Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6210602_Stormwater Report_20211006
Prepared for: LITTLE CROSS, LLC 8625 Mt. Pleasant Church Road Angier, NC 27592 919.422.7066 StIormwater Erosion Control Narrative Kathryn's Retreat Subdivision Phase 4 Harnett County, NC Town of Angier Apri 19, 2021 Curr ENGINEERING Prepared by: Andy Petty, PE The Curry Engineering Group, PLLC PO Box 2018 205 S. Fuquay Ave. Fuquay-Varina, NC 27526 (919)552-0849 � rt 36823 2021.04.08 09.37.17 - 04'00' Curr ENGINEERING TABLE OF CONTENTS NARRATIVES Site Location and Description Project Development Erosion Control Stormwater Management Storm Sewer Hydraulic Gradeline Analysis Storm Sewer Gutter Spread Analysis SUPPORT DOCUMENTS USGS Topography Map FEMA Floodplain Map NRCS Soils Information Rainfall Data Stream Classification CALCULATIONS & ANALYSIS Stormwater Management Calculations Storm Sewer Calculations Gutter Spread Calculations Outlet Protection Calculations Sediment Basin Calculations Diversion Ditch Calculations T (919) 552-0849 205 S. Fuquay Avenue F (919) 552-2043 Fuquay-Varina, NC 27526 E N F� EST Q u, z 10 04� P� NARRATIVES Site Location & Description Little Cross, LLC, plans to develop approximately 13.9 acres of vacant property off Campbell Road in Angier, NC. The property is bordered by vacant property to the west, the Town of Angier sewage treatment plant to the south, and Campbell Road to the east and north. i I r KATHRYN'S RETREAT f r r J ei ti tl rY rt,) rieiui 1 Figure 1 - Vicinity Map - Courtesy of Harnett County GIS 2018 The property historically has been uses for farming and is currently vacant. About half the site is cleared and half is wooded. There is a jurisdictional pond located near the middle of the site with jurisdictional stream that runs from the base of the pond to Black River which bi-sects the south west corner of the proeprty. Since this stream is in the Cape Fear River Basin, there are no riparian buffers required however neither feature will be impacted. Wetlands also exist on the property throughout the property. For Phase 4, there are no impacts anticipated to wetlands. 3 Project Development The developer plans to develop the property such that a total of 27 lots can be constructed in this phase. The lots will be all single family detached dwelling units. The property is zoned to R6. The developer plans to mass grade the property and as a result, a larger disturbance is proposed than what would be needed for infrastructure only. Public utilities will be required for the subdivision. The nearest point of connection for potable water is an existing 6" public water main within the Campbell Road right of way. The nearest public sanitary sewer is connection is an existing 12" sewer outfall along the western side of the property that drains to the Town of Angier sewer treatement plant. Erosion Control The purpose of this project is to clear and grub and construct infrastructure and lot grading for the 27-lot phase of this residential subdivision. The property is privately owned. See owner information on existing conditions plan. The site is currently undeveloped. Approximately 8 acres will be disturbed during construction. The maximum fill will be approx. 2 feet. This project will involve removal of topsoil to create residential roadway and infrastructure as well as mass grading of lots. An underground storm drainage system will be installed to convey stormwater to permanent stormwater management areas. The project is scheduled to begin construction in late spring 2021 with project completion and final stabilization by fall of 2021. The erosion and sediment control program for this project will include the installation of a suitable construction entrance, temporary silt fencing, silt fence outlets, diversion ditches, inlet protection measures and sediment basins. The soils at this site are predominately loamy sands. Soils are mostly well drained with Ksat ranges from moderately low to high. Slopes are largely between 2 to 6%, but up to 10% in some cases. The soils are classified within hydrologic group B/C. Soils information has been obtained through the USDA & NRCS website: http://websoilsurvey.nres.usda.gov/app/ for Harnett County. Stormwater Management The site drains to Black River within the Cape Fear River Basin. The stream index classification is #18-68-12-1 and is designated as "C; Sw". This site is located within a Phase II regulated area of the Cape Fear River basin of North Carolina. Phase II regulations require that all impervious surfaces captured must be treated for 85% total suspended solids (TSS) and the volume of runoff from the first inch of rainfall be treated and released over two to five days. An additional requirement for detention of the 2-yr and 10-yr storm events per the Town of Angier Stormwater ordinance must also be met. 4 To treat 85% TSS and control the pre -post attenuation, a wet detention basin is being utilized to capture on -site stormwater runoff. At this time, the Town of Angier, per their Phase II permit does not require treatment or an off -set payment for nutrient removal (nitrogen or phosphorus). However, per NCDENR Water Quality, a wet detention basin will provide a 25% reduction in nitrogen and a 40% reduction in phosphorus. This project is considered a high density (greater than 24% impervious) project once fully built out. The following is a brief summary of the stormwater requirements for this site from the Town of Fuquay- Varina Stormwater ordinance. Control and treat the difference in stormwater runoff volume leaving the project site for the one inch (1 ") rainfall event. This volume shall draw down between 2-5 days. Must be designed per NCDENR standards to meet 85% Total Suspended Solids (TSS) removal. Peak flow attenuation for the 1 yr, 2 yr and 10 yr 24-hour rainfall events The project includes mass grading the site, however, the intent is to mimic the existing drainage patterns in the post development state without significant diversions. The site drains toward Black River as shown on SW-01. In order to accomplish minimize impacts to natural drainage basins; a wet detention pond is located such that it drains the entire roadway infrastructure and all single family lots. A series of catch basins and yard inlets are provided to capture the runoff from the lots and roadways. The results of the pre - post analysis provide compliance with the pre -post stormwater controls cumulatively for the site. The pre -development conditions were modeled with hydrologic soils type "B" in fair conditions as the surrounding areas have been used for farming with sparse ground cover. A season high water table investigation has not yet been conducted however the wet detention facility has been designed with a clay liner to limit both ground water and reduced permanent pool volume. The wet detention facilities have been modeled using Hydraflow Hydrographs by AutoDesk. The SCS method was utilized for determining pre/post flow rates. Water Quality - Permanent Pool Requirement Permanent Pool Permanent Pool Water Quality Water Quality SCM Number Area Required (SF) Area Provided (SF) Volume Required Volume Required (C F) (C F) 3 4,854 6,536 11,194 12,793 5 Water Quantity Summary Table Pre -Development Post -Development Peak Net Change Net Change Storm Event Peak Flow Flow w/SCM (cfs) (%) (cfs) (cfs) 2 yr 31.98 20.42 -11.56 -36% 10 yr 95.52 69.78 -25.74 -27% 25 yr 141.74 177.06 35.32 25% 100 yr 227.52 355.86 128.34 56% Storm Sewer Hydraulic Grade Iine Analysis The project will require the use of several curb inlets & yard inlets to capture stormwater runoff. Standard NCDOT grated type catch basins are being utilized within the subdivision and right of way street improvements. The storm drainage system for this project has been designed with the following criteria: • Class III RCP with 15-in minimum pipe diameter. • Start the HGL analysis at 80% full of the outlet pipe • Maintain 10 yr. HGL inside system • Minimum slope of 0.5%. • Minimum velocity of 2 fps and max velocity of 10 fps. • Minimum Cover of 2-ft (top of subgrade to crown). Each inlet has a delineated drainage basin composite C value for land use and a minimum Tc of five (5) minutes for the enclosed pipe system sizing. The rational method was utilized for calculating peak flow. The hydraulic grade line for the storm drainage system was calculated using Hydraflow Storm Sewers by Autodesk. The analysis included checking the system for inlet control. Refer to the calculations section for the Hydraflow output calculations. Storm Sewer Gutter Spread Analysis In addition to an HGL anlaysis the storm sewer system in the residential roadways were analyzed for gutter spread. The gutter spread for the storm drainage system has been designed with the following criteria: • Max gutter spread within roadway is 8 feet during the 4 in/hr event with the exception of cul-de-sac catch basins, yard inlets and inlets inside parking areas. • Mannings "n" of the gutter is 0.013. • Cross slope of road is 2% • Longitudinal slope of road as designed. Each inlet has a delineated drainage basin, composite C value for land use and a minimum Tc of five (5) minutes. The rational method was utilized for calculating peak flow. The gutter spread analysis for the storm drainage system was calculated using Hydraflow Storm Sewers by Autodesk. The analysis included checking the system for inlet control. Refer to the calculations section for the Hydraflow output calculations. 7 SUPPORT DOCUMENTS USGS 7.5 Minute Map N EST. 0 10 '06 -- \ r • An 300 ler PROPERTY BOUNDARY Lw a; L� CurryENGINEERING T (919) 552-0849 205 S. Fuquay Avenue F (919)552-2043 FuquayWanna, NC 27526 NC LIC. NO. P-0799 KATHRYNS PLACE SUBDIVISION USGS 7.5 MINUTE MAP SUPPORT DOCUMENTS FEMA Flood Map N EST. 0 10 - �E Mciver St U) * 0�. _ Am Ct LJ f cn 41r f� djM isRiver l WoodcrOft DP' PROPERTY BOUNDARY ' 35°3 -V — 1573 r 4 /1 L � 'All N00 ^� ar o O O N = i CD Q,'�. P a Fox Field Dr o K � O 74-4 + �•• 2- 35°2 'N T'lo n55 T (919) 552-0849 205 S. Fuquay Avenue Curr F (919) 552-2043 FuquayWanna, NC 27528 KA THRYNS PLACE FEMA MAP ENGINEERING NC LIC. NO. P-0799 SUPPORT DOCUMENTS USDA Soils Survey N EST. 0 10 3 N 1-1 1-1 1-1 1-1 Custom Soil Resource Report Soil Map PROPERTY BOUNDARY . "i�f •-•: Cyr.low - - "r N 705390 705470 705550 70%30 705710 70579C 3 g Map Scale: 1:3,800 fi pnnted on A landscape (11" x 8.5'D s11eet N� 0 6-0 100 � 2I)0 300 AD ,3o,D � 900 Map proWan: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 9 L; D _7 -*-A A 705570 7D5950 706030 706110 T (919) 552-0849 205 S. Fuquay Avenue Curr F (919) 5152-2043 FuguayWanna, NC 27526 KA THRYNS PLACE NRCS SOILS MAP ENGINEERINGI NC LIC. NO. P-0799 OL F 'p— 35- 706190 3 SUPPORT DOCUMENTS Rainfall Data N EST. 0 10 NOAA Atlas 14, Volume 2, Version 3 Location name: Erwin, North Carolina, USA* Mt Latitude: 35.3247°, Longitude:-78.6880 Elevation: 148.53 ft** *source: ESRI Maps source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hourp Duration Average recurrence interval (years) 1 2 5 10 25 50 1 100 100 200 500 1000 5-min 5.24 (4.79-5.77) 11 6.16 (5.64-6.78) 7.13 7.91 8.81 1 (8.00-9.66) 9.49 (8.59-10.4) 10.1 1 (9.11-11.1) 10.7 1 (9.60-11.7) 11.4 1 (10.2-12.5) 12.1 1 (10.6-13.2) 4.18 4.93 5.71 6.33 7.02 7.55 8.05 8.50 9.05 9.49 10-min (3.82-4.61) (4.51-5.42) 1 (5.77-6.95) 11 (6.37-7.70) 1 (6.84-8.27) 1 (7.24-8.81) 1 (7.61-9.31) 1 (8.03-9.91) 1 (8.35-10.4) 3.49 4.13 4.81 5.34 5.93 6.38 6.78 7.15 7.60 7.94 15-min (3.18-3.84) 1 (4.40-5.29) 11 (4.86-5.86) 11 (5.39-6.50) 1 (5.77-6.98) 1 (6.10-7.42) 1 (6.40-7.83) 1 (6.74-8.32) 1 (6.98-8.71) 2.39 2.85 3.42 3.87 4.39 4.80 5.20 5.57 6.05 6.43 30-min (2.18-2.63) 11 (2.61-3.14) 11 (3.12-3.76) 11 (3.53-4.25) 11 (3.99-4.82) 1 (4.35-5.26) 1 (4.67-5.68) 1 (4.98-6.09) 1 (5.36-6.62) 1 (5.65-7.05) 1.49 1.79 2.19 2.52 2.93 3.25 3.58 3.90 4.34 4.69 60-min (1.36-1.64) 1 1 (2.00-2.41) 1 (2.66-3.21) 1 (2.95-3.56) 1 (3.22-3.91) 1 (3.49-4.27) 1 (3.84-4.75) 1 (4.13-5.15) 0.874 1.06 1.32 1.53 1.81 2.05 2.28 2.53 2.86 3.14 2-hr (0.790-0.978) (0.957-1.18) 1 1 (1.62-2.02) (1.82-2.28) 1 (2.02-2.54) 1 (2.22-2.81) 1 (2.49-3.18) 1 (2.71-3.50) 0.618 0.748 0.934 1.10 1.31 1.50 1.69 1.89 2.18 2.42 3-hr (0.560-0.693) (0.677-0.836) (0.844-1.05) (0.988-1.22) 11 (1.18-1.46) 1 (1.33-1.67) 1 (1.49-1.88) 1 (1.66-2.10) 1 (1.88-2.42) 1 (2.07-2.70) 0.370 0.447 0.560 0.658 0.790 0.904 1.02 1.15 1.33 1.49 6-hr (0.337-0.412) (0.407-0.497) (0.508-0.621) (0.595-0.729) (0.709-0.874) (0.806-0.999) (0.904-1.13) 1 (1.01-1.27) 1 (1.15-1.47) 1 (1.27-1.64) 0.216 0.261 0.329 0.389 0.470 0.541 0.616 0.698 F 0.815 F 0.918 12-hr (0.196-0.241) (0.237-0.291) (0.297-0.367) (0.350-0.432) (0.420-0.522) (0.479-0.599) (0.540-0.681) (0.605-0.771) (0.695-0.900) (0.772-1.01) 0.127 0.154 0.198 0.233 0.281 0.322 0.364 0.408 0.471 0.523 24-hr (0.116-0.140) (0.141-0.170) (0.180-0.217) (0.211-0.255) (0.254-0.309) (0.290-0.353) (0.326-0.399) (0.365-0.449) (0.418-0.520) (0.462-0.577) 0.074 0.090 0.114 0.134 0.161 0.183 0.207 0.232 0.267 0.295 2-day (0.068-0.081) (0.082-0.098) (0.104-0.125) (0.122-0.146) (0.146-0.176) (0.165-0.200) (0.186-0.226) (0.207-0.254) (0.237-0.293) (0.260-0.325) 0.053 0.064 0.080 0.094 0.112 0.128 0.144 0.160 0.184 0.203 3-day (0.049-0.057) (0.059-0.069) (0.074-0.087) (0.086-0.102) (0.102-0.122) (0.116-0.139) (0.130-0.156) (0.144-0.175) (0.164-0.201) (0.180-0.222) 0.042 0.051 0.064 0.074 0.088 0.100 0.112 0.125 0.142 0.157 4-day (0.039-0.045) (0.047-0.055) (0.058-0.069) (0.068-0.080) (0.081-0.095) (0.091-0.108) (0.101-0.121) (0.112-0.135) (0.128-0.155) (0.140-0.171) 0.028 0.033 0.041 0.048 0.057 0.064 0.071 0.078 0.089 0.098 7-day (0.026-0.030) (0.031-0.036) (0.038-0.045) (0.044-0.052) (0.052-0.061) (0.058-0.069) (0.064-0.077) (0.071-0.085) (0.080-0.097) (0.087-0.106) 0.022 0.027 0.032 0.037 0.043 0.048 0.053 0.058 0.065 0.071 10-day (0.021-0.024) (0.025-0.029) (0.030-0.035) (0.034-0.040) (0.040-0.046) (0.044-0.052) (0.049-0.057) (0.053-0.063) (0.059-0.070) (0.064-0.076) 0.015 0.018 0.021 0.024 0.028 0.031 0.034 0.037 0.041 0.044 20-day (0.014-0.016) (0.017-0.019) (0.020-0.023) (0.022-0.026) (0.026-0.030) (0.028-0.033) (0.031-0.036) (0.034-0.040) (0.037-0.044) (0.040-0.048) 0.012 0.015 0.017 0.019 0.022 0.024 0.026 0.028 0.031 0.033 30-day (0.012-0.013) (0.014-0.016) (0.016-0.019) (0.018-0.021) (0.020-0.024) (0.022-0.026) (0.024-0.028) (0.026-0.030) (0.028-0.033) (0.030-0.036) 0.011 0.012 0.014 0.016 0.018 0.019 0.021 0.022 0.024 0.026 45-day (0.010-0.011) (0.012-0.013) (0.013-0.015) (0.015-0.017) (0.017-0.019) (0.018-0.021) (0.019-0.022) (0.021-0.024) (0.022-0.026) (0.024-0.028) 0.009 0.011 0.013 0.014 0.016 0.017 0.018 0.019 0.021 0.022 60-day (0.009-0.010) (0.010-0.012) (0.012-0.014) (0.013-0.015) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.021) (0.019-0.022) (0.020-0.024) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical NOAA Atlas 14, Volume 2, Version 3 DUNN 4 NW Station ID: 31-2500 ' Location name: Erwin, North Carolina, USA* Latitude: 35.3247°, Longitude:-78.6881° Elevation: Elevation (station metadata): 200 ft** *source: ESRI Maps source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 0.437 0.513 0.594 0.659 0.734 0.791 0.844 0.894 0.954 1.00 5-min (0.399-0.481) (0.470-0.565) (0.543-0.653) (0.601-0.724) (0.667-0.805) (0.716-0.866) (0.759-0.924) (0.800-0.978) (0.846-1.04) (0.883-1.10) 0.697 0.821 0.951 1.06 1.17 1.26 1.34 1.42 1.51 1.58 10-min (0.637-0.768) (0.751-0.903) (0.869-1.05) (0.962-1.16) 1 (1.06-1.28) 1 (1.14-1.38) 1 (1.21-1.47) 1 (1.27-1.55) (1.34-1.65) (1.39-1.74) 0.872 1.03 1.20 1.33 1.48 1.59 1.70 1.79 1.90 1.99 15-min (0.796-0.959) (0.945-1.14) 1 (1.10-1.32) 1 (1.22-1.47) 1 (1.35-1.63) 1 (1.44-1.75) 1 (1.53-1.86) 1 (1.60-1.96) (1.68-2.08) (1.75-2.18) 1.20 1.43 1.71 1.93 2.20 2.40 2.60 2.78 3.02 3.22 30-min (1.09-1.32) 1 (1.31-1.57) 1 (1.56-1.88) (1.76-2.12) 1 (2.00-2.41) 1 (2.17-2.63) 1 (2.34-2.84) 1 (2.49-3.05) (2.68-3.31) (2.83-3.53) 1.49 1.79 2.19 2.52 2.93 3.25 3.58 3.90 4.34 4.69 60-min (1.36-1.64) (1.64-1.97) (2.00-2.41) (2.30-2.76) (2.66-3.21) (2.95-3.56) (3.22-3.91) (3.49-4.27) (3.84-4.75) (4.13-5.15) 1.75 2.12 2.63 3.06 3.63 4.09 4.56 5.06 5.72 6.29 2-hr (1.58-1.96) (1.91-2.36) (2.38-2.93) (2.76-3.41) 1 (3.24-4.04) (3.65-4.55) (4.04-5.07) (4.45-5.61) (4.98-6.35) (5.43-6.99) 1.86 2.25 2.81 3.29 3.94 4.49 5.07 5.68 6.53 7.28 3-hr (1.68-2.08) (2.03-2.51) (2.54-3.14) (2.97-3.67) (3.53-4.39) (4.00-5.01) (4.47-5.64) (4.97-6.32) (5.65-7.27) (6.23-8.10) 2.22 2.68 3.35 3.94 4.73 5.41 6.13 6.89 7.97 8.91 6-hr (2.02-2.47) (2.44-2.98) (3.04-3.72) (3.56-4.37) (4.25-5.24) (4.83-5.98) (5.41-6.76) (6.03-7.59) (6.88-8.79) (7.60-9.84) 2.61 3.15 3.96 4.68 5.67 6.52 7.42 8.41 9.82 11.1 12-hr (2.36-2.91) (2.86-3.51) (3.58-4.42) (4.21-5.21) (5.06-6.28) (5.78-7.22) (6.51-8.21) (7.29-9.29) (8.38-10.8) (9.30-12.2) 3.05 3.70 4.74 5.58 6.75 7.72 8.73 9.80 11.3 12.5 24-hr (2.78-3.35) (3.38-4.07) (4.31-5.22) (5.06-6.13) (6.10-7.42) (6.95-8.48) (7.83-9.59) (8.75-10.8) (10.0-12.5) (11.1-13.8) 3.57 4.32 5.49 6.42 7.73 8.81 9.93 11.1 12.8 14.2 2-day (3.26-3.90) (3.95-4.71) (5.01-5.99) (5.85-7.01) (7.01-8.44) (7.94-9.62) (8.92-10.9) (9.93-12.2) (11.4-14.1) (12.5-15.6) 3.80 4.59 5.79 6.76 8.10 9.19 10.3 11.5 13.2 14.6 3-day (3.49-4.13) (4.22-4.99) (5.31-6.29) (6.18-7.33) (7.37-8.79) (8.33-9.98) 1 (9.32-11.2) 1 (10.4-12.6) (11.8-14.5) (13.0-16.0) 4.03 4.86 6.10 7.09 8.47 9.58 10.7 12.0 13.7 15.1 4-day (3.73-4.36) (4.49-5.26) (5.62-6.60) (6.51-7.65) (7.73-9.14) (8.72-10.3) 1 (9.73-11.6) 1 (10.8-13.0) (12.3-14.9) (13.4-16.4) 4.67 5.60 6.95 8.02 9.49 10.7 11.9 13.2 15.0 16.4 7-day (4.30-5.07) (5.16-6.09) (6.39-7.56) (7.34-8.70) (8.66-10.3) (9.72-11.6) 1 (10.8-12.9) 1 (11.9-14.3) (13.4-16.3) (14.6-17.9) 5.33 6.38 7.78 8.87 10.4 11.5 12.7 14.0 15.6 17.0 10-day (4.97-5.72) (5.94-6.85) (7.23-8.36) (8.22-9.52) (9.56-11.1) (10.6-12.4) 1 (11.7-13.7) 1 (12.8-15.0) (14.2-16.9) (15.4-18.3) 7.18 8.53 10.2 11.6 13.4 14.8 16.2 17.7 19.7 21.3 20-day (6.68-7.72) 1 (7.94-9.17) (9.51-11.0) (10.7-12.4) (12.4-14.4) 1 (13.7-15.9) 1 (14.9-17.5) 1 (16.2-19.1) (18.0-21.2) (19.3-23.0) 8.95 10.6 12.5 13.9 15.9 17.3 18.8 20.3 22.3 23.8 30-day (8.34-9.63) 1 (9.86-11.4) (11.6-13.4) (12.9-15.0) (14.7-17.1) 1 (16.0-18.7) 1 (17.4-20.2) 1 (18.7-21.8) (20.4-24.0) (21.7-25.7) 11.4 13.4 15.5 17.2 19.3 20.9 22.5 24.1 26.2 27.8 45-day (10.7-12.1) 1 (12.6-14.3) (14.6-16.6) 1 (18.0-20.6) 1 (19.5-22.4) 1 (21.0-24.1) 1 (22.4-25.8) (24.2-28.1) (25.6-29.9) 13.6 16.0 18.4 20.2 22.5 24.3 26.0 27.7 29.9 31.6 60-day (12.8-14.5) (15.0-17.0) (17.3-19.6) (18.9-21.5) (21.1-24.0) (22.7-25.9) (24.3-27.8) (25.8-29.6) (27.8-32.0) (29.2-33.9) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical SUPPORT DOCUMENTS Stream Classification EST. 0 10 NC DENR - DIVISON OF WATER RESOURCES .0311 CAPE FEAR RIVER BASIN 2B .0300 Name of Stream Description Class Class Date Index No. Six Runs Creek From Quewiffle Swamp to Black C;Sw,ORW:+ 06/01/94 18-68-2-(11.5) River Crane Creek From source to Six Runs Creek C;Sw 07/01/73 18-68-2-12 Jump -and -Run Branch From source to Crane Creek C;Sw 07/01/73 18-68-2-12-1 Buckhorn Creek (Boney Pond) From source to Crane Creek C;Sw 07/01/73 18-68-2-12-2 Wolf Pit Branch From source to Buckhorn Creek C;Sw 07/01/73 18-68-2-12-2-1 Bridge Branch From source to Buckhorn Creek C;Sw 07/01/73 18-68-2-12-2-2 Peters Branch From source to Buckhorn Creek C;Sw 07/01/73 18-68-2-12-2-3 Robinson Mill Branch From source to Six Runs Creek C;Sw 04/01/59 18-68-2-13 Mathis Mill Branch From source to Six Runs Creek C;Sw 04/01/59 18-68-2-14 Spearmans Mill Creek From source to Six Runs Creek C;Sw 04/01/59 18-68-2-15 Gaddy Branch From source to Six Runs Creek C;Sw 04/01/59 18-68-2-16 Tarkill Branch From source to Six Runs Creek C;Sw 04/01/59 18-68-2-17 Clear Run (Swamp) From source to Black River C;Sw 07/01/73 18-68-3 New Hope Creek From source to Clear Run C;Sw 07/01/73 18-68-3-1 Red Hill Branch From source to New Hope Creek C;Sw 07/01/73 18-68-3-1-1 Free Will Creek From source to Clear Run C;Sw 07/01/73 18-68-3-2 Beaverdam Creek From source to Clear Run C;Sw 07/01/73 18-68-3-3 Big Branch From source to Black River C;Sw 09/01/74 18-68-4 Juniper Branch From source to Black River C;Sw 04/01/59 18-68-5 Devane Branch From source to Black River C;Sw 04/01/59 18-68-6 Rocky Branch From source to Devane Branch C;Sw 04/01/59 18-68-6-1 Canty Mill Creek From source to Black River C;Sw 09/01/74 18-68-7 Cobb Branch From source to Canty Mill Creek C;Sw 09/01/74 18-68-7-1 Wild Cat Creek From source to Black River C;Sw 09/01/74 18-68-8 Keith Branch From source to Black River C;Sw 09/01/74 18-68-9 Kings Branch From source to Black River C;Sw 09/01/74 18-68-10 Cypress Lake Entire lake and connecting stream to C;Sw 04/01/59 18-68-11 Black River South River From source to Big Swamp C;Sw 04/01/59 18-68-12-(0.5) Black River (Little Black River) From source to South River C;Sw 09/01/74 18-68-12-1 (Popes Lake, Rhodes Pond) Youngs Pond Entire pond and connectinq stream C;Sw 09/01/74 18-68-12-1-1 Big Branch Juniper Creek Mingo Swamp East Mingo Creek Stony Run (Hannas Pond) Big Juniper Run (Jernigan Pond) to Black River From source to Black River From source to Black River From source to South River From source to Mingo Swamp From source to Mingo Swamp From source to Mingo Swamp C;Sw 09/01/74 18-68-12-1-2 C;Sw 09/01/74 18-68-12-1-3 C;Sw 09/01/74 18-68-12-2 C;Sw 09/01/74 18-68-12-2-1 C; Sw 09/01/74 18-68-12-2-2 C;Sw 09/01/74 18-68-12-2-3 37 SUPPORT DOCUMENTS Hydrology Group - Soils N EST. 0 10 Appendices Table 8.01d (continued) Name Depth pH K Hydrology Plasti- _ Textural Classification ----------------------- Group city USDA Unified AASHTO AYERSVTLLE 0-8 4.5-6.0 0.32 B NP-I I L, STL, STCL ML, CL-ML, CL, SC A-4, A-6 GR-L, GR-SIL, SM, SM-SC, ML, 0-8 4.5-6.0 0.28 B 4-25 A-4, A-6 GR-SICL SC 8-22 4.5-5.5 0.28 B 4-25 GR-SIL, GR-L, L CL, CL-ML, ML A-4, A-6, A-7 22-26 4.5-5.5 0.28 B NP-10 GR-STL, GR-L CL, CL-ML, ML A-4 26-30 B NP 30 B NP CN-SIL, CN-VFSL, ML, CL, CL-ML, BADIN 0-6 3.6-6.5 0.24 C NP-10 A-4 CN-L GM 6-25 3.6-5.5 0.24 C 15-35 STC, STCL, CN-STCL CL, CH A-6, A-7 25-40 C NP WB 40 C NP UWB BALLAHACK 0-9 4.5-5.5 0.10 D NP-10 FSL, SL, L SM, SC. CL, ML A-4 9-35 4.5-5.5 0.10 D 8-20 SCL, L SC, CL A-4, A-6 35-74 4.5-5.5 0.17 D NP-10 SR-S-SC SM, SC, ML, CL A-2, A-4 BARCLAY 0-57 4.5-6.0 0.43 C NP-7 L, STL, VFSL CL-ML, ML A-4 57-72 4.5-6.0 0.43 C NP FS, LS, FSL SM, SP-SM A-2 SM-SC, SM, CL, BAYBORO 0-14 4.5-5.5 0.15 D NP-7 FSL A-4 ML, ML 0-14 4.5-5.5 0.17 D 4-20 L, CL CL, ML, CL-ML A-6, A-7 14-64 4.5-5.5 0.32 D 20-40 CL, SC, C CL, CH A-7 BAYMEADE 0-36 4.5-6.5 0.10 A NP FS, S SM, SP-SM A-2, A-3 0-36 45-6.5 0.10 A NP LS, LFS SM A-2-4 36-49 4.5-6.5 0.10 A 2-9 FSL, SCL, SL SC, SM, SM-SC A-2, A-4 49-78 4.5-6.5 0.10 A NP LFS, S, LS SM, SP-SM A-2, A-3 BELHAVEN 0-26 4.5 &._ D NP MUCK PT 26-32 3.6-5.5 0.24 D NP-10 SL, FSL SM, SC, SM-SC A-2, A-4 CL, CLrML, SC, 32-65 3.6-6.5 0.24 D 4-15 L, CL, SCL A-4, A-6 SM-SC 65-72 3.6-6.5 0.15 D NP SR-S, FS SM, SP-SM A-2, A-3 BERTTE 0-17 4.5-6.5 0.17 B NP-4 LS, LFS SM A-2 0-17 4.5-6.5 0.20 B NP-7 SL, FSL SM, SM-SC A-2, A-4 SC, CL, SM-SC, 17-42 4.5-6.5 0.24 B 4-16 SCL, CL, SL A-2, A-4,A-6 CL-ML 42-57 4.5-6.0 0.24 B NP-8 FSL, SL, SCL SM, SM-SC A-2, A-4 57-85 4.5-6.0 0.17 B NP-6 SL, LFS, FS SM, SM-SC, SP-SM A-2, A-4 BTBB 0-12 4.5-5.5 0.20 C NP-7 SL, FSL [, A-2, A-4 CI 0-12 4.5-5.5 0.28 C NP-7 L, SIL ML, CL-ML A-4 0-12 4.5-5.5 0.15 C NP S, LS SM, SP-SM A-2, A-3 SM, SM-SC, ML, 12-60 4.5-5.5 0.37 C NP-7 SL, L, STL A-2, A-4 CL-ML BTLTMORE 0-10 5.1-7.8 0.15 A NP-4 FSL, SL, LFS SM A-2, A-4 10-60 5.1-7.8 0.10 A NP LS, LFS, S SM, SP-SM A-2 BLADEN 0-14 3.6-5.5 0.24 D NP FSL, SL SM A-2, A-4 0-14 3.6-5.5 037 D NP-10 L, STL CL, ML, CL-ML A-4 14-41 3.6-5.5 D 23-45 C, SC CL, CH A-7 41-62 3.6-5.5 D 8-35 C, SC, CL CL, CH, SC A-4, A-6, A-7 62-80 D NP Var BL ANEY 0-25 4.5-6.0 0.15 B NP S, LS SM, SP-SM A,2, A-3 0-25 4.5-6.0 0.10 B NP COS, LCOS SM, SP-SM A-2, A-3, A-1-B 25-50 4.5-5.5 0.28 B NP-20 SCL, SL SM, SC, SM-SC A-2, A-4, A- 6, A-1-B 50-65 4.5-5.5 0.28 B NP-14 SL, SCL, LS SM, SC, SM-SC A-2, A-4, A- 6, A-1-B See Tables 8.01b, 8.01c and Figure 8.01d for definition of symbols. 