Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0042853_Application (FTSE)_20211007
DESIGN RESOURCE GROUP September 28, 2021 NCDEQ — Division of Water Resources Mooresville Regional Office 610 East Center Ave., Suite 301 Mooresville, NC 28115 RE: Mineral Springs Fast -Track Application for Gravity Sewer Collection Systems Dear Sir/Madam: RECEIVED/NCDEDIDVVR SEP 2 8 2021 WQROS MOORESVILLE REGIONAL OFFICE Enclosed, please find enclosed the Fast Track Application Package for a private gravity sanitary sewer extension to serve the proposed Mineral Springs project located in Charlotte, North Carolina. The enclosed submittal package includes the following: • Application Form (FTA 04-16) (1 original) • Application Form (FTA 04-16) (1 copy) • Application Fee ($480 Check) • Developers Operational Agreement • Flow Tracking/Acceptance Form (FTSE 04-16) • USGS Topo/Street Level Map • NC Proof of Registered Business If any additional information is needed to process this request, please do not hesitate to contact me at 704.343.0608 Sincerely, Design Resource Group, PA Kevin Hutcherson, EIT Associate 2459 Wilkinson Boulevard, Suite 200 Charlotte, NC 28208 eeeeekH tt IiC 04�,,*i, r CORPORE ' SEAL a - ' C-95AT= %`. • NCBELS 4 704.343.0608 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION I. Application Number: /A ODL1t7 SJ3 (to be completed by DWR) All items must be completed or the application will be returned APPLICANT INFORMATION: RECEIVED/NCDEQ/DWR SEP 2 8 2021 W©ROS MOORESVILLE REGIONAL OFFICE 1. Applicant's name: Taylor Morrison of Carolinas, Inc. (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal 3. Signature authority's name: Thomas Johnson per 15A NCAC 02T .0106(b) Title: VP. Land Development 4. Applicant's mailing address: 11405 N. Community Road City: Charlotte State: NC Zip: 28277- 5. Applicant's contact information: Phone number: (704) 251-8137 Email Address: Tjohnsonc tay1ormorrison.com H. PROJECT INFORMATION: 1. Project name: Mineral Springs 2. Application/Project status: ❑ Other [Si Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.2944° Longitude: -80.7933° 5. Parcel ID (if applicable): 047-032-05, 047-032-06, 047-032-07, 047-032-21 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Joseph Boulos, PE License Number: 047286 Firm: Design Resource Group, PA Mailing address: 2459 Wilkinson Boulevard, Suite 200 City: Charlotte State: NC Zip: 28208- Phone number: (704) 343-0608 Email Address: joe(a,drgrp.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Mallard Creek Permit Number: NC0030210 Owner Name: Charlotte Water V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ® Yes ❑No ❑N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Residential Leased ❑ Retail with food preparation/service ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Food and drink facilities ❑ Church ❑ Businesses / offices / factories ❑ Nursing Home 5. Nature of wastewater : 100 % Domestic/Commercial % Commercial ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) % Industrial (See 15A NCAC 02T .0103(20)) >Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ® No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow Townhomes 190 gal/unit 75 14,250 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 14,250 GPD a See I5A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 14,250 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1564 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT Pump station number or name: Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 1. 2. 3. 4. 5. Design flow of the pump station: Operational point(s) of the pump(s): millions gallons per day (firm capacity) gallons per minute at Summarize the force main to be permitted (for this Pump Station): feet total dynamic head (TDH) Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in I5A NCAC 02T .0305(f) & (g) ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-1 waters of Class 1 or Class 11 impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ I5A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A ➢ This would include Trout Buffered Streams per I5A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch ❑ Yes ®No 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? 11 Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per I5A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ❑ No ® N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with I5A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, -TO5H�h 1©s (Professional Engineer's name from Application Item 111.1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Y` A tio North Carolina Professional Engineer's seal, signature, and date: �,� .••.'; •i,:! 4/,L' 3. Applicant's Certification per 15A NCAC 02T .0106(b): I I U,v'v1 S w1j so; P LAO (Signature Authority's nadie & title from Application Item 1.3.) SE 047286 attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: j (I G t_ FORM: FTA 04-16 Page 5 of 5 STATE OF NORTH CAROLINA COUNTY OF Permit No. ht>`-IASS. DEVELOPER'S OPERATIONAL AGREEMENT This AGREEMENT made pursuant to G.S. 143-215.1 (dl) and entered into this 16th day of September , by and between the North Carolina Environmental Management Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and Taylor Morrison of Carolinas, Inc. , a corporation/general partnership registered/licensed to do business in the State of North Carolina, hereinafter known as the DEVELOPER. WITNESSETH: 1. The DEVELOPER is the owner of the certain lands lying in Mecklenburg County, upon which it is erecting and will erect dwelling units and other improvements, said development to be known as Mineral Springs (hereinafter the Development). 2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve the Development on said lands. 3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143- 215.1 to construct, maintain, and operate the Disposal System. 