HomeMy WebLinkAboutR-2577AB CP2 Meeting Minutes_08-22-2013PAT MCCRORY GOVERNOR STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION August 28, 2013 ANTHONY J. TATA SECRETARY MEMORANDUM TO: John Thomas, US Army Corps of Engineers Christopher Militshcher, US Environmental Protection Agency Marella Buncick, US Fish and Wildlife Service Amy Euliss, NCDENR -DWR Marla Chambers, NC Wildlife Resources Commission Renee Gledhill- Earley, NC Dept. of Cultural Resources — HPO Gregory Errett, Winston -Salem Forsyth MPO Andy Williams, US Army Corps of Engineers Gary Jordan, US Fish and Wildlife Service Travis Wilson, NC Wildlife Resources Commission Tyler Meyer, Greensboro MPO FROM: Karen S. Reynolds Project Development and Environmental Anal, s Branch SUBJECT: R- 2577ABC: US 158 (Reidsville Road) Improvements, from multi -lanes north of I -40 Business in Forsyth County to US 220 in Guilford County, WBS No. 37405, Highway Divisions 9 & 7, Forsyth & Guilford Counties Concurrence Point 2 Meeting Minutes for Sections A & B A Section 404 / NEPA Merger Process Team Meeting was held on August 22, 2013, at 1:00 p.m. in the Structure Design Conference Room of the Century Center Building A, in Raleigh. Packets containing the meeting agenda & impacts tables, vicinity map, watershed map, Strategic Highway Corridor Map, North Carolina Intrastate System Map, traffic forecast and project study corridors mapping were electronically mailed to the Merger Process Team members, prior to the meeting. The following attended: John Thomas - US Army Corps of Engineers Amy Euliss — NCDENR DWR Marla Chambers - NC Wildlife Resources Comm. Gregory Errett — Winston -Salem Forsyth MPO Keith Raulston - Division 9 Construction Engineer Diane Hampton - Division 9 Planning Engineer Anthony Houser— NCDOT Roadway Design Unit Lee Moore — NCDOT Roadway Design Unit Paul Schreoeder — Transportation Planning Branch Mark Staley — NCDOT Roadside Env Unit Steve McKee — NCDOT Utilities Unit The following attended this meeting remotely: Chris Militscher — US EPA Marella Buncick — US Fish and Wildlife Service MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1548 MAIL SERVICE CENTER RALEIGH NC 27699 -1548 Jamshid Hafshejani — NCDOT Utilities Unit Matt Lauffer — NCDOT Hydraulics Unit Amy Simes — NCDENR Liaison for Transportation Andre Davenport— NCDOT Structure Design Unit Tristen Ford — PDEA Community Studies Section Rachelle Beauregard — PDEA Natural Environment Unit Greg Price — PDEA Natural Environment Unit Eric Midkiff— PDEA Project Development Section Ted Walls — PDEA Project Development Section Robert Deaton -- PDEA Project Development Section Karen Reynolds — PDEA Project Development Section TELEPHONE: 919 - 707 -6000 FAX: 919- 250 -4224 WEBSITE: NCDOT GOV LOCATION: CENTURY CENTER, BUILDING A 1000 BIRCH RIDGE DRIVE RALEIGH NC 27610 R- 2577AB: August 22, 2013 - Concmrenee Point 2 Meeting August 28, 2013 Meeting Purpose The purpose of this meeting was the presentation of relevant, segmented environmental impacts tabulations to the R -2577 Merger Process Team, in order to reach concurrence on Point 2, Design Options for Further Study, in Sections A and B. Large - scale, corridor constraints aerial mapping and representative project photographs were displayed during the R- 2577AB Merger Team Meeting discussion. Project Description R -2577A will widen US 158 (Reidsville Road) to a multi -lane facility, from existing multi -lanes north of I -40 Business -US 421 -NC 150 in Forsyth County to SR 1965 (Belews Creek Road), in Forsyth County. R- 2577B, will widen US 158 to a multi -lane facility from SR 1965 (Belews Creek Road) in Forsyth County, to north of SR 2034 (Anthony Road), in Guilford County. R- 2577C, will widen US 158 to a multi -lane facility from north of SR 2034 (Anthony Road) in Guilford County, to the junction with US 220 in Guilford County. Right -of -way acquisition and construction for all three