8.01.15 Appendices Table 8.01d (continued) Name Depth pH K Hydrology Plasti- - --------------------- Textural Classification' ----------------------- Group city USDA Unified AASHTO CROATAN 0-28 4.5 D NP MUCK PT 28-38 3.6-6.5 0.17 D NP-10 SL, FSL, MK-SL SM, Sc, SM-SC A-2, A-4 CL, CL-ML, SC, 38-60 3.6-6.5 0.24 D 4-15 L, CL, SCL A-4, A-6 SM-SC 60-80 D NP Var CURRTTUCK 0-14 4.5-5.5 D NP MUCK, MPT PT A-8 14-28 3.6-5.5 D NP MUCK PT A-8 28-60 3.6-5.5 D NP LS, S SM, SP-SM A-2, A-3 DARE 0-70 3.6-4.4 D NP MUCK PT 70-80 3.6-6.0 0.15 D NP SR-FS, LS SM, SP-SM A-2, A-3 DAVIDSON 0-7 4.5-6.5 0.28 B 3-15 L CL, CL-ML, ML A-4, A-6 CL, SC, CL-ML, 0-7 4.5-6.5 0.28 B 5-18 CL, SCL A-6, A-4 SM-SC 7-12 4.5-6.0 0.32 B 11-25 CL CL A-6 12-53 4.5-6.0 0.24 B 12-33 C CL, CH, ML, MH A-7, A-6 53-72 4.5-6.0 0.28 B 7-30 C, CL, SCL CL, ML, MH A-4, A-6, A-7 DELANCO 0-11 3.6-5.5 0.37 C NP-15 SIL, FSL ML, CL, SM ,SC A-4, A-6 11-36 3.6-5.5 0.32 C 10-25 STCL, CL, L CL, ML A-6, A-7 36-50 3.6-5.5 0.28 C NP-15 SR-GR-SL-STCL ML, CL, SM, SC A-2, A-4, A-6 DELOSS 048 4.5-6.5 0.15 B/D NP-4 LFS SM A-2 0-18 4.5-6.5 0.24 B/D NP-7 SL, FSL, L SM, SM-SC, ML, A-2, A-4 CL-ML SM-SC, SC, CL, 18-56 4.5-5.5 0.24 B/D 4-22 SCL, CL, FSL A-4, A-6, A-7 ML, CL 56-80 B/D NP Var DOROVAN 0-3 3.6-4.4 D NP MPT, MUCK PT 3-74 3.6-4.4 D NP MUCK PT SP-SM, SM-SC, A-1, A-3, A-4, 74-99 4 i-i i n NP-7 S LC L -- --- - - - -- - cnn e_ _I )OTHAN 0-13 4.5-5.5 0.15 B NP LFS, LS SM A-2 0-13 4.5-5.5 0.24 B NP-5 FSL, SL SM, SM-SC A-2, A-4 13-33 4.5-5.5 0.28 B NP-16 SCL, SL, FSL SM-SC, Sc, SM A-2, A-4, A-6 33-60 4.5-5.5 0.28 B 4-23 SCL, SC SM-SC, CL-ML, A-2, A-4, A-6, CL A-7 SM, SC, SM-SC, CL-ML 0-9 4.5-5.5 0.17 C NP-7 LFS, LS SM, SM-SC A-2 SM, Sc, SM-SC, 9-37 4.5-5.5 0.17 C NP-10 FSL, SL, L A-2, A-4 CL-ML SM, SP-SM, 37-66 4.5-6.5 0.17 C NP-7 S, LS, FSL A-1, A-2, A-3 SM-SC DUCKSTON 0-72 3.6-8.4 0.10 A/D NP S, FS SP-SM, SP A-3 DUNBAR 0-8 4.5-5.5 0.32 D NP-7 SL, FSL, L SM, SM-SC A-2, A-4 8-80 3.6-5.5 0.32 D 18-35 SC, CL, C CL, CH A-6, A-7 DUPLIN 0-8 5.1-7.3 0.24 C NP-7 SL, FSL, LS SM, SM-SC A-2, A-4 8-80 4.5-5.5 0.28 C 13-35 SC, CL, C CL, CH, SC A-6, A-7 DURHAM 0-16 4.5-6.0 0.17 B NP-3 LCOS, LS SM A-2 0-16 4.5-6.0 0.24 B NP-7 SL, FSL SM, SM-SC A-2, A-4 16-36 4.5-5.5 0.20 B 10-25 SCL, CL SC, CL A-2, A-6, A-7 36-42 4.5-5.5 0.20 B 13-28 CL, SC, SCL SC, CL A-6, A-7 42-48 4.5-5.5 0.20 B NP-10 SCL, SL SM, SC, SM-SC A-2, A-4 48-60 4.5-5.5 0.17 B NP-7 LS, SL, SCL SM, SM-SC A-2, A-4 EDNEYVILLE 0-10 4.5-6.0 0.24 B NP-7 FSL, SL SM, SM-SC A-2, A-4 0-10 4.5-6.0 0.28 B NP-10 L, STL ML, CL-ML, CL A-4 10-60 4.5-6.0 0.20 B 6-15 FSL, SL, L SM, SM-SC A-2, A-4, A-6 'See Tables 8.01b, 8.01c and Figure 8.01d for definition of symbols. 8.01.19 Table 8.01d (continued) Name Depth pH K Hydrology Plasti- _ Textural Classification ----------------------- Group city USDA Unified AASHTO LUCY 0-24 5.1-6.0 0.15 A NP LS, S, LFS SM, SP-SM A-2 24-35 4.5-5.5 0.24 A NP-15 SL, FSL, SCL SM, SC, SM-SC A-2, A-4, A-6 35-70 4.5-5.5 0.28 A 3-20 SL, SCL, CL Sc, SM-SC, SM A-2, A-6, A-4 LUMBEE 0-14 4.5-5.5 0.24 B/D NP-7 LS, SL, FSL SM, SM-SC A-2, A-4 14-36 4.5-5.5 0.32 B/D 7-25 SCL, SL, CL SC, CL A-4, A-6, A-7 16-60 -5 5 -? LYNCHBURG 0-10 3.6-5.5 0.15 C NP-4 LS, LFS SM, SP-SM A-2 SM, ML, SM-SC, 0-10 3.6-5.5 0.20 C NP-7 SL, FSL, L A-2, A-4 CL,ML SM-SC, SC, CL, 10-62 3.6-5.5 0.20 C 4-18 SCL, SL, CL A-2, A-4, A-6 CL,ML LYNN HAVEN 0-16 3.6-5.5 0.10 B/D NP S, FS SP, SP-SM, SM A-3, A-2-4 16-30 3.6-5.5 0.15 B/D NP S, FS, LS SM, SP-SM A-3, A-2-4 30-75 3.6-5.5 0.10 B/D NP S, FS SP, SP-SM A-3, A-2-4 MADISON 0-6 4.5-6.0 0.24 B NP-8 FSL, SL SM, SM-SC A-2, A-4 0-6 4.5-6.0 0.15 B NP-7 GR-FSL, GF-SL SM, SM-SC A-2, A-4 0-6 4.5-6.0 0.28 B 7-20 CL, SCL CL A-4, A-6 6-30 4.5-5.5 0.32 B 12-43 C, CL, SC MH, ML A-7 30-35 4.5-6.0 0.28 B 7-20 L, SCL, CL CL A-4, A-6 35-66 B WB MANTACHIE 0-11 4.5-5.5 0.37 C NP-10 SIL ML, CL-ML, CL A-4 0-11 4.5-5.5 0.28 C 5-15 CL CL-ML, CL A-4, A-6 CL-ML, SM-SC, 0-11 4.5-5.5 0.28 C NP-5 FSL, SL, L A-4 SM, ML CL, SC, SM-SC, 11-61 4.5-5.5 0.28 C 5-15 L, CL, SCL A-4, A-6 CL-ML MANTEO 0-6 3.6-5.5 0.28 C/D 2-15 CN-SIL, CN-L GM, ML, CL, GC A-4 0-6 3.6-5.5 0.28 C/D 2-15 CN-VSIL, CN-VL GM, ML, CL, GC A-1, A-2, A-4, A-6 6-15 3.6-5.5 0.28 C/D 2-20 CN-VSIL, CN-SIL, GM GC, ML, CL A-1, A-2, A-4, CN-CL A-6 15 C/D UWB MARLBORO 0-9 5.1-6.5 0.15 B NP-4 LS, LFS SM A-2 SM, SM-SC, ML, 0-9 5.1-6.5 0.20 B NP-7 SL, FSL, VFSL A-2, A-4 CL-ML 9-60 4.5-6.0 0.20 B 6-20 SC, CL,C CL, ML, CL-ML A-4, A-6, A-7 60-72 4.5-6.0 0.20 B 6-20 SCL, SC, C CL, ML, SM-SC A-4, A-6, A-7 MASADA 0-10 4.5-5.5 0.32 C NP-8 FSL, L ML, SM, SC, CL A-4, A-6 10-55 4.5-5.5 0.24 C 20-35 CL, C, GR-C CH, CL A-7, A-6 55-72 4.5-5.5 0.24 C 15-25 L, CL, GR-SCL CL, ML A-6, A-7, A-4 MATTAMUSKEET 0-22 4.5 D NP MUCK PT 22-72 3.6-5.5 D NP LS, S, FS SM, SP-SM A-2, A-3 MAXTON 0-12 45-6.0 0.20 B NP-7 SL, FSL SM, SM-SC A-2 0-12 4.5-6.0 0.15 B NP LS, LFS SM, SP-SM A-2 12-33 4.5-5.5 0.24 B 4-15 SCL, SL Sc, SM-SC A-4, A-6, A-2 33-60 4.5-5.5 0.10 B NP SR-LS-S SM, SP-SM, SP A-2, A-3 MAYODAN 0-12 4.5-6.0 0.24 B NP-5 SL, FSL, SIL SM, ML, SM-SC A-2, A-4 GP -GM, GM ,SM, 0-12 4.5-6.0 0.15 B NP-4 GR-SL, GR-FSL A-1 SP-SM A-4, A-6, 0-12 4.5-6.0 0.32 B 7-26 CL, SCL CL, SC A-7-6 A-4, A-6, 12-18 4.5-6.0 0.32 B 7-26 STCL, CL, SCL CL, ML, SC A-7-6 18-47 4.5-5.5 0.28 B 15-45 C, SC, STC MH, CH, CL, ML A-7 47-60 4.5-5.5 B Var 'See Tables 8.01 b, 8.01 c and Figure 8.01 d for definition of symbols. 8.01.24 0 Table 8.01d (continued) Name Depth pH K Hydrology Plasti- - Textural Classification' --------------------- ----------------------- Group city USDA Unified AASHTO NORFOLK 0-17 4.5-6.0 0.17 B NP-14 SL, FSL SM, SM-SC, SC A-2 0-17 4.5-6.0 0.20 B NP LS, LFS SM A-2 5C, SM-SC, CL, 17-38 4.5-5.5 0.24 B 4-15 SL, SCL, CL -L-ML A-2, A-4, A-6 �C, SM-SC, CL, A-4, A-6, 38-70 4.5-5.5 0.24 B 4-23 SCL, SC, CL CL-ML A-7-6 70-99 B Var OAKBORO 0-10 4.5-6.5 0.28 C NP-10 SIL, L ML, CL-ML, CL A-4, A-6 10-46 4.5-6.5 0.28 C NP-15 L, SIL, SICL ML, CL-ML, CL A-4, A-6 46 C UWB SM, ML, SM-SC, OCHLOCKONEE 0-6 4.5-5.5 0.20 B NP-5 FSL, SL A-4, A-2 CL-ML 0-6 4.5-5.5 0.24 B NP-7 SIL, L ML, CL-ML A-4 0-6 4.5-5.5 0.17 B NP LS, LFS SM A-2, A-4 6-44 4.5-5.5 0.20 B NP-9 FSL, SL, STL SM, SL, SC, CL A-4 44-72 4.5-5.5 0.17 B NP-9 LS, SL, SIL SM, ML, CL, SC A-4, A-2 OCILLA 0-28 4.5-5.5 0.10 C NP LS, LFS, S SM, SP-SM A-2, A-3 28-67 4.5-5.5 0.24 C NP-18 SL, SCL SM, CL, SC A-2, A-4, A-6 OLUSTEE 0-8 3.6-5.5 0.10 B/D NP S, FS SP-SM, SM A-3, A-2-4 8-21 3.6-5.5 0.15 B/D NP S, FS SP-SM, SM A-3, A-2-4 21-35 4.5-5.5 0.10 B/D NP S, FS SP-SM, SM A-3, A-2-4 35-62 4.5-5.5 0.24 B/D 8-15 SCL, SL SC A-2, A-4, A-6 62-74 4.5-5.5 0.28 B/D 15-25 Sc SC, CL A-6, A-7 ONSLOW 0-17 3.6-5.5 0.17 B NP LFS, LS SM-SP-SM A-2, A-3, A-4 0-17 3.6-5.5 0.20 B NP-10 FSL, SL SM, ML, SC, CL A-2, A-4 CL, SM-SC, 17-53 3.6-5.5 0.24 B NP-14 SCL, SL, CL 5M , A-2, A-4, A-6 53-80 B Var SM, ML, CL-ML, ORANGE 0-10 5.1-6.5 0.49 D NP-10 STL, L A-4 SM, ML, CL-ML, 0-10 5.1-6.5 0.32 D NP-7 FSL, SL A-4 SM-SC 10-38 5.1-6.5 0.28 D 45-70 C, SLC, SICL CH A-7 38-58 5.6-7.8 0.28 D 10-25 SIL, CNV-SIL, SCL SC, CL, GC A-6, A-7 58 D UWB ORANGEBURG 0-7 4.5-6.0 0.10 B NP LS, LFS, S SM A-2 0-7 4.5-6.0 0.20 B NP SL, FSL SM A-2 0-7 4.5-6.0 0.24 B 3-16 SCL SM, SM-SC, SC A-4, A-6 7-12 4.5-6.0 0.20 B NP-4 SL SM A-2 SC, CL, SM, 12-54 4.5-5.5 0.24 B 3-19 SCL, SL A-6, A-4 SM-SC 54-64 4.5-5.5 0.24 B 8-21 SCL, SC, SL SC, CL A-6, A-4, A-7 OSIER 0-8 3.6-6.0 0.10 A/D NP S, LS, FS SP-SM A-2, A-3 0-8 3.6-6.0 0.15 A/D NP FSL, LFS SM A-2 8-48 3.6-6.0 0.10 A/D NP S, LS, LFS SP-SM, SM A-2, A-3 A-1, A-3, 48-75 3.6-6.0 0.05 A/D NP COS, S, FS SP, SP-SM ML, CL-ML, SM- A-2-4 OTEEN 0-6 5.1-7.3 0.24 C NP-7 FSL, SL, L A-2, A-4 SC, SM 0-6 5.1-7.3 0.17 C NP-7 GR-FSL, GR-L, GR-SL SM, SM-SC A-2, A-4, A-1 6-17 5.1-7.3 0.32 C 11-30 L, CL, C CL A-6, A-7 17-60 C WB PACOLET 0-3 4.5-6.5 0.20 B NP-7 SL, FSL, L SM, SM-SC A-2, A-1-13 0-3 4.5-6.5 0.24 B 4-17 CL, SCL SM-SC, SC A-4, A-6 0-3 4.5-6.5 0.15 B NP-3 LS SM A-2 3-29 4.5-6.0 0.28 B 11-30 SC, CL, C ML, MH A-6, A-7 CL, CL-ML, SM- 29-52 4.5-6.0 0.28 B 5-15 CL, SCL, SL A-2, A-4, A-6 SC, Sc 52-70 4.5-6.0 0.28 B NP-6 SL, FSL, L SM, SM-SC A-4, A-2-4 See Tables 8.01 b, 8.01 c and Figure 8.01 d for definition of symbols. 8.01.26 Table 8.01d (continued) Name Depth pH K Hydrology Plasti- _ Textural Classification ----------------------- Group city USDA Unified AASHTO PORTERS 0-7 4.5 0.24 B NP-10 FSL, SL SM, SM-SC A-2, A-4 0-7 4.5-6.0 0.28 B NP-10 L, STL ME, CL, CL-ML A-4 7-42 45-6.0 0.24 B NP-7 L, SL, FSL SM, SM-SC A-2, A-4 42-60 B UWB PORTSMOUTH 0-19 3.6-5.5 0.24 B/D NP-7 SL, FSL, L SM, SM-SC, ME A-2, A-4 19-35 3.6-5.5 0.28 B/D 7-18 L, SCL, CL SC, CL-ML, CL A-4, A-6 35-38 3.6-5.5 0.17 B/D NP-4 LS, SL SM A-2 38-72 3.6-6.0 0.17 B/D NP SR-COS-LS SP-SM, SP, SM A-1, A-2, A-3 PUNGO 0-72 4.5 D NP MUCK PT 72-84 3.6-7.3 0.24 D 15-35 C, SIC, SC CH, CL,SC A-7, A-6 RABUN 0-9 5.1-6.5 0.32 B 3-20 L, CL, SIL ME, CL, SM, SC A-6, A-7, A-4 0-9 5.1-6.5 0.20 B 3-12 GR-L, GR-CL SM, Sc, SM-SC A-6, A-4 9-37 5.1-6.5 0.28 B 12-30 CL, C, SIC ME, CL, MH, CH A-7 37-48 5.1-6.5 0.28 B 11-23 C, CL, SICL ME, CL A-7, A-6 48-62 B W B RAINS 0-12 4.5-6.5 0.10 B/D NP S, FS SP-SM A-3, A-2-4 12-62 4.5-5.5 0.24 B/D 8-18 SCL SC A-2-6, A-2-4 62-85 4.5.5 0.20 B/D NP-7 LS, LFS, SL SM, SM-SC A-2-4 SM, CL-ML, ME, �ruvuc v- .. v.�� v ivr-i �,, u, SM-SC ' SM, CL-ML, ME, 5-18 4.5-5.5 0.17 D NP-7 L, SL, FSL A-4, A-2 SM-SC 18 D UWB RANGER 0-6 4.5-5.5 0.24 C 2-8 CN-SIL ME, CL-ML, CL A-4 CN-SICL, CNV- 6-26 4.5-5.5 0.24 C 2-10 S N-SIL, GM,CG, GM -GC A-4, A-2 RIDGELAND 0-8 3.6-6.5 0.10 B/D NP S, FS, LFS SP-SM, SM A-2, A-3 8-15 3.6-6.5 0.15 B/D NP S, FS, LFS SP-SM, SP, SM A-2, A-3 15-35 3.6-6.5 0.15 B/D NP S, FS, LFS SP SM, SP SM A-2, A-3 35-80 3.6-6.5 0.15 B/D NP S, FS, LFS SP-SM, SP, SM A-2, A-3 RIMINI 0-58 3.6-6.0 0.10 A NP S, FS SP, SP-SM A-3 58-70 3.6-6.0 0.10 A NP S, FS SP, SP-SM A-3 70-80 36.-6.0 0.10 A NP S, FS SP SP-SM A-3 SM, ME, CL-ML, ROANOKE 0-7 3.6-5.5 0.28 D NP-7 FSL A-2, A-4 SM-SC SM-SC, CL-ML, 0-7 3.6-5.5 0.37 D 5-16 SIL, L A-4, A-6 CL, SC 0-7 3.6-5.5 0.37 D 14-20 STCL, CL CL A-6, A-7 7-12 3.6-5.5 0.24 D 14-20 CL, SICL CL A-6, A-7 12-50 3.6-5.5 0.24 D 22-40 C, SIC, CL CH, CL A-7 CL-ML, GM -GC, A-2, A-4, A-6, 50-72 3.6-6.5 0.24 D NP-40 SR, SC-C CL, ME A-7 ROPER 0-15 3.6-5.5 B/D NP MUCK PT 15-42 3.6-5.5 0.43 B/D 8-25 SIL, SICL, L CL A-4, A-6 42-55 5.6-7.8 0.43 B/D 8-25 SIL, SICL, L CL A-4, A-6 55-72 5.6-7.8 B/D Var ROSMAN 0-50 5.1-6.5 0.24 B 4-15 L, FSL, STL ME, CL-ML A-4 SM, ME, CL-ML, 50-60 5.1-6.5 0.10 B NP-7 SR-GR-S-GR-C A-4 SM-SC RUMFORD 0-17 3.6-5.5 0.17 B NP LFS, LS SM A-2, A-1 0-17 3.6-5.5 0.24 B NP-6 FSL, SL SM, SM-SC A-2, A-4 17-37 3.6-6.0 0.17 B NP-12 FSL, SL, SCL SM, Sc, SM-SC A-2, A-4, A-6 A-1, A-2, A-3, 37-60 3.6-6.5 0.17 B NP-6 SR-SL-GR-S SM, SP, GP, GM A-4 'See Tables 8.01 b, 8.01 c and Figure 8.01 d for definition of symbols. 8.01.28 CALCULATIONS & ANALYSIS Weighted Curve Number N EST. 0 10 Project Data Revisions Project# 2021-001 No Date Description Project Name Kathryns Retreat Date 4/7/2021 Pre -Developed - Drainage Area No. 1 Curve Numbers for Hydrologic Soil Group A B C D Open Space (Lawns, Parks) Poor Condition 68 79 86 89 Fair Condition 49 69 79 84 Good Condition 39 61 74 80 Impervious Areas Parking Lots, Roofs Paved; Curbs 98 98 98 98 Paved; Open Ditches 83 89 98 98 Gravel 76 85 89 91 Dirt 72 82 85 88 Woods Poor Condition 45 66 77 83 Fair Condition 36 60 73 79 Good Condition 30 55 70 77 Residential 1/8 acre or less 65 77 85 92 1/4 acre 38 61 75 87 1/3 acre 30 57 72 86 1/2 acre 25 54 70 85 1 acre 20 51 68 84 2 acre 12 46 65 82 Types of Soils with in Drainage Area Soil Area in Drainage Area Soil Name Hydrologic Group Drainage Area = 45.60 ac Bibb C Total Area in "A" Soils = 0.00 ac Dothan B Total Area in "B" Soils 34.66 ac Lynchburg C Total Area in "C" Soils 10.94 ac Norfolk B Total Area in "D" Soils = 0.00 ac Rains B Poor Fair Good Weighted CN Value 76 68 62 Use the following CN Values for each Land Use Use the following CN Values for each Land Use Poor Fair Good Open Space = 81 71 64 Impervious Surface = 98 98 98 Wooded Area = 69 63 59 Gravel Area = 86 86 86 Land Uses in Sub -Basin Open Space 26.36 ac Impervious 0.00 ac Wooded 19.24 ac Gravel ac Project Data Revisions Project# 2021-001 No Date Description Project Name Kathryn's Retreat Date 4/7/2021 Post -Developed - Drainage Area By -Pass Curve Numbers for Hydrologic Soil Group A B C D Open Space (Lawns, Parks) Poor Condition 68 79 86 89 Fair Condition 49 69 79 84 Good Condition 39 61 74 80 Impervious Areas Parking Lots, Roofs Paved; Curbs 98 98 98 98 Paved; Open Ditches 83 89 98 98 Gravel 76 85 89 91 Dirt 72 82 85 88 Woods Poor Condition 45 66 77 83 Fair Condition 36 60 73 79 Good Condition 30 55 70 77 Residential 1/8 acre or less 65 77 85 92 1/4 acre 38 61 75 87 1/3 acre 30 57 72 86 1/2 acre 25 54 70 85 1 acre 20 51 68 84 2 acre 12 46 65 82 Types of Soils with in Drainage Area Soil Area in Drainage Area Soil Name Hydrologic Group Drainage Area = 19.00 ac Bibb C Total Area in "A" Soils = 0.00 ac Dothan B Total Area in "B" Soils 14.44 ac Lynchburg C Total Area in "C" Soils 4.56 ac Norfolk B Total Area in "D" Soils = 0.00 ac Rains B Poor Fair Good Weighted CN Value 72 65 6® Use the following CN Values for each Land Use Use the following CN Values for each Land Use Poor Fair Good Open Space = 81 71 64 Impervious Surface = 98 98 98 Wooded Area = 69 63 59 Gravel Area = 86 86 86 Land Uses in Sub -Basin Open Space 4.60 ac Impervious 0.00 ac Wooded 14.40 ac Gravel ac Project Data Revisions Project# 2021-001 No Date Description Project Name Kathryn's Retreat Date 4/7/2021 Post -Developed - Drainage Area to SCM#1 Curve Numbers for Hydrologic Soil Group A B C D Open Space (Lawns, Parks) Poor Condition 68 79 86 89 Fair Condition 49 69 79 84 Good Condition 39 61 74 80 Impervious Areas Parking Lots, Roofs