 147 SF \\ \ DDI #112 AREA: 1.61 AC 1 0. / C: 0.40 / \ CB #103 AREA: 0.18 AC / G \. C: 0.69 CB #104 9 \ AREA: 0.11 AC' \ C #10 Ac CB #102 \ WALL #100 6 a \ � �O / �\ \ C: 0.70 s AREA: 0.05 AC 01 \ 1480 ASF m \ # C: 0.69 I 1 � \ \ \ 33 C #10 / \ CB#�1\ \ \ 0 23SF / � •\ 34 � o CB #213 \ \ 0.3 CB #200 AREA: 0.21 AC s sF AREA: 0.43 AC i \\ B M P / C: 0.68 35 C: 0.68 ,5 \ D 3 C AC CB #202 3 SF ®�� CB #300 ?SF � \ 1482 AREA: 0.15 AC � / AREA: 0.25 AC #404 \ C: 0.68 / N R`3=" \_ C: 0.68 � � LP E 1.34 AC \ / �� CB #201 �GNOGR C / N EX, WETLANDS 0.30 / \\ y ��N�'`\�5 �' / \ 1 _ / �m \ (TYP.) AREA: 0.17 AC CB 202 \ C: 0.78 DCB #307 / 4 B #2 / CB \ D. / DDI #111 148 SF 0.4 AC \ DDI #214 C #2 3 \ #212 / CB #211 DCB #307 195 sF \ CB #212 AREA: 0.46 AC AREA: 0.86 AC AREA: 1.44 AC �\ AREA: 0.14 AC C: 0.48 C: 0.40 CB #301 / C: 0.41 C: 0 82 AREA: 0.11 AC \ \ / C: 0.68 \ DDI #111 DDI #21-4 o' / _ AREA: 0.63 AC \ \ I mo g6� / CB #203 B #3 5q8' C: 0.41 \ \ AREA: 0.20 AC \ C: 0.68 0. AC I \ \ \ 156 SF \ \ CB# C #3a SF 6 \ \ CB #308 CB #302 \ < \ AREA: 0.20 AC CB #205 \ AREA: 0.29 AC C: 0.68 ^ W \ 204 \\ C: 0.42 CB #204\\\ AREA: 0.08 AC CB #309 /a AREA: 0.11 AC C: 0.69 AREA: 0.04 AC C: 0.70 C: 0.85 I 14 / 2 CB #310 \\ \ \ CB #303 C / 1 18584 SF / \ o. AC 20 \ 175 CB #310 AREA: 0.05 AC I \ N \ \ a"az AREA: 0.09 AC \ \ C: 0.78 / g t C: 0.80 CB #21/ 4 CB #305 \ \ CB #206 CB #311 B #309 �. CB #304 15 \ \ / AREA: 0.29 AC \ AREA: 0.25 AC AREA: 0.15 AC 0. AC \ \ \ AREA: 0.03 AC C: 0.68 3 3 C: 0.51 g C: 0.66 183 SF CB #209 C:0.63 #3 i \ \ AREA: 0.29 AC 21 c - R' SCB #3Q5 �11\ \ \ C: 0.34 B #21s�za DCB #312 '" � ► \ 01 AREA: 0.35 AC CB #207 / 1 '830 S C: 0.68 CB #306 CB #208 AREA: 0.13 AC / 19 B 6 AREA: 0.33 AC r / C: 0.40 CB #215 C: 0.66 / AREA: 0.20 AC i lor, AREA: 0.03 ACC: 0.33 / 14852 SF AREA: / I/ 15010 SF 1 0.4 AC / CB #210 1 \ \ / I / 1 17 8 SF 1 / PROPERTY BOUNDARY AREA: 0.29 AC 17 - / - C: 0.65 / CB #207 \ DI #313 \ AREA: 0.89 AC �(Z #3� a 16599 S6' ` C: 0.41 I // dI CB I ` N / 1 / B 209 CB #208 L/ ✓ / CB / \ / AREA: 0.10 AC / C: 0.20 d, I I° CB #216 GRAPHIC SCALE I � I �i' / -60 0 30 60 120 ` 61 m ' i ,' 1 ( IN inch - FEET d� / . / - 60 ft. I � 3 PARQ DATE ISSUED FOR REV 08/20/2021 Submittal to City of Weddington and NCDOT 0 09/17/2021 Second Submittal to City of Waddington and NCDEQ 0 NORTH CARn[M qkp 811 Know whars w belo hiInE:..a Pne•CaIl Center Call before you dig. Engineer: R. Joe Harris & Associates, Inc. Engineering • Land Surveying • Planning Management 1186 Stoneaest Blvd., Tega Cay, S.C. 29708 P: (803) 802-1799 www.rjoeharris.com This drawing shall not be used for construction purposes until the seal and signature of the responsible registrant appears on the drawing, and proper permit forms and related fees are transmitted by the Owner, Owner's Agent or Contractor to the Authority having jurisdiction. Corporate Seal Engineer's Seal CAR�'°®.�`�����N CAR000,PI°°®°. O�91 ° o°Oe 0 om SEAL >C-4168 ° z ° SEAL zo y o L9 043341 8 S� ° ��`.` �= ®,�iJ' ° ��, �00 \� ASS� ��°s®��opHER1R````,.e®`0 °°°°°°°°°°°� `.` Project Manager Drawn C. Bridges B. Norris Department Manager Checked P. Murphy C. Bridges Print/Plot Date September 17, 2021 Asi ilt Drawn TOLL BROTHERS 14529 GRAND PALISADES PKWY CHARLOTTE, NORTH CAROLINA 28278 P- (704) 849-2625 Project: Hemby Place Drawing Title: Storm Drainage Areas Project No. Drawing No. 4727 DWG File Name: C 0 0 4727 - Storm •