4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements and lands through fling of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter 47C or 47F of the North Carolina General Statutes. 5. The DEVELOPER has caused to be formed or will cause to be formed at the time of fling of the Declaration, (hereinafter Association), a non-profit corporation organized and existing under and by the virtue of the laws of the State of North Carolina, for the purpose, among others, of handling the property, affairs and business of the Development; of operating, maintaining, re -constructing and repairing the common elements of the lands and improvements subject to unit ownership, including the Disposal System; and of collecting dues and assessments to provide funds for such operation, maintenance, re -construction and repair. 6. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed, maintained and operated in accordance with law and permit provisions in order to protect the quality of the waters of the State and the public interest therein. NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows: 1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate and maintain such systems and facilities in accordance with applicable permit provisions and law. 2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association until construction has been completed in accordance with the permit and approved plans, and the staff of the Division of Water Resources has inspected and approved of the facilities. In order to change the name of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The request must include a copy of the Association Bylaws and Declaration. 3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's successor. FORM: DEV 03-19 Page 1 of 2 4. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and appurtenances thereto are part of the common elements and shall thereafter be properly maintained and operated in conformity with law and the provisions of the permit for construction, operation, repair, and maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater treatment, collection and disposal system as a common element which will receive the highest priority for expenditures by the Association except for Federal, State, and local taxes and insurance. 5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will be maintained out of the common expenses. In order to assure that there shall be funds readily available to repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses, the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses. Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part of the yearly budget. 6. In the event the common expense allocation and separate fund are not adequate for the construction, repair, and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any time. 7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city, town, village, county, water and sewer authorities, or other unit of government shall hereinafter become available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the existing and future wastewater of the Development to be accepted and discharged into said governmental system, and shall convey or transfer as much of the Disposal System and such necessary easements as the governmental unit mayrequire as condition of accepting the Development's wastewater. 8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for the Association to enter into voluntary dissolution without having made adequate provision for the continued proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the Association Bylaws that the Association shall not enter into voluntary dissolution without first having transferred its said system and facilities to some person, corporation or other entity acceptable to and approved by the COMMISSION by the issuance of apermit. 9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and operation of the Disposal System. 10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the Association. IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized representative of the parties hereto on the day and year written as indicated by each of the parties named below: FOR THE ENVIRONMENTAL MANAGEMENT COMMISSION S. Daniel Smith Director, Division of Water Resources Name of DEVELOPER By:.. 6- (Signature) a 1>c L IJScAJ j Ve Lot Print Name and Title (Date) (Date) FORM: DEV 03-19 Page 2 of 2 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Design Resource Group Project Name for which flow is being requested: Mineral Springs (Residential) More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Mallard Creek WWTP b. WWTP Facility Permit #: N00030210 All flows are in MGD c. WWTP facility's permitted flow 12.00 d. Estimated obligated flow not yet tributary to the WWTP 1.089 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 9.5 0.01425 10.589 88.2% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Pump Station Station (Name or Permit Number) No. Firm Capacity, * MGD (A) Design Average Daily Flow** (Firm / p fl, MGD (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Approx. Not Yet Total Current Current Tributary Flow Plus Avg. Daily Daily Flow, Obligated Flow, MGD MGD Flow Available Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Doby Creek Phase 2 Downstream Permit Number: Unknown Page 1 of 6 FTSE 10-18 III. Certification Statement: Keri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. 