Loading...
HomeMy WebLinkAboutSW1210802_Supplement-EZ Form_20211006SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Pardee Partners ASC (High Density) 2 Project Area ac 3.31 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0 5 Is this pro'ect High or Low Density? High 6 IDoes this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet NA 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 1 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader -Filter Strip LS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 22 1 Dry Pond 23 StormFilter 24 Silva Cell 25 Ba filter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Jared L. DeRidder, P.E. 28 Organization: WGLA Engineering, PLLC 29 Street address: 724 5th Avenue West 30 City, State, Zip: Hendersonville, NC 28739 31 Phone numbers : 828-687-7177 32 Email: jderidder@wgla.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. 0 r 4 :4 SEAL 7-7 =.. 041349 �p INS Signatu of Designer�64 Io Date DRAINAGE AREAS 1 Is this a hicih density ro'ect? Yes 2 If so, number of drainage areas/SCMs 1 { 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED {DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Bioretention 5 Total drainage area (sq ft 85378 6 Onsite drainage area (sq ft 85378 7 Offsite drainage area (sq ft 0 8 Total BUA in project (sq ft r 71874 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft NA J 10permitting) New BUA not on subdivided lots (subject to s NA 11 Offsite BUA (sq ft NA 12 Breakdown of new BUA not on subdivided lots: NA - Parking (sq ft NA - Sidewalk (sq ft NA - Roof (sq ft NA -Roadway (sq ft) NA - Future (sq ft) NA - Other, please specify in the comment box below (sq ft NA 13 New infiltrating permeable pavement on subdivided lots (sq ft NA 14 New infiltrating permeable pavement not on subdivided lots (sq ft NA 15permitting) Existing BUA that will remain (not subject to s ft NA 16 Existing BUA that is already permitted (sq ft) NA 17 Existing BUA that will be removed (sq ft NA 18 1 Percent BUA 84% 19 Design storm inches IL 1.0 in 20 Design volume of SCM cu ft 6184 cf 21 Calculation method for design volume Average End {ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): BIORETENTION CELL 1 1Drainage area number 1 1 2 1 Minimum required treatment volume cu ft 5746 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 lWhat is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? N/A 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes j 16 Does the SCM follow the device specific MDC? Yes j 17 Was the SCM designed by an NC licensed professional? Yes j BIORETENTION CELL MDC FROM 02H .1052 18 SHWT elevation (fmsl) 2171.50 j 19 Bottom of the bioretention cell (fmsl) 2173.50 j 20 Ponding depth of the design storm (inches) 12 in 21 Surface area of the bioretention cell (square feet) 5592 sf j 22 Design volume of SCM (cu ft) 6184 cf j 23 Is the bioretention cell used for peak attenuation? Yes 24 Depth of peak attenuation over planting surface (in) 22 in 25 Height of peak attenuation outlet above the planting surface (in) 12 in i 26 Infiltration rate of the in situ soil (inch/hour) j 27 Diameter of the underdrain pipes (if applicable) 6 in j 28 Does the design include Internal Water Storage (IWS)? Yes 29 if so, elevation of the top of the IWS (fmsl) 2072.35 j 30 Elevation of the planting surface (fmsl) 7077 j 31 What type of vegetation will be planted? (grass, trees/shrubs, other)? Grass 32 Media depth (inches) 30 in 33 Percentage of medium to coarse washed sand by volume 75-85% 34 Percentage of fines (silt and clay) by volume 8-10% j 35 Percentage of organic matter by volume 5-10% j 36 Type of organic material Pine Bark Fines j 37 Phosphorus Index (P-Index) of media (unitless) <50 38 Will compaction be avoided during construction? Yes 39 Will cell be maintained to a one inch/hour standard? Yes 40, Depth of mulch, if applicable (inches) NA j 41 Type of mulch, if applicable NA j 42 How many clean out pipes are being installed? 5 i 43 1 Type of pretreatment that will be used: Rip -Rap Outlet j ADDITIONAL INFORMATION 44 Please use this space to provide any additional information about the bioretention cell(s): I Bioretention 3 3:34 PM 9/27/2021