Paved; Curbs 98 98 98 98 Paved; Open Ditches 83 89 98 98 Gravel 76 85 89 91 Dirt 72 82 85 88 Woods Poor Condition 45 66 77 83 Fair Condition 36 60 73 79 Good Condition 30 55 70 77 Residential 1/8 acre or less 65 77 85 92 1/4 acre 38 61 75 87 1/3 acre 30 57 72 86 112 acre 25 54 70 85 1 acre 20 51 68 84 2 acre 12 46 65 82 Types of Soils with in Drainage Area Soil Area in Drainage Area Soil Name Hydrologic Group Drainage Area = 4.20 ac Bibb C Total Area in "A" Soils = 0.00 ac Dothan B Total Area in "B" Soils 3.19 ac Lynchburg C Total Area in "C" Soils 1.01 ac Norfolk B Total Area in "D" Soils = 0.00 ac Rains B Poor Fair Good Weighted CN Value 91 87 83 Use the following CN Values for each Land Use Use the following CN Values for each Land Use Poor Fair Good Open Space = 81 71 64 Impervious Surface = 98 98 98 Wooded Area = 69 63 59 Gravel Area = 86 86 86 Land Uses in Sub -Basin Open Space 1.80 ac Impervious 2.40 ac Wooded 0.00 ac Gravel ac Project Data Revisions Project# 2021-001 No Date Description Project Name Kathryn's Retreat Date 4/7/2021 Post -Developed - Drainage Area to SCM#2 Curve Numbers for Hydrologic Soil Group A B C D Open Space (Lawns, Parks) Poor Condition 68 79 86 89 Fair Condition 49 69 79 84 Good Condition 39 61 74 80 Impervious Areas Parking Lots, Roofs Paved; Curbs 98 98 98 98 Paved; Open Ditches 83 89 98 98 Gravel 76 85 89 91 Dirt 72 82 85 88 Woods Poor Condition 45 66 77 83 Fair Condition 36 60 73 79 Good Condition 30 55 70 77 Residential 1/8 acre or less 65 77 85 92 1/4 acre 38 61 75 87 1/3 acre 30 57 72 86 1/2 acre 25 54 70 85 1 acre 20 51 68 84 2 acre 12 46 65 82 Types of Soils with in Drainage Area Soil Area in Drainage Area Soil Name Hydrologic Group Drainage Area = 16.10 ac Bibb C Total Area in "A" Soils = 0.00 ac Dothan B Total Area in "B" Soils 12.24 ac Lynchburg C Total Area in "C" Soils 3.86 ac Norfolk B Total Area in "D" Soils = 0.00 ac Rains B Poor Fair Good Weighted CN Value 91 87 83 Use the following CN Values for each Land Use Use the following CN Values for each Land Use Poor Fair Good Open Space = 81 71 64 Impervious Surface = 98 98 98 Wooded Area = 69 63 59 Gravel Area = 86 86 86 Land Uses in Sub -Basin Open Space 6.90 ac Impervious 9.20 ac Wooded 0.00 ac Gravel ac Project Data Revisions Project# 2021-001 No Date Description Project Name Kathryn's Retreat Date 4/7/2021 Post -Developed - Drainage Area to SCM#3 Curve Numbers for Hydrologic Soil Group A B C D Open Space (Lawns, Parks) Poor Condition 68 79 86 89 Fair Condition 49 69 79 84 Good Condition 39 61 74 80 Impervious Areas Parking Lots, Roofs Paved; Curbs 98 98 98 98 Paved; Open Ditches 83 89 98 98 Gravel 76 85 89 91 Dirt 72 82 85 88 Woods Poor Condition 45 66 77 83 Fair Condition 36 60 73 79 Good Condition 30 55 70 77 Residential 1/8 acre or less 65 77 85 92 1/4 acre 38 61 75 87 1/3 acre 30 57 72 86 1/2 acre 25 54 70 85 1 acre 20 51 68 84 2 acre 12 46 65 82 Types of Soils with in Drainage Area Soil Area in Drainage Area Soil Name Hydrologic Group Drainage Area = 6.61 ac Bibb C Total Area in "A" Soils = 0.00 ac Dothan B Total Area in "B" Soils 6.61 ac Lynchburg C Total Area in "C" Soils 0.00 ac Norfolk B Total Area in "D" Soils = 0.00 ac Rains B Poor Fair Good Weighted CN Value 88 82 78 Use the following CN Values for each Land Use Use the following CN Values for each Land Use Poor Fair Good Open Space = 79 69 61 Impervious Surface = 98 98 98 Wooded Area = 66 60 55 Gravel Area = 85 85 85 Land Uses in Sub -Basin Open Space 3.55 ac Impervious 3.06 ac Wooded 0.00 ac Gravel ac CALCULATIONS & ANALYSIS SCM Design Worksheets N EST. 0 10 Per ject Data Revisions Project # 2018-002 No Date Description Project Name Kathryn's Retreat 1 8/30/2021 NCDENR Revisions Date 10/6/2021 Wet Detention Pond #3 1) Calculate percent impervious draining to pond. Impervious Drainage Area = 6.61 acres Road/Parking 0.42 ac / sf 1& Impervious Area = 3.21 acres Sidewalk 0.13 ac / sf 5E Lots 2.17 ac / sf 94: % Imperv. = 48.62 % Driveways 0.19 ac / sf 8C Ex. Street 0.31 ac / sf 13 2) Find the volume of the 1.0" storm using the "Simple Method" (Schueler 1987): 1 The volume of the 1" storm must be detained in the pond above the permanent pool and must be drawn down over a period of two to five days. Rv = 0.05 + 0.009 (1) Rv = runoff coefficient (ratio of runoff to rainfall in inches) I = percent impervious Rv = 0.488 in/in Volume of 1.0" storm (must exceed 3630 cf): JCf'IL WQv = 3630 x RD x Rv X A 36823_$ WQv =volume of runoof gnerated from design storm Ro = Design storm = 1 inch . �j'F� 17� Rv= Runoff Coef= 0.488 inch/inch 2021+.1 �1 - A= Drainage Area = 6.61 acre 0 ^ 1001 `F Vr ft WO11,699 3) Determine Surface Area to Drainage Area Ratio & Surface of Permanent Pool (Water Quality) Table 1: Piedmont and Mountain SAIDA Table (Adapted from Driscoll, 1986) 10% 20% 0.51 0.43 0.37 0.30 0.84 IN 0.61 0.51 0.27 0.25 0.44 0.40 30% 1.17 081 0.84 072 061 0.56 40% 1.51 1.22 1.09 0-91 n.79 071 50% 1.70 1 47 1.31 1.13 0.95 087 W% 2.09 1.73 1.40 191 1.12 1.03 70% 2.51 2.04 180 1-66 1.34 1.17 W% 2.92 2.36 2.07 1.82 1.62 1.40 90% 3.25 2.64 2.31 2.04 1.84 1.59 Desired Depth = 3 ft Imp. % Ratio Lower Limit = 40.00 1.51 Upper Limit = 50.00 1.79 Minimum SA Required = 5,043 ft 2 Acutal = 48.62 1.75 Project Data Revisions Project #k 2018-002 No Date Description Project Name Kathryn's Retreat 1 8/30/2021 NCDENR Revisions Date 10/6/2021 Wet Detention Pond 03 Total Main Pool Stage Level Elevation (ft) Area (so StageVolume (co Cumulative Storage (co 0 252.5 2412 - - 0.5 253 2658 1,268 1,268 1.5 254 3186 2,922 4,190 2.5 255 3762 3,474 7,664 3.5 256 4385 4,074 11,737 4.5 257 5057 4,721 16,458 5 257.5 5412 2,617 19,075 5.5 258 6536 2,987 22,062 Total Forebay Volume Stage Level Elevation (ft) Area (sf) Stage Volume (co Uumulative Storage (co 0 255 389 - - 1 256 804 597 597 2 257 1414 1,109 1,706 3 258 2030 1,722 3,428 Temporary Pool Volume Stage Level Elevation (ft) Area (so rage olume (co Cumulative Storage (co 0 258 8566 - - 0.5 258.5 10052 4,655 4,655 1 259 10995 5,262 9,916 1.25 259.25 12018 2,877 12,793 Average Depth Calculation: VPP—Vsheif D.O= Abottomofsheif Where: D„,, = Average depth in feet V- = Total volume of permanent pod (feet') V,n,n = Volume over the shelf only (feel') — see below A.—.~ = Area of wet pond at the bottom of the shelf (feet') V.—= 0.5' Depth_a.,r—r' Perimeterp,,,,, * Wldth„e,.,,,� , Where: D,,,,,,,,,,,,,,, = Depth of water at the deep side of the shelf as measured at permanent pool (feet) Petimeterp.,.,, - = Penmeter of permanent pool at the bottom of the shelf (feet) wAth,,,o,,--p,n a,na = Width from the deep side to the dry side of the shelf as measured at permanent pool (feet) Vsheif = 257 cf Dma,—shelf = 0.5 ft Pei meter = 343 ft Width = 3 ft Vpp = 22062 cf Abe .f sh0f = 5412 sf D®g = 4.03 ft Per ject Data Revisions oject # 2018-002 No Date Description oject Name E Kathryn's Retreat te 10/6/2021 Wet Detention Pond #3 1) Input Orifice and Spillway Information Orifice Diameter = 1.50 in Office Coefficent = 0.60 Volume Provided = 12,793 cf Number Orifices = 1.00 Inv Office = 258.00 Inv Primary Spillway = 259.25 2) Calculate Area, Head and Discharge Flow Q = Co A 2gh g= 32.2 ft/s2 h= use h/3 to simulate decreasing head A= cross section area of orifice Q= discharge cfs Q= discharge cfs Orfice Cross Section Area = 0.012 sf Average head = 0.417 feet Discharge = 0.038 cfs 3) Calculate Drawn Down Time Time= Volume/Flowrate Drawdown Time = 3.88 days Check = OK Per jest Data Revisions Project # 2018-002 No Date Description Project Name Kathryn's Retreat Date 10/6/2021 Wet Detention Pond #3 DETERMINE BOUYANT FORCES Volume = Depth * Area Depth = Riser Top Elev - Riser Bottom Elev Riser Top Elev. _ Bottom of Riser EIev. _ Riser Wall Thickness = Diameter of Manhole = Area = pi * diameter^2 / 4 Area (@ outside diam)= Volume = times wt of water Bouyant Force = 2. DETERMINE COUNTERWEIGHT REQUIREMENTS Riser Top Top Elevation = Thickness = Outside Diam = Volume = Riser Walls Inside Diam = Wall Thickness = Height = Volume = Riser Bottom - Extended Base Bottom Elevation = Diameter = Thickness= Volume = Total Volume = x unit weight of reinforced conc. Counterweight = Factor of Safety Provided (FSP) _ Additional Concrete Required (Y/N) _ Amount of Concrete Required = 3. ADD CONCRETE BELOW INVERT IN RISER Area of Riser (@inside diam) _ Volume Required = Calculated Depth of Concrete = Actual Depth Used = Backcheck Volume = Backcheck Weight of Added Conc (150-62.4) _ Factor of Safety = Factor of Safety > 1.30 (Y/N) _ 261 ft 257.50 ft 6.00 in 4.00 ft 19.64 sf 68.72 cf 62.4 Ibs/cf 4,288 Ibs 261 0 inches 5.00 ft 0.00 cf 4.00 ft 6.00 in 3.50 ft 24.74 cf 257.50 0.00 ft 6.00 in Summary 0.00 cf Add minimum 24 inches below invert of pond 24.74 cf 150 Ibs/cf 3,711 Ibs 0.87 Y 1,864 Ibs 12.57 sf 21.28 cf 1.69 ft 24 in 25.13 cf 2202 lb 1.38 Y CALCULATIONS & ANALYSIS Hydraflow Routing N EST. 0 10 Hydraflow Table of Contents Kathryns Retreate Phase 4 Routing.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 2 - Year SummaryReport......................................................................................................................... 3 HydrographReports ................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Pre -Development DA........................................................... 4 TR-55 Tc Worksheet........................................................................................................... 5 Hydrograph No. 3, SCS Runoff, Post -Development DA - Bypass ............................................ 6 TR-55 Tc Worksheet........................................................................................................... 7 Hydrograph No. 4, SCS Runoff, Post -Development DA - SCM#1........................................... 8 Hydrograph No. 5, Reservoir, SCM#1 Outflow......................................................................... 9 PondReport - Wet Pond#1............................................................................................... 10 Hydrograph No. 6, SCS Runoff, Post Development DA - SCM#2.......................................... 11 Hydrograph No. 7, Reservoir, SCM#2 Outflow....................................................................... 12 PondReport - Wet Pond#2............................................................................................... 13 Hydrograph No. 8, SCS Runoff, Post -Development DA - SCM#3......................................... 14 Hydrograph No. 9, Reservoir, SCM#3 Outflow....................................................................... 15 PondReport - Wet Pond#3............................................................................................... 16 Hydrograph No. 10, Combine, Post -Development Total ....................................................... 17 10 -Year SummaryReport ....................................................................................................................... 18 HydrographReports................................................................................................................. 19 Hydrograph No. 1, SCS Runoff, Pre -Development DA......................................................... 19 Hydrograph No. 3, SCS Runoff, Post -Development DA - Bypass .......................................... 20 Hydrograph No. 4, SCS Runoff, Post -Development DA - SCM#1......................................... 21 Hydrograph No. 5, Reservoir, SCM#1 Outflow....................................................................... 22 Hydrograph No. 6, SCS Runoff, Post Development DA - SCM#2.......................................... 23 Hydrograph No. 7, Reservoir, SCM#2 Outflow....................................................................... 24 Hydrograph No. 8, SCS Runoff, Post -Development DA - SCM#3......................................... 25 Hydrograph No. 9, Reservoir, SCM#3 Outflow....................................................................... 26 Hydrograph No. 10, Combine, Post -Development Total ........................................................ 27 25 - Year SummaryReport ....................................................................................................................... 28 HydrographReports................................................................................................................. 29 Hydrograph No. 1, SCS Runoff, Pre -Development DA......................................................... 29 Hydrograph No. 3, SCS Runoff, Post -Development DA - Bypass .......................................... 30 Hydrograph No. 4, SCS Runoff, Post -Development DA - SCM#1......................................... 