sections of R- 2577ABC will occur, independently. The total project length is 18.8 miles. Concurrence for CP2 in Section C occurred on February 17, 2009. Current Project Schedule State Environmental Assessment: State FONSI (if appropriate) R -2577A Right of Way Acquisition: R -2577A Construction: R -2577B Right of Way Acquisition: R -2577B Construction: R-25 77C Right of Way Acquisition: R -2577C Construction: February 2015 October 2016 FY 2018 Post Year Post Year Post Year Post Year Post Year Concurrence on Point 2: R -2577 Section A- Walkertown & Section B- Belews Creek The Merger Process Team concurred on Point 2, Design Options for Detailed Study in R -2577 Sections A & B. These decisions were based on the expected project environmental impacts to local project resources, tallied from functional roadway designs, in segments of Section A & Section B, along US 158 (Reidsville Road). For the environmental, impact alternative decisions rendered in this meeting, R -2577A was divided into three study segments, with one alternative study - segment overlapping Section B. R -2577B contained the remaining four alternative, study - segments. The R- 2577ABC environmental documents and environmental permits will include all three project sections. This meeting was the continuation of the CP2 Merger Team Meeting held on December 12, 2012. During that meeting, the merger team requested that Sections A & B be divided into smaller segments for the examination of potential, environmental impacts, and that further meeting discussion be postponed until after the project historic effects meeting was held, regarding three potential historic properties. The R- 2577ABC historic effects meeting, was held on July 9, 2013, resulting in one of the two potential historic properties in Section A being declared historically ineligible. Both northern and southern widening alternatives of US 158 (Reidsville Road) will be studied for Segment 1, in R- 2577 - Section A. Segment 1 begins west of SR 2357 (Old Greensboro Road) and ends at the intersection of SR 2385 (Darrow Road). This action is necessary, due to studying an avoidance alternative for the Edgewood Baptist Church historic property, at the intersection of US 158 and Churchland Drive. Northern and transitional widening alternatives of US 158 will be studied for Segment 2, in R- 2577- Section A. Segment 2 begins at the intersection of SR 2385 (Darrow Road) and ends at the intersection of NC 66 (Old Hollow Road). This action is necessary, due to studying an avoidance alternative for the Bel -Air Drive -in historic property, located west of at the intersection of US 158 and NC 66. The transitional, study - alternative for Segment 2, transitions between northern and southern widening designs along US 158, within its limits. R- 2577AB: August 22, 2013 - Concurrence Point 2 Meeting August 28, 2013 Both northern and southern widening alternatives of US 158 (Reidsville Road) will be studied for Segment 3, in R- 2577- Sections A & B. Segment 3 begins at the intersection of NC 66 and ends west of SR 2011 (Flat Rock Road). This action is necessary, due to the northern study alternative impacting almost twice the linear feet of streams as does the southern study- alternative, while requiring five fewer residential relocations, no business relocations, less wetland impacts and no pond impacts. A transitional widening alternative of US 158 will be studied for Segment 4, in R- 2577- Section B. Segment 4 begins at the intersection of SR 2011 (Flat Rock Road) and ends at the intersection of SR 1971 (Goodwill Church Road). The transitional, study - alternative for Segment 4, transitions between northern and southern widening designs, along US 158 within its limits. Fewer relocations were required in this the transitional, study - alternative, than in the northern or southern widening, study - alternatives. A transitional widening alternative of US 