7/6/2021 Signing Official Signature Chief Engineer Title of Signing Official Date Page 2 of 6 FTSE 10-18 CHARLOTTE July 6, 2021 Mr. Kevin Hutcherson Design Resource Group 2459 Wilkinson Boulevard Suite 200 Charlotte, NC 28208 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE MINERAL SPRINGS 1734 MINERAL SPRINGS ROAD, CHARLOTTE, NC 28262 CLTWATER TRACKING# 20213711 After an analysis of the sanitary sewer associated with the proposed design of project, 20213711, MINERAL SPRINGS, it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 14,250 gallons per day (75 units x 190 gpd/unit) at the connection point(s) indicated on the submitted utility plan for transmission to the Mallard Creek Wastewater Treatment Plant; NPDES permit number NC0030210, for treatment. This acceptance of flow is based upon the existing capacity of the designated publicly owned treatments works. Please see attached NCDEQ-FTSE form. Charlotte Water (CLTWater) agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. The applicant should understand that due to the involvement of other agencies and continuing growth of the water system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTWater system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct or extend private water or sewer systems, as the appropriate local or State permits are required prior to construction. if the appropriate authorization to construct permits are not obtained construction has not started within two (2) years of issuance of this flow acceptance, and payment for any service connections have not been received within two (2) years of issuance of this flow acceptance letter, this flow acceptance approval shall be rescinded, and a new flow acceptance request must be made. The CAP analysis performed determines available capacity within the existing public gravity sewer system. The developer is responsible for any additional private or public sewer infrastructure required to convey flow from the proposed development to the existing public gravity sewer. If you have any questions, please do not hesitate to contact me at (704) 432-5801. Sincerely, & W erw4.o- AwzcCo' Guillermo Anzola / Engineering Assistant CHARLOTTE WATER Charlotte Water 5100 Brookshire Blvcl, Charlotte, NC 28216 charlottewater.org Operated by the City of Charlotte V998'I.L6''OL LLZSZ ON '31101UHV0 OSL 311f1S "02J 3Sl0H A1INf NON N S014f N0S1212101A1 21O1AV1 VNI1O2iV0 H1UON '311012JVH0 SDNI?ldS TV i2NIW perry of Design Resource Grou OMO'WO ONV WS\318V1103\tZ'80'60 213M3S 31VAINd - 10\0300N\S11W213d SNOLLVOIIddV\SLN3Wf1000\SONRIdS 1V2I3NIW - 111 Li0-604\PONd)60S\ 9 zwa 19 CL sw U) 0"fllb W 0 CC (wi h ilinClinGrGnAnni V908' I.L6'VOL LLZ8Z ON 'DLLO-WHVO 091. Aiins GJ3snoH AJJNflIWO3 N 9041. NOS12:10INUMAVI. VNI101NO HIEION '3_LL018VHO use or modification is permitted without written authorization copyright© 2020 Design Resource Group, PA This plan or drawing and any accompanying documents or calculations are the property of Design Resource Group. PA; and are in Wald) (INV NIS\7113V1.103\ tr90.60—L13/NLIS 21.VAleld — 1.0\ 0309N\ S.1.1VOI3c1 SNOILVOIlddV\SIN3VirlOOG\SONIeldS 1V2I3NINI — NU. LZ0-604\NO8d)ISGSVO • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings • Print a Pre -Populated Annual Report form • Print an Amended a Annual Report form Business Corporation Legal Name Taylor Morrison of Carolinas, Inc. Prev Legal Name Carolinas NewCo Corp. Information Sosld: 1452437 Status: Current -Active 0 Date Formed: 6/16/2015 Citizenship: Domestic Fiscal Month: December Annual Report Due Date: April 15th Registered Agent: National Registered Agents, Inc. Addresses Reg Office Reg Mailing Mailing 160 Mine Lake Ct Ste 200 160 Mine Lake Ct Ste 200 4900 N Scottsdale Road Suite 2000 Raleigh, NC 27615 Raleigh, NC 27615 Scottsdale, AZ 85251 Principal Office 4900 N Scottsdale Road Suite 2000 Scottsdale, AZ 85251 Officers Assistant Secretary/Vice President Benjamin J Aronovitch 4900 N Scottsdale Road Suite 2000 Scottsdale AZ 85251 Vice President Andrew Bodary 11405 N. Community House Rd., Suite 150 Charlotte NC 28277 Assistant Secretary/Vice President/Director Kristy Boss 1211 N Westshore Blvd, Suite 512 Tampa FL 33607 Vice President Jason E Broome 15501 Weston Parkway Parkwest 1, Suite 100 Cary NC 27513 CFO/Executive Vice President Assistant Secretary C David Cone Caroline G Estrada 4900 N Scottsdale Road, Suite 2000 4900 N Scottsdale Road, Suite 2000 Scottsdale AZ 85251 Scottsdale AZ 85251 Vice President President/Director Kevin Granelli Erik Heuser 11405 N. Community House Rd., Suite 150 4900 N Scottsdale Road Suite 2000 Charlotte NC 28277 Scottsdale AZ 85251 Vice President Vice President Thomas Johnson Rodney (Alan) Kerley 11405 N. Community House Rd., Suite 150 11405 N. Community House Rd., Suite 150 Charlotte NC 28277 Charlotte NC 28277 Vice President Vice President William Scott Kiselick Mike Kissel 15501 Weston Parkway Parkwest 1, Suite 100 11405 N Community House Rd Suite 150 Cary NC 27513 Charlotte NC 28277 Vice President Vice President Sarah Larson Jeff Lear 15501 Weston Parkway Parkwest 1, Suite 100 11405 N. Community House Rd., Suite 150 Cary NC 27513 Charlotte NC 28277 Vice President Authorized Agent Dustan Leasure Joanna Llambias 15501 Weston Parkway Parkwest 1, Suite 100 11405 N. Community House Rd., Suite 150 Cary NC 27513 Charlotte NC 28277 Vice President Assistant Secretary/Vice President Jeremy Medlin S Todd Merrill 15501 Weston Parkway Parkwest 1, Suite 100 1211 N Westshore Blvd, Suite 512 Cary NC 27513 Tampa FL 33607 Vice President Vice President Jodi Mosser David Pellowitz 11405 N. Community House Rd., Suite 150 15501 Weston Parkway Parkwest 1, Suite 100 Charlotte NC 28277 Cary NC 27513 Authorized Agent -Finance Chief Legal Officer/Executive Vice President Susan Royals Darrell C Sherman 15501 Weston Parkway Parkwest 1, Suite 100 4900 N Scottsdale Road, Suite 2000 Cary NC 27513 Scottsdale AZ 85251 Secretary/Director Vice President Darrell C Sherman Larry Stephen (Steve) Suttles 4900 N Scottsdale Road, Suite 2000 11405 N. Community House Rd., Suite 150 Scottsdale AZ 85251 Charlotte NC 28277 Stock Class: Common Shares: 1000 No Par Value: Yes