31 Hydrograph No. 5, Reservoir, SCM#1 Outflow....................................................................... 32 Hydrograph No. 6, SCS Runoff, Post Development DA - SCM#2.......................................... 33 Hydrograph No. 7, Reservoir, SCM#2 Outflow....................................................................... 34 Hydrograph No. 8, SCS Runoff, Post -Development DA - SCM#3......................................... 35 Hydrograph No. 9, Reservoir, SCM#3 Outflow....................................................................... 36 Hydrograph No. 10, Combine, Post -Development Total ........................................................ 37 100 - Year Contents continued... Kathryns Retreate Phase 4 Routing.gpw SummaryReport ....................................................................................................................... 38 HydrographReports................................................................................................................. 39 Hydrograph No. 1, SCS Runoff, Pre -Development DA......................................................... 39 Hydrograph No. 3, SCS Runoff, Post -Development DA - Bypass .......................................... 40 Hydrograph No. 4, SCS Runoff, Post -Development DA - SCM#1......................................... 41 Hydrograph No. 5, Reservoir, SCM#1 Outflow....................................................................... 42 Hydrograph No. 6, SCS Runoff, Post Development DA - SCM#2.......................................... 43 Hydrograph No. 7, Reservoir, SCM#2 Outflow....................................................................... 44 Hydrograph No. 8, SCS Runoff, Post -Development DA - SCM#3......................................... 45 Hydrograph No. 9, Reservoir, SCM#3 Outflow....................................................................... 46 Hydrograph No. 10, Combine, Post -Development Total ........................................................ 47 OFReport.................................................................................................................. 48 Watershed Model Schematic 1 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 CD CD ED 6 CD 8 CD Legend Hyd• Origin Description 10 1 SCS Runoff Pre -Development DA 3 SCS Runoff Post -Development DA - Bypass 4 SCS Runoff Post -Development DA - SCM#1 5 Reservoir SCM#1 Outflow 6 SCS Runoff Post Development DA - SCM#2 7 Reservoir SCM#2 Outflow 8 SCS Runoff Post -Development DA - SCM#3 9 Reservoir SCM#3 Outflow 10 Combine Post -Development Total Project: Kathryns Retreate Phase 4 Routing.gpw Wednesday, 04 / 7 / 2021 Hydrograph Return Period ReC"draflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ ------- 31.98 ------- ------- 95.52 141.74 ------- 227.52 Pre -Development DA 3 SCS Runoff ------ ------- 13.26 ------- ------- 42.52 64.05 ------- 104.28 Post -Development DA - Bypass 4 SCS Runoff ------ ------- 15.67 ------- ------- 27.90 35.62 ------- 48.64 Post -Development DA - SCM#1 5 Reservoir 4 ------- 2.103 ------- ------- 8.484 21.17 ------- 42.71 SCM#1 Outflow 6 SCS Runoff ------ ------- 54.39 ------- ------- 97.20 124.11 ------- 169.54 Post Development DA - SCM#2 7 Reservoir 6 ------- 6.044 ------- ------- 17.69 70.97 ------- 150.15 SCM#2 Outflow 8 SCS Runoff ------ ------- 20.33 ------- ------- 38.82 50.78 ------- 71.32 Post -Development DA - SCM#3 9 Reservoir 8 ------- 0.478 ------- ------- 5.447 23.19 ------- 60.77 SCM#3 Outflow 10 Combine 3, 5, 7, ------- 20.42 ------- ------- 69.78 177.06 ------- 355.86 Post -Development Total 9 Proj. file: Kathryns Retreate Phase 4 Routing.gpw Wednesday, 04 / 7 / 2021 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 31.98 1 726 116,438 ------ ------ ------ Pre -Development DA 3 SCS Runoff 13.26 1 723 42,094 ------ ------ ------ Post -Development DA - Bypass 4 SCS Runoff 15.67 1 718 31,885 ------ ------ ------ Post -Development DA - SCM#1 5 Reservoir 2.103 1 732 26,096 4 259.29 15,439 SCM#1 Outflow 6 SCS Runoff 54.39 1 718 115,558 ------ ------ ------ Post Development DA - SCM#2 7 Reservoir 6.044 1 743 95,433 6 257.08 57,534 SCM#2 Outflow 8 SCS Runoff 20.33 1 718 40,852 ------ ------ ------ Post -Development DA - SCM#3 9 Reservoir 0.478 1 943 30,251 8 260.28 25,909 SCM#3 Outflow 10 Combine 20.42 1 724 193,874 3, 5, 7, ------ ------ Post -Development Total 9 Kathryns Retreate Phase 4 Routing.gpw Return Period: 2 Year Wednesday, 04 / 7 / 2021 Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 Pre -Development DA Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 45.600 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.70 in Storm duration = 24 hrs Q (cfs 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Development DA Hyd. No. 1 -- 2 Year Wednesday, 04 / 7 / 2021 = 31.98 cfs = 726 min = 116,438 cuft = 62 = 0 ft = 18.10 min = Type II = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 Pre -Development DA Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 2.50 0.00 0.00 Travel Time (min) = 12.14 + 0.00 + 0.00 = 12.14 Shallow Concentrated Flow Flow length (ft) = 583.00 0.00 0.00 Watercourse slope (%) = 4.60 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.46 0.00 0.00 Travel Time (min) = 2.81 + 0.00 + 0.00 = 2.81 Channel Flow X sectional flow area (sqft) = 16.37 0.00 0.00 Wetted perimeter (ft) = 12.47 0.00 0.00 Channel slope (%) = 1.50 0.00 0.00 Manning's n-value = 0.045 0.015 0.015 Velocity (ft/s) =4.87 0.00 0.00 Flow length (ft) q0})909.0 0.0 0.0 Travel Time (min) = 3.11 + 0.00 + 0.00 = 3.11 Total Travel Time, Tc.............................................................................. 18.10 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 3 Post -Development DA - Bypass Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 19.000 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.70 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 10.00 ME ME 4.00 2.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post -Development DA - Bypass Hyd. No. 3 -- 2 Year Wednesday, 04 / 7 / 2021 = 13.26 cfs = 723 min = 42,094 cuft = 60 = 0 ft = 13.10 min = Type II = 484 Q (cfs) 14.00 12.00 10.00 . �� 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) I [I TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 3 Post -Development DA - Bypass Description A B C Totals Sheet Flow Manning's n-value = 0.200 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 5.00 0.00 0.00 Travel Time (min) = 7.95 + 0.00 + 0.00 = 7.95 Shallow Concentrated Flow Flow length (ft) = 123.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.14 0.00 0.00 Travel Time (min) = 1.80 + 0.00 + 0.00 = 1.80 Channel Flow X sectional flow area (sqft) = 16.37 0.00 0.00 Wetted perimeter (ft) = 12.47 0.00 0.00 Channel slope (%) = 1.50 0.00 0.00 Manning's n-value = 0.045 0.015 0.015 Velocity (ft/s) =4.87 0.00 0.00 Flow length (ft) Q0})971.0 0.0 0.0 Travel Time (min) = 3.33 + 0.00 + 0.00 = 3.33 Total Travel Time, Tc.............................................................................. 13.10 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 4 Post -Development DA - SCM#1 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 4.200 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.70 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post -Development DA - SCM#1 Hyd. No. 4 -- 2 Year 0.00 0 120 240 360 480 600 720 Hyd No. 4 Wednesday, 04 / 7 / 2021 = 15.67 cfs = 718 min = 31,885 cuft = 83 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 3.00 ' 0.00 840 960 1080 1200 1320 1440 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 5 SCM#1 Outflow Hydrograph type = Reservoir Peak discharge = 2.103 cfs Storm frequency = 2 yrs Time to peak = 732 min Time interval = 1 min Hyd. volume = 26,096 cuft Inflow hyd. No. = 4 - Post -Development DA - SCUM. Elevation = 259.29 ft Reservoir name = Wet Pond #1 Max. Storage = 15,439 cuft Storage Indication method used. Q (cfs) 18.00 15.00 12.00 3.00 0.00 0 300 Hyd No. 5 SCM#1 Outflow Hyd. No. 5 -- 2 Year Q (cfs) 18.00 15.00 12.00 3.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 4 0 Total storage used = 15,439 cuft Pond Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Pond No. 1 - Wet Pond #1 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 257.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 257.50 6,653 0 0 0.50 258.00 7,922 3,644 3,644 1.00 258.50 8,734 4,164 7,808 1.50 259.00 9,720 4,614 12,421 2.50 260.00 10,952 10,336 22,757 3.50 261.00 12,242 11,597 34,354 4.00 261.50 12,907 6,287 40,642 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 15.00 1.50 6.00 0.00 Span (in) = 15.00 1.50 6.00 0.00 No. Barrels = 1 1 4 0 Invert El. (ft) = 257.50 257.50 258.75 0.00 Length (ft) = 60.00 0.00 0.00 0.00 Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes Yes No Stage (ft) 4.00 3.00 PAIIH m Weir Structures [A] [B] [C] [D] Crest Len (ft) = 15.71 30.00 0.00 0.00 Crest El. (ft) = 259.75 260.50 0.00 0.00 Weir Coeff. = 3.33 3.00 3.33 3.33 Weir Type = 1 Rect --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 261.50 260.50 W-M%1111 258.50 0.00 T ' 257.50 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 Total Q Discharge (cfs) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 6 Post Development DA - SCM#2 Hydrograph type = SCS Runoff Peak discharge = 54.39 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 115,558 cuft Drainage area = 16.100 ac Curve number = 83 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 7.00 min Total precip. = 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Development DA - SCM#2 Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 60.00 60.00 50.00 ' i i i i i 0 i i i i i i ' 50.00 40.00 ' ' 40.00 30.00 ' ' 30.00 20.00 ' "' ' 20.00 10.00 ' i i i i i ' " i i i i i i ' 10.00 0.00 1 1 1 1 1 1 1 1 1 ' - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 6 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 7 SCM#2 Outflow Hydrograph type = Reservoir Peak discharge = 6.044 cfs Storm frequency = 2 yrs Time to peak = 743 min Time interval = 1 min Hyd. volume = 95,433 cuft Inflow hyd. No. = 6 - Post Development DA - SCM#k Elevation = 257.08 ft Reservoir name = Wet Pond #2 Max. Storage = 57,534 cuft Storage Indication method used. SCM#2 Outflow Q (cfs) Hyd. No. 7 -- 2 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 7 Hyd No. 6 Total storage used = 57,534 cuft Pond Report 13 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Pond No. 2 - Wet Pond #2 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 254.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 254.00 14,532 0 0 1.00 255.00 17,578 16,055 16,055 2.00 256.00 20,154 18,866 34,921 3.00 257.00 21,373 20,764 55,685 4.00 258.00 22,629 22,001 77,686 5.00 259.00 23,922 23,276 100,961 6.00 260.00 25,245 24,584 125,545 6.50 260.50 25,923 12,792 138,337 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 2.50 8.00 0.00 Crest Len (ft) = 18.85 50.00 0.00 0.00 Span (in) = 18.00 2.50 8.00 0.00 Crest El. (ft) = 258.00 259.30 0.00 0.00 No. Barrels = 1 1 4 0 Weir Coeff. = 3.33 3.00 3.33 3.33 Invert El. (ft) = 254.00 254.00 256.00 0.00 Weir Type = 1 Rect --- --- Length (ft) = 50.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Stage (ft) 7.00 6.00 5.00 4.00 3.00 2.00 WIDE 0.00 0.0 20.0 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) 40.0 60.0 80.0 Stage / Discharge Elev (ft) 261.00 260.00 259.00 258.00 257.00 256.00 W-4&'111111111] 254.00 100.0 120.0 140.0 160.0 180.0 200.0 220.0 Discharge (cfs) Hydrograph Report 14 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 8 Post -Development DA - SCM#3 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 6.610 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.70 in Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 • m 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post -Development DA - SCM#3 Hyd. No. 8 -- 2 Year Wednesday, 04 / 7 / 2021 = 20.33 cfs = 718 min = 40,852 cuft = 78 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 M . 11 3.00 0.00 1 1 1 1 1 i..- ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 8 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 9 SCM#3 Outflow Hydrograph type = Reservoir Peak discharge = 0.478 cfs Storm frequency = 2 yrs Time to peak = 943 min Time interval = 1 min Hyd. volume = 30,251 cuft Inflow hyd. No. = 8 - Post -Development DA - SCUIAa Elevation = 260.28 ft Reservoir name = Wet Pond #3 Max. Storage = 25,909 cuft Storage Indication method used. Q (cfs 21.00 18.00 15.00 12.00 •m . 11 3.00 SCM#3 Outflow Hyd. No. 9 -- 2 Year Q (cfs) 21.00 18.00 15.00 12.00 3.