Loading...
HomeMy WebLinkAboutNCC192471_Notice of Termination_20211004Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 10/4/2021 8:22:25 AM (NOT Submittal) Approve by Morman, Alaina 10/7/2021 9:44:40 AM (NOT Request Review- NCC192471) • The task was assigned to Morman, Alaina. The due date is: October 7, 2021 5:00 PM 10/4/2021 8:22 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC192471 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status PAID 2021 Annual Fee Status OPEN Nby be blank (if not yet billed). Information associated with this permit: Project Name NCDOT US 70 Havelock Bypass E)asting Line Improvements (Areas 1-9) Address US 70, Township 6, NC County Craven Latitude 34.9334 Longitude -76.9547 Permittee Listed Duke Energy Progress, LLC Legally Responsible Thomas Williarms Individual NC Reference No. NCG01-2019-2471 E&SC Plan ID CRAVE-2019-023 Original NOI 17462 Tracking No. Date COC Issued 10/25/2019 Prior Rescission Cate populates only if COCwas already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * r Mistake or Invalid Coverage r Other Additional IVbre information about the basis of this request, if needed. Explanation Supporting Upload Supporting Documentation if applicable. Documentation Mist beRYforrrat Project Close-out Information: Final Close-out 10/1/2021 Inspection Approval Project Close-out 210927 NCDOT US 70 HAVELOCK CRAVE-2019- Approval 37.22KB 023.pdf Documentation Mist be FDFforrrat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Nuwan Wijesuriya Title * Sr Transmission Permitting Manager Organization* Duke Energy Progress, LLC Date * 10/04/2021 Email for nuwan.wijesuriya@duke-energy.com Confirmation * Contact Telephone* 19199316655 NOT Certification NCG01-eNOT-Certification-Form-20210514- Form DEMLR-SW (1).pdf Mist be FDF Fbrrrat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Erails (Optional) Original Permittee CCd on Wification Bmils Email Thomas.WilliamsJr@duke-energy.com Original Site Contact CCd on Notificaiton BTails Email nuwan.wijesuriya@duke-energy.com 935.01 KB