Loading...
HomeMy WebLinkAbout20210985 Ver 1_USACE More Info Request_20211007 Carpenter,Kristi From: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil> Sent: Wednesday, October 06, 2021 1:50 PM To: Lisa Long Cc: Ridings, Rob Subject: [External] Horton Ridge Blvd /Apex/Wake County/ SAW-2020-01098/ NWP 14/ Request for Additional Information Attachments: 2017NWP14.pdf CAUTION. External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to Resort Sparn, Ms. Long, I have reviewed the above reference project and need the following comments/questions addressed in order to proceed with the evaluation of the project. 1) The PCN states "the project will serve as a road connection to the existing Horton Ridge Blvd in accordance with the Town of Apex transportation plans." Please provide some documentation to support the stated purpose such as providing the referenced transportation plan or a traffic study to support the need for the road; 2) The PCN states "the road connection was designed to avoid impacts to WOTUS to the maximum extent practicable, while still containing the required grade and curvatures for safety and connectivity." Please provide additional details to support the proposed project compliance with general conditions 23 a and b. For example, please provide justification to support the proposed location and alignment of the proposed project. Without additional clarification it appears there are uplands north of impact area B and uplands west of impact area C that could be utilized while still achieving the project purpose; 3) Cumulative permanent stream impacts for this project exceed the 150 linear foot threshold per NWP 14 Regional Condition 3.2, and therefore compensatory mitigation is required. Please submit a compensatory mitigation plan.The mitigation rule generally prescribes purchasing stream credits first through a mitigation bank with stream credits available in this HUC, or second through the NC Division of Mitigation Services; please provide a mitigation acceptance letter from your proposed compensatory mitigation provider.Typically, compensatory mitigation is required at a 2:1 credit to impact ratio unless otherwise justified based on evaluation of aquatic function; 4) Cumulative permanent wetland impacts for this project exceed the 0.1acre threshold per Nationwide Permit General Condition 23c, and therefore compensatory mitigation is required. Please submit a compensatory mitigation plan.The mitigation rule generally prescribes purchasing wetland credits first through a mitigation bank with wetland credits available in this HUC, or second through the NC Division of Mitigation Services; please provide a mitigation acceptance letter from your proposed compensatory mitigation provider.Typically, compensatory mitigation is required at a 2:1 credit to impact ratio unless otherwise justified based on evaluation of aquatic function; 5) Based on the cross sections for Area A and Area B rip rap dissipator pads are proposed. Please update the impact table and impact maps to include the proposed riprap dissipator pads. Additionally, the proposed rip rap should be in compliance with regional condition 3.5.2 (see attached); 1 6) What is the design speed of the proposed road?Would a shift of the road at Impact Area A also shift the road at Impact Area B?Would a shift of the road at Impact Area B also shift the Road at Impact Area A?Would a shift of the Road at Impact Area B also shift the Road at Impact Area C? Please submit the above information within 30 days of receipt of this Notification or we may consider your application withdrawn and close the file. Please email ( g rge.L.PhillipsOusace.armw.:rni.l) me if you have any questions. Lyle Phillips Regulatory Specialist US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 25. Fax: (919) 562-0421 Email: eaarge.L.Phillips()usace.arm�y.:_rm_il We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at hops.//EgELA atory.o�s.usace.army.... il. c_Easterner-s_ervice.-s_Larvey/ .Thank you for taking the time to visit this site and complete the survey. 2