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 9 Hyd No. 8 0 Total storage used = 25,909 cuft Pond Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Pond No. 3 - Wet Pond #3 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 258.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 258.00 8,566 0 0 0.50 258.50 10,052 4,655 4,655 1.00 259.00 10,995 5,262 9,916 2.00 260.00 13,203 12,099 22,015 3.00 261.00 14,831 14,017 36,032 4.00 262.00 16,517 15,674 51,706 5.00 263.00 18,259 17,388 69,094 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 15.00 1.50 4.00 0.00 Span (in) = 15.00 1.50 4.00 0.00 No. Barrels = 1 1 1 0 Invert El. (ft) = 257.50 258.00 259.25 0.00 Length (ft) = 120.00 0.00 0.00 0.00 Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes Yes No Stage (ft) 5.00 4.00 3.00 2.00 m 0.00 0.0 20.0 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 12.56 30.00 0.00 0.00 Crest El. (ft) = 261.00 261.50 0.00 0.00 Weir Coeff. = 3.00 3.33 3.33 3.33 Weir Type = 1 Rect --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 40.0 60.0 80.0 Elev (ft) 263.00 262.00 261.00 260.00 259.00 258.00 100.0 120.0 140.0 160.0 180.0 200.0 Discharge (cfs) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 10 Post -Development Total Hydrograph type = Combine Peak discharge = 20.42 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 193,874 cuft Inflow hyds. = 3, 5, 7, 9 Contrib. drain. area = 19.000 ac Post -Development Total Q (cfs) Hyd. No. 10 -- 2 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 10 Hyd No. 3 Hyd No. 5 Hyd No. 7 Time (min) Hyd No. 9 Hydrograph Summary Report 18 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 95.52 1 725 295,957 ------ ------ ------ Pre -Development DA 3 SCS Runoff 42.52 1 722 112,191 ------ ------ ------ Post -Development DA - Bypass 4 SCS Runoff 27.90 1 717 58,225 ------ ------ ------ Post -Development DA - SCM#1 5 Reservoir 8.484 1 725 52,349 4 260.32 26,478 SCM#1 Outflow 6 SCS Runoff 97.20 1 718 211,023 ------ ------ ------ Post Development DA - SCM#2 7 Reservoir 17.69 1 729 190,552 6 259.09 103,274 SCM#2 Outflow 8 SCS Runoff 38.82 1 718 79,442 ------ ------ ------ Post -Development DA - SCM#3 9 Reservoir 5.447 1 730 67,495 8 261.25 39,998 SCM#3 Outflow 10 Combine 69.78 1 723 422,588 3, 5, 7, ------ ------ Post -Development Total 9 Kathryns Retreate Phase 4 Routing.gpw Return Period: 10 Year Wednesday, 04 / 7 / 2021 Hydrograph Report 19 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 Pre -Development DA Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 45.600 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.58 in Storm duration = 24 hrs Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Development DA Hyd. No. 1 -- 10 Year Wednesday, 04 / 7 / 2021 = 95.52 cfs = 725 min = 295,957 cuft = 62 = 0 ft = 18.10 min = Type II = 484 Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 1 1 1 1— ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 20 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 3 Post -Development DA - Bypass Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 19.000 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.58 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 3 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post -Development DA - Bypass Hyd. No. 3 -- 10 Year 360 480 600 Wednesday, 04 / 7 / 2021 = 42.52 cfs = 722 min = 112,191 cuft = 60 = Oft = 13.10 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 4 Post -Development DA - SCM#1 Hydrograph type = SCS Runoff Peak discharge = 27.90 cfs Storm frequency = 10 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 58,225 cuft Drainage area = 4.200 ac Curve number = 83 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 Post -Development DA - SCM#1 Hyd. No. 4 -- 10 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 : Me 4.00 0.00 1 1 1 1 1 1 1 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 4 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 5 SCM#1 Outflow Hydrograph type = Reservoir Peak discharge = 8.484 cfs Storm frequency = 10 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 52,349 cuft Inflow hyd. No. = 4 - Post -Development DA - SCLWA. Elevation = 260.32 ft Reservoir name = Wet Pond #1 Max. Storage = 26,478 cuft Storage Indication method used. SCM#1 Outflow Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - 0.00 0 180 360 540 720 900 1080 1260 1440 1620 Time (min) Hyd No. 5 Hyd No. 4 Total storage used = 26,478 cuft Hydrograph Report 23 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 6 Post Development DA - SCM#2 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 16.100 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.58 in Storm duration = 24 hrs Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Wednesday, 04 / 7 / 2021 = 97.20 cfs = 718 min = 211,023 cuft = 83 = 0 ft = 7.00 min = Type II = 484 Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 6 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 7 SCM#2 Outflow Hydrograph type = Reservoir Peak discharge = 17.69 cfs Storm frequency = 10 yrs Time to peak = 729 min Time interval = 1 min Hyd. volume = 190,552 cuft Inflow hyd. No. = 6 - Post Development DA - SCM42 Elevation = 259.09 ft Reservoir name = Wet Pond #2 Max. Storage = 103,274 cuft Storage Indication method used. Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 SCM#2 Outflow Hyd. No. 7 -- 10 Year Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 Time (min) Hyd No. 7 Hyd No. 6 0 Total storage used = 103,274 cuft Hydrograph Report 25 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 8 Post -Development DA - SCM#3 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 6.610 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.58 in Storm duration = 24 hrs Q (cfs) 40.00 30.00 10.00 0.00 1 0 120 240 — Hyd No. 8 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post -Development DA - SCM#3 Hyd. No. 8 -- 10 Year 360 480 600 720 840 960 Wednesday, 04 / 7 / 2021 = 38.82 cfs = 718 min = 79,442 cuft = 78 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 40.00 30.00 20.00 10.00 0.00 1080 1200 1320 1440 Time (min) Hydrograph Report 26 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 9 SCM#3 Outflow Hydrograph type = Reservoir Peak discharge = 5.447 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 1 min Hyd. volume = 67,495 cuft Inflow hyd. No. = 8 - Post -Development DA - SCUIAa Elevation = 261.25 ft Reservoir name = Wet Pond #3 Max. Storage = 39,998 cuft Storage Indication method used Q (cfs) 40.00 30.00 10.00 SCM#3 Outflow Hyd. No. 9 -- 10 Year 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 Hyd No. 9 Hyd No. 8 0 Total storage used = 39,998 cuft Q (cfs) 40.00 30.00 20.00 10.00 0.00 3000 Time (min) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 10 Post -Development Total Hydrograph type = Combine Peak discharge = 69.78 cfs Storm frequency = 10 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 422,588 cuft Inflow hyds. = 3, 5, 7, 9 Contrib. drain. area = 19.000 ac Post -Development Total Q (cfs) Hyd. No. 10 -- 10 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 180 360 540 720 900 1080 1260 1440 1620 1800 Hyd No. 10 Hyd No. 3 Hyd No. 5 Hyd No. 7 Time (min) Hyd No. 9 Hydrograph Summary Report 28 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 141.74 1 724 428,548 ------ ------ ------ Pre -Development DA 3 SCS Runoff 64.05 1 722 164,853 ------ ------ ------ Post -Development DA - Bypass 4 SCS Runoff 35.62 1 717 75,346 ------ ------ ------ Post -Development DA - SCM#1 5 Reservoir 21.17 1 722 69,436 4 260.76 31,530 SCM#1 Outflow 6 SCS Runoff 124.11 1 718 273,073 ------ ------ ------ Post Development DA - SCM#2 7 Reservoir 70.97 1 723 252,479 6 259.79 120,443 SCM#2 Outflow 8 SCS Runoff 50.78 1 717 105,130 ------ ------ ------ Post -Development DA - SCM#3 9 Reservoir 23.19 1 723 92,980 8 261.77 48,099 SCM#3 Outflow 10 Combine 177.06 1 723 579,747 3, 5, 7, ------ ------ Post -Development Total 9 Kathryns Retreate Phase 4 Routing.gpw Return Period: 25 Year Wednesday, 04 / 7 / 2021 Hydrograph Report 29 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 Pre -Development DA Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 45.600 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 6.75 in Storm duration = 24 hrs Q (cfs 160.00 140.00 120.00 100.00 X1 11 F� 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Development DA Hyd. No. 1 -- 25 Year Wednesday, 04 / 7 / 2021 = 141.74 cfs = 724 min = 428,548 cuft = 62 = 0 ft = 18.10 min = Type II = 484 Q (cfs) 160.00 140.00 120.00 100.00 .1 91 E� 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 30 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 3 Post -Development DA - Bypass Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 19.000 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 6.75 in Storm duration = 24 hrs Q (cfs) 70.00 50.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post -Development DA - Bypass Hyd. No. 3 -- 25 Year Wednesday, 04 / 7 / 2021 = 64.05 cfs = 722 min = 164,853 cuft = 60 = 0 ft = 13.10 min = Type II = 484 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 1 1 1 1— ' _7111 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report 31 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 4 Post -Development DA - SCM#1 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 4.200 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.75 in Storm duration = 24 hrs Q (cfs) 40.00 30.00 10.00 0.00 0 120 240 — Hyd No. 4 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post -Development DA - SCM#1 Hyd. No. 4 -- 25 Year 360 480 600 720 840 960 Wednesday, 04 / 7 / 2021 = 35.62 cfs = 717 min = 75,346 cuft = 83 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 40.00 30.00 20.00 10.00 0.00 1080 1200 1320 Time (min) Hydrograph Report 32 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 5 SCM#1 Outflow Hydrograph type = Reservoir Peak discharge = 21.17 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 69,436 cuft Inflow hyd. No. = 4 - Post -Development DA - SCLWA. Elevation = 260.76 ft Reservoir name = Wet Pond #1 Max. Storage = 31,530 cuft Storage Indication method used SCM#1 Outflow Q (cfs) Hyd. No. 5 -- 25 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 5 — Hyd No. 4 Total storage used = 31,530 cuft 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 6 Post Development DA - SCM#2 Hydrograph type = SCS Runoff Peak discharge = 124.11 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 273,073 cuft Drainage area = 16.100 ac Curve number = 83 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 7.00 min Total precip. = 6.75 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 140.00 120.00 100.00 Post Development DA - SCM#2 Hyd. No. 6 -- 25 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 1 1 1 1 1 1 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 6 Time (min) 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 7 SCM#2 Outflow Hydrograph type = Reservoir Peak discharge = 70.97 cfs Storm frequency = 25 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 252,479 cuft Inflow hyd. No. = 6 - Post Development DA - SCM#k Elevation = 259.79 ft Reservoir name = Wet Pond #2 Max. Storage = 120,443 cuft Storage Indication method used. Q (cfs 140.00 120.00 100.00 HIMITIN SCM#2 Outflow Hyd. No. 7 -- 25 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 7 — Hyd No. 6 Total storage used = 120,443 cuft 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 8 Post -Development DA - SCM#3 Hydrograph type = SCS Runoff Peak discharge = 50.78 cfs Storm frequency = 25 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 105,130 cuft Drainage area = 6.610 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.75 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 60.00 50.00 30.00 20.00 10.00 Post -Development DA - SCM#3 Hyd. No. 8 -- 25 Year Q (cfs) 60.00 50.00 A 30.00 20.00 10.00 0.00 1 1 1 1'—I I I I 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 8 Time (min) 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 9 SCM#3 Outflow Hydrograph type = Reservoir Peak discharge = 23.19 cfs Storm frequency = 25 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 92,980 cuft Inflow hyd. No. = 8 - Post -Development DA - SCUTAa Elevation = 261.77 ft Reservoir name = Wet Pond #3 Max. Storage = 48,099 cuft Storage Indication method used. Q (cfs) 60.00 50.00 30.00 20.00 10.00 0.00 0 240 — Hyd No. 9 SCM#3 Outflow Hyd. No. 9 -- 25 Year 480 720 960 Hyd No. 8 Q (cfs) 60.00 50.00 VA� 30.00 20.00 10.00 0.00 1200 1440 1680 1920 2160 Time (min) Total storage used = 48,099 cuft 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 10 Post -Development Total Hydrograph type = Combine Peak discharge = 177.06 cfs Storm frequency = 25 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 579,747 cuft Inflow hyds. = 3, 5, 7, 9 Contrib. drain. area = 19.000 ac Q (cfs 180.00 150.00 120.00 30.00 Post -Development Total Hyd. No. 10 -- 25 Year \ L7 0.00 0 120 240 — Hyd No. 10 360 480 600 Hyd No. 3 Hyd No. 9 Q (cfs) 180.00 150.00 120.00 30.00 r.T.w 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 Hyd No. 7 Hydrograph Summary Report 38 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 227.52 1 724 675,954 ------ ------ ------ Pre -Development DA 3 SCS Runoff 104.28 1 721 264,122 ------ ------ ------ Post -Development DA - Bypass 4 SCS Runoff 48.64 1 717 104,975 ------ ------ ------ Post -Development DA - SCM#1 5 Reservoir 42.71 1 720 99,032 4 261.01 34,503 SCM#1 Outflow 6 SCS Runoff 169.54 1 718 380,455 ------ ------ ------ Post Development DA - SCM#2 7 Reservoir 150.15 1 720 359,714 6 260.21 130,939 SCM#2 Outflow 8 SCS Runoff 71.32 1 717 150,184 ------ ------ ------ Post -Development DA - SCM#3 9 Reservoir 60.77 1 720 137,850 8 262.14 54,143 SCM#3 Outflow 10 Combine 355.86 1 720 860,718 3, 5, 7, ------ ------ Post -Development Total 9 Kathryns Retreate Phase 4 Routing.gpw Return Period: 100 Year Wednesday, 04 / 7 / 2021 Hydrograph Report 39 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 Pre -Development DA Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 45.600 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.73 in Storm duration = 24 hrs Q (cfs 240.00 210.00 180.00 150.00 120.00 •It 11 30.