Loading...
HomeMy WebLinkAboutSW1210503_Supplement-EZ Form_20210730SUPPLEMENT-EZ COVER PAGE PROJECT INFORMATION 1 Project Name 2 Project Area (ac) 3 Coastal Wetland Area (ac) 4 Surface Water Area (ac) 5 Is this project High or Low Density? 6 Does this project use an off -site SCM? Hot Sprinqs Microqrid 15.8 0 0 Low No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 8 Will the vegetated setback remain vegetated? 9 If BUA is proposed in the setback, does it meet NCAC 02H. 1 003(4)(c-d)? 10 Is streambank stabilization proposed on this project? NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip (LS-FS) 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Jeffrey Ruppert 28 Organization: SEI Engineering 29 Street address: 39845 Matthews Lane 30 City, State, Zip: Paonia, CO 81428 31 Phone number(s): 970.527.3920 32 Email: jeff@seisolarpros.com Certification Statement: certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. C "4NA Signature of Designer OgMsgnetl by —Rapped, P.E. ON:0=Rapped, P.E.', =Usun—s,e,ee. Jeff Ruppert, P.E. E=;eff,.egnle,p,ne-., OU=Engmeer , 0=SE1 Eng —nng LLC, L=US Unified She --="Jeff Rapped. P.E.' July 29, 2021 Date Seal DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so, number of low density drainage areas 2 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LD 1 LD 2 4 Type of SCM NONE NONE 5 Total drainage area sq ft 574,556 109,210 6 Onsite drainage area (sq ft) 574,556 109,210 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 203 sf 2,795 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) I 10 New BUA not on subdivided lots (subject to permitting) (sf) 203 sf 2,795 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk sq ft - Roof (sq ft) 216 sf - Roadway sq ft - Future (sq ft) - Other, please specify in the comment box below (sq ft) 203 sf 2,579 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft) I 14 New infiltrating permeable pavement not on subdivided lots (sq ft) 15 Existing BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted sq ft 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 0% 3% 19 Design storm (inches) 20 Design volume of SCM (cu ft 21 Calculation method for design volume ADDITIONAL INFORMATION 1. 22 Please use this space to provide any additional information about the drainage area(s): For BUA "other" this includes the racking post at 2.68 square inches per post and concrete equipment pads. LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per .1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) na 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (% ) 8 Bottom width of curb outlet swale(s) (feet) 9 Maximum side slope of curb outlet swale(s) (H:V) 10 Minimum length of curb outlet swale(s) (feet) 11 Are treatment swales used instead of curb outlet swales? No 12 Is stormwater released at the edge of the setback as dispersed flow? N/A 13 Have stormwater outlets been designed to prevent downslope erosion? 14 Are variations to rule .1003 proposed? ADDITIONAL INFORMATION 15 1 Please use this space to provide any additional information about this low density project: The project is low -density and will use vegetative meadow conditions to achieve site stablization, reduce velocities. The site has been graded to reduce concentrated flows and encourage sheet flow of stormwater. Swale # Drainage Drainage Area ac (ac) Pervious area ac C Q (Cfs) Slope N Vanow (fps) V,«uai (fps) Flow depth (ft) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28