Loading...
HomeMy WebLinkAboutNCC215564_Site Plan or Location Map_20211007Seeding Schedule and Seedbed Preparation Notes 5EEPING 50HEDULE FOR ALL ORA55ED AREAS PLANTIN& DATES SEED MIX: RATES: LBS/ACRE March I - June I Sericea lespedeza 50 (scarified) KY-51 Fescue 1-75 June I - September I KY-31 Fescue 1-75 Sorghum - Sudan hybrids 50 September I - March I KY-51 Fescue 250 Fertilize seedbeds with 2 tons/acre lime and 500 IbsJocre 10-20-20. Mulch with 2 tons/acre clean straw or hay. Tack with rapid setting emulsified asphalt at 10 gal./1000 so,. ft., or other tacking agent approved by Owner. ���� 1�71��JJ757C�7►1t�►C�i1� I. Surface water control measures are to be installed according to plan. 2. Areas to be seeded shall be ripped and spread with topsoil (if available), 3" deep. Total seedbed prepared depth shall be 4" to b" deep. 3. Loose rocks, roots and other obstructions shall be removed from the surface so that they will not interfere with establishment and maintenance of vegetation. Surface for final seedbed preparation, at finish grades shown, shall be reasonably smooth and uniform. 4. If no soil test is taken, fertilizer and lime shall be applied according to the seeding specifications above. In addition, provide 15 IbsJl000 sq. ft. of superphosphate. 5. If soil test is taken, provide lime and fertilizer according to the soil test report. A soil test is recommended. 6. Lime and fertilizer shall be applied uniformly and mixed with the soil during seedbed preparation. TEMPORAR`I' ER051 ON CONTROL 5EED I NO SEEDING 50HEDULE/5EEDBED PREPARATION FOR ALL GRASSED AREAS TO BE USED FROM JANUARY I THROUGH DECEMBER 51 SEED MIX: RATES: LBS/ACRE Hybrid Turf -type Tall Fescue Blend. A minimum of (5) 250 varieties of Turf -type Tall Fescue shall be used. All seed must be certified with a minimum germination rate of 55%. All seed must contain no noxious weeds. Fertilize seedbeds with 2 tons/acre lime and 500 lbs./acre 10-20-20. Mulch with 2 tons/acre clean straw or hay. Tack with rapid setting emulsified asphalt at 10 gal./1000 sci. ft., or other tacking agent approved by Owner. SEEDBED PREPARATION NOTES 1. Surface water control measures are to be installed according to plan. 2. Areas to be seeded shall be ripped and spread with topsoil (if available), 5" deep. Total seedbed prepared depth shall be 4" to b" deep. 5. Loose rocks, roots and other obstructions shall be removed from the surface so that they will not interfere with establishment and maintenance of vegetation. Surface for final seedbed preparation, at finish grades shown, shall be reasonably smooth and uniform. 4. If no soil test is taken, fertilizer and lime shall be applied according to the seeding specifications above. In addition, provide 15 lbs.11000 sci. ft. of superphosphate. 5. If soil test is taken, provide lime and fertilizer according to the soil test report. A soil test is recommended. 