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre -Development DA Hyd. No. 1 -- 100 Year Wednesday, 04 / 7 / 2021 = 227.52 cfs = 724 min = 675,954 cuft = 62 = 0 ft = 18.10 min = Type II = 484 Q (cfs) 240.00 210.00 180.00 150.00 120.00 •1 91 30.00 0.00 1 1 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 40 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 3 Post -Development DA - Bypass Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 19.000 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.73 in Storm duration = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Wednesday, 04 / 7 / 2021 = 104.28 cfs = 721 min = 264,122 cuft = 60 = 0 ft = 13.10 min = Type II = 484 Q (cfs) 120.00 Post -Development DA - Bypass Hyd. No. 3 -- 100 Year Q (cfs) 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0 120 240 360 480 600 720 840 — Hyd No. 3 960 1080 1200 - 0.00 1320 1440 1560 Time (min) 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 4 Post -Development DA - SCM#1 Hydrograph type = SCS Runoff Peak discharge = 48.64 cfs Storm frequency = 100 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 104,975 cuft Drainage area = 4.200 ac Curve number = 83 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post -Development DA - SCM#1 Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 50.00 50.00 40.00 ' ' 40.00 30.00 ' ' 30.00 20.00 ' ' ' i i i ' 20.00 10.00 ' i i i i i ' " i i i ' 10.00 0.00 1- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 4 Time (min) Hydrograph Report 42 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 5 SCM#1 Outflow Hydrograph type = Reservoir Peak discharge = 42.71 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 99,032 cuft Inflow hyd. No. = 4 - Post -Development DA - SCUM. Elevation = 261.01 ft Reservoir name = Wet Pond #1 Max. Storage = 34,503 cuft Storage Indication method used SCM#1 Outflow Q (cfs) Hyd. No. 5 -- 100 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 5 Hyd No. 4 0 Total storage used = 34,503 cuft 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 6 Post Development DA - SCM#2 Hydrograph type = SCS Runoff Peak discharge = 169.54 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 380,455 cuft Drainage area = 16.100 ac Curve number = 83 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 7.00 min Total precip. = 8.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Development DA - SCM#2 Q (cfs) Hyd. No. 6 -- 100 Year 180.00 160.00 140.00 120.00 100.00 60.00 40.00 20.00 Q (cfs) 180.00 160.00 140.00 120.00 100.00 60.00 40.00 20.00 0.00 1 1 1 1 1 1 1 1 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 6 Time (min) 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 7 SCM#2 Outflow Hydrograph type = Reservoir Peak discharge = 150.15 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 359,714 cuft Inflow hyd. No. = 6 - Post Development DA - SCM42 Elevation = 260.21 ft Reservoir name = Wet Pond #2 Max. Storage = 130,939 cuft Storage Indication method used. Q (cfs) 180.00 160.00 140.00 120.00 100.00 60.00 40.00 20.00 Q (cfs) 180.00 160.00 140.00 120.00 100.00 60.00 40.00 20.00 0.00 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 6 0 Total storage used = 130,939 cuft 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 8 Post -Development DA - SCM#3 Hydrograph type = SCS Runoff Peak discharge = 71.32 cfs Storm frequency = 100 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 150,184 cuft Drainage area = 6.610 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 80.00 70.00 50.00 30.00 10.00 Post -Development DA - SCM#3 Hyd. No. 8 -- 100 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 1 1 1 1 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 8 Time (min) 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 9 SCM#3 Outflow Hydrograph type = Reservoir Peak discharge = 60.77 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 137,850 cuft Inflow hyd. No. = 8 - Post -Development DA - SCUIAa Elevation = 262.14 ft Reservoir name = Wet Pond #3 Max. Storage = 54,143 cuft Storage Indication method used. SCM#3 Outflow Q (cfs) Hyd. No. 9 -- 100 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 9 Hyd No. 8 0 Total storage used = 54,143 cuft 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 04 / 7 / 2021 Hyd. No. 10 Post -Development Total Hydrograph type = Combine Peak discharge = 355.86 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 860,718 cuft Inflow hyds. = 3, 5, 7, 9 Contrib. drain. area = 19.000 ac Q (cfs 400.00 350.00 250.00 150.00 100.00 50.00 Post -Development Total Hyd. No. 10 -- 100 Year Q (cfs) 400.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Hyd No. 3 Hyd No. 5 Hyd No. 7 Time (min) Hyd No. 9 Hydraflow Rainfall Report 48 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2021 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 57.0356 11.9000 0.8655 -------- 2 69.0307 12.5000 0.8674 -------- 3 0.0000 0.0000 0.0000 -------- 5 69.4522 12.4000 0.8238 -------- 10 68.8066 11.9000 0.7899 -------- 25 64.1391 11.1000 0.7420 -------- 50 58.2337 10.1000 0.6979 -------- 100 53.8523 9.3000 0.6602 -------- File name: Raleigh.IDF Intensity = B / (Tc + D)^E Wednesday, 04 / 7 / 2021 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 4.94 3.94 3.30 2.85 2.51 2.25 2.04 1.87 1.73 1.61 1.50 1.41 2 5.76 4.64 3.89 3.37 2.98 2.67 2.42 2.22 2.05 1.91 1.79 1.68 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.60 5.36 4.54 3.96 3.52 3.17 2.89 2.66 2.47 2.31 2.16 2.04 10 7.38 6.01 5.11 4.47 3.98 3.60 3.29 3.04 2.83 2.65 2.49 2.35 25 8.16 6.68 5.70 5.01 4.48 4.07 3.74 3.46 3.23 3.03 2.86 2.71 50 8.76 7.17 6.14 5.41 4.86 4.43 4.08 3.79 3.55 3.34 3.16 3.00 100 9.30 7.63 6.55 5.79 5.22 4.77 4.41 4.11 3.85 3.64 3.45 3.28 Tc = time in minutes. Values may exceed 60. Precip. file name: Z:WUtoCAD\Hydraflow\PCPWngier.pep Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.05 3.70 1.00 4.80 5.58 6.75 7.30 8.73 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CALCULATIONS & ANALYSIS Storm Sewer Composite C Values N EST. 0 10 Project Data Revisions roject# 2021-001 No Date Description roject Name rP Kathryns Retreat - Phase 4 ate 4/7/2021 Storm Sewer System Area (ac) SpaceDrainage Open •. •.- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- Table Value of RunnoffCoeifficients------ Open SpaceValue0.15 SF Residential 0.60 Woodlands 0.10 Open Open------ ------ ------ CALCULATIONS & ANALYSIS Hydraulic Grade Line N EST. 0 10 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan 110 12 113 102 11 109 2 3 9 101 4 105 6 106 7 5 107 1 10 8 q 1g4 112 108 Outfall 111 Project File: KR 100 Series HGL.stm Number of lines: 13 Date: 4/7/2021 Storm Sewers v2021.00 MyReport Page 1 Line Inlet Line Drng Runoff Inlet i Flow Invert Invert Gnd/Rim Gnd/Rim HGL HGL No. ID ID Area Coeff Time Inlet Rate Up Dn El Up El Dn Up Dn (ac) (C) (min) (in/hr) (cfs) (ft) (ft) (ft) (ft) (ft) (ft) 1 101 P676 0.12 0.60 5.0 7.44 13.91 259.00 258.00 264.25 259.79 260.34 j 260.00 2 102 P677 0.18 0.60 5.0 7.44 13.64 259.44 259.10 264.25 264.25 260.86 260.52 3 103 P677 (1) 0.21 0.80 5.0 7.44 13.19 260.07 259.54 266.46 264.25 261.64 261.37 4 104 P677 (1) (1) 0.13 0.64 5.0 7.44 6.33 262.16 260.57 268.28 266.46 263.13 j 262.05 5 105 P678 0.34 0.60 5.0 7.44 4.86 263.84 262.26 270.06 268.28 264.69 j 263.13 6 106 P679 0.32 0.60 5.0 7.44 2.85 264.93 264.04 271.15 270.06 265.61 264.69 7 107 P680 0.05 0.63 5.0 7.44 1.86 266.05 265.03 272.16 271.15 266.59 j 265.61 8 108 P682 0.01 0.95 5.0 7.44 0.07 266.42 266.15 272.16 272.16 266.52 266.59 9 113 P681 0.49 0.60 5.0 7.44 2.19 266.40 266.15 272.50 272.16 267.01 266.76 10 112 P683 0.31 0.60 5.0 7.44 1.38 264.11 264.04 270.06 270.06 264.73 264.69 11 109 P686 0.37 0.60 5.0 7.44 7.06 261.40 260.57 265.50 266.46 262.43 j 262.05 12 110 P687 1.60 0.60 10.0 6.07 5.83 264.00 261.50 268.00 265.50 264.98 262.43 13 111 P684 0.37 0.60 5.0 7.44 1.65 262.53 262.26 268.28 268.28 263.04 263.13 Project File: KR 100 Series HGL.stm Number of lines: 13 Date: 4/7/2021 NOTES: Intensity = 73.48 / (Inlet time + 12.40) ^ 0.80 -- Return period = 10 Yrs. ; " Critical depth Storm Sewers Hydraulic Grade Line Computations Page 1 Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) WS) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) N (ft) (ft) (ft) (ft) (sgft) (ft/s) (ft) (ft) N N (ft) (K) (ft) 1 24 13.91 258.00 260.00 2.00 2.24 4.43 0.30 260.30 0.378 54.000 259.00 260.34 j 1.34" 2.24 6.21 0.60 260.94 0.604 0.491 n/a 0.94 n/a 2 24 13.64 259.10 260.52 1.42' 2.38 5.73 0.51 261.03 0.502 67.615 259.44 260.86 1.42 2.38 5.73 0.51 261.37 0.503 0.503 0.340 1.00 0.51 3 24 13.19 259.54 261.37 1.83 3.01 4.38 0.30 261.67 0.296 107.00 260.07 261.64 1.57 2.64 5.00 0.39 262.02 0.372 0.334 0.358 1.07 0.42 4 18 6.33 260.57 262.05 1.48 1.21 3.59 0.42 262.48 0.000 91.606 262.16 263.13 j 0.97" 1.21 5.23 0.42 263.56 0.000 0.000 n/a 1.32 n/a 5 18 4.86 262.26 263.13 0.87 1.03 4.57 0.35 263.48 0.000 176.51 263.84 264.69 j 0.85" 1.03 4.73 0.35 265.03 0.000 0.000 n/a 1.50 n/a 6 15 2.85 264.04 264.69 0.65 0.64 4.44 0.27 264.96 0.000 108.60 264.93 265.61 0.68" 0.68 4.19 0.27 265.88 0.000 0.000 n/a 0.50 0.14 7 15 1.86 265.03 265.61 0.58 0.51 3.35 0.21 265.81 0.000 101.63 266.05 266.59 j 0.54" 0.51 3.65 0.21 266.80 0.000 0.000 n/a 2.03 0.42 8 15 0.07 266.15 266.59 0.44 0.05 0.18 0.03 266.63 0.000 26.500 266.42 266.52 0.10" 0.05 1.49 0.03 266.56 0.000 0.000 n/a 1.00 0.03 9 15 2.19 266.15 266.76 0.61' 0.59 3.70 0.21 266.97 0.506 49.353 266.40 267.01 0.61 0.59 3.71 0.21 267.22 0.511 0.508 0.251 1.00 0.21 10 15 1.38 264.04 264.69 0.65 0.64 2.16 0.07 264.76 0.163 26.500 264.11 264.73 0.62 0.60 2.30 0.08 264.81 0.193 0.178 0.047 1.00 0.08 11 18 7.06 260.57 262.05 1.48 1.29 4.00 0.46 262.52 0.000 68.881 261.40 262.43 j 1.03" 1.29 5.47 0.46 262.89 0.000 0.000 n/a 0.50 n/a 12 15 5.83 261.50 262.43 0.93 0.98 5.97 0.50 262.93 0.000 137.43 264.00 264.98 0.98" 1.03 5.67 0.50 265.48 0.000 0.000 n/a 1.00 n/a 13 15 1.65 262.26 263.13 0.87 0.47 1.81 0.19 263.32 0.000 26.500 262.53 263.04 0.51 " 0.47 3.51 0.19 263.23 0.000 0.000 n/a 1.00 n/a Project File: KR 100 Series HGL.stm Number of lines: 13 Run Date: 4/7/2021 Notes: ' Normal depth assumed; " Critical depth.; j-Line contains hyd. jump c = cir e = ellip b = box Storm Sewers v2021.00 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan Outfall 0 Project File: KR 200 Series HGL.stm I Number of lines: 1 1 Date: 4/7/2021 201 Storm Sewers v2021.00 MyReport Page 1 Line No. Inlet ID Line ID Drng Area (ac) Runoff Coeff (C) Inlet Time (min) i Inlet (in/hr) Flow Rate (cfs) Invert Up (ft) Invert Dn (ft) Gnd/Rim El Up (ft) Gnd/Rim El Dn (ft) HGL Up (ft) HGL Dn (ft) 1 201 P685 1.09 0.60 10.0 6.07 3.97 259.91 258.00 264.25 259.52 260.72 j 259.25 Project File: KR 200 Series HGL.stm Number of lines: 1 Date: 4/7/2021 NOTES: Intensity = 73.48 / (Inlet time + 12.40) ^ 0.80 -- Return period = 10 Yrs. ; " Critical depth Storm Sewers Hydraulic Grade Line Computations Page 1 Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) WS) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) N (ft) (ft) (ft) (ft) (sgft) (ft/s) (ft) (ft) N N (ft) (K) (ft) 1 15 3.97 258.00 259.25 1.25 0.84 3.24 0.16 259.41 0.378 23.918 259.91 260.72 j 0.81 " 0.84 4.75 0.35 261.07 0.677 0.528 n/a 1.00 n/a Project File: KR 200 Series HGL.stm Number of lines: 1 Run Date: 4/7/2021 Notes: ; " Critical depth.; j-Line contains hyd. jump ; c = cir e = ellip b = box Storm Sewers v2021.00 CALCULATIONS & ANALYSIS Gutter Spread N EST. 0 10 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan 110 12 1 102 11 109 2 3 9 105 6 106 7 101 4 5 107 1 10 8 ��4 112 108 111 Project File: KR 100 Series GUTTER.stm Number of lines: 13 Date: 4/7/2021 Storm Sewers v2021.00 Gutter Page 1 Line Inlet Drng Inlet i Runoff Flow Q Q Q Curb Grate Grate Grate Gutter Gutter Cross Inlet Gutter Gutter Byp No. ID Area Time Inlet Coeff Rate Capt Carry Byp Len Len Width Area Slope Width SI, Sx Depth Depth Spread Ln No (ac) (min) (in/hr) (C) (cfs) (cfs) (cfs) (cfs) (ft) (ft) (ft) (sgft) (ft/ft) (ft) (ft/ft) (ft) (ft) (ft) (ft) 1 101 0.12 5.0 4.00 0.60 8.63 0.29 0.00 0.00 .... 