Good Afternoon,
The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete, Stormwater Management Permit
Application for the subject project on September 20, 2021. Staff review of the plans and specifications has determined
that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 - 1062
rules. We are forwarding Permit No. SW6210502, dated October 6, 2021, for the construction, operation and
maintenance of the subject project and the stormwater system. This permit shall be effective from the date of issuance
and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency
permit that may be required.
The original signed permit package and approved modified plans are being mailed to the permittee, Benjamin A. Stout,
at the following address (NOTE: An electronic version of this permit can be found in our online repository:
https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources):
BSNJ Land, LLC
Attn: Benjamin A. Stout
PO BOX 53798
Fayetteville, NC 28305
I will hold onto our hard copy of this project for 30 days (in case any issues/typos with the permit are noticed and
corrections need to be made) after which point, it will be kept on file at the Fayetteville Regional Office. If you have any
questions, or need additional information concerning this matter, please contact me at jim.farkas@ncdenr.gov.
Thank you,
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources – Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 707-3646
Jim.Farkas@ncdenr.gov
1
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Farkas, Jim J
Sent: Tuesday, September 14, 2021 11:48 AM
To: jnobles@lkanda.com
Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov>
Subject: RE: SW6210502; James Farm - Phase 2
Good Morning,
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application
th
for the subject project on August 6, 2021. A review of that information has determined that the application is not
complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free
to contact me. My contact information is listed below.
Thank you,
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources – Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 707-3646
Jim.Farkas@ncdenr.gov
Email correspondence to and from this address is subject to the
2
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Farkas, Jim J
Sent: Thursday, June 3, 2021 3:15 PM
To: jnobles@lkanda.com
Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov>
Subject: SW6210502; James Farm - Phase 2
Good Afternoon,
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application
rd
for the subject project on May 3, 2021. A review of that information has determined that the application is not
complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free
to contact me. My contact information is listed below.
Thank you,
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources – Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 707-3646
Jim.Farkas@ncdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
3
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
4