HomeMy WebLinkAboutSW6210502_Add Info_20210603ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIAN WRENN Director Jeffrey A. Nobles, PE PO BOX 53787 Fayetteville, NC 28305 NORTH CAROLINA Environmental Quality June 3, 2021 Subject: Request for Additional Information Stormwater Permit No. SW6210502 James Farm — Phase 2 Hoke County Dear Mr. Nobles: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on May 3, 2021. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. There does not appear to be a public airport located within 5 miles of the project area (Section II, 5). If you believe that there is, please provide the name of the public airport. 2. Please include the contact information for the local jurisdiction for building permits (Section III, 4). 3. Per the provided USGS topographic map, there appears to be surface waters located within the project area (Gully Branch). Please account for these surface waters in the project density calculation (Section IV, 6-8), identify the surface area of the surface water in the main set of plans (Section VI, 8h), and show the required vegetated setbacks (Section VI, 8p) in the main set of plans. 4. Part of the 65.82-acre property area is already covered under a prior permit (SW6190103) and therefore cannot also be covered under this permit. Please take one of the following actions: a. Permit this current phase (Phase 2) as a modification to the original permit (SW6190103). Section II, 1 & 2 would need to be revised and a designer certification provided (If it has not already been provided). D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 NORTH OAROLINA _ Depar ntofEnvimnmmdlDoellry 919.707.9200 b. Change the project area (Section IV, 4 & "Total Drainage Area" in Section IV, 10) for this submission so that Phase 1 is not included, recalculating the percent impervious area as needed. 5. Please provide the original, signed & notarized deed restriction document (available at the following link: hgps:Hdeq.nc.gov/about/divisions/energy-mineral-and-land- resources/stormwater/stormwater-program/post-construction-1) (Section VI, 2) 6. Please dimension the entire extent of this project area with bearings and distances (Section VI, 8i) 7. Per 15A NCAC 02H .1003(2)(c)(i), the side slopes of the vegetated conveyances must be 3:1 or flatter (Unless you are providing engineering calculations and an on -site soil investigation to show stability). Per the calculations, vegetated conveyances 1-6 are shown to have side slopes of 2:1 (0.5 ft/ft). Please revise. 8. The swale detail on plan sheet C-04 indicates that ditches 1 & 2 have side slopes of 3:1 and a 2 ft bottom width. Per the calculations, only ditches 7 & 8 have these dimensions. Please either revise this detail to apply to all proposed ditches or revise the note on this sheet and reference the roadside ditch detail on sheet C-08 (Please also revise the roadside ditch detail on sheet C-08 to avoid the 2:1 slope in accordance with earlier comment). 9. The velocity in Swale 6 (6.02 fps) exceeds the allowable velocity (5.0 fps) and could result in erosion. Please revise. 10. The ditch information shown on sheet C-04A does not appear to contain the information for Swale 8. 11. The ditch information shown on sheet C-04A shows the BUA within the drainage area to Swale 4 as 4,043 sf (0.09 ac) whereas the calculations show 0.13 ac. The ditch information also shows the BUA within the drainage area to Swale 7 as 22,965 sf (0.53 ac) whereas the calculations show 0.55 ac. Please revise as needed. 12. Please show the drainage easements for the proposed vegetated conveyances in the main set of plans. 13. While not required, it is recommended to reduce the velocities of vegetated conveyances entering wetlands to no more than 2.0 feet per second to help protect the wetlands. 14. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. a. Pdfs must be uploaded using the form at: hgps://edocs.deq.nc.gov/Forms/SW Project Submittal b. Hard copies must be mailed or delivered to the following address: Jim Farkas 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to July 3, 2021, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW6210502 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Jim.Farkas@ncdenr.gov or (919) 707-3646. Sincerely, V "I Jim Farkas Environmental Engineer Stormwater Program cc: Fayetteville Regional Office