6. Lime and fertilizer shall be applied uniformly and mixed with the soil during seedbed preparation. PERMANENT 5EED I NC 5CHEDULE NGDENR- NEW 5TAB1 L I ZAT1 ON TIMEFRAME CHART SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS PERIMETER DIKES, SHALES, DITCHES AND SLOPES -i DAYS NONE HIGH QUALITY WATER (HOW) ZONES -i DAYS NONE SLOPES STEEPER THAN 5:1 -i DAYS IF SLOPES ARE 10' OR LE55 IN LENGTH AND ARE NOT STEEPER THAN 2:1, 4 DAYS ARE ALLOWED SLOPES 5:1 OR FLATTER 14 DAYS -i DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT PERIMETERS AND HDW ZONES Narrative THE 5555 ZINFANDEL STREET PROPERTY 15 CURRENTLY VACANT/UNDEVELOPED LAND THAT 15 ZONED FOR 51NOLE FAMILY RESIDENTIAL. PROPOSED IMPROVEMENTS INCLUDE CONSTRUCTION OF A 51NOLE FAMILY RESIDENCE, INSTALLATION OF PAVED DRIVE FROM ZINFANDEL STREET, AND CLEARING/DISTURBED LIMITS ARE AS SHOWN ON THI5 PLAN. THE STORM WATER WILL SHEET FLOW ACROSS THI5 PROPERTY WITH NO CHANNELING. SHEET FLOW OF 5TORMWATER WILL CONTINUE INTO AN EXISTING DRAINAGE EASEMENT AND 5WALE AT REAR OF PROPERTY. Legend Deta i I Key 7ci0 EXISTING CONTOUR SF SILT FENCE • - - • - - LIMITS OF D 15TURBANCE C ] ? STONE GONST . ENTRANCE - - mm PROPERTY LINE W 31. GRAVEL OUTLET BROOKBERRY FARM PHASE IV, MAP I I I PLAT BOOK 65, PAGE 147 DRAINAGE ARROW PDE - DE north \- P�'�� PDE--_�------------ I PDE Ppqi� 4 \ ---� -- -, � PDE-_ PD PDE-_ VICINITY MAP - \-850``� E P - - (NOT TO SCALE) PDE -�pE�---------- 52-\`, `--------DE- PDE I-_ ---P-DE-,-- g54----__-- PDE--_ PDE- -P----------- PDE pDE- - i PDE PpE= PD _ E LOT I6 \ �� 9Fmn --- PDE P --- THE ARBORS AT MEADOWLARK- •- - DES PLAT BOOK 68, PAGE I L C = J /�C5LOT 14 /---- MEADOWLARK DEV. LLG \ • / _ _ - DEED BOOK 5540, PAGE 5-15 L C THE ARBORS AT MEADOWLARK GRAVEL OUTLET WITH , J PLAT BOOK 68, PAGE 1 / 6'xl2' x 2' DEEP 15,142 50. FT.t EXCAVATED SEDIMENT _ - - - - 3 &RAVEL OUTLET WITH 6'xl2' x 2' STORAGE AREA (TYP) Gi 2 "� - - - - - - - - - - •/ G1.2 DEEP EXCAVATED SEDIMENT :F_\ %�-4A STORAGE AREA (TYP) ' 0 o lJ) IL \ / I i •------------------ -----J I N N 03 vN SILT FENCE (TYP) LOT 15 THE ARBORS AT MEADOWLARK PLAT BOOK 68, PAGE I PROP05ED FOUNDATION INSTALL PROPOSED �•:.....::..... CONCRETE WASHOUT PIT IN THIS AREA, SEE NCDEQ DETAIL, SHEET 01.2 PROPOSED DRIVE LIMITS OF DISTURBANCE (TYP) Zinfandel Street (50'R/W Public) I O • -I Q �. z 862- - IN 0 0 0o Z 82 CU I 864, -'°217 4'7 \ SILT FENCE (TYP) LIMITS OF DISTURBANCE (TYP) TY BOUNDARY (TYP) LOT 15 THE ARBORS AT MEADOWLARK PLAT BOOK 68, PAGE I SILT FENCE (TYP) • 2 TEMPORARY CONSTRUCTION G1.2 ENTRANCE, MIN. 25' x 50'. � c 6.0. TO KEEP CONSTRUCTION I ENTRANCE AREA GLEAN OF MUD/ROCK AND DEBRIS AT ALL TIMES w ifil • i,� t U. wi� 1. OWNER/DEVELOPER: DREAM BUILDERS H5 CONSTRUCTION, LLG 8605 N. NC HWY 150 CLEMMON5, NC 27012 556.462.2105 DREAMBU I LDER5W5@ &MA I L.COM 2. LANDSCAPE ARCHITECT: MLA DESIGN GROUP ADDRESS: 120 CLUB OAKS COURT, SUITE 100, WI N5TON-5ALEM, NC 27104 CONTACT/PHONE NUMBER: 5COTT MILLER, RLA, PRINCIPAL, (33(o) 765-1a25 5. PROPERTY LOCATION 4 ZONING: PROPERTY ADDRESS: 5858 ZINFANDEL ST., HIN5TON-5ALEM, NC TOTAL ACREAGE: APPROX 0.42t ACRES PARCEL ID NUMBER: 58a6-54-CIO1a.00 WATERSHED: THI5 SITE 15 NOT LOCATED WITHIN A WATER SUPPLY WATERSHED EXI5TING/PROP05ED ZONING: RSa EX./PROP LAND USE: SINGLE FAMILY RESIDENTIAL 4, 51TE SIZE 4 COVERAGE: 51TE TOTAL ACREAGE = 0.42t ACRES (15,142 S.F.) EX. IMPERVIOUS SURFACE AREA = 0 5.F. (00.0%) TOTAL NEW IMPERVIOUS SURFACE AREA = 5,6150 S.F. (21.7%) TOTAL PROPOSED BUILDING TO LAND = 14.5% TOTAL PROPOSED PAVED SURFACES TO LAND = 5.0% TOTAL PROPOSED OPEN SPACE TO LAND = 77.5% PROPOSED DISTURBED