3.00 2.00 6.00 Sag 2.00 0.020 0.05 n/a 0.05 6.51 Sag Yard Inlet 2 102 0.18 5.0 4.00 0.60 8.43 0.43 0.00 0.00 .... 3.00 2.00 6.00 Sag 2.00 0.020 0.06 n/a 0.06 7.91 Sag Yard Inlet 3 103 0.21 5.0 4.00 0.80 8.13 0.94 0.27 0.00 3.00 3.00 2.00 6.00 Sag 2.00 0.020 0.17 n/a 0.17 6.31 Sag 4 104 0.13 5.0 4.00 0.64 3.88 0.47 0.19 0.05 3.00 3.00 2.00 .... 0.010 2.00 0.020 0.13 0.06 0.13 4.58 3 5 105 0.34 5.0 4.00 0.60 2.95 0.75 0.13 0.19 3.00 3.00 2.00 .... 0.010 2.00 0.020 0.16 0.09 0.16 6.01 4 6 106 0.32 5.0 4.00 0.60 1.71 0.64 0.00 0.13 3.00 3.00 2.00 .... 0.010 2.00 0.020 0.15 0.08 0.15 5.49 5 7 107 0.05 5.0 4.00 0.63 1.11 0.13 0.00 0.00 3.00 3.00 2.00 .... 0.010 2.00 0.020 0.08 0.00 0.08 1.99 6 8 108 0.01 5.0 4.00 0.95 0.04 0.04 0.00 0.00 3.00 3.00 2.00 .... 0.010 2.00 0.020 0.05 0.00 0.05 1.27 10 9 113 0.49 5.0 4.00 0.60 1.18 1.18 0.00 0.00 .... 3.00 2.00 6.00 Sag 2.00 0.020 0.12 n/a 0.12 13.53 Sag Yard Inlet 10 112 0.31 5.0 4.00 0.60 0.74 0.62 0.00 0.12 3.00 3.00 2.00 .... 0.010 2.00 0.020 0.15 0.08 0.15 5.41 13 11 109 0.37 5.0 4.00 0.60 4.32 0.89 0.00 0.00 .... 3.00 2.00 6.00 Sag 2.00 0.020 0.10 n/a 0.10 11.56 Sag Yard Inlet 12 110 1.60 10.0 3.70 0.60 3.55 3.55 0.00 0.00 .... 3.00 2.00 6.00 Sag 2.00 0.020 0.24 n/a 0.24 26.08 Sag Yard Inlet 13 111 0.37 5.0 4.00 0.60 0.89 0.79 0.12 0.21 3.00 3.00 2.00 .... 0.010 2.00 0.020 0.16 0.10 0.16 6.19 3 Project File: KR 100 Series GUTTER.stm Number of lines: 13 Date: 4/7/2021 NOTES: Intensity = 11.82 / (Inlet time + 15.40) ^ 0.36 -- Return period = 1 Yrs. ; " Critical depth Storm Sewers CALCULATIONS Outlet Protection N EST. 0 10 o?� Project Data Rovisi Project # 2021-001 No Date Description Project Name Kathryns Retreat Phase 4 Date 4/7/2021 Defined Channel (Y/N) N Diameter (in) 24 Flow Rate (cfs) 13.91 Slope (%) 1.87 Mannino Coef. 0.013 nal Depth (ft) 0.94 et Velocity (fps) 9.60 z 2i t ®�Q�Aur mrQ w�ows.rmmrm ur�rnrra i� S70 i s�Qn+'mu mm.® �•®� - .mQma.®rrnrawr QQvrrwr�rn•Qrr-® roanrQ�wQQmaA�QruQji mn �f �m� QQL r�rm.�rrro �m um ramsv�rp �i�-sm�Qr►�miu rm�m�s�®-mrrQ�mm®' ■m�mr�m®� �m®amao� rm mm�am<vros�w rau rQramm�mmoQo`--•.rm�®® rrw� ®rarr®. Qs� mmm--------w� oamar m� �LrQrrrrrsmrQrmm nroQosv�Q�-vn��rr�Q® mu��mrQ�QreQrrv��ed� m= mz mmmmrimmtQrQf�Q►-�mrr�a® r��rmmmdwrm®n��m�nrQrr m=A�4�mmmL mil `�4=rQQP D•��rrmlQQa1®�Or��VQ® m=I omarrrmmr� ®�Q 4r�6�1Qm►"®�Q�rO►�� r DIAMETER (Ft.) Zone = 2 iliiii■iiii FES#100 Diagram of Outlet Appron LENGTH OF APRON TO PROTECT TO PREVENT SCO DR W APRON MATERIAL c: n CULVERT HOLE USE L2ALWAYS L2 Li 1 STONE FILLING (FINE) CL. A 3 x D� 4 x D. 2 STONE FILLING (LIGHT) GL_ B 3 X D� 6 x D 3 STONE FILLING (MEDIUM) GL. 1 4 X D� 6 x Do 4 STONE FILLING (HEAVY) CL. 1 4 X D� 6 x Do 5 STONE FILLING (HEAVY) CL_ 2 5 x D� 10 x Ea 6 STONE FILLING (HEAVY) CL_ 2 6 X D� 10 x Dq J SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Classification Average Diameter (in) Stone Class Minimum Thickness (in) Fine 3 A 12 Light 6 B 18 Medium 13 1 24 Heavy 1 23 1 2 36 Equations Summary L = See Table Length of Apron = 12 ft W, = 3 x Diameter Width at Pipe, W, = 6 ft Width at end of Apron, W2 = W2 = Diameter + 0.4*L (defined channel) N/A ft Width at end of Apron, W2 = W2 = 1.25 X W, (undefined channel) 8 ft Classification = LIGHT NCDOT Stone Class = B Min. Thickness= 18 in Projeot Data Revisions Project# 2021-001 No Date Description Project Name Kathryns Retreat Phase 4 Date 4/7/2021 Defined Channel (Y/N) N Diameter (in) 15 Flow Rate (cfs) 3.97 Slope (%) 8.00 Mannino Coef. 0.013 nal Depth (ft) 0.40 et Velocity (fps) 16.69 t rrrrrr .,.m•r...ruumrm ur,lrnrra S70 i �1oa MIr1�n 7 ■000m� wAn wrr..�n+trrammr�oavo® ••� ono•o.® rrarr.�•®rpPmIP�1101 - o�.,momo.®rrnrarr �onFji r�u�n�rnu°�® O�'I�Rarrrrr��r-® ,m Im rrrar 41rr�� 1m lI0 r remv�rr► �.7rmrfl'�rrr►'OOrr ro rn�us�®7Arrn�mm®' FEW te n® an MEritl►���0® NORM rrrs�w Q1 rrr. m m`r 1mmm�mw� Omar PM m i REM m rrrrrrrrrr,�rpr�m EEMMEW N R.r000svr-------v® UA �m��mr�rrarearrviarwar �rd� MIN MIN m>.mosv�m�m'®rr�a® sA�{, rm�16V r1�>tr��rrQrr m m �1.4�L `�4=rOrrP m��rr®aa1®>�Or��VO® m ry inw rmM 1M ®�0 Igrr06�i�"®�Q�rO►�� r ® Zone = 3 Equations L = See Table W, = 3 x Diameter W2 = Diameter + 0.4*L W2=1.25XW, FES#200 Diagram of Outlet Appron LENGTH OF APRON TO PROTECT TO PREVENT SCO DR W APRON MATERIAL c: n CULVERT HOLE USE L2ALWAYS L2 Li 1 STONE FILLING (FINE) CL. A 3 x D� 4 x D. 2 STONE FILLING (LIGHT) GL_ B 3 X D� 6 x D 3 STONE FILLING (MEDIUM) GL. 1 4 X D� 8 x Do 4 STONE FILLING (HEAVY) CL. 1 4 X D� 6 x Do 5 STONE FILLING (HEAVY) CL_ 2 5 x D� 10 x Ea 6 STONE FILLING (HEAVY) CL_ 27 6 X D� 10 x Dq 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Classification Average Diameter (in) Stone Class Minimum Thickness (in) Fine 3 A 12 Light 6 B 18 Medium 13 1 24 Heavy 23 2 36 Summary Length of Apron = 10 ft Width at Pipe, W, = 4 ft Width at end of Apron, W2 = (defined channel) N/A ft Width at end of Apron, W2 = (undefined channel) 5 ft Classification = MEDIUM NCDOT Stone Class = 1 Min. Thickness= 24 in Project Data Revisions Project # 2021-001 No Date Description Project Name Kathryns Retreat Phase 4 Date 4/7/2021 Defined Channel (Y/N) N Diameter (in) 15 Flow Rate (cfs) 5.45 Slope (%) 0.63 Mannino Coef. 0.013 nal Depth (ft) 0.99 et Velocity (fps) 3.86 z 2i t rrrrrr w�ows.rruumrm ur�rnrra S70 i - ®rrnrawr err®o�onFji �awrrrr�rnmr-® ■im®��-s�arr►�miu r�®n�vm�-ten® arQmm�a�vrrrs�w �aosrr►�`�mdd�o® rrw»rarr®. osi mm�rim�w� Omar ardrrrrr.�ro�m �os•avr�v�-vn��rr�u® o raQ mo'��mr��arrv��ed�r ®n�mvs�m��m-�mrr�a® m 1ri� rm�6V r�1r��YQrr ®1r®Arr�mW ®�0 1rr�6�1��"®�Q�rO►�� r LJWNIC ICI kr L.) Zone = 2 <-- Use 2 Minimum iliiii■iiii FES#300 Diagram of Outlet Appron LENGTH OF APRON TO PROTECT TO PREVENT SCO DR W APRON MATERIAL c: n CULVERT HOLE USE L2ALWAYS L2 Li 1 STONE FILLING (FINE) CL. A 3 x D� 4 x D. 2 STONE FILLING (LIGHT) GL- B 3 X D� 6 x D 3 STONE FILLING (MEDIUM) GL. 1 4 X D� 6 x Do 4 STONE FILLING (HEAVY) CL. 1 4 X D� 6 x Do 5 STONE FILLING (HEAVY) CL- 2 5 x D� 10 x Ea 6 STONE FILLING (HEAVY) CL- 2 6 X D� 10 x Dq 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Classification Average Diameter (in) Stone Class Minimum Thickness (in) Fine 3 A 12 Light 6 B 18 Medium 13 1 24 Heavy 23 2 36 Equations Summary L = See Table Length of Apron = 16 ft W, = 3 x Diameter Width at Pipe, W, = 8 ft Width at end of Apron, W2 = W2 = Diameter + 0.4*L (defined channel) N/A ft Width at end of Apron, W2 = W2 = 1.25 X W, (undefined channel) 10 ft Classification = LIGHT NCDOT Stone Class = B Min. Thickness= 18 in CALCULATIONS Temporary Ditch Calculations EST. 0 10 o?� Project Data Revisions Project# 2021-001 No Date Description Project Name Kathryns Retreat Phase 4 Date 4/7/2021 Peak Discharge Calculation (10 Year Design) Drainage Area 4.28 ac C = 0.50 Bare Earth I10 = 7.91 in/hr Assume Tc =5 min A = 4.28 ac Q10= 16.93 cfs Determine Ditch Flow Depth (d) and Velocity (v) - Check for Temporary Conditions Apply Manning's Equation: V=Z49/n *R2/3*S1/2, Q=A/V Ditch Characteristics: n = 0.02 Bare Earth Base Width (B) = 1.50 ft M= 3 Ditch Slope (S) = 1.30% M:1 rc Permissible Max Velocity (Vp) = 2.00 fps FBI Apply the Following Analysis to Determine Actual "d"and 'Y' d = flow depth = 0.82 ft Area (A) = B*d + M*d2 = 3.24 Perimeter (P) = b + 2d*(M2+1).5 = 6.68 R = A/P = 0.48 VpR = V Permiss * R = 0.97 V = Flow Velocity = 5.23 fps Q = design flow = 16.93 cfs check Q: OK Check Ditch Velocity for Lining: VP = 2.00 fps Vactual>Vallow, Find Temp Lining Vactual = 5.23 fps Determine Temporary Liner Recalculate with Liner: Liner Material = Straw with Net Tshear 51e55 = Shear stress = g*d*s n = 0.033 Table 8.05e NCESCPDM g = density of water = 62.4 Ib/ft3 Base Width (B) = 1.50 ft d = flow depth = 1.03 ft M = 3 S = channel slope = 1.30% Ditch Slope (S) = 1.30% Tshear stress = Shear Stress = 0.83 T allow (Td) = 1.45 psf Compare Tshear stress to To. - Apply the Following Analysis to Determine Actual "d" and 'Y' T al low (Td) 1.45 d = flow depth = 1.03 ft Tshear stress = 0.83 Area (A) = B*d + M*d2 = 4.69 Perimeter (P) = b + 2d*(M2+1).5 = 7.99 Tshear stress < Td => OK R = A/P = 0.59 V = Flow Velocity = 3.61 fps Summary Q = design flow = 16.93 cfs check Q: OK Temporary Ditch Loner e Straw with Net Project Data Revisions Project# 2021-001 No Date Description Project Name Kathryns Retreat Phase 4 Date 4/7/2021 TDD B Peak Discharge Calculation (10 Year Design) Drainage Area 1.1 ac C = 0.50 Bare Earth I10 = 7.91 in/hr Assume Tc =5 min A= 1.10 ac Q10= 4.35 cfs Determine Ditch Flow Depth (d) and Velocity (v) - Check for Temporary Conditions Apply Manning's Equation: V=Z49/n *R2/3*S1/2, Q=A/V Ditch Characteristics: n = 0.02 Bare Earth Base Width (B) = 1.50 ft M= 2 Ditch Slope (S) = 1.20% M:1 Permissible Max Velocity (Vp) = 2.00 fps FBI Apply the Following Analysis to Determine Actual "d"and 'Y' d = flow depth = 0.47 ft Area (A) = B*d + M*d2 = 1.15 Perimeter (P) = b + 2d*(M2+1).5 = 3.60 R = A/P = 0.32 VpR = V Permiss * R = 0.64 V = Flow Velocity = 3.79 fps Q = design flow = 4.35 cfs check Q: OK Check Ditch Velocity for Lining: VP = 2.00 fps Vactual>Vallow, Find Temp Lining Vactual = 3.79 fps Determine Temporary Liner Recalculate with Liner: Liner Material = Jute Net Tshear 51e55 = Shear stress = g*d*s n = 0.022 Table 8.05e NCESCPDM g = density of water = 62.4 Ib/ft3 Base Width (B) = 1.50 ft d = flow depth = 0.53 ft M = 2 S = channel slope = 1.20% Ditch Slope (S) = 1.20% Tshear stress = Shear Stress = 0.39 T allow (Td) = 0.45 psf Compare Tshear stress to To. - Apply the Following Analysis to Determine Actual "d" and 'Y' T al low (Td) 0.45 d = flow depth = 0.53 ft Tshear stress = 0.39 Area (A) = B*d + M*d2 = 1.35 Perimeter (P) = b + 2d*(M2+1).5 = 3.86 Tshear stress < Td => OK R = A/P = 0.35 V = Flow Velocity = 3.66 fps Summary Q = design flow = 4.93 cfs check Q: FixQ Temporary Ditch Loner e Jute Net CALCULATIONS Sediment Basin Calculations EST. 0 10 o?� Project Data Revisions Project# 2021-001 No Date Description Project Name Kathryn's Retreat Phase 4 Date 4/7/2021 Skimmer Basin 01 Sediment Basin # 1 Area Disturbed = 287931.6 sf 6.61 acres Peak Discharge Calculation: Drainage Area = 287932 sf Composite C 6.61 acres C A (ac) C*A Woods/Open 0.15 0.00 0.00 QIo = C x I x A Bare Earth 0.50 0.00 0.00 C = 0.50 Ex. Impery 0.50 0.00 0.00 I10= 7.44 in/hr A = 6.61 acres Composite Value = 0.00 010 = 24.59 cfs Minimum Surface Area Calculation: Surface Area (SF) = Q10 x 435 sf/ac = 24.59 cfs x 435 sf/ac Surface Area Req = 10696 sf Basin Volume Calculation: Volume of Sediment = (Drainage Ac.) x (1800 cf sed./year) x (1 year) = 6.61 ac x 1800 x 1 yr Min Vol = 11898 cf Assumed basin depth = 2 ft min D = 2' for "Temp Sediment Trap" Resultant Basin Area Req = 5949 sf Check Surface Area Criteria Surface Area Requirement = 10696 sf Basin Volume Calc Area = 5949 sf Therefore: Surface Area Governs Min Volume Req = 11898 cf Min Area Req = 10696 sf L:WRatio = 2.5 Use L=2.5xW, calculate basin dimensions Actual W = 65 ft Min W = 66 ft L= 165 ft Min = 165 ft D = 2 ft Actual Vol = 21450 cf Vol Check: OK Actual Area = 10725 sf Area Check: OK Actual Basin Dimensions = 65 ft W x 165 ft L x 2 ft Weir Design and Velocity Check: Calculate Flow Depth H = [Q/CL]2i3 Q10 = 24.59 cfs C = 2.68 constant L= 30 ft min L=10' H= 0.45 ft max H=0.5' Calculate Velocity Over Weir V = Q/A V = 24.59 cfs / 30 ft x 0.45 ft V = 1.81 ft/sec OK Skimmer Sizing: 4 Skimmer Size (inches) Skimmer Size 0.333 Head on Skimmer (feet) (Inches) 1.5 2.5 Orifice Size (1/4 inch increments) 2.57 Dewatering Time (days) 2 2.5 3 ��d6