158 will be studied for Segment 5, in R- 2577 - Section B. Segment 5 begins at the intersection of SR 1971 (Goodwill Church Road) and ends at the intersection of Peaceful Valley Drive. The transitional, study - alternative for Segment, transitions between northern and southern widening designs, along US 158 within its limits. No relocations were required in this study - alternative. A transitional widening alternative of US 158 will be studied for Segment 6, in R- 2577- Section B. Segment 6 begins at the intersection of Peaceful Valley Drive and ends at the intersection of SR 2038 (Coldwater Road). The transitional, study- alternative for Segment 6, transitions between northern and southern widening designs, along US 158 within its limits. No relocations were required in this study- alternative. A northern widening alternative of US 158 will be studied for Segment 7, in R- 2577- Section B. Segment 7 begins at the intersection of SR 2038 (Coldwater Road) and ends at the intersection of SR 2034 (Anthony Road). This study - alternative was favored in Segment 7, due to the lesser anticipated number of residential relocations, since neither the northern or southern study - alternatives impacted any project streams or wetlands. Other Items Discussed The R -2577 Merger Process Team will next meet in the project vicinity in 2014, regarding Concurrence Point 2A — Bridging Design Options for Sections A, B & C. Thank you, for your participation in this R- 2577ABC Merger Process Team Meeting. These meeting minutes summarize the topics discussed. R- 2577AB: August 22, 2013 - Concurrence Point 2 Meeting August 28, 2013 Attachment: Section 404/NEPA Merger Process Concurrence Agreement for CP2, in R -2577 Sections A & B cc: Andy Williams, US Army Corps of Engineers Gary Jordan, US Fish and Wildlife Service Travis Wilson, NC Wildlife Resources Commission Pat Ivey, P.E. — NCDOT Highway Division 9 Keith E. Raulston, P.E. — NCDOT Highway Division 9 Rodney Hatton — NCDOT Highway Division 9 Kent Boyer — NCDOT Highway Division 9 Lois Little — Area Negotiations Office (Divisions 7, 9 & 10) Mike Mills, P.E. — NCDOT Highway Division 7 Patty Eason, P.E. — NCDOT Highway Division 7 Heather Fulghum — NCDOT Highway Division 7 Anthony Houser, P.E. — NCDOT Roadway Design Unit Lee Moore — NCDOT Roadway Design Unit Charles Hunt, P.E. — NCDOT Structures Management Unit Andre Davenport, P.E. — NCDOT Structures Management Unit Jay Twisdale, Jr., P.E. — NCDOT Hydraulics Unit Matt Lauffer, P.E., - NCDOT Hydraulics Unit John Pilipchuk, L.G., P.E — NCDOT Geotechnical Engineering Unit Cyrus Parker, L.G., P.E. —NCDOT Geotechnical Engineering Unit Stuart Bourne, P.E. —NCDOT Traffic Management Unit Domit Ishak — NCDOT Congestion Management Section Joseph Ishak, P.E. — NCDOT Work Zone Traffic Control Section Phil Harris, P.E. — NCDOT Project Development and Environmental Analysis, NEU Rachelle Beauregard — NCDOT Project Development and Environmental Analysis, NEU Greg Price — NCDOT Project Development and Environmental Analysis, NEU Drew Joyner — NCDOT Project Development and Environmental Analysis, HEU Harrison Marshall — NCDOT Project Development and Environmental Analysis, HEU Tristan Ford — NCDOT Project Development and Environmental Analysis, HEU Mary Pope Furr — NCDOT Project Development and Environmental Analysis, HEU Matt Wilkerson — NCDOT Project Development and Environmental Analysis, HEU Eric Midkiff, P.E. — NCDOT Project Development and Environmental Analysis Ted Walls — NCDOT Project Development and Environmental Analysis F111IN 15; US 158 Improvements: NCDOT Highway Divisions 9 & 7, Forsyth & Guilford Counties NCDOT TIP Project No,: 11-2517A & B, WB8 No. 37405 The Merger Process Team met on August 22, 2013, and eoaacurs with resign Option(s) for Further Study of the proposed Improvements to US 15$ (Reidsville Road) in the Wcal%ertown and the Belews Creek areas of Forsyth and GWIford Co +anti,�-