AREA = 12,38a 5.F. F-ros ion Control Notes I. MAINTENANCE: QUALIFIED PERSONNEL (PROVIDED BY GENERAL CONTRACTOR) SHALL INSPECT AT LEAST ONCE EVERY SEVEN DAYS AND WITHIN 24 HOUR5 OF THE END OF A STORM THAT 15 0.5 INCHES OR GREATER THE EROSION CONTROL STRUCTURES INSTALLED. GENERAL CONTRACTOR (&.C) SHALL INSPECT OVERALL PERFORMANCE OF EROSION AND SEDIMENT CONTROL FACILITIES AND AREAS DOWNSTREAM. IF SILT 15 APPARENT DOWNSTREAM FROM STRUCTURES, SOME FAILURE HAS OCCURRED. IF SEDIMENT 15 OBSERVED DOWNSTREAM, TAKE CORRECTIVE MEASURES AS NECESSARY. FOR MAINTENANCE OF INDIVIDUAL EROSION CONTROL STRUCTURES, SEE APPLICABLE DETAIL. 2. ALL DEMOLISHED AREAS MUST BE SEEDED AND MULCHED WITHIN 14 DAYS. GROUNDCOVER SHALL BE INSTALLED ON ALL EXPOSED SURFACES WITHIN 14 DAYS FOLLOWING COMPLETION OF ANY PHASE OF DEMOLITION. 5. SEEDED AREAS SHALL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND 15 MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. 4. PERMANENT &ROUNDCOVER MUST BE INSTALLED FOR ALL DEMOLISHED AREAS WITHIN 14 WORKING DAYS FOLLOWING COMPLETION OF CONSTRUCTION. 5. G.G. 15 RESPONSIBLE FOR ALL EROSION CONTROL PRACTICES REQUIRED TO MINIMIZE EFFECTS ON ADJACENT PROPERTIES. 6. G.G. 15 RESPONSIBLE FOR COMPLYING WITH ALL CITY AND STATE EROSION CONTROL REQUIREMENTS. 7. THE OWNER 15 RESPONSIBLE FOR THE LONG TERM MAINTENANCE OF THE GROUND COVER ON THE PROPERTY. &ROUND COVER MUST BE MAINTAINED TO A DEGREE THAT PREVENTS SOIL EROSION AND SEDIMENTATION AT ALL TIMES. ACCEPTANCE AND APPROVAL OF THI5 PLAN 15 CONDITIONED UPON THE PROPERTY OHNER(5) COMPLIANCE WITH FEDERAL AND STATE HATER QUALITY LAWS, REGULATIONS, AND RULES. IN ADDITION, LOCAL CITY OR COUNTY ORDINANCES OR RULES MAY AL50 APPLY TO THI5 LAND-DI5TURBIN& ACTIVITY. THI5 APPROVAL DOES NOT SUPERSEDE ANY OTHER PERMIT OR APPROVAL. 5. FOR EROSION CONTROL DETAILS AND SEEDING SPECIFICATIONS SEE THI5 SHEET 6 SHEET C1.2. a. MAINTAIN RAINFALL LOG AS MAY BE REQUIRED BY TOWN/STATE IN ACCORDANCE WITH REGULATIONS. SEE NOTES BELOW. EC Maintenance Man I. INSPECT ALL SEDIMENTATION AND EROSION CONTROL DEVICES FOR STABILITY AND FUNCTION EACH WEEK AND FOLLOWING EACH RAINFALL EVENT. 2. REMOVE SILT/SEDIMENT FROM TEMPORARY DEVICES WHEN ACCUMULATED VOLUME HAS REACHED 50% CAPACITY. 5. REMOVE ACCUMULATED SILT/SEDIMENT FROM BEHIND TEMPORARY SEDIMENT FENCE WHEN DEPTH EXCEEDS APPROXIMATELY 05. REPAIR AND REPLACE SILT FENCE AS NECESSARY. 4. SEED AND STABILIZE TEMPORARY DIVERSION BERMS IMMEDIATELY AFTER CONSTRUCTION INCLUDING "GLEAN" HATER DIVERSION BERMS. RE-&RADE/REPAIR BERMS AS REQUIRED. 5. CONTRACTOR SHALL APPOINT AN ON-51TE INSPECTOR AND MAINTAIN RECORDS OF INSPECTIONS IN ACCORDANCE WITH THE PROVISIONS OF THE GENERAL NPDE5 5TORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES. City of Winston-Salem Construction 5equence I. OBTAIN 6RADING/ERO51014 CONTROL PLAN APPROVAL AND PERMIT FROM THE CITY OF HINSTON-5ALEM INSPECTIONS. 2. CONTACT EROSION CONTROL INSPECTOR TO ESTABLISH A PRE-00145TRUCTION CONFERENCE AND INSPECTION SCHEDULE. SELF INSPECTION -----EFFECTIVE OCTOBER 1, 2010, PERSONS CONDUCTING LAND-D15TURBIN6 ACTIVITIES, LARGER THAN ONE (1) ACRE, MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE INSPECTION IN WRITING ON APPROVED FORMS AVAILABLE FROM THE CITY OF KN15TON-5ALEM INSPECTIONS OFFICE. THE PHASES ARE AS FOLLOWS: 1. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. 2. CLEARING AND GRUBBING OF EXISTING GROUND COVER. 3. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS. 4. INSTALLATION OF STORM DRAINAGE FACILITIES. 5. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 6. ESTABLISHMENT OF PERMANENT 5ROUND COVER SUFFICIENT TO RESTRAIN EROSION. 3. CLEAR SITE ONLY AS NECESSARY TO INSTALL INITIAL EROSION CONTROL MEASURES AS FOLLOWS: A. TEMPORARY CONSTRUCTION ENTRANCE/EXIT B. TEMPORARY SEDIMENT BASINS. FOR SITES OVER ONE (1) ACRE, OUTLET STRUCTURES H/ SKIMMERS THAT ONLY WITHDRAW HATER FROM THE SURFACE OF THE BASIN, SHALL BE UTILILIZED. NO SEDIMENT TRAPS OR ROCK DAMS ALLOWED. G. TEMPORARY DIVERSION BERMS D. TEMPORARY SILT FENCING SEED EMBANKMENTS AND DISTURBED AREAS OF DEVIGE5 (INCLUDING "GLEAN" HATER DIVERSION) UPON COMPLETION OF CONSTRUCTION. SEE &ROUND STABILIZATION CRITERIA ON PAGE #2 FOR MORE INFORMATION. 4. BEGIN CLEARING, GRUBBING, AND 5TRIPPING OF SITE A5 REQUIRED. EARTHEN -MATERIAL STOCKPILES ON-51TE FOR LATER DISTRIBUTION AND/OR REMOVAL, AREAS DEDICATED FOR MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS, CONSTRUCTION AND DOMESTIC HASTE, AND HAZARDOUS OR TOXIC HASTE SHALL BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE HATER5 (UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE), AND WITHIN AREAS PROTECTED BY ER05ION CONTROL MEASURES. 5. BEGIN 51TE GRADING. MAINTAIN ER05ION CONTROL DEVIGE5 IN ACCORDANCE WITH THE MAINTENANCE PLAN. INSTALL ADDITIONAL ER05ION CONTROL MEASURES AS REQUIRED. 6. INSTALL STORM DRAINAGE SYSTEM AND UTILITIES. STORM PIPING SHALL BE INSTALLED TO THE POINT WHERE IT ENTERS EACH DEVICE. COMPLETION OF PIPING WILL ONLY BE ALLOWED ONCE THE SITE HAS BEEN DEEMED STABLE BY THE ER05ION CONTROL INSPECTOR. INSTALL PROTECTION AROUND ALL INLETS AS STORM DRAIN SYSTEM 15 INSTALLED. GROUND STABILIZATION CRITERIA 7 9 9 SITEAREA STABILIZATION STABILIZATION DESCRIPTION TIMEFRAME TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES, & SLOPES SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 1V OR LESS IN LENGTH & ARE NOT STEEPER THAN 2:1, 14 DAYS ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS FOR SLOPES > 50 FEET IN LENGTH EDAYS ALL OTHER AREAS WITH 14 DAYS NONE SLOPES FLATTER THAN 4:1 PRIOR TO THE CONTRACTOR DEMOBILIZING FROM THE 51TE (AT APPROXIMATELY 45 DAYS PRIOR TO DEMOBILIZATION), THE FINANCIALLY RESPONSIBLE PARTY (OR THEIR DESIGNEE) WILL NOTIFY THE DE516NATED EROSION CONTROL INSPECTOR OF THEIR ANTICIPATED DATE TO LEAVE THE SITE. AN ON -SITE INSPECTION HILL BE CONDUCTED PRIOR TO THE LEAVE DATE BY THE DESIGNATED EROSION CONTROL INSPECTOR TO MAKE CERTAIN ALL ACTION ITEMS HAVE BEEN APPRE55ED BY THE CONTRACTOR. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES ONLY AFTER FINAL INSPECTION AND APPROVAL BY INSPECTOR. AFTER SUBSTANTIAL COMPLETION OWNER SHALL BE RESPONSIBLE FOR LONG TERM MAINTENANCE OF &ROUND COVER. - 11 *,5 t J 01 EN, 5/24/21 ul a: CA 00 Di u �. �n,; z ct .r r--1 0 L) r--1 4 4-4 o •4 N � CO LO U) c LO 4-. ^) 9) • i--1 Date: 24 August 2021 For Permitting Revisions: Drawn By NLH Checked By GSM Project # Sheet Title EROSION CONTROL PLAN 0 20' 40' 60' north scale: I" = 20' Sheet C 1 • 1 of 2